Night/Weekend Work

Total Page:16

File Type:pdf, Size:1020Kb

Night/Weekend Work NOTICE Construction, Installation and Maintenance January 6 to January 12, 2018 Please note, information reported below is subject to change without notice. If you are a member of the media, please call 650.508.7927 to confirm any information below. For all other inquiries, please call the Construction Outreach Hotline at 650.508.7726. San Carlos Transit Center Project 25th Avenue Grade Separation Project Peninsula Corridor Electrification Project Maintenance CONSTRUCTION 25th Avenue Grade Separation Project Night/Weekend Work Borel Creek On Saturday, January 6 and Sunday, January 7, during the day crews will be installing cast-in-drilled-hole piles within the Caltrain right-of-way. Crews will continue to install the piles at night on Monday, January 8 to Friday, January 12. The installation is done by drilling a borehole into the ground, which is then reinforced. Crews will then pour concrete into the borehole to form the pile 31st Avenue The temporary shoring at this location is now complete. On Saturday, January 6 and Sunday, January 7, during the day crews will be preparing to install the cast-in-drilled-hole piles within the Caltrain right-of-way. Then at night on Monday, January 8 to Friday, January 12, crews will be installing the piles. The installation is done by drilling a borehole into the ground, which is then reinforced. Crews will then pour concrete into the borehole to form the pile When possible, work will be conducted during the day. However, due to the proximity of some activities relative to the railroad tracks, night work may be required throughout the project. In an effort to start construction earlier in the evening, Caltrain will be single tracking its trains on evenings when night work is scheduled. Please note the construction schedule is subject to change. Neighbors will hear additional noises from heavy machinery and equipment backup alarms. Caltrain will implement noise mitigation measures for residents directly adjacent to the project site. We apologize for any inconvenience these activities may occur. Weekday Work From Monday, January 8 to Friday, January 12 crews will: Install cast-in-drilled-hole piles within the Caltrain right-of-way at Borel Creek and 31st Avenue Remove wells near Hayward Park Station Continue to work on the temporary parking lots at 31st Avenue and at Pacific Blvd. and Delaware Pothole near 25th Avenue to determine the location of underground utilities On Monday, January 8 to Thursday, January 11 crews will be excavating at the Pedestrian Underpass and at 28th Avenue. Then on Thursday, January 11 and Friday, January 12, crews will be working on the abutments at the Pedestrian Underpass and conduct pile testing at 28th Avenue. For riders, single tracking will occur on Tuesday, January 2 to Friday, January 5, starting at 8:00 p.m. until the evening's last train to allow for the night construction activities. Please note that on Tuesday, January 2, the parking lot on the northwestern end of the Hillsdale Station was permanently closed to construct the elevated trackway and 31st Avenue bridge for the grade separation project. Parking is now available in the new temporary lot opened on the east side of the station which is accessible from E. 28th and E. 31st Avenues at South Delaware Street. To view a map of the temporary parking area, click here. Customers can use the temporary walkway from the parking lot to access the Caltrain platform. Background Caltrain, in cooperation with the City of San Mateo, will raise the tracks and slightly lower the road (grade separate) at E. 25th Avenue in San Mateo. This will improve safety for both motorists and pedestrians, and it will reduce local traffic congestion in San Mateo. In addition, the project will create new east-west street connections at 28th and 31st Avenues; and as part of the project improvements, Caltrain will build a new elevated Hillsdale Station with updated amenities at E. 28th Avenue. Construction is expected to be complete in early 2020. In order to maintain regular train service, some activities will be conducted during nights and weekends, outside of normal train service hours. Neighbors may experience construction noise and light during these times. We apologize for any inconvenience this may cause. For more information on the 25th Avenue Grade Separation Project, please visit www.caltrain.com/25thgs. For questions about the project, please call the Caltrain Construction Hotline at 650.508.7726 or email [email protected]. Los Gatos Creek Bridge Replacement Project Weekly Update Night/Weekend Work There is no night work scheduled next week for the Los Gatos Creek Bridge Project. Weekday Work Monday, January 8 to Friday, January 12, crews will continue storm drain work during the day. Background Caltrain, in cooperation with the City of San Jose, is preparing to replace the railroad bridge crossing at Los Gatos Creek in San Jose. The current bridge was built in 1935, and in order to maintain safe rail operations and meet current seismic safety standards, the bridge must be replaced. The project will also include installation of a tail track south of the San Jose Diridon station. The tail track will provide improved operations at the station and minimize system-wide delays. Construction is expected to be complete in early 2018. In order to maintain regular train service, some activities will be conducted during nights and weekends, outside of normal train service hours. Neighbors may experience construction noise and light during these times. We apologize for any inconvenience this may cause. For more information on the Los Gatos Creek Bridge Replacement Project, please visit www.caltrain.com/losgatos. For questions about the project, please call the Caltrain Construction Hotline at 650.508.7726 or email [email protected]. Peninsula Corridor Electrification Project The Peninsula Corridor Electrification Project (PCEP) is a key component of the Caltrain Modernization program. The PCEP would electrify the Caltrain Corridor from San Francisco’s 4th and King Caltrain Station to approximately the Tamien Caltrain Station. The primary purpose of the Project is to improve Caltrain system performance, reduce long-term environmental impact by reducing noise, improving regional air quality and reducing greenhouse gas emissions. An electrified Caltrain system would better address Peninsula commuters’ vision of increased service and improved travel times in an environmentally friendly and reliable way. This also is expected to help accommodate increase system ridership through improved system operations. San Francisco No work anticipated. Brisbane No work anticipated. South San Francisco No work anticipated. Parking spaces #46 to 74 at the South San Francisco Station will be blocked off to accommodate staging of material and equipment for the construction of the Peninsula Corridor Electrification Project. No Parking signage will be placed in the designated area that will be closed off to traffic. San Bruno No work anticipated. Millbrae January 6 through January 12, Caltrain will be doing work during the day and night to locate underground utilities, relocate signal cables and to install OCS foundations. Foundation work activities will include excavation, drilling, placement of foundations and pouring of concrete. Day work hours for January 6 and 7 will be from 7 a.m. through 7 p.m. and day work hours for January 8 through January 12 will be from 8 a.m. to 5 p.m. Night work hours will be from 7:45 p.m. to 5:30 a.m. We apologize for any inconvenience this may cause and the field team will work as quietly as possible. During work hours at the Millbrae station all passengers will board and de- board from the same platforms. Please look for the signs to indicate which platform to use. If you have any questions, feel free to call the project hotline at 650-399-9659 or toll-free at 855-463-4373. Burlingame January 6 through January 12, Caltrain will be doing work during the day and night to locate underground utilities, relocate signal cables and to install OCS foundations. Foundation work activities will include excavation, drilling, placement of foundations and pouring of concrete. Day work hours for January 6 and 7 will be from 7 a.m. through 7 p.m. and day work hours for January 8 through January 12 will be from 8 a.m. to 5 p.m. Night work hours will be from 7:45 p.m. to 5:30 a.m. We apologize for any inconvenience this may cause and the field team will work as quietly as possible. During work hours at the Burlingame station all passengers will board and de-board from the same platforms. Please look for the signs to indicate which platform to use. If you have any questions, feel free to call the project hotline at 650-399-9659 or toll-free at 855-463-4373. San Mateo No work anticipated. Belmont No work anticipated. San Carlos No work anticipated. Redwood City No work anticipated. Unincorporated San Mateo County No work anticipated. Atherton No work anticipated. Menlo Park No work anticipated. Palo Alto No work anticipated. Mountain View No work anticipated. Sunnyvale Not work anticipated. Santa Clara No work anticipated. San Jose January 8 through January 12, Caltrain will be doing work during the day to perform a concrete demolition at the Caltrain Central Equipment and Maintenance Facility for potholing. Work hours will be from 7 a.m. to 5 p.m. We apologize for any inconvenience this may cause. For more information, please call the dedicated outreach line at 650.508.6499; visit the website at www.caltrain.com/PCEP or email [email protected]. MAINTENANCE Caltrain will perform routine maintenance at several locations next week. To avoid disruptions to service, the work will mainly take place Saturday through Friday from 8 p.m.
Recommended publications
  • May 7, 2019 Media Contact: Dan Lieberman, 650-508-6385 Samtrans and Caltrain Encourage Cycling on Bike to Work Day This Thursday
    NEWS May 7, 2019 Media Contact: Dan Lieberman, 650-508-6385 SamTrans and Caltrain Encourage Cycling on Bike to Work Day This Thursday, May 9, Bay Area bicyclists will participate by the thousands in the 25th Annual Bike to Work Day, an annual event that encourages commuters to choose bicycles over cars for their daily commute. SamTrans buses can carry two bikes on racks at the front of each bus, and two additional bikes are allowed inside the bus, depending on passenger loads. Some things to know: only single-rider, two-wheel bicycles are permitted. There is no age limit for riders using the bike racks or bringing bikes on board the bus. However, riders must be able to load and unload their bikes without help from the operator. On Caltrain, every train is equipped with at least two bike cars. Due to the popularity of the onboard bike program, capacity for bicyclists can be a challenge. Cyclists are encouraged to choose local trains with lighter ridership to ensure they are able to board if they want to test out biking to work for the first time. Some express and limited stop trains are already operating at or near capacity for onboard bikes. Each weekday approximately 6,000 bicyclists take a bike on the train, more than any other rail service in the country. While biking and taking public transit can work well together for first- and last-mile connections, as well as getting people out of their cars and off freeways, onboard capacity may be at its limit on Bike to Work Day.
    [Show full text]
  • Caltrain TIRCP Application Jan
    PENINSULA CORRIDOR JOINT POWERS AUTHORITY APPLICATION FOR 2018 TRANSIT AND INTERCITY RAIL CAPITAL PROGRAM FUNDS PROJECT NARRATIVE A. Project Title Page Project Title: Peninsula Corridor Electrification Expansion Project The Peninsula Corridor Electrification Expansion Project (EEP) includes a series of incremental investments in the 51-mile Caltrain Corridor between the 4th and King Station (San Francisco) and the Tamien Station (San Jose). These investments are focused on expanding and fully converting Caltrain’s mainline diesel fleet to electric trains. This investment builds on and leverages the existing Peninsula Corridor Electrification Project (PCEP) and supports the goals of the Transit and Intercity Rail Capital Program (TIRCP), providing increased capacity and service flexibility, supporting state and interregional connectivity, and reducing greenhouse gas emissions through elimination of diesel service from the mainline Peninsula Corridor. In addition to providing immediate, direct benefits, the EEP also represents an incremental step within a larger program of development that will evolve the Peninsula Corridor in a way that supports the ridership, service levels, and connectivity goals contemplated in the draft 2018 State Rail Plan. The central component of Caltrain’s 2018 TIRCP application is the purchase of 96 additional Electric Multiple Units (EMU). This procurement will fully exercise all available options under Caltrain’s current contract with Stadler and will provide sufficient EMUs to fully electrify Caltrain’s mainline fleet, while also sustaining and expanding capacity to accommodate growing demand. In addition to requesting funds for the purchase of EMUs, Caltrain is also requesting a smaller amount funding for a series of associated projects that will equip the corridor to receive and operate a fully electrified fleet in a way that allows the railroad to reap the maximum benefit from its investments.
    [Show full text]
  • TA Board Agenda
    BOARD OF DIRECTORS 2020 EMILY BEACH, CHAIR RICO E. MEDINA, VICE CHAIR CAROLE GROOM DON HORSLEY JULIA MATES KARYL MATSUMOTO CARLOS ROMERO JIM HARTNETT EXECUTIVE DIRECTOR AGENDA BOARD OF DIRECTORS MEETING SAN MATEO COUNTY TRANSPORTATION AUTHORITY Due to COVID-19, this meeting will be conducted via teleconference only (no physical location) pursuant to the Governor’s Executive Orders N-25-20 and N-29-20. Directors, staff and the public may participate remotely via Zoom at https://samtrans.zoom.us/j/97489736685?pwd=UkN4T0gwU0IwbHFjZkNCTm1Dd0VaZz09 or by entering Webinar ID: 974 8973 6685, Passcode: 019469 in the Zoom app for audio/visual capability or by calling 1-669-900-9128 (enter webinar ID and press # when prompted for participant ID) for audio only. The video live stream will be available during or after the meeting at http://www.smcta.com/about/boardofdirectors/video.html. Public Comments: Members of the public are encouraged to participate remotely. Public comments may be submitted to [email protected] prior to the meeting’s call to order so that they can be sent to the Board as soon as possible, while those received after an agenda item is heard will be included into the Board’s weekly correspondence and posted online at: http://www.smcta.com/about/boardofdirectors/boardofdirectorscalendar.html Oral public comments will also be accepted during the meeting through Zoom* or the teleconference number listed above. Public comments on individual agenda items are limited to one per person PER AGENDA ITEM. Use the Raise Hand feature to request to speak. For participants calling in, dial *67 if you do not want your telephone number to appear on the live broadcast.
    [Show full text]
  • Caltrain Rapid Rail Study Implementation Plan
    Caltrain Rapid Rail Study Implementation Plan Summary In late 1997 the JPB began work on the Caltrain Rapid Rail Study. The study's purpose was to develop a strategic plan for Caltrain capital improvements between 2000 and 2010. The Rapid Rail Study evaluated the railroad's existing facilities and major expansion projects proposed over the years. The objective was to consider all the potential capital improvements in a single plan. Following this analysis, the Rapid Rail Study prioritized specific improvement programs using goals and objectives from Caltrain's Strategic Plan. The Draft Rapid Rail Study was released to the public on October 1, 1998. Between October 1998 and February 1999 the JPB received over 200 written comments and many oral comments at meetings held to discuss the study and at regular JPB meetings. These comments were used to revise the draft study's recommendations. The revised recommendations were adopted by the JPB at the __ 1999 meeting and are summarized in this document. This Implementation Plan will serve as the final study report. The draft study, Chapter 16 on the Caltrain Downtown San Francisco Extension Project status, and the response to comments document will serve as appendices to the report. 1. Implementation Process The purpose ofthe Caltrain Rapid Rail Study was to set forth a long-term strategic plan for Caltrain physical investments. The distinction between a strategic plan, such as the Rapid Rail Study, and a programming document, such as the annual capital improvement program, is critical to fully understand the implementation process. The Rapid Rail Study was designed to identify an overall direction for capital improvements based on Caltrain's Strategic Plan (which considered all aspects ofCaltrain service).
    [Show full text]
  • Track the Fun Is Your Guide to Attractions and Events Served by VTA Light Rail to Santa Clara Station Visit Us at the Samtrans Booth Caltrain
    Who We Be thru August 29 Concerts / Theaters An Oasis in Glass Fox Theatre thru August 8 Redwood City station museum.stanford.edu 2215 Broadway Contemporary Jewish Oaklahoma! June 3 – 19 Track Museum San Francisco station foxrwc.com Muni Route 30 or 45 Mountain View Center for 736 Mission St. Performing Arts Bill Graham and the Rock & Roll Mountain View station Revolution the Fun 500 Castro St. Spring 2016 Friday’s thru June 3 Cyrano thejcm.org April 6 – May 1 Yerba Buena Center for Seussical Community Events & Fun Destinations the Arts May 14 – 22 San Francisco station mvcpa.com Muni Routes 30 or 45 SJ Center for the 701 Mission St. Performing Arts Samara Golden San Jose Diridon station thru May 29 VTA light rail to Convention Center Take This Hammer 255 Almaden Blvd. thru August 14 Disney’s Beauty of the Beast ybca.org April 1 – 3 Fort Mason “The Godfather” Live in Concert San Francisco station April 8 – 10 Muni Route 30 to Marina Blvd. & “Titanic” Live in Concert Laguna St. May 20 – 22 When We Were Small sanjosetheaters.org thru April 10 SAP Center at San Jose Fort Mason Historic District San Jose Diridon station Walking Tour Stars on Ice thru December Sun, April 8, 4:00 pm fortmason.org Selena Gomes Children’s Discovery Wed, May 11, 7:30 pm Museum of San Jose Bellator MMA San Jose Diridon station Sat, May 14, 3:30 pm VTA light rail to San Antonio sapcenteratsanjose.com 180 Woz Way California Theater Biosite Open House San Jose Diridon station April 14 – 16 VTA light rail to Convention Ctr.
    [Show full text]
  • AGENDA* Amended 12/18/19, Approx
    BOARD OF DIRECTORS 2019 GILLIAN GILLETT, CHAIR DAVE PINE, VICE CHAIR CHERYL BRINKMAN JEANNIE BRUINS CINDY CHAVEZ RON COLLINS DEVORA “DEV” DAVIS CHARLES STONE SHAMANN WALTON JIM HARTNETT EXECUTIVE DIRECTOR AGENDA* Amended 12/18/19, approx. 2:30 pm PENINSULA CORRIDOR JOINT POWERS BOARD Work Program – Legislative – Planning (WPLP) /Committee Meeting San Mateo County Transit District Administrative Building Bacciocco Auditorium, 2nd Floor 1250 San Carlos Avenue, San Carlos CA 94070 TELECONFERENCE LOCATION: 70 West Hedding Street, 10th Floor, Office of Supervisor Cindy Chavez, San Jose, CA 95110 December 19, 2019 – Thursday 9:00 am 1. Call to Order/Pledge of Allegiance 2. Roll Call 3. Public Comment on Items not on the Agenda Comments by each individual speaker shall be limited to three (3) minutes. Items raised that require a response will be deferred for staff reply. 4. Approve Meeting Minutes of November 26, 2019 MOTION 5. Adoption of the 2019 Title VI Program (materials added) MOTION 6. Draft Caltrain Rail Corridor Use Policy (amended) INFORMATIONAL 7. Draft Transit Oriented Development Policy (materials added) INFORMATIONAL 8. Adoption of 2020 Legislative Program MOTION 9. Committee Member Requests 10. Date/Time of Next Regular WPLP Committee Meeting: January 22, 2020 at 3:00 pm 9:00 am, San Mateo County Transit District Administrative Building, 2nd Floor, 1250 San Carlos Avenue, San Carlos, CA 94070 11. Adjourn Committee Members: Charles Stone (Chair), Cheryl Brinkman, Cindy Chavez Page 1 of 2 Work Program-Legislative-Planning (WPLP) Committee December 19, 2019 INFORMATION FOR THE PUBLIC All items appearing on the agenda are subject to action by the Board.
    [Show full text]
  • San Bruno / South San Francisco Community-Based Transportation Plan January 2012
    San Bruno / South San Francisco Community-Based Transportation Plan January 2012 APPENDICES Table of Contents Appendix A: Existing Conditions Report Appendix B: Community Outreach Appendix C: Potential Funding Sources Appendix D: Stakeholder Committee South San Francisco/San Bruno Community-Based Transportation Plan DRAFT Existing Conditions Report PREPARED BY San Mateo County Transit District 1250 San Carlos Avenue San Carlos, CA 94070 January 2011 Report prepared by: San Mateo County Transit District for C/CAG Corinne Goodrich – Strategic Development Manager Emily Betts – Project Manager Kimberly O’Neill – Intern, Strategic Development Maps prepared by: Wilbur Smith Associates For questions and comments please contact: Emily Betts (650) 508-6327 [email protected] 2 Table of Contents Chapter 1 - Profile of the Project Area ......................................................................... 7 1.1 Population Growth ........................................................................................... 11 1.2 Age ................................................................................................................. 11 1.3 Race ............................................................................................................... 12 1.4 Linguistic Isolation ............................................................................................ 13 1.5 Incidence of Below Poverty Households .............................................................. 14 1.6 Income Levels .................................................................................................
    [Show full text]
  • California High-Speed Rail San Francisco to San Jose Project Section Draft EIR/EIS Appendix
    Appendix 9-A APPENDIX 9-A: PUBLIC AND AGENCY MEETING LIST California High-Speed Rail Authority July 2020 San Francisco to San Jose Project Section Draft EIR/EIS Appendix 9-A Appendix A: Public and Agency Meetings List Date Organization/Individual Topic 4/5/2016 Bay Area Council Transportation Pre-scoping briefing covering awareness of the Project Committee Meeting Section and scoping notification 4/5/2016 City Age Summit Pre-scoping briefing covering awareness of the Project Section and scoping notification 4/5/2016 City of Mountain View Pre-scoping briefing covering awareness of the Project Section and scoping notification 4/8/2016 #iwillride students Transbay Transit Center walking tour 4/12/2016 Bay Area Chapter of Disabled Pre-scoping briefing covering awareness of the Project Veteran Business Alliance Section and scoping notification 4/12/2016 City of San Mateo Partnership on grade separation project 4/12/2016 San Jose CWG CWG roles, membership, and responsibilities; presentation on 2016 Business Plan; updates on HSR statewide and San Francisco to San Jose and San Jose to Merced Project Section; Q&A 4/13/2016 NorCal Legislative briefing San Francisco to San Jose and San Jose to Merced Project Sections and San Francisco to San Jose section scoping notification 4/14/2016 Diridon Station meeting Project alignment and interface with Diridon Station 4/26/2016 Mountain View City Council Project update, milestones 4/29/2016 Caltrain Blended Infrastructure Station planning, LMF planning, passing track Working Group 5/3/2016 VTA Meet the
    [Show full text]
  • Land Use Information
    Appendix H Land Use Information 1 Appendix H 2 Land Use Plan Summary and Consistency Review 3 This appendix summarizes relevant local land use plans and provides a general consistency review 4 of the Proposed Project with applicable plans. However, as noted in Chapter 2, Project Description, 5 pursuant to SamTrans’ enabling legislation (Public Utilities Code Section 103200 et seq.) and the 6 1991 Interstate Commerce Commission’s approval of the Peninsula Corridor Joint Powers Board 7 (JPB) acquisition of the Caltrain line, JPB activities within the Caltrain right-of-way (ROW) are 8 exempt from local building and zoning codes and other land use ordinances. Nonetheless, the JPB 9 will cooperate with local government agencies in performing improvements within its ROW and will 10 comply with applicable local regulations affecting any of its activities within other jurisdictions. 11 This appendix also provides a profile of local parks within 0.25 miles of the Caltrain ROW. 12 H.1 Summary of Local Land Use Plans 13 H.1.1 General Plans 14 A general plan is a legal document required of each local agency by California Government Code 15 Section 65301 and adopted by the jurisdiction’s city council or board of supervisors. Local general 16 plans lay out the pattern of future residential, commercial, industrial, agricultural, open space, and 17 recreational land uses within a community. To facilitate implementation of planned growth patterns, 18 general plans typically also include goals and/or policies addressing the coordination of land use 19 patterns with the development and maintenance of infrastructure facilities and utilities.
    [Show full text]
  • BART Destinations Guide
    BART Destinations Guide Fun Places to Go on BART DECEMBER 2014 FREE BART... and you’re there. Traveling by BART is a fast, fun, and convenient way to explore the Bay Area. Table of Contents RIDING BART 3–4 The destinations in this guide BART BART Hours BART Fares are color-coded and arranged System Map of Service and Tickets by region. All of the listings can be reached directly by SAN FRANCISCO 5–11 BART, or by taking BART and 16th St Mission Civic Center/ Glen Park 24th St Mission UN Plaza Montgomery St an easy connection to other Embarcadero Balboa Park Powell St local transit services. Take BART ... and you’re there. OaKLAND AND BERKELEY 12–14 12th St/Oakland Downtown North Berkeley 19th St/Oakland Berkeley Oakland Int’l Airport (OAK) Ashby Fruitvale Lake Merritt Rockridge Coliseum MacArthur West Oakland OtHER ALAMEda COUNTY CITIES 15 –16 Bay Fair Fremont Union City Castro Valley Hayward West Dublin/ Dublin/ San Leandro Pleasanton Pleasanton South Hayward CONTRA COSta COUNTY CITIES 17–18 Concord North Concord/ Pleasant Hill/ El Cerrito del Norte Martinez Contra Costa Centre El Cerrito Plaza Orinda Richmond Lafayette Pittsburg/Bay Point Walnut Creek SOUTH BAY CITIES 19 –22 Colma San Bruno South Daly City San Francisco San Francisco Millbrae Int’l Airport (SFO) 1 2 BART Hours of Service BART Fares and Tickets Weekdays (Monday–Friday) 4 am–Midnight Purchase BART tickets at ticket vending machines Saturdays 6 am–Midnight in stations. Ticket vending machines accept U.S. Sundays and Holidays 8 am–Midnight currency and debit/credit cards.
    [Show full text]
  • Suicides on Commuter Rail in California
    MTI Suicides on Commuter Rail in California: Patterns- Possible A Case Study Suicides on Commuter Rail in Funded by U.S. Department of California: Possible Patterns- Transportation and California Department of Transportation A Case Study MTI ReportMTI 10-05 MTI Report 10-05 October 2010 MINETA TRANSPORTATION INSTITUTE MTI FOUNDER Hon. Norman Y. Mineta The Norman Y. Mineta International Institute for Surface Transportation Policy Studies (MTI) was established by Congress as part MTI BOARD OF TRUSTEES of the Intermodal Surface Transportation Efficiency Act of 1991. Reauthorized in 1998, MTI was selected by the U.S. Department of Transportation through a competitive process in 2002 as a national “Center of Excellence.” The Institute is funded by Con- Honorary Co-Chair Rebecca Brewster Steve Heminger Stephanie Pinson gress through the United States Department of Transportation’s Research and Innovative Technology Administration, the Califor- Hon. James Oberstar ** President/COO Executive Director President/COO nia Legislature through the Department of Transportation (Caltrans), and by private grants and donations. Chair American Transportation Metropolitan Transportation Gilbert Tweed Associates, Inc. House Transportation and Research Institute Commission New York, NY Smyrna, GA Oakland, CA Infrastructure Committee The Institute receives oversight from an internationally respected Board of Trustees whose members represent all major surface Hans Rat House of Representatives Donald H. Camph Hon. John Horsley # Secretary General transportation modes. MTI’s focus on policy and management resulted from a Board assessment of the industry’s unmet needs Washington, DC President Executive Director Union Internationale des and led directly to the choice of the San José State University College of Business as the Institute’s home.
    [Show full text]
  • Phleger Estate
    PHLEGER ESTATE PHLEGER ESTATE n 1935, Herman and Mary Elena Phleger purchased their Mountain Meadow property that has come to be known as the Phleger Estate. In 1984, Herman died. IHe and Mary Elena had been life-long boosters of conservation and environmen- tal causes. In that spirit, Mary Elena offered the Peninsula Open Space Trust (POST) the opportunity to preserve the property. Within four years, POST managed to raise the necessary funding to make the purchase possible. On April 29, 1995, the Phleger Estate was dedicated as a part of the GGNRA. The 1,084 acre parcel1 is located west of Cañada Road and north of San Mateo Coun- ty’s Huddart Park in the southern hill country of the Peninsula, once a portion of Ran- cho Cañada de Raymundo in the heart of a robust logging industry during the nine- teenth century. Its western boundary is a forested ridge plainly visible from United States Interstate 280 to the east. This ridge and slope is the eastern portion of Kings Mountain of the Sierra Morena or Santa Cruz Range of Mountains (also referred to as the Skyline) and at 2,315 feet is the second highest point in San Mateo County.2 Three major drainages run from the Mountain into West Union Creek. The Phleger Estate includes redwoods, mixed evergreens and tan oak woodlands. The redwoods are mostly in stream corridors of canyons of the Skyline and also along West Union Creek. These trees include mostly second-growth redwoods, however, the lumberjacks did not take every one of the original sequoias, because a few old growth trees, obviously the more inaccessible ones, live in the upper portions of the property.
    [Show full text]