Billy Bishop Airport Master Plan
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Member Motion City Council MM7.6
Member Motion City Council Notice of Motion MM7.6 ACTION Ward: All Accepting the Donation of the Royal Canadian Air Force Wing Commander Lieutenant-Colonel William G. Barker Memorial Statue - by Councillor Paul Ainslie, seconded by Mike Layton * Notice of this Motion has been given. * This Motion is subject to referral to the Economic and Community Development Committee. A two-thirds vote is required to waive referral. Recommendations Councillor Paul Ainslie, seconded by Mike Layton, recommends that: 1. City Council accept the donation of the William Barker Memorial Statue by Armando Barbon, subject to the conditions of the Public Art and Monuments Donations Policy and subject to a donation agreement with the Donor, and City Council request City staff to determine the location for the statue in a high-pedestrian-volume site within the former City of Toronto area. Summary Toronto has rich history. Commemorating significant contributors who had an impact the City's fabric is important. William George Barker, Victoria Cross recipient, born in 1894, first came to live in Toronto in 1919 following World War I with his best friend Billy Bishop. Mr. Barker would call the City of Toronto his home until his death in 1930. During his short life, William G. Barker VC had a substantial influence on the City with his numerous achievements including: created the first commercial airline (“Bishop Barker Airlines”) that flew out of Armour Heights and from Lake Ontario by what is aptly named Billy Bishop Toronto City Airport; requested the first landing rights at the City Island for a venture that flew passengers from Toronto to Muskoka during the summer months; with Billy Bishop, began what is now known as the Toronto International Air Show; was the first President of the newly christened Toronto Maple Leafs under new owner Conn Smythe, whom William G. -
Porter Airlines Runway 08-26 Extension Study, BBTCA
Porter Airlines Runway 08-26 Extension Study Billy Bishop Toronto City Centre Airport Porter Airlines Runway 08-26 Extension Study Billy Bishop Toronto City Centre Airport (BBTCA) Prepared for: Mr Andrew Pierce Porter Airlines Inc. Billy Bishop Toronto City Airport Toronto, ON M5V 1A1 Date May 24, 2013 Submitted by: LPS Aviation Inc. One Antares Drive, Suite 250 Ottawa, Ontario CANADA K2E 8C4 Tel: (613) 226-6050 Fax: (613) 226-5236 e-mail: [email protected] Web site: www.lpsaviation.ca Executive Summary Porter Airlines retained LPS AVIA Consulting to As long as the current approach surfaces remain review airport standards and recommended in the locations stated in the Airport Zoning practices to determine how Runway 08-26 may Regulations, and the landing thresholds are be extended to support operation of the partially displaced to these locations, Porter can Bombardier CS100 aircraft. Porter Airlines achieve a landing distance which is sufficient for provided LPS AVIA with the required runway the operations projected. As a result there will be distances for safe operations based on its no need to make changes to the existing Marine mission requirements, which are supported by Exclusion Zone. manufacturer calculations and take into account Transport Canada requires specific runway governing regulations. design characteristics for safe take-off Airport standards and practices are based in part operations. These include, among other on the most demanding type of aircraft using the requirements, a 60 m. strip beyond the end of the airport on a regular basis, and known as the take-off runway. Transport Canada is preparing a design aircraft. -
ACI World AIRPORT DEVELOPMENT NEWS
Issue 01 – 2012 ACI World AIRPORT DEVELOPMENT NEWS A service provided by ACI World in cooperation with Momberger Airport Information www.mombergerairport.info Editor & Publisher: Martin Lamprecht [email protected] / Founding Editor & Publisher: Manfred Momberger EUROPE Great Britain: Plymouth Airport could become a GBP 25 million to 30 million ‘world-class international gateway’ under plans being worked on by a group of business people campaigning to save it. On 23 December 2011, the Viable group unveiled a vision for the Derriford site which would see the runway extended, a new terminal built, and land turned over for lucrative commercial use. Viable will discuss the plans with Plymouth City Council. The Sutton Harbour Group (SHG), which operates Plymouth on a 150-year-lease from Plymouth City Council, closed the airport on 23 December 2011 saying it is not economically sustainable. But Viable, which opposed the closure, disagrees with the suggestion that Plymouth cannot support a top-class aerodrome. Basing its design on London City Airport, Viable envisages a facility that could eventually handle up to 1 million passengers a year. The phased project would take up to ten years to fully realize, initially seeing the reopening of the airport with restricted operations and limited services. But the group said that after about three years, the operation could be expanded dramatically. Its vision is for the runway to be extended from 1160 m to its maximum 1390 m, so larger aircraft can be welcomed. A runway loop would mean aircraft can wait for take-off slots, diminishing delays. But ahead of this, a simple initial resurfacing of the runway would only cost GBP 500 000, Viable said, a quarter of the expected cost. -
WILLIAM AVERY “BILLY” BISHOP, VC, CB, DSO and Bar, MC, DFC, ED
WILLIAM AVERY “BILLY” BISHOP, VC, CB, DSO and Bar, MC, DFC, ED 1894 – 1956 William Avery “Billy” Bishop, was Canada’s leading fighter pilot in the First World War and is the top Canadian “ace” (having five victories or more) of all time, racking up a total of 72 confirmed victories before the end of the war. Born February 8, 1894, in Owen Sound, Ontario, Bishop enrolled in the Royal Military College in Kingston, Ontario, at the age of 17. When the First World War broke out in 1914, Bishop, like hundreds of thousands of young men across the country, signed up to serve in the Canadian Expeditionary Force. In 1915, Bishop requested, and was granted, a transfer to the Royal Flying Corps, where he would emerge as one of the most lethal aces of the war. Among his many military honours, he was awarded the highest military decoration a Canadian could receive – the Victoria Cross – "for most conspicuous bravery, determination and skill”, on June 2, 1917. At the end of the war, Bishop achieved the rank of Lieutenant-Colonel. Upon returning to Canada, Bishop and fellow Victoria Cross winner and Canadian air ace William “Billy” Barker founded a charter seaplane service operating out of Toronto Harbour with flights to fishing camps in northern Ontario. At the end of his military service, Bishop maintained his links with the air force. In 1938, he was made an honorary Air Vice-Marshall in the Royal Canadian Air Force, and served as a celebrity recruiting agent. He promoted the British Commonwealth Air Training Plan, which had been established in Canada to train Commonwealth pilots from around the world at the dawn of the Second World War. -
Turtle Island Reads
TABLE OF CONTENTS Video Summary & Related Content 3 Video Review 4 Before Viewing 5 While Viewing 6 Talk Prompts 9 After Viewing 12 The Story 15 Activity #1: “The Year of the Gun” Photo Essay 23 Activity #2: Take Action to Prevent Gun Violence 25 Sources 27 CREDITS News in Review is produced by Visit www.curio.ca/newsinreview for an archive of all CBC NEWS and curio.ca previous News In Review seasons. As a companion resource, go to www.cbc.ca/news for additional GUIDE articles. Writer: Chris Coates Editor: Sean Dolan CBC authorizes reproduction of material contained VIDEO in this guide for educational purposes. Please Host: Michael Serapio identify source. Senior Producer: Jordanna Lake News In Review is distributed by: Packaging Producer: Marie-Hélène Savard curio.ca | CBC Media Solutions Associate Producer: Francine Laprotte Supervising Manager: Laraine Bone © 2018 Canadian Broadcasting Corporation UNDER THE GUN: Toronto's War Against Firearm Violence Video duration – 14:25 In 2018 Canada’s largest city, Toronto, saw a massive increase in gun violence on its streets. Shootings were frequent and often flagrant, taking place in broad daylight and near children’s playgrounds. The numbers were so high it had people worried that gun deaths in 2018 would surpass that of the so-called “Summer of the Gun” back in 2005. Police, politicians, social advocates and residents all made suggestions on what was needed to decrease the gun violence. But the solutions remain as contentious as the problem. RELATED CONTENT • News in Review, January 2006 – Guns and Gangs: Toronto Fights Back • News in Review, February 2006 – Gang Wars: Bloodbath in Vancouver • News in Review, November 2008 – A Community Fights Gangs and Guns • News in Review, April 2013 – U.S. -
Billy Bishop Toronto City Airport Pedestrian Tunnel Partner Profiles
Billy Bishop Toronto City Airport Pedestrian Tunnel Partner Profiles The pedestrian tunnel to Billy Bishop Toronto City Airport was built using an innovative public- private partnership (P3) model and was structured as a Design-Build-Finance-Maintain project with private-sector partners Forum Equity Partners as lead developer, PCL Constructors as design builder, Johnson Controls as facility manager, and Arup as the lead designer (in association with ZAS.) No taxpayer dollars were used for the construction of the tunnel. Forum Equity Partners is a leading Canadian infrastructure investment and development firm, specializing in public sector development opportunities and public-private partnerships (P3s). Forum has established itself as a leader in infrastructure development and investment, with one of the most successful track records in the industry and committed financing in excess of $3 Billion for P3 projects and other related developments. Recent Forum P3 projects include the South West Detention Centre in Windsor, Ontario; the Pre- Trial Client Services Centre in Surrey, BC; and the CAMH Mixed-Use Development in downtown Toronto. In 2011, Forum received the Gold Award for Project Financing from the Canadian Council for Public Private Partnerships and its projects have received other industry awards. PCL is a group of independent construction companies that carries out work across Canada, the United States, the Caribbean, and in Australia. These diverse operations in the civil infrastructure, heavy industrial, and buildings markets are supported by a strategic presence in 31 major centres. Together, these companies have an annual construction volume of more than $7.5 billion, making PCL the largest contracting organization in Canada and one of the largest in North America. -
Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa
Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa Updated March 8, 2021 Do you know the history behind a street name not on the list? Please contact us at [email protected] with the details. • - The Gloucester Historical Society wishes to thank others for sharing their research on street names including: o Société franco-ontarienne du patrimoine et de l’histoire d’Orléans for Orléans street names https://www.sfopho.com o The Hunt Club Community Association for Hunt Club street names https://hunt-club.ca/ and particularly John Sankey http://johnsankey.ca/name.html o Vanier Museoparc and Léo Paquette for Vanier street names https://museoparc.ca/en/ Neighbourhood Street Name Themes Neighbourhood Theme Details Examples Alta Vista American States The portion of Connecticut, Michigan, Urbandale Acres Illinois, Virginia, others closest to Heron Road Blackburn Hamlet Streets named with Eastpark, Southpark, ‘Park’ Glen Park, many others Blossom Park National Research Queensdale Village Maass, Parkin, Council scientists (Queensdale and Stedman Albion) on former Metcalfe Road Field Station site (Radar research) Eastway Gardens Alphabeted streets Avenue K, L, N to U Hunt Club Castles The Chateaus of Hunt Buckingham, Club near Riverside Chatsworth, Drive Cheltenham, Chambord, Cardiff, Versailles Hunt Club Entertainers West part of Hunt Club Paul Anka, Rich Little, Dean Martin, Boone Hunt Club Finnish Municipalities The first section of Tapiola, Tammela, Greenboro built near Rastila, Somero, Johnston Road. -
AN ECONOMIC ASSESSMENT of STOL AIRCRAFT POTENTIAL INCLUDING TERMINAL AREA ENVIRONMENTAL CONSIDERATIONS Volume I
NASA CONTRACTOR NASA CR-2424 REPORT CM AN ECONOMIC ASSESSMENT OF STOL AIRCRAFT POTENTIAL INCLUDING TERMINAL AREA ENVIRONMENTAL CONSIDERATIONS Volume I by H. L. Solomon and S. Sokolsky Prepared by THE AEROSPACE CORPORATION El Segundo, Calif. for Ames Research Center NATIONAL AERONAUTICS AND SPACE ADMINISTRATION • WASHINGTON, D. C. • MAY 1974 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. NASA CR -2b2k 4. Title and Subtitle 5. Report Date "An Economic Assessment of STOL Aircraft Potential Including MAY 197^ Terminal Area Environmental Considerations" Volume I 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. H. L. Solomon and S. Sokolsky 10. Work Unit No. 9. Performing Organization Name and Address The Aerospace Corporation 11. Contract or Grant No. El Segundo; California NAS 2-6473 13. Type of Report and Period Covered Contractor Report 12. Sponsoring Agency Name and Address Final Report National Aeronautics and Space Administration Washington, D.C. .„ 14. Sponsoring Agency Code 1 5. Supplementary Notes 16. Abstract This report presents the results of an economic and environmental study of short haul airline systems using short takeoff and landing (STOL) aircraft. The STOL system characteristics were .optimized for maximum patronage at a specified return on investment, while maintaining noise impact compatibility with the terminal area. Supporting studies of aircraft air pollution and .hub airport icongestion relief were also performed. The STOL concept specified for this study was an Augmentor Wing turbofan aircraft having a field length capability of 2,000 ft. and an effective perceived noise level of 95 EPNdB at. 500 ft. -
Flying Together: the Southern Ontario Airport Network May 2017
Flying Together: The Southern Ontario Airport Network May 2017 FLYING TOGETHER: THE SOUTHERN ONTARIO AIRPORT NETWORK 1 1 INTRODUCTION Southern Ontario is set to experience significant growth over the next three decades and is one of the fastest growing regions in North America. Not surprisingly, demand for air travel across the region will follow suit, rising to approximately 110 million passengers over the same timeframe. This growth presents significant opportunities for the region, local communities and their airports. As growth comes to Southern Ontario it is critical that we are ready for it. By working together, our region’s airports will be better placed to support local economic development, and in doing so increase the competitiveness of the region, the province and the country. Successful cities and regions around the world have reaped the benefits of a network approach to supporting air service needs, and by better using the available airport infrastructure in Southern Ontario, our region can benefit as well. This approach will ensure that Southern Ontario is well placed to keep the jobs and economic benefits of growth in air service demand in the region. 2 FLYING TOGETHER: THE SOUTHERN ONTARIO AIRPORT NETWORK 2 UNPRECEDENTED AIR TRAVEL DEMAND IS COMING TO SOUTHERN ONTARIO As the most densely populated and economically productive region in Canada, Southern Ontario is an engine of the Canadian economy. The region is Canada’s export powerhouse, accounting for 37 per cent of the Canadian economy overall, 39 per cent of the goods exports and 48 per cent of the services exports. 88 per cent of Southern Ontario’s The region is also home to several Fortune population lives in the metropolitan areas 500 companies, 28 universities and colleges, of the Greater Toronto Area, Hamilton, and an innovation corridor that features the second-largest concentration of tech Kingston, Kitchener-Waterloo, London, companies in North America. -
CCAA Creditors List
ROSEBUD CREEK FINANCIAL CORP. AND 957855 ALBERTA LTD. Preliminary list of creditors as at June 17, 2020 as submitted by Rosebud Creek Financial Corp. and 957855 Alberta Ltd., (Unaudited) Creditor Address Amount due (CDN$)* #1 CONVENIENCE 924 EDMONTON TRAIL N.E. CALGARY AB T2E 3J9 3,306.39 #1 CONVENIENCE STORE 1 - 10015 OAKFIELD DR.S.W. CALGARY AB T2V 1S9 313.20 1178160 ALBERTA LTD. DEALER #3424 15416 BEAUMARIS ROAD EDMONTON AB T5X 4C1 1,364.04 12TH AVENUE PHARMACY 529 1192 - 101ST STREET NORTH BATTLEFORD SK S9A 0Z6 1,017.80 21 VARIETY BOX 729 PETROLIA ONN0N 1R0 1,498.12 2867-8118 QC INC (PJC 06 501 MONT ROYAL EST MONTREAL QC H2J 1W6 191.53 329985 ONTARIO LIMITED o/a KISKO PRODUCTS 50 ROYAL GROUP CRES, Unit 1 WOODBRIDGE ON L4H 1X9 44,357.47 3RD AVENUE MARKET 148 - 3 AVENUE WEST BOX 2382 MELVILLE SK S0A 2P0 613.72 407 ETR PO BOX 407, STN D SCARBOROUGH ONM1R 5J8 1,224.96 5 CORNERS CONVENIENCE 176 THE QUEENSWAY SOUTH KESWICK ON L4P 2A4 1,077.00 649 MEGA CONVENIENCE 5651 STEELES AVE E, UNIT 22 SCARBOROUGH ON M1V 5P6 853.72 7-ELEVEN CANADA INC 13450 102ND AVE, SUITE 2400 SURREY BC V3T 5X5 1,602.73 881 CORNER GAS BOX 360, 67165 LAKELAND DR LAC LA BICHE AB T0A 2C0 1,700.24 9334-3580 QUEBE 289 BOUL ST-JEAN POINTE CLAIRE QC H9R 3J1 15,964.29 957855 ALBERTA LTD. 120 SINNOTT ROAD SCARBOROUGH ON M1L 4N1 1,000,000.00 9666753 CANADA CORP. -
Response to the KPMG Study: Pickering Lands Aviation Sector Analysis
Response to the KPMG Study: Pickering Lands Aviation Sector Analysis Land Over Landings April 18, 2020 (rev. April 26, 2020) © Land Over Landings, 2020 1 Contents Overview and General Observations / 3 Extracts and Detailed Comments on the Reports / 5 The Supply and Demand Report / 6 The Contextual Bridge Report / 27 The Airport Type and Role Report / 28 The Revenue Generation and Economic Impact Assessment Report / 47 End Note / 49 2 Overview and General Observations In 2016, Transport Canada tasked KPMG to forecast capacity and demand in the southern Ontario airport system for the 20-year period 2016 to 2036. Following completion of the supply and demand study, KPMG conducted an additional three studies, which took so long to produce that some details of the December 2016 forecast report are now significantly out of date, and the later, newer sections diverge from the first report in tone, intent, and perspective. Because of the disjointed structure (four separate reports purporting to be one) and the extended timeline, a lot of material is repeated – and even contradicted – in subsequent reports. Regardless, the essential conclusion is clear, and is expressed frequently and unequivocally in the Supply and Demand Report (December 2016) – in fact, it is repeated no fewer than eighteen times, not counting five times in the executive summary. No additional airport in southern Ontario will be needed to meet 2036 demand. The report shows that, with modest capacity expansions of some existing airports, southern Ontario airport capacity will not only meet forecasted demand but will exceed it by a huge margin. The report further states that adequate runway and terminal building capacity exists within the system as a whole, with the introduction of high-speed rail services in the region. -
EUR ANP, Volume I August 2021 EUROPEAN (EUR) AIR NAVIGATION PLAN
EUROPEAN (EUR) AIR NAVIGATION PLAN VOLUME I EUR ANP, Volume I August 2021 EUROPEAN (EUR) AIR NAVIGATION PLAN VOLUME I EUR ANP, Volume I August 2021 Page i Working Copy This version of the Working Copy of the European (EUR) Air Navigation Plan Volume I (Doc 7754), includes the following approved amendment(s) which have not yet been published: P. f. Amdt. Originator Brief Description Date Approved EUR/NAT Serial No. by Council Notification SL 17- 17/01 AOP-SAR Ukraine To reflect Changes in Table AOP I-1 1Table SAR I-1 7 June 2017 0350.TEC SL 17- 17/04 AOP Israel To reflect Changes in Table AOP I-1 9th August 2017 0581.TEC SL 17- 17/06 AOP Poland To reflect Changes in Table AOP I-1 9th August 2017 0582.TEC Bulgaria, Croatia, 12th February 17/13 AOP To reflect Changes in Table AOP I-1 SL 18- Kazakhstan, 2018 0152.TEC Latvia 12th February SL 18- 17/15 AOP Finland To reflect Changes in Table AOP I-1 2018 0154.TEC 18/05 Russian SL 18- To reflect Changes in AOP I-1 and ATM I-1 22nd June 2018 AOP/ATM Federation 0372.TEC 18/08 SL 19- Finland To reflect Changes in GEN I-I, ATM I-1, SAR I-1 8 January 2019 GEN/ATM/SAR 0027.TEC 18/10 AOP Turkey To reflect Changes in Table AOP I-1 17 January 2019 SL 19- 0041.TEC Revoked by To reflect Changes in Table AOP I-1 17/04 AOP Israel Council on 4 16 May 2019 (Changes Removed From Table AOP I-1) February 2019 19/06 GEN AOP To reflect Changes in Table GEN I-1, Table AOP I-1, Ukraine 2 July 2019 4 July 2019 ATM Table ATM I-1 19/05 ICAO To reflect Changes in Table GEN I-1, Table AOP I-1, GEN/AOP/ATM Secretariat, 15 August 2019 20 August 2019 Table ATM I-1, Table SAR I-1 /SAR Kazakhstan 19/07 To reflect Changes in Table GEN I-1, Table ATM I-1, 2 September Norway 28 August 2019 GEN/ATM Charts ATM I-1 and ATM I-2.