CY 2014 INTERNAL REVENUE ALLOTMENT for BARANGAYS PROVINCE of LAGUNA (In P0.00 )

Total Page:16

File Type:pdf, Size:1020Kb

CY 2014 INTERNAL REVENUE ALLOTMENT for BARANGAYS PROVINCE of LAGUNA (In P0.00 ) CY 2014 INTERNAL REVENUE ALLOTMENT FOR BARANGAYS PROVINCE OF LAGUNA (In P0.00 ) COMPUTATION OF THE FY 2014 INTERNAL REVENUE ALLOTMENT CY 2010 BARANGAY Census of P80,000 Population FOR BRGYS. SHARE EQUAL TOTAL W/ 100 OR MORE BASED ON SHARING (ROUNDED) POPULATION POPULATION 01 MUN. OF ALAMINOS 1 Barangay I (Pob.) 2,780 80,000.00 1,159,300.81 607,973.12 1,847,274.00 2 Barangay II (Pob.) 2,634 80,000.00 1,098,416.66 607,973.12 1,786,390.00 3 Barangay III (Pob.) 2,629 80,000.00 1,096,331.59 607,973.12 1,784,305.00 4 Barangay IV (Pob.) 3,127 80,000.00 1,304,004.90 607,973.12 1,991,978.00 5 Del Carmen 1,089 80,000.00 454,128.99 607,973.12 1,142,102.00 6 Palma 2,251 80,000.00 938,700.04 607,973.12 1,626,673.00 7 San Agustin 4,650 80,000.00 1,939,118.26 607,973.12 2,627,091.00 8 San Andres 3,180 80,000.00 1,326,106.68 607,973.12 2,014,080.00 9 San Benito 5,720 80,000.00 2,385,323.96 607,973.12 3,073,297.00 10 San Gregorio 3,294 80,000.00 1,373,646.35 607,973.12 2,061,619.00 11 San Ildefonso 2,479 80,000.00 1,033,779.39 607,973.12 1,721,753.00 12 San Juan 2,640 80,000.00 1,100,918.75 607,973.12 1,788,892.00 13 San Miguel 1,938 80,000.00 808,174.45 607,973.12 1,496,148.00 14 San Roque 1,536 80,000.00 640,534.55 607,973.12 1,328,508.00 15 Santa Rosa 3,579 80,000.00 1,492,495.54 607,973.12 2,180,469.00 - - - - - Total 43,526 1,200,000.00 18,150,980.92 9,119,596.85 28,470,579.00 = = = = = 02 MUN. OF BAY 1 Bitin 6,141 80,000.00 2,560,887.14 607,973.12 3,248,860.00 2 Calo 3,576 80,000.00 1,491,244.49 607,973.12 2,179,218.00 3 Dila 5,167 80,000.00 2,154,714.85 607,973.12 2,842,688.00 4 Maitim 4,002 80,000.00 1,668,892.75 607,973.12 2,356,866.00 5 Masaya 5,136 80,000.00 2,141,787.39 607,973.12 2,829,761.00 6 Paciano Rizal 3,789 80,000.00 1,580,068.62 607,973.12 2,268,042.00 7 Puypuy 3,203 80,000.00 1,335,698.02 607,973.12 2,023,671.00 8 San Agustin (Pob.) 1,382 80,000.00 576,314.29 607,973.12 1,264,287.00 9 San Antonio 5,583 80,000.00 2,328,192.95 607,973.12 3,016,166.00 10 San Isidro 2,506 80,000.00 1,045,038.79 607,973.12 1,733,012.00 11 San Nicolas (Pob.) 1,361 80,000.00 567,556.98 607,973.12 1,255,530.00 12 Santa Cruz 2,439 80,000.00 1,017,098.80 607,973.12 1,705,072.00 13 Santo Domingo 6,237 80,000.00 2,600,920.55 607,973.12 3,288,894.00 14 Tagumpay 2,026 80,000.00 844,871.74 607,973.12 1,532,845.00 15 Tranca 3,150 80,000.00 1,313,596.24 607,973.12 2,001,569.00 - - - - - Total 55,698 1,200,000.00 23,226,883.60 9,119,596.85 33,546,481.00 = = = = = 03 MUN. OF BIÑAN 1 Biñan (Poblacion) 3,750 80,000.00 1,563,805.05 607,973.12 2,251,778.00 2 Bungahan 1,709 80,000.00 712,678.09 607,973.12 1,400,651.00 3 Canlalay 19,238 80,000.00 8,022,528.40 607,973.12 8,710,502.00 4 Casile 3,427 80,000.00 1,429,109.31 607,973.12 2,117,082.00 5 De La Paz 29,568 80,000.00 12,330,290.03 607,973.12 13,018,263.00 6 Ganado 3,952 80,000.00 1,648,042.01 607,973.12 2,336,015.00 7 Langkiwa 25,709 80,000.00 10,721,030.39 607,973.12 11,409,004.00 8 Loma 6,769 80,000.00 2,822,772.36 607,973.12 3,510,745.00 9 Malaban 28,550 80,000.00 11,905,769.09 607,973.12 12,593,742.00 10 Malamig 2,929 80,000.00 1,221,436.00 607,973.12 1,909,409.00 11 Mampalasan 6,086 80,000.00 2,537,951.34 607,973.12 3,225,924.00 12 Platero 11,428 80,000.00 4,765,643.75 607,973.12 5,453,617.00 13 Poblacion 3,640 80,000.00 1,517,933.43 607,973.12 2,205,907.00 14 San Antonio 23,067 80,000.00 9,619,277.60 607,973.12 10,307,251.00 15 San Francisco (Halang) 23,429 80,000.00 9,770,236.92 607,973.12 10,458,210.00 16 San Jose 5,839 80,000.00 2,434,948.71 607,973.12 3,122,922.00 17 San Vicente 8,762 80,000.00 3,653,882.62 607,973.12 4,341,856.00 18 Santo Domingo 5,456 80,000.00 2,275,232.09 607,973.12 2,963,205.00 19 Santo Niño 5,201 80,000.00 2,168,893.35 607,973.12 2,856,866.00 20 Santo Tomas (Calabuso) 38,990 80,000.00 16,259,402.34 607,973.12 16,947,375.00 21 Soro-soro 6,708 80,000.00 2,797,334.47 607,973.12 3,485,308.00 22 Timbao 8,746 80,000.00 3,647,210.38 607,973.12 4,335,184.00 23 Tubigan 6,416 80,000.00 2,675,566.18 607,973.12 3,363,539.00 24 Zapote 4,027 80,000.00 1,679,318.11 607,973.12 2,367,291.00 - - - - - Total 283,396 1,920,000.00 118,180,292.01 14,591,354.95 134,691,646.00 = = = = = 04 MUN. OF CABUYAO 1 Baclaran 12,192 80,000.00 5,084,242.97 607,973.12 5,772,216.00 2 Banaybanay 21,934 80,000.00 9,146,799.97 607,973.12 9,834,773.00 3 Banlic 12,675 80,000.00 5,285,661.06 607,973.12 5,973,634.00 4 Barangay Dos (Pob.) 1,840 80,000.00 767,307.01 607,973.12 1,455,280.00 5 Barangay Tres (Pob.) 2,846 80,000.00 1,186,823.78 607,973.12 1,874,797.00 6 Barangay Uno (Pob.) 2,839 80,000.00 1,183,904.67 607,973.12 1,871,878.00 7 Bigaa 10,051 80,000.00 4,191,414.54 607,973.12 4,879,388.00 8 Butong 12,360 80,000.00 5,154,301.43 607,973.12 5,842,275.00 9 Casile 2,128 80,000.00 887,407.24 607,973.12 1,575,380.00 10 Diezmo 2,681 80,000.00 1,118,016.35 607,973.12 1,805,989.00 11 Gulod 9,417 80,000.00 3,927,027.23 607,973.12 4,615,000.00 12 Mamatid 50,213 80,000.00 20,939,558.08 607,973.12 21,627,531.00 13 Marinig 37,169 80,000.00 15,500,018.61 607,973.12 16,187,992.00 14 Niugan 26,807 80,000.00 11,178,912.50 607,973.12 11,866,886.00 15 Pittland 1,740 80,000.00 725,605.54 607,973.12 1,413,579.00 16 Pulo 15,124 80,000.00 6,306,930.01 607,973.12 6,994,903.00 17 Sala 8,275 80,000.00 3,450,796.47 607,973.12 4,138,770.00 18 San Isidro 18,145 80,000.00 7,566,731.35 607,973.12 8,254,704.00 - - - - - Total 248,436 1,440,000.00 103,601,458.83 10,943,516.21 115,984,975.00 = = = = = 05 CALAMBA CITY 1 Bagong Kalsada 3,306 80,000.00 1,378,650.53 607,973.12 2,066,624.00 2 Banadero 7,116 80,000.00 2,967,476.46 607,973.12 3,655,450.00 3 Banlic 12,780 80,000.00 5,329,447.60 607,973.12 6,017,421.00 4 Barandal 4,625 80,000.00 1,928,692.89 607,973.12 2,616,666.00 5 Barangay 1 (Pob.) 6,569 80,000.00 2,739,369.43 607,973.12 3,427,343.00 6 Barangay 2 (Pob.) 8,005 80,000.00 3,338,202.51 607,973.12 4,026,176.00 7 Barangay 3 (Pob.) 4,408 80,000.00 1,838,200.71 607,973.12 2,526,174.00 8 Barangay 4 (Pob.) 3,237 80,000.00 1,349,876.52 607,973.12 2,037,850.00 9 Barangay 5 (Pob.) 6,285 80,000.00 2,620,937.26 607,973.12 3,308,910.00 10 Barangay 6 (Pob.) 2,447 80,000.00 1,020,434.92 607,973.12 1,708,408.00 11 Barangay 7 (Pob.) 2,519 80,000.00 1,050,459.98 607,973.12 1,738,433.00 12 Batino 1,249 80,000.00 520,851.33 607,973.12 1,208,824.00 13 Bubuyan 1,666 80,000.00 694,746.46 607,973.12 1,382,720.00 14 Bucal 11,346 80,000.00 4,731,448.55 607,973.12 5,419,422.00 15 Bunggo 3,809 80,000.00 1,588,408.91 607,973.12 2,276,382.00 16 Burol 1,783 80,000.00 743,537.17 607,973.12 1,431,510.00 17 Camaligan 978 80,000.00 407,840.36 607,973.12 1,095,813.00 18 Canlubang 54,655 80,000.00 22,791,937.29 607,973.12 23,479,910.00 19 Halang 6,829 80,000.00 2,847,793.24 607,973.12 3,535,766.00 20 Hornalan 1,397 80,000.00 582,569.51 607,973.12 1,270,543.00 21 Kay-Anlog 2,665 80,000.00 1,111,344.12 607,973.12 1,799,317.00 22 La Mesa 11,836 80,000.00 4,935,785.74 607,973.12 5,623,759.00 23 Laguerta 1,766 80,000.00 736,447.92 607,973.12 1,424,421.00 24 Lawa 9,169 80,000.00 3,823,607.59 607,973.12 4,511,581.00 25 Lecheria 8,391 80,000.00 3,499,170.17 607,973.12 4,187,143.00 26 Lingga 5,817 80,000.00 2,425,774.39 607,973.12 3,113,748.00 27 Looc 14,524 80,000.00 6,056,721.20 607,973.12 6,744,694.00 28 Mabato 705 80,000.00 293,995.35 607,973.12 981,968.00 29 Majada Labas 5,172 80,000.00 2,156,799.92 607,973.12 2,844,773.00 30 Makiling 7,510 80,000.00 3,131,780.24 607,973.12 3,819,753.00 31 Mapagong 4,942 80,000.00 2,060,886.54 607,973.12 2,748,860.00 32 Masili 3,585 80,000.00 1,494,997.62 607,973.12 2,182,971.00 33 Maunong 2,105 80,000.00 877,815.90 607,973.12 1,565,789.00 34 Mayapa 21,826 80,000.00 9,101,762.39 607,973.12 9,789,736.00 35 Paciano Rizal 11,958 80,000.00 4,986,661.53 607,973.12 5,674,635.00 36 Palingon 6,403 80,000.00 2,670,144.99 607,973.12 3,358,118.00 37 Palo-Alto 10,628 80,000.00 4,432,032.01 607,973.12 5,120,005.00 38 Pansol 10,868 80,000.00 4,532,115.53 607,973.12 5,220,089.00 39 Parian 20,248 80,000.00 8,443,713.22 607,973.12 9,131,686.00 40 Prinza 3,996 80,000.00 1,666,390.66 607,973.12 2,354,364.00 41 Punta 3,511 80,000.00 1,464,138.54 607,973.12 2,152,112.00 42 Puting Lupa 1,720 80,000.00 717,265.25 607,973.12 1,405,238.00 43 Real 13,805 80,000.00 5,756,887.65 607,973.12 6,444,861.00 44 Saimsim 5,504 80,000.00 2,295,248.79 607,973.12 2,983,222.00 45 Sampiruhan 8,144 80,000.00 3,396,167.55 607,973.12 4,084,141.00 46 San Cristobal 12,584 80,000.00 5,247,712.72 607,973.12 5,935,686.00 47 San Jose 4,203 80,000.00 1,752,712.70 607,973.12 2,440,686.00 48 San Juan 4,780 80,000.00 1,993,330.17 607,973.12 2,681,303.00 49 Sirang Lupa 8,225 80,000.00 3,429,945.74 607,973.12 4,117,919.00 50 Sucol 4,779 80,000.00 1,992,913.15 607,973.12 2,680,886.00 51 Milagrosa (Tulo) 5,308 80,000.00 2,213,513.92 607,973.12 2,901,487.00 52 Turbina 4,475 80,000.00 1,866,140.69 607,973.12 2,554,114.00 53 Ulango 858 80,000.00 357,798.59 607,973.12 1,045,772.00 54 Uwisan 2,358 80,000.00 983,320.61 607,973.12 1,671,294.00 - - - - - Total 389,377 4,320,000.00 162,375,924.73 32,830,548.64 199,526,476.00 = = = = = 06 MUN.
Recommended publications
  • Estimation of Local Poverty in the Philippines
    Estimation of Local Poverty in the Philippines November 2005 Republika ng Pilipinas PAMBANSANG LUPON SA UGNAYANG PANG-ESTADISTIKA (NATIONAL STATISTICAL COORDINATION BOARD) http://www.nscb.gov.ph in cooperation with The WORLD BANK Estimation of Local Poverty in the Philippines FOREWORD This report is part of the output of the Poverty Mapping Project implemented by the National Statistical Coordination Board (NSCB) with funding assistance from the World Bank ASEM Trust Fund. The methodology employed in the project combined the 2000 Family Income and Expenditure Survey (FIES), 2000 Labor Force Survey (LFS) and 2000 Census of Population and Housing (CPH) to estimate poverty incidence, poverty gap, and poverty severity for the provincial and municipal levels. We acknowledge with thanks the valuable assistance provided by the Project Consultants, Dr. Stephen Haslett and Dr. Geoffrey Jones of the Statistics Research and Consulting Centre, Massey University, New Zealand. Ms. Caridad Araujo, for the assistance in the preliminary preparations for the project; and Dr. Peter Lanjouw of the World Bank for the continued support. The Project Consultants prepared Chapters 1 to 8 of the report with Mr. Joseph M. Addawe, Rey Angelo Millendez, and Amando Patio, Jr. of the NSCB Poverty Team, assisting in the data preparation and modeling. Chapters 9 to 11 were prepared mainly by the NSCB Project Staff after conducting validation workshops in selected provinces of the country and the project’s national dissemination forum. It is hoped that the results of this project will help local communities and policy makers in the formulation of appropriate programs and improvements in the targeting schemes aimed at reducing poverty.
    [Show full text]
  • Laguna Lake Development and Management
    LAGUNA LAKE DEVELOPMENT AUTHORITY Presentation for The Bi-Lateral Meeting with the Ministry of Environment Japan On LAGUNA DE BAY Laguna Lake Development Authority Programs, Projects and Initiatives Presented By: CESAR R. QUINTOS Division Chief III, Planning and Project Development Division October 23, 2007 LLDA Conference Room Basic Fac ts o n Lagu na de Bay “The Lake of Bay” Laguna de Bay . The largest and most vital inland water body in t he Philipp ines. 18th Member of the World’s Living Lakes Network. QUICK FACTS Surface Area: * 900 km2 Average Depth: ~ 2.5 m Maximum Depth: ~ 20m (Diablo Pass) AerageVolmeAverage Volume: 2,250,000,000 m3 Watershed Area: * 2,920 km2 Shoreline: * 285 km Biological Resources: fish, mollusks, plankton macrophytes (* At 10.5m Lake Elevation) The lake is life support system Lakeshore cities/municipalities = 29 to about 13 million people Non-lakeshore cities/municipalities= 32 Total no. of barangays = 2,656 3.5 million of whom live in 29 lakeshore municipalities and cities NAPINDAN CHANNEL Only Outlet Pasig River connects the lake to Manila Bay Sources of surface recharge 21 Major Tributaries 14% Pagsanjan-Lumban River 7% Sta. Cruz River 79% 19 remaining tributary rivers The Pasig River is an important component of the lake ecosystem. It is the only outlet of the lake but serves also as an inlet whenever the lake level is lower than Manila Bay. Salinity Intrusion Multiple Use Resource Fishing Transport Flood Water Route Industrial Reservoir Cooling Irrigation Hydro power generation Recreation Economic Benefits
    [Show full text]
  • Wage Order No.IVA-12 Final
    Republic of the Philippines DEPARTMENT OF LABOR AND EMPLOYMENT National Wages and Productivity Commission Regional Tripartite Wages and Productivity Board No. IV-A City of Calamba, Laguna WAGE ORDER NO. IVA-12 SETTING THE MINIMUM WAGE FOR CALABARZON AREA WHEREAS, under R. A. 6727, Regional Tripartite Wages and Productivity Board –IVA (RTWPB- IVA) is mandated to rationalize minimum wage fixing in the Region based on various factors such as: the socio-economic condition affecting the cost of living of the workers, the business environment for the creation of new jobs and the preservation of existing employment, the capacity to pay by the majority of the employers, and the comparability of wages that will allow sustainable viability and competitiveness of business and industry; WHEREAS, the Board issues this Wage Order No. IVA-12, granting increases in the basic pay of all covered private sector workers in the region effective fifteen (15) days upon publication in a newspaper of general circulation; WHEREAS, the Board, as part of its regular functions made an assessment of the socio-economic indicators in the region and resolved to review the present wage structure of the region motu proprio; WHEREAS, the Board, in the performance of its mandate, engaged its clientele and stakeholders in the region to a series of consultations on the wage adjustment issue on June 6 and 22, 2007, July 3, 5, 12 and 19, 2007 and a public hearing on August 7, 2007 specifically, the locators in selected economic zones, the garments industry, the labor sector,
    [Show full text]
  • Local Franchise
    Republic of the Philippines ENERGY REGULATORY COMMISSION San Miguel Avenue, Pasig City IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO INCLUDE IN CUSTOMER'S BILL A TAX RECOVERY ADJUSTMENT CLAUSE (TRAC) FOR FRANCHISE TAXES PAID IN THE PROVINCE OF LAGUNA AND BUSINESS TAX PAID IN THE MUNICIPALITIES OF PANGIL, LUMBAN,PAGSANJAN AND PAKIL ALL IN THE PROVINCE OF LAGUNA ERC CASE NO. 2013-002 CF FIRST ,LAGUNA ELECTRIC COOPERATIVE, INC. (FLECO), Applicant. x- - - - - - - - - - - - - - - - - - - - - - - x DECISION Before this Commission for resolution is the application filed on January 8, 2013 by the First Laguna Electric Cooperative, Inc, (FLECO) for authority to include in its customer's bill a Tax Recovery Adjustment Clause (TRAC) for franchise taxes paid to the Province of Laguna and business taxes paid to the Municipalities of Pangil, Lumban, Pagsanjan and Pakil, all in the Province of Laguna. In the said application, FLECO alleged, among others, that: 1. It is a non-stock non-profit electric cooperative (EC) duly organized and existing under and by virtue of the laws of the Republic of the Philippines. It is represented by its Board President, Mr. Gabriel C. Adefuin, It has its principal office at Barangay Lewin, Lumban, Laguna; " ERC CASE NO. 2013-002 CF DECISION/April 28, 2014 Page 2 of 18 2. It is the exclusive holder of a franchise issued by the National Electrification Administration (NEA) to operate an electric light and power services in the Municipalities of Cavinti, Pagsanjan, Lumban, Kalayaan, Paete, Pakil, Pangil, Siniloan, Famy, Mabitac, and Sta. Maria, all in the Province of Laguna; 3.
    [Show full text]
  • SEPTEMBER 20 15 Ddiissttrriicctt Ddeeppuuttyy
    SEPTEMBER 20 15 DDiissttrriicctt DDeeppuuttyy KNIGHTS OF COLUMBUS - 1 COLUMBUS PLAZRA, NeEWm HAViEnN, dCONeNEr CTICUT IMPORTANT REMINDERS CAMPAIGN FOR PEOPLE WITH • Encourage each council in your district to utilize INTELLECTUAL DISABILITIES the Member Management/Member Billing ne of the most popular and successful Applications located in Officers Online. programs conducted by local councils • Supreme Council Office staff is here to assist benefits people with intellectual disabilities you by keeping you informed about Orderwide Oby collecting funds outside stores and on street news, council reminders and membership corners. In appreciation, the donor is offered a piece initiatives. Should you have any questions or of candy, often a Tootsie Roll ®. The high visibility of comments during your term as district deputy, this program has led to the campaign being referred please send an e-mail to [email protected]. to as the “Tootsie Roll Drive.” • Ensure that councils submitted the Semiannual Council Audit (#1295). Submission is required While the nickname is understandable, it is to retain bonding on the offices of the financial misleading since the Knights of Columbus has no secretary and treasurer. official tie to Tootsie Rolls or their manufacturer. NEW MEMBERSHIP Many councils participate in the same fundraising RECRUITMENT VIDEO drive, but distribute other items. References to this During the Membership 365 Seminar held at the program should highlight the positive aspects of the 2015 Supreme Convention, the supreme knight fundraising and not advertise candy. If councils in introduced a new membership your district conduct this program, it is recommended recruitment video — An that it be promoted as the “Campaign for People with Invitation .
    [Show full text]
  • ERDB Joins DENR Sectoral Conference 2009 MOA Signing On
    DENR ERDB Newsletter Vol. 3 No. 1 January - March 2009 ERDB joins DENR Sectoral Conference 2009 joint DENR Sectoral Conference was held on March 17 - 19, 2009 at the Bayview Park Hotel in Roxas Boulevard, Malate, Manila. Fifty (50) participants composed of the Amembers of the ERDB Executive Committee and the National Technical Coordinators (NTCs) of the different banner programs, the Regional Technical Directors for Research and their Division Chiefs attended the conference. ERDB Director Adeluisa G. Siapno (leftmost) discussing The conference started with a plenary session among various the priority projects of ERDB during the DENR Sectoral sectors to discuss the concerns in the implementation of Upland Conference held on March 17 - 19, 2009 at the Bayview Development Program (UDP) and the Philippine Reference Park Hotel in Roxas Boulevard, Malate, Manila. System (PRS 92). In this conference, the objective, framework, budget priority sites and the roles of the different sectors in the implementation of the UDP were discussed and clarified. a. priority Research, Development and Extension (RDE) Plans and Programs for CY 2009; The Research Sector Conference followed and discussed the b. updates on the implementation of Banner Programs; and following agenda: c. roles of the Research Sector in the implementation of UDP. Ü Next page MOA signing on Malapapaya held in Mabitac Memorandum of Agreement was signed between the Ecosystems Research and Development Bureau (ERDB), DENR Region 4A, Regional Research and Development Coordinating Council-Southern Tagalog Agriculture and Resources Research and Development Consortium (RRDCC-STARRDEC), JOPA Enterprises, Municipal Government of Mabitac, andA the Mabitac Malapapaya and Tissue Cultured Lakatan Farmers Association (MMTCLFA) on March 30, 2009 at the Municipal Hall in Mabitac, Laguna.
    [Show full text]
  • Reg-04-Wo-10.Pdf
    Republic of the Philippines DEPARTMENT OF LABOR AND EMPLOYMENT National Wages and Productivity Commission Regional Tripartite Wages and Productivity Board No. IV-A City of Calamba, Laguna WAGE ORDER NO. IVA-10 SETTING THE MINIMUM WAGE FOR CALABARZON AREA WHEREAS, under R. A. 6727, Regional Tripartite Wages and Productivity Board -IVA (RTWPB- IVA) is mandated to rationalize minimum wage fixing in the Region considering the prevailing socio- economic condition affecting the cost of living of wage earners, the generation of new jobs and preservation of existing employment, the capacity to pay and sustainable viability and competitiveness of business and industry, and the interest of both labor and management; WHEREAS, the Board issued Wage Order No. IVA-09, as amended granting wage increases to all covered private sector workers in the Region effective 01 November 2004; WHEREAS, the Board in anticipation of the wage issue convened on 13 April 2005 to discuss and formulate action plan/s to resolve the issue; WHEREAS, the Board guided by the instruction of President Gloria Macapagal-Arroyo on Labor Day (May 1, 2005) for the Regional Boards to resolve the wage issue within thirty (30) days initiated assessment of the socio-economic situation of the Region and conducted sectoral consultations and public hearing on the wage issue; WHEREAS, the Board conducted series of wage consultations with employers sector locating in industrial parks/economic zones in the Provinces/Municipalities of Sto. Tomas, Batangas on 26 April 2005, Dasmariñas, Cavite on 18 May 2005, Biñan, Laguna on 19 and 24 May 2005, and Canlubang, Laguna on 23 May 2005.
    [Show full text]
  • ISSN: 2320-5407 Int. J. Adv. Res. 7(10), 870-877
    ISSN: 2320-5407 Int. J. Adv. Res. 7(10), 870-877 Journal Homepage: - www.journalijar.com Article DOI: 10.21474/IJAR01/9902 DOI URL: http://dx.doi.org/10.21474/IJAR01/9902 RESEARCH ARTICLE DEMAND AND SUPPLY ANALYSIS OF CAKES MADE OF FRUIT IN THE EASTERN PART OF LAGUNA: A BENCHMARK STUDY FOR THE ESTABLISHMENT OF CAKE BUSINESS IN SINILOAN LAGUNA. Juliet A. Caramonte, MBA College of Business Management and Accountancy, Laguna State Polytechnic University (LSPU)Siniloan, Laguna, Philippines. …………………………………………………………………………………………………….... Manuscript Info Abstract ……………………. ……………………………………………………………… Manuscript History A study was conducted in the four municipality in the Eastern part of Received: 14 August 2019 Laguna during summer of 2016. It aimed to seek an optimistic Final Accepted: 16 September 2019 opportunity on creating a unique cake products that could meet interest Published: October 2019 of the people who are looking for a new variety of taste for cakes made of fruit. Key words:- Demand and Supply, Innovation, Based on the survey there are a lot of bakeshop but there is none who Utilization, economic impact. produce cake products with cream filling. Utilization of raw materials such as fruits like ube, macapuno, langka and other fruit available during every season will be use as flavours for production of cake. Results showed that population as one of the demand determinants increased by 13.79% from 2010-2015 in Siniloan Laguna. The demand for cakes is increasing as population grows every year. Changes in one’s tastes and preferences was also the main concern of the study for the human satisfaction and consumption. Results revealed that Supply for cakes are only limited in the eastern part of Laguna based on survey.
    [Show full text]
  • Presentation of Lennie Santos-Borja (3.4
    RE-GREENING THE LAGUNA DE BAY WATERSHED: PARTNERSHIP THROUGH CDM AND N0N-CDM REFORESTATION PROJECTS Edgardo C. Manda General Manager and Lennie C. Santos-Borja Chief, Research and Development Division Head, Carbon Finance Unit Laguna Lake Development Authority, Philippines 12th Living Lakes Conference 25 September 2008 Castiglione del Lago, Regione Umbria Italy THE PHILIPPINE ARCHIPELAGO THE LAGUNA DE BAY BASIN 1 Laguna de Bay Features • Average Depth: ~2.5 m. • Average Volume: 2.25 MCM Mar ikina • Shoreline: 285 km. • Lake surface area: 900 km2 • Watershed area: ~2920 km2 Mang ahan Ba ras Mor on g Ta nay Ta guig • (24 sub-basins including many tributaries A ngon o Pililla St a. M aria + a floodway) Sin ilo an Pang il • 6 provinces, 12 cities, 49 municipalities Munt inlup a Jala -jala Sa n Pe dro • Of which 27 are lakeshore towns and 2 are Calir aya Biñan lakeshore cities Cab uyao Pa gsanja n Pila • One outlet: Napindan Channel – Pasig River San Cr ist oba l Los B año s (serves as inlet of saline water during C alauan St a. C ru z San Ju an Pasig River backflow) The Largest Lake in the Philippines and one of the largest in Southeast Asia 2 A THREATENED ECOSYSTEM Forests receded . 14% 5% 29% 52% Forest 19,100 has. Open 53,480 has Built- up/Industrial 110,780 has. Agricultural 198,640 has. Extensive built-up of agriculture areas. 3 4 sedimentation of the lake Delta formation 5 N TAYTAY ANGONO BINANGONAN PASIG CARDONA BARAS TAGUIG LUPANG ARENDA SUCAT TANAY PILILLA TAYTAY, RIZAL MUNTINLUPA SAN PEDRO SINILOAN BIÑAN MABITAC STA.
    [Show full text]
  • Region Totally Partially
    3. Damages 5 The total number of damaged houses is 35,077 (6,866 totally and 28,211 partially). Details in Tab C Region Totally Partially Total 6,866 28,211 Region III (Bataan & Pampanga) 16 50 Region IV-A (Laguna, Cavite, Quezon & Rizal) 5,233 18,972 Region IV-B (Occ & Or Mindoro) 2 21 Region V (Cam Norte & Cam Sur) 1,615 9,168 5 The most affected municipalities in terms of number of houses damaged were: o Paracale, Camarines Norte – 5,201 (3,965 partially, 1,236 totally) o Santa Cruz, Laguna –- 3,174 (2,513 partially, 634 totally) o Liliw, Laguna – 2,348 (2,292 partially, 56 totally) 5 The estimated cost of damage to infrastructure, agriculture, fisheries, schools and private property in Regions IV-A and V were placed at PhP 494,698,172 Region/Prov Infrastructure Agriculture Fisheries Private Schools Total Total 307,770,000 97,968,172 37,050,000 6,500,000 45,410,000 494,698,172 Region IV-A 292,170,000 78,068,172 37,050,000 5,800,000 413,088,172 Batangas 133,000,000 116,250 20,976,000 5,800,000 159,892,250 Cavite 9,570,000 25,544,185 35,114,185 Rizal (48,468,000) 2,974,606 1,530,000 4,504,606 Laguna 143,450,000 3,882,000 2,948,000 150,280,000 Quezon 6,150,000 45,551,131 11,596,000 63,297,131 Region V 15,600,000 19,900,000 6,500,000 39,610,000 81,610,000 Cam Sur 39,610,000 39,610,000 Camarines 15,600,000 19,900,000 6,500,000 Norte 42,000,000 Note: PhP48,468,000 cost of damage due to TS “Ondoy” 5 The National Electrification Administration (NEC) assessed that six (6) Electric Companies (ECs) namely: CANORECO in Camarines Norte; QUEZELCO I and II in Quezon; BATELEC I and II in Batangas and FLECO in Laguna were directly hit by Typhoon “SANTI” 5 DepEd reported that 101 school buildings were damaged in Batangas, Batangas City, Tanauan City and Camarines Sur: 81 Elementary Schools and 20 High Schools with 256 classrooms 4.
    [Show full text]
  • The Philippine Synthesis Report
    Ecosystems and People The Philippine Millennium Ecosystem Assessment (MA) Sub-Global Assessment Ecosystems and People: The Philippine Millennium Ecosystem Assessment (MA) Sub-global Assessment Edited by Rodel D. Lasco Ma. Victoria O. Espaldon University of the Philippines Los Baños/ University of the Philippines World Agroforestry Centre (ICRAF-Philippines) Diliman Editorial Assistant Maricel A. Tapia A contribution to the Millennium Ecosystem Assessment prepared by the Philippine Sub-global Assessment Published by: Environmental Forestry Programme College of Forestry and Natural Resources University of the Philippines Los Baños In collaboration with: Department of Environment Laguna Lake and Natural Resources Development Authority Published by the Environmental Forestry Programme College of Forestry and Natural Resources University of the Philippines Los Baños College, Laguna, Philippines 4031 © Copyright 2005 by College of Forestry and Natural Resources, University of the Philippines Los Baños ISBN 971-547-237-0 Layout and cover design: Maricel A. Tapia This report is a contribution to the Millennium Ecosystem Assessment prepared by the Philippine Sub-global Assessment Team. The report has been prepared and reviewed through a process approved by the MA Board but the report itself has not been accepted or approved by the Assessment Panel or the MA Board. CONTENTS Foreword vii Acknowledgments ix Summary for Decision Makers 1 Philippine Sub-Global Assessment: Synthesis 9 Introduction 35 Laguna Lake: Conditions and Trends 1. Overview of the Laguna Lake Basin 43 2. Laguna Lake’s Tributary River Watersheds 53 3. Water Resources 63 4. Fish 115 5. Rice 133 6. Biodiversity 151 7. Climate Change 167 8. Institutional Arrangements, Social Conflicts, and Ecosystem Trends 187 9.
    [Show full text]
  • Laguna Province, the Philippines
    Overseas Field Work Report 2000: Laguna Province, The Philippines Graduate School of International Development Nagoya University Overseas Fieldwork Report 2000: Laguna Province, The Philippines March 2001 Graduate School of International Development Nagoya University, Nagoya, Japan Overseas Fieldwork Report 2001 Laguna Province, The Philippines Copyright©2001 Graduate School of International Development, Nagoya University Furo-cho Chikusa-ku. Nagoya, Japan 464-8601 http://www.gsid.nagoya-u.ac.jp/ Introduction It was in the evening of July 24, at a Hotel in Hokkaido, when I received the fax from Dr. Osada, Dean of the Graduate School of International Development (GSID), Nagoya University, in which he proposed to change the site for the ninth annual Overseas Fieldwork (OFW 2000). A travel advisory issued by Japan’s Ministry of Foreign Affairs covering Bohol province and other places in the Philippines, affected his final decision. As program director, I accepted his judgment. In January 2000, with a generous subsidy from the Foundation for Advanced Studies on International Development (FACID), members from OFW Committee and professors from the University of the Philippines Los Baños (UPLB) visited several places in Laguna Province and Bohol Province to look for suitable sites for OFW 2000. After many heated discussions – both provinces were highly evaluated for their attractive sites and open-minded municipal and provincial government officials, they eventually decided on Bohol. We unfortunately gave up Bohol in July for security reasons, however, fortunately Laguna was still in our hands. Of course, the sudden change of locations from Bohol to Laguna added extra work for our colleagues from UPLB, even though Laguna is their home province.
    [Show full text]