Information Paper on Route 8 Control Area Bill
Total Page:16
File Type:pdf, Size:1020Kb
Load more
										Recommended publications
									
								- 
												  Destinations : Tin King Estate - Admiralty/CentralResidents’ Service Route No. : NR723 Destinations : Tin King Estate - Admiralty/Central Routeing (Tin King Estate - Admiralty) : via Tin King Road, Tsing Tin Road, Tuen Mun Road, Tsing Long Highway, Cheung Tsing Highway, Cheung Tsing Tunnel, Tsing Kwai Highway, West Kowloon Highway, Western Harbour Crossing, Sai Ying Pun Interchange, Connaught Road West, Connaught Road Central, Man Kat Street, Man Cheung Street, Man Yiu Street, Harbour View Street, Connaught Road Central, Harcourt Road, Cotton Tree Drive slip road, Queensway, Rodney Street and Drake Street. Stopping Places : Pick Up : Tin King Road outside Tin Chui Set Down : 1. Connaught Road West House Waterfront Police Station 2. Man Cheung Street Hong Kong Station 3. Drake Street Admiralty Garden Departure time : Mondays to Saturdays (except Public Holidays) 1. 7.00 a.m. 5. 7.55 a.m. 2. 7.15 a.m. 6. 8.05 a.m. 3. 7.30 a.m. 7. 8.15 a.m. 4. 7.45 a.m. 8. 8.30 a.m. Routeing (Central - Tin King Estate) : via Connaught Road Central, Connaught Road West, Wing Lok Street, Hillier Street, Connaught Road Central, Connaught Road West, Sai Ying Pun Interchange, Western Harbour Crossing, West Kowloon Highway, Tsing Kwai Highway, Cheung Tsing Tunnel, Cheung Tsing Highway, Tsing Long Highway, Tuen Mun Road, Tuen Hi Road, Tuen Mun Road, Tsing Tin Road, Ming Kum Road and Tin King Road. Stopping Places : Pick Up : 1. No. 137 Connaught Road Central Set Down : 1. Tuen Hi Road outside Tuen Mun Town Hall 2. Tin King Road outside Tin Chui House Departure time : Mondays to Fridays (except Public Holidays) 1.
- 
												  Minutes Have Been Seen by the Administration)立法會 Legislative Council LC Paper No. CB(2)2042/11-12 Ref : CB2/PL/HA (These minutes have been seen by the Administration) Panel on Home Affairs Minutes of meeting held on Thursday, 15 March 2012, at 4:30 pm in Conference Room 3 of the Legislative Council Complex Members : Hon IP Kwok-him, GBS, JP (Chairman) present Hon KAM Nai-wai, MH (Deputy Chairman) Hon James TO Kun-sun Hon Mrs Sophie LEUNG LAU Yau-fun, GBS, JP Dr Hon Philip WONG Yu-hong, GBS Hon Miriam LAU Kin-yee, GBS, JP Hon Emily LAU Wai-hing, JP Hon Timothy FOK Tsun-ting, GBS, JP Hon CHEUNG Hok-ming, GBS, JP Prof Hon Patrick LAU Sau-shing, SBS, JP Hon Cyd HO Sau-lan Dr Hon LAM Tai-fai, BBS, JP Hon CHAN Hak-kan Hon CHEUNG Kwok-che Hon WONG Sing-chi Hon Paul TSE Wai-chun, JP Hon Tanya CHAN Members : Hon CHEUNG Man-kwong absent Hon WONG Yung-kan, SBS, JP Public Officers : Agenda item III attending Home Affairs Bureau Ms Florence HUI Hiu-fai, JP Under Secretary for Home Affairs - 2 - Miss WONG Yuet-wah Principal Assistant Secretary for Home Affairs (Culture)2 Leisure and Cultural Services Department Ms Cynthia LIU Deputy Director of Leisure and Cultural Services (Culture) Dr Louis NG Assistant Director (Heritage & Museums) Leisure and Cultural Services Department Agenda Item IV Home Affairs Bureau Ms Florence HUI Hiu-fai, JP Under Secretary for Home Affairs Mr Jonathan McKINLEY, JP Deputy Secretary for Home Affairs (2) Hong Kong Amateur Athletic Association Mr KWAN Kee Chairman of the Hong Kong Amateur Athletic Association Organising Committee of the Hong Kong Marathon 2012 Mr William
- 
												  Final ReportTransport and Housing Bureau The Government of the Hong Kong SAR FINAL REPORT Consultancy Services for Providing Expert Advice on Rationalising the Utilization of Road Harbour Crossings In Association with September 2010 CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT September 2010 WILBUR SMITH ASSOCIATES LIMITED CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT TABLE OF CONTENTS Chapter Title Page 1 BACKGROUND AND INTRODUCTION .......................................................................... 1-1 1.1 Background .................................................................................................................... 1-1 1.2 Introduction .................................................................................................................... 1-1 1.3 Report Structure ............................................................................................................. 1-3 2 STUDY METHODOLOGY .................................................................................................. 2-1 2.1 Overview of methodology ............................................................................................. 2-1 2.2 7-stage Study Methodology ........................................................................................... 2-2 3 IDENTIFICATION OF EXISTING PROBLEMS ............................................................. 3-1 3.1 Existing Problems
- 
												  Islands District Council Traffic and Transport Committee Paper T&TCIslands District Council Traffic and Transport Committee Paper T&TC 41/2020 2020 Hong Kong Cyclothon 1. Objectives 1.1 The 2020 Hong Kong Cyclothon, organised by the Hong Kong Tourism Board, is scheduled to be held on 15 November 2020. This document outlines to the Islands District Council Traffic and Transport Committee the event information and traffic arrangements for 2020 Hong Kong Cyclothon, with the aim to obtain the District Council’s continuous support. 2. Event Background 2.1. Hong Kong Tourism Board (HKTB) is tasked to market and promote Hong Kong as a travel destination worldwide and to enhance visitors' experience in Hong Kong, by hosting different mega events. 2.2. The Hong Kong Cyclothon was debuted in 2015 in the theme of “Sports for All” and “Exercise for a Good Cause”. Over the past years, the event attracted more than 20,000 local and overseas cyclists to participate in various cycling programmes, as well as professional cyclists from around the world to compete in the International Criterium Race, which was sanctioned by the Union Cycliste Internationale (UCI) and The Cycling Association of Hong Kong, China Limited (CAHK). The 50km Ride is the first cycling activity which covers “Three Tunnels and Three Bridges (Tsing Ma Bridge, Ting Kau Bridge, Stonecutters Bridge, Cheung Tsing Tunnel, Nam Wan Tunnel, Eagle’s Nest Tunnel)” in the route. 2.3. Besides, all the entry fees from the CEO Charity and Celebrity Ride and Family Fun Ride and partial amount of the entry fee from other rides/ races will be donated to the beneficiaries of the event.
- 
												  Contributing to the Growth of Hong Kong for YearsTransport International Holdings Limited CONTRIBUTING TO THE GROWTH OF HONG KONG FOR 80 YEARS Transport International Holdings Limited 9 Po Lun Street, Lai Chi Kok, Kowloon, Hong Kong Telephone : (852) 2786 8888 Facsimile : (852) 2745 0300 www.tih.hk Stock Code: 62 Concept and design by YELLOW CREATIVE (HK) LIMITED 2012 Annual Report The FSCTM logo identifies products which contain wood from well-managed forests certified in accordance with the rules of the Forest Stewardship Council. Transport International Holdings Limited 2012 Annual Report TIH_Eng.indb 2 13年4月17日 下午4:10 Corporate Directory BOARD OF DIRECTORS BOARD COMMITTEES Bermuda Dr Norman LEUNG Nai Pang^ Audit Committee Butterfield Fulcrum Group GBS, JP, LLD, BA Dr Eric LI Ka Cheung (Bermuda) Limited Chairman CONTRIBUTING TO SIU Kwing-chue, Gordon 26 Burnaby Street Hamilton HM 11 Dr John CHAN Cho Chak^ John Anthony MILLER THE GROWTH OF HONG KONG GBS, JP, DBA(Hon), DSocSc(Hon), Bermuda BA, DipMS, CCMI, FCILT, FHKIoD Nomination Committee Deputy Chairman REGISTER OF MEMBERS Dr John CHAN Cho Chak FOR YEARS Book closure for 2013 AGM: KWOK Ping-luen, Raymond# Dr Eric LI Ka Cheung 16 May 2013 to 23 May 2013 80 JP, MA(Cantab), MBA, Hon DBA, Hon LLD SIU Kwing-chue, Gordon (both dates inclusive) Dr KWOK Ping-sheung, Walter# Remuneration Committee JP, D.Sc., MSc(Lond), DIC, MICE Book closure for 2012 final dividend: Dr John CHAN Cho Chak 29 May 2013 NG Siu Chan# Dr Eric LI Ka Cheung Professor LIU Pak-wai DIVIDENDS 1933 William LOUEY Lai Kuen# BSc(Econ) Standing Committee Interim HK$0.15
- 
												  Legislative Council立法會 Legislative Council LC Paper No. CB(4)1409/16-17(04) Ref. : CB4/PL/TP Panel on Transport Meeting on 21 July 2017 Background brief on replacement of traffic control and surveillance system in Tsing Ma Control Area Purpose This paper provides background information on the replacement of the traffic control and surveillance system ("TCSS") in Tsing Ma Control Area ("TMCA"). It also summarizes the major discussions by Legislative Council ("LegCo") Members on financial proposals on the replacement of TCSSs in TMCA and other tunnels in the past. Background Tsing Ma Control Area 2. TMCA, opened for public use in May 1997, covers a key section of the highway route to North-West Lantau, Ma Wan and the Hong Kong International Airport at Chek Lap Kok. It comprises a 21-kilometre expressway network including Tsing Kwai Highway, Cheung Tsing Tunnel, Cheung Tsing Highway, Northwest Tsing Yi Interchange, Ting Kau Bridge, Tsing Yi North Coastal Road, Lantau Link, Ma Wan Road and North Lantau Highway (up to Sunny Bay Interchange). The Government enacted the Tsing Ma Control Area Ordinance (Cap. 498) to provide for the control and regulation of vehicular and pedestrian traffic within TMCA and related matters. As with other Government tunnels and control areas, the Administration has selected through open tender an operator to undertake the management, operation and maintenance of the tunnel and control area.1 3. At present, the Lantau Link provides the only vehicular access to Lantau, Chek Lap Kok and Ma Wan. According to the Administration in May 2016, Lantau Link is used by 84 000 vehicles daily on average.
- 
												  Highways Infrastructure Transport—Footbridges/ Pedestrian Tunnels 6157TB Centre Street Escalator Link (Stage 1)CAPITAL WORKS RESERVE FUND (Payments) Sub- Approved Actual Revised head project expenditure estimate Estimate (Code) Approved projects estimate to 31.3.2018 2018–19 2019–20 ————— ————— ————— ————— $’000 $’000 $’000 $’000 Head 706—Highways Infrastructure Transport—Footbridges/ pedestrian tunnels 6157TB Centre Street escalator link (stage 1) ............ 60,700 53,409 910 482 6158TB Elevated walkway between Tong Ming Street and Tong Tak Street, Tseung Kwan O ....................................... 221,600 24,686 27,400 30,000 6162TB Extension of footbridge network in Tsuen Wan—Footbridge A along Tai Ho Road............................................. 183,850 165,063 854 524 6164TB Footbridge connecting Tsuen Wan Plaza, Skyline Plaza and adjacent landscaping area ...................................... 146,200 11,993 19,860 26,100 6167TB Provision of barrier-free access facilities at public footbridges, elevated walkways and subways— design works and phase 1 construction works ................................... 292,100 230,887 6,635 2,807 6168TB Lift and pedestrian walkway system at Waterloo Hill ....................................... 116,700 25,664 14,191 22,133 6169TB Lift and pedestrian walkway system at Cheung Hang Estate, Tsing Yi ............. 222,700 34,121 30,141 20,237 6173TB Extension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar ...................... 74,300 49,323 100 12,177 6175TB Lift and pedestrian walkway system between Kwai Shing Circuit and Hing Shing Road, Kwai Chung ............... 239,400 22,393 24,000 45,152 6178TB Lift and pedestrian walkway system between Castle Peak Road and Kung Yip Street, Kwai Chung ................. 584,400 — 200 84,017 6182TB Elevated pedestrian corridor in Yuen Long Town connecting with Long Ping Station .................................... Cat. B — — 88,830 † 6185TB Lift and pedestrian walkway system between Tai Wo Hau Road and Wo Tong Tsui Street, Kwai Chung ............................................
- 
												  Global Reach, Endless PossibilitiesGlobal reach, endless possibilities China Hong Kong India Indonesia Japan Malaysia Philippines Singapore Thailand Vietnam www.aecom.com Building a better world. One AECOM AECOM has continuously expanded its expertise and portfolio of work since it was established in 1990. With all of its operating companies now united as One AECOM, the firm offers clients an integrated platform of services and spirit of collaborative excellence. AECOM is a global provider of professional, technical and management support services to a broad range of markets, including transportation, ENR – #1 Transportation facilities, environmental and energy. Growing from 3,000 employees in the United States in 1990 to & General Building; #3 over 44,000 worldwide today, AECOM is a Fortune 500 company that serves clients in more than Design Firms 24,000+ employees 100 countries and had revenue of US$6.1 billion during the 12-month period ending June 30, 2009. ENR - #1 General ENSR and EDAW joined AECOM is a leader in all of the key markets that it serves, and provides a blend of global reach, local Building; #3 Design AECOM ENR - #1 Pure Design, Firms knowledge, innovation, and technical excellence to deliver solutions that enhance and sustain the London 2012 Olympic Bid Transportation, Mass 13,800+ employees NASA Shuttle Recovery Transit/Rail, Airports, world’s built, natural, and social environments. Chicago Skyway Program Education, Government Dubai Festival City Noble Windfarms Offices, Transmission and Los Angeles Distribution and General Community College Building
- 
												  Safe Community Tung ChungSafe Community Tung Chung Name of the Community: Tung Chung Country: China, Special Administrative Region Number of inhabitants: About 100,000 Programme started year: 2003 (designated in 2006) International Safe Communities Network Membership: Redesignation year: 2011 Info address on www for the Programme: No – being constructed and will be attached to the HK OSH Council For further information contact Mr. Leung Siu Tong Tung Chung Safe & Healthy City Shop 211, 2/F, Yat Tung Shopping Centre, Yat Tung (I) Estate, Tung Chung, N.T. Phone: (852) 35201575 Fax: (852) 35201574 E-mail: [email protected] Tung Chung Safe & Healthy City Project Background of Tung Chung Tung Chung situates at the northern part of the Lantau Island, the largest island in Hong Kong. It connects Kowloon with the New Territories South via Route 8 Expressway, linking the Airport, Tung Chung, Disneyland, Tsing Yi and Shatin. Tung Chung was a fishing village developed as part of the airport core program, and now becomes the hub of the Greater Pearl River Delta with the building of the Hong Kong-Zhuhai-Macau Bridge. As the most populated areas in Lantau and fastest growing town in Hong Kong, Tung Chung is also the Gateway to Hong Kong. The HK International Airport is just a few minutes away and Tung Chung serves as interchange for all transports to the famous scenery spots in Lantau, such as the Hong Kong Disneyland Resort, Buddha (Tian Tan Buddha), and the Ngong Ping 360 Cable Car. With the active pursuance of the Tung Chung Safe and Community and leadership of the District Councilors, more recreation facilities, public transport network, and healthcare infrastructure are set up, such as the new public library, cycling paths, herbal garden and the construction of the new North Lantau Hospital.
- 
												  Replacement of Traffic Control and Surveillance System in the Tsing Ma Control Area”For discussion FCR(2017-18)59 on 2 February 2018 ITEM FOR FINANCE COMMITTEE CAPITAL WORKS RESERVE FUND HEAD 708 – CAPITAL SUBVENTIONS AND MAJOR SYSTEMS AND EQUIPMENT Transport Department New Subhead “Replacement of Traffic Control and Surveillance System in the Tsing Ma Control Area” Members are invited to approve a new commitment of $298,910,000 for the replacement of traffic control and surveillance system in the Tsing Ma Control Area. PROBLEM The Transport Department (TD) needs to replace the traffic control and surveillance system (TCSS) in the Tsing Ma Control Area (TMCA) to maintain the safe, reliable and efficient operation of the control area. PROPOSAL 2. The Commissioner for Transport, on the advice of the Director of Electrical and Mechanical Services, proposes to replace the TCSS in TMCA at an estimated cost of $298,910,000. The Secretary for Transport and Housing supports the proposal. /JUSTIFICATION ….. FCR(2017-18)59 Page 2 JUSTIFICATION 3. The TCSS in TMCA1 is for ensuring the safe and effective operation of the control area. The existing TCSS commenced operation when TMCA was commissioned in 1997, and has already been in use for more than 20 years. According to the Electrical and Mechanical Services Trading Fund (EMSTF), it is increasingly difficult and not cost effective to carry out repairs for the TCSS. For example, the existing multimode optical fibre cables2 in the system can only provide limited bandwidth. The telecommunication industry has long been replaced them by single-mode optical fibre cables. Other relevant equipment such as prismatic variable message signs, closed circuit television (CCTV) system and emergency telephone system are also beyond their economical serviceable life.
- 
												  Man Fung Building, Yuen Long – Central / Wan ChaiResidents’ Service Route No. : NR922 Destinations﹕Man Fung Building, Yuen Long – Central / Wan Chai Routeing (Man Fung Building, Yuen Long to Central)﹕ via Fung Kwan Street, Fung Yau Street East, Fung Yau Street South, Fung Kam Street, Fung Cheung Road, Castle Peak Road, Long Yat Road, Castle Peak Road, Pok Oi Interchange, Yuen Long Highway, Tsing Long Highway, North West Tsing Yi Interchange, Cheung Tsing Highway, Cheung Tsing Tunnel, Tsing Kwai Highway, West Kowloon Highway, Western Harbour Crossing, Sai Ying Pun Interchange, Connaught Road West, Chung King Road, Chung Kong Road, Macau Ferry Pier access road, Connaught Road Central, Man Kat Street, Connaught Road Central, Queen Victoria Street, Des Voeux Road Central, Chater Road, Murray Road, Yee Wo Street, Sugar Street and Gloucester Road,. Stopping Places: Pick Up﹕ No. 11-15 Fung Kwan Street Set Down﹕ 1. Chung King Road (Man Fung Building) 2. Chater Road Statue Square 3. Hennessy Road opposite to Southorn Playground 4. Gloucester Road outside Park Lane Hotel Departure time﹕ Mondays to Fridays Saturdays (except public holidays) (except public holidays) 7.10 am to 8.20 am 7.25 am (Frequency: 10-20 minutes) 7.50 am Routeing (Wan Chai to Man Fung Building, Yuen Long)﹕ via Lockhart Road, Luard Road, Gloucester Road, Harcourt Road, Cotton Tree Drive, Lambeth Walk, Charter Road, Jackson Road, Connaught Road Central, Connaught Road West, Sai Ying Pun Interchange, Western Harbour Crossing, West Kowloon Highway, Tsing Kwai Highway, Cheung Tsing Tunnel, Cheung Tsing Highway, North West Tsing Yi Interchange, Tsing Long Highway, Yuen Long Highway, Pok Oi Interchange, Castle Peak Road – Yuen Long, Yuen Long Tai Yuk Road, Ma Tin Road, Ma Tong Road, Fung Cheung Road and Fung Kam Street.
- 
												  Legislative Council Brief Free-Flow TollingFile Ref.: THB(T)CR 1/4651/2019 LEGISLATIVE COUNCIL BRIEF Road Tunnels (Government) Ordinance (Chapter 368) Road Traffic Ordinance (Chapter 374) Tsing Sha Control Area Ordinance (Chapter 594) FREE-FLOW TOLLING (MISCELLANEOUS AMENDMENTS) BILL 2021 INTRODUCTION At the meeting of the Executive Council on 16 March 2021, the Council ADVISED and the Chief Executive ORDERED that the Free-Flow Tolling A (Miscellaneous Amendments) Bill 2021 (“the Bill”) , at Annex A, should be introduced into the Legislative Council (“LegCo”). JUSTIFICATIONS 2. At present, a motorist using a government tolled tunnel 1 or Tsing Sha Control Area (“TSCA”) (hereafter collectively referred to as “Tolled Tunnels”) may stop at a toll booth to pay the toll manually by tendering cash or prepaid toll tickets to a toll collector, or using the “stop-and-go” electronic payment facilities installed thereat. Alternatively, a motorist who drives a vehicle with an Autotoll tag issued by the Autotoll Limited (a private company) may pass through an Autotoll booth without stopping, with the toll payable deducted from a prepaid account. 3. The Hong Kong Smart City Blueprint published in December 2017 promulgated, among others, the development of toll tag (previously known as “in- vehicle unit”) for allowing motorists to pay tunnel tolls by remote means through an automatic tolling system, namely the “free-flow tolling system” (“FFTS”). In the Smart City Blueprint 2.0 published in December 2020, one of the Smart Mobility 1 Covering Cross-Harbour Tunnel, Eastern Harbour Crossing (“EHC”), Lion Rock Tunnel, Shing Mun Tunnels, Aberdeen Tunnel, Tate’s Cairn Tunnel and will cover the two Build-Operate- Transfer (“BOT”) tunnels, viz.