PERI UP MI and DUO for largest diamond bourse Surat Diamond Bourse, Surat – Page 4 DUO and SKYDECK system for largest convention center ITPO Pragati Maidan, New Delhi – Page 5 Bridge piers of different height constructed by hydraulic climbing system RCS with VARIO Makhida Bridge, Kota – Page 8 Dear Readers,

We are glad to present before you the 2018 edition of Geographical presence and ability to service faster has been PERI Scope. With over 70 subsidiaries and over 140 logistics one of our core strength for Indian market. We believe in centers PERI continues to set standards in the industry as delighting customer for every opportunity we gain to serve. world’s largest manufacturer and supplier of formwork and We continue to expand our presence with offi ces in scaffolding system. PERI India celebrates its successful Mumbai, Delhi, Chennai, Bengaluru and Kolkata and resident journey over a decade and continues to built a strong engineer in other and tier II cities. Our state of the customer base by offering distinct solutions for every art new stockyard facility at Bhiwandi which is expanded construction need. fi ve times the earlier facility is another banchmark in the formwork and scaffolding industry. New stockyard facility With rapid urbanization, more and more high rise structures is equipped with experince center, dedicated assembly area and infrastructure development will be seen across India. and training facility other than huge storage space. With implementation of RERA and Government impetus on infrastructure, there is streamlining in construction I once again express my deepest gratitude to all our estimed methodology and rush to complete project in time. Modern stake holders for your continued support and promise that construction demands technologies that are faster, safer PERI will always be your trusted partner for all your form- and more innovative. work and scaffolding needs.

For nearly 50 years, PERI products and systems have successfully proved in the market globally. Given its strong background, PERI India has expanded its foot prints across all construction sectors. With landmark projects such as Mahatma Mandir, Statue of Unity, ITPO, Surat Diamond Bourse, Bengaluru Metro and using state of art formwork and scaffolding system, we have proved Mr. Raj Lakhani our mettle in delivering customized solutions for every Managing Director complex need, and in most cost effective manner. PERI (India) Pvt Ltd

Title photo: Statue of Unity, Sadhu Bet, Near Sardar Sarovar Dam,

2 PERI DUO The lightweight formwork for universal application

Lightweight Universal application Quick and silent assembly Ease of handling at site: < 20 kg/m2 4 in 1 – walls, rafts, columns and slabs All components assembled by hand

DUO, a universal application formwork ensures high productivity and reduces free, develop no moisture expansion system (single system for walls, requirement for skilled labor at site. and do not rust. foundations, columns and slabs) is the latest innovation in formwork industry Being a lightweight formwork system, All these features make the DUO in India. It is seen as a potential it is crane independent and has formwork system very benefi cial when replacement for the conventional intuitive application. The formwork compared to conventional formwork formwork. Ergonomic in all aspects, is manufactured from robust techno systems, as they not only enhance it offers time and labor cost saving, polymer and offers virtually tool-free the life of the product but also ensure along with high fl exibility. The system assembly. Techno polymers are shrink maximum repetition.

PERI DUO received Best Innovation Machine award during bauma CONEXPO India 2016

3 Formwork and scaffolding solution for the largest diamond bourse with PERI UP MI, MULTIFLEX and DUO Surat Diamond Bourse, Surat

Surat Diamond Bourse, a company Retaining wall of 4.05 m height and Contractor by diamond barons has established a 90 m length was constructed with PSP Projects Ltd Field Service new bourse at Surat, Gujarat. The hub PERI DUO formwork system in one PERI India will have 22 iconic and interconnected pour. Different column size from buildings of more than 15 fl oors and 0.60 m to 1.20 m width, height of house more than 10,000 offi ces. 4.05 m and shear wall are also con- Once constructed, it will be world's structed with DUO formwork system. largest diamond bourse. 10,000 m² of DUO formwork with Mr. P S Patel, Managing Director: PSP projects was awarded fi rst phase 4.05 m height was supplied for walls, “With PERI, we have already of this iconic project with 9 towers. columns and retaining walls. More realized numerous projects and than 15,000 m² of MULTIFLEX system know the solution capability as PERI provided complete formwork was offered for slab and beams. well as high standard of service. solution with innovative PERI UP MI PERI UP MI shoring system of more For this prestigious project, the shoring application with MULTIFLEX than 7,000 m² area is used for con- formwork solution was perfect in for slab and DUO for walls and structing slabs for the project. Beam all respects – it provided our site columns. thickness of up to 1.50 m was casted personnel with a high level of with PERI UP MI. The shoring solution safety, was easy to install as well was done with MULTIFLEX. as being cost eff ective.”

4 Unique light weight formwork solution for high columns of largest convention center ITPO (Indian Trade Promotion Organization) Complex, Pragati Maidan, Delhi

Mr. Rajarshi SenGupta, Redevelopment of ITPO was not available at every Assitant General Manager (Indian Trade Promotion section of the site. Hence, & Regional HOD Organization) complex with formwork solution has to be (Formwork Methods & Planning): integrated exhibition and crane free. PERI provided “Casting of 30 m tall free standing convention center is con- solution with DUO formwork RCC columns was critical and structed at Pragati Maidan, system for columns, shear challenging from every technical Delhi. Government of India walls and retaining walls perspective. The light weight plans to host the fl agship and SKYDECK formwork PERI DUO formwork enabled easy Contractor Auto expo and other mega for slabs with fl oor to fl oor handling at all heights without Shapoorji Pallonji events like G20 summit once height more than 5.00 m. & Co Ltd any crane dependency. Also thanks Field Service the property is developed. Column height upto 30 m to PERI for the very helpful site PERI India was casted with PERI DUO execution support towards facilitat- Overall project was planned formwork system. Each ing faster construction of this iconic to be completed in 20 months pour was casted with mega project.” time and the client has 4.05 m shuttering height. specifi c requirement for light DUO column formwork weight modular formwork system ensured faster system. Also tower crane cycle time for the project.

PERI UP MI Modular shoring and scaff olding system for every application

PERI UP MI is an innovative solution among the steel scaffolding systems and stands for quick and simple assem- bly. It is adaptable to suit all geometries and applications like facade scaffolding, shoring towers and access scaffolding.

PERI UP MI is a modular and fl exible system with gravity lock technology which allows easy and safe assembly. Assembly of the system takes place virtually without couplers whilst the self-locking system reduces assembly time.

5 RCS climbing system for luxury development of hotel and residences of Colombo ITC Colombo One, Sri Lanka Contractor International construction consortium Field Service PERI India

Mr. Deeptha Liyanage, Deputy General Manager

“It was our fi rst experience in Sri Lanka to work with PERI where we used PERI RCS climbing formwork system and LIWA wall formwork systems for our project. During the design stage PERI has given us their extensive expertise on designing the sys- tem for the project. The ACS self-climbing system for the boom placer arrange- ment allowed us to meet the project’s schedule demands and tight tolerances. The main advantage that we receive is the time saving, labour cost reduction Located on the coast of Colombo, Sri track project with timeline of 18 months. and better fi nish of the concrete work. Lanka, ITC Colombo One Hotel and The client wanted to complete the project Furthermore, it is also important to note Residences is a new luxury develop- without compromising on safety, qua- the high quality of the materials which ment of 50 stories in the heart of the lity and time. PERI provided complete we see no any hindrance of using same capital city. Drawing inspiration from solution for core wall, columns and materials for another few projects thus, the rich architectural history of Sri shear wall to adhere project timelines it gives high return on the investment Lanka, the ITC Colombo One Hotel and and budget. Solution with system we made on the PERI materials.” Residences provides a contemporary formwork carrying boom placer was luxury experience, while incorporating provided for the fi rst time in Sri Lanka. elements of local Sri Lankan architec- Boom Placer was attached with ture and vernacular practices. ICC PERI ACS system, and ACS system (International construction consortium) was carrying 15 metric ton weight of was looking for fast and economical boom placer without crane that saved solution to meet their budget and huge time in lifting the boom placer construction schedule. It was a fast separately.

SCS climbing formwork solution for core areas of IT park Rupa Renaissance, Navi Mumbai

Rupa Renaissance has come up with Contractor three building project in Navi Mumbai. Rupa Renaissance Field Service It consists of 5 star hotel, 31 storey IT PERI India park & service apartment with 5 star amenities. IT park tower was built with in 4 different core areas which are non- composite. Deck sheet slab makes fast slab erection but cores were needed to move ahead of slab at fast pace. Core Mr. Bhagirath Jadeja, Project Manager: area was around 900 m². PERI SCS “PERI climbing system has helped us climbing system was adopted for speed to complete our project faster. It is of construction. PERI provided solution much better and safer system compared for core areas with SCS climbing system to conventional practices. Close coopera- and BR shaft platform with VARIO wall tion and training support from PERI panels. PERI provided 32 BR platforms technical team ensured smooth execu- and 20 SCS units for the project. tion of project.”

6 RCS climbing system for tallest IT park of Kerala Sands Infi nit, Kochi

Contractor TATA Projects Field Service PERI India

Sands Infra, the IT wing of LuLu PERI provided solution for the core wall Mr. Ramamoorthy Ravichandiran Group International, is constructing a with RCS with VARIO wall formwork. Construction Manager: 30-storeyed IT tower at SmartCity, Core wall area is 2651 m² which is “PERI RCS system has proved Kochi. Once built, it will be tallest complicated core geometry. its uniqueness for our project. IT building in the Kerala state. The site We can safely and quickly area is spread across 12.74 acre and PERI RCS system was adopted to realize our large area of core the buildup area is 3.6 million ft2. get smooth and safe site execution wall. Along with good quality It is built by TATA projects. with formwork height of 4.30 m. material it was great co-oopera- PERI provided more than 50 unit of tion with PERI engineers during The project required to build core at RCS with unique arrangement of +1 site execution.” faster pace. Core needs to move ahead levels for stacking the reinforcement. of slab which was built in composite structure.

PERI SCS System for single and double-sided application

SCS serves as a load-bearing structure for supporting single-sided, non-tied or double-sided, anchored wall formwork. The SCS Climbing System is characterized by a high level of cost-effectiveness as the modular concept with multi-piece brackets facilitates optimum adaptation to suit project-specifi c requirements and geometries.

Concreting and following platforms can be inclined at ±15° and ±30°. advanteges are large cranable climbing units, material – optimized solution and safe horizontal working areas.

7 Bridge piers of different height constructed by hydraulic climbing system RCS along with VARIO Makhida Bridge, Kota

NHAI has constructed a six Vijay M Mistry Construction Mr. Dilip Patel, Chief engineer: lane highway over Chambal Pvt Ltd was the contractor “Project involves more than river. Project includes a total for the project. PERI 40 piers with more than 25 m of 43 Piers for bridge with provided solution with height. We selected PERI RCS varying height of 27 m. Hydraulic climbing system and VARIO system to get a RCS along with VARIO. faster cycle with higest safety. The project requires Project needs solution We achieved 3 day cycle for construction of piers of with reducing pier size. each pour with PERI system.” different heights. The Pier Contractor size at bottom is 7500 mm Hence, customized solution Vijay M Mistry Construction Pvt Ltd x 2500 mm and at top it was provided with adaptor Field Service is 7000 mm x 2000 mm in order to climb the system. PERI India (i.e reduction of 500 mm) With PERI solutions, con- and semi-circular at both tractor was able to construct ends. The site had limited the project faster. crane access as it spans over a river.

PERI RCS The universal modular climbing system for a wide range of applications

The RCS combines the advantages of different climbing systems in a modular system and is used as climbing formwork as well as a climbing protection panel. Through the rail-guid- ed climbing, the climbing unit is securely connected to the building at all times which makes the climbing procedure fast and safe also in windy conditions. The units are moved by crane or by means of mobile climbing hydraulics to the next section. RCS is easily adapted to suit jobsite-specifi c requirements.

8 Safe and optimized formwork solution for commercial project at Pune Amar Business Zone, Pune

Amar Business Zone is an time, safety and quality Mr. Saurabh Jangle, Director: intelligently designed project of surface fi nish. Also there “I rate PERI’s contribution very high that boasts of a strategic were different fl oor heights for the project. PERI provided complete location and offers an and they wanted to optimize formwork solution as per the project opportunity of being closely the system for cost-effec- need. From core wall to shear wall to connected with the high-end tiveness. retaining wall to column we have used residential hub at Pune. It all PERI formwork system. We are using is a commercial project with PERI provided solution crane climbing system SCS with VARIO 2 basements, ground and with crane climbing system Contractor and BR shaft platform for core walls 18 fl oors. SCS with VARIO and BR S J Contracts which is very safe climbing solution. Field Service shaft platform for core walls. PERI India LIWA is proven system from PERI and S J Contracts is the con- LIWA formwork solution we are using it for all vertical application. tractor for the prestigious was offered for shear wall, Overall solution and site support from project. Requirement of retaining wall and columns. PERI engineers helped in better the project was better cycle cost-competitiveness.”

LIWA formwork for new supreme court building of Mauritius New Supreme Court, Mauritius

Supreme court of Mauritius Contractor has come up with new Renaatus Projects Private Limited building facility. Design Field Service consultant Formpro Engi- PERI India neers Pvt Ltd recommended to go for PERI formwork system for the project.

PERI provided solution with Mr. S Manoj Poosappan LIWA formwork system Joint Managing Director: for walls and columns. Walls “In our project, we are using the PERI and columns up to 3.70 m LIWA formwork system for all vertical height was casted with members and pouring 3.70 m height LIWA formwork in single structure in single short without error. pour. Excellent quality Fixing of PERI formwork system is surface fi nish and quick easy and quick compared to conven- erection and de-shuttering tional formwork. Quality of surface cycle was achieved by fi nish and push pull prop system adopting PERI LIWA form- is much better than the conventional work system for the project. formwork.”

9 One of the prestigious hospital of Patna with SKYDECK slab formwork solution Medanta Hospital, Patna

Contractor Shapoorji Pallonji & Co Ltd. Field Service PERI India

Medanta medicity has come up which would be fl exible enough to be Mr. Anurag Pal, with super-speciality hospital at Patna. molded as per the various structural Planning Manager: The hospital would be opened in layout. Achieving this complex struc- “Medanta Hospital building has public-private partnership mode on ture in faster timeline was a challenge diff erent layouts at diff erent fl oors the campus of Jai Prabha Hospital at taken up by PERI. and fl oor to fl oor height is ranging Kankerbagh. In phase one, the hospital from 3.60 m – 6.15 m. All the will come up with 300 beds facility PERI provided solution with SKYDECK requirement was completely which will be further scaled up to formwork system for the project. fulfi lled and tight construction 500 beds. Once built, this 10 fl oor SKYDECK is lightweight aluminium schedule was also maintained hospital will be one of the prestigious formwork, which gave good produc- with their solution. In addition to hospital building in Patna. tivity on site for higher fl oor heights. fast shuttering and moving times Light weight SKYDECK panels en- with SKYDECK I would also The building has various fl oor heights sured safe erection and dismantling praise the cooperation at site as well as layouts for each fl oor. Thus, of formwork at site with lesser with PERI engineers.” they wanted a slab formwork system manpower.

Integrated mall project with SKYDECK Global Mall, Bengaluru

Sobha group has come up with Global slab layout. SKYDECK system helped Mall Project in Bengaluru. It is an to cover all different layouts with integrated project which includes hotel, varying slab thickness. SKYDECK offi ce spaces, amusement park and system also helped in achieving faster leisure activities. completion of the project.

PERI provided solution with SKYDECK formwork system for slabs. The drop head in the SKYDECK system allows early striking depending on slab thickness and strength of the concrete. Structurally optimized formwork system also minimized the requirement of props at site. There were different Contractor Sobha Developers slab thicknesses for the project varying Field Service from 0.25 m – 0.35 m with varying PERI India

10 SKYDECK with early striking solution for slab Bagmane Goldstone, Bengaluru

Contractor New Consolidated Construction Company Limited (NCCCL) Field Service PERI India

Bagmane Goldstone is part of Bagmane columns for the project. They were Mr. Mahesh Mudda world technology center commercial looking for formwork system which Managing Director: project. The project is located in is less labor intensive, gives better “We are using SKYDECK techno- the heart of IT corridor of the city and concrete surface fi nish and faster to logy for quite some time in India. spreads across 52 acres of land. execute. All PERI systems has so far given The project is developed by Bagmane us a good results and SKYDECK group, a leading developer and PERI provided solution with SKYDECK has also given a superb impact on manager of commercial real estate for slab formwork and MULTIFLEX for the project by all means.” in Bengaluru. beam formwork. With PERI formwork solution contractor could achieve faster New Consolidated Construction cycle time and good concrete fi nish. Company Limited is the contractor for SKYDECK being a lightweight alumini- the project. They were looking for um formwork helped in achieving complete solution for slab, beam and better labor effi ciency at site.

PERI SKYDECK The proven slab formwork with very fast shuttering times

SKYDECK is aluminium panelized formwork system designed for standard use in con- structing slabs. It allows fast as well as safe forming operations with a systematic assembly sequence. The low weight, compact dimensions and design of the system components facilitates non-tiring and ergonomic working operations.

SKYDECK is cost effective slab formwork system that utilizes a drop head to facilitate early striking. It is a structurally optimized system that minimizes requirement of props when compared with other systems. It is very effi cient, easy to handle and less labour intensive system.

11 Contractor SCS single sided climbing system Prathima Infra Ltd Field Service for dam and surgepool structure PERI India Kaleshwaram Dam, Telangana

Government of Telangana has come challenge for the project was to cast working platform for rebar fi xing, up with a lot of irrigation projects. wall with more than 50 m height formwork erection and striking. The Kaleshwaram dam is one such project and 90 m length with inclination of solution does not need dismentaling to ease out water issues for the people 30° . PERI provided solution with of wall formwork and SCS while of Telangana. It is a non overfl ow SCS climbing system for the project. lifting. PERI supplied 40 units of dam having walls at inclination of The solution was offered without any SCS and more than 350 m² VARIO 30° down stream side. The tie and the brackets were acting as wall formwork for the project.

SCS and VARIO for varying radius and inclination of water tank Overhead Tank Metro, Ahmedabad

Metro-Link Express for high and also at some inclination. and Ahmedabad (MEGA) is an under It was a critical structure application construction mass-transit rail system due to reducing diameter and complete for the cities of Ahmedabad and system is to be adjusted at every Gandhinagar in Gujarat. There was pour to achieve require diameter. a requirement of overhead tank at metro depot. The project was progressed under strict supervision of PERI engineers The overhead tank has a special and customer requirement. Total 8 structure requirement with reducing units of SCS were supplied for the diameter as height increases. Precision project. and safety during construction were important requirement for the project.

PERI provided solution for tank with Contractor URC Infra SCS with VARIO wall formwork Field Service system. The tank is more than 40 m PERI India

12 Flexible and light weight DUO and PERI UP MI for Bengaluru Metro Bengaluru Metro, Bengaluru

Namma Metro, also known as Bengaluru stretch. The requirement of the project contractor freedom to use it for different Metro is a metro system serving the includes station building and columns height and rotate between the stations. city of Bengaluru. It is currently the for rail track. They were looking for Slabs with fl oor height of 6.50 m – 11.0 m third longest operational metro network solution of formwork which is light and beam thickness 0.60 m to 1.50 m in India after the and weight, fl exible and easy to handle at was casted with PERI UP MI Hyderabad Metro. These phase of site. Also it should have minimum shoring system with MULTIFLEX. expansion route of modern infrastruc- components and should be handled ture include 24 stations. crane free. PERI provided solution with DUO formwork system for columns, ITD Cementation is the contractor for walls and water tank and PERI UP MI Contractor ITD Cementation India Limited the project. The route has metro with MULTIFLEX for slabs. DUO being Field Service station placed at every one kilometer light weight and fl exible system gave PERI India

Contractor Power ducts solution for smart city Larsen & Toubro Pvt Ltd Field Service with DUO formwork system PERI India Dholera smart city, Gujarat

Dholera is a town in Ahmedabad district which is strategically selected as Special Investment Region and would be developed as world class greenfi eld city. It is also part of the selected smart city development across India. Overall smart city development required large number of power duct to lay down cables. PERI provided solution with DUO formwork system for the project. Light weight DUO formwork was easy to handle at site and supported faster completion of project. 1000 m² of DUO was supplied for the project. Power ducts of more than 20 km stretch was casted with DUO formwork system. 150 m stretch was casted every day with DUO formwork.

13 Reliable formwork solution with LIWA and GRIDFLEX Marian Park, Mangalore

Contractor Marian Projects Pvt Ltd Field Service PERI India

Mr. Ujwal Dsouza Director-Operations & Administration: “Our fi rst hand experience with PERI formwork systems has been really great and satisfying. PERI not only understood our core requirements, but delivered a system formwork which has enhanced our experience in faster construction methodologies used worldwide. Technical solutions by PERI team have been noteworthy in the project with safety features beyond limits and com- mendable concrete fi nishes. We strongly believe that PERI stands rich in formwork reliability and one of the most preferred international formwork supplier.”

Marian Park is a mixed use develop- good concrete fi nish, ease of handling, easy shuttering and de-shuttering. It is ment which offers spacious apartment maintenance and economy to use. the safest slab formwork as a person with a panoramic view of the lush They wanted to achieve 12 days cycle can walk on GRIDFLEX before fi xing greenery of Mangalore. The project time and wanted reliable solution for plywood. Having component weight involves construction of 31 fl oors formwork system. less than 20 kg, it can be installed very residential buildings and 13 fl oors easily from existing fl oor. With all such commercial buildings. PERI provided solution with GRIDFLEX benefi ts customer achieved their formwork system for slab and LIWA performance requirement adopting Marian projects had prioritize their formwork system for walls and PERI system formwork. requirement in the order of safety, column. GRIDFLEX can be used for

Contractor Versatile formwork solution KEF Infra Field Service with LIWA for manufacturing plant PERI India BOSCH manufacturing plant, Bidadi, Bengaluru

Bosch, a leading supplier of technology and services has come up with extension of their existing plant at Bidadi near Bengaluru.

KEF Infra was the contractor for the project. They were looking for wall form- work solution which is proven and should be multi purpose to use in future sites.

PERI provided solution with LIWA formwork system for walls including elevator walls. LIWA has only 4 panel widths and simple corner design. The solution was standardized for the contractor to use for their future sites.

14 Crane free panel formwork solution for automobile plant KIA Motors, Ananthpur

South Korea's Kia Motors Corp has set 0.75 m – 2.80 m. Required formwork forming should take place completely up its fi rst manufacturing plant in India solution has to be light weight and by hand. Walls of different thickness in Andhra Pradesh. Kia Motors intends crane free due to limited crane acces- was executed with PERI LIWA form- to produce small sedans and small sport sibility. work system. utility vehicles at the plant. PERI provided solution with LIWA KEC international ltd was selected as formwork system for walls. LIWA is sub-contractor to construct the facility. the lightest PERI steel panel formwork Contractor KEC International Limited They were looking for solution for and designed for construction sites Field Service walls where thickness was ranging from where crane capabilities are limited or PERI India

PERI LIWA The simple lightweight steel panel formwork

LIWA is the lightest PERI steel panel form- work and deliberately dispensed with more elaborate equipment features in favour of lower investment costs. LIWA has only a minimum of different panel elements. In addition, the perforated strip allows each panel to be used as a multi-purpose panel. This means that corners and columns can also be formed without requiring any special panels.

Only 4 panel widths, and each standard panel is simultaneously a multi purpose panel and a simple corner solution and reduced accessories accelerate work and simplify material planning and stocking.

15 Educational building with DUO and PERI UP MI , Ahmedabad

Nirma university is one of the India’s PERI provided solution with DUO Contractor leading universities based in Ahme- formwork system for walls and column Chavda Infra Field Service dabad. They offer courses varying and PERI UP MI with MULTIFLEX for PERI India from Management, Engineering, Law, slab. PERI UP MI is a modular and Science, Architecture etc. They fl exible system designed for Indian grid planned a new building for their requirement. Gravity lock technology upcoming courses. of PERI UP MI ensures better econo- my through high labor productivity and Chavda Infra is the contractor for the faster erection. Mr. Mahesh Chavda, Director: project. They were looking for form- “We have completed numerous work system which has high labor Walls and columns height varying from projects together with PERI. PERI has effi ciency and at the same time easy 3.00 m to 4.05 m height are casted always been a reliable partner with to handle at site. with PERI formwork system. the very high quality and effi cient service. We are exteremly satisfi ed.”

Retaining wall with DUO formwork Lulu Mall, Lucknow

Lulu group International has come up with hyper mall project at Lucknow. Once built it will be biggest mall of North India. It is spread across more than 20 lakh ft2. built up area. The mall features more than 200 international and national brands along with 11 screen multiplex, 2,500 seater food court and more than 20 dining restaurants.

KEF Infra is the contractor for the project. They were looking for solution PERI provided solution with DUO Contractor of retaining wall for the project. They formwork system. The solution was KEF Infra Field Service also needed standardized formwork provided with 900 mm, 600 mm PERI India system which can be used for their width DUO panel and 450 mm DUO future projects. Formwork solution multipanel. PERI supplied around was required for wall length of 50 m 200 m² DUO with alignment system and thickness of 300 mm. for the project.

16 RCS with edge protection for high rise building Bhojwani Tower, Mumbai

Bhojwani tower is one of the premium project, PERI provided solution with crane climbing unit for the project. high rise residential projects in south RCS and edge protection system. With edge protection, PERI covered Mumbai. Customer was looking for safe 2793 m² peripheral area of the project. climbing system solution along with Total of 12 RCS platform were used for edge protection system. Talib & Shamsi core walls and columns. PERI supplied Contractor Talib & Shamsi Construction Pvt Ltd Construction has been awarded the a total 20 units of RCS P as edge pro- Field Service contract to construct the building. In this tection system and 12 units of BR shaft PERI India

Versatile DUO formwork for tunnel project Vissanapete Tunnel Project, Andhra Pradesh

Vissanapete is a village in Krishna easy to handle and does not require quickly by hand. PERI supplied more district of the Indian state of Andhra crane facility. PERI provided solution for than 300 m² DUO formwork system for Pradesh. The road infrasture connecting the project with DUO formwork system. the project. it has more than a kilometer long tunnel. DUO is a light weight universal form- RVR projects is the contractor for the work system. The system can be Contractor RVR Projects project. They were looking for solution handled with hand and does not require Field Service of formwork which are light weight, crane facility. It can also be assembled PERI India

17 PERI Seminars

Concrete Show India 2018

PERI India participated in 6th edition of UBM India’s Concrete show India in May 2018 at Bombay Convention and Exhibition Centre, Goregaon, Mumbai as “Formwork Partner”. PERI show- cased PERI UP MI, DUO, LIWA and components at the show. The show got an overwhelming response from visitors and many prospective visitors appreciated PERI’s contribution to formwork and scaffolding industry.

Excon 2017

Confederation of Indian Industry (CII), India's premier industry association has organized Excon 2017 between 12th - 16th December 2017, Bengaluru. 2017 was the 9th edition of the exhibition. PERI India participated in the exhibition and showcased portfolio of formwork and scaffolding solution.

PERI Components Accessories and commodities for daily use on construction sites

Girders Props Plywood Tie System

PERI has range of accessories from grades of plywood to releasing agents. With these various system components PERI offers support to all kinds of construction sites.

18 ICI – BC seminar 2018

ICI-BC (Indian Concrete Institute – Bengaluru Centre) has organized a one-day seminar on 'CONCRETE MIX DESIGN' on March 2018 at Bengaluru. This seminar is amongst a series of ongoing seminars, conferences in its endeavor towards enhancing applica- tion oriented knowledge dissemination for the direct benefi t of the Construc- tion Industry. Mr. Umang Bhavsar presented on innovative formwork and scaffolding technologies.

Instruct 2018

Instruct is an institute of likeminded, dedicated professionals to provide vocational training in the construction and infrastructure industry.

They organized two day seminar to enhance knowledge and skill set of practicing professionals on various types of formwork and scaffolding system. Mr. Srinivasan Navaneetha presented on current scenario of formwork system in India and modern formwork technologies.

PERI The service provider, off ering more than just products

Rental Service Pre-Assembly Service Engineering and Software Site Supervision Large rental fl eet with Systems can be pre-assem- Effi cient formwork planning Provided to ensure effi cient cleaning and repair services bled at PERI facilities and and design through use of use of systems sent on-site PERI CAD software

19 PERI UP MI received best formwork and scaffolding product of the year 2018 by Construction Times Awards

Construction Times awards is an annual award and honors the best contribution in construction and infrastructure sector. There were various categories under which nominations were invited. An independent jury was formed to decide the winner in each category. The award was then presented during the ceremony on 27th Oct 2018 at ITC, Mumbai. PERI UP MI received the “Best formwork and scaffolding product of the year 2018”.

PERI UP MI is an innovative solution among the steel scaffolding systems and stands for quick and simple assembly. It has unique gravity lock technology which allows easy and safe assembly of the system.

PERI offi ces in India Your partner for most cost-eff ective solution for your jobsite

Head Offi ce Bengaluru PERI (India) Pvt Ltd PERI (India) Pvt Ltd 109, Westminster, 1406, DLH Park, S.V. Road, 13, Cunningham Road, Goregaon (W), Mumbai, Opposite Reliance Digital, Maharashtra 400062 Bengaluru – 560 052 Phone +91 (22) 2876 7400 Phone +91 (80) 41214910 [email protected] Delhi PERI (India) Pvt Ltd Regional Offi ces 820, DLF Trade Tower A, Jasola District Centre, Chennai New Delhi – 110025 PERI (India) Pvt Ltd Phone +91 (11) 4106 8820 Plot No, 11, Second Floor, Chowdry Nagar 1st Street, Kolkata Valasaravakkam, Unit No. DGK810, 8th fl oor,

Chennai – 600087 DLF Galleria, Action area 1B, | 2019 © PERI en 11 GmbH Phone +91 (44) 4202 4792 New Town, Kolkata – 700156 IN

The photographs in this brochure feature construction sites Formwork in progress. For this reason especially safety and anchor details cannot always be considered as conclusive or final. Scaffolding These are subject to the risk assessment carried out by Engineering the contractor.