Cy11) Touch 2 with Go (Cy13/Cy16/Mm17/Mm19

Total Page:16

File Type:pdf, Size:1020Kb

Cy11) Touch 2 with Go (Cy13/Cy16/Mm17/Mm19 TOUCH & GO (CY11) TOUCH 2 WITH GO (CY13/CY16/MM17/MM19) SPRING 2021 MAP UPDATE RELEASE NOTES Keeping up to date with CONTENTS This Toyota Map Update Release Notes TOUCH 2 with Go (CY13/CY16) these and many more Release date: Spring, 2021 features: Map update information 3 helps you stay on track with updates on Version: 6.17.0 Database: 2020.Q2 Full map navigation Navigation features 4 the Map release for the Touch & Go and Driver-friendly full map Media: USB stick or download by user pan-European navigation Map changes 4 Touch 2 with Go navigation systems. It System vendor: Harman with clear visual displays for signposts, junctions and also provides product information, map Coverage: Albania, Andorra, Austria, Belarus, Belgium, Bosnia Herzegovina, lane guidance. Freshness of map updates 5 changes, premium content and sales Bulgaria, Croatia, Czech Republic, Denmark, Estonia, Finland, Gibraltar, Speed limit and safety Map jewels and highlights 6 France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Kazakhstan, arguments. camera alerts Kosovo, Latvia, Liechtenstein, Lithuania, Luxembourg, North Macedonia, Drive safely with the help of Malta, Moldova, Monaco, Montenegro, Netherlands, Norway, Poland, a speed limit display and Toyota map updates are released at least once a year, Portugal, Romania, Russia, San Marino, Serbia, Slovak Republic, Slovenia, warning, including an optional speed warning and at a maximum twice a year. Spain, Sweden, Switzerland, Turkey, Ukraine, United Kingdom, Vatican. setting. Alerts notify you of fixed safety camera locations (in countries where it is legal). MAP UPDATE INFORMATION TOUCH 2 with Go (MM17/MM19) Intuitive detour suggestions Touch & Go (CY11) (only updated in Spring) Release date: Spring, 2021 Real-time traffic information Release date: Spring, 2021 Version: 2021-1 updates* alert you to Version: 2.22.0 congestion ahead on your Database: 2020.Q3 planned route. The system Database: 2020.Q2 Media: USB stick or download by user calculates potential delay Media: USB stick System vendor: Harman times and suggests a System vendor: Harman detour to avoid the Coverage: Albania, Andorra, Austria, Belarus, Belgium, Bosnia Herzegovina, problem. Coverage: Albania, Andorra, Austria, Belarus, Belgium, Bosnia Herzegovina, Bulgaria, Croatia, Czech Republic, Denmark, Estonia, Finland, Gibraltar, *Depending on local service availability. Bulgaria, Croatia, Czech Republic, Denmark, Estonia, Finland, Gibraltar, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Kazakhstan, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Kazakhstan, Kosovo, Latvia, Liechtenstein, Lithuania, Luxembourg, North Macedonia, 3D city maps Kosovo, Latvia, Liechtenstein, Lithuania, Luxembourg, North Macedonia, In major cities, maps are Malta, Moldova, Monaco, Montenegro, Netherlands, Norway, Poland, enhanced by 3D images of Malta, Moldova, Monaco, Montenegro, Netherlands, Norway, Poland, Portugal, Romania, Russia, San Marino, Serbia, Slovak Republic, Slovenia, notable buildings and Portugal, Romania, Russia, San Marino, Serbia, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Turkey, Ukraine, United Kingdom, Vatican. landmarks along your route Spain, Sweden, Switzerland, Turkey, Ukraine, United Kingdom, Vatican. to make navigation easier and clearer than ever before. 2 3 NAVIGATION FEATURES MAP CHANGES FRESHNESS OF MAP UPDATES 3D Landmarks & 3D city models: a realistic environment representation will About 15% of the road network changes every year and HERE Technologies, HERE Maps Conception are far greater in the automotive industry than in the consumer electronics ease customer’s routing thanks to recognizable buildings and monuments. Toyota’s map supplier, does the same to keep the map update as accurate (PND, phones), and this is due to: The creation of a map update is a long and tedious process. The release Speed limits: you can check the maximum speed limit at any time and as possible. of a latest map update for your car involves a thorough process from data a) The HERE Database is increasing: every year, the size of the map adapt your speed if necessary. From the last map update (with 2020.Q1 data) to the current map update collection until the final product is made available. Below a few steps taken: database increases significantly (new streets, new details, etc.) but the map 2D junction visuals: it is well-known that taking a wrong exit could extend (with 2020.Q3 data), HERE Technologies has added or modified the update needs to be contained within a fixed file size. the driving time considerably. With junction representations, you remain on a) Data collection & integration in the database into the HERE database (3 following key changes: the right lane and there is no doubt or hesitation at the next turn. months): this process is managed by HERE. Every quarter HERE releases b) Product bug checking: the final product released to the market needs Extended lane information: very helpful on highways and complex For accurate guidance: updated information with changes on the road networks. to be tested, ready and perfect for use. Unlike phones or computers, bugs intersections to select the right lane and avoid dangerous last-minute + 329,623 street names cannot be fixed with a simple download, a remote bug fix or even a reboot. b) Data compilation & test validation (7 - 10 months): this process is done manoeuvres, meaning you’re better prepared and not risking driving in the + 1,451 roundabouts by the system vendor and Toyota. The system vendor oversees compiling c) Old navigation systems: the expectation that map updates also need to wrong direction. + 118,190 one-way roads data from HERE database into the Toyota navigation system. Once this run on older navigation systems designed and launched many years ago Speed cameras: provides an awareness of fixed cameras, radar zones and For safe travel: is done, Toyota will proceed with the testing and approval phase for the which have a longer lifetime lasting several years. In comparison, PND and stoplight intersection cameras (where allowed), helping to adjust your + 542,927 km of roads update product. Compilation and test validations may involve several phones have an average life cycle of 1-2 years. driving speed when needed. + 1,173,614 speed limits interactions before the final approval is given by Toyota. Traffic information: very important for itinerary calculation. Avoid traffic For more information about map updates visit: + 80,324 turn restrictions jams and follow less congested roads to save time during rush hours and c) Distribution (2-3 weeks): once the product has been integrated and www.toyota-mapupdates.eu/FAQ/ reach your destination faster. For convenience: tested into the Toyota navigation system, it would usually take about 2-3 Core POI list and search: enter a destination address or select amongst + 172,056 signpost information weeks for Toyota Europe to distribute the product to all Toyota dealerships. a list of points of interest. For the UK and The Netherlands, a search by + 508,803 Points of Interest Why is the map in my recently bought map update outdated? Why does it extended postal codes is available. More information about how much the map changes over time (Map Change take so long to compile maps while other companies (e.g. Google) do this Sign-as-real: will facilitate driver directions and reduce hesitation mistakes Viewer): http://mapchanges.navigation.com/?app=toyota on a daily basis? while driving following the system guidance. More information about HERE Technologies’ data collection and integration: The production of a map update for the in-dash navigation system is a very https://www.youtube.com/watch?v=tnMV_WcNrL0&yt:cc=on&hl=en complex process from data collection, data compilation, data testing and final distribution. The duration and constraints on compilation and testing 4 5 MAP JEWELS AND HIGHLIGHTS Aurillac: N122: the 3 km long bypass has been added to avoid the city center of Aurillac. Lagorce: D1: The 1 km long bypass has been added to avoid a factory classified as a Saint-Triviers-sur-Moignans: D936: the 2 km long bypass has been opened to (2020.2) hazardous chemical site. (2020.1) avoid the city center of Saint-Triviers-sur-Moignans. (2020.2) Discover the major road network changes in your country. Avignon: a new traffic plan in city center has been apply. (2020.1) Le Blanc-Mesnil: N2: the intersection for entrance to “Aéroport Paris-Le Bourget” Sauvagnon: Hauban Nord-Ouest: the 2 km long bypass has been opened to has been updated with a new stretch of road. (2020.1) avoid the city center of Sauvagnon. (2020.2) Find out where new bypasses, highways, roundabouts, Baraqueville: the 7 km long bypass has been added to avoid the city center of Baraqueville. (2020.1) Le Havre: Chaussée Hermann du Pasquier: a new stretch of road of 2 km has Toutainville: Demi-échangeur de Toutainville: the interchange between A13 and sections of roads and many more are included on your new been added to avoid an industrial area. (2020.2) D675 has been added to reflect reality, with a new entry and a new exit ramp. Bordeaux: Boulevard des Frères Moga: a new tunnel has been added to avoid the (2020.1) map update with 2020.Q3 data: intersection. (2020.1) Marcey-les-Grève: D973: The 4 km long bypass has been added to the North of Marcey-lès-Grèves to avoid the city center. (2020.1) Uzès: D979: The 2 km long bypass has been added to avoid the city center of AUSTRIA: Bourg-en-Bresse: D656: the 1 km long bypass has been added to avoid the city center Uzès. (2020.1) of Sauzet. (2020.1) Marignane: D20 E: The 2 km long bypass has been added to avoid the city center Straß in der Steiermark: 1 incorporation of municipalities as per 1.1.2020. (2020.2) of Marignane. (2020.2) Villeneuve-sur-Allier: N7: the 6 km long bypass has been added to avoid the city Bourg-en-Bresse: Rocade Sud-Est: the 3km long bypass has been added to South-East center of Villeneuve-sur-Allier.
Recommended publications
  • Landwein Rhein-Neckar“
    „Landwein Rhein-Neckar“ Produktspezifikation für eine geschützte geografische Angabe 1 Produktspezifikation für Weine mit geschützter geografischer Angabe 1. Geschützter Name „Landwein Rhein-Neckar“ Traditionelle Begriffe, die mit dieser geschützten geografischen Angabe verbunden sind: - Weine und Weinerzeugnisse sind zusätzlich zum bestehenden geschützten Weinnamen obligatorisch mit dem traditionellen Begriff „Landwein“ zu kennzeichnen. Mögliche zusätzliche Bezeichnung zur vorgenannten: Federweißer. Die nachfolgende Produktspezifikation bezieht sich auf die Kategorien 1. und 11. des Anhangs XIb der VO (EG) Nr. 1234/2007. 2. Beschreibung der Weine 2.1. Analytisch Nachfolgend aufgeführte Analysewerte, die anhand einer physikalischen und chemischen Analyse gemäß Artikel 26 der VO (EG) Nr. 607/2009 zu ermitteln sind, sind verbindlich vorgegebene Werte, die bei den angegebenen Weinsorten erreicht werden müssen bzw. dürfen, um die Bezeichnung verwenden zu dürfen: • Vorhandener Alkoholgehalt mindestens 4,5% vol. • Gesamtalkoholgehalt nach Erhöhung des natürlichen Alkoholgehalts: max. 11,5 % vol (Weinbauzone A) bzw. 12 % vol (Weinbauzone B) bei Weiß- und Roséwein sowie 12,0 %vol (Weinbauzone A) bzw. 12,5 % vol (Weinbauzone B) bei Rotwein. • Gesamtalkoholgehalt ohne Erhöhung des natürlichen Alkoholgehaltes maximal 15 %vol. • Zuckergehalt bei Erzeugnissen mit Geschmacksangaben Geschmacksangabe Landwein Zuckergehalt (Abweichung höchstens 1 g/l) trocken Wenn sein Zuckergehalt folgende Werte nicht überschreitet: - 4 g/l oder - 9 g/l, sofern der in g/l Weinsäure ausgedrückte Gesamtsäuregehalt höchstens um 2 g/l niedriger ist als der Zuckergehalt. halbtrocken Wenn sein Zuckergehalt den vorgenannten Höchstwert überschreitet, folgende Werte aber 2 nicht überschreitet: - 12 g/l oder - 18 g/l, sofern der in g/l Weinsäure ausgedrückte Gesamtsäuregehalt höchstens um 10 g/l niedriger ist als der Zuckergehalt.
    [Show full text]
  • Download Starten PDF, 1,1 MB
    Bevölkerung in Baden-Württembergs am 30. Juni 2020 ! Hinweis: Im Antrag bitte den Gemeindeschlüssel - wie in der Tabelle dargestellt - vollständig eintragen. Beispiel: Landkreis Böblingen 8115 im Antrag eintragen. Amtlicher Gemeindeschlüssel Regionalname Bevölkerung (AGS) insgesamt 8 Land Baden-Württemberg 11.101.991 8115 Landkreis Böblingen 393.172 8116 Landkreis Esslingen 534.718 8117 Landkreis Göppingen 258.580 8118 Landkreis Ludwigsburg 545.442 8119 Landkreis Rems-Murr-Kreis 427.486 8121 Stadtkreis Heilbronn 126.317 8125 Landkreis Heilbronn 345.643 8126 Landkreis Hohenlohekreis 112.966 8127 Landkreis Schwäbisch Hall 197.456 8128 Landkreis Main-Tauber-Kreis 132.523 8135 Landkreis Heidenheim 132.832 8136 Landkreis Ostalbkreis 314.062 8211 Stadtkreis Baden-Baden 55.237 8212 Stadtkreis Karlsruhe 309.328 8215 Landkreis Karlsruhe Landkreis 446.312 8216 Landkreis Rastatt 231.948 8221 Stadtkreis Heidelberg 159.134 8222 Stadtkreis Mannheim 309.450 8225 Landkreis Neckar-Odenwald-Kreis 143.702 8226 Landkreis Rhein-Neckar-Kreis 548.688 8231 Stadtkreis Pforzheim 125.945 8235 Landkreis Calw 159.833 8236 Landkreis Enzkreis 199.773 8237 Landkreis Freudenstadt 118.246 8311 Stadtkreis Freiburg im Breisgau 230.070 8315 Landkreis Breisgau-Hochschwarzwald 264.882 8316 Landkreis Emmendingen 166.650 8317 Landkreis Ortenaukreis 431.464 8325 Landkreis Rottweil 140.012 8326 Landkreis Schwarzwald-Baar-Kreis 212.813 8327 Landkreis Tuttlingen 141.107 8335 Landkreis Konstanz 286.666 8336 Landkreis Lörrach 229.028 8337 Landkreis Waldshut 171.151 8415 Landkreis Reutlingen
    [Show full text]
  • Zehn Jahre Hedi-Studer-Stiftung Jahre Alt
    Die Bürgerstiftung Neuenburg am Rhein ist inzwischen zehn Zehn Jahre Hedi-Studer-Stiftung Jahre alt. Den Grundstein gelegt hat die Neuenburger Bürgerin und Geschäftsinhaberin Hedi Studer, die der Bürgerschaft der Stadt etwas von dem zurückge- ben wollte, was diese im Lauf vieler Jahre durch ihre Einkäufe im kleinen „Tante-Emma-La- den“ hatte liegen lassen. Diesen Wunsch hatte sie an ihrem 90. Geburtstag geäußert. Daraus wurde die Stiftungsidee gebo- ren. Die Stiftung trägt deshalb auch den Namen Hedi-Studer- Stiftung.Indenzurückliegenden zehn Jahren ist das Stiftungska- pital auf jetzt über 600.000 Euro angewachsen. Es wurden zahl- reiche Projekte gefördert, die in die satzungsgemäßen Aufga- benfelder der Bürgerstiftung fallen: Vortragsreihen in Koope- Die Neuenburger Bürgerstiftung soll weiter wachsen: Reinhold Waiz (Kassenverwalter), Joachim Schuster ration mit der Regio VHS, Um- (Vorsitzender), Martin Bächler (Ansprechpartner Stadtverwaltung) sowie Egbert Studer und Gerhard Speck weltprojekte, Projekte zur (Mitglieder im Stiftungsvorstand) (von links). Stadtgeschichte, die beiden Ur- kundenbücher, Projekte in den kapitals für gezielte Förderung deratsfraktionen, Thomas Benz Stifterin will die Stiftung enga- Schulen und vieles mehr. Auch zur Verfügung stehen. Wer in (CDU), Gerhard Speck (Freie gierte Menschen zusammen- wenn die Zinserträge derzeit zu den Genuss der Förderung Wähler), Egbert Studer (SPD) bringen, die etwas für die Stadt wünschen übrig lassen, sind es kommt, entscheidet der Vor- sowie Bürgermeister Joachim tun wollen. doch pro Jahr um die 10.000 Eu- stand der Stiftung. Er besteht Schuster, der gleichzeitig der ro, die als Erträge des Stiftungs- aus Vertretern der drei Gemein- Vorsitzende ist. Im Sinne der Fortsetzung auf Seite 7 Narrensuppe tantin des großen neuen politi- Mal das Zepter schwang.
    [Show full text]
  • Sustainable Financing Review for Croatia Protected Areas
    The World Bank Sustainable Financing Review for Croatia Protected Areas October 2009 www.erm.com Delivering sustainable solutions in a more competitive world The World Bank /PROFOR Sustainable Financing Review for Croatia Protected Areas October 2009 Prepared by: James Spurgeon (ERM Ltd), Nick Marchesi (Pescares), Zrinca Mesic (Oikon) and Lee Thomas (Independent). For and on behalf of Environmental Resources Management Approved by: Eamonn Barrett Signed: Position: Partner Date: 27 October 2009 This report has been prepared by Environmental Resources Management the trading name of Environmental Resources Management Limited, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies on the report at their own risk. Environmental Resources Management Limited Incorporated in the United Kingdom with registration number 1014622 Registered Office: 8 Cavendish Square, London, W1G 0ER CONTENTS 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 AIMS 2 1.3 APPROACH 2 1.4 STRUCTURE OF REPORT 3 1.5 WHAT DO WE MEAN BY SUSTAINABLE FINANCE 3 2 PA FINANCING IN CROATIA 5 2.1 CATEGORIES OF PROTECTED
    [Show full text]
  • Transport Development Strategy of the Republic of Croatia (2017 – 2030)
    Transport Development Strategy of the Republic of Croatia (2017 – 2030) Republic of Croatia MINISTRY OF THE SEA, TRANSPORT AND INFRASTRUCTURE Transport Development Strategy of the Republic of Croatia (2017 - 2030) 2nd Draft April 2017 The project is co-financed by the European Union from the European Regional Development Fund. Republic of Croatia Ministry of the Sea, Transport and Infrastructure I Transport Development Strategy of the Republic of Croatia (2017 – 2030) TABLE OF CONTENTS 1 Introduction ............................................................................................................. 1 1.1 Background on development of a Croatian Comprehensive National Transport Plan .................................................. 1 1.2 Objectives of the Transport Development Strategy (TDS 2016) ............................. 4 1.3 Revision of the TDS (2016) Ex-Ante conditionality .................................................. 4 1.4 Methodology for the development of the TDS (2016) ............................................ 5 2 Analysis .................................................................................................................... 7 2.1 General aspects of transport ................................................................................... 7 2.2 Public transport and zero-emission modes ........................................................... 34 2.3 Rail Transport......................................................................................................... 72 2.4 Road transport
    [Show full text]
  • Route Evaluation Report Croatia Eurovelo 8 – Mediterranean Route
    Route Evaluation Report Croatia EuroVelo 8 – Mediterranean Route MEDCYCLETOUR Project Davorin Belamarić April 27th 2018 Contents 1 Background ......................................................................................................................... 5 1.1 Mission of the project and report objectives ................................................................. 5 1.2 Organization ................................................................................................................ 7 1.3 Brief methodological explanations ................................................................................ 8 1.3.1 Different phases of the route evaluation ................................................................ 8 1.3.2 ECS – European Certification Standard used for this evaluation ........................... 9 1.3.3 Used tools and equipment, photographs ..............................................................10 1.4 Overview of the sections .............................................................................................10 2 Infrastructure ......................................................................................................................16 2.1 Existing route infrastructure ........................................................................................16 2.1.1 Public transport ....................................................................................................19 2.2 Critical deficiencies .....................................................................................................30
    [Show full text]
  • Regionalplan Südlicher Oberrhein Tabellarische Übersicht Regionale
    Regionalplan Südlicher Oberrhein (Stand Januar 2019) Tabellarische Übersicht Regionale Grünzüge (PS 3.1.1)– Gliederung in Teilgebiete Hauptkriterien: BO = Hohe oder sehr hohe Bedeutung für das Schutzgut Boden gemäß Raumanalyse Landschaftsrahmenplan KL = Hohe bis sehr hohe Bedeutung für das Schutzgut Klima und Luft gemäß Raumanalyse Landschaftsrahmenplan AL = Hohe oder sehr hohe Bedeutung für das Schutzgut Arten und Lebensräume gemäß Raumanalyse Landschaftsrahmen- plan BKT = Kernflächen und Trittsteine des Biotopverbunds für Wald- und Offenlandlebensräume gemäß regionaler Biotopverbund- konzeption BWK = Waldkorridore gemäß regionaler Biotopverbundkonzeption und Wildtierkorridore gemäß Generalwildwegeplan Baden- Württemberg N = Wichtige Bereiche für Naturerlebnis und Naherholung (wenig lärmbelastete Gebiete mit besonderer Naturerlebnisquali- tät = Hohe oder sehr hohe Bedeutung für das Schutzgut Landschaftsbild und landschaftsbezogene Erholung gemäß Raumanalyse Landschaftsrahmenplan) DSR = Aus Sicht des Denkmalschutzes besonders erhaltenswerte landschafts- und ortsbildprägende Siedlungsränder KHL = Gebiete mit kulturhistorisch bedeutsamen Landnutzungen und Landschaftselementen WVF = Waldgebiete im Verdichtungsraum Freiburg (vgl. LEP PS 5.3.5) VF1 = Landwirtschaftliche Vorrangfluren Stufe 1 S = Siedlungstrennung / Vermeidung bandartiger Siedlungsentwicklungen GFZ = Großräumiger Freiraumzusammenhang z Kriterium flächenhaft (d.h. auf mind. rd. ein Viertel der Gebietsfläche) gegeben | Kriterium kleinflächig gegeben Nebenkriterien (treten ergänzend
    [Show full text]
  • Etir Code Lists
    eTIR Code Lists Code lists CL01 Equipment size and type description code (UN/EDIFACT 8155) Code specifying the size and type of equipment. 1 Dime coated tank A tank coated with dime. 2 Epoxy coated tank A tank coated with epoxy. 6 Pressurized tank A tank capable of holding pressurized goods. 7 Refrigerated tank A tank capable of keeping goods refrigerated. 9 Stainless steel tank A tank made of stainless steel. 10 Nonworking reefer container 40 ft A 40 foot refrigerated container that is not actively controlling temperature of the product. 12 Europallet 80 x 120 cm. 13 Scandinavian pallet 100 x 120 cm. 14 Trailer Non self-propelled vehicle designed for the carriage of cargo so that it can be towed by a motor vehicle. 15 Nonworking reefer container 20 ft A 20 foot refrigerated container that is not actively controlling temperature of the product. 16 Exchangeable pallet Standard pallet exchangeable following international convention. 17 Semi-trailer Non self propelled vehicle without front wheels designed for the carriage of cargo and provided with a kingpin. 18 Tank container 20 feet A tank container with a length of 20 feet. 19 Tank container 30 feet A tank container with a length of 30 feet. 20 Tank container 40 feet A tank container with a length of 40 feet. 21 Container IC 20 feet A container owned by InterContainer, a European railway subsidiary, with a length of 20 feet. 22 Container IC 30 feet A container owned by InterContainer, a European railway subsidiary, with a length of 30 feet. 23 Container IC 40 feet A container owned by InterContainer, a European railway subsidiary, with a length of 40 feet.
    [Show full text]
  • Liste Der Mitgliedskommunen (A-Z)
    Mitgliedsgemeinden im Gemeindenetzwerk Bürgerschaftliches Engagement in Baden-Württemberg (alphabetisch) Nr. PLZ Stadt/ Gemeinde Landkreis Einwohner Homepage 63 77855 Achern Ortenaukreis 24.512 www.achern.de 86 74858 Aglasterhausen Neckar-Odenwald-Kreis 4.986 www.aglasterhausen.de 134 73095 Albershausen Göppingen 4.335 www.albershausen.de 1 75379 Althengstett Calw 7.937 www.althengstett.de 188 72119 Ammerbuch Tübingen 11.500 www.ammerbuch.de 207 73340 Amstetten Alb-Donau-kreis 4.000 www.amstetten.de 2 88279 Amtzell Ravensburg 3.800 www.amtzell.de 138 71546 Aspach Rems-Murr-Kreis 8.093 www.aspach.de 172 88326 Aulendorf Ravensburg 9.900 www.aulendorf.de 3 78073 Bad Dürrheim Schwarzwald-Baar-Kreis 12.707 www.badduerrheim.de Bad Rippoldsau- 128 77776 Schapbach Freudenstadt 2.230 www.bad-rippoldsau-schapbach.de 4 73337 Bad Überkingen Göppingen 3.980 www.bad-ueberkingen.de 5 72574 Bad Urach Reutlingen 12.500 www.bad-urach.de 162 88339 Bad Waldsee Ravensburg 19.596 www.bad-waldsee.de 101 74206 Bad Wimpfen Heilbronn 6.900 www.badwimpfen.de 81 79282 Ballrechten-Dottingen Breisgau-Hochschwarzwald 2.240 www.ballrechten-dottingen.de 137 78580 Bärenthal Tuttlingen 442 www.baerenthal.de 6 88697 Bermatingen Bodenseekreis 3.900 www.bermatingen.de 170 89182 Bernstadt Alb-Donau-Kreis 2.116 www.bernstadt-wuertt.de 209 79589 Binzen Lörrach 3.076 www.binzen.de 88 89134 Blaustein Alb-Donau-kreis 15.125 www.blaustein.de 145 78176 Blumberg Schwarzwald-Baar-Kreis 10.096 www.stadt-blumberg.de 156 72411 Bodelshausen Tübingen 5.600 www.bodelshausen.de 195 79283
    [Show full text]
  • Report on the Observance of Standards and Codes
    REPORT ON THE OBSERVANCE OF STANDARDS AND CODES CORPORATE GOVERNANCE COUNTRY ASSESSMENT REPUBLIC OF CROATIA This Corporate Governance Assessment of Croatia has been completed as part of the joint World Bank-IMF program of Reports on the Observance of Standards and Codes, (ROSC) which are designed to strengthen the international financial architecture. This ROSC is based upon a template structured around the OECD Principles of Corporate Governance completed by the World Bank team, and the Croatian Securities Commission, based on a review of relevant legislation and discussions with the Croatian Securities Commission, the Ministry of Finance, the Zagreb Stock Exchange, the Varazdin Over-The-Counter Market, the Croatian Privatization Fund, the Central Depository Agency, the Commercial Court of Zagreb, the Croatian Association of Accountants and Financial Experts, the Croatian Employers’ Association, Expandia Privatization Investment Fund, the Law Faculty of Zagreb, Croatian Chamber of Economy, and Zagrebacka banka. The assessment was conducted March through May 2001 by the Europe and Central Asia Regional Department of the World Bank in collaboration with the Corporate Governance Unit of the Private Sector Advisory Services Department of the World Bank. REPORT ON THE OBSERVANCE OF STANDARDS AND CODES Corporate Governance Assessment Republic of Croatia Contents I. EXECUTIVE SUMMARY II. DESCRIPTION OF PRACTICE A Capital Market Overview A1 Capital market structure A2 Ownership structure A3 Regulatory framework and professional/best practice
    [Show full text]
  • Croatia National Report 2007
    CROATIA NATIONAL REPORT 2007 I Network The total length of motorway network, as completed by the end of 2007 in Croatia, amounts to 1163.5 km. In 2007, 75,9 km of new motorways and 3,8 km of semi motorways were built (as compared to 43 km that were built in 2006), and 15,7 km of existing roads were upgraded to the full motorway profile: On the Motorway A1: Zagreb - Split - Ploče; Dugopolje-Bisko-Šestanovac Sections (37 km) - opened to traffic in full profile in 06/2007 On the Motorway A2: Zagreb - Macelj Krapina-Macelj Section (17.2 km) –13,4 km was completed as full motorway and 3,8 km as semi motorway On the Motorway A5: Beli Manastir-Osijek-border with Bosnia and Herzegovina Sredanci-Đakovo Section (23 km) – opened to traffic as full motorway in 11/2007 On the Motorway A6: Zagreb - Rijeka - on the Vrbovsko-Bosiljevo Section (8,44 km) – upgrade to the full motorway profile of the viaduct Zeceve Drage, tunnel Veliki Gložac, viaduct Osojnik and viaduct Severinske Drage together with corresponding motorway segments in 06/2007 - on the Oštrovica-Kikovica Section (7,25 km) - upgrade to the full motorway profile in 11/2007 On the Motorway A11: Zagreb – Sisak On the Jakuševec-Velika Gorica South Section – completion of the interchange Velika Gorica South and 2,5 km of a motorway segment in 5/2007 and in 09/2007 In Croatia, motorways are operated by 4 companies, i.e. by Hrvatske autoceste d.o.o. (operates all toll motorways except for those in concession) and by three concession companies BINA-ISTRA d.d.
    [Show full text]
  • Aach Aach, Stadt Aachen, Stadt Aalen, Stadt Aarbergen Aasbüttel
    Die im Folgenden aufgeführten Gemeinden (oder entsprechenden kommunalen Verwaltungen) sind mit dem jeweiligen teilnehmenden Land (Bundesministerium für Verkehr und digitale Infrastruktur) als die Liste der in Betracht kommenden Einrichtungen vereinbart worden und können sich für das WiFi4EU-Programm bewerben. „Gemeindeverbände“, sofern sie für jedes Land festgelegt und nachstehend aufgeführt sind, können sich im Namen ihrer Mitgliedsgemeinden registrieren, müssen den endgültigen Antrag jedoch für jede Gemeinde in ihrer Registrierung einzeln online einreichen. Jeder Gutschein wird an eine einzelne Gemeinde als Antragsteller vergeben. Während der gesamten Laufzeit der Initiative kann jede Gemeinde nur einen einzigen Gutschein einsetzen. Daher dürfen Gemeinden, die im Rahmen einer Aufforderung für einen Gutschein ausgewählt wurden, bei weiteren Aufforderungen nicht mehr mitmachen, wohingegen sich Gemeinden, die einen Antrag gestellt, aber keinen Gutschein erhalten haben, in einer späteren Runde wieder bewerben können. Gemeinden (oder entsprechende kommunale Verwaltungen) Aach Adelshofen (Fürstenfeldbruck) Aach, Stadt Adelshofen (Ansbach, Landkreis) Aachen, Stadt Adelsried Aalen, Stadt Adelzhausen Aarbergen Adenau, Stadt Aasbüttel Adenbach Abenberg, St Adenbüttel Abensberg, St Adendorf Abentheuer Adlkofen Absberg, M Admannshagen-Bargeshagen Abstatt Adorf/Vogtl., Stadt Abtsbessingen Aebtissinwisch Abtsgmünd Aerzen, Flecken Abtsteinach Affalterbach Abtswind, M Affing Abtweiler Affinghausen Achberg Affler Achern, Stadt Agathenburg Achim, Stadt
    [Show full text]