Billy Bishop Airport Master Plan

Billy Bishop Airport Master Plan

2018 Airport Master Plan LEANER REENER UIETER Table of Contents INVESTING IN BALANCE: 3.5 Landside 50 AN EXECUTIVE SUMMARY 6 3.5.1 Ground Access 51 3.5.2 Ferry Terminus 52 1 INTRODUCTION 17 3.5.3 Pedestrian Tunnel 53 1.1 Preface 18 3.5.4 Arrival Departure Curbs 54 1.2 Governance 19 3.5.5 Taxi Corral 54 1.3 Social and Environmental Responsibility 20 3.5.6 Parking 54 80 YEARS 1.4 Vision, Mission and Guiding Principles 21 3.6 Air Terminal Building 55 1.4.1 Vision Statement 21 3.7 General Aviation Activity 57 OF MAKING CONNECTIONS 1.4.2 Mission Statement 21 3.8 Airport Support 58 1.4.3 Guiding Principles 22 3.8.1 Fire Station 58 On September 8, 1939, Billy Bishop Toronto City Airport welcomed its first 1.5 Planning Objectives 24 3.8.2 Airport Maintenance Garage 58 commercial flight—an aircraft from the U.S. carrying renowned conductor Tommy Dorsey and his swing band who were performing at the Canadian 1.5.1 The Purpose of an Airport Master Plan 24 3.8.3 Materials Storage 58 National Exhibition. In the 80 years since that flight the airport has grown 1.5.2 The 2018 Airport Master Plan 25 3.8.4 Field Electrical Centre 59 into an important transportation gateway connecting Toronto to the world 1.5.3 Planned Upgrades Recommended 3.8.5 NAV CANADA Control Tower 59 and welcoming more than 2.8 million passengers each year. in the 2012 Airport Master Plan 25 3.8.6 Fuel Farm 59 1.5.3.1 Implementation of 2012 Master Plan 3.8.7 Non-Passenger Screening Facility Providing service to more than 20 destinations in Canada and the U.S. Recommendations 27 for Vehicles 59 and located less than 3 kilometres from downtown, Billy Bishop Airport is 1.5.4 The Planning Process 30 3.8.8 Aircraft De-icing 59 convenient, efficient and one of the only airports in the world that is walkable and bikeable, with more than 40 per cent of our passengers walking, biking, 1.5.5 Provincial and Municipal Planning 3.9 Services and Utilities 60 or taking transit or shuttle from the airport. Initiatives 31 1.6 Regulatory Requirements 32 4 SOCIO-ECONOMIC PROFILE 61 Billy Bishop Airport offers an award-winning, world-class experience and is 1.6.1 Tripartite Agreement 32 4.1 Socio-Economic Overview 61 just one more thing to love about Toronto. 1.6.2 Canadian Aviation Regulations 32 4.2 Economic Impact 66 1.6.3 Canadian Aviation Security Regulations 32 4.3 Regional Air System Capacity and To read more about the last 80 years at Billy Bishop Toronto City the Southern Ontario Airport Network 66 Airport please visit BillyBishopAirport.com 2 COMMUNITY CONSULTATION AND ENGAGEMENT 33 5 PLANNING INITIATIVES IN THE 2.1 Consultation Process 33 COMMUNITY 68 2.2 Stakeholder/Community Engagement 34 5.1 Overview 68 2.3 Agencies 35 5.2 TOcore 69 2.4 Other Stakeholders 36 5.3 Bathurst Quay Neighbourhood Plan 71 2.5 Public Outreach 36 5.4 Waterfront Transit Reset Study 73 2.6 Website 37 5.5 Waterfront Toronto Revitalization 74 2.7 What We Heard 37 5.6 Coordination with NAV CANADA 75 2.7.1 Community Consultation 38 5.7 Other Planning Initiatives 76 2.7.2 Airport Stakeholder Consultation 38 5.8 Opportunities and Challenges 77 2.7.3 Environics Public Opinion Survey of Toronto Residents 39 6 ACTIVITY FORECAST 82 6.1 Historical Activity 82 3 BILLY BISHOP AIRPORT TODAY 40 6.1.1 Aircraft Movements 82 3.1 Setting 40 6.1.2 Passenger Activity 88 3.2 History 42 6.2 Managed Growth Strategy 90 3.3 Role 44 6.2.1 Aircraft Movements 91 3.3.1 Air Ambulance 45 6.2.2 Passenger Activity 93 3.4 Airside Infrastructure 46 3.4.1 Runways 48 7 INFRASTRUCTURE REQUIREMENTS 95 3.4.2 Taxiways 48 7.1 Airside 95 3.4.3 Aprons 49 7.1.1 Runways 95 3.4.4 Seaplane Ramp 49 7.1.2 Taxiways 95 3.4.5 Ground Run-up Enclosure 49 7.1.3 Aprons 96 3.4.6 Navigational Aids 49 7.1.4 Navigational Aids 96 2 Billy Bishop Toronto City Airport | Master Plan 2018 Billy Bishop Toronto City Airport | Master Plan 2018 3 Table of Contents Table of Contents FIGURE 5-4 WATERFRONT TORONTO PLANNING 7.2 Air Terminal Building 97 10.2.1 Access 132 PRECINCTS 74 7.3 Landside 97 10.2.2 Parking 132 FIGURE 6-1 HISTORICAL ANNUAL AIRCRAFT 7.4 Airport Support Facilities 98 10.2.3 Taxi Coral 132 MOVEMENTS 82 7.4.1 Combined Services Building 98 10.2.4 City of Toronto Administration Building 132 FIGURE 6-2 2010 NEF CONTOURS VERSUS 1990 7.4.2 Equipment Storage 98 10.2.5 Curbs/Drop-Off 133 OFFICIAL CONTOUR 84 7.4.3 Terminal A 98 10.2.6 Ferry Service 133 FIGURE 6-3 NEF CONTOURS ASSOCIATED WITH 7.5 General Aviation Development 99 10.2.7 Water Taxi Service to Move People 133 BASE CASE 85 10.3 Terminal Facilities 134 FIGURE 6-4 NEF CONTOURS ASSOCIATED WITH 8 THE ENVIRONMENT, SUSTAINABLE 10.4 Airport Support Facilities 134 THEORETICAL CAPACITY 86 DEVELOPMENT, AND CORPORATE SOCIAL 10.4.1 Combined Services Building 134 FIGURE 6-5 SCHEDULED AIR CARRIER RESPONSIBILITY 100 10.4.2 Equipment Storage Building 134 MOVEMENTS BY TIME OF DAY 87 8.1 Introduction 100 10.5 General Aviation Development 135 FIGURE 6-6 HISTORICAL ANNUAL PASSENGER 8.2 Noise Management Program 101 10.5.1 North Development 135 ACTIVITY PRIOR TO 2006 88 8.2.1 Regulations and Policies 102 10.5.2 South Development 136 FIGURE 6-7 HISTORICAL ANNUAL PASSENGER 8.2.2 Construction Activity 103 10.6 Airport Land Use Plan 138 ACTIVITY 88 8.2.3 Ground Run-up Enclosure 103 FIGURE 6-8 PASSENGER ACTIVITY BY SECTOR 89 8.2.4 Airfield Rehabilitation Program 104 11 CONCLUSIONS 140 FIGURE 6-9 DEPARTURE SEATS BY TIME OF DAY 89 8.2.5 Traffic Management 104 FIGURE 6-10 ARRIVAL SEATS BY TIME OF DAY 89 8.2.6 Reconfigured Passenger and Vehicle Traffic FIGURE 6-11 AIRCRAFT MOVEMENT GROWTH 91 Operations 105 Tables FIGURE 6-12 NEF CONTOURS ASSOCIATED WITH MANAGED GROWTH STRATEGY 92 8.2.7 Noise Management Office 105 TABLE 3.1 RUNWAY UTILIZATION 46 FIGURE 6-13 PASSENGER ACTIVITY GROWTH 93 8.2.8 Noise Management Sub-Committee 105 TABLE 3.2 ACCESS MODE 51 8.2.9 Converting the Airport Ferry to Electric-Power 106 FIGURE 6-14 PEAK PLANNING DAY MOVEMENTS 93 8.2.10 Noise Monitor Terminals 106 FIGURE 10-1 AIRPORT DEVELOPMENT PLAN 125 8.2.11 Webtrak 106 FIGURE 10-2 RUNWAY END SAFETY AREA (RESA) 127 8.2.12 Calm Wind Trial 107 Figures FIGURE 10-3 ENGINEERED MATERIAL ARRESTING 8.3 Wildlife Management 110 FIGURE 1-1 PLANNING PROCESS 30 SYSTEM (EMAS) 127 8.4 Air Quality 112 FIGURE 3-1 BILLY BISHOP TORONTO CITY FIGURE 10-4 AIRCRAFT STOPPED BY EMAS 127 8.5 Water Quality 113 AIRPORT LOCATION 40 FIGURE 10-5 LANDSIDE DEVELOPMENT PLAN 131 8.6 Environmental Projects 114 FIGURE 3-2 LAND OWNERSHIP 41 FIGURE 10-6 TYPICAL COMBINED SERVICES 8.6.1 Climate Change & Extreme Weather FIGURE 3-3 AIR SERVICE DESTINATIONS 44 BUILDING LAYOUT 134 Vulnerability Assessment 114 FIGURE 3-4 EXISTING CONDITIONS 47 FIGURE 10-7 AIRPORT DEVELOPMENT PLAN 8.6.2 South Channel Dock Wall Rehabilitation FIGURE 3-5 AIR TERMINAL BUILDING —NORTH FIELD 135 and Beautification 114 —UPPER LEVEL 56 FIGURE 10-8 AIRPORT DEVELOPMENT PLAN 8.7 Greenhouse Gas Emissions 116 FIGURE 3-6 AIR TERMINAL BUILDING —SOUTH FIELD 136 —GROUND LEVEL 56 FIGURE 10-9 AIRPORT LAND USE PLAN 9 PRIORITIES AND RECOMMENDATIONS 120 FIGURE 4-1 PROPOSED RESIDENTIAL —OVERVIEW 139 9.1 Priorities 120 DEVELOPMENT 62 9.2 Recommendations 121 FIGURE 4-2 PROPOSED NON-RESIDENTIAL 9.2.1 Infrastructure 121 DEVELOPMENT 63 FIGURE 4-3 POINTS OF PASSENGER ORIGIN 64 Appendices 9.2.2 Access 121 A LIST OF ACRONYMS FIGURE 4-4 SOUTHERN ONTARIO AIRPORT 9.2.3 Community Focussed Mitigation 122 A-1 List of Acronyms 144-145 NETWORK 67 10 AIRPORT DEVELOPMENT PLAN 124 FIGURE 5-1 TOCORE STUDY AREA 10.1 Airside 126 —DOWNTOWN PLAN 69 10.1.1 Runways 126 FIGURE 5-2 BATHURST QUAY NEIGHBOURHOOD 10.1.2 Runway End Safety Areas 126 PLAN 71 10.1.3 Taxiways 130 FIGURE 5-3 RECOMMENDED WATERFRONT 10.1.4 Aprons 130 TRANSIT NETWORK 73 10.2 Landside 131 4 Billy Bishop Toronto City Airport | Master Plan 2018 Billy Bishop Toronto City Airport | Master Plan 2018 5 Investing In Balance —which is the 1983 agreement between the City of Toronto, It is this regular consultation that has informed changes Federal Government and Toronto Port Authority in operations and procedures as well as prompted much Investing In Balance: (PortsToronto) that governs all operations—and our needed investment in infrastructure. For example, own Managed Growth Strategy. concerns raised over traffic led to such infrastructure solutions as the pedestrian tunnel which opened in 2015. To PortsToronto, which owns and operates Billy Bishop The tunnel has mitigated traffic and congestion associated An Executive Summary Airport, this managed growth approach is informed by with the airport by normalizing the flow of passengers regular consultation with government partners including that had previously arrived and departed in waves As an urban airport located in the heart of one of North America’s First Nations, the community and stakeholders.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    74 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us