Lucknow Metro: Urban Transportation Systems Must Be Accountable to Local and Subaltern Needs

Total Page:16

File Type:pdf, Size:1020Kb

Lucknow Metro: Urban Transportation Systems Must Be Accountable to Local and Subaltern Needs ISSN (Online) - 2349-8846 Lucknow Metro: Urban Transportation Systems Must be Accountable to Local and Subaltern Needs AAKASH BAJPAI Aakash Bajpai ([email protected]) is a student at Tata Institute of Social Sciences, Tuljapur. Vol. 55, Issue No. 1, 04 Jan, 2020 While the city’s North-South Corridor (NSC) of the Lucknow metro has been functional since March 2019 and has recorded a daily ridership of about 40,000–70,000, this is only 16% of the projections made by planners. This shortfall is a result of the government adopting a “one-size-fits-all” approach that fails to take into account existing transportation services (both public and private) and local needs. Sound infrastructure is indispensable to expand the economy, but infrastructure and development have to be synchronised. As India plans to boost its secondary sector, an efficient public transportation system cannot be compromised. The challenge before policymakers and urban planners is to design and implement an inclusive system. I will examine whether, and to what extent, the Lucknow metro has met this challenge. In 2013, the Delhi Metro Rail Corporation (DMRC) prepared a report titled the “Updated Final Detailed Project Report for Lucknow Metro Rail Project” (referred to here as the DPR) that advocated for the construction of a metro project in Lucknow. The DMRC argued that Lucknow had inadequate public transport, and this encouraged commuters to purchase motor vehicles (DMRC 2013).[1] Lucknow metro’s North-South Corridor (NSC) has been functional since March 2019 and the East-West Corridor was approved for construction in ISSN (Online) - 2349-8846 June 2018 (Rawat 2018). The report forecasted the daily ridership of the North-South Corridor to be 4,29,250 in 2015 and 6,44,659 by 2020 (DMRC 2013: 93). In 2019, however, the ridership hovered between 40,000 and 70,000 riders per day, at about 16% of the 2015 projection (Srivastava 2019). The Lucknow Metro Rail Corporation Limited (LMRC) suffered a net loss of about Rs 18.97 crore in 2016–17 and Rs 25.38 crore in 2017–18 (LMRCL 2019a). Exclusionary Infrastructure Metro fares in Lucknow are high (even higher than the fares of the Delhi Metro), suggesting that the metro was designed keeping in mind the city’s middle class. While the Delhi metro charges Rs 60 for a distance greater than 32 kilometres (km), the Lucknow metro charges Rs 60 for any distance greater than 21 km (18 stations) (DMRC 2019a; Lucknow Metro 2019). For example, for the same fare, a rider can travel a distance of about 38 km in Delhi and a distance of about 23 km in Lucknow (DMRC 2019b; LMRC 2019b). Moreover, the Delhi metro gives discounts on Sundays and National Holidays (DMRC 2019a). However, given that even Lucknow’s middle class appears to not use the metro as widely as anticipated (as seen from the low ridership), even their needs seem to have been overlooked. Taxis provide commuters comfort by providing a combination of air conditioning, decongested seating and door-to-door service (given that one does not have to walk to and fro from a station). In addition to taxis, the middle class can also continue to use either two-wheelers or four-wheelers given the limited incentives provided by the Lucknow metro. These preferences underscore the need for urban planners to synthesise both affordability and comfort. Moreover, these preferences also show that planners need to study not just economic and demographic characteristics of commuters, but also social and cultural aspects (such as how people spend their money). There are other reasons to believe that the metro was not designed to cater to the needs of Lucknow’s commuters. According to the DPR, a rider’s average trip length on the Lucknow metro will be about 7.6 km by 2020 (this figure is projected to decrease in subsequent years) (DMRC 2013: 93). People are likely to be dissuaded from using the metro for such short distances for three reasons. First, it takes time to access the metro, including the time it takes to reach a station, purchase tickets (in cases where the passenger does not have a metro card) and exit a station (Mohan 2008). Poor first-mile and last-mile connectivity is also a serious issue as the feeder service that connects stations to residences is not yet functional (as of December 2019). Moreover, given that most Indian cities have expanded irregularly and lack a dedicated central business, jobs are dispersed. In this context, a high- capacity public transport system would fail to meet the needs of daily commuters (Mohan 2008). Second, Lucknow’s metro stations lack organised parking facilities. Third, cheaper and faster alternatives such as para-transit vehicles (including auto-rickshaws and tempos) are well established. ISSN (Online) - 2349-8846 However, to increase the metro’s ridership, officials suggested stopping public buses and para-transit vehicles from running on the same route as the metro (Navbharat Times 2019). The union of auto-tempo drivers vehemently opposed the move. This policy had the potential to gentrify neighbourhoods by driving away transportation providers. Moreover, this policy demonstrates how the administration is more comfortable with the “elimination of the poor” rather than the elimination of poverty. Why must auto–tempo drivers and others face the consequences of the administration’s haphazard and subpar planning? Para-transit vehicles not only provide a livelihood to the urban poor, but they also provide affordable transportation to the working-class. A decision to stop para-transit vehicles from operating affects not just the operators themselves, but also the urban poor who use these options owing to affordability. This move would force them to use more expensive modes of transportation such as the metro. Although the suggestion was not enacted owing to fervent opposition by the union, it points to a larger problem in India, namely that metro systems are usually not integrated with other modes of transportation (Tiwari 2013). City planners must make efforts to plan and implement the Lucknow metro to complement, rather than compete with or, worse yet, to thwart existing modes of transportation. Given that creating new feeder services as a part of metro projects can prove to be expensive, existing para-transit vehicles could be used for the purpose, as envisaged in the National Transit Oriented Development Policy (MoHUA 2017: 10). Para-transit vehicles also run on compressed natural gas (CNG) in most big cities, and hence, should not be seen only as adding to pollution and congestion. Metro projects require a lot of initial funding and are often sustained by high ticket prices, making the service inaccessible to low-income groups. In Lucknow, for instance, urban planners’ top-down approach has failed to provide availability, affordability and accessibility to commuters. Given the urgency of a situation where taxpayers are paying for the losses incurred due to vacant seats and ill-conceived planning by the LMRC, what can be done to learn and rectify the situation? Creating Vibrant Transportation Systems It is clear that infrastructure in India needs to be more inclusive, and public transport must be democratised. Therefore, a bottom-up approach, which takes into account the needs of commuters, must be incorporated to create a vibrant transportation system. While one of the tangible advantages of the metro systems is their ability to avoid traffic, bus systems (with dedicated corridors) can also achieve the same. This is important because fast transport systems tend to also be costly; this pattern steals time and productivity from the poor and reallocates it to the rich (Badami 2009). Bus services (using electric buses) can be valuable in a city with ill-conceived and irregular growth. Besides, given that there are fewer commuters in tier-2 cities than in tier-1 cities,[2] light rail transport systems, which require lesser capital than metro systems, could be explored as potential alternatives. ISSN (Online) - 2349-8846 Public transportation services should prioritise the safety and the needs of women, senior citizens, persons with disabilities and low-income groups. One way this can be done is by offering fare concessions to marginalised sections of society. Moreover, women’s rights groups can be hired as consultants, and their suggestions can be incorporated by urban planners to effectively democratise spaces that are supposed to be “public,” but which remain highly exclusionary to specific groups. Contrary to popular perception, a study conducted by Sreenivas and Sant (2008) in Pune has argued that cars and motorbikes utilise more subsidies than public transportation systems. The government must provide appropriate incentives to encourage the use of public transport while simultaneously establishing disincentives for private transport (Mitra 2006). Awareness through public outreach programmes can help persuade people to minimise the use of private vehicles. Comprehensive bus systems can serve as an alternative not just to metro systems, but also to private vehicles. The transportation crisis cannot be solved by implementing strong public transportation systems alone; plans have to include developing infrastructures for cyclists and pedestrians. This is important because the poor and marginalised overwhelmingly rely on these modes of commuting. Countries such as the Netherlands, Sweden, and Japan have shown that bicycles can be used effectively for short trips (BBC 2013; Badami 2009; Kidd 2012). Moreover, facilities for cycling and walking are affordable, environmentally friendly, and can decongest roads. Although Lucknow has dedicated cycle lanes on some roads, these are frequently encroached upon. It is paradoxical that good cycle tracks and footpaths exist in affluent urban areas and not in the peri-urban areas, where they can be better utilised by the low- income groups who do not own private motor vehicles for short-distance travel.
Recommended publications
  • ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr
    GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:672 ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr. Hari Babu;Mohammed Shri Faizal P.P.;Senguttuvan Shri Balasubramaniam;Somaiya Dr. Kirit;Thomas Prof. Kuruppassery Varkey;Venugopal Dr. Ponnusamy Will the Minister of URBAN DEVELOPMENT be pleased to state: Will the MINISTER OF URBAN DEVELOPMENT be pleased to state: (a) the details of metro rail proposals received by the Government during the last three years and the current year, stretch and State/ UT-wise along with the estimated cost of each stretch; (b) the details of proposals cleared and lying pending stretch and State-wise, the reasons for pendency along with the time by which pending proposals are likely to be cleared; (c) the funds sanctioned, released and utilized during the above period for various projects, stretch and State/UT-wise; (d) the present status of various under construction and sanctioned metro rail stretches, stretch and city-wise and the time by which these are likely to be completed and operationalized; and (e) Whether various metro rail projects are going behind schedule and if so, the details thereof, stretch and city-wise and the details of cost escalated as a result thereof along with the steps taken/being taken to complete these projects within a reasonable period of time? Answer THE MINISTER OF STATE IN THE MINISTRY OF URBAN DEVELOPMENT (RAO INDERJIT SINGH) (a)& (b) : The details of metro rail proposals received/ cleared/pending during the last three years and the current year along with the names of stretch and the estimated cost stretch wise, State/UT-wise are given in Annexure-I & IA.
    [Show full text]
  • LUCKNOW METRO RAIL CORPORATION LIMITED Administrative Building, Vipin Khand, Gomti Nagar, Lucknow-226010
    CIN : U60300UP2013SGC060836 LUCKNOW METRO RAIL CORPORATION LIMITED Administrative Building, Vipin Khand, Gomti Nagar, Lucknow-226010 Phone: 0522- 2304014-15 NOTICE No. LMRC/HR/Recruitment/O&M/3/2018/NE01 dated 17/7/2018. Ref: - LMRC Advertisement No. LMRC/HR/Rectt./O&M/3/2018 dated 21/2/2018 ---------------------- 10 numbers of Candidates bearing following Roll Numbers (arranged in merit order with application of vertical and horizontal reservation) have been short listed provisionally for Biometric Verification, Document Verification & Medical Examination for the post of Station Controller cum Train Operator (SC/TO)(NE-01), the online written test of which was held by LMRC on 16/4/2018 and Psycho Aptitude Test held from 09-5-2018 to 12-5-2018 Venue : HR Branch, LMRC Depot, Transport Nagar, near 32 PAC Batalion, Lucknow. (Location- Within 8 Km. from Charbagh Rly. Station) Post Name & Code : Station Controller CumTrain Operator (SC/TO)(NE-01) Date & Reporting Time : 23-July-2018 at 09-30 AM Number of candidate called : 10 (including reserved community candidates). Candidate should bring 10 passport size recent colour photographs with all original documents/certificates. The standard of Medical Examination for Station Controller/Train Operator (SC/TO)(NE-01) is A-1(Aye-One). The process of medical examination may take up to 3 working days. The candidate must come prepared to join training immediately, as the requirement is very urgent. Candidates may note that the call for Document Verification & Medical Examination of shortlisted candidates for the post of Station Controller/Train Operator (SC/TO)(NE-01) is purely provisional subject to their fulfillment of the eligibility criteria as mentioned in advertisement notice No.
    [Show full text]
  • Stakeholder Engagement Plan (Sep)
    STAKEHOLDER ENGAGEMENT PLAN (SEP) STAKEHOLDER ENGAGEMENT PLAN NORTH – SOUTH CORRIDOR 1 INDEX Sno. Topic Page No. 1. Introduction 3 2. Project Description 3 3. Project Impact Study 8 4. Stakeholder Identification & Mapping 10 5. Our Stakeholders 12 Our Stakeholders & their Expectations 15 6. Stakeholder Prioritization Matrix 16 7. Engagement Strategies 20 Project Impact (Negative and Positive) 22 8. Grievance Management 23 Resettlement & Rehabilitation Plan 25 9. Key Management Functions 27 2 INTRODUCTION The opportunities provided by constructive stakeholder relations and the risks associated with poor ones are now better understood in today’s dynamic market environment. It is important to actively develop and sustain relationships with affected communities and other stakeholders throughout the life of project and not simply during the initial feasibility and assessment phase. This facilitates in reaping the benefits of improved risk management and better outcomes on the ground. The report focuses on classifying our stakeholders, principles of stakeholder engagement plan, expectations of our key stakeholders and strategies engaged for the delivery of effective stakeholder engagement plan. This document is an attempt to clarify engagement of Lucknow Metro Rail Corporation with its various stakeholders. The Stakeholder Engagement Plan will be revised as and when required, in synchronization with the timely progress the project makes. PROJECT DESCRIPTION As Lucknow is a vibrant city attracting a lot of people from several places particularly from West Bengal, Bihar and Eastern Parts of Uttar Pradesh. It is witnessing an economic boom and it became among the top 10 fastest growing Metro cities of India. It is the second largest city of Northern India after Delhi.
    [Show full text]
  • Notice Inviting Tender (Nit) A
    LMRC/PD/CONCOURSE-02: Licensing of nineteen (19) nos. of Concourse level commercial spaces in unpaid area at Seven Metro Stations of priority corridor. NOTICE INVITING TENDER (NIT) A. GENERAL 1) Lucknow Metro commenced commercial run for priority stretch, Transport Nagar to Charbagh/8 stations, on 6th September 2017. Stretch opened to public though limited in length, it’s popular and Ridership crossed 40,000 mark in the first week of its operation. 2) When full North South (N-S) corridor gets ready it’ll have great utility and immense serviceability along with a special feeder/extension service for first/last mile connectivity, its ridership then, has been assessed to be a few lakhs of commuters daily. 3) In order to fulfil its mandate to raise non-fare box revenue through value capture from its real estate etc., Lucknow Metro Rail Corporation (LMRC) Ltd. invites Open bids from eligible applicants, who fulfil qualification criteria as stipulated in clause 7 below, for “Licensing of nineteen (19) nos. of Concourse level commercial spaces in unpaid area at Seven Metro Stations of priority corridor.” 4) Key Details: Bid No. LMRC/PD/CONCOURSE-02 License Period 12 Years Bid documents on sale From 18.06.2018 to 10.07.2018 (between 09:30 Hrs. to 17:30 Hrs.) on working days Cost of bid documents Rs. 5000/-(inclusive of 18% GST) (Demand Draft on a Scheduled Commercial bank based in India in favour of “Lucknow Metro Rail Corporation Ltd.” payable at Lucknow.) Date &time of Submission of 17.07.2018 up-to 15:00 Hrs.
    [Show full text]
  • Fare AFC SYSTEM for LUCKNOW METRO
    Fare AFC SYSTEM FOR LUCKNOW METRO Multi-channel and State-of-the-art Web presence that is multi-modal ticketing contactless card-based accessible using a and transit interface fare collection system mobile application Lucknow Metro Rail Corporation (LMRC) in the process. This project seamlessly is one of the most ambitious Mass Rapid connects the Lucknow city through all Transit System (MRTS) projects deployed its transit points thereby speeding up by the Government of India and the business and commercial activities in Government of Uttar Pradesh. It is the this Tier-2 city. This fast, reliable, and fastest executed metro rail project so far environment friendly transit system has in India while abiding with all quality also substantially added to the city’s parameters and setting new benchmarks revenue. TRANSPORT REVOLUTION IN LUCKNOW CITY LMRC has sparked a new revolution in the city of Lucknow, the capital of Uttar Pradesh. With a population of over 3 million, the city is a major commercial and trading centre in the state. Through this LMRC project, the city has received a world class MRTS, which is convenient, safe, cost-effective, and affordable to the average Indian citizen. Where it took 45 minutes to commute from Transport Nagar to Charbagh now takes 15 minutes. The MRTS is envisioned to contribute to the rapid growth and urbanization of the Lucknow city in the next couple of years. Datamatics has been the technology partner to the LMRC project in consortium with Mikroelektronika. DATAMATICS IMPLEMENTS TRUFARE, AFC SYSTEM FOR LMRC Datamatics is a technology company that builds intelligent solutions for data-driven enterprises to improve their productivity and customer experience.
    [Show full text]
  • Global Report Global Metro Projects 2020.Qxp
    Table of Contents 1.1 Global Metrorail industry 2.2.2 Brazil 2.3.4.2 Changchun Urban Rail Transit 1.1.1 Overview 2.2.2.1 Belo Horizonte Metro 2.3.4.3 Chengdu Metro 1.1.2 Network and Station 2.2.2.2 Brasília Metro 2.3.4.4 Guangzhou Metro Development 2.2.2.3 Cariri Metro 2.3.4.5 Hefei Metro 1.1.3 Ridership 2.2.2.4 Fortaleza Rapid Transit Project 2.3.4.6 Hong Kong Mass Railway Transit 1.1.3 Rolling stock 2.2.2.5 Porto Alegre Metro 2.3.4.7 Jinan Metro 1.1.4 Signalling 2.2.2.6 Recife Metro 2.3.4.8 Nanchang Metro 1.1.5 Power and Tracks 2.2.2.7 Rio de Janeiro Metro 2.3.4.9 Nanjing Metro 1.1.6 Fare systems 2.2.2.8 Salvador Metro 2.3.4.10 Ningbo Rail Transit 1.1.7 Funding and financing 2.2.2.9 São Paulo Metro 2.3.4.11 Shanghai Metro 1.1.8 Project delivery models 2.3.4.12 Shenzhen Metro 1.1.9 Key trends and developments 2.2.3 Chile 2.3.4.13 Suzhou Metro 2.2.3.1 Santiago Metro 2.3.4.14 Ürümqi Metro 1.2 Opportunities and Outlook 2.2.3.2 Valparaiso Metro 2.3.4.15 Wuhan Metro 1.2.1 Growth drivers 1.2.2 Network expansion by 2025 2.2.4 Colombia 2.3.5 India 1.2.3 Network expansion by 2030 2.2.4.1 Barranquilla Metro 2.3.5.1 Agra Metro 1.2.4 Network expansion beyond 2.2.4.2 Bogotá Metro 2.3.5.2 Ahmedabad-Gandhinagar Metro 2030 2.2.4.3 Medellín Metro 2.3.5.3 Bengaluru Metro 1.2.5 Rolling stock procurement and 2.3.5.4 Bhopal Metro refurbishment 2.2.5 Dominican Republic 2.3.5.5 Chennai Metro 1.2.6 Fare system upgrades and 2.2.5.1 Santo Domingo Metro 2.3.5.6 Hyderabad Metro Rail innovation 2.3.5.7 Jaipur Metro Rail 1.2.7 Signalling technology 2.2.6 Ecuador
    [Show full text]
  • ISTT Recognises Mears Group for Complicated Installation – PAGE 16
    ISSUE 38 | WINTER 2018 The official publication of the International Society for Trenchless Technology AWARD-WINNING ISTT recognises Mears Group HDD for complicated installation – PAGE 16 No-Dig flourishes in NASTT No-Dig Findings of CIPP 14 the Americas 26 Show preview 47 report challenge ISO 9001:2008 FM 56735 FM 588513 17-12-11-012_ID18023_eAZ_HDD_Trenchless International_210x297_RZgp Flexibility Trailer, crawler or modular rigs by Herrenknecht. Quick installation, successful worldwide. FP AD 1 Power PAGE ONEE f fi c i e n t Herrenknecht HDD rigs with 100–600 t. Torque and pull forces continuously adjustable for optimum performance at each operating point. Plus tailor-made onsite services and a full range Herrenknechtof additional equipment. Control Modern sensor systems with real-time monitoring and online analysis of drilling data. To protect drill rods and tools in the borehole. For maximum performance. Pioneering Underground Technologies www.herrenknecht.com 17-12-11-012_ID18023_eAZ_HDD_Trenchless International_210x297_RZgp.indd 1 11.12.17 13:04 | CONTENTS | INSIDE TRENCHLESS INTERNATIONAL 16 | Cover Story PROJECT AWARD Mears Group has received as ISTT Award at Trenchless World Congress for a challenging HDD installation in Florida, US. 14 26 FP AD 2 GREAT SOUTHERN PRESS PTY LTD Primus Line ACN 005 716 825 ABN 28 096 872 004 Suite 1, Level 3 169-171 Victoria Parade Fitzroy VIC 3065 Australia TEL: +61 3 9248 5100 REPORTS NASTT NO-DIG SHOW [email protected] From the Chairman’s desk 6 Event preview 26 www.trenchlessinternational.com
    [Show full text]
  • Monetising the Metro
    1 2 Indian Metro Systems – 2020 Analysis Contents Metro Rail In India: Introduction ............................................................................................................ 5 Brief Global History of Metro systems .................................................................................................... 5 Why is Metro the right MRT option? ...................................................................................................... 8 Key Benefits ........................................................................................................................................ 9 Impact on Urbanisation ...................................................................................................................... 9 When to Build a Metro ..................................................................................................................... 10 When Not to Build a Metro .............................................................................................................. 10 Implementation of Metro In Indian Context ........................................................................................ 11 Indian Issues with Implementation................................................................................................... 13 Metro in India: Spotlight Kolkata .......................................................................................................... 14 Metro in India: Spotlight Delhi .............................................................................................................
    [Show full text]
  • Datamatics Afc System for Lucknow Metro
    DATAMATICS AFC SYSTEM FOR LUCKNOW METRO Multi-channel and State-of-the-art Web presence that is multi-modal ticketing contactless card-based accessible using a and transit interface fare collection system mobile application Lucknow Metro Rail Corporation (LMRC) This project seamlessly connects the is one of the most ambitious Mass Rapid Lucknow city through all its transit Transit System (MRTS) projects deployed points thereby speeding up the business by the Government of India and and commercial activities in this city. Government of Uttar Pradesh. It is the This fast, reliable, and environment fastest executed metro rail project so far friendly transit system has become the in India while complying with all city’s lifeline. passenger convenience and safety parameters and setting new benchmarks. TRANSPORT REVOLUTION IN LUCKNOW CITY LMRC has sparked a new revolution in the city of Lucknow, the capital of Uttar Pradesh. With a population of over 3 million, the city is a major commercial and trading centre in the state. Through this LMRC project, the city has received a world class MRTS, which is convenient, safe, cost-effective, and affordable to the average Indian citizen. It has reduced the commuting time by two thirds thus contributing to rapid urbanization. The MRTS is envisioned to contribute to the rapid growth and urbanization of the Lucknow city in the next couple of years. Datamatics has been the prime technology provider to the LMRC project along with its partner Mikroelektronika. DATAMATICS IMPLEMENTS AFC SYSTEM FOR LMRC Datamatics is a technology company that builds intelligent solutions for data-driven enterprises to improve their productivity and customer experience.
    [Show full text]
  • Systra Chosen As General Consultant for the Nagpur Metro Project
    Paris, 14 June 2016 INDIA: SYSTRA CHOSEN AS GENERAL CONSULTANT FOR THE NAGPUR METRO PROJECT The SYSTRA-AECOM-Egis Rail-Rites consortium led by SYSTRA, has been awarded the mission of General Consultant for the first phase of the Nagpur metro project. This contract strengthens SYSTRA’s position in the supervision of urban transport infrastructure projects in the peninsular. Jean-Charles Vollery, Asia-Pacific Regional Director: “Nagpur Metro Rail Corporation Limited (NMRCL) has chosen SYSTRA as general consultant for the creation of the first two lines in this city of more than two million inhabitants. The award of this new contract to SYSTRA, in addition to the six projects already underway in Indian megacities, highlights the confidence shown by the Indian transport authorities in our ability to manage complex projects. " Two metro lines to build the sustainable city of the future Considered as the second cleanest city in India and the second most green, local authorities are dedicated to maintaining this ranking while supporting the demographic and economic growth of Nagpur through the development of public transport infrastructure. They therefore selected the SYSTRA-AECOM-Egis Rail-Rites consortium, the members of which have together contributed to the construction of all metro projects in India, to build the city’s first two metro lines. The Nagpur metro project has two lines: - The first line of nearly 20km will link the city’s two main gateways from North (Kamptee) to South (Wardha) with 17 stations, of which 15 will be elevated. It will serve the city’s current international airport, Dr. Babasahed Ambedkar, as well as the future neighbourhood to be built under the MIHAN project, Multi-modal International Cargo Hub and Airport at Nagpur.
    [Show full text]
  • ANSWERED ON:27.04.2016 Land for Metro Rail Birla Shri Om;Sahu Shri Chandu Lal
    GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:476 ANSWERED ON:27.04.2016 Land for Metro Rail Birla Shri Om;Sahu Shri Chandu Lal Will the Minister of URBAN DEVELOPMENT be pleased to state: Will the Minister of URBAN DEVELOPMENT be please to state: (a) the area of land acquired for construction of metro rail projects in the country, city and State-wise; (b) the number of people displaced due to these metro rail projects, city and State-wise; (c) the rehabilitation measures taken for those displaced persons; and (d) the details of fund allocated and utilised for rehabilitation and compensation, State-wise? Answer THE MINISTER OF URBAN DEVELOPMENT (SHRI M. VENKAIAH NAIDU) (a),(b) & (d): As informed by Metro Companies, the details of land acquired, number of people displaced, funds allocated and utilised for rehabilitation and compensation to families affected due to construction of metro rail projects, which are being implemented on 50:50 equity sharing joint venture between Government of India (GoI) and the concerned State Governments State-wise are given in Annexure. (c): Resettlement and Rehabilitation is done as per the extant policies. ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (a), (b) & (d) OF THE LOK SABHA UNSTARRED QUESTION NO.476 FOR ANSWER ON 27.04.2016 REGARDING LAND FOR METRO RAIL ASKED BY SHRI OM BIRLA AND SHRI CHANDU LAL SAHU. DETAILS OF LAND ACQUIRED, NUMBER OF PEOPLE DISPLACED, FUNDS ALLOCATED AND UTILISED FOR REHABILITATION FOR CONSTRUCTION OF METRO RAIL PROJECTS BEING IMPLEMENTED ON 50:50 EQUITY SHARING JOINT VENTURE BETWEEN GOVERNMENT OF INDIA (GOI) AND THE CONCERNED STATE GOVERNMENTS - STATE-WISE.
    [Show full text]
  • Lucknow Metro Rail Corporation
    LUCKNOW METRO RAIL CORPORATION Location - Lucknow, Uttar Pradesh, India Transit type - Rapid transit Number of Lines - 3 (Phase I) Number of stations - 36 (Phase I) Chief Executive - Madhukar Jetley Headquarters - Janpath, Hazratganj, Lucknow Website - www.lmrcl.com Operations will start - 2017 (est) Operator(s) - Lucknow Metro Rail Corporation Train length - 4 coach trainset Headway - 7 mins System length - 33.976 Km Track gauge - 1435 mm Top speed - 80 Km/h Board of LMRC Chairman – Mr. Alok Ranjan, IAS Managing Director – Mr. Kumar Keshav Director – Shri Sadakant, IAS Director – Shri Kumar Kamlesh, IAS Director – Shri Mukesh Mittal, IAS Director – Shri Daljeet Singh, IAS Director – Shri Mahendra Kumar, IAS Introduction Aiming to bring world-class infrastructure to the city of Lucknow, the Hobble Chief Minister of Uttar Pradesh announced the Lucknow Metro Rail Project in his Budget speech for the year 2014-15. The project will provide the inhabitants and visitors of Lucknow a world class Mass Rapid Transit System that is convenient, sage, fast, reliable and cost-effective. For seamless implementation of the project, a SPV in the form of a company known as Lucknow Metro Rail Corporation Limited has been incorporated by the Government of Uttar Pradesh. The Lucknow Metro is an under construction rapid transit system in the city of Lucknow construction on the first phase began on 27th September, 2014. LMRC is responsible to build and operate this network. The metro project will be the most expensive public transport system in the state of Uttar Pradesh, costing Rs. 12500 Crore. It will provide speedy mass transport and help in reduce traffic congestion on city roads.
    [Show full text]