Review of Staff Working at Store Unit at Matunga

Total Page:16

File Type:pdf, Size:1020Kb

Review of Staff Working at Store Unit at Matunga CENTRAL RAILWAY REVIEW OF STAFF WORKING AT STORE UNIT AT MATUNGA Officers & Inspectors Officers Inspectors Shri. Rajesh Sahani Shri Santosh Handore SECY (PG)/HQ WSI/BB Shri. A. K. Gupta Shri Swapnil Awale DWSO/BB WSI/HQ Shri R. Subramanian Shri Akbar Sayed Dy. Secretary & APIO WSI/BB Officers & Inspectors Officer Supervisors Shri. Bajrang Lal Agarwal Shri.P M Bhosekar Dy.CMM/MTN Ch.OS(EST) Shri.Arvind Hatmode Ch.OS(Gen) 1 SYNOPSIS OF THE STUDY Study Number : WSCR/Stores/HQ/2/17-18 : : Review of staff working at Store Name of Study Unit Matunga. Approved by : AGM Department : Stores Division : Mumbai Date of Commencement : 08-06-2017 Date of Completion : 10.11.2017 Date of Submission : 06.03.2018 No. of Recommendations : 01 Sanctioned Strength : 399 No. of Men studied : 205 No. of vacancies : 194 No. of posts identified surplus : 52 Financial Implication(Tentative) : Rs. 2,45,37,240 2 INDEX No. Contents Page No. Acknowledgement, Terms of Reference, Authority And 1 04 Methodology 2 Summary of Recommendations 05 3 Chapter – I Introduction 06 4 Chapter – II Existing Scenario 08 5 Chapter – III Critical Analysis 32 6 Chapter – IV Recommendations & Suggestions 33 7 Chapter – V Financial Implications 34 3 Acknowledgement The work-study team takes this opportunity to express heartily thanks to Shri Bajrang Agarwal, Dy.CMM/CWE for the valuable guidance provided by them for successful completion of study. The work study team also likes to thanks all Chief Office Superintendent of various sections and all Chief Depot Material Superintendent & Depot Material Superintendent of various wards for the guidance rendered to the work study team for early completion of the study. The work-study team is also thankful to other staff of all depot who rendered guidance to the team in conducting the study. Authority and Term of Reference The work-study on “Review of staff working at Store Unit Matunga” has been included in work-study Program 2017-18 with No. WSCR/Stores/HQ/2/17- 18. The term of reference for the given work-study is “Review of staff working at Store Unit Matunga”. Methodology The work-study team has adopted the strategy as under: 1. Collection of data of details of existing staff strength, workload, allotment of duties, existing/New procedures to carry out the work. 2. Discussion in details with supervisors & other staff of store department regarding existing scenario. 3. Critical analysis of the data collected. 4 SUMMARY OF RECOMENDATION Sr. Page Recommendations and Suggestions No. No. Recommendations 1: 52 posts of Group C Staff/ 1 33 erstwhile Group D staff may be surrendered. 5 CHAPTER 1 INTRODUCTION Store depots are of considerable importance for smooth functioning of the workshops as timely supply of required materials and spare parts are very much essential for the unit to achieve the targeted out-turn. The responsibility of planning, processing, liaison, inspection, and stocking etc of the required materials and prompt supply of the same to various shops, besides accounting of the receipts and issues is lying with the attached store depot. Objectives of Material Management: The following are concepts of good Material Management:- a. To ensure timely availability of required material for production, maintenance requirements b. To maintain uninterrupted material supplies at minimum cost c. To minimize purchase/product cost and reduce percentages of obsolesce of inventories. d. To reduce material/product costs through standardization, value analysis and import substitution, indigenization, EOQ analysis and other material management techniques e. To maintain public accountability at all stages of transaction f. Efficient control of inventories to reduce working capital g. To suggest measures to prevent deterioration of materials and to eliminate losses, pilferages maintain shelf life. h. Timely disposal of surplus, non-moving, not-required and unwanted materials In modern era, where Integrated Materials Management Information System (iMMIS) with online facility is being provided in all stores depots of Indian Railways. In view of the above factors, the work-study on “Review of staff working at Store Unit Matunga” has been included as a annual study for the year 2017- 18, with the approval of AGM. The Carriage Workshop, Matunga was set up in 1915 as a repair workshop for broad gauge and narrow gauge coaches and wagons of the erstwhile Great Indian Peninsular (GIP) Railway. The workshop primarily serves the Carriage Workshop Matunga and in addition to this it also serves Vidyavihar Car Shed, Kalva Car Shed, Sanpada Car Shed, Diesel Loco Shed Kalyan, and Electrical Loco Shed Kalya. The Stores Depot, MTN is functioning under the administrative control of Dy.CMM/CWE who is assisted by 1 SMM and 2 AMM. This stores depot is mainly catering the Carriage & Wagon Workshop, Matunga for supply of spare parts and other materials required for day-to-day working. The administrative control of Stores depots under SMM/VVH, AMM/EMU/SNPD, AMM/EMU/KLW, AMM/DCL/KYN, SMM/ELS/KYN is also under Dy.CMM/CWE. Purchase of Stock items is normally done through concerned section of Controller of Stores office, CSTM which is based on the requirement as per AAC finalized by the CWM/MTN in consultation with the WAO/MTN. 6 Materials are received in Store Depot/MTN by trucks, trains or by hand delivery and are checked first for correctness of quantity and quality as per Purchase order issued by COS office. The materials are inspected by Store/technical inspectors and DCOS/ACOS to check whether the materials received are as per specifications etc indicated in the PO. The step-wise procedure for purchase of Stock items through COS/CSTM is as under:- Preparation of estimate sheets of items Verification of quantity by associated accounts unit i.e. WAO/MTN Forwarding of the vetted figures to COS Clubbing of demands of all depots and vetting by FA&CAO Floating of tender enquiries at HQ Opening of tenders and acceptance PO sent to HQ finance for pre-check PO released for firm by HQ Receipt of material at MTN Inspection of material After acceptance, preparation of RO and material handed over to ward. If rejected, material is returned to the firm. Taken on bin cards Storage and issue of material On accepting the material as per specifications, Receipt order (RO) is prepared and the materials are transferred to the concerned wards where necessary entries are made in the records. Similarly material when issued to the shops, the transaction is recorded in the wards. Sometimes, material is issued to different Store depots also through depot transfer. 7 CHAPTER 2 EXISTING SCENARIO The Stores Depot, MTN is functioning under the administrative control of Dy.CMM/CWE who is assisted by 1 SMM and 2 AMM. This stores depot is mainly catering the Carriage & Wagon Workshop, Matunga for supply of spare parts and other materials required for day-to-day working. The administrative control of Stores depots under SMM/VVH, AMM/EMU/SNPD, AMM/EMU/KLW, AMM/DCL/KYN, SMM/ELS/KYN is also under Dy.CMM/CWE. Purchase of Stock items is normally done through concerned section of Controller of Stores office, CSTM which is based on the requirement as per AAC finalized by the CWM/MTN in consultation with the WAO/MTN. Materials are received in Store Depot/MTN by trucks, trains or by hand delivery and are checked first for correctness of quantity and quality as per Purchase order issued by COS office. The materials are inspected by Store/technical inspectors and DCOS/ACOS to check whether the materials received are as per specifications etc indicated in the PO. The step-wise procedure for purchase of Stock items through COS/CSTM is as under:- Preparation of estimate sheets of items Verification of quantity by associated accounts unit i.e. WAO/MTN Forwarding of the vetted figures to COS Clubbing of demands of all depots and vetting by FA&CAO Floating of tender enquiries at HQ Opening of tenders and acceptance PO sent to HQ finance for pre-check PO released for firm by HQ Receipt of material at MTN Inspection of material After acceptance, preparation of RO and material handed over to ward. If rejected, material is returned to the firm. Taken on bin cards Storage and issue of material On accepting the material as per specifications, Receipt order (RO) is prepared and the materials are transferred to the concerned wards where necessary entries are made in the records. Similarly material when issued to the shops, the transaction is recorded in the wards. Sometimes, material is issued to different Store depots also through depot transfer. 8 Sanctioned Strength of Group C staff and erstwhile Group D staff of Stores Deport Matunga and Other Depots falling under its jurisdiction is given in following tables dated, Group 'C' Staff Depot/ Bill Unit S/S MoR Vac MTN 2040 124 81 43 MTN 2100/2102 28 10 18 VVH 2043 26 12 14 KVLA 2046 13 9 4 DSL 2038 16 12 4 ELS 2045 31 16 15 SNPD 2094 19 11 8 Total 257 151 106 Croup 'D' Staff MTN 2040 30 13 17 MTN 2100/2102 212 103 109 VVH 2043 19 11 8 KVLA 2046 8 6 2 DSL 2038 6 8 -2 ELS 2045 26 17 9 SNPD 2094 8 4 4 Total 309 162 147 9 Detailed sanctioned strength of sanctioned posts along with On roll staff and vacancies thereof at Store Depot Matunga is given in following tables respectively, Sanctioned Sr. Category Man On Roll Vacancy Strength 1 CDMS 16 18 -2 2 DMS 10 9 1 3 Ch.OS/OS 54 36 18 4 Sr.Clerk/Jr Clerk 26 9 17 5 Steno 5 1 4 6 Typist 4 1 3 7 Tech Insp.
Recommended publications
  • Reg. No Name in Full Residential Address Gender Contact No
    Reg. No Name in Full Residential Address Gender Contact No. Email id Remarks 20001 MUDKONDWAR SHRUTIKA HOSPITAL, TAHSIL Male 9420020369 [email protected] RENEWAL UP TO 26/04/2018 PRASHANT NAMDEORAO OFFICE ROAD, AT/P/TAL- GEORAI, 431127 BEED Maharashtra 20002 RADHIKA BABURAJ FLAT NO.10-E, ABAD MAINE Female 9886745848 / [email protected] RENEWAL UP TO 26/04/2018 PLAZA OPP.CMFRI, MARINE 8281300696 DRIVE, KOCHI, KERALA 682018 Kerela 20003 KULKARNI VAISHALI HARISH CHANDRA RESEARCH Female 0532 2274022 / [email protected] RENEWAL UP TO 26/04/2018 MADHUKAR INSTITUTE, CHHATNAG ROAD, 8874709114 JHUSI, ALLAHABAD 211019 ALLAHABAD Uttar Pradesh 20004 BICHU VAISHALI 6, KOLABA HOUSE, BPT OFFICENT Female 022 22182011 / NOT RENEW SHRIRANG QUARTERS, DUMYANE RD., 9819791683 COLABA 400005 MUMBAI Maharashtra 20005 DOSHI DOLLY MAHENDRA 7-A, PUTLIBAI BHAVAN, ZAVER Female 9892399719 [email protected] RENEWAL UP TO 26/04/2018 ROAD, MULUND (W) 400080 MUMBAI Maharashtra 20006 PRABHU SAYALI GAJANAN F1,CHINTAMANI PLAZA, KUDAL Female 02362 223223 / [email protected] RENEWAL UP TO 26/04/2018 OPP POLICE STATION,MAIN ROAD 9422434365 KUDAL 416520 SINDHUDURG Maharashtra 20007 RUKADIKAR WAHEEDA 385/B, ALISHAN BUILDING, Female 9890346988 DR.NAUSHAD.INAMDAR@GMA RENEWAL UP TO 26/04/2018 BABASAHEB MHAISAL VES, PANCHIL NAGAR, IL.COM MEHDHE PLOT- 13, MIRAJ 416410 SANGLI Maharashtra 20008 GHORPADE TEJAL A-7 / A-8, SHIVSHAKTI APT., Male 02312650525 / NOT RENEW CHANDRAHAS GIANT HOUSE, SARLAKSHAN 9226377667 PARK KOLHAPUR Maharashtra 20009 JAIN MAMTA
    [Show full text]
  • Redharavi1.Pdf
    Acknowledgements This document has emerged from a partnership of disparate groups of concerned individuals and organizations who have been engaged with the issue of exploring sustainable housing solutions in the city of Mumbai. The Kamala Raheja Vidyanidhi Institute of Architecture (KRVIA), which has compiled this document, contributed its professional expertise to a collaborative endeavour with Society for Promotion of Area Resource Centres (SPARC), an NGO involved with urban poverty. The discussion is an attempt to create a new language of sustainable urbanism and architecture for this metropolis. Thanks to the Dharavi Redevelopment Project (DRP) authorities for sharing all the drawings and information related to Dharavi. This project has been actively guided and supported by members of the National Slum Dwellers Federation (NSDF) and Dharavi Bachao Andolan: especially Jockin, John, Anand, Savita, Anjali, Raju Korde and residents’ associations who helped with on-site documentation and data collection, and also participated in the design process by giving regular inputs. The project has evolved in stages during which different teams of researchers have contributed. Researchers and professionals of KRVIA’s Design Cell who worked on the Dharavi Redevelopment Project were Deepti Talpade, Ninad Pandit and Namrata Kapoor, in the first phase; Aditya Sawant and Namrata Rao in the second phase; and Sujay Kumarji, Kairavi Dua and Bindi Vasavada in the third phase. Thanks to all of them. We express our gratitude to Sweden’s Royal University College of Fine Arts, Stockholm, (DHARAVI: Documenting Informalities ) and Kalpana Sharma (Rediscovering Dharavi ) as also Sundar Burra and Shirish Patel for permitting the use of their writings.
    [Show full text]
  • Bus-Shelter-Advertising.Pdf
    1 ONE STOP MARKETING 2 What Are You Looking For? AIRLINE/AIRPORT CINEMA DIGITAL NEWSPAPER RADIO TELEVISION MAGAZINE SERVICES OUTDOOR NON TRADITIONAL 3 Bus Shelter @ INR 35,000/- Per Month Bus Shelter @ INR 35,000/- Per Month Powai, Mumbai Suresh Nagar, Mumbai Near L&T, Powai Garden, Powai Military Road Juhu-Versova Link Road ,Bharat Nagar/Petrol Pump Bus Shelter @ INR 35,000/- Per Month Bus Shelter @ INR 35,000/- Per Month Juhu, Mumbai VN Purav Marg, Mumbai Juhu S.Parulekar Marg, Traffic Towrds Juhu Bus Station Marathi Vidnyan Parishad, V. N. Purav Road, Chunabhatti Bus Shelter @ INR 35,000/- Per Month Bus Shelter @ INR 35,000/- Per Month Andheri East, Mumbai Andheri East, Mumbai International Airport Road, Sahar Road, Ambassador Outside Techno Mall, Jogeshwari Link Road, Behram Hotel Bagh 4 Bus Shelter @ INR 35,000/- Per Month Bus Shelter @ INR 35,000/- Per Month Lohar Chawl, Mumbai Lad Wadi, Mumbai Kalbadevi Road ,Princess Street 2 Kalbadevi Road ,Princess Street 1 Bus Shelter @ INR 35,000/- Per Month Bus Shelter @ INR 35,000/- Per Month Savarkar Nagar, Mumbai Mahim Nature park, Mumbai Near L&T, Powai Garden, Powai Military Road Dharavi Depot, Dumping Road, Dharavi Bus Shelter @ INR 35,000/- Per Month Bus Shelter @ INR 35,000/- Per Month Antop Hill, Mumbai Bharat Nagar, Mumbai Antop Hill, Shaikh Misri Road, Antop Hill Juhu-Versova Link Road ,Bharat Nagar/Petrol Pump 5 Bus Shelter @ INR 35,000/- Per Month Bus Shelter @ INR 35,000/- Per Month Wadala, Mumbai Kurla East, Mumbai Wadala Station, Kidwai Marg, Wadala S.T. Depot (Kurla East), S.T.
    [Show full text]
  • Mumbai District
    Government of India Ministry of MSME Brief Industrial Profile of Mumbai District MSME – Development Institute Ministry of MSME, Government of India, Kurla-Andheri Road, Saki Naka, MUMBAI – 400 072. Tel.: 022 – 28576090 / 3091/4305 Fax: 022 – 28578092 e-mail: [email protected] website: www.msmedimumbai.gov.in 1 Content Sl. Topic Page No. No. 1 General Characteristics of the District 3 1.1 Location & Geographical Area 3 1.2 Topography 4 1.3 Availability of Minerals. 5 1.4 Forest 5 1.5 Administrative set up 5 – 6 2 District at a glance: 6 – 7 2.1 Existing Status of Industrial Areas in the District Mumbai 8 3 Industrial scenario of Mumbai 9 3.1 Industry at a Glance 9 3.2 Year wise trend of units registered 9 3.3 Details of existing Micro & Small Enterprises and artisan 10 units in the district. 3.4 Large Scale Industries/Public Sector undertaking. 10 3.5 Major Exportable item 10 3.6 Growth trend 10 3.7 Vendorisation /Ancillarisation of the Industry 11 3.8 Medium Scale Enterprises 11 3.8.1 List of the units in Mumbai district 11 3.9 Service Enterprises 11 3.9.2 Potentials areas for service industry 11 3.10 Potential for new MSME 12 – 13 4 Existing Clusters of Micro & Small Enterprises 13 4.1 Details of Major Clusters 13 4.1.1 Manufacturing Sector 13 4.2 Details for Identified cluster 14 4.2.1 Name of the cluster : Leather Goods Cluster 14 5 General issues raised by industry association during the 14 course of meeting 6 Steps to set up MSMEs 15 Annexure - I 16 – 45 Annexure - II 45 - 48 2 Brief Industrial Profile of Mumbai District 1.
    [Show full text]
  • No. Sub Division Designation,Address & Telephone
    No. Sub Division Designation,Address & Designation,Address & Designation,Address & Telephone Telephone Number of Assistant Telephone Number of Number of Government Information Information Officer Government Information Officer Officer 1 Office of the 1] Administrative Officer,Desk -1 1] Assistant Commissiner 1] Deputy Commissiner of Commissioner of {Confidential Br.},Office of the of Police,{Head Quarter- Police,{Head Quarter-1},Office of the Police,Mumbai Commissioner of Police, 1},Office of the Commissioner of Police, D.N.Road, D.N.Road,Mumbai-01,Telephone Commissioner of Police, Mumbai-01,Telephone No.2620043 No.22695451 D.N.Road, Mumbai-01, Telephone No.22624426 Confidential Report, Sr.Esstt., 2] Sr.Administrative Officer, Assistant Commissiner of Deputy Commissiner of Police, {Head Dept.Enquiry, Pay, Desk-3 {Sr.Esstt. Br.}, Office of Police, {Head Quarter- Quarter-1},Office of the Commissioner Licence, Welfare, the Commissioner of Police, 1},Office of the of Police, D.N.Road, Mumbai- Budget, Salary, D.N.Road,Mumbai-01, Telephone Commissioner of Police, 01,Telephone No.2620043 Retirdment No.22620810 D.N.Road, Mumbai-01, etc.Branches Telephone No.22624426 3] Sr.Administrative Officer,Desk - Assistant Commissiner of Deputy Commissiner of Police, {Head 5 {Dept.Enquiry} Br., Office of the Police, {Head Quarter- Quarter-1},Office of the Commissioner Commissioner of Police, 1},Office of the of Police, D.N.Road, Mumbai- D.N.Road,Mumbai-01,Telephone Commissioner of Police, 01,Telephone No.2620043 No.22611211 D.N.Road, Mumbai-01, Telephone
    [Show full text]
  • Heritage List
    LISTING GRADING OF HERITAGE BUILDINGS PRECINCTS IN MUMBAI Task II: Review of Sr. No. 317-632 of Heritage Regulation Sr. No. Name of Monuments, Value State of Buildings, Precincts Classification Preservation Typology Location Ownership Usage Special Features Date Existing Grade Proposed Grade Photograph 317Zaoba House Building Jagananth Private Residential Not applicable as the Not applicable as Not applicable as Not applicable as Deleted Deleted Shankersheth Marg, original building has been the original the original the original Kalbadevi demoilshed and is being building has been building has been building has been rebuilt. demoilshed and is demoilshed and is demoilshed and is being rebuilt. being rebuilt. being rebuilt. 318Zaoba Ram Mandir Building Jagananth Trust Religious Vernacular temple 1910 A(arc), B(des), Good III III Shankersheth Marg, architecture.Part of building A(cul), C(seh) Kalbadevi in stone.Balconies and staircases at the upper level in timber. Decorative features & Stucco carvings 319 Zaoba Wadi Precinct Precinct Along Jagannath Private Mixed Most features already Late 19th century Not applicable as Poor Deleted Deleted Shankershet Marg , (Residential & altered, except buildings and early 20th the precinct has Kalbadevi Commercial) along J. S. Marg century lost its architectural and urban merit 320 Nagindas Mansion Building At the intersection Private (Nagindas Mixed Indo Edwardian hybrid style 19th Century A(arc), B(des), Fair II A III of Dadasaheb Purushottam Patel) (Residential & with vernacular features like B(per), E, G(grp) Bhadkamkar Marg Commercial) balconies combined with & Jagannath Art Deco design elements Shankersheth & Neo Classical stucco Road, Girgaum work 321Jama Masjid Building Janjikar Street, Trust Religious Built on a natural water 1802 A(arc), A(cul), Good II A II A Near Sheikh Menon (Jama Masjid of (Muslim) source, displays Islamic B(per), B(des),E, Street Bombay Trust) architectural style.
    [Show full text]
  • DMTI@SOFTPRO “ONLINE & CLASSROOM Training” Dadar West / Matunga West | Andheri West | * THANE West * | ‘ONLINE’
    DMTI@SOFTPRO “ONLINE & CLASSROOM Training” Dadar West / Matunga West | Andheri West | * THANE West * | ‘ONLINE’ ON-PAGE OPTIMIZATION KEYWORD RESEARCH OFF-PAGE - Importance of FORUMS - Competitor ANALYSIS - META TAGS Optimization - Keyword Proximity, OPTIMIZATION - Website AUDITING - Creating Competitor - CANONICAL Tag Keyword Density, Analysis - Submission to Search E - SOCIAL BOOKMARKING Report for Analysis. - Website Analysis - IMAGE OPTIMIZATION - Directory Submission - Press Release - Copy-scape - Heading Tags in Contents - Internal Link Building - Deep Linking - One Way Link building - Duplicate Content Issues - Header Keyword Optimiz - Robots file Optimization - Article writing/directory - GOOGLE SITE MAPS - Coding Standards - Footer Keyword Optimiz - URL renaming/re-writing - Classified submissions - Sitemap Creation, XML - Usage of all Tags SOCIAL MEDIA OPTIMIZATION & MARKETING YOU TUBE Marketing FACEBOOK MARKETING LINKEDIN Types of social media / Key terms to understand Video optimization Create Marketing & Advertising Marketing on Linkedin How Social Media influences audience & Google Promoting on Promote Facebook pages Advertise on LinkedIn Developing unique content, positioning and voice YouTube Advertise on Facebook (PPC) Using LinkedIn for business Integrating social media into your website and blogs Seo for Youtube Video, Branding, Lead Generation GOOGLE PLUS How to choose right social media for your Youtube Analytics Campaign Creations & AD’s Using Google Plus for business/brand. Behavioural & cultural standard ✓ SLIDESHARE
    [Show full text]
  • Unpaid Dividend Data As on 31.03.2020
    Cummins India Limited Unpaid Dividend Data Interim Dividend 2019-2020 Sr. No. NAM1 FLNO Add1 Add2 Add3 City PIN Amount 1 A GURUSWAMY A005118 J-31 ANANAGAR CHENNAI CHENNAI 600102 8400.000 2 CYRUS JOSEPH . 1202980000081696 2447-(25),2, PATTOM, TRIVANDRUM 196.000 3 GIRIRAJ KUMAR DAGA G010253 C/O SHREE SWASTIK INDUSTRIES DAGA MOHOLLA BIKANER 0 1400.000 4 NEENA MITTAL 0010422 15/265 PANCH PEER STREET NOORI GATE UTTAR PRADESHAGRA 0 14.000 5 PRAVEEN KUMAR SINGH 1202990003575291 THE INSTITUTE OF ENGINEERS BAHADUR SHAH ZAFAR MARG NEW DELHI 110002 336.000 6 PAWAN KUMAR GUPTA IN30021411239166 1/1625 MADARSA ROAD KASHMIRI GATEDELHI 110006 721.000 7 RAJIV MANCHANDA IN30096610156502 A-324-A DERAWAL NAGAR DELHI 110009 7.000 8 VANEET MAKKAR IN30021410957483 E 4/9 MODEL TOWN DELHI 110009 175.000 9 MEENU CHADHA 1203350001859754 F-3 KIRTI NAGAR . NEW DELHI 110015 700.000 10 RAKESH KHER IN30112715640524 E-13 GROUND FLOOR GREEN PARK EXTN NEW DELHINEW DELHI 110016 1400.000 11 RAJNI DHAWAN R027270 C-398, DEFENCE COLONY NEW DELHI NEW DELHI 110024 490.000 12 UMESH CHANDRA CHATRATH U004751 C-398, DEFENCE COLONY NEW DELHI NEW DELHI 110024 490.000 13 SURESH KUMAR S033265 H.NO.882, GALI NO.57 TRI NAGAR DELHI DELHI 110035 1050.000 14 S N SINGH 1202990001556651 ALPHA TECHNICAL SERVICES PVT LTD A 22 BLOCK B 1 MOHAN CO IND AREA NEW DELHI 110044 98.000 15 SAUDAMINI CHANDRA IN30021410834754 C-12 GULMOHAR PARK NEW DELHI 110049 980.000 16 MADHU RASTOGI IN30236510099372 C-124, SHAKTI NAGAR EXTENSION, DELHI 110052 7.000 17 SHASHI KATYAL IN30159010012885 C- 1 A/106 c JANAK
    [Show full text]
  • Total List of MCGM and Private Facilities.Xlsx
    MUNICIPAL CORPORATION OF GREATER MUMBAI MUNICIPAL DISPENSARIES SR SR WARD NAME OF THE MUNICIPAL DISPENSARY ADDRESS NO NO 1 1 COLABA MUNICIPALMUNICIPAL DISPENSARY 1ST FLOOR, COLOBA MARKET, LALA NIGAM ROAD, COLABA MUMBAI 400 005 SABOO SIDIQUE RD. MUNICIPAL DISPENSARY ( 2 2 SABU SIDDIQ ROAD, MUMBAI (UPGRADED) PALTAN RD.) 3 3 MARUTI LANE MUNICIPAL DISPENSARY MARUTI LANE,MUMBAI A 4 4 S B S ROAD. MUNICIPAL DISPENSARY 308, SHAHID BHAGATSINGH MARG, FORT, MUMBAI - 1. 5 5 HEAD OFFICE MUNICIPAL DISPENSARY HEAD OFFICE BUILDING, 2ND FLOOR, ANNEX BUILDING, MUMBAI - 1, 6 6 HEAD OFFICE AYURVEDIC MUNICIPAL DISPENSARY HEAD OFFICE BUILDING, 2ND FLOOR, ANNEX BUILDING, MUMBAI - 1, 7 1 SVP RD. MUNICIPAL DISPENSARY 259, SARDAR VALLABBHAI PATEL MARG, QUARTERS, A BLOCK, MAUJI RATHOD RD, NOOR BAUG, DONGRI, MUMBAI 400 8 2 WALPAKHADI MUNICIPAL DISPENSARY 009 9B 3 JAIL RD. UNANI MUNICIPAL DISPENSARY 259, SARDAR VALLABBHAI PATEL MARG, 10 4 KOLSA MOHALLA MUNICIPAL DISPENSARY 20, KOLSA STREET, KOLSA MOHALLA UNANI , PAYDHUNI 11 5 JAIL RD MUNICIPAL DISPENSARY 20, KOLSA STREET, KOLSA MOHALLA UNANI , PAYDHUNI CHANDANWADI SCHOOL, GR.FLOOR,CHANDANWADI,76-SHRIKANT PALEKAR 12 1 CHANDAN WADI MUNICIPAL DISPENSARY MARG,MARINELINES,MUM-002 13 2 THAKURDWAR MUNICIPAL DISPENSARY THAKURDWAR NAKA,MARINELINES,MUM-002 C PANJRAPOLE HEALTH POST, RAMA GALLI,2ND CROSS LANE,DUNCAN ROAD 14 3 PANJRAPOLE MUNICIPAL DISPENSARY MUMBAI - 400004 15 4 DUNCAN RD. MUNICIPAL DISPENSARY DUNCAN ROAD, 2ND CROSS GULLY 16 5 GHOGARI MOHALLA MUNICIPAL DISPENSARY HAJI HASAN AHMED BAZAR MARG, GOGRI MOHOLLA 17 1 NANA CHOWK MUNICIPAL DISPENSARY NANA CHOWK, FIRE BRIGADE COMPOUND, BYCULLA 18 2 R. S. NIMKAR MUNICIPAL DISPENSARY R.S NIMKAR MARG, FORAS ROAD, 19 3 R.
    [Show full text]
  • Waiting List of Officers for Allotment of (Fresh) Type 'Iii'
    WAITING LIST OF OFFICERS FOR ALLOTMENT OF (FRESH) TYPE ‘III’ QUARTERS AS ON JANUARY, 2019 S.No NAME OF THE DESIGN Date of PREFERENCE Date of . APPLICANT . Seniority Appl S/SHRI & DOB 1. Jayanand Abasaheb PO 23.12.96 Matunga, (5/85) 29.05.18 Raut 2. Narendra Kumar EO 15.01.02 Kharghar 31.01.19 Choudhary 01.02.76 3. Vivek Kumar E.O. 22.08.02 Belapur (Change Prf. 22.07.2010) 22.07.10 4. Vinod Kumar PO 23.01.03 Kharghar (M-1 below fifth floor) 28.12.18 24.08.82 5. Suresh Choudhary P.O. 04.09.04 Peddar Road(pref chng vide ltr dtd 15.07.13 29.03.16) 6. Katke Balaji Supdt 16.02.09 Bhandup 02.01.19 Radhakisan (SC) 01.10.82 7. Ajay Kumar Jha E.O. 01.06.09 Antop Hill (1st Priority - Bld- 26.12.18 10.05.80 8,Flat No. 165 except grd n top flr) 8. Avadesh Meena (ST) EO 05.06.09 Peddar Road (Except Gr. & Top 11.09.18 Floor) 9. Manoj PO 03.10.09 Kharghar 19.12.18 20.11.86 10. Dharamvir Singh PO 06.10.09 Kharghar 02.01.19 05.01.88 11. Mankesh Meena (ST) Supdt 30.11.09 Antop hill (10/220), Kharghar 19.11.18 14.07.84 12. Deepak Devrani AC 21.12.09 Peddar Road 02.08.11 13. Bigan Kumar (SC) PO 24.05.10 Kharghar (M16/901) 26.12.18 09.06.80 14. Rajiv Kumar (STA) 25.10.10 Antop Hill (Except Gr.
    [Show full text]
  • Mumbai Central District – Maharashtra
    Mumbai Central District – Maharashtra Sl. Name of the Complete postal E-mail No. Sub-Division address of ACP/Dy. Telephone Numbers along with STD and Police SP/SDPO office and Code Station Police Station along with PIN Code Office Residence Fax 1. Tardeo Division Tardeo Division, 022- 022- 022- [email protected] Tardeo Police Station 23532142 25371537 23534142 t.in Bldg, M.P. Mills Compound, Tardeo Road, Mumbai- 400034, Maharashtra 2. Agripada Jicab Circle, Satrasta, 022- 022- 022- agripadaacp@mtnl. Division Mumbai-400011, 23085125 24139357 23070532 net.in Maharashtra 3. Worli Division Worli Police Station 022- 022- 022- [email protected] Building, 4th Floor, 24955626 28924778 24955626 .in Dr A.B Road, Mumbai-400030, Maharashtra 4. Bhoiwada Bhoiwada Division, 022- 022- --- bhoiwadaacp@mtn Division Kalachowki Police 23739053 23804565 l.net.in Station, 1st floor, Vir Shrikant Hadkar Marg, Mumbai- 400013, Maharashtra 5. Matunga Dr.B A Road, Near 022- --- --- matungaacp@mtnl. Division Kingcircle Railway 24015445 net.in Station Matunga, Mumbai-400013, Maharashtra 6. Sion Division Office of the Asst. 022- --- --- [email protected] Commissioner of 24074575 n Police, Mumbai, Maharashtra 7. Dadar Division Dadar Police Station 022- 022- 022- [email protected] Building, Ist floor 24323044 23533694 24323044 .in Bhawani Shankar Road, Mumbai- 400028, Maharashtra 8. Mahim Division Opp. Mahim Chirch 022- 022- 022- [email protected] Fort Road, Mahim 24466033 22870942 24466033 et.in Police Station Compound, Mahim Mumbai-400016, Maharashtra 9. Kurla Division Sarveshwar Road, 022- 022- 022- [email protected]. Takiya Wad Kurla 26501147 22672056 26501147 in Police Station, 1st floor, Kurla (W), Mumbai-400070, Maharashtra 10.
    [Show full text]
  • Working of Matunga Workshop
    Report No.PA 8 of 2008 (Railways) Chapter 5 Working of Matunga Workshop 5.1 Highlights • Target for outturn of Matunga Workshop is fixed on the basis of arisings of coaches for POH. The availability of manpower, machinery etc is not taken into calculation at all. The method of fixing the target appears to be unscientific. (Para 5.8.1) • Coaches booked by base stations for POH at Matunga workshop are received without the list of missing items prepared jointly by Security, Mechanical and Electrical department. During the period from 2004-05 to 2006-07 fittings valuing Rs.0.87 crore were found missing. (Para 5.8.2) • Matunga workshop has taken more than the prescribed time for POH of coaches. Railway suffered loss of Rs.11.82 crore on account of detention to coaches during the 2006-07 alone. (Para 5.8.4) • Rejection of periodically overhauled coaches by Neutral Control Wing as well as coaches marked sick within 100 days after they were periodically overhauled indicates the poor workmanship. Railways suffered loss of Rs.3.56 crore on account of detention to rejected coaches. (Paras 5.8.7 and 5.8.8) • The expenditure of Rs.12.15 crore incurred on augmentation of POH capacity of the workshop remained unproductive for the last two to three years resulting in non-achievement of projected saving in time taken for POH and consequential loss of Rs.54.28 crore on account of excessive detention to coaches. (Para 5.8.9) 5.2 Recommendations • The system of fixing of targets needs to be reviewed to bring into place a more scientific system.
    [Show full text]