I Project Overview (I) Overview of the original project The New Guiyang-Guangzhou Railway Project starts from the North Guiyang Railway Station and ends at the South Guangzhou Railway Station, via Guiyang City, Qiannan Autonomous Prefecture and Qiandongnan Autonomous Prefecture in Province, City, Guizhou City and Hezhou City in Autonomous Region, and City, City and Guangzhou City in Province. The length of main line is 857.300km. The Project is designed as a Class I double-track railway, with a design speed of 200km/h, employing electric traction. In the original plan, there are 317 bridges of 171,411 linear meters, 240 tunnels of 476,660 linear meters and 35 stations. The floor area of the Project totals as 4472.46 ha., including permanent land occupation of 2484.72 ha. and temporary land occupation of 1987.74 ha. The debris volume is 95,562,500m3 and the soil borrow volume is 3,411,800m3. The estimated total investment amount of the Project is 79.9711 billion yuan. The Project is planned to commence in 2008 and complete in 2013, with a construction period of 6 years. In July 2008, the Environmental Protection Department gave reply on the Project with Official Reply on Environmental Impact Report of New Guiyang-Guangzhou Railway Project (HS [2008] No.258). In September 2008, the National Development and Reform Commission gave reply on the feasibility study report of the Project with FGJC [2008] No.2526 Document. In December 2008, the Project was formally commenced. However, in December 2009, variations were made for functional orientation and main technical standards of the New Guiyang-Guangzhou Railway Project. (II) Status of variation of the original project Variations of the New Guiyang-Guangzhou Railway Project mainly include: The railway was changed from a Class I railway to a passenger dedicated line, the design speed was increased from 200km/h to 250km/h, the originally designed freight transportation facilities were deleted, the quality and level of passenger transportation service were improved and the track structure of the whole line was changed from ballasted track to ballastless track. See Table 1, 2 and 3 for details of main changes.

1

Table 1 Comparison on project scope and construction scale Item In the original After adjustment to the Added or reduced environmental scope of feasibility assessment scheme study From CK0+000 to From DK0+000 to CK823+513: The DK829+433.79: The Mileage scope Main line: 3.87km added. length of the main length of main line is line is 857.300km. 861.17km. Speed 200km/h 250km/h / Passenger dedicated Railway classification Class I railway / line Minimum radius of curve 3500m 4500m / Short term: 82-86 Short term: 79-106 Short term: -3-106 pairs/day pairs/day pairs/day added Pairs of trains Long term: 112-116 Long term: 119-152 Long term: 6-36 pairs/day pairs/day pairs/day added Main line: 3.87km added. Supporting works: Main line: 857.3km Main line: 861.17km 50.982km reduced. Route Relevant supporting Relevant supporting Route section subject to works: 137.278km works: 86.296km plane adjustment: 399.704km, with the deviation of 0-2000m. Seamless. Ballasted track: From the Guiyang North Laoluobao-Hezhou section Track Seamless, ballasted. Railway Station to changed to ballastless Laoluobao Station. track. Other sections employ ballastless track. Subgrade of the main line: Subgrade 218.342km 130.976km 27.3678km reduced. Bridge and culvert 190.739km/324 Nr. 260.381km/521 Nr. 69.642km/197 Nr. added. Tunnel 476.66km/240 Nr. 463.068km/215 Nr. 4.202km/25 Nr. reduced. 14 overtaking stations Station and yard 35 stations 21 stations deleted. Single-phase power Single-phase power Two traction substations frequency AC 25kV frequency AC 25kV i.e. Zenleng and Bangtu Electrification AT power supply. AT power supply. traction substations deleted 16 new traction 14 new traction after adjustment to the substations. substations. scope of feasibility study. GSM-R network The same as those in communication. the original Communication and signal No change One base station per environmental 6km. assessment scheme. Maintaining the existing Guiyang locomotive depot and The same as those in stationed locomotive the original Locomotive No change turnaround depot environmental without changing assessment scheme. their scales and facilities. For 35 stations. For 21 stations. Drainage systems for 14 Employing SBR Employing SBR stations deleted. Water supply and drainage treatment process and treatment process and Reduced discharge of waste water waste water treatment waste water: 75m3/day. treatment in artificial in artificial wetland, by

2

wetland, by which which the treated waste the treated waste water will be drained water will be drained when meeting the when meeting the standard. standard. House area: House area: 181,356m2. 158,979m2. House area: 22377m2 Staffing: 2,301 Staffing: 2,070 reduced. Building construction persons. persons. Staffing: 231 persons No boiler added No boiler added along reduced. along the whole line. the whole line. Investment 53,391,075,000 yuan 65,362,569,700 yuan 12 billion yuan added. One point reduced from the Ecological 11 10 province-level resort in Environmental . sensitive Noise 304 284 Twenty points reduced. points vibration 209 207 Two points reduced. Electromagnetic 202 201 One point added.

3

Table 2 Comparison on design route schemes In the original environmental assessment scheme After adjustment to the scope of feasibility study Added or Item Description Mileage Length Mileage Length reduced Guiyang-Hezhou section of the main 5.732km line of CK0+000 - CK597+650 596.081 DK0+000 - DK597+650 601.813 added. Guiyang-Guangzhou Railway Hezhou-Guangzhou Main line section of the main 1.862km line of CK567+200 - CK806+300 261.219 DK567+174 - DK829+364 259.357 reduced. Guiyang-Guangzhou Railway 3.87km Total 857.3 861.17 added. Comprehensive maintenance depot of Guiyang North Left EMU track: DzK0+000 - DzK2+312.88 Left EMU track: DZK0+000 - DZK3+054.94 3.670 6.286 增加 2.616km Railway Station Right EMU track: DyK0+000 - DyK1+356.79 Right EMU track: DYK0+000 - DYK3+230.88 EMU station and EMU running track Container Passageway Zhuzhou-Liupanshui Line: K561+391 - 33.900 / 0 Deleted. Reconstruction K595+280 Works Mazhipu Untwining Guiyang Line Project LZK0+000 - LZK2+469.84 terminal (including the LYK0+000 - LYK3+478.52 reconstructed 7.975 / 0 Deleted. Zhuzhou-Liupanshui Line: K559+350 - Zhuzhou-Liupanshui K560+363.11 Line and Mazhipu Station) Reconstruction of the existing Guiyang- -Guiyang Railway: K423+200 - Out-city Passenger Reconstruction of the existing Chongqing-Guiyang K423+677.37 Track Reconstruction Railway: DK423+201.96 - DK423+726.56 2.325km Reconstruction of the existing Kexi Railway: 5.376 3.051 Works (including two Left track: LZDK573+530 - LZDK574+791.9 reduced. K423+200 - K423+699.89 untwining lines in Right track: LYDK573+530 - LYDK574+794.07 Left track in Guangzhou: ZCK572+600 - Guangzhou) ZCK574+800.00

4

In the original environmental assessment scheme After adjustment to the scope of feasibility study Added or Item Description Mileage Length Mileage Length reduced Right track in Guangzhou: YCK572+500 - YCK574+777.29 Existing Guiyang-Guilin Out-city Passenger Track Reconstruction Works in Mixed CK37+524.68=D1K574+400 - 1.6km Railway Section of 23.935 DK37+017.86=D1K574+900 - D1K597+250 22.335 DK598+349.92=CK13+553.10 reduced. Guiyang-Guangzhou Railway and Guiyang-Guilin Out-city Passenger Track Relevant supporting Lvyinhu connecting LZCK0+000 - LZCK3+786.96 8.141 / 0 Deleted. works in line LYCK0+000 - LYCK4+354.16 Left track from West Guilin Station to North Guilin Station: LCK0+000 - LCK5+142.37 Left track from North Guilin Station to Left track from West Guilin Station to passenger Dingjiang Station: LC1K404+900 - connecting line in Guiyang: ZL1DK0+000 - LC1K411+300 ZL1DK6+566.34 Right track from North Guilin Station to Right track from West Guilin Station to passenger Main line of Dingjiang Station: LYC1K348+600 - connecting line in Guiyang: YL1DK0+000 - Guiyang-Guangzhou LYC1K411+300 22.536 YL1DK6+483.26 4.228km Relevant Railway to 26.764 Left track from North Guilin Station to the Left track from West Guilin Station to passenger added. supporting connecting line of reconstructed -Guangxi Railway: connecting line in Guangzhou: ZL2DK0+000 - works in North Guilin Station LCK348+600 - LCK349+400 ZL1DK6+905.64 Guilin Right track from North Guilin Station to the Right track from West Guilin Station to passenger reconstructed Hunan-Guangxi Railway: connecting line in Guangzhou: YL2DK0+000 - K347+000 - K349+561 YL2DK6+809.28 Right track from West Guilin Station to North Guilin Station: LYCK0+000 - LYCK3+324.55 North Guilin Station Left track from West Guilin Station to North Guilin 2.128km Reconstruction LCK409+500 - LCK412+400 2.900 5.028 Station: LDK420+400 - LDK423+278.08 added. Works Guangzhou Connecting line in Up connecting line (L1): 3.616km in length. 7.876 Up connecting line (L1): L1DK3+668.599 7.377 499m

5

In the original environmental assessment scheme After adjustment to the scope of feasibility study Added or Item Description Mileage Length Mileage Length reduced terminal Hengjiang Untwining Down connecting line (L2): 4.260km in length. Down connecting line (L2): L2DK3+709.412 reduced. Line Area Connecting line in intercity yard of Up connecting line: 6.843km in length. 13,660m 13.661 / 0 Guangzhou South Down connecting line: 6.818km in length. reduced. Railway Station Qicha-Sanyan Bridge Section 5,070m 2.709 GMGDK0+000 - GMGDK7+778.758 7.779 Reconstruction added. Works New Track No.2 from West 259m 1.379 GMDK0+000 - GMDK1+120.38 1.120 Guangzhou Station to reduced. Guangzhou Station Reconstruction Works of East Foshan-Qicha 3,757m Section of the 1.351 GK31+400.00 - GK36+508.13 5.108 added. Existing Guangzhou-Maoming Railway -Guangzhou 421m Reconstruction 1.869 GJGDK2263+700.00 - GJGDK2265+148.82 1.448 reduced. Works 50.982km Total of relevant supporting works 137.278 86.296 reduced.

6

Table 3 Comparison on adjustments to route scheme in feasibility study stage Max. deviation of line S/N Adjustment range Adjusted length (km) location (m) 1 DK45+000 - DK52+000 7 250 deviating leftwards. 2 DK82+000 - DK92+000 10 200 deviating leftwards. 3 DK92+000 - DK105+000 13 100 deviating rightwards. 4 DK154+000 - DK162+000 8 450 deviating rightwards. 5 DK167+000 - DK180+000 13 150 deviating rightwards. 6 DK190+000 - DK194+500 4.5 650 deviating rightwards. 7 DK205+000 - DK212+000 7 770 deviating rightwards. 8 DK216+000 - DK234+000 18 550 deviating rightwards. 9 DK236+400 - DK243+000 6.6 275 deviating rightwards. 10 DK243+000 - DK270+000 27 860 deviating leftwards. 11 DK275+080 - DK283+700 8.62 480 deviating leftwards. 12 DK283+700 - DK 305+850 22.15 526 deviating rightwards. 13 DK343+200 - DK 357+592 14.392 325 deviating leftwards. 1270 deviating 14 DK 373+860 - DK 391+776 17.916 rightwards. 15 DK 393+000 - DK406+865 13.865 755 deviating rightwards. 16 DK406+865 - DK413+000 6.135 525 deviating leftwards. 17 DK413+000 - DK423+000 10 400 deviating rightwards. 18 DK437+600 - DK440+338 2.738 125 deviating rightwards. 19 DK441+190 - DK445+400 4.21 258 deviating leftwards. 20 DK455+000 - DK463+000 8 923 deviating rightwards. 21 DK463+000 - DK466+250 3.25 243 deviating leftwards. 1257 deviating 22 DK466+250 - DK492+328 26.078 rightwards. 23 DK530+250 - DK546+000 15.75 108 deviating rightwards. 24 DK546+000 - DK559+000 13 112 deviating rightwards. 25 DK566+000 - DK569+000 3 86 deviating leftwards. 26 DK567+800 - DK571+800 4 0-1.2 27 DK572+200 - DK577+900 5.7 0-0.9 28 DK580+700 - DK582+600 1.9 0-180 29 DK584+600 - DK587+200 2.6 0-180 30 DK588+000 - DK588+900 0.9 0-180 31 DK588+900 - DK592+900 4 0-180 32 DK594+100 - DK594+900 0.8 0-0.2 33 DK599+100 - DK600+500 1.4 0-0.7 34 DK607+700 - DK610+000 2.3 0-100 35 DK613+000 - DK616+600 3.6 0-200 36 DK622+700 - DK623+900 1.2 0-0.5 37 DK627+900 - DK629+100 1.2 0-0.7 38 DK631+800 - DK633+300 1.5 0-0.5 39 DK634+200 - DK636+200 2 0-1 40 DK637+600 - DK638+500 0.9 0-0.8 41 DK640+400 - DK642+400 2 0-0.8 42 DK645+100 - DK650+200 5.1 0-17.7 43 DK652+300 - DK654+200 1.9 0-0.8 44 DK657+400 - DK662+800 5.4 0-42 45 DK665+200 - DK667+500 2.3 0-3.7 46 DK667+500 - DK675+100 7.6 0-32 47 DK675+900 - DK680+100 4.2 0-0.8 48 DK682+300 - DK684+000 1.7 0-200 49 DK692+800 - DK695+400 2.6 0-200 50 DK696+600 - DK701+400 4.8 0-3.2 51 DK730+500 - DK733+100 2.6 0-200

7

Max. deviation of line S/N Adjustment range Adjusted length (km) location (m) 52 DK738+300 - DK746+400 8.1 0-200 53 DK754+000 - DK755+900 1.9 0-200 54 DK762+000 - DK763+600 1.6 0-1.1 55 DK764+300 - DK770+000 5.7 0-20.1 56 DK780+200 - DK794+700 14.5 0-500 57 DK792+000 - DK802+500 10.5 0-2000 合计 399.704 II Environmental impact assessment of the Project (I) Assessment of impact on ecological environment After variation, the horizontal deviation of line location is within 2km, and the ecological status in the changed section is basically kept same with that of the original scheme. Also, the vegetation and land use types are basically kept as same as those in the original scheme. In the original project, totally seven ecological sensitive areas are included. After variation, works located in the four ecological sensitive points (i.e. the Province-level Nature Reserve of Shoucheng, the Province-level Resort in Rongjiang and Gurong, the National Forest Park of Mountain Longjiashan and Qianling Park) have not been changed. For those avoiding the Congjiang province-level Resort, works located in the two ecological sensitive points (the National Resort in Lipingdong Village and the Yangshuo National Forest Park) have been slightly changed. Detailed changes are shown as below. Dong Village National Resort in Liping was classed as the fifth batch of national key resorts by the State Council in January 2004. According to the Overall Planning of Dong Village National Resort in Liping the total planned area of resort is 153km2, including four sites of Zhaoxing-Diping, Bazhai-Jiuchao, Yandong-Koujiang and Tiansheng Bridge-Bazhou River, one old building cluster of Lipingqiao Street, 2 independent scenic spots of Shangzhong and Hongzhou. In the original plan, the line is designed as Luoxiang Tunnel to cross Dong Village Resort in Liping and the inlet/outlet of the tunnel are both located outside the resort. The length of line crossing the resort is 5.6km.In order to carry out the proposal of “further optimization of Congjiang Station and Rongjiang Station, strictly control the construction scale of the station and yard, prevent environment problems from secondary planning and development” approved in the original environment assessment report, the location of Congjiang Station is to relocate out side the Congjiang Resort, resulting in little deviation of line location when the line is crossing the development and control area of Dong Village Resort in Liping, and it has added small scale of subgrade and bridge works (including 1.06km of subgrade and 0.25km of Batang Double-track Major Bridge).In the report, it is proposed that the works will occupy a few lands after variation, with no influence on the scenic sport in the landscape area from project construction. By taking advantage of landscape greening measures, the Project has little impact on the scenic area. At the same time, the Project has been incorporated in the traffic planning of the scenic area, and the project construction shall be in compliance with related planning of Dong Village National Resort in Liping. Yangshuo National Forest Park is located in the Xingping Town at northeast of Yangshuo County, Guangxi Zhuang Autonomous Region, classed as National Forest Park [Forest Permit (2005) No. 956] by State Forestry Bureau in 2006, total area of 3391.7 hectares. In the original plan, the length of the line crossing the forest park is 587.05m, as the Xingfuyuan Tunnel and Xingfuyuan Double-track Super Major Bridge crossing the forest park. Since the curve radius is adjusted slightly, it can cross the forest park by the bridge along the changed line, and dip 120m toward south at the same time. Therefore, the line is

8

of 200m in the park, 387.05m shorter than that in the original environment assessment plan. It has little impact on the forest and vegetation in the park and the landscape after variation.

After variation, a land area of 4138.41 hectares is occupied by the works. Compared with the original environmental evaluation plan, it has been reduced 333.59 hectares. The permanent lands occupied by the works are 2368.08 hectares, and temporary lands are 1770.33 hectares; the permanent arable lands occupied are 1125.7 hectares, and the temporary arable lands are 925 hectares. Table 4 Comparison on land use before and after project adjustment Unit: hm2 Work content Permanent land Temporarily land Total Guiyang-Hezhou 1653.68 1343.3 2996.98 After adjustment to Section the scope of Hezhou-Guangzhou 714.4 427.03 1141.43 feasibility study Section Total 2368.08 1770.33 4138.41 Guiyang-Hezhou 1772.55 1524.01 3296.56 In the original Section environmental Hezhou-Guangzhou 711.7 463.73 1175.43 assessment scheme Section Total 2484.3 1987.7 4472 Guiyang-Hezhou -118.87 -180.71 -299.58 Section Changes Hezhou-Guangzhou 2.7 -36.7 -34 Section Total -116.17 -217.41 -333.58 After changes in the feasibility study, there are 371 spoil grounds/disposal sites. Compared with those (347 spoil grounds/disposal sites) in the original environmental assessment, 24 spoil grounds/disposal sites are added. Site selection of 280 spoil grounds/disposal sites are basically kept the same as those in the original environmental assessment, and that of 91 spoil grounds/disposal sites has been adjusted. Land occupied mainly includes waste land, land with sparse woods and dry land with low yield, etc. Disposal sites are generally located in waste gullies and waste land not easily subject to water scouring. Therefore, the site selection of such spoil grounds/disposal sites meets relevant environmental requirements. There are 9 borrow areas in total. Five borrow areas have been adjusted. Land occupied includes waste land and garden plot. No basic farmland or woodland has been occupied by borrow area. Therefore, the site selection of borrow area meets relevant environmental requirements. In the original environmental assessment scheme, the designed construction access road totals as 976.2km. Based on site investigation, the actual length of construction access roads newly built during construction of the project totals as 885km with a floor area of 91.2km. Compared with that in the design, 91.2km has been reduced. Land occupied mainly includes brush land, shrub land and dry land. The excavation of construction access road will change, bury or damage the original vegetation and terrain, which will damage the soil and water conservation of the original land and resulting in water loss and soil erosion to some extent. Based on site investigation, both sides of construction access road for the project are provided with tree planting and greening measures, effectively reducing the amount of water loss and soil erosion.

9

Table 5 Arrangement of other large-scale temporary facilities Type Area (mu) Qty. (Nr.) Gradation station 77.6 9 Construction camp 2352.5 240 Beam yard 1440.8 14 Track slab yard 415.9 4 Batching plant 2298.9 158 According to a field survey, apart from the spoil ground and the access route in the Project, the temporarily occupied lands include 9 gradation stations, 240 construction camps, 14 beam yards, 4 Track slab yards, 158 batching plants. The occupied lands are mainly brush land, shrub land and dry land. During construction, the temporary works occupy the land, interrupt the land surface and damage the vegetation, these actions changed the functions of land use and made the land hardened, and thus it destroys and exerts a certain influence on the water conservation function of the original land and the eco-environment. After the analysis of the report, it is regarded that the principle of ecologically protecting measures are consistent with the original environmental evaluation. As the road sections in sensitive area of scenic spots in Lipingdong Town are adjusted into bridges, subgrade and tunnels which pass through the development and control area planning in this scenic spot from the original total tunnel, the variation of engineering construction have certain impact on the scenic spots, strengthen the design of landscape coordination in combination of the requirements for follow-up construction in the development and control area planning in this spot. In accordance with the requirements of the original report and the approval, the engineering protection and environmental protection for spoil (ballast) works shall be well conducted, and the eco-recovery measures of temporary lands occupied such as construction camp, beam yard, track slab yard, batching plant and the access road shall be taken well. (II) Assessment of impact on acoustical environment 1 Present quality and protection objective In the original report, there are 304 acoustic environment sensitive points, including 261 in residential area, 41 in school and 2 in hospital. After variation, 45 new sensitive points have been added due to deviation of line location, including 50 in residential area, 2 in school and 1 in hospital; 64 sensitive points have been reduced, including 50 in residential area and 14 in school. Moreover, totally 285 acoustical environmental sensitive points are distributed along the line, including 253 in residential area, 29 in school and 3 in hospital. See Table 6 for details. Table 6 Addition and deletion of acoustic environment sensitive points In the After Sensitive points added Section original Sensitive points reduced upon changes changing upon changes report There are There are Totally 41 sensitive Totally 53 sensitive points are reduced from areas 279 267 points are added in such as Banbian Street, Jingxin Primary School, sensitive sensitive areas such as Tianxing Xiangya Primary School, Xinmin Primary points, points, village, Youhang School, Yabie village, Shangzhai village, Lali including including village, Waibianbao village, Tandi primary school, Fuliandong village, Main line 241 in 340 in village, Bangtu village, Xinzhai village, Datangkou village, Datangkou residential residential Community 8 of Primary School, Tangdi Primary School and area, 36 in area, 26 in Baisha village, Maning surrounding residential area, Meitianzhai village, school and school and village, Susha village, Xiaxishan village, village, Longkou 2 in 3 in Dacun village, Jinwu village, Dongjiashan village, Pengshan village, hospital. hospital. village, Dapotou Modaoshan village, Lijiacun Primary School,

10

village, Shuitouyong Hengling village, Dajiangtou village, Enqinwan village, Zhuyuan Primary School, Taojia Primary School, Dongxin village, Longyougang village, Tongpen village, Luojiadong village, village, Yuelong No.3 Junior Middle School of Huangtian Town, village, Xidi Rongmu Primary School, Chonggang village, international garden Litou village, Houtian village, Gegang village, residential area, Shuntang Primary School, Duifei village, Yuhuwan residential Mabulang village, Lianshi village, Xiahao village, area of Zhongheng Rencun village, Shuangbu Primary School, Group, Xiangyu wan Lujiacun village, Shangbo village, Henggang residential area, village, Xuanwan village, Tanbian village, Baijie Caibian village, village, Xuhai Middle School, Caotang village, Taipingtang village, Lianghao village, Xihua village, Shani village, Zhennan village and Qicha village and Hongshifang village, etc., Yajunanwan residential including 39 in residential area and 14 in school. area, etc., including 38 in residential area, 2 in school and 1 in hospital.

There are 4 sensitive There are There are points added in Guilin Totally 11 sensitive points are reduced from 25 sensitive 18 sensitive North Station New Mazhipu-Lvyinhu connecting line, Mazhipu points, points, of Railway village, Gaozhai village, Paomuzhai village, Connecting including including Administration, Xixiaozhai village, Dafengdong village, Tianxin line 20 in 13 in Residential area at village, Dutian village, Dinglingshan village, residential residential North Guilin Station, Baimo village, Luxi village and Xubian village, area and 5 area and 5 Zhujia village and Luxi all of which are residential areas. in hospital. in hospital. village. 2 Major environmental impact and proposed protection measures See Table 7 for prediction results of noise impact on the 45 newly added acoustical environmental sensitive points during operation period of the line. Table 7 Predicted noise levels of newly added acoustic environment sensitive points Predictive sound level (dB) Exceeded value (dB) Number of sensitive Area Daytime Nighttime Daytime Nighttime points exceeding standard Within 61.2-70.1 59.3-68.6 / / / 30m At 30m 53.2-69.1 50.2-66.1 Up to standard Up to standard Residential Class 4 53.1-67.7 49.4-64.7 Up to standard 1.1-10.6 25 areas along area the line Class 2 52.0-66.4 48.1-63.3 0.5-6.4 1.2-13.3 17 area Class 1 55.2-64.5 51.5-61.3 0.2-12.1 6.5-19.0 20 area Teaching School 55.5-58.9 / 3.9 / 1 building Outpatient Hospital 68.1 / 13.1 / 1 service See Table 8 for prediction results of noise impact on the 240 acoustical environmental sensitive points involved before and after project adjustment.

11

Table 8 Predicted noise level of 240 acoustic environment sensitive points involved before and after project adjustment Predictive sound level (dB) Exceeded value(dB) Number of sensitive Area points Daytime Nighttime Daytime Nighttime exceeding standard Within 30m 52.5-74.6 48.1-73.4 / / / Residential At 30m 47.5-69.6 44.5-66.6 Up to standard Up to standard areas Class 4 area 52.4-73.3 46.6-71.7 0.5-3.3 0.3-16.7 148 along the Class 2 area 51.3-68.4 46.4-60.9 0.6-8.4 0.3-17.4 112 line Class 1 area 50.9-64.5 43.3-61.4 0.1-9.5 4.5-16.4 80 Teaching 54.9-67.9 / 0.1-7.9 / 12 building School Student 53.4-66.8 49.6-66.5 1.0-6.8 3.2-16.5 6 dormitory Hospital 58.1-62.6 54.7-57.7 2.6 4.7-7.7 2 In the 240 noise sensitive points, the noise level of 33 points is up to standard and that of 207 points exceeds the standard value, involving 14 schools, 1 hospital and 192 residential areas. Control measures for acoustic environment sensitive points mentioned in the report: Since the 15 noise sensitive points which are predicted to exceed the standard have reached the standard after being adjusted far away from the project, the function displacement of 5 households and 2 schools are deleted, sound insulation windows of 6035m2 are provided. See Table 9 for other measures and changes. Table 9 Measures and changes Measures in the original report Quantities Noise reduction measure Qty. Length (m) Area (m2) Investment Qty. Length (m) Area (m2) Investment Sound barrier 127 55220 131755 16367.35 145 63010 152036.5 22029.2 380 households Function replacement 0 6275 246 0 5798 and 3 schools Sound-proof wall 3 300 900 72 0 Ventilation and sound 198 0 80335 3666.95 153 0 80030 3651.7 insulation window Engineering demolition 4 0 0 Damping rail 1 400 0 60 0 Total 26441.3 31478.9 After taking corresponding measures, all sensitive points can be maintained in current situation or to meet standards. (III) Assessment of vibration impact on the environment 1 Present quality and protection objective After variation, 47 new vibration sensitive points are added within the assessment range of the whole line (including 43 in residential area, 3 in school and 1 in hospital), and another 50 points (including 47 in residential area, 3 in school) are reduced. Therefore, there are in total 207 vibration sensitive points now, including 200 in residential area, 6 in school and 1 in hospital. The supplementary report of monitoring results indicates that the status of the vibration sensitive points is all qualified.

12

2 Major environmental impact and proposed protection measures (1) Guiyang-Hezhou Section According to the supplementary report, the vibration is predicted as 64.5-77.5dB at the new sensitive points after the Project, all in compliance with the requirements of “Two Sides of the Trunk Line” in Standard of Environmental Vibration in Urban Area (GB10070-88).The vibration of the sensitive vibration sensitive points which are both involved before and after the variations is predicted as 56.1-77.5dB in the daytime and at night, all in compliance with the standard requirements. The variations for the vibration control measures in the supplementary report: In the original report, it has taken necessary measures for pollution control in the sensitive points with predicated vibration value more than 80dB, with laid elastic sleeper of 12670m along the line. Because the vibration source intensity declines and the prediction sensitive points have met the requirement, it does not employ elastic sleeper. (2) Hezhou-Guangzhou Section According to the supplementary report, the vibration is predicted as 58.3-79.4dB at the new sensitive points after variation, all in compliance with the requirements, except for that in the daytime and at night in Henggang Village above the Foshan Tunnel has exceeded standard value because the tunnel is shallow buried. The vibration at the sensitive points before and after the variation is respectively predicted as 67.4 and 80.1dB in the daytime and at night. Except that the vibration in Xicun Village of the original sensitive point has exceeded 0.1dB over the standard because of section type and speed variation, all other sensitive points can meet the requirements of the standard. The variations for the vibration control measures in the supplementary report include: In the original report, it takes necessary measures for noise pollution control in the 37 sensitive points with a predicated vibration value more than 80dB, in which two schools are subject to function replacement measures, and another 35 sensitive points are subject to laying elastic sleeper for 19710m. Because the vibration source intensity declines and most sensitive points have met the requirement in prediction, it does not employ elastic sleeper in the supplementary report, and at the same time, it takes function replacement measures for 2 households in Xicun Village and 1 in Henggang Village where the vibration is predicted as more than 80dB. (IV) Assessment of impact on water environment There is no change of water environment protection objective before and after the variation of the Project. In the Gongcheng River Grade I Water Source Protection Area (Class II water), Yijiang Water Source Protection Area (Class III water), Beijiang Potential Water Source Protection Area (Class II water), Dongping Waterway Potential Water Source Protection Area (Class III water), Guangzhou Grade II Water Source Protection Area in Valley (Class III water), Guangzhou Potential Water Source Protection Area in Pearl River Valley (Class III water) involved in the original report, the line strike-off alignment, project organization type and environmental protection measures for the above sensitive points in the Project are all the same as those in the original report. After the variations, 14 stations are cancelled for the Project. The total waste water discharge during operation period is 2433m3/d in the rest 21 stations, 75m3/d less than that in the original assessment report. Sanjiang Station, Guilin West Station, Yangshuo Station

13

and West Station have been relocated, and the waste water there is discharged into the Class III water. In the report, it is proposed to adjust the wastewater treatment process, by taking advantage of artificial wetland wastewater treatment system, etc. to meet Grade I discharge standard. The other stations are to remain and keep their original wastewater treatment measures and discharge locations. There are 240 tunnels in the original plan, while 215 after the variations, with 25 tunnels deleted. According to the assessment, for Guizhou-Hezhou Section, Hushan Tunnel is deemed as the key soluble rock tunnel according to the deepening of design exploration and the current construction conditions, and for Hezhou-Guangzhou Section, the construction of Shuangjieding Tunnel, Dianfeng Tunnel, Liangguang Tunnel, Beilingshan Tunnel, Gaozhuba Tunnel, Daqishan Tunnel and other tunnels may cause water level change for the underground aquifer. Therefore, during the construction, it is to add supplementary exploration about the connection of underground water and surface water for the above tunnels and to propose purposeful water plugging measures, etc. During the follow-up construction, it is to strengthen construction management and environment supervision, in order to avoid the construction close to the sections of portable water source protection area causing impact on water environment. (V) Assessment of impact on electromagnetic radiation environment There are 201 electromagnetic radiation sensitive points, 1 less than that in the original environment assessment, with 929 affected households. It adds cable television into the network for the rental houses of migrant workers as the compensation, increasing by 424 households compared to that in original environment assessment. According to the supplementary report, it is proposed to reserve cable TV compensation for the TV users of 929 households within the assessment area, who use antenna to watch TV and the signal-to-noise ratio is less than 35dB affected by the Project. According to the assessment, it is seen that the electromagnetic assessment model and parameter selection are correct with control measures available and assessment conclusion dependable. The compensation measures for the TV users shall be carried out based on the principle of “three simultaneous” prior to project operation. (VI) Assessment results The New Guiyang-Guangzhou New Railway Project is in compliance with the requirements of Medium-term and Long-term Railway Network Planning of (adjusted in 2008) and national industry policy. After the variations, the horizontal deviation of the route is within 2km, and the ecological status in the changed section is basically kept same with that of the original plan. The Project has bypassed one province-level resort in Congjiang County, and the section type and length are slightly changed in the Dong Village Resort, a state level resort in Liping and Yangshuo State Level Forest Park. After the variations, because of line deviation, new 45 sensitive points are added, 64 deleted, and 19 noise sensitive points deleted. Then, there are 285 sensitive points in total. For the sensitive point within 30m where it can not meet the standard requirement of 60-70 dB after employing sound barrier measures, it is to take advantage of relocation measures, and the principles for other treatment measures are in compliance with the original environment assessment report. For the current construction ongoing, part of environment protection measures are implemented step by step. For the follow-up construction and operation, after carrying out

14

the environment protection measures proposed in the original report and the approval [HS (2008) No. 258] of environment assessment department as well as the measures proposed in the supplementary report of adjustment plan and by the experts, the adverse impact of construction on the environment has been controlled to a certain extent, and line type and the length for the Project have been slightly changed in the Dong Village Resort in Liping. After acquiring the approval of related authorities, the construction of the Project is feasible from the perspective of environmental protection. III Public Participation The evaluation department has issued two detailed information bulletins on Guizhou Daily and Guangxi Daily on May 12 and May 26, 2010 respectively, and uploaded supplementary report abridgement on the websites of China Environment Impact Assessment website and China Railway Siyuan Survey and Design Group Co., LTD. During public participation in the survey, it has publicly consulted the public opinions based on visiting relevant units and public, convening symposium, pasting bulletins, releasing public participation questionnaire. It has released 1925 questionnaires actually and investigated the key deviation sections. From the investigation, it is indicated that this project has gained the understanding and support from the majority people along the line, and the public also pays much attention to the environmental problems involved in the project construction. Since the Project has been commenced in Guiyang-Guangzhou Railway line, the public mainly focuses on the environment protection issues during the construction period. The problems the residents are worrying in terms of the noise disturbance, ecological environment impact, traffic jam, etc. are all as feedback to the Owner by the environment assessment unit. It is to carry out related measures in the design to mitigate the above problems. For the construction disturbance, the contractor and the Owner shall strictly carry out the recommendations and measures proposed in the environment assessment report, and the environment protection department at all levels and related department shall strengthen supervision mechanism and mitigate the impact from the construction to the environment. IV Environment Monitoring Plan Environment monitoring plan is carried out at the adjustment section, while the unchanged section remains the original environment monitoring plan. Table 10 Environmental monitoring plan Environment Executed Supervised Estimate, Assessment sensitive Protection target Mitigation measures by by 10,000yuan indicators factor Strengthen the design of landscape coordination in The combination of the Decline the impact Scenic spots in Owner Government requirements for - on landscape Lipingdong Town and department follow-up construction environment contractor in the development Ecological and control area environment planning in this spot Strengthen the design of landscape The coordination in Decline the impact Yangshuo Forest Owner Government combination of the - on landscape Park and department requirements for environment contractor follow-up construction in the development

15

Environment Executed Supervised Estimate, Assessment sensitive Protection target Mitigation measures by by 10,000yuan indicators factor and control area planning in this spot 63010m of sound Residential barrier, 246 The building, school, households of function Acoustical Owner Government 314789000 Decline the impact hospital etc. with replacement, 80030m2 environment and department yuan on urban resident 200m from two of ventilation and contractor sides of the line sound insulation window 2 households in Function replacement The Xicun Village Vibration for the 2 households in Owner Government Decline the impact and one in - environment Xicun Village and one and department on urban resident Henggang in Henggang Village contractor Village

16

Attachment Table of noise pollution control measures taken for the sensitive points S/N Sensitive point Mileage Control measures and description Biyuyuan and resident 1 self-building house DK6+250 - DK6+400 nearby Barrier with height of 2.5 - 3m, length of 1172m (subgrade of 197m 2 Kangjia Nanqiaoyuan DK6+450 - DK6+550 and bridge of 975m) for the left side of DK6+300 - DK6+700 and Dafa Residential Area right side of DK6+300-DK7+072. and resident 3 DK6+550 - DK7+100 self-building house nearby Wulichong Sound barrier with height of 2m, length of 200m for the left side of 5 Newly-built DK8+650 - DK8+800 DK8+600 - DK8+800 Residential Area Wulichong residential Sound barrier with height of 2m, length of 200m for the right side of 6 DK8+800 - DK8+900 building DK8+800 - DK9+020 Dushi Leyuan, Huinong commercial 7 building, DK9+900 - DK10+500 Huinongxiang community Completely close the existing railway lines. Persons are forbidden to 8 Zhongfu Mansion DK10+300 - DK10+400 access. Control the whistling noise. Sound barrier with height of Residential building 2-3m, length of 1200m (subgrade of 513m and bridge of 987m) for 9 near the Xiangya DK10+550 - DK10+800 the left side of DK9+850 - DK10+800 and left side of DK2001+550 - Primary School DK2002+100.Ventilation and sound insulation window of 1300m2 for Guiyang 12th Middle high building, and ventilation and sound insulation window of 10 DK10+500 - DK10+700 School 1000m2 for Guiyang 12th Middle School Yaxiangju, Teachers’ 11 DK10+700 - DK10+800 building Railway living 12 DK11+000 - DK11+300 management section Sound barrier with height of 3m, length of 450m for left side of 13 Wujiagzhuang DK41+800 - DK42+100 DK41+850 - DK42+050 and the right side of DK41+800 - DK42+050 Sound barrier with height of 2-3m, length of 250m (subgrade of 14 Maocaochong DK43+000 - DK43+400 103m and bridge of 147m) for right side of DK43+200 - +450 Sound barrier with height of 2m, length of 105m for the right side of 15 Lijiayuan DK49+100 - DK49+200 DK49+115 - +220 17 Dongkouzhai DK61+600 - DK61+750 Install ventilation and sound insulation window of 75m2 Sound barrier with height of 2m, length of 459m for left side of 18 Jiarangxi DK68+600 - DK68+900 DK68+638 - +933 and the right side of DK68+736 - +900 19 Baozi DK68+900 - DK69+150 Install ventilation and sound insulation window of 125m2 20 Jianshanzhai DK72+250 - DK72+320 Install ventilation and sound insulation window of 60m2 Sound barrier with height of 2-3m, length of 150m (subgrade of 84m 21 Shangzhai DK73+250 - DK73+400 and bridge of 66m) for left side of DK73+250 - +400 Sound barrier with height of 3m, length of 50m for the left side of 22 Zishan DK91+080 - DK91+200 DK91+050-100 Sound barrier with height of 2m, length of 550m for left side of 23 Hujiazhai DK93+850 - DK94+200 DK93+821 - DK94+230 and the right side of DK94+089 - +230 24 Shuiniutian DK96+800 - DK96+900 Install ventilation and sound insulation window of 100m2 Sound barrier with height of 3.5m, length of 454m for left side of 25 Wengdang DK98+600 - DK98+840 DK98+570 - +780 and the right side of DK98+600 - +844 26 Longde DK114+100 - DK114+300 5 households for function replacement Sound barrier with height of 3m, length of 155m for the left side of 28 Xiawutang DK117+400 - DK117+800 DK117+645 - +800 29 Hejiazhuang DK118+400 - DK118+500 Panying Primary 30 School and residential DK119+800 - DK120+100 building nearby 31 Tuanzhai DK124+400 - DK124+800 Install ventilation and sound insulation window of 200m2 32 Pu’an Town DK141+950 - DK142+500 Install ventilation and sound insulation window of 550m2 Sound barrier with height of 3m, length of 290m for the left side of 34 Sanjiang Township DK186+900 - DK187+600 DK187+300 - +610 Sound barrier with height of 2m, length of 230m for the left side of 35 Zengu DK187+900 - DK188+100 DK187+880-DK188+110 Sound barrier with height of 2-3m, length of 150m (subgrade of 20m 36 Jiahui Village DK200+350 - DK200+500 and bridge of 130m) for left side of DK200+350 - +500

17

Sound barrier with height of 4m, length of 250m for the right side of 37 Yuezhai DK215+700 - DK216+200 DK215+850-DK216+100 40 Luoxiang Town DK275+800 - DK276+650 Sound barrier with height of 3m, length of 850m for right side of Luoxiang Middle 42 DK276+100 - DK276+250 DK276+180-DK276+700 and the left side of DK276+370 - +700 School Sound barrier with height of 2m, length of 260m for the left side of 43 Tongle DK311+100 - DK311+550 DK311+050-DK311+120 and DK311+380-570 Silikou and Sili Sound barrier with height of 2m, length of 150m for the right side of 44 DK322+300 - DK322+450 Primary School DK322+300-DK322+450 45 Sili Village DK327+400 - DK327+500 Install ventilation and sound insulation window of 60m2 46 Guli Village DK328+900 - DK329+000 Install ventilation and sound insulation window of 175m2 47 Xiabanwa DK340+100 - DK340+200 Install ventilation and sound insulation window of 60m2 Sound barrier with height of 2m, length of 200m for the left side of 48 Tangdi DK391+000-DK391+200 DK391+000-DK391+200 Sound barrier with height of 2m, length of 200m for the right side of 49 Jiezhai DK391+550-DK391+650 DK391+500-DK391+700 Sound barrier with height of 2m, length of 400m for the right side of 50 Wutong Town DK392+550-DK3921+980 DK392+600- DK393+000 Sound barrier with height of 2m, length of 200m for the left side of 51 Qingmei Mountain DK405+000-DK405+150 DK404+950- DK404+150 Sound barrier with height of 2m, length of 200m for the right side of 52 Luxin DK408+450-DK408+600 DK408+450- DK408+650 Sound barrier with height of 2m, length of 200m for the right side of 53 Nanyuantou DK409+050-DK400+250 DK409+100 - +300 54 Maojia DK414+600-DK414+800 Install ventilation and sound insulation window of 300m2 Sound barrier with height of 2m, length of 450m for left side of 55 Wangjiazhuang DK424+700-DK424+900 DK424+670 - +820 and the right side of DK424+670 - +970 Sound barrier with height of 3.5m, length of 200m for the left side of 56 Dating DK429+200-DK429+400 DK429+200 - +400 Sound barrier with height of 3.5m, length of 250m for the right side 57 Fulian DK434+760-DK438+000 of DK434+750 - DK435+000 Sound barrier with height of 3.5m, length of 150m for the right side 58 Shanglongtang DK436+100-DK436+200 of DK436+100 - +250 Sound barrier with height of 3.5m, length of 850m for left side of 59 Dacun DK436+400-DK436+900 DK436+700 - +900 and the right side of DK436+400 - +950 60 Guyuan DK436+700-DK436+900 Sound barrier with height of 2m, length of 200m for the left side of 61 Dantangxu DK443+200-DK443+400 DK443+150 - +350 Sound barrier with height of 2m, length of 300m for the left side of 62 Dashankou DK445+800-DK449+100 DK445+800-DK446+100 Sound barrier with height of 2m, length of 350m for the left side of 63 Leicun DK447+500-DK447+800 DK447+450 - +800 Sound barrier with height of 2-3m, length of 200m (subgrade of 64 Tangbian DK449+700-DK449+850 100m and bridge of 100m) for right side of DK449+700 - +900 Sound barrier with height of 2m, length of 220m for the left side of 65 Zhatou DK451+500-DK451+700 DK451+500 - +720 Sound barrier with height of 2m, length of 100m for the left side of 66 Huangshanbei DK451+950-DK452+050 DK451+950 - +DK452+050 Sound barrier with height of 3m, length of 150m for the left side of 67 Laoshan DK454+400-DK454+550 DK454+350 - +500 68 Pingshan DK462+400-DK462+500 Install ventilation and sound insulation window of 80m2 Take function replacement measures in combination of works 69 Junshanping DK492+100-DK492+200 relocation Sound barrier with height of 2m, length of 350m for the left side of 70 Xiamo DK495+200 - DK495+500 DK495+150 - +500 71 Liaoguangdong DK497+900 - DK498+100 Sound barrier with height of 2-3.5m, length of 600m (subgrade of 170m and bridge of 430m) for right side of DK497+900 - 72 Liaodong DK498+250 - DK498+500 DK498+500 Sound barrier with height of 2m, length of 600m for left side of 73 Kangjia, Mengjia DK501+700-DK502+000 DK501+650 - DK5m2+000 and the right side of DK501+650 - DK501+900 Sound barrier with height of 2-3m, length of 330m (subgrade of 74 Haungjiazhen DK504+500-DK504+850 110m and bridge of 220m) for the left side of DK504+680 - +850 and right side of DK504+540 - +700 Foot of Mountain 75 DK505+500-DK505+700 Install ventilation and sound insulation window of 75m2 Fegnhuang 76 Lijiacun Site 1 DK508+000-DK508+200 Install ventilation and sound insulation window of 50m2 77 Lijiacun Site2 DK508+800 - DK509+200 Sound barrier with height of 3.5m, length of 760m for left side of

18

DK508+820 - +DK509+280 and the right side of DK508+900 - +DK509+200 Sound barrier with height of 2m, length of 950m for left side of 80 Wayaotou DK511+350 - DK512+100 DK511+470- DK512+m20 and the right side of DK511+450 - +950 Sound barrier with height of 2m, length of 150m for the right side of 82 Yangmeitan DK521+300 - DK521+400 DK521+250- DK521+400 83 Shaping Village DK539+400 - DK539+700 Install ventilation and sound insulation window of 900m2 Sound barrier with height of 3.5m, length of 600m for left side of 84 Xingzhai DK541+100 - DK541+900 DK541+400 - +600 and the right side of DK541+300 - +700 85 Yankou DK542+600 - DK542+900 Install ventilation and sound insulation window of 100m2 Sound barrier with height of 2m, length of 430m for the left side of 86 Huilong DK543+700 - DK544+100 DK543+670-DK544+100 Sound barrier with height of 2-3m, length of 500m (subgrade of 87 Longwo DK544+350 - DK544+750 150m and bridge of 350m) for right side of DK544+300-DK544+800 Sound barrier with height of 2-3m, length of 500m (subgrade of 88 Litou DK545+300 - DK545+700 240m and bridge of 260m) for right side of DK545+260 - +760 Sound barrier with height of 2m, length of 140m for the left side of 89 Zhuzhizhai DK545+800 - DK545+950 DK545+820 - +960 Sound barrier with height of 2m, length of 600m for the right side of 90 Maozhang DK546+500 - DK547+000 DK546+400 - DK547+000 Sound barrier with height of 2m, length of 400m for the left side of 91 Chiling DK551+600 - DK552+000 DK547+800- DK548+200 92 Lianhua DK549+000 - DK549+500 Sound barrier with height of 2m, length of 600m for the right side of Lianhua Primary 93 DK549+450 - DK549+550 DK548+950-DK549+550 School 94 Taojia DK550+300 - DK550+700 Install ventilation and sound insulation window of 300m2 Sound barrier with height of 2m, length of 200m for the left side of 95 Daxiping DK559+550 - DK559+700 DK559+550 - +750 Sound barrier with height of 2m, length of 200m for the left side of 96 Shengpingjie DK562+150-DK562+300 DK562+150 - +350 Sound barrier with height of 2-3.5m, length of 740m (subgrade of 97 Yangniudi DK562+500-DK562+900 380m and bridge of 260m) for the left side of DK562+520 - +880 and right side of DK562+600 - +880 Sound barrier with height of 2-3m, length of 150m (subgrade of 63m 98 Laozhai DK570+500-DK570+600 and bridge of 67m) for right side of DK570+450 - +600 99 Hejia DK572+000 - DK572+300 Install ventilation and sound insulation window of 100m2 Sound barrier with height of 3.5m, length of 250m for the right side 100 Buba DK581+400 - DK581+600 of DK581+350 - +600 101 Jipotang DK590+550 - DK590+750 Install ventilation and sound insulation window of 50m2 Sound barrier with height of 3.5m, length of 350m for the left side of 102 Youmaya DK593+500 - DK593+900 DK593+570 - +920 103 Baimenlou DK594+600 - DK594+750 Install ventilation and sound insulation window of 250m2 104 Chuanyudu DK594+950 - DK595+150 Install ventilation and sound insulation window of 100m2 105 Lijiatang DK595+200 - DK595+450 Install ventilation and sound insulation window of 150m2 Sound barrier with height of 3.5m, length of 1,200m for the right side 106 Huangtian Town DK596+500 - DK597+650 of DK596+450-DK597+650 107 Tianxingzhai DK63+050 - DK63+150 Install ventilation and sound insulation window of 105m2 108 Youxing DK109+900 - DK110+000 Install ventilation and sound insulation window of 150m2 Sound barrier with height of 3m, length of 380m for the right side of 109 Waibianbao DK217+450 - DK217+800 DK217+420 - +800 Bangtu and Bangtu Sound barrier with height of 2m, length of 595m for the left side of 110 DK251+550 - DK251+900 Hope Primary School DK251+200-350 and DK251+500 - +945 111 Batang DK277+700 - DK277+900 Install ventilation and sound insulation window of 450m2 112 Zhongli DK343+900 - DK344+050 Install ventilation and sound insulation window of 400m2 Sound barrier with height of 2m, length of 150m for the left side of 113 Shuangjiang DK352+000 - DK352+150 DK352+000 - DK352+150 Sound barrier with height of 2m, length of 450m for the right side of 114 Xiaxishan DK398+200 - DK398+600 DK398+200 - DK398+650 115 Liucun DK401+400 - DK401+550 Install ventilation and sound insulation window of 195m2 116 Shetou DK409+750 - DK409+900 Install ventilation and sound insulation window of 600m2 117 Wanzijiang DK411+800 - DK412+000 Install ventilation and sound insulation window of 300m2 Sound barrier with height of 3m, length of 300m for the right side of 118 Maling DK419+400 - DK419+600 DK419+350 - +650 Sound barrier with height of 2m, length of 490m for left side of 119 Shangqin DK420+400 - DK420+650 DK420+380 - +600 and the right side of DK420+380 - +650 Sound barrier with height of 2m, length of 150m for the right side of 120 Lutian DK442+100 - DK442+200 DK442+100 - +250 121 Pingshan Hospital DK461+150 - DK461+300

19

Sound barrier with height of 2m, length of 1,150m for left side of 122 Dayuan DK469+800 - DK470+500 DK469+800 - DK470+550 and the right side of DK469+850 - DK470+200 Dayuan Primary 123 DK470+000 - DK470+150 School Sound barrier with height of 2-3m, length of 650m (subgrade of 124 Sidi DK472+600 - DK472+900 240m and bridge of 410m) for the left side of DK472+650 - DK472+950 and right side of DK472+550 - DK472+900 Sound barrier with height of 2-3m, length of 140m (subgrade of 70m 125 Fanduan Mountain DK474+400 - DK474+700 and bridge of 70m) for left side of DK474+570 - +710 Sound barrier with height of 2-3m, length of 200m (subgrade of 87m 126 Tiantangling DK477+900 - DK478+100 and bridge of 113m) for left side of DK477+900 - DK478+1000 Sound barrier with height of 2m, length of 120m for the left side of 129 Chenjia DK523+000 - DK523+400 DK522+980 - DK523+100 Sound barrier with height of 2-3m, length of 450m (subgrade of 90m 130 Gulou DK551+700 - DK552+100 and bridge of 370m) for left side of DK551+700 - DK552+150 131 Tiandong DK552+600 - DK552+900 Install ventilation and sound insulation window of 600m2 Guilin North Station Sound-proof wall with height of 3m and length of 390m has been New District of built for Xiang-Gui Railway Line. For this assessment, sound barrier 132 GZKK0+150 - GZKK0+550 Railway with height of 3m and length of 400m has been provided for the left Administration side of GZKK0+150 - GZKK0+550. Ventilation and sound insulation window of 1000m2 has been Residential area at GZKK1+150 - GZKK2+000、 133 installed for Xiang-Gui Railway, and no noise reduction measure has Guilin North Station GYKK5+000 - GYKK5+800 been taken in this assessment. Sound barrier with height of 3m and length of 340m has been built GZKK1+450 - GZKK1+800、 for Xiang-Gui Railway, and sound barrier with height of 3m and 134 Luxi GYKK5+100 - GYKK5+400 length of 400m are built at the right side of GYKK5+050 - GYKK5+450 in this assessment. GZKK3+900 - GZKK4+050、 135 Zhujia Village Install ventilation and sound insulation window of 900m2 GYKK2+850 - GYKK3+000 One family for building's function replacement; install 2m-height,150m-length,sound-absorbing noise barriers at the right 136 Zhushan Jiao DK567+400~+770 side of DK567+600~+750; other sections will adopt noise-insulation ventilating windows of 50m2 and three famlies will be compensated for electronmagnetic influence. Eight families for building's function replacement; install 200m2 137 Hewu、Shiyan Zui DK571+310~+900 noise-insulation ventilating windows;three families will be compensated for electronmagnetic influence. Eight families for building's function replacement; install 200m2 of 138 Lingbei Village DK572+100~+530 noise-insulation ventilating windows; two families will be compensated for electronmagnetic influence. Install 800m-length,2m-height sound-absorbing noise barrier at the right side of DK573+550 ~ +850 and DK574+100 ~ +600; two 139 Beiduzhai、Yantang DK573+600~DK574+620 families for building's function replacement; other sections will adopt noise-insulation windows of 170m2 and six families will be compensated for electronmagnetic influence. Nine families for building's function replacement; install 500m2 of 140 Liantang DK575+250~DK576+100 noise-insulation ventilating windows; seven families will be compensated for electronmagnetic influence. Install 700m-length, 2m-height sound-absorbing noise barriers and 110m2 of sound-insulation ventilating windows at the left side of DK576+700 ~ DK577+000 and right side of DK576+650 ~ 141 Lanwu DK576+600~DK577+220 DK577+050; at the sections without noise barriers, install 300m2 of sound-insulation ventilating windows and eight families will be compensated for electronmagnetic influence. Four families for building's function replacement; install 300m2 of 142 Guishui Village DK577+800~DK578+600 noise-isolation ventilation windows; four families will be compensated for electronmagnetic influence. Five families for building's function replacement;install 300m2 of 143 Mawang Tang DK580+650~DK581+350 noise-insulation ventilating windows; three families will be compensated for electronmagnetic influence. Five families for building's function replacement; install 150m2 of 144 Dalu Cha DK583+800~DK584+080 noise-insulation ventilating windows; three families will be compensated for electronmagnetic influence. Six families for building's function replacement;installation of 2m-height,300m-length, sound-absorbing noise barriers at the right 145 Xincun DK584+800~DK585+300 side of DK585+000 ~ DK585+300; other sections will adopt noise-insulation ventilating windows of 50m2 and nine famlieswill

20

be compensated for electronmagnetic influence. Install 2m-height, 1950m-length sound-absorbing noise barriers and 300m2 of sound-insulation ventilating windows at the right side of DK586+100~DK586+900 and DK587+000~DK587+350 as well as Baisha Production 146 DK586+100~DK587+300 the left side of DK586+350~DK586+750and Brigade DK586+950~DK587+350; at the sections without noise barriers, install sound-insulation ventilating windows of 400m2 and nineteen families will be compensated for electronmagnetic influence. Group 8 of Baisha 147 DK587+600~DK588+000 Install 200m2 of noise-insulation ventilating windows. Production Brigade One family for building's function replacement and three families 148 Dawan DK599+350~+500 will be compensated for electronmagnetic influence. One family for building's function replacement; install 30m2 149 Yintian DK610+670~+800 sound-insulation ventilating windows. Eleven families for building's function replacement; install 150m2 150 Datang Village DK611+000~+680 sound-insulation ventilating windows and three families will be compensated for electronmagnetic influence. 151 Dudizhai DK611+900~DK612+300 Install 200m2 of noise-insulation ventilating windows. Three families for building's function replacement and install 230m-length,2m-height sound-absorbing noise barriers as well as 120m2 of sound-insulation ventilating windows at the left side of 152 Rongmu Village DK612+360~DK613+000 DK612+770 ~ DK613+000; at sections without installation of sound-absorbing noise barriers, adopt sound-insulation ventilating windows of 300m2 and eight families will be compensated for electronmagnetic influence. 153 Nanshuizhai DK614+180~+500 Install 400m2 of noise-insulation ventilating windows. Twelve families for building's function replacement; install 154 Gejiang Village DK629+400~DK630+300 noise-insulation ventilating windows of 420m2 and three famlies will be compensated for electronmagnetic influence. Eleven families for building's function replacement; install 155 Huiling Wo DK630+300~DK631+200 noise-insulation ventilating windows of 610m2 and fourteen famlies will be compensated for electronmagnetic influence. Twenty-eight families for building's function replacement; install 156 Tanbo Village DK631+200~DK632+300 noise-insulation ventilating windows of 780m2 and sixteen famlies will be compensated for electronmagnetic influence. Five families for building's function replacement;install 200m-length, 2m-height sound-absorbing noise barriers at the right side of 157 Maning Village DK632+700~DK633+600 DK633+150~+350;install 200m2 of sound-insulation ventilating windows and six families will be compensated for electronmagnetic influence. at the sections without noise barriers. Nine families for building's function replacement;install 300m2 of 158 Susha Village DK633+800~DK634+750 sound-insulation ventilating windows; seventeen families will be compensated for electronmagnetic influence. Eight families for building's function replacement and install 350-length,2m-height at the right side of DK635+100~+450; for 159 Huangxie Mountain DK635+100~+500 other sections, install 300m2 of sound-insulation ventilating windows and thirteen families will be compensated for electronmagnetic influence. Six families for building's function replacement;install 500m2 of 160 Xinzhai DK635+650~DK636+100 sound-insulation ventilating windows; six families will be compensated for electronmagnetic influence. Two families for building's function replacement;install 300m sound-absorbing noise barriers at the right side of DK636+700~ DK637+000,including 144m-length, 2m-height sound-absorbing 161 Tangkou Village DK636+200~DK637+100 noise barriers on the bridge and 156m-length,3m-height noise barriers on the road embankment; for other sections, install sound-insulation ventilating windows of 100m2 and twelve families of electronmagnetic influence compensation. At the right side of DK637+950~DK638+350, install 400m-length, 2m-height sound-absorbing noise barriers and 140m2 of 162 Linggen DK637+900~DK638+330 sound-insulation ventilating windows , thirteen families will be compensated for electronmagnetic influence. 163 Da Village DK643+500~+750 Install 300m2 of noise-insulation ventilating windows. Three families for building's function replacement;install 300m2 of 164 Gejiang Village DK644+000~+300 sound-insulation ventilating windows; four families will be compensated for electronmagnetic influence. Six families for building's function replacement and install 165 Jinwu Village DK644+600~DK645+250 450-length, 2m-height sound-absorbing noise barriers at the right side

21

of DK644+900 ~ DK645+350; at other sections, install sound-insulation ventilating windows of 400m2 and fifteen families will be compensated for electronmagnetic influence. Four families for building's function replacement and install 250-length, 2m-height sound-absorbing noise barriers at the right side 166 Nanma Village DK645+350~+600 of DK645+350~+600; at other sections, install sound-insulation ventilating windows of 250m2 and nine families will be compensated for electronmagnetic influence. At the right side of DK645+900~DK646+100, install 200-length, 2m-height sound-absorbing noise barriers and five families for 167 Nanshe Village DK645+800~DK646+100 building's function replacement; at the sections without noise barriers, install sound-insulation ventilating windows of 340m2 and five families will be compensated for electronmagnetic influence. 168 Lixiang Village DK646+450~+750 Install 150m2 of noise-insulation ventilating windows. At the left side of DK646+940~DK647+200 install 260-length, 2m-height sound-absorbing noise barriers and sound-insulation 169 Shuntang DK646+900~DK647+400 ventilating windows of 130m2; for the sections without noise barriers, install 150m2 of sound-insulation ventilating windows and nine families will be compensated for the electronmagnetic influence. Install 200m2 of sound-insulation ventilating windows; one family 170 Shungang Village DK647+700~+890 will be compensated for electronmagnetic influence. 171 Tangwei DK649+500~+760 Install 220m2 of noise-insulation ventilating windows. Seven families for building's function replacemnt;install 300m2 of Muge Village,Mugong 172 DK657+150~+730 sound-insulation ventilating windows; seven families will be Village compensated for electronmagnetic influence. 173 Meikeng DK663+740~DK664+000 Install 120m2 of noise-insulation ventilating windows. Seven families for building's function replacement and install 100-length, 2m-height sound-absorbing noise barriers at the right side 174 Aozai Wei DK675+320~+600 of DK675+450~+550; at other sections, install sound-insulation ventilating windows of 200m2 and seven families of electronmagnetic influence compensation. Two families for building's function replacemnt; install 200m2 of 175 Modao Lang DK678+160~+350 sound-insulation ventilating windows; five families will be compensated for electronmagnetic influence. Sixteen families for building's function replacemnt; install 260m2 of 176 Buliu DK684+000~+400 sound-insulation ventilating windows; four families will be compensated for electronmagnetic influence. Five families for building's function replacement and install 150-length, 2m-height sound-absorbing noise barriers at the left side Shilv Village, Duifei 177 DK687+300~DK688+000 of DK687+350~+500; at other sections, install sound-insulation Village ventilating windows of 100m2 and eight families will be compensated for electronmagnetic influence. At the right side of DK697+540 ~ +650, install 110-length, 2m-height sound-absorbing noise barriers, four families for building's Chelun Ping,Dapo 178 DK696+720~DK697+800 function replacement and install 160m2 of sound-insulation Village ventilating windows for the rest; at the sections without noise barriers, install sound-insulation ventilating windows of 300m2 and eleven families will be compensated for electronmagnetic influence. Four families for building's function replacement; at the left side of DK698+150~+450, install 300-length, 2m-height sound-absorbing 179 Shizai Gang DK698+200~+420 noise barriers and eight families will be compensated for electronmagnetic influence. At the right side of DK698+770~+880, install 110-length, 2m-height sound-absorbing noise barriers and 110m2 of sound-insulation 180 Potang Zhai DK698+770~DK699+000 ventilating windows, three families for building's function replacement and three families will be compensated for electronmagnetic influence. 181 Qushan Village DK701+700~+830 Install 350m2 of noise-insulation ventilating windows. Eight families for building's function replacement,;install 600m2 of 182 Xiangkou DK702+100~+900 sound-insulation ventilating windows; nine families will be compensated for electronmagnetic influence. Five families for building's function replacement,;install 100m2 of 183 Fuzhu Keng DK704+180~+340 sound-insulation ventilating windows; four families will be compensated for electronmagnetic influence. Three families for building's function replacement,;install 200m2 of 184 Baishi Village DK706+300~+500 sound-insulation ventilating windows; seven families will be compensated for electronmagnetic influence. 185 Zendong Kengkou DK708+200~+500 One family for building's function replacement,;install 100m2 of

22

sound-insulation ventilating windows; three families will be compensated for electronmagnetic influence. 186 Qixing Primary School DK708+260~+320 Building's function replacement. Four families for building's function replacement,;install 200m2 of 187 Maotian Lang DK708+870~DK709+000 sound-insulation ventilating windows; three families will be compensated for electronmagnetic influence. Noise barriers have been installed; at the right side of DK709+650~ Lanshu Zui,Baifen , 188 DK709+550~+900 +900,install 250m-length 2m-height sound-absorbing noise barriers Gang and sound-insulation ventilating windows of 200m2; three families will be compensated for electronmagnetic influence. At the left side of DK710+150~+500, install 350m-length,2m-height sound-absorbing noise barriers and two families for building's 189 Xilin Village DK710+100~+500 function replacement while at the right side, install 200m2 of sound-insulation ventilating windows and fourteen families will be compensated for electronmagnetic influence. At the left side of DK711+250 ~ +580 and right side of DK711+330~+730, install 730m-length,2m-height sound-absorbing 190 Maihou Tang DK711+120~+700 noise barriers as well as 200m2 of sound-insulation ventilating windows and nine families will be compensated for electronmagnetic influence. Xin Mountain Village、 191 DK716+250~+700 Install 400m2 of noise-insulation ventilating windows. Lianshi Five families for building's function replacement;at the right side of DK721+530 ~ +650, install 120m-length sound-absorbing noise barriers totally,including 110m-length, 2m-height noise barriers on 192 Xiaoshui Village DK721+350~+720 the bridge and 10m-length,3m-height noise barriers on the road embankment;install 150m2 of sound-insulation ventilating windows and four families will be compensated for electronmagnetic influence. 193 Dapo Tou DK722+440~+560 Install 200m2 of noise-insulation ventilating windows. Install 200m sound-absorbing noise barriers at the left side of DK727+700 ~ +900,including 45m-length, 2m-height sound-absorbing noise barriers on the bridge and 194 Gaolang Village DK727+720~DK728+000 155m-length,3m-height noise barriers on the road embankment; for other sections, install sound-insulation ventilating windows of 200m2 . At the right side of DK730+700 ~ DK731+100, install 400m-length,2m-height sound-absorbing noise barriers; for other 195 Liaopan,Anjiang DK730+400~DK731+120 sections, install 300m2 of sound-insulation ventilating windows and nine families will be compensated for electronmagnetic influence. Ten families for building's function replacement; install 300m2 of 196 Futian, Sengcun DK732+280~+880 sound-insulation ventilating windows; eight families will be compensated for electronmagnetic influence. 197 Honglian DK735+100~+200 Install 80m2 of noise-insulation ventilating windows. 198 Bailong Village DK736+780~+850 Install 300m2 of noise-insulation ventilating windows. At the right side of DK737+750~DK738+050, install 300m-length sound-absorbing noise barriers totally , including 166m-length, 199 Zhugao Tang, Rencun DK737+480~DK738+100 2m-height noise barriers on the bridge and 134m-length,3m-height noise barriers on the road embankment; for other sections, install 600m2 of sound-insulation ventilating windows and six families will be compensated for electronmagnetic influence. 200 Shuitou Yong DK750+700~DK751+050 Six families will be compensated for electronmagnetic influence. Install 160m-length, 3m-height sound-aborbing noise barriers ar the 201 Zhongbu DK753+340~+450 right side of HGDK0+300~+460. At the left side of DK755+052 ~ +332 and right side of NDK414+550~+750, install 480m-length sound-absorbing noise 202 Zhuzai Gang,Fucao DK755+090~+950 barriers totally,including 385m-length, 2m-height noise barriers on the bridge and 95m-length,3m-height noise barriers on the road embankment; twenty-three families will be compensated for electronmagnetic influence. At both sides of DK758+400~+600, install 400m-length,2m-height Dagang She、Dabu 203 DK758+100~+600 sound-absorbing noise barriers; for ther sections without noise Gang barriers, install 200m2 of sound-insulation ventilating windows and five families will be compensated for electronmagnetic influence. Install 500m2 of noise-insulation ventilating windows; nine families 204 Nanhua DK759+300~+550 of electronmagnetic influence compensation. 205 Zhuyuan Village DK763+880~+980 At the right side of DK763+830~DK764+030 install 200m-length,

23

2m-height sound-absorbing noise barriers and four famlies will be compensated for electronmagnetic influence. 206 Qingqi Hospital DK766+320~+500 Install 1200m2 of noise-insulation ventilating windows. Foshan Yaobang 207 Vocational and DK766+620~+720 Install 900m2 of noise-insulation ventilating windows. Techonical School At the left side of DK767+500 ~ DK768+100, install Qujia Village, Lujia 208 DK767+520~DK768+050 600m-length,2m-height sound-absorbing noise barriers and 230m2 of Village sound-insulation ventilating windows; twelve families will be compensated for electronmagnetic influence. At the left side of DK769+400~+800, install 400m-length,2m-height 209 Gemei Village DK769+450~+850 sound-absorbing noise barriers and 750m2 of sound-insulation ventilating windows; fourteen families will be compensated for electronmagnetic influence. Install 200m2 of noise-insulation ventilating windows; two families 210 Longyou Gang DK771+250~+400 of electronmagnetic influence compensation. At the left side of DK771+660~DK772+100 and the right side of ~ Shangtang Lujia、 DK771+710 DK772+150, install 880m-length,2m-height 211 DK771+700~DK772+100 sound-absorbing noise barriers and 490m2 of sound-insulation Guojia Village ventilating windows; nine families will be compensated for electronmagnetic influence . At the right side of DK772+470 ~ +620, install 150m-length,2m-height sound-absorbing noise barriers and 150m2 of 212 Xiaheng Village DK772+500~+600 sound-insulation ventilating windows; six families will be compensated for electronmagnetic influence. At the left side of DK775+620~+820, install 200m-length,2m-height sound-absorbing noise barriers and 200m2 of sound-insulation 213 Xixin Village DK775+620~+800 ventilating windows; five families will be compensated for electronmagnetic influence. 214 Zhoubian DK776+300~+950 Install 600m2 of noise-insulation ventilating windows. At the left side of L1DK1+700~L1DK2+000 and right side of DK779+575~+850,NYDK779+575~+850 and NYDK779+575~ +850, install 1050m-length sound-absorbing noise barriers totally, including 737m-length, 2m-height noise barriers on the bridge and 215 Xinxi Village DK778+950~DK779+950 313m-length,3m-height noise barriers on the road embankment; ten families for building's function replacement at the intersection of main line and lie line; for the rest sections, install 820m2 o f sound-insulation ventilaring windows and thirty-two families will be compensated for electronmagnetic influence. One family for building's function replacement; install 210m2 of 216 Hengjiang villa DK781+170~+260 sound-insulation ventilating windows; two families will be compensated for electronmagnetic influence. 217 Yuelong Village DK781+530~+680 Install 200m2 of noise-insulation ventilating windows. At the left side of NDK782+500 ~ +700 and right side of ~ 218 Hecun DK782+480~+800 NYDK782+600 +800, install 400m-length,2m-height sound-absorbing noise barriers; twelve families will be compensated for electronmagnetic influence. At the right side of NYDK783+750 ~ +930, install Bajia Village, Erjia 180m-length,2m-height sound-absorbing noise barriers and 1000m2 219 DK783+750~DK784+780 of sound-insulation ventilating windows, four families for building's Village, Jiyang Cun function replacement and twenty-one families will be compensated for electronmagnetic influence. At the left side of DK784+950~DK785+400 and the right side of DK785+000~+400, install 850m-length,2m-height sound-absorbing 220 Dongcun DK784+900~DK785+650 noise barriers and 1000m2 of sound-insulation ventilating windows; twenty-three families will be compensated for electronmagnetic influence. At the right side of DK786+600 ~ +940, install 221 Shang'an DK786+660~+920 340m-length,2m-height sound-absorbing noise barriers and 400m2 of sound-insulation ventilating windows, nine families will be compensated for electronmagnetic influence. At the left side of DK786+900 ~ DK787+100, install 222 Nanyao Village DK786+900~DK787+150 200m-length,2m-height sound-absorbing noise barriers and 350m2 of sound-insulation ventilating windows at the right side of DK787+280 ~ +580, install 223 Xincun DK787+350~+550 300m-length,2m-height sound-absorbing noise barriers and 200m2 of sound-insulation ventilating windows, nine families will be

24

compensated for electronmagnetic influence. at the left side of DK788+550~DK789+050 and right side of ~ Xishe, Hecao Li, YDK788+590 YDK789+090, install 1000m-length,2m-height 224 DK788+550~DK789+020 Xiaotang sound-absorbing noise barriers and 780m2 of sound-insulation ventilating windows, thirty families will be compensated for electronmagnetic influence. At the left side of DK790+100 ~ +600, install 500m-length sound-absorbing noise barriers totally , including 400m-length, Xidi International 225 DK789+750~DK790+500 2m-height noise barriers on the bridge and 60m-length,3m-height Garden noise barriers on the road embankment;at the right side of GK35+850 ~ GK36+100, install 250m-length,3.5m height sound-absorbing noise barriers. Two families for building's function replacement;at the right side of DK789+900 ~ DK790+150, install 250m-length,2m-height sound-absorbing noise barriers; at the left side of GK35+630~ 226 Luogang DK789+670~DK790+200 +750,install 120m-length,3.5m-height sound-absorbing noise barriers;for the rest sections, install 450m2 of sound-insulation ventilating windows and six families will be compensated for electronmagnetic influence. 227 Yuemiao Kindergarten DK790+050~+100 Function replacement. At the left side of GK34+390 ~ +550, install 160m-length,3.5m-height sound-absorbing noise barriers and 510m2 228 Taoyuan Village DK791+200~+420 of sound-insulation ventilating windows,two families for building's function replacement and six families will be compensated for electronmagnetic influence. At the left side of GK31+780 ~ GK32+200, install 229 Caibian DK793+500~+830 420m-length,3.5m-height sound-absorbing noise barriers and 430m2 of sound-insulation ventilating windows. One family for building's function replacement withine 16m from the 230 Henggang DK799+550~656 railway line. At the right side of DK801+950 ~ DK803+800, install 403m-length,3.5m-height sound-absorbing noise barriers and 830m2 231 Xicun DK801+340~DK802+270 of sound-insulation ventilating windows,two families for building's function replacement withine 16m from the railway line and twenty-five families will be compensated for electronmagnetic influence. At the left side of DK804+900~DK805+300 and right side of YDK804+600 ~ +950, install 750m-length,2m-height 232 Zhennan Village DK804+650~DK805+500 sound-absorbing noise barriers and 510m2 of sound-insulation ventilating windows,twenty-seven families will be compensated for electronmagnetic influence. At the left side of DK806+050~+400, install 350m-length,2m-height 233 Hongwei Village DK806+050~+370 sound-absorbing noise barriers and 180m2 of sound-insulation ventilating windows,thirteen families will be compensated for electronmagnetic influence. At the left side of GMGDK7+050 ~ +600, install 234 Shangyi Village DK806+700~DK807+500 550m-length,3.5m-height sound-absorbing noise barriers and 800m2 of sound-insulation ventilating windows. At the left side of DK807+800 ~ DK808+100, install Group 3 of Longxi 235 DK807+550~DK808+080 300m-length,2m-height sound-absorbing noise barriers and 730m2 of Village sound-insulation ventilating windows and ten families will be compensated for electronmagnetic influence. 236 Tanbian Dong Village DK809+150~+350 Install 400m2 of noise-insulation ventilating windows. At the left side of GMGDK4+710 ~ +930, install 220m-length,3.5m-height sound-absorbing noise barriers and 260m2 237 Yanbian Village DK809+660~DK810+050 of sound-insulation ventilating windows,ten families will be compensated for electronmagnetic influence. 238 Zhoubian Village DK810+050~+270 Install 400m2 of noise-insulation ventilating windows. At the left side of DK810+650 ~ DK811+200, install 239 Shaobian Village DK810+650~DK811+170 550m-length,3.5m-height sound-absorbing noise barriers and 500m2 of sound-insulation ventilating windows,twenty-three families will be compensated for electronmagnetic influence. 240 Shaobian School DK810+720~+830 Install 900m2 of noise-insulation ventilating windows. At the left side of DK811+370 ~ +770, install 400m-length,3.5m-height sound-absorbing noise barriers and 720m2 241 Gehai Village DK811+420~+730 of sound-insulation ventilating windows,fourteen families will be compensated for electronmagnetic influence.

25

Kangyi Residential District,BuildingD on 242 Jianshe West Road, DK812+080~+300 Install 2000m2 of noise-insulation ventilating windows. Junyi Residential District 243 Hubang Village DK812+300~DK813+120 Install 1200m2 of noise-insulation ventilating windows 244 Shengli New Village DK813+110~+300 Install 400m2 of noise-insulation ventilating windows 245 Nanbian Village DK815+100~+300 Install 200m2 of noise-insulation ventilating windows George English and At the right side of DK815+150 ~ +470, install 320m-length, 246 Chinese DK815+200~+420 2m-height sound-absorbing noise barriers and 1500m2 of School,Kindergarten sound-insulation ventilating windows. 247 Guantian Village DK815+530~+780 Install 400m2 of noise-insulation ventilating windows At the left side of DK816+950~DK817+250, install 300m-length, 248 Dahe DK817+000~+250 2m-height sound-absorbing noise barriers. At the left side of DK817+500~DK818+250, install 750m-length, 2m-height sound-absorbing noise barriers while at the sections Zengjiao 、 249 DK817+500~DK818+400 without noise barriers, install 590m2 of sound-insulation ventilating Hongshi Fang windows,forty-nine families will be compensated for electronmagnetic influence. At the left side of DK818+650~DK819+120 and right side of ~ 250 Ditangfang of Jushu DK818+680~DK819+180 DK818+800 DK819+210, install 880m-length, 2m-height sound-absorbing noise barriers and 580m2 of sound-insulation ventilating windows. At the left side of DK819+450~DK820+300, install 850m-length, 2m-height sound-absorbing noise barriers and 310m2 of 251 Chigang DK819+490~DK820+300 sound-insulation ventilating windows,three families for building's function replacement. At the left side of NDK822+050 ~ +420 and right side of YDK822+000 ~ +450, install 820m-length, 2m-height sound-absorbing noise barriers and nine families between railway 252 Yongyuan DK822+000~+400 lines will have the building's function replaced;for the rest sections, install 810m2 of sound-insulation ventilating windows and twenty-six families will be compensated for the electronmagnetic influence. At the left side of NDK824+000~+400 and DK824+000~+400 as well as the right side of NDK824+100 ~ +450, DK824+100 ~ +500and NYDK824+120~+500 , install 1930m-length, 2m-height 253 Xintiandi DK824+000~+400 sound-absorbing noise barriers and four families between railway lines will have the building's function replaced;for the rest sections, install 770m2 of sound-insulation ventilating windows and twenty-five families will be compensated for the electronmagnetic influence. 254 Xintiandi Kindergarten DK824+300~+330 Install 400m2 of noise-insulation ventilating windows. Three families for building's function replacement; install 300m2 of 255 Qingtang L1DK2+270~+470 sound-insulation ventilating windows; five families will be comensated for electronmagnetic influence. At the right side of L1DK2+600~+850 and L2DK2+600~+900, Xinnong Primary 256 L2DK2+650~+850 School install 550m-length, 2m-height sound-absorbing noise barriers and sound-insulation ventilating windows of 1000m2. At the right side of L2DK3+250 ~ +480, install 230m-length, 2m-height sound-absorbing noise barriers; for the sections without 257 Xiebian, Xubian L2DK2+900~L2DK3+430 noise barriers, install sound-insulation ventilating windows of 300m2 and eleven families will be compensated for electronmagnetic influence. At the right side of GMDK0+160~+400 and GJGDK2264+350~ Residential District of 258 GMDK0+200~+370 locomotive depot +580, install 470m-length, 3.5m-height sound-absorbing noise barriers and sound-insulation ventilating windows of 3200m2. 259 Wangsheng Tang GMDK0+000~+600 Install 3000m2 of noise-insulation ventilating windows. Residential buildings 260 on the Keshan North GMDK0+840~+890 Install 600m2 of noise-insulation ventilating windows. Street 261 North Dagangyuan GMDK0+700~+810 Install 600m2 of noise-insulation ventilating windows. Guangzhou Chenjia 262 Gen Commemoration GMDK0+810~+890 Install 3100m2 of noise-insulation ventilating windows. Middle School 263 Dagangyuan GMDK0+910~GMDK1+100 Install 1100m2 of noise-insulation ventilating windows. 264 Dormitory of GJGDK2264+250~+620 At the left side of GJGDK2264+260~+500, install 240m-length,

26

locomotive depot 3.5m-height sound-absorbing noise barriers and 1200m2 of sound-insulation ventilating windows. No.2 High Schol of 265 Guangzhou Railway GJGDK2264+480~+660 Install 1200m2 of noise-insulation ventilating windows. Co. 266 Dormitory of car depot GJGDK2264+800~+900 Install 1500m2 of noise-insulation ventilating windows.