Anglia Route Study Long Term Planning Process Summary Document March 2016 2 Anglia Route Study: Summary Document March 2016 the Railway in Anglia

Total Page:16

File Type:pdf, Size:1020Kb

Anglia Route Study Long Term Planning Process Summary Document March 2016 2 Anglia Route Study: Summary Document March 2016 the Railway in Anglia Anglia Route Study Long Term Planning Process Summary Document March 2016 2 Anglia Route Study: Summary Document March 2016 The Railway in Anglia The railway in Anglia plays a vital role in the region’s economy, providing links between communities and employment, industry and markets, and conveying nationally important freight flows from ports where container traffic arrives in the UK. The rail industry has delivered more trains, reduced delays and improved safety, at the same time as improved efficiency and value over the last 20 years. Over the next 30 years more and more people are expected to travel by train, and more freight traffic is forecast to come off the road and onto the railway. This presents significant challenges which are explored and options to address them presented in the Anglia Route Study. Anglia Route Study: Summary Document 3 March 2016 Planning for Growth The Anglia Route Study identifies key corridors and highlights expected increases in passenger and freight flows, proposing options to meet this demand he Anglia Route Study examines The Route Study forms part of a suite of Toptions to improve the railway in Studies for the UK rail network, which East Anglia, setting out a long term represent a crucial component of the strategy to meet growing passenger and railway’s Long Term Planning Process freight demand on the railway from 2019 (LTPP). Looking ahead to 2043 ensures and beyond. that those requirements prioritised for the next ten years are consistent with The Route Study sets out a vision for the longer-term developments. next 10 to 30 years of a much busier A COLLABORATIVE PROCESS railway, with investment enabling faster, The choices set out in the Route Study more frequent and more reliable have been developed together with industry partners to deliver a railway that journeys. It presents choices for funders offers value to taxpayers, users and to meet this future demand. funders. Outside London, the Anglia region has The Anglia Route Study Draft for the fastest growing employment in Consultation was published in November England and needs a rail service to 2014 and the consultation ran until support this economic growth. The February 2015. Over 190 responses were benefits of these potential investments received and have been used to review, will flow far beyond the railway, leading update and complete further analysis to to: support the final strategy for Anglia. • economic growth • reduced environmental impact • regeneration of communities 4 Anglia Route Study: Summary Document March 2016 Anglia Route The Anglia Route comprises 1,426 track miles covering the whole of East Anglia and routes into and around London The Great Eastern Main Line runs The Orbital Routes include the North between London Liverpool Street and London Line (NLL) and Gospel Oak to Norwich and carries key commuter flows Barking line (GOB), providing a major link into London, a fast-growing long distance between key arterial routes to and from flow connecting world leading centres for the capital. It carries a busy commuter biosciences, engineering and renewable service and provides connections for energy, as well as a significant amount of freight to other routes across London. freight. The Essex Thameside route runs from The Cross country corridor via Ely London Fenchurch Street to supports freight between the Port of Shoeburyness and carries a mixture of Felixstowe and other regions such as the commuter and leisure traffic along with Midlands, Yorkshire and Scotland container traffic to and from the ports at alongside busy inter-regional passenger Tilbury and London Gateway. services. Sheringham The West Anglia Main Line runs between Cromer London Liverpool Street and Kings Lynn and carries busy commuter and leisure Kings Lynn traffic from Stansted Airport and Great Cambridge into London Liverpool Street. Norwich Yarmouth It has the potential for significant housing and employment growth. Lowestoft Ely Thetford Bury St Edmunds Cambridge Sudbury Ipswich Felixstowe Manningtree Harwich Town Stansted Braintree Colchester Marks Walton-on-the-Naze Airport Tey Hertford East Witham Clacton-on-Sea Chelmsford Southminster Chingford Sheneld Southend Victoria Richmond Shoeburyness London Liverpool Street London Fenchurch Street Anglia Route Study: Summary Document 5 March 2016 Priority flows and growth The forecast growth in passenger and freight demand is significant across all main service groups in the Anglia region n terms of peak-level demand, the Freight growth across Anglia to 2043 I pattern for the Anglia route is largely 8000 driven by commuting habits to and from 7000 London. As a result, additional growth will be driven by employment growth 6000 rather than people transferring to rail 5000 from other modes of transport. 4000 The forecast growth in freight over the 3000 next 30 years is significant across the km Tonne Net Million region, particularly in container traffic 2000 Other which is conveyed on the main routes 1000 Container both via London and via Ely to other 0 parts of the country. 2012 2024 2034 2044 Passenger crowding in 2043 without investment Norwich to improve the rail service (average across high-peak hour, not representing individual trains) Kings Lynn Peterborough Ely Seats busy - up to 85% taken Bury St. Cambridge Edmunds Seats full - 85% to 100% taken Ipswich Felixstowe 0 to 40% standing space utilised Stansted Airport 40% to 80% standing space utilised Hertford East Colchester Over 80% standing space utilised Marks Tey Eneld Town Chelmsford Chingford Sheneld Southend Gospel Victoria Oak Barking Shoeburyness Stratford Richmond London Liverpool Street Grays London Fenchurch Street 6 Anglia Route Study: Summary Document March 2016 Choices for funders Investment is required in Anglia to meet forecast growth in both passenger and freight numbers here is the clear potential in Anglia Tfor further growth and expansion which would be significantly supported and enhanced by improvements to the railway. We have therefore set out a number of investment opportunities for our funders. Sheringham Level Crossings (corridor wide) 11 Kings Lynn 4 Doubling Signalling Trowse Bridge Norwich improvements 9 GEML Level Crossings Ely area capacity 5 improvements 7 Ely Thetford Haughley Junction Ely - Soham partial 10 Doubling doubling 8 Bury Cambridge St Edmunds Felixstowe Branch 6 Capacity Enhancement Ipswich West Anglia Train Loop north of Lengthening 12 Felixstowe 3 Witham Stansted Colchester Airport Signalling Witham 2 improvements Journey Time Improvements 13 Chelmsford Preparatory works for a 1 Liverpool Street major intervention such as 14 Station Capacity Crossrail 2 on West Anglia Shoeburyness Signalling London improvements 15 Essex Thameside 17 Train lengthening Freight regulating points 16 Anglia Route Study: Summary Document 7 March 2016 Great Eastern Main Line West Anglia Main Line To deliver more and faster trains To enable housing growth and economic development through 1. Improvements at London Liverpool more and faster trains Street station including more passenger space and additional 12. Longer trains on peak services platform(s) 13. Line speed improvements 2. Improvements to signalling to allow to support faster journeys more trains to run between 14. Preparatory works for a major Chelmsford and Stratford (through intervention such as Crossrail 2 Digital Railway) on West Anglia 3. Passing loop north of Witham 4. Doubling of Trowse Swing Bridge Orbital Routes Sheringham 5. Level crossing closures or improved (NLL & GOB) Level Crossings safety mitigations To deliver more freight and 11 passenger trains (corridor wide) Kings Lynn Doubling 4 15. Improvements to signalling Signalling Trowse Bridge Norwich Cross country corridor via Ely to allow more trains to run improvements 9 To deliver more freight trains and 16. Regulating points enabling freight better connectivity to wait for a path without GEML Level Crossings detaining passenger services Ely area capacity 5 6. Felixstowe Branch capacity enhancements improvements 7 Ely Thetford Haughley Junction 7. Ely area improvements, including Essex Thameside signalling improvements to allow Ely - Soham partial 10 Doubling more trains to run, Ely North Junction To deliver more seats in peak hours doubling 8 Bury and level crossings Cambridge St Edmunds Felixstowe Branch 6 Capacity Enhancement 8. Partial doubling of the Ely to Soham 17. Longer trains on peak services single line Ipswich Train lengthening comprises both the West Anglia Train Loop north of 9. Improvements to signalling to allow medium and long term strategy on this corridor. Should the realised rate of Lengthening 12 Felixstowe 3 more trains to run at Ely and Bury St Witham Edmunds growth out-perform the forecasts in the Stansted Colchester Signalling medium term, it is still likely to fall within Airport 10. Haughley Junction doubling the longer term demand forecasts. The Witham 2 improvements Journey Time Improvements 11. Level crossing closures or improved strategy will therefore still cater to this 13 Chelmsford safety mitigations speedier passenger increase, but may Preparatory works for a 1 Liverpool Street require earlier implementation. major intervention such as 14 Station Capacity Crossrail 2 on West Anglia Shoeburyness Signalling London improvements 15 Essex Thameside 17 Train lengthening Longer Term Freight regulating 16 An intervention such as Crossrail 2 is On the Great Eastern Main Line further points required to meet demand and improve enhancements to support peak growth the frequency
Recommended publications
  • Our Counties Connected a Rail Prospectus for East Anglia Our Counties Connected a Rail Prospectus for East Anglia
    Our Counties Connected A rail prospectus for East Anglia Our Counties Connected A rail prospectus for East Anglia Contents Foreword 3 Looking Ahead 5 Priorities in Detail • Great Eastern Main Line 6 • West Anglia Main Line 6 • Great Northern Route 7 • Essex Thameside 8 • Branch Lines 8 • Freight 9 A five county alliance • Norfolk 10 • Suffolk 11 • Essex 11 • Cambridgeshire 12 • Hertfordshire 13 • Connecting East Anglia 14 Our counties connected 15 Foreword Our vision is to release the industry, entrepreneurship and talent investment in rail connectivity and the introduction of the Essex of our region through a modern, customer-focused and efficient Thameside service has transformed ‘the misery line’ into the most railway system. reliable in the country, where passenger numbers have increased by 26% between 2005 and 2011. With focussed infrastructure We have the skills and enterprise to be an Eastern Economic and rolling stock investment to develop a high-quality service, Powerhouse. Our growing economy is built on the successes of East Anglia can deliver so much more. innovative and dynamic businesses, education institutions that are world-leading and internationally connected airports and We want to create a rail network that sets the standard for container ports. what others can achieve elsewhere. We want to attract new businesses, draw in millions of visitors and make the case for The railways are integral to our region’s economy - carrying more investment. To do this we need a modern, customer- almost 160 million passengers during 2012-2013, an increase focused and efficient railway system. This prospectus sets out of 4% on the previous year.
    [Show full text]
  • Issue 185 Feb 2020 SPECIAL FEATURE on HOW the LATEST
    Issue 185 ● Feb 2020 www.railfuture.org.uk/East+Anglia twitter.com/RailfutureEA Railfuture campaigns for better services over a bigger railway (passengers + freight) Join us for £20 per year www.railfuture.org.uk/join SPECIAL FEATURE ON HOW THE LATEST TRAIN TECHNOLOGY CAN BENEFIT PASSENGERS Image reproduced courtesy of Petards Rail Technology— www.petards.com Inside this edition of RAIL EAST... • East West Rail - Progress at last! • Station footfall for 2018/19 • Look back over last 10 years • Easy Stations — the winners • What we expect in the next 10 • A giant leap for train technology • Cambridge South consultation • Whittlesford audit improvements RAIL EAST 185 — FEBRUARY 2020 Railfuture East Anglia www.railfuture.org.uk TOPICS COVERED IN THIS ISSUE OF RAIL EAST In this issue’s 24 pages we have fewer (but longer) articles than last time and only five authors. Contributions are welcome from readers. Contact info on page 23. Chair’s thoughts – p.3 Easy Stations winners announced – plus how do our stations compare with Germany’s? And a snapshot of progress with platform development work at Stevenage East West Rail big announcement (1) – p.5 Preferred route for the central section is finally published – now the serious work begins East West Rail big announcement (2) – p.7 Progress on the western section, as Transport & Works Order is published and work on the ground is set to start Another critical consultation – Cambridge South – p.8 Momentum builds on this key item of passenger infrastructure – Railfuture’s wish- list for the new station
    [Show full text]
  • Services Between Enfield Lock and Tottenham Hale
    Crossrail 2 factsheet: Services between Enfield Lock and Tottenham Hale New Crossrail 2 services are proposed to serve Tottenham Hale, Northumberland Park, Angel Road, Ponders End, Brimsdown and Enfield Lock, with between 10 and 12 trains per hour in each direction operating directly to, and across, central London. What is Crossrail 2? Why do we need Crossrail 2? Crossrail 2 is a proposed new railway serving London and On the West Anglia Main Line, local stopping services and the wider South East that could be open by 2030. It would faster services from Cambridge and Stansted Airport all connect the existing National Rail networks in Surrey and compete for space on the line. This limits the number of Hertfordshire with trains running through a new tunnel trains that can call at local stations, and extends journey from Wimbledon to Tottenham Hale and New Southgate. times to and from the area. Crossrail 2 will connect directly with National Rail, Liverpool Street and Stratford stations also currently face London Underground, London Overground, Crossrail 1, severe capacity constraints. It is forecast that by 2043 High Speed 1 international and domestic and High Speed 2 demand for rail travel on this line will have increased by 39%. services, meaning passengers will be one change away There is currently no spare capacity for additional services. from over 800 destinations nationwide. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce journey times for longer distance Crossrail 2 in this area services, and would enable us to run more local services to central London.
    [Show full text]
  • Network Rail Response with Appendices
    Defendant’s Response to Sole Reference Ref: TTP1546 1 of 9 1 DETAILS OF PARTIES 1.1 The names and addresses of the parties to the reference are as follows:- (a) Freightliner Limited whose Registered Office is at 3rd Floor, 90 Whitfield Street, London W1T 4EZ (“Freightliner”) ("the Claimant"); and (b) Network Rail Infrastructure Limited whose Registered Office is at 1 Eversholt Street, London NW1 2DN ("Network Rail") ("the Defendant"). 1.2 Other Train and Freight Operating Companies that could be affected by the outcome of this dispute: (a) Greater Anglia (Abellio East Anglia Ltd), MTR Corporation (Crossrail) Ltd, Arriva Rail London Ltd, GB Railfreight Ltd, DB Cargo (UK) Ltd, c2c (Trenitalia c2c Ltd) 2 CONTENTS OF THIS DOCUMENT This Response to the Claimant’s Sole Reference includes:- (a) Confirmation, or qualification, that the subject matter of the dispute is as set out by the Claimant in its Sole Reference, in the form of a summary schedule cross-referenced to the issues raised by the Claimant in the Sole Reference, identifying which the Defendant agrees with and which it disagrees with. (b) A detailed explanation of the Defendant’s arguments in support of its position on those issues where it disagrees with the Claimant’s Sole Reference, including references to documents or contractual provisions not dealt with in the Claimant’s Sole Reference. (c) Any further related issues not raised by the Claimant but which the Defendant considers fall to be determined as part of the dispute; (d) The decisions of principle sought from the Panel in respect of (i) legal entitlement, and (ii) remedies; (e) Appendices and other supporting material.
    [Show full text]
  • Submissions to the Call for Evidence from Organisations
    Submissions to the call for evidence from organisations Ref Organisation RD - 1 Abbey Flyer Users Group (ABFLY) RD - 2 ASLEF RD - 3 C2c RD - 4 Chiltern Railways RD - 5 Clapham Transport Users Group RD - 6 London Borough of Ealing RD - 7 East Surrey Transport Committee RD – 8a East Sussex RD – 8b East Sussex Appendix RD - 9 London Borough of Enfield RD - 10 England’s Economic Heartland RD – 11a Enterprise M3 LEP RD – 11b Enterprise M3 LEP RD - 12 First Great Western RD – 13a Govia Thameslink Railway RD – 13b Govia Thameslink Railway (second submission) RD - 14 Hertfordshire County Council RD - 15 Institute for Public Policy Research RD - 16 Kent County Council RD - 17 London Councils RD - 18 London Travelwatch RD – 19a Mayor and TfL RD – 19b Mayor and TfL RD - 20 Mill Hill Neighbourhood Forum RD - 21 Network Rail RD – 22a Passenger Transport Executive Group (PTEG) RD – 22b Passenger Transport Executive Group (PTEG) – Annex RD - 23 London Borough of Redbridge RD - 24 Reigate, Redhill and District Rail Users Association RD - 25 RMT RD - 26 Sevenoaks Rail Travellers Association RD - 27 South London Partnership RD - 28 Southeastern RD - 29 Surrey County Council RD - 30 The Railway Consultancy RD - 31 Tonbridge Line Commuters RD - 32 Transport Focus RD - 33 West Midlands ITA RD – 34a West Sussex County Council RD – 34b West Sussex County Council Appendix RD - 1 Dear Mr Berry In responding to your consultation exercise at https://www.london.gov.uk/mayor-assembly/london- assembly/investigations/how-would-you-run-your-own-railway, I must firstly apologise for slightly missing the 1st July deadline, but nonetheless I hope that these views can still be taken into consideration by the Transport Committee.
    [Show full text]
  • Chapter Four – a Good Public Transport Experience
    A GOOD PUBLIC TRANSPORT EXPERIENCE 129 Chapter four – A good public transport experience London has one of the most extensive public transport networks in the world, with more than 9 million trips made every day by bus, tram, Tube, train and river boat. Use of the public transport system has increased by 65 per cent since 2000, largely because of enhanced services and an improved customer experience. An easy to use and accessible public transport system is an essential part of the Healthy Streets Approach as it gives people alternatives to car use for journeys that are not possible on foot or by cycle. By providing the most efficient and affordable option for journeys that are either impractical or too long to walk or cycle, public transport has helped to reduce Londoners’ dependency on cars during the past 15 years and this trend must continue. VERSION FOR PUBLICATION A GOOD PUBLIC TRANSPORT EXPERIENCE 131 401 As it grows, the city requires the public This chapter sets out the importance of The whole journey ‘By 2041, the transport capacity to reduce crowding a whole journey approach, where public A good public transport experience and support increasing numbers of transport improvements are an integral means catering for the whole journey, public transport people travelling more actively, efficiently part of delivering the Healthy Streets with all its stages, from its planning to and sustainably. Figure 18 shows that Approach. The chapter then explains the return home. All public transport system will need by 2041 the public transport system will in four sections how London’s public journeys start or finish on foot or by need to cater for up to around 15 million transport services can be improved for cycle, and half of all walking in London is trips every day.
    [Show full text]
  • Signal Box Register Series
    Signal Box Registers Publication schedule and current state of play as at 10th July 2019 Item Publication dateStatus 1. Great Western PB: 22 December 2007 Out of Print HB: 28 December 2007 Out of Print 1. Great Western PB: 10 May 2011 Published (Revised Edition) HB: 24 May 2011 Published 2. Midland Railway latest draft is version E22 dated Substantially complete. 18th September 2017 Publication expected 2020-2021 3. LNER (Southern Area) PB: 29 May 2012 Published. HB: 6 Nov 2012 Published. 4. Southern Railway PB & HB: 23 April 2009 Published 5. LNWR (includes NSR, Sources include NSR (1998), No work started yet. MCR, FR and L&Y) LNWR (240-599), L&Y (1999). 6. Scotland PB: 31 Oct 2012 Published. HB: 7 Nov 2012 Published. 7. North Eastern Region Work in hand (includes H&B) 8. London Transport PB: 12 Jul 2019 Published. HB: 26 Jul 2019 Published. 9. Ireland PB & HB: 3 August 2015 Published CD-ROM CD: 1 January 2008 Includes Volume 1 CDROM updates #1: 2 February 2008 Corr. Sht 1 & updated vol. 1 GW. #2: 16 September 2008 Corr. Sht 2 & updated vol. 1 GW. #3: 23 April 2009 Plus Volume 4 Southern Railway #4: 24 May 2011 Plus corr. sheet 3 & the GW register (revised edition) #5: 21 June 2012 As above plus correction sheet 4 and volume 3 LNER (Southern) #6: 15 Nov 2012 (DVD-ROM) As above plus correction sheet 5 and volume 6 Scotland #7: 25 Jul 2013 (DVD-ROM) As above plus correction sheet 6 #8: 31 May 2014 (DVD-ROM) As above plus correction sheet 7 #9: 3 Aug 2015 (DVD-ROM) As above plus correction sheet 8 #9: 3 Aug 2015 (CD-ROM) Volume 9 Ireland & Isle of Man #10: 21 Nov 2015 (DVD-ROM) As above plus correction sheet 9 #11: 10 Jul 2019 (DVD-ROM) As above plus correction sheet 10 Volume 8 London Transport Correction sheets 1: 16 January 2008 Amended vol.
    [Show full text]
  • Route Plan 5 – West Anglia
    This Route Plan is part of a set. 2009 Plans Route Route Plans 2009 To view or download the others Route 5 visit www.networkrail.co.uk West Anglia Note Other documents in the Delivery Plan This Route Plan forms part of the Control Period 4 5 Route (CP4) Delivery Plan and supersedes the version can be found on the Network Rail website published in April 2008. www.networkrail.co.uk West Key to route diagrams Anglia 03 KEY Junction Station name Station Station 01 STATION Station name name name name 02 Junction KEY STATION Junction name A A name 1 B 04 KEY STATION KEY STATION Capacity and operational constraints Track descriptions A Location: capacity or operational constraint The colour of the line denotes the route classification Issues on the route 1 Primary Location: issue on the route London and South East commuter Secondary Key planned projects A Rural Location: planned project on the route Freight only Strategic route sections 01 The line shading indicates strategic route sections Listed in the appendix of the route plan which are numbered on the map The width of the line denotes the number of tracks Other symbols Multiple track Key station location Double track KEY STATION Key station on this route Single track KEY STATION Key station on another route Connecting local Other station location Other lines are shown as follows: Station name Other station on this route Line on other route Junction name Junction / other landmark Non Network Rail infrastructure Non operational line communities GRIP stages 1 Output definition 2 Pre-feasibility 3 Option selection 4 Single option selection 5 Detailed design 6 Construction, test and commission 7 Scheme hand back 8 Project close out Cover printed on box board which is both FSC and TCF.
    [Show full text]
  • South East Strategic Leaders and South East England Councils
    South East Strategic Leaders and South East England Councils (Examination in Public IDs 2448 and 3133) London Plan Examination in Public – Matter M76 Transport schemes and development M76 - (a) Are all of the transport schemes set out in Table 10.1 necessary and adequate to deliver the development proposed in the Plan? (b) In the context of the identified funding gap of £3.1 billion per year, is there a reasonable prospect that the transport schemes set out in Table 10.1, and any other essential strategic transport schemes, will be delivered in a timely fashion in relation to the timing of development proposed in the Plan? SESL/SEEC comments 1. We focus our response on M76 part (a), given the importance of infrastructure to underpin sustainable development in both London and the wider South East, the need to tackle existing infrastructure deficits, and the vital interdependencies as explained in our papers on other matters such as M16 re the wider South East and beyond. 2. SESL/SEEC welcome the inclusion, in Table 10.1 and Figure 2.15, of schemes that are in, and should offer better transport for, parts of the wider South East as well as bringing benefits to communities in London. The principle of schemes outside London offering benefits for the wider South East’s local economies is important, to avoid simply opening up corridors that encourage further commuting into the capital. In Table 10.1 these include: Brighton Mainline Upgrade (higher frequencies) Crossrail 2 (including West Anglia Main Line 4-tracking) Heathrow Airport Southern Access Heathrow Airport Western Access National Rail freight upgrades, especially to enable freight to bypass London Thameslink Programme.
    [Show full text]
  • Stratford Additional Platforms Summary of Route Study And
    Stratford Additional Platforms Summary of Route Study and Capacity Analysis undertaken Introduction The purpose of this paper is to summarise the findings of the analysis undertaken for both the Stratford additional platform scheme and the Anglia Route Study. The requirements for additional platform capacity at Stratford cannot be examined in isolation and therefore need to be considered alongside the train service output and wider capacity constraints. Demand Analysis (source Anglia Route Study) See diagrams with build‐up of demand in Appendix A. It should be noted that the primary demand driver on West Anglia services is London, with very little build up to Stratford. The services to Stratford are currently 4‐car and the proposal for additional platforms is being developed based on 12‐car platform specifications. The analysis of the build‐up shows that with an average load factor to total capacity of 85%, there will be a reasonable level of crowding over all peak hour services. Capacity is needed in peak hours for a further 1,000 passengers by 2023 and 2,100 passengers by 2043 on the Cambridge and Stansted Airport services. On suburban services capacity a further 1,700 passengers by 2023 and 4,200 passengers by 2043 will be required. West Anglia passenger Growth 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 WA Cambridge WA Stansted WA Suburban 2043 - Peak Arrivals 3,439 2,707 14,158 2023 - Peak Arrivals 2,919 2,298 12,019 2013 - Peak Arrivals 2,474 1,948 10,186 Total Capacity - end CP5 2,534 2,600 12,458 2023 capacity gap 900 104 1,682 2043 capacity gap 1,511 585 4,199 As noted in the Anglia Route Study, the demand projections on this corridor are not as high as some of the other corridors.
    [Show full text]
  • England's Economic Heartland Rail Study Phase 1 15 MB
    Passenger Rail Study Phase One: Baseline Assessment of the current network A technical report produced by Network Rail for the EEH evidence base Table of Figures ....................................................................................................................................................... 3 Glossary ................................................................................................................................................................... 4 Executive Summary ................................................................................................................................................. 5 An Area of National Importance ......................................................................................................................... 5 Understand the Railway’s Role ........................................................................................................................... 5 Introduction ............................................................................................................................................................ 9 Aim of Phase 1 of the Passenger Rail Study ........................................................................................................ 9 What is the purpose of baselining the existing passenger network? ............................................................... 10 Methodology ....................................................................................................................................................
    [Show full text]
  • Item 6 High Level Output Specficiation Update
    AGENDA ITEM 6 TRANSPORT FOR LONDON RAIL AND UNDERGROUND PANEL SUBJECT: HIGH LEVEL OUTPUT SPECIFICATION ISSUES DATE: 11 NOVEMBER 2010 1 PURPOSE 1.1 The purpose of the paper is to update the Rail and Underground Panel on the current status of the High Level Output Specifications for 2009-2014 and 2014- 2019 as they impact on TfL, as requested at the previous meeting. 1.2 The Panel is asked to note the paper. 2 HIGH LEVEL OUTPUT SPECIFICATION 1 (2009-2014) 2.1 The 2007 white paper “Delivering a sustainable railway” set the strategic direction for the rail industry and included the High Level Output Specification programme for 2009 through to 2014 (HLOS1, also known as Control Period 4). As originally specified by government, this would provide significant extra capacity to London’s rail network. The total national spend for Control Period 4, excluding Crossrail, is £28bn, of which £20.3bn is operating and renewals expenditure, and £7.7bn is enhancement funding. Train Capacity Enhancements 2.2 The enhancement funding includes the Thameslink programme, which is of great strategic importance to London. It brings major connectivity, journey time, rolling stock, station and interchange benefits, but above all it brings much extra capacity. It has two main stages: Key Output 1 has 16 trains per hour (tph) through the central core section, and Key Output 2 has 24 tph. 2.3 The enhancement funding also includes the provision of 1300 net additional vehicles (carriages) to be delivered across England and Wales. London’s share of the 1,300 vehicles is 845, or 65 per cent.
    [Show full text]