LUCKNOW METRO RAIL CORPORATION LIMITED Administrative Building, Vipin Khand, Gomti Nagar, Lucknow-226010 Phone: 0522- 2304014-15

Total Page:16

File Type:pdf, Size:1020Kb

LUCKNOW METRO RAIL CORPORATION LIMITED Administrative Building, Vipin Khand, Gomti Nagar, Lucknow-226010 Phone: 0522- 2304014-15 CIN : U60300UP2013SGC060836 LUCKNOW METRO RAIL CORPORATION LIMITED Administrative Building, Vipin Khand, Gomti Nagar, Lucknow-226010 Phone: 0522- 2304014-15 NOTICE No. LMRC/HR/Recruitment/O&M/3/2018/NE01 dated 27/09/2019. Ref: - LMRC Advertisement No. LMRC/HR/Rectt./O&M/3/2018 dated 21/2/2018 ---------------------- 08 numbers of Candidates bearing following Roll Numbers (arranged in merit order with application of vertical and horizontal reservation) have been short listed provisionally for Biometric Verification, Document Verification & Medical Examination for the post of Station Controller cum Train Operator (SC/TO)(NE01), the online written test of which was held by LMRC on 16/4/2018 and Psycho Aptitude Test held from 09-5-2018 to 12-5-2018 Venue : Ground floor, Meeting Hall, Lucknow Metro Rail Corporation, Administrative Building,Vipin Khand, Gomti Nagar, Lucknow- 226010 Post Name & Code : Station Controller CumTrain Operator (SC/TO)(NE01) Date & Reporting Time : 04-Oct-2019 at 10-00 AM Number of candidate called : 08 (including reserved community candidates). Candidate should bring 10 passport size recent colour photographs with all original documents/certificates. The standard of Medical Examination for Station Controller/Train Operator (SC/TO)(NE01) is A-1(Aye-One). The process of medical examination may take up to 3 working days. The candidate must come prepared to join training immediately, as the requirement is very urgent. Candidates may note that the call for Document Verification & Medical Examination of shortlisted candidates for the post of Station Controller/Train Operator (SC/TO)(NE-01) is purely provisional subject to their fulfillment of the eligibility criteria as mentioned in advertisement notice No. LMRC/HR/Rectt./O&M/3/2018 dated 21-2-2018. Candidate must bring with themselves the following documents at the time of document verification/medical examination, without which their medical examination will not be conducted. i) Proof of Date of Birth (High School/Matriculation certificate) in original & 3 photocopies ii) Proof of having passed Requisite Qualification with Provisional/Diploma or Degree certificates by the date of closing date of online applications i.e on 27.03.2018. Valid SC of UP, ST of UP, OBC of UP certificates, UP Domicile for women of UP, DFF of UP Certificate & ESM certificate in the prescribed format as mentioned in the notification if belongs to reserved community and requiring concession/relaxation. iii) SC candidates of UP, ST candidates of UP, OBC candidates of UP should also bring domicile certificate of UP. iv) UP Domicile for women of UP, DFF of UP Certificate & ESM certificate should also bring at the time of Document verification & medical test. v) OBC of UP certificates should be current and issued within one year on the closing date of application as mentioned in the notification. vi) The Candidates who have been obtained CGPA/CPI in prescribed qualification as per notification, they must bring conversion formula from University/Institution for calculation of equivalent percentage of marks 1 /2 IMPORTANT:- i) All candidates are advised to join immediately as extensions will not be possible and consequently further requirement may not be there for their induction. ii) The selected candidates will have to deposit Training Cost amounting Rs 35,000 plus GST @ 18% at the time of joining. iii) The selected candidates will also have to deposit Tenth class original marksheet & original Certificate at the time of joining. iv) The selected candidates have also deposit a surety bond amount of Rs 1,50,000 plus GST to serve the corporation for a minimum period of three years(exclusive of the period in which he remained on LWP or EOL) and also a three month prior notice plus GST will be required before seeking resignation from the employee. Next 08 Psycho Aptitude Test qualified candidates provisionally called from the merit list against the resultant vacancies for document verification & Medical examination by applying vertical & horizontal reservation for the post of (SC/TO)(NE01) Applicant Applicant Applicant S.No Father Name Roll No. App Seq No. Sub Name Category Category PRASHANT LAXMAN PRASAD 1 162114601118 18169955 Unreserved AGRAWAL AGRAWAL NAVNEET TRIBHUWAN 2 162114000101 18258380 Unreserved PANDEY PRASAD PANDEY PRASANT AJAY KUMAR 3 162114600030 18141924 Unreserved KESARWANI KESARWANI RADHA KRISHNA 4 DHRUV ANAND 162114600218 18197683 Unreserved PRASAD 5 DEEPAK SINGH SURESH SINGH 162112900254 18221205 Unreserved GAURAV 6 OMKAR SINGH 162114500004 18007878 Unreserved KUMAR DIVYA SINGH RAJESH KUMAR 7 162112800065 18167236 OBC(NCL) PATEL PATEL 8 PANKAJ DHEER JAGDISH DHEER 162114200024 18043568 SC *The shortlisting of the above candidates is subject to fitness in A-1 medical category and fulfilling all the eligibility criteria & terms and conditions mentioned in the LMRC advertisement No LMRC/HR/Recruitment/O&M/3/2018 dated 21.02.2018. 2 /2 .
Recommended publications
  • ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr
    GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:672 ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr. Hari Babu;Mohammed Shri Faizal P.P.;Senguttuvan Shri Balasubramaniam;Somaiya Dr. Kirit;Thomas Prof. Kuruppassery Varkey;Venugopal Dr. Ponnusamy Will the Minister of URBAN DEVELOPMENT be pleased to state: Will the MINISTER OF URBAN DEVELOPMENT be pleased to state: (a) the details of metro rail proposals received by the Government during the last three years and the current year, stretch and State/ UT-wise along with the estimated cost of each stretch; (b) the details of proposals cleared and lying pending stretch and State-wise, the reasons for pendency along with the time by which pending proposals are likely to be cleared; (c) the funds sanctioned, released and utilized during the above period for various projects, stretch and State/UT-wise; (d) the present status of various under construction and sanctioned metro rail stretches, stretch and city-wise and the time by which these are likely to be completed and operationalized; and (e) Whether various metro rail projects are going behind schedule and if so, the details thereof, stretch and city-wise and the details of cost escalated as a result thereof along with the steps taken/being taken to complete these projects within a reasonable period of time? Answer THE MINISTER OF STATE IN THE MINISTRY OF URBAN DEVELOPMENT (RAO INDERJIT SINGH) (a)& (b) : The details of metro rail proposals received/ cleared/pending during the last three years and the current year along with the names of stretch and the estimated cost stretch wise, State/UT-wise are given in Annexure-I & IA.
    [Show full text]
  • LUCKNOW METRO RAIL CORPORATION LIMITED Administrative Building, Vipin Khand, Gomti Nagar, Lucknow-226010
    CIN : U60300UP2013SGC060836 LUCKNOW METRO RAIL CORPORATION LIMITED Administrative Building, Vipin Khand, Gomti Nagar, Lucknow-226010 Phone: 0522- 2304014-15 NOTICE No. LMRC/HR/Recruitment/O&M/3/2018/NE01 dated 17/7/2018. Ref: - LMRC Advertisement No. LMRC/HR/Rectt./O&M/3/2018 dated 21/2/2018 ---------------------- 10 numbers of Candidates bearing following Roll Numbers (arranged in merit order with application of vertical and horizontal reservation) have been short listed provisionally for Biometric Verification, Document Verification & Medical Examination for the post of Station Controller cum Train Operator (SC/TO)(NE-01), the online written test of which was held by LMRC on 16/4/2018 and Psycho Aptitude Test held from 09-5-2018 to 12-5-2018 Venue : HR Branch, LMRC Depot, Transport Nagar, near 32 PAC Batalion, Lucknow. (Location- Within 8 Km. from Charbagh Rly. Station) Post Name & Code : Station Controller CumTrain Operator (SC/TO)(NE-01) Date & Reporting Time : 23-July-2018 at 09-30 AM Number of candidate called : 10 (including reserved community candidates). Candidate should bring 10 passport size recent colour photographs with all original documents/certificates. The standard of Medical Examination for Station Controller/Train Operator (SC/TO)(NE-01) is A-1(Aye-One). The process of medical examination may take up to 3 working days. The candidate must come prepared to join training immediately, as the requirement is very urgent. Candidates may note that the call for Document Verification & Medical Examination of shortlisted candidates for the post of Station Controller/Train Operator (SC/TO)(NE-01) is purely provisional subject to their fulfillment of the eligibility criteria as mentioned in advertisement notice No.
    [Show full text]
  • Stakeholder Engagement Plan (Sep)
    STAKEHOLDER ENGAGEMENT PLAN (SEP) STAKEHOLDER ENGAGEMENT PLAN NORTH – SOUTH CORRIDOR 1 INDEX Sno. Topic Page No. 1. Introduction 3 2. Project Description 3 3. Project Impact Study 8 4. Stakeholder Identification & Mapping 10 5. Our Stakeholders 12 Our Stakeholders & their Expectations 15 6. Stakeholder Prioritization Matrix 16 7. Engagement Strategies 20 Project Impact (Negative and Positive) 22 8. Grievance Management 23 Resettlement & Rehabilitation Plan 25 9. Key Management Functions 27 2 INTRODUCTION The opportunities provided by constructive stakeholder relations and the risks associated with poor ones are now better understood in today’s dynamic market environment. It is important to actively develop and sustain relationships with affected communities and other stakeholders throughout the life of project and not simply during the initial feasibility and assessment phase. This facilitates in reaping the benefits of improved risk management and better outcomes on the ground. The report focuses on classifying our stakeholders, principles of stakeholder engagement plan, expectations of our key stakeholders and strategies engaged for the delivery of effective stakeholder engagement plan. This document is an attempt to clarify engagement of Lucknow Metro Rail Corporation with its various stakeholders. The Stakeholder Engagement Plan will be revised as and when required, in synchronization with the timely progress the project makes. PROJECT DESCRIPTION As Lucknow is a vibrant city attracting a lot of people from several places particularly from West Bengal, Bihar and Eastern Parts of Uttar Pradesh. It is witnessing an economic boom and it became among the top 10 fastest growing Metro cities of India. It is the second largest city of Northern India after Delhi.
    [Show full text]
  • Notice Inviting Tender (Nit) A
    LMRC/PD/CONCOURSE-02: Licensing of nineteen (19) nos. of Concourse level commercial spaces in unpaid area at Seven Metro Stations of priority corridor. NOTICE INVITING TENDER (NIT) A. GENERAL 1) Lucknow Metro commenced commercial run for priority stretch, Transport Nagar to Charbagh/8 stations, on 6th September 2017. Stretch opened to public though limited in length, it’s popular and Ridership crossed 40,000 mark in the first week of its operation. 2) When full North South (N-S) corridor gets ready it’ll have great utility and immense serviceability along with a special feeder/extension service for first/last mile connectivity, its ridership then, has been assessed to be a few lakhs of commuters daily. 3) In order to fulfil its mandate to raise non-fare box revenue through value capture from its real estate etc., Lucknow Metro Rail Corporation (LMRC) Ltd. invites Open bids from eligible applicants, who fulfil qualification criteria as stipulated in clause 7 below, for “Licensing of nineteen (19) nos. of Concourse level commercial spaces in unpaid area at Seven Metro Stations of priority corridor.” 4) Key Details: Bid No. LMRC/PD/CONCOURSE-02 License Period 12 Years Bid documents on sale From 18.06.2018 to 10.07.2018 (between 09:30 Hrs. to 17:30 Hrs.) on working days Cost of bid documents Rs. 5000/-(inclusive of 18% GST) (Demand Draft on a Scheduled Commercial bank based in India in favour of “Lucknow Metro Rail Corporation Ltd.” payable at Lucknow.) Date &time of Submission of 17.07.2018 up-to 15:00 Hrs.
    [Show full text]
  • Lucknow Metro: Urban Transportation Systems Must Be Accountable to Local and Subaltern Needs
    ISSN (Online) - 2349-8846 Lucknow Metro: Urban Transportation Systems Must be Accountable to Local and Subaltern Needs AAKASH BAJPAI Aakash Bajpai ([email protected]) is a student at Tata Institute of Social Sciences, Tuljapur. Vol. 55, Issue No. 1, 04 Jan, 2020 While the city’s North-South Corridor (NSC) of the Lucknow metro has been functional since March 2019 and has recorded a daily ridership of about 40,000–70,000, this is only 16% of the projections made by planners. This shortfall is a result of the government adopting a “one-size-fits-all” approach that fails to take into account existing transportation services (both public and private) and local needs. Sound infrastructure is indispensable to expand the economy, but infrastructure and development have to be synchronised. As India plans to boost its secondary sector, an efficient public transportation system cannot be compromised. The challenge before policymakers and urban planners is to design and implement an inclusive system. I will examine whether, and to what extent, the Lucknow metro has met this challenge. In 2013, the Delhi Metro Rail Corporation (DMRC) prepared a report titled the “Updated Final Detailed Project Report for Lucknow Metro Rail Project” (referred to here as the DPR) that advocated for the construction of a metro project in Lucknow. The DMRC argued that Lucknow had inadequate public transport, and this encouraged commuters to purchase motor vehicles (DMRC 2013).[1] Lucknow metro’s North-South Corridor (NSC) has been functional since March 2019 and the East-West Corridor was approved for construction in ISSN (Online) - 2349-8846 June 2018 (Rawat 2018).
    [Show full text]
  • Fare AFC SYSTEM for LUCKNOW METRO
    Fare AFC SYSTEM FOR LUCKNOW METRO Multi-channel and State-of-the-art Web presence that is multi-modal ticketing contactless card-based accessible using a and transit interface fare collection system mobile application Lucknow Metro Rail Corporation (LMRC) in the process. This project seamlessly is one of the most ambitious Mass Rapid connects the Lucknow city through all Transit System (MRTS) projects deployed its transit points thereby speeding up by the Government of India and the business and commercial activities in Government of Uttar Pradesh. It is the this Tier-2 city. This fast, reliable, and fastest executed metro rail project so far environment friendly transit system has in India while abiding with all quality also substantially added to the city’s parameters and setting new benchmarks revenue. TRANSPORT REVOLUTION IN LUCKNOW CITY LMRC has sparked a new revolution in the city of Lucknow, the capital of Uttar Pradesh. With a population of over 3 million, the city is a major commercial and trading centre in the state. Through this LMRC project, the city has received a world class MRTS, which is convenient, safe, cost-effective, and affordable to the average Indian citizen. Where it took 45 minutes to commute from Transport Nagar to Charbagh now takes 15 minutes. The MRTS is envisioned to contribute to the rapid growth and urbanization of the Lucknow city in the next couple of years. Datamatics has been the technology partner to the LMRC project in consortium with Mikroelektronika. DATAMATICS IMPLEMENTS TRUFARE, AFC SYSTEM FOR LMRC Datamatics is a technology company that builds intelligent solutions for data-driven enterprises to improve their productivity and customer experience.
    [Show full text]
  • Global Report Global Metro Projects 2020.Qxp
    Table of Contents 1.1 Global Metrorail industry 2.2.2 Brazil 2.3.4.2 Changchun Urban Rail Transit 1.1.1 Overview 2.2.2.1 Belo Horizonte Metro 2.3.4.3 Chengdu Metro 1.1.2 Network and Station 2.2.2.2 Brasília Metro 2.3.4.4 Guangzhou Metro Development 2.2.2.3 Cariri Metro 2.3.4.5 Hefei Metro 1.1.3 Ridership 2.2.2.4 Fortaleza Rapid Transit Project 2.3.4.6 Hong Kong Mass Railway Transit 1.1.3 Rolling stock 2.2.2.5 Porto Alegre Metro 2.3.4.7 Jinan Metro 1.1.4 Signalling 2.2.2.6 Recife Metro 2.3.4.8 Nanchang Metro 1.1.5 Power and Tracks 2.2.2.7 Rio de Janeiro Metro 2.3.4.9 Nanjing Metro 1.1.6 Fare systems 2.2.2.8 Salvador Metro 2.3.4.10 Ningbo Rail Transit 1.1.7 Funding and financing 2.2.2.9 São Paulo Metro 2.3.4.11 Shanghai Metro 1.1.8 Project delivery models 2.3.4.12 Shenzhen Metro 1.1.9 Key trends and developments 2.2.3 Chile 2.3.4.13 Suzhou Metro 2.2.3.1 Santiago Metro 2.3.4.14 Ürümqi Metro 1.2 Opportunities and Outlook 2.2.3.2 Valparaiso Metro 2.3.4.15 Wuhan Metro 1.2.1 Growth drivers 1.2.2 Network expansion by 2025 2.2.4 Colombia 2.3.5 India 1.2.3 Network expansion by 2030 2.2.4.1 Barranquilla Metro 2.3.5.1 Agra Metro 1.2.4 Network expansion beyond 2.2.4.2 Bogotá Metro 2.3.5.2 Ahmedabad-Gandhinagar Metro 2030 2.2.4.3 Medellín Metro 2.3.5.3 Bengaluru Metro 1.2.5 Rolling stock procurement and 2.3.5.4 Bhopal Metro refurbishment 2.2.5 Dominican Republic 2.3.5.5 Chennai Metro 1.2.6 Fare system upgrades and 2.2.5.1 Santo Domingo Metro 2.3.5.6 Hyderabad Metro Rail innovation 2.3.5.7 Jaipur Metro Rail 1.2.7 Signalling technology 2.2.6 Ecuador
    [Show full text]
  • ISTT Recognises Mears Group for Complicated Installation – PAGE 16
    ISSUE 38 | WINTER 2018 The official publication of the International Society for Trenchless Technology AWARD-WINNING ISTT recognises Mears Group HDD for complicated installation – PAGE 16 No-Dig flourishes in NASTT No-Dig Findings of CIPP 14 the Americas 26 Show preview 47 report challenge ISO 9001:2008 FM 56735 FM 588513 17-12-11-012_ID18023_eAZ_HDD_Trenchless International_210x297_RZgp Flexibility Trailer, crawler or modular rigs by Herrenknecht. Quick installation, successful worldwide. FP AD 1 Power PAGE ONEE f fi c i e n t Herrenknecht HDD rigs with 100–600 t. Torque and pull forces continuously adjustable for optimum performance at each operating point. Plus tailor-made onsite services and a full range Herrenknechtof additional equipment. Control Modern sensor systems with real-time monitoring and online analysis of drilling data. To protect drill rods and tools in the borehole. For maximum performance. Pioneering Underground Technologies www.herrenknecht.com 17-12-11-012_ID18023_eAZ_HDD_Trenchless International_210x297_RZgp.indd 1 11.12.17 13:04 | CONTENTS | INSIDE TRENCHLESS INTERNATIONAL 16 | Cover Story PROJECT AWARD Mears Group has received as ISTT Award at Trenchless World Congress for a challenging HDD installation in Florida, US. 14 26 FP AD 2 GREAT SOUTHERN PRESS PTY LTD Primus Line ACN 005 716 825 ABN 28 096 872 004 Suite 1, Level 3 169-171 Victoria Parade Fitzroy VIC 3065 Australia TEL: +61 3 9248 5100 REPORTS NASTT NO-DIG SHOW [email protected] From the Chairman’s desk 6 Event preview 26 www.trenchlessinternational.com
    [Show full text]
  • Monetising the Metro
    1 2 Indian Metro Systems – 2020 Analysis Contents Metro Rail In India: Introduction ............................................................................................................ 5 Brief Global History of Metro systems .................................................................................................... 5 Why is Metro the right MRT option? ...................................................................................................... 8 Key Benefits ........................................................................................................................................ 9 Impact on Urbanisation ...................................................................................................................... 9 When to Build a Metro ..................................................................................................................... 10 When Not to Build a Metro .............................................................................................................. 10 Implementation of Metro In Indian Context ........................................................................................ 11 Indian Issues with Implementation................................................................................................... 13 Metro in India: Spotlight Kolkata .......................................................................................................... 14 Metro in India: Spotlight Delhi .............................................................................................................
    [Show full text]
  • Datamatics Afc System for Lucknow Metro
    DATAMATICS AFC SYSTEM FOR LUCKNOW METRO Multi-channel and State-of-the-art Web presence that is multi-modal ticketing contactless card-based accessible using a and transit interface fare collection system mobile application Lucknow Metro Rail Corporation (LMRC) This project seamlessly connects the is one of the most ambitious Mass Rapid Lucknow city through all its transit Transit System (MRTS) projects deployed points thereby speeding up the business by the Government of India and and commercial activities in this city. Government of Uttar Pradesh. It is the This fast, reliable, and environment fastest executed metro rail project so far friendly transit system has become the in India while complying with all city’s lifeline. passenger convenience and safety parameters and setting new benchmarks. TRANSPORT REVOLUTION IN LUCKNOW CITY LMRC has sparked a new revolution in the city of Lucknow, the capital of Uttar Pradesh. With a population of over 3 million, the city is a major commercial and trading centre in the state. Through this LMRC project, the city has received a world class MRTS, which is convenient, safe, cost-effective, and affordable to the average Indian citizen. It has reduced the commuting time by two thirds thus contributing to rapid urbanization. The MRTS is envisioned to contribute to the rapid growth and urbanization of the Lucknow city in the next couple of years. Datamatics has been the prime technology provider to the LMRC project along with its partner Mikroelektronika. DATAMATICS IMPLEMENTS AFC SYSTEM FOR LMRC Datamatics is a technology company that builds intelligent solutions for data-driven enterprises to improve their productivity and customer experience.
    [Show full text]
  • Systra Chosen As General Consultant for the Nagpur Metro Project
    Paris, 14 June 2016 INDIA: SYSTRA CHOSEN AS GENERAL CONSULTANT FOR THE NAGPUR METRO PROJECT The SYSTRA-AECOM-Egis Rail-Rites consortium led by SYSTRA, has been awarded the mission of General Consultant for the first phase of the Nagpur metro project. This contract strengthens SYSTRA’s position in the supervision of urban transport infrastructure projects in the peninsular. Jean-Charles Vollery, Asia-Pacific Regional Director: “Nagpur Metro Rail Corporation Limited (NMRCL) has chosen SYSTRA as general consultant for the creation of the first two lines in this city of more than two million inhabitants. The award of this new contract to SYSTRA, in addition to the six projects already underway in Indian megacities, highlights the confidence shown by the Indian transport authorities in our ability to manage complex projects. " Two metro lines to build the sustainable city of the future Considered as the second cleanest city in India and the second most green, local authorities are dedicated to maintaining this ranking while supporting the demographic and economic growth of Nagpur through the development of public transport infrastructure. They therefore selected the SYSTRA-AECOM-Egis Rail-Rites consortium, the members of which have together contributed to the construction of all metro projects in India, to build the city’s first two metro lines. The Nagpur metro project has two lines: - The first line of nearly 20km will link the city’s two main gateways from North (Kamptee) to South (Wardha) with 17 stations, of which 15 will be elevated. It will serve the city’s current international airport, Dr. Babasahed Ambedkar, as well as the future neighbourhood to be built under the MIHAN project, Multi-modal International Cargo Hub and Airport at Nagpur.
    [Show full text]
  • ANSWERED ON:27.04.2016 Land for Metro Rail Birla Shri Om;Sahu Shri Chandu Lal
    GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:476 ANSWERED ON:27.04.2016 Land for Metro Rail Birla Shri Om;Sahu Shri Chandu Lal Will the Minister of URBAN DEVELOPMENT be pleased to state: Will the Minister of URBAN DEVELOPMENT be please to state: (a) the area of land acquired for construction of metro rail projects in the country, city and State-wise; (b) the number of people displaced due to these metro rail projects, city and State-wise; (c) the rehabilitation measures taken for those displaced persons; and (d) the details of fund allocated and utilised for rehabilitation and compensation, State-wise? Answer THE MINISTER OF URBAN DEVELOPMENT (SHRI M. VENKAIAH NAIDU) (a),(b) & (d): As informed by Metro Companies, the details of land acquired, number of people displaced, funds allocated and utilised for rehabilitation and compensation to families affected due to construction of metro rail projects, which are being implemented on 50:50 equity sharing joint venture between Government of India (GoI) and the concerned State Governments State-wise are given in Annexure. (c): Resettlement and Rehabilitation is done as per the extant policies. ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (a), (b) & (d) OF THE LOK SABHA UNSTARRED QUESTION NO.476 FOR ANSWER ON 27.04.2016 REGARDING LAND FOR METRO RAIL ASKED BY SHRI OM BIRLA AND SHRI CHANDU LAL SAHU. DETAILS OF LAND ACQUIRED, NUMBER OF PEOPLE DISPLACED, FUNDS ALLOCATED AND UTILISED FOR REHABILITATION FOR CONSTRUCTION OF METRO RAIL PROJECTS BEING IMPLEMENTED ON 50:50 EQUITY SHARING JOINT VENTURE BETWEEN GOVERNMENT OF INDIA (GOI) AND THE CONCERNED STATE GOVERNMENTS - STATE-WISE.
    [Show full text]