PERI up MI and DUO for Largest Diamond Bourse DUO And

PERI up MI and DUO for Largest Diamond Bourse DUO And

IN 1 2019 The PERI Magazine Scope PERI UP MI and DUO for largest diamond bourse Surat Diamond Bourse, Surat – Page 4 DUO and SKYDECK system for largest convention center ITPO Pragati Maidan, New Delhi – Page 5 Bridge piers of different height constructed by hydraulic climbing system RCS with VARIO Makhida Bridge, Kota – Page 8 Dear Readers, We are glad to present before you the 2018 edition of Geographical presence and ability to service faster has been PERI Scope. With over 70 subsidiaries and over 140 logistics one of our core strength for Indian market. We believe in centers PERI continues to set standards in the industry as delighting customer for every opportunity we gain to serve. world’s largest manufacturer and supplier of formwork and We continue to expand our presence with offi ces in scaffolding system. PERI India celebrates its successful Mumbai, Delhi, Chennai, Bengaluru and Kolkata and resident journey over a decade and continues to built a strong engineer in other metro and tier II cities. Our state of the customer base by offering distinct solutions for every art new stockyard facility at Bhiwandi which is expanded construction need. fi ve times the earlier facility is another banchmark in the formwork and scaffolding industry. New stockyard facility With rapid urbanization, more and more high rise structures is equipped with experince center, dedicated assembly area and infrastructure development will be seen across India. and training facility other than huge storage space. With implementation of RERA and Government impetus on infrastructure, there is streamlining in construction I once again express my deepest gratitude to all our estimed methodology and rush to complete project in time. Modern stake holders for your continued support and promise that construction demands technologies that are faster, safer PERI will always be your trusted partner for all your form- and more innovative. work and scaffolding needs. For nearly 50 years, PERI products and systems have successfully proved in the market globally. Given its strong background, PERI India has expanded its foot prints across all construction sectors. With landmark projects such as Mahatma Mandir, Statue of Unity, ITPO, Surat Diamond Bourse, Bengaluru Metro and Hyderabad Metro using state of art formwork and scaffolding system, we have proved Mr. Raj Lakhani our mettle in delivering customized solutions for every Managing Director complex need, and in most cost effective manner. PERI (India) Pvt Ltd Title photo: Statue of Unity, Sadhu Bet, Near Sardar Sarovar Dam, Gujarat 2 PERI DUO The lightweight formwork for universal application Lightweight Universal application Quick and silent assembly Ease of handling at site: < 20 kg/m2 4 in 1 – walls, rafts, columns and slabs All components assembled by hand DUO, a universal application formwork ensures high productivity and reduces free, develop no moisture expansion system (single system for walls, requirement for skilled labor at site. and do not rust. foundations, columns and slabs) is the latest innovation in formwork industry Being a lightweight formwork system, All these features make the DUO in India. It is seen as a potential it is crane independent and has formwork system very benefi cial when replacement for the conventional intuitive application. The formwork compared to conventional formwork formwork. Ergonomic in all aspects, is manufactured from robust techno systems, as they not only enhance it offers time and labor cost saving, polymer and offers virtually tool-free the life of the product but also ensure along with high fl exibility. The system assembly. Techno polymers are shrink maximum repetition. PERI DUO received Best Innovation Machine award during bauma CONEXPO India 2016 3 Formwork and scaffolding solution for the largest diamond bourse with PERI UP MI, MULTIFLEX and DUO Surat Diamond Bourse, Surat Surat Diamond Bourse, a company Retaining wall of 4.05 m height and Contractor by diamond barons has established a 90 m length was constructed with PSP Projects Ltd Field Service new bourse at Surat, Gujarat. The hub PERI DUO formwork system in one PERI India will have 22 iconic and interconnected pour. Different column size from buildings of more than 15 fl oors and 0.60 m to 1.20 m width, height of house more than 10,000 offi ces. 4.05 m and shear wall are also con- Once constructed, it will be world's structed with DUO formwork system. largest diamond bourse. 10,000 m² of DUO formwork with Mr. P S Patel, Managing Director: PSP projects was awarded fi rst phase 4.05 m height was supplied for walls, “With PERI, we have already of this iconic project with 9 towers. columns and retaining walls. More realized numerous projects and than 15,000 m² of MULTIFLEX system know the solution capability as PERI provided complete formwork was offered for slab and beams. well as high standard of service. solution with innovative PERI UP MI PERI UP MI shoring system of more For this prestigious project, the shoring application with MULTIFLEX than 7,000 m² area is used for con- formwork solution was perfect in for slab and DUO for walls and structing slabs for the project. Beam all respects – it provided our site columns. thickness of up to 1.50 m was casted personnel with a high level of with PERI UP MI. The shoring solution safety, was easy to install as well was done with MULTIFLEX. as being cost eff ective.” 4 Unique light weight formwork solution for high columns of largest convention center ITPO (Indian Trade Promotion Organization) Complex, Pragati Maidan, Delhi Mr. Rajarshi SenGupta, Redevelopment of ITPO was not available at every Assitant General Manager (Indian Trade Promotion section of the site. Hence, & Regional HOD Organization) complex with formwork solution has to be (Formwork Methods & Planning): integrated exhibition and crane free. PERI provided “Casting of 30 m tall free standing convention center is con- solution with DUO formwork RCC columns was critical and structed at Pragati Maidan, system for columns, shear challenging from every technical Delhi. Government of India walls and retaining walls perspective. The light weight plans to host the fl agship and SKYDECK formwork PERI DUO formwork enabled easy Contractor Auto expo and other mega for slabs with fl oor to fl oor handling at all heights without Shapoorji Pallonji events like G20 summit once height more than 5.00 m. & Co Ltd any crane dependency. Also thanks Field Service the property is developed. Column height upto 30 m to PERI for the very helpful site PERI India was casted with PERI DUO execution support towards facilitat- Overall project was planned formwork system. Each ing faster construction of this iconic to be completed in 20 months pour was casted with mega project.” time and the client has 4.05 m shuttering height. specifi c requirement for light DUO column formwork weight modular formwork system ensured faster system. Also tower crane cycle time for the project. PERI UP MI Modular shoring and scaff olding system for every application PERI UP MI is an innovative solution among the steel scaffolding systems and stands for quick and simple assem- bly. It is adaptable to suit all geometries and applications like facade scaffolding, shoring towers and access scaffolding. PERI UP MI is a modular and fl exible system with gravity lock technology which allows easy and safe assembly. Assembly of the system takes place virtually without couplers whilst the self-locking system reduces assembly time. 5 RCS climbing system for luxury development of hotel and residences of Colombo ITC Colombo One, Sri Lanka Contractor International construction consortium Field Service PERI India Mr. Deeptha Liyanage, Deputy General Manager “It was our fi rst experience in Sri Lanka to work with PERI where we used PERI RCS climbing formwork system and LIWA wall formwork systems for our project. During the design stage PERI has given us their extensive expertise on designing the sys- tem for the project. The ACS self-climbing system for the boom placer arrange- ment allowed us to meet the project’s schedule demands and tight tolerances. The main advantage that we receive is the time saving, labour cost reduction Located on the coast of Colombo, Sri track project with timeline of 18 months. and better fi nish of the concrete work. Lanka, ITC Colombo One Hotel and The client wanted to complete the project Furthermore, it is also important to note Residences is a new luxury develop- without compromising on safety, qua- the high quality of the materials which ment of 50 stories in the heart of the lity and time. PERI provided complete we see no any hindrance of using same capital city. Drawing inspiration from solution for core wall, columns and materials for another few projects thus, the rich architectural history of Sri shear wall to adhere project timelines it gives high return on the investment Lanka, the ITC Colombo One Hotel and and budget. Solution with system we made on the PERI materials.” Residences provides a contemporary formwork carrying boom placer was luxury experience, while incorporating provided for the fi rst time in Sri Lanka. elements of local Sri Lankan architec- Boom Placer was attached with ture and vernacular practices. ICC PERI ACS system, and ACS system (International construction consortium) was carrying 15 metric ton weight of was looking for fast and economical boom placer without crane that saved solution to meet their budget and huge time in lifting the boom placer construction schedule. It was a fast separately. SCS climbing formwork solution for core areas of IT park Rupa Renaissance, Navi Mumbai Rupa Renaissance has come up with Contractor three building project in Navi Mumbai. Rupa Renaissance Field Service It consists of 5 star hotel, 31 storey IT PERI India park & service apartment with 5 star amenities.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us