HOUSING and LAND USE REGULATORY BOARD Lupong Nangangasiwa Sa Pabahay at Gamit Ng Lupa

Total Page:16

File Type:pdf, Size:1020Kb

HOUSING and LAND USE REGULATORY BOARD Lupong Nangangasiwa Sa Pabahay at Gamit Ng Lupa Republic of the Philippines Office of the President HOUSING AND LAND USE REGULATORY BOARD Lupong Nangangasiwa sa Pabahay at Gamit ng Lupa HLURB MEMORANDUM CIRCULAR NO. 03 Series of 2019 ( AP¥'\ L OS) 2019) TO HLURB CENTRAL VISAYAS REGION FROM THE CHIEF EXECUTIVE OFFICER SUBJECT INTEGRATION OF SAN PEDRO BAY AND LEYTE GULF (SPBLGB) FRAMEWORK PLAN IN THE COMPREHENSIVE LAND USE PLANS OF AFFECTED LOCAL GOVERNMENT UNITS The Regional Land Use Committee (RLUC) Region VIII adopted the San Pedro Bay and Leyte Gulf Basin (SPBLGB) Framework Plan through RLUC Resolution No. 08 Series of 2018. The framework plan provided for the strategic and policy framework for the sustainable and resilient development path of the SPBLGB area. The framework plan also provided guidance to decision-makers, planners and other stakeholders especially in the implementation of the adopted spatial structure and land and water use prescriptions for the SPBLGB. To further supplement the results or outcomes of Climate and Disaster Risk Assessment (CDRA) process, the policies, spatial framework, programs and projects outlined in the SPBLGB Framework Plan that also aims to improve the adaptive capacities of communities and local government units along the coastlines of San Pedro Bay and Leyte Gulf Basin, shall be considered or incorporated in the preparation or updating of Comprehensive Land Use Plans of the identified local government units. Local government units covered by the framework plan includes Tacloban City, municipalities of Palo, Tanauan, Dulag, Tolosa, Mayorga, MacArthur and Abuyog in the Province of Leyte; Municipalities of Basey and Marabut in the Province of Samar; and Municipalities of Lawaan and Balangiga in the Province of Eastern Samar. The San Pedro Bay and Leyte Gulf Basin Framework Plan can be accessed at https://bit.ly/2Bhd10n Sunnymede IT Center, 1614 Quezon Avenue, South Triangle, Quezon City ___ •••••• 1,.... 1 ___ 1-. ____ _ '- - Republic of the Philippines REGIONAL DEVELOPMENT COUNCIL Eastern Visayas (Region VIII) REGIONAL LAND USE COMMITTEE (RLUC) VIII Resolution No.8, Series of 2018 APPROVING AND ADOPTING THE SAN PEDRO BAY AND LEYTE GULF BASIN (SPBLGB) FRAMEWORK PLAN Whereas, the Climate Change Commission (CCC). in partnership with the United Nations Development Programme (UNDP), is implementing the Resilience and Preparedness Toward Inclusive Development (RAPID) Program, funded by the Department of Foreign Affairs and Trade-Australian Government (DFAT-Australian Government); Whereas, among the components of the Program is the preparation of a Baywide Coastal Zoning and Land Use Framework (BCZLUF), which will define the spatial strategy to guide land and water use decisions to mitigate the impact of climate change in twelve (12) target local government units (LGUs) along the coastline of San Pedro Bay and Leyte Gulf, viz: Tacloban City, Palo, Tanauan, Tolosa, Dulag, Mayorga, MacArthur, and Abuyog in the province of Leyte, Balangiga and Lawaan in the province of Eastern Samar, and Basey and Marabut in the province of Samar; Whereas, the eee and NEDA Regional Office (NRO) VIII have entered into a Memorandum of Agreement (MOA) on December 1, 2017, for the collaborative development of the BCZLUF, which was favorably supported by the members of the RLUC VIII during its 1st Semester Meeting on April 20, 2017; Whereas, the planning approach in the preparation of the BeZLUF consists of the following: 1) use of ecological landscape otherwise known as the ridge-to-reef approach; 2) multi-criteria land suitability analysis to determine the most appropriate use of land viz-a-vis the current land use and physical/topographical make-up; 3) harmonization of comprehensive land use plans (CLUPs) and other plan documents of concerned LGUs, as well as of the national line agencies; and, 4) consultative and participatory process involving key stakeholders, among others; Whereas, upon review, the Committee finds the SPBLGB Framework Plan comprehensive, which contained the following significant chapters: 1) Analysis of Existing Situation; 2) Planning Issues and Concerns; 3) Development Framework; 4) Results of the Land Suitability Analysis and the Preferred Spatial Strategy; 6} the Secretariat: ROC Chair's Office: NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY INEOAI 2F NEDA ~"ofl.1 Office No. VIII Buildin, Recion.1 Office No. VIII Teletax No. 323-297S Government Center, Palo, laytAl, Phillpp,n•• , 6501 e-mln: nro8OnecN.,ov.ph Telephone No. 323-3092 Fax; 32a·3093 Web 'te: Irttp;/lwww.rdc8.ph .·mlll; nr08~"eda.,ov.ph W.bslte: http://www.nedel.ph RLUC VIII Resolution No. 8, Series of 2018 Page 2 of 2 pages Ecological Management Zones Use Policy Framework; 7) Proposed Programs and Projects; 8) Institutional Implementation Framework; and, 9) Action Plan ; NOW, THEREFORE, upon the motion of RLUC VIII-Private Sector Representative (PSR), EnP. Nestor B. Tabungar, that was duly seconded by the Department of the Interior and Local Government (DILG) VIII representative, Ms. Blanca P. Cercado, BE IT RESOLVED, AS IT IS HEREBY RESOLVED, to approve and adopt the San Pedro Bay and Leyte Gulf Basin (SPBlGB) Framework Plan. RESOLVED FURTHER, to enjoin the provinces of Leyte, Samar, and Eastern Samar, the City Government of Tacloban, and the concerned municipalities to adopt the SPBLGB Framework Plan in the preparation and updating of their respective provincial development and physical framework plans (PDPFPs) and CLUPs, respectively. RESOLVED FURTHERMORE, that copies of the SPBLGB Framework Plan be forwarded to the Housing and Land Use Regulatory Board (HLURB) and the DILG VIII as one of the basis for the review of subsequent PDPFPs/CLUPs, and comprehensive development plans (COPs), and to the ROC VIII for adoption and approval. UNANIMOUSLY APPROVED, this 16th day of October, Two Thousand and Eighteen, at the Felipina Hall, NEDA Regional Office VIII, Government Center, Palo, leyte, Philippines. Certified true and correct: Attested/Approved: a.u..ujU} 1 ~ . ~~~ l ~ t.!- EnP. ANNIELYN B. COSTINIANO Acting Secretary Chairperson d Presiding Officer .
Recommended publications
  • List of Establishments Where LHP, CLES and LEGS Were Conducted in CY 2017
    Republic of the Philippines DEPARTMENT OF LABOR AND EMPLOYMENT Regional Office No. VIII Tacloban City List of Establishments where LHP, CLES and LEGS were conducted in CY 2017 1. LHP NAME OF ESTABLISHMENT ADDRESS 1 TECHIRON Guiuan E. Samar 2 RED DAVE SECURITY AGENCY Brgy. San Roque, Biliran, Biliran 3 JRD GLASS SUPPLY Borongan City 4 EMCOR Borongan City 5 Jollibee Borongan City 6 J & C Lucky Mgt. & Devt., Inc. Borongan City 7 Zhanlin Marketing Borongan City 8 J Marketing Borongan City 9 Employees Union/Association (LGU-Julita) Julita, Leyte 10 Philippine Airline DZR Airport, San Jose, Tacloban City 11 Laoang Businesses Laoang, Northern Samar 12 Catarman Businesses Catarman, Northern Samar 13 Big 8 Finance Corporation Abgao Maasin city 14 Go Cash Lending Investor Abgao Maasin City 15 Assets Credit and Loan Tunga-Tunga Maasin City 16 J Marketing Maasin City 17 Nickel Collection and Lending Investor Kangleon St. Abgao Maasin City 18 Metro Global Tacloban City 19 Golden Lion Foods (Maasin)Corp.Jollibee Tunga-tunga Maasin City 20 J & F Department Store Maasin City 21 My Food Resources Inc. (Mang Inasal) Tagnipa, Maasin City 22 Coen Fashion and General Merchandise Abgao, Maasin City 23 Goodland Rice Mill Catarman, N. SAmar 24 Zopex Construction Catarman, N. SAmar 25 J&C Lucky 99 Store Catarman, N. SAmar 26 SH Dine In Catarman, N. SAmar 27 Jet Trading Catarman, N. SAmar 28 R8 Distribution Ormoc City 29 Arbee's Bakeshop Ormoc City 30 Phil. Oppo Mobile Ormoc City 31 Pmpc Ormoc City 32 IBMPC Ormoc City 33 Generika Drugstore Ormoc City 34 Mayong’s Bakeshop Ormoc City 35 Palawan Pawnshop Ormoc City 36 Ade-Da-Didi Ormoc City 37 Montery Ormoc City 38 Cecile Cont.
    [Show full text]
  • March 2020 PSA Leytest Newsbits 2
    The Official Quarterly Newsletter of PSA Leyte PSA Leyte celebrates 30th Civil Registration Month Couples during the mass wedding in Ormoc City on Februry 13, 2020 Grade 10 students of Ormoc City during the Civil Registratiojn Quiz Anchored on the theme “Shaping Civil Registration and Vital Statistics (CRVS) by embracing new trends in the 4th Industrial Revolution (4IR),” the Philippine Statistics Authority (PSA)- Leyte Provincial Statistical Office conducted activities targeted at framing a strong and qualitative civil registration system in the province, in collaboration with Local Civil Registry Offices. This is in connection with the annual observance of Civil Registration Month every February wherein civil registration activities are in its full blast. For this year, the month-long celebration was started by its Launching and Caravan on January 31 to February 1, 2020, hosted by the Local Government Unit (LGU) of Matalom, Leyte. One hundred seventy- three (173) City/Municipal Civil Registrars (C/MCRs) and their staff graced said event. to page 2 Leyte LGUs support 2020 CPH In preparation for the conduct of the 2020 Census of Population and Housing (CPH), PSA-Leyte conducted convening and information dissemination activities in the cities/municipalities of the province. Above activities were conducted as early as November 2019. Members of City/Municipal Census CSS Jamisola discusses 2020 CPH to MCCB Chair and members of Coordinating Boards (C/MCCB) Palo, Leyte of LGUs in Leyte were convened by PSA in order to discuss about their roles in the upcoming 2020 CPH operation. These were done together with the presentation of the highlights of the to page 2 January-March 2020 PSA LEYTEst Newsbits 2 Mr.
    [Show full text]
  • Super Typhoon HAIYAN in Tacloban City & Leyte, Philippines
    Super Typhoon HAIYAN in Tacloban City & Leyte, Philippines Data & documentation from the landfall zone of a Category-5 cyclone. storm Super Typhoon HAIYAN (YOLANDA) location & date Tacloban City & Leyte, Philippines – 08 November 2013 report date 03 April 2014 author Josh Morgerman version 1.0 __ Contents 1. INTRODUCTION ......................................................................................................................................... 1 1.1 Purpose ........................................................................................................................................... 2 1.2 Background & Scope .................................................................................................................... 2 2. LEYTE (GROUND SURVEY) ...................................................................................................................... 3 2.1 Radar Track .................................................................................................................................... 4 2.2 Wind Eye (& Center) ...................................................................................................................... 4 2.2.1 Methodology ........................................................................................................................ 4 2.2.2 Analysis & Findings ............................................................................................................. 5 2.3 Wind Damage & Radii ...................................................................................................................
    [Show full text]
  • MINES and GEOSCIENCES BUREAU REGIONAL OFFICE NO. 8 APPLICATION for SAND and GRAVEL INDUSTRIAL PERMIT (IPA) ANNEX-E SEQ HOLDER %Ownership of (Integer No
    Republic of the Philippines Department of Environment and Natural Resources MINES AND GEOSCIENCES BUREAU REGIONAL OFFICE NO. 8 APPLICATION FOR SAND AND GRAVEL INDUSTRIAL PERMIT (IPA) ANNEX-E SEQ HOLDER %Ownership of (Integer no. (Name, Authorized Major Filipino DATE DATE FILED of TENEMENT NO Representative with and Foreign AREA (has.) APPROVED MUNICIPALITY PROVINCE COMMODITY REMARKS (mm/dd/yyyy) TENEMENT designation, Address, Person(s) with (mm/dd/yyyy) NO) Contact details) Nationality Lanoy, Anita, M. 100 % Filipino 9.9441 New Higasaan River, MGB-8 ISSUED ORDER OF DENIAL/ Brgy. Sotero, Javier, Leyte Brgy. Libertad, Abuyog REJECTION DATED AUGUST 13, 2019. Received a Motion for Reconsideration on September 18, 2019 from Ms. Lanoy. MGB-8 sent a letter dated December 11, 2004-88 03/02/2004 Sand & Gravel 2019 addressed to the Postmaster, Philippine Postal Corporation, Tacloban City reiterating letters dated August 30, 2019 & September 19, 2019 requesting for a Certification as to the receipt of the IPA-2004-88-VIII Leyte Order of Denial/Rejection of Ms. Lanoy. Johanna G. Andrade 100 % Filipino ISSUED ORDER OF REJECTION ON Maharlika Highway, 10/22/2015. MGB-8 sent a letter dated Campetic, Palo, Leyte. December 11, 2019 addressed to the TIN#:146-199-843 Postmaster, Philippine Postal Corporation, Tacloban City reiterating letters dated 2009-151 09/25/2009 August 30, 2019 & September 19, 2019 requesting for a Certification as to the receipt of the Order of Denial/Rejection of Ms. Andrade. Sent letter dated Daguitan River, Brgy. January 14, 2020 to the Postmaster IPA-000151-VIII 7.769 Kalaw, Burauen Leyte Sand & Gravel requesting for a Certification/Return Card.
    [Show full text]
  • Status of Leyte Gulf Fisheries Cys 2001-2011
    Status of Leyte Gulf Fisheries CYs 2001-2011 Item Type article Authors Francisco, Miriam C.; Dayap, Nancy A.; Tumabiene, Lea A.; Francisco, Ruben Sr. A.; Candole, Mizpah Jay; De Veyra, Jaye Hanne; Bautista, Elmer DOI 10.31398/tpjf/25.1.2017C0011 Download date 27/09/2021 05:51:19 Link to Item http://hdl.handle.net/1834/40965 The Philippine Journal of Fisheries 25Volume (1): 136-155 24 (1-2): _____ January-June 2018 JanuaryDOI 10.31398/tpjf/25.1.2017C0011 - December 2017 Status of Leyte Gulf Fisheries CYs 2001-2011 Miriam C. Francisco1, Nancy A. Dayap1, Lea A. Tumabiene1,*, Ruben A. Francisco, Sr., Mizpah Jay Candole1, Jaye Hanne De Veyra1, Elmer Bautista1 1Bureau of Fisheries and Aquatic Resources Regional Office No. 08 Maharlika Highway, Brgy. Diit, Tacloban City ABSTRACT Leyte Gulf is among the major fishing grounds in the Philippines with a shelf area of 13, 147 km2 covering the islands of Samar and Leyte. For this reason, it was chosen as the study area in Eastern Visayas under the National Stock Assessment Program (NSAP) which aims to assess the status of fisheries resources. This paper presents the fishery stock assessment results from CY 2001-2011. The annual fish catch from 2001-2011 showed a declining trend. The lowest was in 2008 with 12, 483.52 MT while the highest was in 2003 with 26,367.32 MT. The municipal fisheries had a high catch contribution except in 2001 where commercial catch was higher by 30%. Thirty eight (38) types of fishing gears were identified operating in Leyte Gulf.
    [Show full text]
  • Terms of Reference
    Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS REGIONAL OFFICE VIII Baras, Palo, Leyte TERMS OF REFERENCE Consultancy Services for the Conduct of Feasibility Study of the Proposed Road Opening/Construction of Junction Himay-angan- Silago-Abuyog Boundary Road (Bagacay-Tib-o), Abuyog, Leyte 1.0 INTRODUCTION Basic needs, goods, services and information must be effectively established and prioritized by the growing infrastructure development in Eastern Visayas and should be an inclusive opportunity for everyone. This will help decongest urban areas, interconnect growth hubs and provide basic services. Bypasses and diversion roads and other infrastructure projects, a primary task of the department, is now a proposal thing that should provide appropriate and economical infrastructure while being ensured that these projects meet and fulfill their purpose. A measure to attain this goal is the proper conduct of feasibility study with feasible results prior to funding the construction of the project. This proposed consultancy services of the feasibility study of the above-named project is outsourced to bypass the DPWH, Regional Office VIII, Baras, Palo, Leyte with the assistance of the Project Preparation Division, Planning Service (PDD, PS). The feasibility study must contain the extent and nature of improvements/construction needed with the economic and technical justification thereof, environmental and social impacts and development program for suitable and optimal investments. Results from the study, if determined and found feasible, will be used by DPWH for programming purposes and its implementation through local financing/external sources. Abuyog, being a 1st class municipality in the province of Leyte with recognized tourist destinations, will eventually attract a significant number of tourists and future dwellers – both from the International and Domestic areas which may live and/or invest in it.
    [Show full text]
  • Region 8 Households Under 4Ps Sorsogon Biri 950
    Philippines: Region 8 Households under 4Ps Sorsogon Biri 950 Lavezares Laoang Palapag Allen 2174 Rosario San Jose 5259 2271 1519 811 1330 San Roque Pambujan Mapanas Victoria Capul 1459 1407 960 1029 Bobon Catarman 909 San Antonio Mondragon Catubig 1946 5978 630 2533 1828 Gamay San Isidro Northern Samar 2112 2308 Lapinig Lope de Vega Las Navas Silvino Lobos 2555 Jipapad 602 San Vicente 844 778 595 992 Arteche 1374 San Policarpo Matuguinao 1135 Calbayog City 853 Oras 11265 2594 Maslog Calbayog Gandara Dolores ! 2804 470 Tagapul-An Santa Margarita San Jose de Buan 2822 729 1934 724 Pagsanghan San Jorge Can-Avid 673 1350 1367 Almagro Tarangnan 788 Santo Nino 2224 1162 Motiong Paranas Taft 1252 2022 Catbalogan City Jiabong 1150 4822 1250 Sulat Maripipi Samar 876 283 San Julian Hinabangan 807 Kawayan San Sebastian 975 822 Culaba 660 659 Zumarraga Almeria Daram 1624 Eastern Samar 486 Biliran 3934 Calbiga Borongan City Naval Caibiran 1639 2790 1821 1056 Villareal Pinabacdao Biliran Cabucgayan Talalora 2454 1433 Calubian 588 951 746 2269 Santa Rita Maydolong 3070 784 Basey Balangkayan Babatngon 3858 617 1923 Leyte Llorente San Miguel Hernani Tabango 3158 Barugo 1411 1542 595 2404 1905 Tacloban City! General Macarthur Capoocan Tunga 7531 Carigara 1056 2476 367 2966 Alangalang Marabut Lawaan Balangiga Villaba 3668 Santa Fe Quinapondan 1508 1271 800 895 2718 Kananga Jaro 997 Salcedo 2987 2548 Palo 1299 Pastrana Giporlos Matag-Ob 2723 1511 902 1180 Leyte Tanauan Mercedes Ormoc City Dagami 2777 326 Palompon 6942 2184 Tolosa 1984 931 Julita Burauen 1091
    [Show full text]
  • Threatened Birds of Asia: the Birdlife International Red Data Book
    Threatened Birds of Asia: The BirdLife International Red Data Book Editors N. J. COLLAR (Editor-in-chief), A. V. ANDREEV, S. CHAN, M. J. CROSBY, S. SUBRAMANYA and J. A. TOBIAS Maps by RUDYANTO and M. J. CROSBY Principal compilers and data contributors ■ BANGLADESH P. Thompson ■ BHUTAN R. Pradhan; C. Inskipp, T. Inskipp ■ CAMBODIA Sun Hean; C. M. Poole ■ CHINA ■ MAINLAND CHINA Zheng Guangmei; Ding Changqing, Gao Wei, Gao Yuren, Li Fulai, Liu Naifa, Ma Zhijun, the late Tan Yaokuang, Wang Qishan, Xu Weishu, Yang Lan, Yu Zhiwei, Zhang Zhengwang. ■ HONG KONG Hong Kong Bird Watching Society (BirdLife Affiliate); H. F. Cheung; F. N. Y. Lock, C. K. W. Ma, Y. T. Yu. ■ TAIWAN Wild Bird Federation of Taiwan (BirdLife Partner); L. Liu Severinghaus; Chang Chin-lung, Chiang Ming-liang, Fang Woei-horng, Ho Yi-hsian, Hwang Kwang-yin, Lin Wei-yuan, Lin Wen-horn, Lo Hung-ren, Sha Chian-chung, Yau Cheng-teh. ■ INDIA Bombay Natural History Society (BirdLife Partner Designate) and Sálim Ali Centre for Ornithology and Natural History; L. Vijayan and V. S. Vijayan; S. Balachandran, R. Bhargava, P. C. Bhattacharjee, S. Bhupathy, A. Chaudhury, P. Gole, S. A. Hussain, R. Kaul, U. Lachungpa, R. Naroji, S. Pandey, A. Pittie, V. Prakash, A. Rahmani, P. Saikia, R. Sankaran, P. Singh, R. Sugathan, Zafar-ul Islam ■ INDONESIA BirdLife International Indonesia Country Programme; Ria Saryanthi; D. Agista, S. van Balen, Y. Cahyadin, R. F. A. Grimmett, F. R. Lambert, M. Poulsen, Rudyanto, I. Setiawan, C. Trainor ■ JAPAN Wild Bird Society of Japan (BirdLife Partner); Y. Fujimaki; Y. Kanai, H.
    [Show full text]
  • The Eagle's Webbed Feet
    The Eagle’s Webbed Feet The Eagle’s Webbed Feet •A Maritime History of the United States A Maritime History of the United States A Maritime History of the Uniteds The Second World War “Scratch one flattop!” “Damn it Captain, they’re getting away!” Pearl Harbor • China is the real bone of contention between the US and Japan • May 1941, Roosevelt orders the fleet to remain in Pearl Harbor • July 1941 – Oil imports to Japan halted • Japanese decision to go southeast for resources • The Soviet-Japanese Border Wars (1932-1939) o Battles of Khalkhin Gol (Nomonhan) (May-Sept 1939) o Neutrality Pact (April 1941) • The Philippines is the real target of the Pearl Harbor attack • Mahan’s influence on the IJN. “If you attack us, we will break your empire; before we are through with you …. we will crush you.” Admiral Stark (CNO) to Ambassador Nomura (Nov 1941) • What were the Japanese thinking? (Compromise Peace) Pearl Harbor (2) • Destroyed or severely damaged 8 battleships, 10 cruisers/destroyers, 230 aircraft, & killed 2400 men. Cost was 29 planes, 5 midget subs. • A “short war” meant they could ignore fuel depots, repair facilities and the submarine base. • Their air superiority meant they could ignore the US carriers • War declared on Japan the next day • On December 11th Germany declared war on the US (???) • One of the two stupidest decisions of World War Two USS Arizona USS Shaw War in the Atlantic • The US Navy’s role in the Atlantic War was: • The U-Boat War (Priority #1) • Safely convoying troops, equipment, and supplies • Destroy the U-Boat fleet • Conduct amphibious operations of Army forces • Because of Pearl Harbor, the Navy reluctantly supported the “Germany First” policy envisioned in Rainbow Five but it did not really believe in it.
    [Show full text]
  • Landslides Have Become Very Frequent in Leyte Which Justifies the Need for Soil Assessment and Characterization of the Landslide-Prone Areas in the Province
    Annals of Tropical Research 412 ( ):1 1529 -1 (201 9 ) © VSU, Leyte, Philippines Landslides have become very frequent in Leyte which justifies the need for soil assessment and characterization of the landslide-prone areas in the province. This study assessed the physical characteristics of soils from the landslide areas in Cadac-an watershed in Leyte, Philippines. Landslide cuts located in the central highlands of Cadac-an watershed were used as representative profiles in this study. These were examined, characterized and sampled for the analyses of soil physical properties which include particle size distribution (Pipette method), bulk density (Paraffin-clod method), particle density (Pycnometer method), porosity, total soil wet density, water holding capacity and field capacity (Gravimetric method), saturated hydraulic conductivity (Constant head method), liquid limit and plastic index. Generally, soils from the landslide areas in Cadac-an watershed had a sandy loam to clay loam to clayey texture, low bulk density, low particle density, high porosity, moderate total soil wet density, moderate to high water holding capacity, low to moderate field capacity, moderately high to high saturated hydraulic conductivity, moderate liquid limit and low plastic index. Based on the above characteristics, the soils are susceptible to landslide occurrence thus it is highly recommended to conduct constant assessment and monitoring of the area. Keywords: landslides, soil physical characteristics, watershed, Leyte, Philippines One of the disaster prone areas in the world is the Philippines. It is characterized by the presence of the active Philippine Fault Zone which passes at the center of Leyte cordillera and is located in the dangerous zone known as the Ring of Fire , where a large number of earthquakes, volcanic eruptions and other disasters often occur.
    [Show full text]
  • EXPLANATORY NOTE the First District of Leyte Coniprises The
    13THCONGRESS OF THE REPUBLIC ) OF THE PHILIPPINES 1 Third Regular Session 1 Introduced by Senator Ralph G. Recto EXPLANATORY NOTE The First District of Leyte coniprises the Municipalities of Alangalang, Babatngon, Palo, San Miguel, Sta. Fe, Tanaua, Tolosa and the City ofTacloban, the capital ofthe province and the acknowledged Regional Center of Region 8. The request for two additional branches is to address the growing demand for the immediate resolution of cases which presently clog the docklets and slow down the dispensation of justice in the area. The Leyteiios deserve expenditous resolutions of their legal problems. The density of cases being distributed among the five (5) courts is contributory to the slow disposition of cases and to the administration of justice in general. Hence, this bill seeks to create two (2) additional Regional Trial Court branches in the Eighth Judicial Region in Eastern Visayas, particularly in the City of Tacloban, Province of Leyte, in addition to the five (5) branches thereof in the First District ofthe aforementioned province. It is hoped that this proposal will greatly reduce the burden of the existing courts. In view thereof, the immediate passage of this bill is 13THCONGRESS OF THE REPUBLIC ) OF THE PHILIPPINES 1 Third Regular Session ) Introduced by Senator Ralph G. Recto AN ACT CREATING TWO ADDITIONAL REGIONAL TFUAL COURT BRANCHES IN THE PROVINCE OF LEYTE TO BE STATIONED IN THE CITY OF TACLOBAN, AMENDING FOR THE PURPOSE SECTION 14, PARAGRAPH (I) OF BATAS PAMBANSA BLG. 129, OTHERWISE KNOWN AS THE JUDICIARY REORGANIZATION ACT OF 1980, AS AMENDED, AND APPROPRIATING FUNDS THEREFOR Be enacted by the Senate and House of Representatives of the Philippines in Congress assembled: SECTION 1.
    [Show full text]
  • Modeling of Degraded Reefs in Leyte Gulf, Philippines in the Face of Climate Change and Human-Induced Disturbances
    Modeling of degraded reefs in Leyte Gulf, Philippines in the face of climate change and human-induced disturbances Barron Cedric Tan1 · Jonathan A. Anticamara1 · Maria Ching S. Villanueva2 1University of the Philippines-Diliman 2Laboratoire de Biologie Halieutique, IFREMER, France Received: 07 February 2017 / Accepted: 08 June 2017 / Published online: XX August 2017 Abstract Philippine reefs are mega-diverse but, to date, few ecosystem models have been developed to understand their dynamics and functioning. This study assessed the status of reefs in 12 municipalities of Leyte Gulf, Philippines. It is an important fishing ground experiencing degradation and impacts of super- typhoons—the strongest one was Haiyan (local name: Yolanda). Empirical and literature data were used to develop Ecopath (trophic) models and Ecosim simulations to evaluate the impacts of reduction and increase in productivity on the Leyte Gulf Reef (LGR) ecosystem. Results showed that the LGR’s ecosystem is in a degraded state—dominated by small-medium herbivores and carnivores, with most productivity immediately returned to detritus. In addition, a comparative study of two Ecopath models showed that reduction in the coral cover (e.g., by Super-Typhoon Haiyan) will result in a decline in biomass of many functional groups. Changes in LGR’s productivity (e.g., eutrophication) will also strongly impact most functional groups (e.g., shift to overdominance of herbivores that take advantage of algal growth and extirpation of coral reef-dependent species). Moreover, additional climate-related or human-induced disturbances on the degraded LGR will further decrease the reef’s productivity. Therefore, effective recovery and management of degraded reef ecosystems is needed to sustain the LGR’s productivity (e.g., reef fisheries production).
    [Show full text]