The Black Country Enterprise Zone
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
79 Wolverhampton
79 Wolverhampton - West Bromwich via Wednesbury Mondays to Fridays Operator: NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB Wolverhampton Bus Station (Stand R) 0415 0445 0505 0525 0540 0555 0610 0622 0634 0644 0654 0703 0712 0720 0729 0738 0748 0757 Bilston, War Memorial (Stop BB) 0427 0457 0517 0537 0552 0607 0622 0634 0646 0656 0706 0717 0726 0734 0744 0754 0804 0814 Darlaston, Darlaston Asda (near) 0436 0506 0526 0546 0601 0616 0631 0644 0656 0707 0718 0729 0739 0749 0759 0809 0819 0829 Wednesbury Bus Station (Stand A) 0445 0515 0535 0555 0610 0625 0640 0654 0707 0718 0729 0740 0751 0801 0811 0822 0832 0842 Guns Village, Chapel Street (opp) 0452 0522 0542 0602 0617 0632 0647 0702 0716 0727 0738 0750 0801 0812 0822 0833 0843 0853 West Bromwich Bus Station (Stand S) 0457 0527 0547 0607 0622 0637 0652 0707 0722 0734 0745 0757 0809 0820 0830 0841 0851 0901 Mondays to Fridays Operator: NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB NXB Wolverhampton Bus Station (Stand R) 0807 0818 0829 0840 0851 0902 0913 0923 0933 0943 0953 1003 1013 1023 1033 1043 1053 1103 Bilston, War Memorial (Stop BB) 0825 0836 0847 0858 0909 0918 0928 0938 0946 0956 1006 1016 1026 1036 1046 1056 1106 1116 Darlaston, Darlaston Asda (near) 0840 0851 0902 0912 0922 0932 0942 0952 0958 1008 1018 1028 1038 1048 1058 1108 1118 1128 Wednesbury Bus Station (Stand A) 0853 0904 0914 0924 0934 0942 0954 1004 1008 1018 1028 1038 1048 1058 1108 1118 1128 1138 Guns Village, Chapel Street (opp) 0904 0914 0924 0934 0944 0951 1004 1014 -
Catalogue.Pdf
Barnett Ross WEDNESDAY 25TH OCTOBER 2017 At The Radisson Blu Portman Hotel 22 Portman Square London W1H 7BG Commencing at 12.00 p.m. AUCTION 25 TH OCTOBER 2017 Auctioneers J. Barnett FRICS J. L. G. Ross MRICS Tel: 020 8492 9449 Fax: 020 8492 7373 Notice to all Bidders 1. Please note the General Conditions of Sale which are included with this catalogue and the Special Conditions of Sale which are available on request. An Addendum will be made available on the Auction Day and the bidder should check whether the lot which he/she is interested in bidding for is included. 2. Prospective purchasers are assumed to have inspected the properties in which they are interested and to have made all usual pre-contract searches and enquiries. 3. The successful Bidder is Bound under Contract as soon as the Auctioneer’s gavel falls on his/her final bid. Immediately thereafter the successful Bidder will be handed a Form to fill out supplying details of his/her name and address together with (if different) the name and address of the purchaser and those of his/her solicitors. He/she must also supply a cheque for the deposit, which we will hold at our office. The bidder will be given our bank account details and must arrange to transfer the deposit monies to our client bank account the following day by way of a ‘same day CHAPS payment.’ Once these funds are received we will return the bidder’s cheque by post. 4. The information from the Form will be used to complete a memorandum of contract similar to the one at the back of this catalogue which the purchaser must sign and hand to the Auctioneer’s staff prior to leaving the room. -
Contacts: T Becoming More Active
KEY National Cycle Route Existing cycle routes and safer routes to school On road cycle facilities rrss and bus lanes AA SSttaa Canal towpath Cycle stands Pedestrian area Walsall Walk On Health Walks Local Programme Town Centre Map Groups TO BROWNHILLS A454 TO ALDRIDGE & A34 TO BLOXWICH/ A461 TO BROWNHILLS CANNOCK TO ALDRIDGE Active Sustainable Travel TO Da & LICHFIELD Gr y WALSALL Str REEDSWOOD een ee t COLLEGE L an POLICE ARBORETUM e STATION And Road Safety Walking is Not sure where to start? Joining a group LAW LEATHER MUSEUM COURTS treet Littleton S one of the best is a great way of discovering new routes A4148 The A*STARS programme looks at promoting Wi llen A4148 TO h sustainable travel on the school journey and during and improving your skills and fitness with al st St t l C e y af t e BIRMINGHAM/ cle We Rout e ford n ee Str e La tr ld M6 J7 & J9 the school day. It also develops opportunities for e St and easiest ways of S the help of more experienced people. TO WILLENHALL u fie Bl on re rt Lich et training and new initiatives, such as walking bus he Here are a few useful contacts: t becoming more active. Supermarket Ha schemes. After a successful pilot, the programme is Supermarket now being rolled-out across all Walsall schools d CIVIC Walking regularly can: CTC Walsall Member Group a BATHS Ro CENTRE Pilot project achievements (2010-2012): n to LIBRARY Wol er verhampton POST (Cyclists’ Touring Club) Street Hath In OFFICE to • Help weight loss A454 TO WILLENHALL/ wn 3% increase in walking and cycling levels in R WOLVERHAMPTON M6 J10 WALSALL CANAL ART ow Contact: 01543 377145 BASIN GALLERY COUNCIL A*STARS schools, compared to an overall Walsall THE • Ease back pain Butlers HOUSE [email protected] Passage CROSSING t average of 1.8% e e r Pa t S rk l www.chasecycling.co.uk l • Reduce the risks of heart disease St re Br ha i s 3.7% reduction in single car use. -
TO LET GATEWAY SITE at I54 INDUSTRIAL UNIT JUNCTION 2 67,884 Ft² (6,306 M²) M54 MOTORWAY 1 Innovation Drive, I54, Wolverhampton WV9 5GA
AVAILABLE NOW TO LET GATEWAY SITE AT i54 INDUSTRIAL UNIT JUNCTION 2 67,884 ft² (6,306 m²) M54 MOTORWAY 1 Innovation Drive, i54, Wolverhampton WV9 5GA www.apex54.co.uk HIGH PROFILE Apex@54 provides more than 67,000 ft² of manufacturing and office space at the high profile i54 site, next to Jaguar Land Rover. Occupying a prime site fronting junction 2 of the M54 motorway, Apex@54 is located immediately adjacent to the new access road leading to phase 2 of the i54 Business Park. The 300 acre, i54 site has been attractively landscaped to include footpaths and cycle routes to create an outstanding working environment. Over 2.5 million ft² of new buildings have been built to date with some 2,700 people employed across the current businesses. Occupiers include MOOG, Atlas Copco, ISP and eurofins. THE SITE POND Gly il 69 CAR PARKING SPACES PARKING CAR 69 il INNOVATION DRIVE INNOVATION 29 CAR PARKING SPACES . N 22 CAR PARKING SPACES SPECIFICATION Warehouse External • 12m clear internal height • Secure 40m deep yard • 50 kn/m2 floor loading • 120 parking spaces • 1MVA power supply • 20 EV charging points • 2 dock levellers • Covered shelter for 14 cycles • 4 ground level doors • 3.2 acre site • PV panels already installed Offices • Access flooring throughout EPC rating • Comfort cooling / heating Yet to be assessed • Lift access to all floors • Potential expansion space to the 2nd floor Specification Floor Ft² m² Ground floor 63,888 5,935 First floor offices 3,996 371 67,884 6,306 Tenure Planning The property is available on a Industrial and manufacturing new lease on terms to be agreed uses (B2 of the town and country planning order) Service Charge A service charge is payable Business Rates to the management company Business rates are yet to be established to deal with all assessed. -
A Science & Innovation Audit for the West Midlands
A Science & Innovation Audit for the West Midlands June 2017 A Science & Innovation Audit for the West Midlands Contents Foreword 1. Introduction .......................................................................................................................... 1 2. Economic and research landscape .................................................................................... 4 3. The West Midlands SIA Framework ................................................................................. 15 4. Innovation Ecosystem ....................................................................................................... 18 5. Enabling Competencies .................................................................................................... 38 6. Market Strengths ................................................................................................................ 49 7. Key findings and moving forward .................................................................................... 73 Annex A: Case Studies ........................................................................................................ A-1 www.sqw.co.uk A Science & Innovation Audit for the West Midlands Foreword In a year of change and challenge on other fronts, this last year has also been one of quiet revolution. This year has seen a dramatic increase across the UK in the profile of science and innovation as a key driver of productivity and its potential to improve the way our public services are delivered. The potential has always -
Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM (AMBER)
Agenda Item: 5D Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM (AMBER) CABINET Date 10 OCTOBER 2012 Portfolio(s) COUNCILLOR P BILSON/ ECONOMIC REGENERATION & ENTERPRISE Originating Service Group(s) PARTNERSHIPS, ECONOMY AND CULTURE Contact Officer(s)/ GRAHAM CLARK / MARK TAYLOR KEY DECISION: NO Telephone Number(s) 5850 6609 IN FORWARD PLAN: YES Title BLACK COUNTRY ENTERPRISE ZONE – BUSINESS RATE UPLIFT. RECOMMENDATION 1) That Cabinet endorse the principles for the retention, management and use of the Black Country Enterprise Zone business rate uplift, namely: i. For i54 the business rate uplift is returned to Wolverhampton City Council and Staffordshire County Council to reimburse the two authorities for the financial investment made to deliver the motorway link and other on-site infrastructure works. ii. For the remaining Enterprise Zone sites business rate uplift is pooled into a Black Country Investment Fund to be deployed by the Black Country LEP to support the Black Country’s economic priorities. 2) That Cabinet agree to enter into two Agreements and/or Memorandum of Understandings setting out the arrangements for collecting and distributing the business rate uplift received as outline in point 1 above. 3) That the Cabinet Member for Economic Regeneration & Enterprise in conjunction with the Interim Strategic Director Education and Enterprise be authorised to finalise the Agreements/Memorandum of Understanding as follows: i. An Agreement / Memorandum of Understanding with South Staffordshire District Council, Staffordshire County Council, Stoke & Staffordshire LEP and Black Country LEP setting out the arrangements for the business rate uplift in respect of i54 and; ii. An Agreement / Memorandum of Understanding with Walsall Metropolitan Borough Council and Black Country LEP setting out the arrangements for the business rate uplift in respect of the remaining Enterprise Zone sites. -
TO LET \\ SQ FT SAT NAV: ST18 9AR 474,903 WOLVERHAMPTON/M6/M6 TOLL Southbound 9.4 Miles to J11A STAFFORD Northbound 6 Miles to J14 M6
CROSS-DOCKED WAREHOUSE DISTRIBUTION UNIT TO LET \\ SQ FT SAT NAV: ST18 9AR 474,903 WOLVERHAMPTON/M6/M6 TOLL Southbound 9.4 miles to J11A STAFFORD Northbound 6 miles to J14 M6 474,903 SQ FT \\ TO LET A449 M6/J13 0.6 miles ACTON GATE 01 Source: NOMIS 2020 / Google Carlisle 108,700 // 3 HOURS Leeds 793,100 // 2 HOURS the fast access location Liverpool 1.6 MILLION // 1.5 HOUR STAFFORD475 DIRECTLY SERVES THE MIDLANDS Manchester 2.8 MILLION // 1 HOUR Stoke-on-Trent AND NORTH WEST 256,400 // 30 MINUTES Derby, Nottingham & Leicester 0.95 MILLION // 1.5 HOURS Occupying a highly visible position at Acton Gate, Wolverhampton 263,400 // 45 MINUTES Stafford475 is directly adjacent to the M6, with Junction 13 accessible within a minute’s drive. Birmingham & Solihull 474,903 sq ft industrial logistics opportunity 2 MILLION // 45 MINUTES Cross-docked with three large goods yards Cardi 12 metre clear internal height 366,900 // 2.5 HOURS Bristol Fitted with racking and new LED lighting 463,400 // 2 HOURS London 9 MILLION // 2.5 HOURS 0.6 miles to J13 M6 48 million people within 4.5 hours’ HGV drive time Southampton 252,500 // 3 HOURS Short term lease available 02 ACCOMMODATION Extensive specification The property has been measured in accordance with the RICS Code of Measuring Practice (6th Edition) as set out below: Warehouse 403,777 sq ft 37,512.11 sq m Stafford475 offers a generous specification including cross-docked loading, 12 metre clear internal height SPECIFICATION Ground Floor Offices 18,380 sq ft 1,707.59 sq m and three sizeable yards. -
West Midlands European Regional Development Fund Operational Programme
Regional Competitiveness and Employment Objective 2007 – 2013 West Midlands European Regional Development Fund Operational Programme Version 3 July 2012 CONTENTS 1 EXECUTIVE SUMMARY 1 – 5 2a SOCIO-ECONOMIC ANALYSIS - ORIGINAL 2.1 Summary of Eligible Area - Strengths and Challenges 6 – 14 2.2 Employment 15 – 19 2.3 Competition 20 – 27 2.4 Enterprise 28 – 32 2.5 Innovation 33 – 37 2.6 Investment 38 – 42 2.7 Skills 43 – 47 2.8 Environment and Attractiveness 48 – 50 2.9 Rural 51 – 54 2.10 Urban 55 – 58 2.11 Lessons Learnt 59 – 64 2.12 SWOT Analysis 65 – 70 2b SOCIO-ECONOMIC ANALYSIS – UPDATED 2010 2.1 Summary of Eligible Area - Strengths and Challenges 71 – 83 2.2 Employment 83 – 87 2.3 Competition 88 – 95 2.4 Enterprise 96 – 100 2.5 Innovation 101 – 105 2.6 Investment 106 – 111 2.7 Skills 112 – 119 2.8 Environment and Attractiveness 120 – 122 2.9 Rural 123 – 126 2.10 Urban 127 – 130 2.11 Lessons Learnt 131 – 136 2.12 SWOT Analysis 137 - 142 3 STRATEGY 3.1 Challenges 143 - 145 3.2 Policy Context 145 - 149 3.3 Priorities for Action 150 - 164 3.4 Process for Chosen Strategy 165 3.5 Alignment with the Main Strategies of the West 165 - 166 Midlands 3.6 Development of the West Midlands Economic 166 Strategy 3.7 Strategic Environmental Assessment 166 - 167 3.8 Lisbon Earmarking 167 3.9 Lisbon Agenda and the Lisbon National Reform 167 Programme 3.10 Partnership Involvement 167 3.11 Additionality 167 - 168 4 PRIORITY AXES Priority 1 – Promoting Innovation and Research and Development 4.1 Rationale and Objective 169 - 170 4.2 Description of Activities -
Pharmacies Providing the Flu Vaccination
Pharmacies providing the Flu vaccination Pharmacy Address A.Karims Chuckery Pharmacy 7-9 Kinnerley Street, The Chuckery, Walsall WS1 2LD ASDA Pharmacy (Bloxwich, Walsall) Woodhall Street, Bloxwich, Walsall WS3 3JR Asda Pharmacy (Darlaston) St. Lawrence Way, Darlaston, Wednesbury WS10 8UZ Asda Pharmacy (Walsall) 42 George Street, Walsall WS1 1RS BDS Pharmacy Unit 11, Park Hall Estate, Liskeard Road, Walsall WS5 3EY Beacon Pharmacy 81 Collingwood Drive, Great Barr, Birmingham B43 7JW Blackwood Pharmacy 87 Blackwood Road, Streetly, Sutton Coldfield B74 3PW Boots UK Ltd (Darlaston, King St) 44 King Street, The Colman Centre, Darlaston, Wednesbury WS10 8DE Boots UK Ltd (Walsall Aldridge) 14-16 Anchor Parade, Aldridge, Walsall WS9 8QP Boots UK Ltd (Walsall Park Place) Unit A, 58 Park Street, Walsall WS1 1NG Boots UK Ltd (Willenhall Wm Stafford) 3 Stafford Street, Shot Heath, Willenhall WV13 1TQ Broadstone Pharmacy 63A Broadstone Avenue, Leamore, Walsall WS3 1ER Broadway Pharmacy 4 Hawes Close, Broadway, Walsall WS1 3HG Caldmore Chemist 49 Brace Street, Caldmore, Walsall WS1 3PS Coalpool Pharmacy 140 Dartmouth Ave, Coalpool, Walsall WS3 1SP Harden Pharmacy 1 Chestnut Road, Harden, Walsall WS3 1BB Harding Pharmacy Shop 3, Brackendale Shopping Ctre, Stroud Avenue Short Heath, Willenhall WV12 4HA Jhoots Pharmacy (36A Pinfold Street) 36A Pinfold Street, Darlaston, Wednesbury WS10 8SY LloydsPharmacy (Anchor Meadow) Anchor Meadow, Aldridge, Walsall WS9 8AJ LloydsPharmacy (Bloxwich) 169 High Street, Bloxwich, Walsall WS3 3LH LloydsPharmacy (Brownhills) -
Travelling To/From Manor Hospital
Travelling to/from Manor Hospital Direct buses and trains from The information shown on this page is how to get Walsall to/from Manor Hospital from Walsall Town Centre. BUS OPERATOR BUS STOP OPERATOR Route Number BUSES TOWARDS STOP Route Number BUSES TOWARDS Huntington 2 WD Arriva National Expres West Midlands + via Bloxwich, Cheslyn Hay & Cannock 36 Alumwell via Manor Hospital V 4 Blackheath Diamond via West Bromwich & Oldbury S T Diamond Willenhall 37 Q National Expres West Midlands Hayley Green National Expres West Midlands + via Darlaston, Bentley & Lodge Farm 4H S T via West Bromwich & Oldbury 37 Willenhall Diamond via Darlaston, Bentley & Lodge Farm R Thandi Stowlawn 39 Q Merry Hill Centre National Expres West Midlands + via Manor Hospital, Darlaston & Bilston National Expres West Midlands 4M S T via West Bromwich & Oldbury 41 Willenhall Diamond via Lodge Farm & New Invention M National Expres West Midlands Sutton Coldfield 6 K National Expres West Midlands 45 West Bromwich via Aldridge, Little Aston & Four Oaks via Bescot, Yew Tree & Stone Cross W National Expres West Midlands Castlefort 7 7A K National Expres West Midlands 51 Birmingham via Longwood & Aldridge via Great Barr & Perry Barr A WG National Expres West Midlands Bloxwich 9 H National Expres West Midlands 69 Wolverhampton via Rushall, High Heath & Pelsall via Short Heath & New Invention P National Expres West Midlands Lichfield 10 10A J National Expres West Midlands 70 Bloxwich via Rushall, Brownhills & Burntwood via Beechdale & Dudley Fields P National Expres West Midlands -
West Midlands Police Freedom of Information 10/02/2021
West Midlands Police Freedom of Information (1) From 1st January 2019-2020 to date how many people in total have sat as members on Independent Advisory groups (IAG) I would like the number of people who have sat for the while time period requested (If you are able to break this down into individual meeting within that time period that would be useful too) SOLIHULL - 18 COVENTRY - 75 BHAM EAST - We have 2 IAG’s on BE (previously Birmingham North & Birmingham East). Both meet quarterly. B’ham North attendees is 35 in 2019 and 36 in 2020. B’ham East 37 and 33 BHAM WEST – B’ham South Have 11 IAG members although not all have attended the IAGs and generally around 5 will attend the meetings. B’ham West Have 12 IAG members we are unable to say how many have previously attended WOLVERHAMPTON – At Wolverhampton there are 18 members who sat on the IAG throughout this time period DUDLEY - 27 as of October 2020 SANDWELL - 14 members in total WALSALL – Walsall NPU don’t have an IAG they have an SCRG (Strategic Community Reference Group) of which there are 31 members (2) From 1st January 2019-2020 to date how many people of South Asian ethnicity have sat as members on Independent Advisory groups (IAG) I would like to know people who have confirmed their ethnicity. If this data is not available then I would like to know the number of members who appear to be of South Asian ethnicity. SOLIHULL – None COVENTRY - 28 Asian in total – we don’t have a breakdown of South Asian BHAM EAST - We do not ask our attendees to identify themselves by ethnicity or religion. -
Jaguar Land Rover Case Study
JAGUAR LAND ROVER CASE STUDY Kingspan Energy has delivered the UK’s largest rooftop solar photovoltaic system for Jaguar Land Rover’s new Engine Manufacturing Centre based at i54 South Staffordshire, Wolverhampton, West Midlands. PROJECT SUMMARY Premium car manufacturer Jaguar Land Rover is at the forefront of driving sustainability values and responsible use of resources in all areas of their business. These considerations were critically important in the design and build of their new Engine Manufacturing Centre based at i54 South Staffordshire, Wolverhampton, West Midlands. The new engine manufacturing centre has been designed to minimise energy demand and maximise efficiency from the ground up. Jaguar Land Rover also had a strong desire to integrate the most cost-effective and efficient solar photovoltaic (PV) system into the envelope of the new factory building. This would not only provide renewable energy and cost savings but also deliver an attractive return on investment. OVERVIEW PERFORMANCE To meet Jaguar Land Rover’s requirements the project contractor had to deliver a large-scale rooftop The 5.8 MWp system spreads across 35,000 m2 of solar PV system, built to the highest specification, roof space and is expected to generate 30% of the under strict site conditions, during the winter period. plant’s annual energy requirements. Kingspan Energy was chosen to lead the project This output, enough to power more than 1,600 from start to finish. Having already worked on some homes, will be used on site to reduce the building’s of the most prestigious large-scale solar PV projects primary energy consumption from the grid.