2018 Hong Kong Cyclothon 1. Objectives 2. Event Background
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
T and Analysis of Walkability in Hong Kong
Measurement and Analysis of Walkability in Hong Kong By: Michael Audi, Kathryn Byorkman, Alison Couture, Suzanne Najem ZRH006 Measurement and Analysis of Walkability in Hong Kong An Interactive Qualifying Project Report Submitted to the faculty of the Worcester Polytechnic Institute In partial fulfillment of the requirements for Degree of Bachelor of Science In cooperation with Designing Kong Hong, Ltd. and The Harbour Business Forum On March 4, 2010 Submitted by: Submitted to: Michael Audi Paul Zimmerman Kathryn Byorkman Margaret Brooke Alison Couture Dr. Sujata Govada Suzanne Najem Roger Nissim Professor Robert Kinicki Professor Zhikun Hou ii | P a g e Abstract Though Hong Kong’s Victoria Harbour is world-renowned, the harbor front districts are far from walkable. The WPI team surveyed 16 waterfront districts, four in-depth, assessing their walkability using a tool created by the research team and conducted preference surveys to understand the perceptions of Hong Kong pedestrians. Because pedestrians value the shortest, safest, least-crowded, and easiest to navigate routes, this study found that confusing routes, unsafe or indirect connections, and a lack of amenities detract from the walkability in Hong Kong. This report provides new data concerning the walkability in harbor front districts and a tool to measure it, along with recommendations for potential improvements. iii | P a g e Acknowledgements Our team would like to thank the many people that helped us over the course of this project. First, we would like to thank our sponsors Paul Zimmerman, Dr. Sujata Govada, Margaret Brooke, and Roger Nissim for their help and dedication throughout our project and for providing all of the resources and contacts that we required. -
NR700 Destinations: Shan King Estate – Hung Hom Station Routeing
Residents’ Service Route No.: NR700 Destinations: Shan King Estate – Hung Hom Station Routeing (Shan King Estate – Hung Hom Station): via Shan King Estate access road, Ming Kum Road, Tsing Wun Road, Wong Chu Road, Tuen Mun Road, Tsuen Wan Road, Kwai Chung Road, Lai Chi Kok Road, Cheung Mou Street, Cheung Shun Street, Tai Nan West Street, Cheung Yee Street, Cheung Lai Street, Lai Chi Kok Road, Tung Chau Street, West Kowloon Corridor, Prince Edward Road West, Lai Chi Kok Road, Shanghai Street, Jordan Road, Canton Road, Salisbury Road, Chatham Road South and Cheong Wan Road. Stopping Places: Pick Up: 1. Shan King Estate access road Set Down: 1. Cheung Shun Street near its junction with outside King Lok House Cheung Lai Street 2. Shanghai Street near its junction with Fife Street 3. Jordan Road outside King George V Memorial Park 4. Canton Road outside House No. 74 5. Chatham Road South near Mody Road 6. Hung Hom Station, Public Vehicle Carpark Departure Time: Mondays to Fridays (except Public Holidays) Saturdays (except Public Holidays) 1. 7.30 a.m. 1. 7.40 a.m. 2. 7.45 a.m. 2. 8.00 a.m. 3. 8.00 a.m. 3. 8.20 a.m. 4. 8.15 a.m. 5. 8.30 a.m. Routeing (Kowloon Park Drive – Shan King Estate): via Kowloon Park Drive, Peking Road, Ashley Road, Middle Road, Kowloon Park Drive, Canton Road, Ferry Street, Waterloo Road, Reclamation Street, Argyle Street, Cherry Street, West Kowloon Corridor, Lai Chi Kok Road, Kwai Chung Road, Tsuen Wan Road, Tuen Mun Road, Tuen Hi Road, Tuen Mun Road, San Tak Street, San Wo Lane, Tuen Mun Heung Sze Wui Road, Choi Yee Bridge, Shek Pai Tau Road and Shan King Estate access road. -
Destinations : Tin King Estate - Admiralty/Central
Residents’ Service Route No. : NR723 Destinations : Tin King Estate - Admiralty/Central Routeing (Tin King Estate - Admiralty) : via Tin King Road, Tsing Tin Road, Tuen Mun Road, Tsing Long Highway, Cheung Tsing Highway, Cheung Tsing Tunnel, Tsing Kwai Highway, West Kowloon Highway, Western Harbour Crossing, Sai Ying Pun Interchange, Connaught Road West, Connaught Road Central, Man Kat Street, Man Cheung Street, Man Yiu Street, Harbour View Street, Connaught Road Central, Harcourt Road, Cotton Tree Drive slip road, Queensway, Rodney Street and Drake Street. Stopping Places : Pick Up : Tin King Road outside Tin Chui Set Down : 1. Connaught Road West House Waterfront Police Station 2. Man Cheung Street Hong Kong Station 3. Drake Street Admiralty Garden Departure time : Mondays to Saturdays (except Public Holidays) 1. 7.00 a.m. 5. 7.55 a.m. 2. 7.15 a.m. 6. 8.05 a.m. 3. 7.30 a.m. 7. 8.15 a.m. 4. 7.45 a.m. 8. 8.30 a.m. Routeing (Central - Tin King Estate) : via Connaught Road Central, Connaught Road West, Wing Lok Street, Hillier Street, Connaught Road Central, Connaught Road West, Sai Ying Pun Interchange, Western Harbour Crossing, West Kowloon Highway, Tsing Kwai Highway, Cheung Tsing Tunnel, Cheung Tsing Highway, Tsing Long Highway, Tuen Mun Road, Tuen Hi Road, Tuen Mun Road, Tsing Tin Road, Ming Kum Road and Tin King Road. Stopping Places : Pick Up : 1. No. 137 Connaught Road Central Set Down : 1. Tuen Hi Road outside Tuen Mun Town Hall 2. Tin King Road outside Tin Chui House Departure time : Mondays to Fridays (except Public Holidays) 1. -
Minutes Have Been Seen by the Administration)
立法會 Legislative Council LC Paper No. CB(2)2042/11-12 Ref : CB2/PL/HA (These minutes have been seen by the Administration) Panel on Home Affairs Minutes of meeting held on Thursday, 15 March 2012, at 4:30 pm in Conference Room 3 of the Legislative Council Complex Members : Hon IP Kwok-him, GBS, JP (Chairman) present Hon KAM Nai-wai, MH (Deputy Chairman) Hon James TO Kun-sun Hon Mrs Sophie LEUNG LAU Yau-fun, GBS, JP Dr Hon Philip WONG Yu-hong, GBS Hon Miriam LAU Kin-yee, GBS, JP Hon Emily LAU Wai-hing, JP Hon Timothy FOK Tsun-ting, GBS, JP Hon CHEUNG Hok-ming, GBS, JP Prof Hon Patrick LAU Sau-shing, SBS, JP Hon Cyd HO Sau-lan Dr Hon LAM Tai-fai, BBS, JP Hon CHAN Hak-kan Hon CHEUNG Kwok-che Hon WONG Sing-chi Hon Paul TSE Wai-chun, JP Hon Tanya CHAN Members : Hon CHEUNG Man-kwong absent Hon WONG Yung-kan, SBS, JP Public Officers : Agenda item III attending Home Affairs Bureau Ms Florence HUI Hiu-fai, JP Under Secretary for Home Affairs - 2 - Miss WONG Yuet-wah Principal Assistant Secretary for Home Affairs (Culture)2 Leisure and Cultural Services Department Ms Cynthia LIU Deputy Director of Leisure and Cultural Services (Culture) Dr Louis NG Assistant Director (Heritage & Museums) Leisure and Cultural Services Department Agenda Item IV Home Affairs Bureau Ms Florence HUI Hiu-fai, JP Under Secretary for Home Affairs Mr Jonathan McKINLEY, JP Deputy Secretary for Home Affairs (2) Hong Kong Amateur Athletic Association Mr KWAN Kee Chairman of the Hong Kong Amateur Athletic Association Organising Committee of the Hong Kong Marathon 2012 Mr William -
Proposed Road Improvement Works in West Kowloon Reclamation Development Phase I
Proposed Road Improvement Works in West Kowloon Reclamation Development Phase I Project Profile (Report No. 276799/11.01/B) August 2011 Highways Department, HKSAR Government Proposed Road Improvement Works in West Kowloon276799 ReclamationTNI Development BRI 096/03 B P:\Hong Kong\ENL\PROJECTS\276799(BRI) West Kowloon Road Phase I Impr\reports\PP\Project Profile RevA doc 01 December 2009 Schemes H, I, J, Q (Interim Option) and Improvement Works at the Junction of Canton Road/ Ferry Street/ Jordan Road Project Profile August 2011 Highways Department 6/F., Homantin Government Offices, 88 Chung Hau Street, Homantin, Kowloon Mott MacDonald, 20/F, Two Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong T +852 2828 5757 F +852 2827 1823 W www.mottmac.com.hk Phase I Project Profile Issue and revision record Revision Date Originator Checker Approver Description A June 2011 Various Eric Ching H. T. Cheng First Issue B August 2011 Various Eric Ching H. T. Cheng Second Issue This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission used for any other purpose. which is due to an error or omission in data supplied to us by other parties This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it. -
Branch List English
Telephone Name of Branch Address Fax No. No. Central District Branch 2A Des Voeux Road Central, Hong Kong 2160 8888 2545 0950 Des Voeux Road West Branch 111-119 Des Voeux Road West, Hong Kong 2546 1134 2549 5068 Shek Tong Tsui Branch 534 Queen's Road West, Shek Tong Tsui, Hong Kong 2819 7277 2855 0240 Happy Valley Branch 11 King Kwong Street, Happy Valley, Hong Kong 2838 6668 2573 3662 Connaught Road Central Branch 13-14 Connaught Road Central, Hong Kong 2841 0410 2525 8756 409 Hennessy Road Branch 409-415 Hennessy Road, Wan Chai, Hong Kong 2835 6118 2591 6168 Sheung Wan Branch 252 Des Voeux Road Central, Hong Kong 2541 1601 2545 4896 Wan Chai (China Overseas Building) Branch 139 Hennessy Road, Wan Chai, Hong Kong 2529 0866 2866 1550 Johnston Road Branch 152-158 Johnston Road, Wan Chai, Hong Kong 2574 8257 2838 4039 Gilman Street Branch 136 Des Voeux Road Central, Hong Kong 2135 1123 2544 8013 Wyndham Street Branch 1-3 Wyndham Street, Central, Hong Kong 2843 2888 2521 1339 Queen’s Road Central Branch 81-83 Queen’s Road Central, Hong Kong 2588 1288 2598 1081 First Street Branch 55A First Street, Sai Ying Pun, Hong Kong 2517 3399 2517 3366 United Centre Branch Shop 1021, United Centre, 95 Queensway, Hong Kong 2861 1889 2861 0828 Shun Tak Centre Branch Shop 225, 2/F, Shun Tak Centre, 200 Connaught Road Central, Hong Kong 2291 6081 2291 6306 Causeway Bay Branch 18 Percival Street, Causeway Bay, Hong Kong 2572 4273 2573 1233 Bank of China Tower Branch 1 Garden Road, Hong Kong 2826 6888 2804 6370 Harbour Road Branch Shop 4, G/F, Causeway Centre, -
摘要) Acceptance for Registration (Summary)
公報編號 Journal No.: 86 公布日期 Publication Date: 26-11-2004 分項名稱 Section Name: 接納註冊 (摘要) Acceptance for Registration (Summary) 香港特別行政區政府知識產權署商標註冊處 Trade Marks Registry, Intellectual Property Department The Government of the Hong Kong Special Administrative Region 接納註冊 (摘要) 商標註冊處處長已根據《商標條例》(第 559 章)第 42 條,接納下列商標的註冊申請。現根據《商標條 例》第 43 條及《商標規則》(第 559 章附屬法例)第 15 條,公布申請的詳情。 根據《商標條例》第 44 條及《商標規則》第 16 條,任何人擬就下列商標的註冊提出反對,須在本公告 公布日期起計的三個月內,採用表格第 T6 號提交反對通知。(例如,若果公布日期爲 2003 年 4 月 4 日,則該三個月的最後一日爲 2003 年 7 月 3 日。)反對通知須載有反對理由的陳述及《商標規則》第 16(2)條所提述的事宜。反對人須在提交反對通知的同時,將該通知的副本送交有關申請人。 有關商標註冊處處長根據商標條例(第 43 章)第 13 條/商標條例(第 559 章)附表 5 第 10 條所接納的註冊申請, 請到 http://www.info.gov.hk/pd/egazette/檢視電子憲報。 ACCEPTANCE FOR REGISTRATION (SUMMARY) The Registrar of Trade Marks has accepted the following trade marks for registration under section 42 of the Trade Marks Ordinance (Cap. 559). Under section 43 of the Trade Marks Ordinance and rule 15 of the Trade Marks Rules (Cap. 559 sub. leg.), the particulars of the applications are published. Under section 44 of the Trade Marks Ordinance and rule 16 of the Trade Marks Rules, any person who wishes to oppose the registration of any of these marks shall, within the 3-month period beginning on the date of this publication, file a notice of opposition on Form T6. (For example, if the publication date is 4 April 2003, the last day of the 3-month period is 3 July 2003.) The notice of opposition shall include a statement of the grounds of opposition and the matters referred to in rule 16(2). -
Head 60 — HIGHWAYS DEPARTMENT
Head 60 — HIGHWAYS DEPARTMENT Controlling officer: the Director of Highways will account for expenditure under this Head. Estimate 2019–20 .................................................................................................................................... $4,175.7m Establishment ceiling 2019–20 (notional annual mid-point salary value) representing an estimated 2 378 non-directorate posts as at 31 March 2019 rising by 71 posts to 2 449 posts as at 31 March 2020 .......................................................................................................................................... $1,319.2m In addition, there will be an estimated 37 directorate posts as at 31 March 2019 and as at 31 March 2020. Commitment balance.............................................................................................................................. $19.1m Controlling Officer’s Report Programmes Programme (1) Capital Projects This programme contributes to Policy Area 21: Land and Waterborne Transport (Secretary for Transport and Housing) and Policy Area 23: Environmental Protection, Conservation, Power and Sustainable Development (Secretary for the Environment). Programme (2) District and Maintenance This programme contributes to Policy Area 21: Land and Works Waterborne Transport (Secretary for Transport and Housing) and Policy Area 24: Water Supply, Drainage and Slope Safety (Secretary for Development). Programme (3) Railway Development This programme contributes to Policy Area 21: Land and Waterborne Transport (Secretary -
Islands District Council Traffic and Transport Committee Paper T&TC
Islands District Council Traffic and Transport Committee Paper T&TC 41/2020 2020 Hong Kong Cyclothon 1. Objectives 1.1 The 2020 Hong Kong Cyclothon, organised by the Hong Kong Tourism Board, is scheduled to be held on 15 November 2020. This document outlines to the Islands District Council Traffic and Transport Committee the event information and traffic arrangements for 2020 Hong Kong Cyclothon, with the aim to obtain the District Council’s continuous support. 2. Event Background 2.1. Hong Kong Tourism Board (HKTB) is tasked to market and promote Hong Kong as a travel destination worldwide and to enhance visitors' experience in Hong Kong, by hosting different mega events. 2.2. The Hong Kong Cyclothon was debuted in 2015 in the theme of “Sports for All” and “Exercise for a Good Cause”. Over the past years, the event attracted more than 20,000 local and overseas cyclists to participate in various cycling programmes, as well as professional cyclists from around the world to compete in the International Criterium Race, which was sanctioned by the Union Cycliste Internationale (UCI) and The Cycling Association of Hong Kong, China Limited (CAHK). The 50km Ride is the first cycling activity which covers “Three Tunnels and Three Bridges (Tsing Ma Bridge, Ting Kau Bridge, Stonecutters Bridge, Cheung Tsing Tunnel, Nam Wan Tunnel, Eagle’s Nest Tunnel)” in the route. 2.3. Besides, all the entry fees from the CEO Charity and Celebrity Ride and Family Fun Ride and partial amount of the entry fee from other rides/ races will be donated to the beneficiaries of the event. -
The Hongkong and Shanghai Banking Corporation Branch Location
The Hongkong and Shanghai Banking Corporation Bank Branch Address 1. Causeway Bay Branch Basement 1 and Shop G08, G/F, Causeway Bay Plaza 2, 463-483 Lockhart Road, Causeway Bay, Hong Kong 2. Happy Valley Branch G/F, Sun & Moon Building, 45 Sing Woo Road, Happy Valley, Hong Kong 3. Hopewell Centre Branch Shop 2A, 2/F, Hopewell Centre, 183 Queen's Road East, Wan Chai, Hong Kong 4. Park Lane Branch Shops 1.09 - 1.10, 1/F, Style House, Park Lane Hotel, 310 Gloucester Road, Causeway Bay, Hong Kong 5. Sun Hung Kai Centre Shops 115-117 & 127-133, 1/F, Sun Hung Kai Centre, Branch 30 Harbour Road, Wan Chai, Hong Kong 6. Central Branch Basement, 29 Queen's Road Central, Central, Hong Kong 7. Exchange Square Branch Shop 102, 1/F, Exchange Square Podium, Central, Hong Kong 8. Hay Wah Building Hay Wah Building, 71-85 Hennessy Road, Wan Chai, Branch Hong Kong 9. Hong Kong Office Level 3, 1 Queen's Road Central, Central, Hong Kong 10. Chai Wan Branch Shop No. 1-11, Block B, G/F, Walton Estate, Chai Wan, Hong Kong 11. Cityplaza Branch Unit 065, Cityplaza I, Taikoo Shing, Quarry Bay, Hong Kong 12. Electric Road Branch Shop A2, Block A, Sea View Estate, Watson Road, North Point, Hong Kong 13. Island Place Branch Shop 131 - 132, Island Place, 500 King's Road, North Point, Hong Kong 14. North Point Branch G/F, Winner House, 306-316 King's Road, North Point, Hong Kong 15. Quarry Bay Branch* G/F- 1/F, 971 King's Road, Quarry Bay, Hong Kong 16. -
Visit : Yau Ma Tei Vernacular Solution for Architecture [Student Notes]
Design and Applied Technology Teaching kit for Senior Secondary Curriculum Visit : Yau Ma Tei Vernacular Solution for Architecture [Student notes] Organizer Sponsor Research Team 1 Contents Design and Applied Technology | Design and Applied Technology Preamble Learning plan i Visit: Yau Ma Tei - Vernacular Solutions for Architecture 1.1 Itinerary for the Visit 01 1.2 Brief History of Yau Ma Tei 02 1.2.1 What is Localization? 03 1.2.2 What is Vernacular Architecture? 03 Solutions for Architecture - Vernacular Ma Tei Yau Visit: 1.3 Checkpoints 1 Public Square 04 2 Temple Street 05 3 Mido Cafe 07 4 Yau Ma Tei Car Park Building and Gascoigne Road Flyer 08 5 Prosperous Garden 09 6 Man Wah Sun Chuen, Man Sing Street 10 7 Shanghai Street No. 313-315 11 8 Yau Ma Tei Wholesale Fruit Market 13 9 Yau Ma Tei Theatre 15 Summary, Key words and Further reading 17 Create Hong Kong of the Government of the Hong Kong Special Administrative Region provides funding support to the project only, and does not otherwise take part in the project. Any opinions, findings, conclusions or recommendations expressed in these materials/events (or by members of the project team) do not reflect the views of the Government of the Hong Kong Special Administrative Region. © 2012 Hong Kong Institute of Architects Topic 10 Visit: Yau Ma Tei - Vernacular Solutions for Architecture Major teaching areas Design and Applied Technology: Strand 1 Design and Innovation • Design in practice | Design and Applied Technology • Design consideration Strand 2 Technology Principles • Nature -
1 Introduction
Agreement No. CE 80/2001 (DS) Mott Connell Ltd Drainage Improvement in Tsuen Wan and Kwai Chung – Tsuen Wan Drainage Tunnel Environmental Impact Assessment 1 INTRODUCTION 1.1 Background The Drainage Services Department (DSD) completed the “Stormwater Drainage Master Plan (DMP) Study in Tsuen Wan, Kwai Chung and Tsing Yi” in July 1999. In that Study it was identified that the drainage systems in Tsing Yi could meet the current flood protection standard in general, but not the drainage systems in Tsuen Wan and Kwai Chung. A series of drainage improvement works including the “Drainage Improvement in Tsuen Wan and Kwai Chung – Tsuen Wan Drainage Tunnel” (The Project) and the “Drainage Improvement in Tsuen Wan and Kwai Chung – Urban Drainage Improvement Works” were proposed, and subsequently DSD commissioned a Preliminary Project Feasibility Study (PPFS) for “Drainage Improvement in Tsuen Wan and Kwai Chung – Package A, Tsuen Wan Drainage Tunnel” which was completed in April 2000. The PPFS concluded that the construction of a tunnel of an internal diameter of 6.5m and length 5.35km should be implemented to alleviate the flooding risk in Tsuen Wan and Kwai Chung. At the end of October 2002, Mott Connell Limited (MCL) was commissioned by the Drainage Services Department under Agreement No. CE 80/2001 (DS) to carry out the investigation and preliminary design for the “Drainage Improvement in Tsuen Wan and Kwai Chung – Tsuen Wan Drainage Tunnel” (The Project). The primary objective of the Project is to develop an optimum preliminary design of the proposed tunnel and associated drainage structures based on the recommendations of the Preliminary Project Feasibility Study Report (PPFS), the Stormwater Drainage Master Plan Study in Tsuen Wan, Kwai Chung and Tsing Yi (DMP) and the results of the various investigations to be carried out under this Assignment.