Design Services for Downtown Plaza City of Middleton, Wisconsin

Feb 7, 2018

Dear Selection Committee,

There are rare occasions in the life of a community that a single action can define the way that functions, comes together, and presents itself. Middleton Downtown plaza is indeed this singular opportunity for this community.

The of the will determine its long term contribution to the community and will serve as the stage for many community activities, planned or unplanned, that will help create a greater bond in this community, so that we can achieve in concert, what we can not do alone.

We view the space as an outdoor room that will benefit from

Sincerely,

Hamid Noughani, AIA Principal

ASSEMBLAGE ARCHITECTS 7433 Elmwood Ave. ,Middleton, WI 53562 (608) 827-5047

Established in 2003, Assemblage Architects is a full design firm with emphasis on technically challenging projects. Our office is located in Middleton, Wisconsin.

1 ASSEMBLAGE ARCHITECTS Design Team Roles and Responsibilities:

Assemblage Architects: Prime Design Firm.

With an office located within two blocks of the project site, and just behind the City Hall, we will have significant access to the staff and the site.As a long time resident of Middleton, and commitment to downtown well being, we offer an understanding of the general desires and needs of the community.

We will lead the community meetings and document their input. We will present it in a clear through models, renderings and animation. We will develop options reflecting community comments and will administer project construction from a block away.

We are joined in this proposal by our longterm collaborators:

JSD: Site Civil and Landscape .

JSD will also participate in public meetings and presentations to assist us in developing options and approaches that are elegant and timeless.

Henneman : Electrical Engineering and Lighting Design

Henneman’s office is located on Greenway Boulevard, less than 1 mile away. Henneman will provide lighting and electrical design as well as any other engineering work that may contribute to the Plaza’s design success.

ASSEMBLAGE ARCHITECTS 2 1. General overview and design approach and preliminary schedule :

• Approach: We will approach this space by creating a stage for the City’s social interactions. An outdoor living room with flexible amenities that can serve the broadest functions and host diverse events. Our strategy is to achieve this based on building community consensus and common goals and objectives.

Assemblage Architects places great value on collaborative design. We will kick off the design process with a design that includes the Downtown Plaza Core Team, city staff, and other stakeholders. Stakeholder ideas, input, and comments are central to this intensive planning session. This provides our design team with immediate, live feedback. allow the Project Team to establish design direction in a collaborative manner.

Pre-conceptual ideas generated during the charrette process will be further refined and presented to all project stakeholders for review and comment.

Once the Project Team has selected a schematic design pathway, we will present it at a public meeting. Public comments will be recorded. Comments will be discussed with the Project Team, and incorporated to the extent desired by the Project Team.

We anticipate conducting several meetings at design milestones to gather additional stakeholder feedback. Feedback will be incorporated prior to next presentation.

Goals and Objectives: Through public input we will identify a series of goals and objectives, organize them by hierarchy and let these goals become our design principles.

Design Guidelines: Based on goals and objectives we will develop a series of tangible design guidelines that we help us design the space and maintain its focus and boundaries.

• Working with the Core Team, City Staff, and other Stakeholders:

Meeting: We will meet on Bi-weekly bases with the core team and the staff to present project development and hear comments.

Collaborative Project Website: We will establish a project website to show our progress, decisions and seek input from the community at large.

Open Houses: Because we are located in Downtown Middleton, we will hold open houses (on some weekend TBD) to talk to our neighbors and hear their comments and reflect on their perspectives.

3 ASSEMBLAGE ARCHITECTS Schedule Outline

Phase Dates in 2018 Deliverables March 20th A/E Selection April - May Public Input Process  General Public Input Meeting 1  General Public Input Meeting 2  Business Input Meeting  City Input Meeting

May - August Develop three (3) Schematic Design Concepts

August 31st Submit Schematic Design Concepts to City Schematic Design Development September 25th Public Presentation and Input Session October 16th Concept Selected October 16th - Submit Final Design Drawings December 31st Design Documentation

Design Fees Phase 1 Phase 2 Assemblage Lead - $8,000 $31,000

JSD Site civil-lanscape architect $5,000 $10,000

Henneman Lighting and electrical $1,000 $9,000 $14,000 $50,000

ASSEMBLAGE ARCHITECTS 4

Mountaineer Challenge Academy Outdoor Plaza Kingwood, WV

This project created a courtyard space as part of the building program to accommodate the students outdoor activities. The space included a shelter space and proper lighting. The new plaza is designed to host graduation parties, all school social gatherings and other activities.

The space is raised from the adjacent grade to create a more defined space and is enhanced by a series of integrated elements to allow for smaller gatherings.

Design Team: Assemblage Architects: Prime Cost: Plaza only: Estimated $1,000,000 Actual: $1,500,000 Completion: 2012

5 ASSEMBLAGE ARCHITECTS Multi-Purpose Building Plaza New Construction Kingwood, WV

This project created a courtyard space as part of the building program to allow gatherings for large events as well as an outdoor exercise space. The space is designed with the proper lighting to accommodate nighttime activities. The light fixtures are designed to define the space. The plaza center is left open to maximize flexibility.

Design Team: Assemblage Architects: Prime Cost: Plaza only: Estimated $800,000 Actual: $800,000 Completion: 2014

ASSEMBLAGE ARCHITECTS 6 UW-Madison Engineering Hall Plaza Renovation Madison, Wisconsin

The Engineering Hall Plaza Renovation addresses a number of issues pertaining to the existing building entry configuration. The design will integrate the accessible entrance with the main entry, while providing for an accessible, contiguous plaza space raised slightly above the existing sidewalk. An inte- grated ADA compliant ramp will allow the new plaza to be accessible. This will also allow the plaza to be easily accessed by cleaning and snow removal equipment. This ramp will link the accessible path of travel with the main building entrance.

Design Team: Assemblage Architects: Prime Henneman Engineering: M,E,P, Cost: Estimated $1,000,000 Actual: $1,100,000 Anticipated Completion: 2019

7 ASSEMBLAGE ARCHITECTS UW- Madison School of Veterinary Medicine Building Addition and Plaza Madison, Wisconsin

This project contains the first installation of a linear accelerator dedicated to the treatment of animals.The program includes: radiation treatment vault, private entry, physical therapy, anesthesiology, treatment planning, animal prep space, image reading, and conference spaces.

Project included significant electrical and HVAC components to maintain precise environmental conditions within the treatment vault.

Design Team: Assemblage Architects: Prime Affiliated Engineers: M,E,P, FP, IT Size: 8,000 GSF Cost: $1.4 Million Completion: 2010

ASSEMBLAGE ARCHITECTS 8 XMACIA BLVD AND PLAZA Sabadell,Spain

Project consisted of a new major street and urban park as part of the city expansion and urbanization. Design team: Hamid Noughani during tenure at LLuis Rambla i Amet, Architect 1992

9 ASSEMBLAGE ARCHITECTS Madison College Southeast Plaza & South West Plaza Madison, WI

Project scope was reorganization of the main buildings first floor functions to create a campus common that encompasses student life. The renovation provided a complete new food service program, and a new space for the culinary arts program.

The project required keeping the building fully functional and occupied during construction. This necessitated a complex sequencing plan.

The renovation added 60,000 SF to the building footprint, and renovated an additional 70,000 SF of existing space. The project created new shipping/ receiving truck bays that are connected to the administration building. The main structure and administration building were sprinkled in the process. A full service cosmetology program was relocated from the downtown campus to the Truax campus.

Design team: Assemblage Architects: Prime Henneman Engineering: Electrical, FP, IT, AV JSD: Site Civil Completion 2017

ASSEMBLAGE ARCHITECTS 10 AC Marriott Hotel New Construction Madison, Wisconsin

Henneman Engineering provided electrical engineering and lighting design services for the 165 room facility. The 10-story building features a dynamic two-story lobby lighting display along with a tenth floor restaurant offering picturesque views of the State Capitol. Henneman collaborated extensively with our architectural partner to design and integrate lighting into the building’s architecture resulting in a space which captures the attention of both guests and passerby.

Design team: Henneman Engineering: Electrical Engineering and Lighting Design Completion 2017

11 ASSEMBLAGE ARCHITECTS Calvin Moody Park Community Building and Park Renovation Milwaukee, Wisconsin

A new 3,000 square foot community building is under design along with an outdoor splash pad with a small playground, an open air picnic structure, lit parkways, a Helios exercise station and improved green spaces for gatherings and field sports. The project will also include reconstruction of the parking lot and relocation of the lighted basketball courts. Space will also be set aside for a community garden.

Design team: Henneman Engineering: Electrical Engineering and Lighting Design Completion 2014 Construction Cost at Completion: $1.5M

ASSEMBLAGE ARCHITECTS 12 Johnsons Park Renovation and LED Lighting Installation Milwaukee County Parks Milwaukee, Wisconsin

Johnsons Park Renovation and LED Lighting Installation Johnsons ParkMilwaukee Renovation County Parksand LED Lighting InstallationMilwaukee, Wisconsin Milwaukee, Wisconsin

Henneman Engineering providedHenneman electrical Engineering engineering provided electrical engineering services to install new LED lights and new services to install new LEDfixtures, lights andincluding new fixtures,the poles and bases as part of the Johnsons Park Renovation. The new lighting including the poles and basesdesign as illuminated part of the anJohnsons existing Parkpath that circumnavigates and bisects the park. Renovation. The new lighting design illuminated an existing path that circumnavigatesHenneman and bisects worked the park. with the park/landscape architect as part of an overall renovation to the park. Henneman worked with theThe park/landscape renovation included architect improvements as to an existing performance stage and T-ball fields. The part of an overall renovationproject to the also park. included The renovation a new picnic shelter and bathroom facilities. included improvements to an existing performance stage and T-ball fields. The projectConstruction also included Cost: a Notnew Available picnic shelter and bathroom facilities.Completion Date: 2010

Design team: Henneman Engineering: Electrical Engineering and Lighting Design Completion 2010 Henneman Engineering provided electrical engineering services to install new LED lights and new fixtures, including the poles and bases as part of the Johnsons Park Renovation. The new lighting design illuminated an existing path that circumnavigates and bisects the park.

Henneman worked with the park/landscape architect as part of an overall renovation to the park. The renovation included improvements to an existing performance stage and T-ball fields. The project also included a new picnic shelter and bathroom facilities.

Construction Cost: Not Available Completion Date: 2010

www.henneman.com • 888.616.0216

13 ASSEMBLAGEwww.henneman.com ARCHITECTS • 888.616.0216 Carbon at Union Corners Mixed-Use Retail/Residential Madison, Wisconsin

JSD provided survey, civil engineering and landscape architectural services for the construction of two four-story mixed-use apartment buildings at Winnebago Street in Madison, WI. Carbon at the Union Corners development included engineering and site development for newly constructed buildings and on-site and off-site improvements for building access, parking, and pedestrian connectivity. Landscape architectural services were provided in developing an integrated site design that featured a public plaza, terrace, and outdoor seating for commercial tenants. Stormwater management was integrated into a Riverwalk pedestrian connection that featured native plant species and a stream bed that connected multiple sites within the development. JSD provided support and coordination for the City of Madison “ Commission and Plan Commission review and approval processes” for this project. JSD provided construction drawings, documentation, and administration throughout the construction phase of this project.

Design team: JSD: Civil Engineering, , Survey Completion Fall 2016

EAST WASHINGTON AVENUE EAST WASHINGTON AVENUE

UNDERGROUND PARKING ACCESS MIXED USE BUILDING

UW CLINIC MIXED USE BUILDING BUILDING MILWAUKEE STREET

PARKING ACCESS LOADING DOCK

UNDERGROUND PARKING ACCESS

UNDERGROUND PARKING ACCESS

MIXED USE MIXED USE UNDERGROUND BUILDING BUILDING PARKING ACCESS WINNEBAGO STREET

WINNEBAGO STREET

ASSEMBLAGE ARCHITECTS 14

UNION CORNERS DEVELOPMENT RENDERING Location: Madison, Wisconsin 316 West Washington Avenue Renovation Madison, Wisconsin

This was an exciting renovation for the Hovde Properties at 316 West Washington Avenue, located in downtown Madison. This 40-year old architectural building façade veneer was stripped and replaced with window paneling to brighten the eyes of employees utilizing this space for office and mixed-use retail. Two magnificent plaza spaces at the front and rear entrance to the building were created. The site design and landscape architectural components provided by JSD offer employees a unique tree Bosque seating space to relax under while overseeing others enjoying the mixed-use retail component of the first floor entries. Architectural pavers, ornamental grasses, and upright deciduous trees direct the user’s eye towards the building’s grand entrance while decreasing the overall scale of Hovde Properties multi-story building.

Design team: JSD: Civil Engineering, Landscape Architecture, Survey, Structural Engineering, Construction Services

15 ASSEMBLAGE ARCHITECTS Oregon School Districts – Prairie View Netherwood Knoll Elementary School :: Oregon, WI

Prairie View Netherwood Knoll Elementary School Oregon, Wisconsin Institutional

The Outdoor Classroom, located between Prairie Prairie View Outdoor Classroom View Elementary School and Netherwood Knoll captivates the community of Oregon and its The Outdoor Classroom, located between Prairie children attending classes here. The centerpiece View Elementary School and Netherwood Knoll of the design, a 120-seat amphitheater, will serve captivates the community of Oregon and its as a gathering space for classrooms during school hours and evening performances. JSD developed children attending classes here. The centerpiece this project in conjunction with input from of the design, a 120-seat amphitheater, will serve Oregon District staff members and project as a gathering space for classrooms during school stakeholders. The project scope included hours and evening performances. JSD developed revamping the parking lot design, developing this project in conjunction with input from wayfinding opportunities, and creating outdoor activities for children to learn and grow. JSD Oregon District staff members and project provided services including surveying, civil stakeholders. The project scope included engineering, and landscape architecture. revamping the parking lot design, developing wayfinding opportunities, and creating outdoor Design team: activities for children to learn and grow. JSD JSD: Civil Engineering, Landscape Architecture, Survey provided services including surveying, civil engineering, and landscape architecture.

Oregon School Districts – Prairie View Netherwood Knoll Elementary School :: Oregon, WI

Planning & Development ● Civil Engineering ● Transportation Engineering ● Municipal Engineering ●

Structural Engineering ● Water Resources ● Landscape Architecture ● Construction Services ● Surveying & Mapping

Institutional ASSEMBLAGE ARCHITECTS 16 Prairie View Outdoor Classroom

The Outdoor Classroom, located between Prairie View Elementary School and Netherwood Knoll captivates the community of Oregon and its children attending classes here. The centerpiece of the design, a 120-seat amphitheater, will serve as a gathering space for classrooms during school hours and evening performances. JSD developed this project in conjunction with input from Oregon District staff members and project stakeholders. The project scope included revamping the parking lot design, developing wayfinding opportunities, and creating outdoor activities for children to learn and grow. JSD provided services including surveying, civil engineering, and landscape architecture.

Planning & Development ● Civil Engineering ● Transportation Engineering ● Municipal Engineering ●

Structural Engineering ● Water Resources ● Landscape Architecture ● Construction Services ● Surveying & Mapping

Firms and Consultants Kim Spoden, AIA, LEED AP Project Manager: Assemblage Architects The firm’s other principal will manage the project and coordinate consultants. Ms. Spoden has 23 years of Project assignment: Prime Firm experience with 14 years of working with the university Management, Architecture and the state. She will orchestrate the management of the Team Members: project and documents. • Hamid Noughani, AIA Selected Relevant Experience: • Kim Spoden, AIA • Mountaineer Challenge Academy Outdoor Plaza, • Evan Weir, AIA Kingwood, WV • Multi-purpose Building, Plaza Kingwood, WV Henneman Engineering • Madison College SE/SW Plaza Project assignment: Electrical • UW-Madison School of Veterinary Medicine Linear Team Members: Accelerator Addition and Renovation, • Brad Biddick • UW-Madison Engineering Hall Plaza Renovation

JSD Professional Services Evan Weir, AIA Project assignment: Project Architect: Team Members: Mr. Weir is a licensed architect with over 11 years of • Michael Schmeltzer, P.L.A., A.S.L.A. experience on renovation type projects and working • Michael Grzesiak, P.E. with UW-Madison. His experience includes organizing • Justin Frahm, A.S.L.A construction document sets and construction administration • Kevin Yeska on many projects with a wide variety of sizes. • Adam Kaniewski, A.S.L.A Selected Relevant Experience: Geographic Proximity: • Mountaineer Challenge Academy Outdoor Plaza, Assemblage Architects is located in Middleton, WI. Kingwood, WV Henneman Engineering is located in Madison, WI. • Multi-purpose Building, Plaza Kingwood, WV JSD is located in Verona, WI. – All within 15 minutes of • Madison College SE/SW Plaza the project site. • UW-Madison School of Veterinary Medicine Linear Accelerator Addition and Renovation, Key Team Members Qualifications • UW-Madison Engineering Hall Plaza Renovation

Assemblage Architects Henneman Engineering Hamid Noughani, AIA, LEED AP Principal in Charge: Brad Biddick The firm’s founding principal with interest in complex Electrical Designer: projects that require careful planning, long range Brad is an electrical designer and has 18 years of commitment, and extensive collaboration among engineering experience. He is a registered designer of consultants. Mr. Noughani established Assemblage electrical engineering systems in the state of Wisconsin. Architects in Madison in 2003. He has 27 years of Brad has a passion for lighting design and he brings a experience, 18 of those years working with DFD and wealth of experience and talent to innovative and energy UW systems. efficient lighting strategies. He has extensive experience Selected Relevant Experience: with commercial, mixed-use, government, healthcare and • Mountaineer Challenge Academy Outdoor Plaza, research facilities. Brad’s relevant project experience Kingwood, WV includes: • Multi-purpose Building, Plaza Kingwood, WV • Johnsons Park Renovation and LED Lighting • Madison College SE/SW Plaza Installation, Milwaukee, WI • UW-Madison School of Veterinary Medicine Linear • AC Marriott Hotel, Madison, WI Accelerator Addition and Renovation, • Calvin Moody Park Community Building and Park • UW-Madison Engineering Hall Plaza Renovation Renovation, Milwaukee, WI

17 ASSEMBLAGE ARCHITECTS JSD Professional Services • Memorial High School, Baseball Diamond, Madison, WI • Pumping Station, Baseball Diamond, Milwaukee, WI Michael Schmeltzer, P.L.A, A.S.L.A. • West High School, Recreation Courts & Fitness Stations, Senior Landscape Architect: Madison, WI Mr. Schmeltzer holds a Bachelor of Degree • Pewaukee High School, Tennis Courts, Pewaukee, WI in Landscape Architecture from the University • East High School, Football Field, Madison, WI. of Wisconsin-Madison and has over 39 years of • DePere High School, Running Track, DePere, WI. experience as a Landscape Architect. With respect to • Beloit College, Running Track/Baseball and Softball recreational/athletic facility work, Mr. Schmeltzer has Fields, Beloit, WI. extensive project management and design related • Beaver Dam High School, Master Plan, Athletic Facility experience on a wide variety of recreational and Improvements, Beaver Dam, WI. athletic facility improvement projects. Over the past • Memorial High School, Track Resurfacing, Madison, WI. 35 years of his 39-year career, he has been the project • Memorial High School, Tennis Courts Crack Repair, manager and lead designer for numerous projects Resurfacing, Madison, WI. presenting diverse and demanding needs. In addition, • Memorial High School, Tennis Courts, Madison, WI. Mr. Schmeltzer has provided construction administration • Memorial High School, Running Track, Madison, WI. and supervision for the majority of these past projects. • East High School, Tennis Courts Crack Repair, Resurfacing, Madison, WI. Selected Relevant Experience: • McFarland High School, Limited Development Master • Verona Area School District, Athletic Fields Complex Plan, Running Track, McFarland, WI. Planning, Verona, WI • Sun Prairie Jr. and Sr. High School, Tennis Court • Columbus High School, Running Track, Columbus, Repairs and Reconstruction, Sun Prairie, WI WI • LaFollette High School, Baseball, Running Track, and • Village of Weston, Athletic Facilities Planning, Tennis Courts, Madison, WI Weston, WI • Middleton Refuse District, Athletic Facilities Master Plan, • West Madison Little League, Expansion Planning, Middleton, WI. Madison, WI • Laconia High School, Running Track, Rosendale, WI • Belleville High School, Softball Diamonds, Belleville, • Belleville High School, Varsity Baseball and Softball, WI Belleville, WI • UW-Madison, Cole Beach Res. Hall Tennis and • New Glarus High School, Conceptual Plans, Soccer/ Volleyball Courts, Madison, WI Football and Baseball, New Glarus, WI • UW-Madison, U-Bay Soccer Fields, Soccer Field, • Madison East High School, Running Track, Madison, WI Madison, WI • Brodhead High School, Running Track, Brodhead, WI. • Reddan Soccer Park, Synthetic Championship Field • Madison East High School, Tennis Courts, Madison, WI. and 5 Turf Fields, Verona, WI • Oregon High School, Baseball and Softball Complex, • LaFollette High School, Football/Soccer and Track, Oregon, WI. Madison, WI. • Ripon High School, Tennis Courts, Ripon, WI. • Mineral Point High School, Football/Soccer, Mineral Point, WI. • Oregon High School Athletic Fields, Jaycee Park East, Championship Soccer Field, Softball, Baseball and Lacrosse, Oregon, WI • Dura Landfill Soccer Complex, Conceptual Plans for 17 Soccer Fields, Toledo, Ohio • Mansfield Stadium, Memorial High School, Soccer/ Football Field, Madison, WI • East High School, Soccer/Football Field, Madison, WI • Verona High School, Tennis Courts, Verona, WI • Country View Elementary, Softball Field Renovation, Verona Area School District, Verona, WI • Lafollette High School, Baseball Diamond, Madison, WI • Mineral Point High School, Football Field, Mineral Point, WI

ASSEMBLAGE ARCHITECTS 18 Michael Grzesiak, P.E. Project Engineer: GOVERNMENT (FEDERAL/STATE/COUNTY) Mr. Grzesiak holds a Bachelor of Science Degree in Civil • Canyon Creek Drainage Study & Improvements, Garfield Engineering from the UW-Platteville with an emphasis County, CO in Transportation and Geotechnical Engineering. His project experience and expertise is in civil site design; RESIDENTIAL state, county, and municipal roadway design; residential/ • @Edge, Fitchburg, WI commercial site development design; residential • 706 Williamson Street, Madison, WI subdivision design, utility design; sanitary sewer • Noel Manor, Verona, WI design; and stormwater management. Mr. Grzesiak is • West Gateway Apartments, Cross Plains, WI a Registered Professional Engineer in both the State of • American Parkway & Tancho, Madison, WI Wisconsin and the State of Colorado. • Orchard Pointe Apartments, Fitchburg, WI • Frautschi - Rowland Residence, Madison, WI Selected Relevant Experience: • Mequon Memory Care Site Plan, Mequon, WI MUNICIPAL • Kettle Park West, Phase II, Stoughton, WI • Madison Metropolitan Sewerage District (MMSD) • Renaissance on the Park, Phase II, Fitchburg, WI Nine Springs Plant Facilities, Madison, WI • Aster Assisted Living, Mequon, WI • Lake Springs Ranch P.U.D. residential development, INSTITUTIONAL / RECREATIONAL Garfield County, CO • Oregon School District - Athletic Field • West Glenwood Estates residential development, Improvements, Oregon, WI Glenwood Springs, CO • Columbus High School Running Track, Columbus, • Westcliffe residence, Aspen, CO WI • 1490 Red Butte Rd residence, Aspen, CO • St. Croix County Senior Care Center, New • Pfister Residence, Aspen, CO Richmond, WI • West Buttermilk residence, Aspen, CO • Madison College Culinary Addition, Madison, WI • Beauchamp residence, Aspen, CO

HEALTHCARE INDUSTRIAL • Grant Regional Medical Facility, Lancaster, WI • Schreiber Foods Expansion, Richland Center, WI • Green County Health Services, Monroe, WI • Vintage Parts, Beaver Dam, WI • Meriter Emergency Generator Facility, Madison, WI • Project Badger, Madison, WI • Wausau Smiles, Wausau, WI • Gas Pad Reclamation, Battlement Mesa, CO • Gas Pad Design, Garfield County, CO COMMERCIAL • Parmenter Circle Development, Middleton, WI TRANSPORTATION • TRU by Hilton Hotel, Stoughton, WI • Preliminary Traffic Engineering, Camp Phillips Road, • Kettle Park West, Stoughton, WI Westin, WI • Bollig Properties, Blooming Grove, WI • Monona Area Schools, Preliminary Traffic Engineering, • Old Sauk Trails, Madison, WI Monona, WI • Gammex Expansion, Middleton, WI • Sugar Creek Commons, Preliminary Traffic Engineering, • Union Corners Mixed-Use Residential/Commercial, Verona, WI Madison, WI • 29 East Interchange (USH 51 & STH 29), Rothschild, WI • Nine Mound Hospitality - Fairfield Inn, Verona, WI • US 6, Silt, CO • Kettle Park West, Lot 7 Stormwater Facility, • County Road 311 ( CR 311, CR 315, CR 324) , Silt, CO Stoughton, WI • County Road 113 (CR 113, CR 110), Glenwood Springs, • Stoughton Kwik Trip, Stoughton, WI CO • Treysta Development, Monona, WI • Battlement Mesa Intersection Improvements, Battlement • Steinhafels, Grand Chute, WI Mesa, CO • The Boulevard Development, Madison, WI • Erik’s Bike Shop, Madison, WI • Maple Bluff Country Club Improvements, Madison, WI • Goddard School, Verona, WI • Rainbow Childcare Center, Madison, WI • Benjamin Plumbing, Fitchburg, WI • Atlantis Valley Foods, Cottage Grove, WI 19 ASSEMBLAGE ARCHITECTS Justin Frahm, A.S.L.A. WI Site Designer: • Pewaukee School District, Pewaukee, WI Mr. Frahm holds a Bachelor of Science Degree • Sun Prairie United Methodist Church, Sun Prairie, WI in Landscape Architecture from the University of Wisconsin-Madison. He has over 8 years of experience GOVERNMENT (FEDERAL, STATE, COUNTY) as a Landscape Designer and has extensive experience • Fox Lake Correctional Facility Structural Assessment, in residential, commercial and institutional landscape Fox Lake, WI design, and construction management. As a designer, • Necedah Wildlife Refuge, Necedah, WI he is able to effectively and creatively take a plan from • WisDOT HWY 10, Wood and Portage Counties, WI concept drawing to design and construction through • WisDOT Outdoor Vegetation Review the use of presentation renderings, contemporary Program 84.305, WI (Statewide) presentation techniques and state-of-the-art tools to illustrate and convey his design solutions. He MUNICIPAL (TOWN, CITY, VILLAGE) generates ideas with technical understanding and • Village of Poynette Park & Open Space Plan, Poynette, creative flair as reflected in his development of master WI plans, planting plans, presentation renderings including • Belleville Pedestrian/Bicycle Reconstruction, 3-dimensional and design, construction Belleville, WI details, and horizontal control construction plans. • Whalen Pond Stormwater Remediation, Verona, WI • City of Marshfield Historic Main Street Renovation, Selected Relevant Experience: Marshfield, WI INSTITUTIONAL • Marshfield Clinic, Marshfield, WI EDUCATIONAL • St. Joseph’s Hospital and House of Dove Hospice • Reddan Soccer Park, Verona, WI Care Facility, Marshfield, WI • Madison College Soccer & Softball Athletic Facilities, • UW Health - Wingra Clinic, Madison, WI Madison, WI • Dean Clinic, Madison, WI • Madison Metropolitan School District, West High School, • Grant Regional Health Center, Lancaster, WI Recreation Courts & Fitness Stations, Madison, WI • St. Croix Senior Care Health Center Expansion, New Richmond, WI COMMERCIAL AND RETAIL • Meriter Unity Point Office Expansion-Park Street, • Hovde Properties – 316 West Washington Ave. Madison, Madison, WI WI • UW Hospital & Clinics Oxygen Tank Expansion, • Capitol Center West - 306. W. Main Condominiums, Madison, WI Madison, WI • Midwest Biolink Commercialization and Business • Nordstrom Rack, Bonefish Grill, and Jason’s Deli at Center, Madison, WI West Towne Mall, Madison, WI • UW-Madison West Campus Cogeneration Facility • Meriter Office Expansion – Park Street, Madison, WI Addition, Madison, WI • 50-Twenty Apartments, Madison, WI • Hope Lutheran Church, Stratford, WI • Alliant Energy University Research Park II Substation, • UW-Whitewater Laurentide Hall, Whitewater, WI Madison, WI • UW-Whitewater Student Success Center, • American Parkway Apartments, Madison, WI Whitewater, WI • A & B Process Systems, Stratford, WI • UW-Whitewater Young Auditorium Dance Studio • Acuity Insurance Master Planning, Sheboygan, WI Addition, Whitewater, WI • Advanced Pain Management Medical Building, Oconto • Madison College Ft. Atkinson and Portage Campus, Falls, WI WI • Alliance Collection Agency, Marshfield, WI • Madison College EVOC Training Facility, Sun • Alliant Energy Beloit Gateway Substation, Beloit, WI Prairie, WI • Bagels Forever Parking Expansion, Madison, WI • Madison College TRUAX Campus Fire Training • Crothall Laundry Services Creekside, Oak Creek, WI Facility, Madison, WI • Erin Hills Golf Course, Hartford, WI • Madison College TRUAX Campus Athletic Fields • Fairfield Inn & Suites, Verona, WI Parking Expansion, Madison, WI • Greenfield Corners, Brookfield, WI • MMSD – East High School, Hawthorne Elementary, • Great Lakes Higher Education Print Facility, Stoughton, and LaFollette High School Parking Lot WI Redevelopment, Madison, WI • Hansen Funeral Home, Marshfield, WI • MMSD – Lapham, Toki, & Whitehorse Schools’ • Harlan Hills Condo Association, Fitchburg, WI Parking Lot Redevelopment & Restoration, Madison, • Longfellow School Apartments, Madison, WI cont... ASSEMBLAGE ARCHITECTS 20 • Lynch Chevrolet, Pleasant Prairie, WI Kevin Yeska • Kettle Park West Commercial Center Development, Senior Landscape Designer: Stoughton, WI Mr. Yeska holds a Bachelor of Science Degree from the • Kwik Trip, Cross Plains, WI University of Wisconsin–Madison in Landscape Architecture. • Madison Taxi, Madison, WI He serves as a senior landscape designer with expertise • Market on Sixth, Marshfield, WI in commercial, institutional, and residential design. Kevin’s • MG&E Training Facility, Madison, WI graphic skills allow him to conceptualize a design idea • Nelson Global Products Facility, Stoughton, WI and transform it into a working construction document • Prince Corporation, Marshfield, WI through the utilization of various rendering software. His • Renaissance Learning, Wisconsin Rapids, WI present the client, and the general public, with a • Rezin Berries LLC, Wisconsin Rapids, WI contemporary “pop” through graphic renderings and planting • Security Health Plan, Marshfield, WI . Additionally, Mr. Yeska has experience in site • Solar Court Development, Verona, WI layout and municipal requirements relating to site access, • Sutter Creek Residential Community, Brookfield, WI parking accommodations, and designing open green spaces, • Summit Credit Union - Muskego, Stoughton, all of which aid in establishing a “sense of place” for the Waukesha, West Allis, WI design. • Taco Bell - Brookfield, Deforest, Janesville, Kenosha, Madison, Pewaukee,WI Selected Relevant Experience: • Treysta on the Water Residential Development, COMMERCIAL AND RETAIL Monona, WI • 316 West Washington – Hovde Property, Madison, WI • Westmoor Country Club, Brookfield, WI • CBL West Towne Mall, Nordstrom Rack, Madison, WI • Union Corners, Madison, WI • Hometown Circle, Verona, WI • Kettle Park West, Stoughton, WI • Steinhafels Furniture Store Improvements, Oak Creek, WI • Kwik Trip, Stoughton, WI • Summit Credit Union, Muskego, Waukesha, Franklin, WI

INSTITUTIONAL • Bethel Lutheran Church, Madison, WI • Oregon School Districts Master Plan Improvements, Oregon, WI • Madison Area Technical College Culinary Expansion, Madison, WI • Goddard School Day Care, Verona, WI • Erin Hills Golf Course, Town of Erin, WI • Verona Area School District Tennis Courts, Verona, WI

RESIDENTIAL • Aster Memory Care, Cedarburg, WI, Mequon, WI • Nine Mound Development, Verona, WI • Forest Glen Condominiums, Fitchburg, WI • Prairie Oaks, Verona, WI • Noel Manor, Verona, WI • St. Croix County Health Center, New Richmond, WI • Orchard Pointe, Fitchburg, WI • West Gateway Development, Cross Plains, WI • Sutter Creek Residential Development, Brookfield, WI

GOVERNMENT (FEDERAL, STATE, AND COUNTY) • Madison Metropolitan Sewage District, Madison, WI

STATEWIDE PROJECTS • Outdoor advertising signage, vegetation analysis, coordination, various counties 21 ASSEMBLAGE ARCHITECTS Adam Kaniewski, A.S.L.A. • High Crossing Redevelopment, Madison, WI Landscape Designer: • Summit Credit Union, Muskego, WI Mr. Kaniewski, Landscape Designer, holds a Bachelor • Summit Credit Union, Oconomowoc, WI of Science Degree in Landscape Architecture • Camp Phillips Centre Development, Weston, WI and Environmental Studies from the University of • Windsor Crossing Development, Windsor, WI Wisconsin-Madison. He has experience in large scale • Benjamin Plumbing Office Building, Fitchburg, WI master planning, site planning, hardscape design, • The Employer Group Office Building, Verona, WI and athletic facilities, with a commitment to providing • FLIX Brewhouse, Madison, WI high quality design and attention to detail from initial • Kwik Trip, Stoughton, WI conception through construction. Mr. Kaniewski also • Lot 7-1 Kettle Park West, Stoughton, WI has experience creating both plan and 3-D presentation • Lot 7-4 Kettle Park West, Stoughton, WI graphics as an effective means to communicating • design intent. RESIDENTIAL • Lalor Road Residence, Town of Dunn, WI • Windsor Crossing Multi-Family, Windsor, WI • The Condominiums at Fox Highlands, Greenville, WI • Fox Highlands Neighborhood, Greenville, WI Selected Relevant Experience: • Forest Glen Condominiums, Fitchburg, WI PARKS AND RECREATION • Jaycee Park, Oregon, WI GOVERNMENT (FEDERAL, STATE AND COUNTY) • Parks & Rec Planning Development, Weston, WI • WisDOT I-39/STH 11 Interchange Seeding, Rock • Beloit College – Baseball/Softball Fields Planning, County, WI Beloit, WI • WisDOT Outdoor Advertisement Right-Of-Way Signage • Johnson Creek High School Running Track, • WisDOT Rest Areas 11 & 12 Johnson Creek, WI • Juneau County Health and Human Services Building, • UW-Madison – Soccer Practice Field Regrading, Mauston, WI Madison, WI

INSTITUTIONAL • Erin Hills Golf Course Site Improvements, Erin, WI • Madison College – Ft. Atkinson Data Center Facility, Fort Atkinson, WI • Madison College – Commercial Avenue Campus Resurfacing, Madison, WI • Madison College – Administration Building North and South Additions, Madison, WI • Madison College – Truax Campus East Lot Improvements, Madison, WI • Aster Memory Care, Mequon, WI • St. Croix County Senior Care Expansion, New Richmond, WI • Bethel Lutheran Church – South Entrance Design, Madison, WI • Rainbow Childcare, Multiple Locations, WI • Noel Manor Retirement Living, Verona, WI • Oregon High School, Oregon, WI • Oregon Middle School, Oregon, WI • COMMERCIAL • 316 West Washington Plaza Renovations, Madison, WI • TRU by Hilton Hotel and Conference Center, Stoughton, WI • Kettle Park West Development, Stoughton, WI • Union Corners Buildings 4 and 5, Madison, WI • Lot 1 Horizon Drive, Verona, WI ASSEMBLAGE ARCHITECTS 22