ANSWERED ON:27.04.2016 Land for Metro Rail Birla Shri Om;Sahu Shri Chandu Lal

Total Page:16

File Type:pdf, Size:1020Kb

ANSWERED ON:27.04.2016 Land for Metro Rail Birla Shri Om;Sahu Shri Chandu Lal GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:476 ANSWERED ON:27.04.2016 Land for Metro Rail Birla Shri Om;Sahu Shri Chandu Lal Will the Minister of URBAN DEVELOPMENT be pleased to state: Will the Minister of URBAN DEVELOPMENT be please to state: (a) the area of land acquired for construction of metro rail projects in the country, city and State-wise; (b) the number of people displaced due to these metro rail projects, city and State-wise; (c) the rehabilitation measures taken for those displaced persons; and (d) the details of fund allocated and utilised for rehabilitation and compensation, State-wise? Answer THE MINISTER OF URBAN DEVELOPMENT (SHRI M. VENKAIAH NAIDU) (a),(b) & (d): As informed by Metro Companies, the details of land acquired, number of people displaced, funds allocated and utilised for rehabilitation and compensation to families affected due to construction of metro rail projects, which are being implemented on 50:50 equity sharing joint venture between Government of India (GoI) and the concerned State Governments State-wise are given in Annexure. (c): Resettlement and Rehabilitation is done as per the extant policies. ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (a), (b) & (d) OF THE LOK SABHA UNSTARRED QUESTION NO.476 FOR ANSWER ON 27.04.2016 REGARDING LAND FOR METRO RAIL ASKED BY SHRI OM BIRLA AND SHRI CHANDU LAL SAHU. DETAILS OF LAND ACQUIRED, NUMBER OF PEOPLE DISPLACED, FUNDS ALLOCATED AND UTILISED FOR REHABILITATION FOR CONSTRUCTION OF METRO RAIL PROJECTS BEING IMPLEMENTED ON 50:50 EQUITY SHARING JOINT VENTURE BETWEEN GOVERNMENT OF INDIA (GOI) AND THE CONCERNED STATE GOVERNMENTS - STATE-WISE. <pre> Name of the Project State Land Acquired ( in Hectare) No. of Families displaced Fund for Rehabilitation (Rs. in crores) Allocation (Budget)# Utilization for Rehabilitation & Compensation Delhi Metro Rail Project Delhi 728.84^ 6,028 445.83 92.66* Bangalore Metro Rail Project Karnataka 141.61 169 2,564.44 2,570.28** Chennai Metro Rail Project Tamil Nadu 13.113 698 142.00 131.66 Kochi Metro Rail Project Kerala 40.409 243 (Persons) 672.25 529.99 Nagpur Metro Rail Project, Maharashtra 72.29 0 174.00 0 Ahmedabad Metro Project, Gujarat 84.65 0 125.78 7.95 Lucknow Metro Rail Project Uttar Pradesh 26.874 2 381.00 41.77 Mumbai Metro (Line-III) Maharashtra 0 0 91.00 0 </pre> ^ For Delhi Metro Network outside Delhi, the land is leased to Delhi Metro Rail Corporation. *Further payment for rehabilitation in Phase- III will be released as per the demand from State Government. # As per Detailed Project Reports. **Excess funds are met out from other heads to enable timely settlement of compensation. ******.
Recommended publications
  • Detailed Project Report for Nagpur Metro
    Detailed Project Report for Nagpur Metro Presentation By Delhi Metro Rail Corporation Sep.02, 2013 22, 2013 NAGPUR AT A GLANCE • Nagpur is the third largest city of Maharashtra and also the winter capital of the state. • With a population of approximately 25 lakhs, Nagpur Metropolitan Area is the 13th largest urban conglomeration in India. • The last decade population Growth rate in NMC area was 17.26%. • Current Vehicle Statistics (2012) shows number of registered vehicles are 12.37 lakh out of which 10.32 lakhs are two wheelers. • As per provisional reports of Census India, population of Nagpur NMC in 2011 is 2,405,421; of which male and female are 1,226,610 and 1,178,811 respectively. Although Nagpur city has population of 2,405,421; its urban UA / metropolitan population is 2,497,777 of which 1,275,750 are males and 1,222,027 are females. http://www.census2011.co.in/census/city/353- nagpur.html 9/17/2013 DMRC 2 REGISTERED VEHICLES IN NAGPUR CITY (As per Motor Transport Statistics of Maharashtra as on 31st March, 2012) CATEGORY VEHICLES % TOTAL OF TWO WHEELERS 1032607 83.47 AUTO RICKSHAWS 17149 1.38 CARS (Cars, Jeeps, Station Wagons 132709 10.73 & Taxi) OTHERS (Bus, Truck, LCV, 54634 4.42 Tractors etc.) TOTAL OF ALL TYPES 1237099 100 9/17/2013 DMRC 3 RAIL AND AIR TRANSPORT IN NAGPUR CITY • A total of 160 trains from various destinations halt at Nagpur. • Almost 1.5 lakh passengers board/alight different stations in Nagpur Daily. • Nagpur central alone is used by nearly 100,000 passengers.
    [Show full text]
  • ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr
    GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:672 ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr. Hari Babu;Mohammed Shri Faizal P.P.;Senguttuvan Shri Balasubramaniam;Somaiya Dr. Kirit;Thomas Prof. Kuruppassery Varkey;Venugopal Dr. Ponnusamy Will the Minister of URBAN DEVELOPMENT be pleased to state: Will the MINISTER OF URBAN DEVELOPMENT be pleased to state: (a) the details of metro rail proposals received by the Government during the last three years and the current year, stretch and State/ UT-wise along with the estimated cost of each stretch; (b) the details of proposals cleared and lying pending stretch and State-wise, the reasons for pendency along with the time by which pending proposals are likely to be cleared; (c) the funds sanctioned, released and utilized during the above period for various projects, stretch and State/UT-wise; (d) the present status of various under construction and sanctioned metro rail stretches, stretch and city-wise and the time by which these are likely to be completed and operationalized; and (e) Whether various metro rail projects are going behind schedule and if so, the details thereof, stretch and city-wise and the details of cost escalated as a result thereof along with the steps taken/being taken to complete these projects within a reasonable period of time? Answer THE MINISTER OF STATE IN THE MINISTRY OF URBAN DEVELOPMENT (RAO INDERJIT SINGH) (a)& (b) : The details of metro rail proposals received/ cleared/pending during the last three years and the current year along with the names of stretch and the estimated cost stretch wise, State/UT-wise are given in Annexure-I & IA.
    [Show full text]
  • Integrated Land Use and Transport Planning Ahmedabad City
    29.09.2014 INTEGRATED LAND USE AND TRANSPORT PLANNING AHMEDABAD CITY By I.P.GAUTAM, VICE CHAIRMAN & MANAGING DIRECTOR AHMEDABAD METRO RAIL CO.(MEGA ) GANDHINAGAR , GUJARAT URBAN PROFILE OF GUJARAT • Gujarat : One of the Most Urbanized States in the Country. Accounts for 6% of the total geographical area of the Country Around 5% of the Country’s population of 1.21 billion. Total Population of Gujarat 60.4 million State Urban Population 25.7 million (42.58%) Gujarat Urban Population Gujarat Rural Population National Urban Population 31.16% 42.58% 57.42% State Urban Population 42.58% 0 1020304050 Source : Census 2011 ( Provisional Figures) Ahmedabad – Gandhinagar Region Ahmedabad 7th largest city in India Population 6.4 million 3 JANMARG Network Operational BRT Network Proposed BRT Network Built up Area River BRTS AHMEDABAD & LAND USE Chandkheda Sabarmati Rly. stn Naroda Ranip Ahmedabad village Sola RoB Airport. RTO Naroda GIDC NarodaNaroda AEC Gujarat University DuringGandhigram peak Rly. Odhav Bopal stn Kalupur Rly. Industrial estate hours Stn. Odhav Shivranjani Nehrunagar Soninicha During off peak ManinagarRl ali Geeta y. stn. hoursMandir Kankaria Anjali Danilimda Junction JashodanagarJn Narol Vatva Industrial Narol estate Metro rail alignment – First phase North South Corridor 15.4 km East West Corridor 20.5 Km 6 Intergrated MRT & BRTS Ahmedabad 7 Metro integration with AMTS & BRTS in 2018/2021 8 Special Provisions for Urban Transport System in the Development Plans of Ahmedabad & Gandhinagar 1. Proposed Metro Rail & BRTS corridors are integral part of Development Plan 2021. / Master Plan of Ahmedabad Urban Development Authority (AUDA) and Gandhinagar Urban Development Authority (GUDA), 2.
    [Show full text]
  • Ahmedabad Gandhinagar Metro - MEGA, Ahmedabad
    Birla Vishvakarma Mahavidyalaya Engineering College, V. V. Nagar 388120 A Report on Industrial/Site Visit Ahmedabad Gandhinagar Metro - MEGA, Ahmedabad Construction of Helipad Building at V. S. Hospital, Ahmedabad Organized by: Structural Engineering Department Starting Date & Time: 05/1001/20167, 08:030 am Pick up point: BVM Engineering College, V. V. Nagar Venue & Place of Company: 1. Ahmedabad Gandhinagar Metro - MEGA, Ahmedabad 2. Construction of Helipad Building at V. S. Hospital, Ahmedabad Duration: 1 Day Faculty Members: • Prof. B. R. Dalwadi • Prof. V. A. Arekar Co-ordinated by: Prof. V. V. Agrawal Total Number of Students: 25 (Students of Elective: DESIGN OF PRESTRESSED CONCRETE STRUCTURES & BRIDGES) A technical tour for a day was organized for the students of civil engineering department by Structure engineering department of our college Birla Vishvakarma Mahavidyalaya under IEI. Students gathered at the college campus at around 8:30 am for registration and total 25 students registered themselves for the visit. We had 4 faculties from structure department along with us. Ahmedabad Gandhinagar Metro - MEGA First of all we went to the Ahmedabad Metro Rail Project site-phase 1 which was in the stretch of 6 km. The construction of the site was under J. Kumar pvt. ltd. The financing was done by state and central government. JICA of Japan has funded it with 4870 crores for the entire stretch of the Metro Link Express For Gandhinagar and Ahmedabad (MEGA) Company Ltd. On the casting yard we first met the planning engineer of the site Devam Patel who was the representative of J. kumar. He gave us the detailed information of the project regarding concrete mix, grade of concrete, design of segment, launching of girders, station details.
    [Show full text]
  • Metro Rail Projects in India
    MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI REFERENCE NOTE No. 49/RN/Ref/November/2016 For the use of Members of Parliament NOT FOR PUBLICATION1 METRO RAIL PROJECTS IN INDIA Prepared by Smt. Sunanda Das Mohanty, Additional Director (23035036) and Shri S.L. Dogra, Deputy Director of Lok Sabha Secretariat under the supervision of Smt. Kalpana Sharma, Joint Secretary. The reference material is for personal use of the Members in the discharge of their Parliamentary duties, and is not for publication. This Service is not to be quoted as the source of information as it is based on the sources indicated at the end/in the text. This Service does not accept any responsibility for the accuracy or veracity of the information or views contained in the note/collection. METRO RAIL PROJECTS IN INDIA INTRODUCTION Metros are major capital assets of cities. Urban Metro1 Projects have proven to be very useful in decongesting large cities. There are around 148 cities around the world which has a metro system with nearly 540 metro lines, 9,000 stations and 11,000 kilometres of line infrastructure . The world’s metro systems carry 150 million passengers per day. The earliest metro system, the London Underground, first electrified underground line opened in 1890, was the world's first metro system. With more than 500 km of infrastructure, Shanghai has the world’s longest Metro network. London is the longest non Asian Metro network in the ranking, with New York, Moscow, Madrid and Paris. INDIAN SCENARIO Metro systems2 are often given preference as mass transit options for Indian cities due to the belief that road-based bus systems cannot cater to capacity requirements as much as metro systems.
    [Show full text]
  • World Bank Document
    CASE 1 GREATER THAN PARTS GREATER THAN PARTS THAN PARTS GREATER Ahmedabad, India Public Disclosure Authorized Scaling Up with Contiguous Replication of Town Planning Schemes A Metropolitan Opportunity Madhu Bharti and Shagun Mehrotra Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Editors Shagun Mehrotra, Lincoln Lewis, Mariana Orloff, and Beth Olberding © 2020 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington, DC 20433 Telephone: 202-473-1000; internet: www.worldbank.org Some rights reserved. This work is a product of the staff of The World Bank with external contri- butions. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, itsBoard of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Nothing herein shall constitute or be considered to be a limitation upon or waiver of the privileges and immunities of The World Bank, all of which are specifically reserved. Rights and Permissions This work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) http://creativecommons.org/licenses/by/3.0/igo. Un- der the Creative Commons Attribution license, you are free to copy, distribute, transmit, and adapt this work, including for commercial purposes, under the following conditions: Translations—If you create a translation of this work, please add the following disclaimer along with the attribution: This translation was not created by The World Bank and should not be considered an official World Bank translation.
    [Show full text]
  • Parshawanath Metro City
    https://www.propertywala.com/parshawanath-metro-city-ahmedabad Parshawanath Metro City - Chandkheda, Ahme… 2, 3 & 4 BHK Flat for sale in Metro city Ahmedabad Parshawanath Metro City is an ongoing project of this group, offering 2, 3 & 4 BHK residential apartments and located at Chandkheda, North Ahmedabad. Project ID : J305808119 Builder: Parshawanath Builders Properties: Apartments / Flats Location: Parshawanath Metro City, Chandkheda, Ahmedabad (Gujarat) Completion Date: Nov, 2014 Status: Started Description Parshwanath Metro City – A scheme to elevate your luxury dreams that is Metro City. A apt gift for the city with endless dreams! Located at the quite, serene yet most progressing area of Ahmedabad. It offers 2, 3 & 4 BHK Luxurious Apartment with all aspect modern amenities and features like 24 hours water supply, Percolating well for rain water harvesting, Day & night security services by professional security guards and CCTV campus monitoring, Ample parking space for two, four wheelers, Senior citizen sit outs, Well landscaped gardens, children play area with play staton, Elegant entrance foyer for each block, provision of central pipe for domestic gas supply, etc. Type - 2, 3 & 4 BHK Luxurious Apartment Buildup Area - 1593 Sq. Ft. (175 yds.), 1602 Sq. Ft. (178 yds.), 2205 Sq. Ft. (245 yds.), 2250 Sq. Ft. (250 yds.). Price - On Request Features 24 hours water supply. Day & night security services by professional security guards and CCTV campus monitoring. Percolating well for rain water harvesting. Ample parking space for two & four wheelers. Drop off zone for school buses as well for public transport. Senior citizen sit outs. Well Landscaped gardens, children play area with play station.
    [Show full text]
  • LUCKNOW METRO RAIL CORPORATION LIMITED Administrative Building, Vipin Khand, Gomti Nagar, Lucknow-226010
    CIN : U60300UP2013SGC060836 LUCKNOW METRO RAIL CORPORATION LIMITED Administrative Building, Vipin Khand, Gomti Nagar, Lucknow-226010 Phone: 0522- 2304014-15 NOTICE No. LMRC/HR/Recruitment/O&M/3/2018/NE01 dated 17/7/2018. Ref: - LMRC Advertisement No. LMRC/HR/Rectt./O&M/3/2018 dated 21/2/2018 ---------------------- 10 numbers of Candidates bearing following Roll Numbers (arranged in merit order with application of vertical and horizontal reservation) have been short listed provisionally for Biometric Verification, Document Verification & Medical Examination for the post of Station Controller cum Train Operator (SC/TO)(NE-01), the online written test of which was held by LMRC on 16/4/2018 and Psycho Aptitude Test held from 09-5-2018 to 12-5-2018 Venue : HR Branch, LMRC Depot, Transport Nagar, near 32 PAC Batalion, Lucknow. (Location- Within 8 Km. from Charbagh Rly. Station) Post Name & Code : Station Controller CumTrain Operator (SC/TO)(NE-01) Date & Reporting Time : 23-July-2018 at 09-30 AM Number of candidate called : 10 (including reserved community candidates). Candidate should bring 10 passport size recent colour photographs with all original documents/certificates. The standard of Medical Examination for Station Controller/Train Operator (SC/TO)(NE-01) is A-1(Aye-One). The process of medical examination may take up to 3 working days. The candidate must come prepared to join training immediately, as the requirement is very urgent. Candidates may note that the call for Document Verification & Medical Examination of shortlisted candidates for the post of Station Controller/Train Operator (SC/TO)(NE-01) is purely provisional subject to their fulfillment of the eligibility criteria as mentioned in advertisement notice No.
    [Show full text]
  • Trams Der Welt / Trams of the World 2021 Daten / Data © 2021 Peter Sohns Seite / Page 1
    www.blickpunktstrab.net – Trams der Welt / Trams of the World 2021 Daten / Data © 2021 Peter Sohns Seite / Page 1 Algeria ... Alger (Algier) ... Metro ... 1435 mm Algeria ... Alger (Algier) ... Tram (Electric) ... 1435 mm Algeria ... Constantine ... Tram (Electric) ... 1435 mm Algeria ... Oran ... Tram (Electric) ... 1435 mm Algeria ... Ouragla ... Tram (Electric) ... 1435 mm Algeria ... Sétif ... Tram (Electric) ... 1435 mm Algeria ... Sidi Bel Abbès ... Tram (Electric) ... 1435 mm Argentina ... Buenos Aires, DF ... Metro ... 1435 mm Argentina ... Buenos Aires, DF - Caballito ... Heritage-Tram (Electric) ... 1435 mm Argentina ... Buenos Aires, DF - Lacroze (General Urquiza) ... Interurban (Electric) ... 1435 mm Argentina ... Buenos Aires, DF - Premetro E ... Tram (Electric) ... 1435 mm Argentina ... Buenos Aires, DF - Tren de la Costa ... Tram (Electric) ... 1435 mm Argentina ... Córdoba, Córdoba ... Trolleybus Argentina ... Mar del Plata, BA ... Heritage-Tram (Electric) ... 900 mm Argentina ... Mendoza, Mendoza ... Tram (Electric) ... 1435 mm Argentina ... Mendoza, Mendoza ... Trolleybus Argentina ... Rosario, Santa Fé ... Heritage-Tram (Electric) ... 1435 mm Argentina ... Rosario, Santa Fé ... Trolleybus Argentina ... Valle Hermoso, Córdoba ... Tram-Museum (Electric) ... 600 mm Armenia ... Yerevan ... Metro ... 1524 mm Armenia ... Yerevan ... Trolleybus Australia ... Adelaide, SA - Glenelg ... Tram (Electric) ... 1435 mm Australia ... Ballarat, VIC ... Heritage-Tram (Electric) ... 1435 mm Australia ... Bendigo, VIC ... Heritage-Tram
    [Show full text]
  • Stakeholder Engagement Plan (Sep)
    STAKEHOLDER ENGAGEMENT PLAN (SEP) STAKEHOLDER ENGAGEMENT PLAN NORTH – SOUTH CORRIDOR 1 INDEX Sno. Topic Page No. 1. Introduction 3 2. Project Description 3 3. Project Impact Study 8 4. Stakeholder Identification & Mapping 10 5. Our Stakeholders 12 Our Stakeholders & their Expectations 15 6. Stakeholder Prioritization Matrix 16 7. Engagement Strategies 20 Project Impact (Negative and Positive) 22 8. Grievance Management 23 Resettlement & Rehabilitation Plan 25 9. Key Management Functions 27 2 INTRODUCTION The opportunities provided by constructive stakeholder relations and the risks associated with poor ones are now better understood in today’s dynamic market environment. It is important to actively develop and sustain relationships with affected communities and other stakeholders throughout the life of project and not simply during the initial feasibility and assessment phase. This facilitates in reaping the benefits of improved risk management and better outcomes on the ground. The report focuses on classifying our stakeholders, principles of stakeholder engagement plan, expectations of our key stakeholders and strategies engaged for the delivery of effective stakeholder engagement plan. This document is an attempt to clarify engagement of Lucknow Metro Rail Corporation with its various stakeholders. The Stakeholder Engagement Plan will be revised as and when required, in synchronization with the timely progress the project makes. PROJECT DESCRIPTION As Lucknow is a vibrant city attracting a lot of people from several places particularly from West Bengal, Bihar and Eastern Parts of Uttar Pradesh. It is witnessing an economic boom and it became among the top 10 fastest growing Metro cities of India. It is the second largest city of Northern India after Delhi.
    [Show full text]
  • Seismic Evaluation of Metro-Rail Bridge Piers by Force Based Approach and Displacement Based Approach
    Vol-3 Issue-1 2017 IJARIIE-ISSN(O)-2395-4396 SEISMIC EVALUATION OF METRO-RAIL BRIDGE PIERS BY FORCE BASED APPROACH AND DISPLACEMENT BASED APPROACH Vishal Desai1, Vipul Vyas2, Bhagirath Joshi3 1PG Scholar of Structural Engineering, Charotar University, Gujrat, India 2Assistent Professor of Civil Engineering Department, Charotar University, Gujrat, India 3Senior Manager, STUP Consultant P Ltd, Ahmedabad, Gujarat, India ABSTRACT Now a day the widely used the Force based design (FBD) method for seismic design of metro bridge pier has limitation to damage control of structure. It is understood that Displacement can be directly related to damage control not a force. The alternative design methods are becoming popular in recent years. This paper contains to design of metro bridge pier using direct displacement based design (DDBD) method confirming to IS provisions and traditional strength based method. Parametric analysis of pier is considered different circular and square cross- section having different heights of 8m, 10m, 12m and 15m were carried out using FBD and DDBD procedure. The seismic assessment obtains from the analysis of the pier design using both methods were compared. Keyword: - Force Based Design, Direct Displacement Based Design, Bridge substructure, Performance Based design, Elevated metro system, RC Bridge Pier 1. INTRODUCTION The Metro system is railway transportation system in an urban area with a high frequency and the grade severance from other traffic. Elevated metro system is more preferred type of system due to easy of construction without any difficulty. For substructure (pier) analysis, load combination with seismic forces is critical in design. Seismic forces are one of the most destructive forces on the earth.
    [Show full text]
  • Notice Inviting Tender (Nit) A
    LMRC/PD/CONCOURSE-02: Licensing of nineteen (19) nos. of Concourse level commercial spaces in unpaid area at Seven Metro Stations of priority corridor. NOTICE INVITING TENDER (NIT) A. GENERAL 1) Lucknow Metro commenced commercial run for priority stretch, Transport Nagar to Charbagh/8 stations, on 6th September 2017. Stretch opened to public though limited in length, it’s popular and Ridership crossed 40,000 mark in the first week of its operation. 2) When full North South (N-S) corridor gets ready it’ll have great utility and immense serviceability along with a special feeder/extension service for first/last mile connectivity, its ridership then, has been assessed to be a few lakhs of commuters daily. 3) In order to fulfil its mandate to raise non-fare box revenue through value capture from its real estate etc., Lucknow Metro Rail Corporation (LMRC) Ltd. invites Open bids from eligible applicants, who fulfil qualification criteria as stipulated in clause 7 below, for “Licensing of nineteen (19) nos. of Concourse level commercial spaces in unpaid area at Seven Metro Stations of priority corridor.” 4) Key Details: Bid No. LMRC/PD/CONCOURSE-02 License Period 12 Years Bid documents on sale From 18.06.2018 to 10.07.2018 (between 09:30 Hrs. to 17:30 Hrs.) on working days Cost of bid documents Rs. 5000/-(inclusive of 18% GST) (Demand Draft on a Scheduled Commercial bank based in India in favour of “Lucknow Metro Rail Corporation Ltd.” payable at Lucknow.) Date &time of Submission of 17.07.2018 up-to 15:00 Hrs.
    [Show full text]