Proposed Main Modifications 2018 Habitats Regulations Assessment
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Peterborough's Green Infrastructure & Biodiversity Supplementary
Peterborough’s Green Infrastructure & Biodiversity Supplementary Planning Document Positive Planning for the Natural Environment Consultation Draft January 2018 297 Preface How to make comments on this Supplementary Planning Document (SPD) We welcome your comments and views on the content of this draft SPD. It is being made available for a xxxx week public consultation. The consultation starts at on XX 2018 and closes on XX xxx 2018. The SPD can be viewed at www.peterborough.gov.uk/LocalPlan.There are several ways that you can comment on the SPD. Comments can be made by email to: [email protected] or by post to: Peterborough Green Infrastructure and Biodiversity Draft SPD Consultation Sustainable Growth Strategy Peterborough City Council Town Hall Bridge Street Peterborough PE1 1HF All responses must be received by XX xxxx 2018. All comments received will be taken into consideration by the council before a final SPD is adopted later in 2018. 2 298 Contents 1 Introduction 4 Purpose, Status, Structure and Content of the SPD 4 Collaborative working 4 Definitions 5 Benefits of GI 5 Who should think about GI & Biodiversity 7 2 Setting the Scene 8 Background to developing the SPD 8 Policy and Legislation 8 3 Peterborough's Approach to Green Infrastructure and Biodiversity 11 Current Situation 11 Vision 12 Key GI Focus Areas 14 4 Making It Happen - GI Delivery 23 Priority GI Projects 23 Governance 23 Funding 23 5 Integrating GI and Biodiversity with Sustainable Development 24 Recommended Approach to Biodiversity for all Planning -
Draft Whittlesey Neighbourhood Plan This Determination Statement
24 August 2021 Strategic Environmental Assessment Determination Statement: Draft Whittlesey Neighbourhood Plan This determination statement has been produced by Fenland District Council (FDC) as “responsible authority”, to meet the requirements of Regulation 9 of the Environmental Assessment of Plans and Programmes Regulations 2004. This Determination Statement forms a Submission Document for the purposes of neighbourhood planning, as required by The Neighbourhood Planning (General) Regulations 2012 (as amended) (reg. 15(e)(ii)). A Screening Assessment was undertaken by FDC during the preparation of the draft Whittlesey Neighbourhood Plan. As part of this assessment, FDC consulted the statutory bodies. The SEA Screening Report follows this Determination Statement. The Screening Report examines the strategic policy and environmental context relevant to Whittlesey, and presents the findings of the screening assessment. The report identifies that the draft Whittlesey Neighbourhood Plan does not seek to increase the overall quantum of growth beyond that which has already been permitted through the planning system. Other policies generally accord with the adopted Local Plan, the potential environmental effects of which were duly assessed through the plan-making process. The Screening Report was sent to consultation bodies for comment (13 July to 23 August 2021). Responses were received from Environment Agency, Historic England and Natural England. Through its response to the draft Screening Report consultation, Historic England concurred with the Council that the preparation of a Strategic Environmental Assessment is not required. Natural England confirmed it agrees with the report’s conclusions that the Whittlesey Neighbourhood Plan would not be likely to result in a significant effect on any European Site, either alone or in combination and therefore no further assessment work is required. -
Cambridgeshire ‘Flood & Water Supplementary Planning Document (SPD)
Cambridgeshire ‘Flood & Water Supplementary Planning Document (SPD) Habitats Regulations Assessment Cambridgeshire County Council, Cambridge City Council, East Cambridgeshire District Council, Fenland District Council, Huntingdonshire District Council, and South Cambridgeshire District Council August 2015 1 The need for an assessment The Cambridgeshire ‘Flood and Water’ Supplementary Planning Document (SPD) is being developed to provide guidance on flood risk and water management planning matters across Cambridgeshire. The local planning authorities (LPAs) for Cambridge City Council, East Cambridgeshire District Council, Fenland District Council, Huntingdonshire District Council and South Cambridgeshire District Council are producing this guidance jointly with Cambridgeshire County Council to provide a ‘countywide’ approach to development, specifically on flooding and water management (e.g. SuDS). All LPAs are committed to adopting the SPD following public consultation of the document. The SPD is subject to public consultation, which will be carried out during September and October 2015. It has been identified that an assessment is required in accordance with the Habitats Directive 92/43/EEC and Habitats Regulations 1994. These require a Habitats Regulations Assessment to be carried out for the SPD in order to determine any likely significant effects that it might have on the integrity of European nature conservation sites. These are designated as either Special Areas of Conservation (SACs) or Special Protection Areas (SPAs). Collectively the sites form part of a European network of protected areas known as Natura 2000, and Ramsar sites. The government requires that Ramsar sites are afforded the same level of protection as European sites. The sites in Cambridgeshire are set out in Appendix A. Advice from Natural England, following comments on an initial draft of this document, has been used to inform this assessment. -
App C Corridor Assessment PAS.Pdf
England's Economic Heartland ASSESSMENT OF STRATEGIC CORRIDORS Appendix C to the ISA JUNE 2020 PUBLIC England's Economic Heartland ASSESSMENT OF STRATEGIC CORRIDORS Appendix C to the ISA TYPE OF DOCUMENT (VERSION) PUBLIC PROJECT NO. 70068182 DATE: JUNE 2020 WSP The Forum Barnfield Road Exeter, Devon EX1 1QR Phone: +44 1392 229 700 Fax: +44 1392 229 701 WSP.com PUBLIC QUALITY CONTROL Issue/revision First issue Revision 1 Revision 2 Revision 3 Revision 4 Remarks Sample Draft Draft For client Final Review Final for review Consultation Date April 2020 May 2020 May 2020 May 2020 June 2020 Prepared by Katie Dean Katie Dean Katie Dean Katie Dean Katie Dean Signature Checked by Sally Newbold Sophie Rice Sophie Rice Sophie Rice Sally Newbold Signature Authorised by Sally Newbold Sally Newbold Sally Newbold Ursula Stevenson Signature Project number 70068182 70068182 70068182 70068182 70068182 Report number 01 02 03 04 05 File reference ASSESSMENT OF STRATEGIC CORRIDORS PUBLIC | WSP Project No.: 70068182 June 2020 England's Economic Heartland CONTENTS 1 INTRODUCTION 8 1.1 INTRODUCTION 8 1.2 CORRIDOR SHORTLIST 8 1.3 ASSESSMENT APPROACH 9 2 ASSESSMENT FINDINGS 16 2.1 INTRODUCTION 16 2.2 OXFORDSHIRE - MILTON KEYNES CONNECTIVITY STUDY AREA 18 OVERVIEW 18 KEY SUSTAINABILITY FEATURES 19 2.3 NORTH - SOUTH CONNECTIONS (A1 REGION) 20 OVERVIEW 20 KEY SUSTAINABILITY FEATURES 21 2.4 LUTON – BEDFORD – NORTHAMPTONSHIRE 22 OVERVIEW 22 KEY SUSTAINABILITY FEATURES 23 2.5 OXFORD TO SWINDON/SOUTH WEST 24 OVERVIEW 24 KEY SUSTAINABILITY FEATURES 25 2.6 (LONDON) - BUCKINGHAMSHIRE-MILTON -
(Public Pack)Agenda Document for Cabinet, 20/04/2017 19:00
A meeting of the CABINET will be held in CIVIC SUITE 0.1A, PATHFINDER HOUSE, ST MARY'S STREET, HUNTINGDON, PE29 3TN on THURSDAY, 20 APRIL 2017 at 7:00 PM and you are requested to attend for the transaction of the following business:- Contact (01480) APOLOGIES 1. MINUTES (Pages 5 - 8) To approve as a correct record the Minutes of the meeting held on A Roberts 16th March 2017. 388015 2. MEMBERS' INTERESTS To receive from Members declarations as to disclosable pecuniary and other interests in relation to any Agenda item. 3. HUNTINGDONSHIRE LOCAL PLAN TO 2036 QUARTERLY UPDATE AND INFRASTRUCTURE PLANNING UPDATE (Pages 9 - 18) To consider a report by the Head of Development on progress of the C Kerr Local Plan preparation and on the main elements of the evidence 388430 base currently under preparation. 4. CAMBRIDGESHIRE FLOOD AND WATER SUPPLEMENTARY PLANNING DOCUMENT (Pages 19 - 284) To consider a report by the Planning Service Manager to which is J Campbell attached the draft Cambridgeshire Flood and Water Supplementary 388432 Planning Document. 5. A428 BLACK CAT TO CAXTON GIBBET IMPROVEMENTS (Pages 285 - 294) To consider a report by the Head of Development on the proposed C Kerr upgrading of the A428 Black Cat to Caxton Gibbet. 388430 S Bell 388387 6. FINDINGS OF THE CCTV TASK AND FINISH GROUP (Pages 295 - 300) To consider a report by the Overview and Scrutiny Panel A Green (Communities and Environment) on the findings of a study on CCTV. 388008 7. STRATEGIC REVIEW OF PARKING - PROJECT OVERVIEW (Pages 301 - 310) To consider a report by the Head of Operations on the terms of the G McDowell Strategic Review of Parking. -
Cambridgeshire Local Transport Plan 2011-2031
Cambridgeshire Local Transport Plan 2011-2031 Policies and Strategy July 2015 Graham Hughes Executive Director, Economy, Transport and Environment Cambridgeshire County Council Shire Hall Castle Hill Cambridge CB3 0AP www.cambridgeshire.gov.uk Third Cambridgeshire Local Transport Plan 2011-2031 LTP: Policies and Strategy document version 1.2.1, July 2015 For information on the review and update of this document since it was first adopted in March 2011, see the LTP: Change Log at http://www.cambridgeshire.gov.uk/ltp. Third Cambridgeshire LTP 2011-2031: Policies and Strategy July 2015 Contents EXECUTIVE SUMMARY III 1. INTRODUCTION 1-1 THE SCOPE OF THE LTP 1-2 THE ISSUES 1-7 THE STRATEGY 1-11 THE LTP SUITE OF DOCUMENTS 1-11 2. OBJECTIVES, INDICATORS AND TARGETS 2-1 CAMBRIDGESHIRE LTP OBJECTIVES 2-1 PERFORMANCE MANAGEMENT AND LOCAL TRANSPORT PLAN INDICATORS 2-4 ROAD SAFETY INDICATORS 2-6 TRENDS IN TRAVEL INDICATORS 2-9 ENVIRONMENT INDICATORS 2-15 ROAD AND FOOTWAY CONDITION INDICATORS 2-18 3. PROBLEMS AND CHALLENGES 3-1 INTRODUCTION 3-1 LTP OBJECTIVES 1 AND 4 3-2 LTP OBJECTIVE 2 3-7 LTP OBJECTIVE 3 3-10 LTP OBJECTIVE 5 3-13 CONCLUSION 3-18 4. STRATEGY – MEETING THE CHALLENGES 4-1 INTRODUCTION 4-1 OUR OVERARCHING STRATEGY 4-1 CHALLENGE 1: IMPROVING THE RELIABILITY OF JOURNEY TIMES BY MANAGING DEMAND FOR ROAD SPACE, WHERE APPROPRIATE AND MAXIMISING CAPACITY AND EFFICIENCY OF THE EXISTING NETWORK 4-7 CHALLENGE 2: REDUCING THE LENGTH OF THE COMMUTE AND THE NEED TO TRAVEL BY PRIVATE CAR 4-22 CHALLENGE 3: MAKING SUSTAINABLE MODES OF TRANSPORT A -
A14 Cambridge to Huntingdon Improvement Scheme Environmental Statement Appendices Appendix 8.1: Air Quality
A14 Cambridge to Huntingdon improvement scheme Environmental Statement Appendices Appendix 8.1: Air quality data Date: December 2014 6.3 Page left intentionally blank. A14 Cambridge to Huntingdon improvement scheme Environmental Statement Appendices 1 Planning policy 1 1.1 Introduction 1 1.2 National Planning Practice Guidance (NPPG) flowchart 1 1.3 Local planning policies relevant to air quality 2 2 Operational assessment methodology 7 2.1 Introduction 7 2.2 Receptors 7 3 Meteorological data 9 4 Baseline data 15 4.1 Introduction 15 4.2 Continuous monitoring data 15 4.3 Diffusion tube monitoring data 17 4.4 Sites used for verification 27 4.5 J2A scheme specific monitoring 51 5 Diffusion tube bias adjustment factors and annualisation 54 5.1 Introduction 54 5.2 Factor from local co-location studies 54 5.3 Discussion of choice of factor to use 56 5.4 Short-term to long-term data adjustment 56 6 Background pollution concentrations 60 7 Operational phase impacts 62 7.1 Introduction 62 7.2 Model verification 62 7.3 Modelled concentrations 69 8 Compliance with EU limit values 126 9 Bibliography 127 f 6.3 December 2014 i A14 Cambridge to Huntingdon improvement Environmental Statement Appendices scheme 1 Planning policy 1.1 Introduction 1.1.1 This section provides the National Planning Practice Guidance NPPG flowchart (Box 1) and details of local planning policies which are used to inform significance as described in Chapter 8. 1.2 National Planning Practice Guidance (NPPG) flowchart Box 1: NPPG flow chart 6.3 December 2014 1 A14 Cambridge to -
88. Bedfordshire and Cambridgeshire Claylands Area Profile: Supporting Documents
National Character 88. Bedfordshire and Cambridgeshire Claylands Area profile: Supporting documents www.naturalengland.org.uk 1 National Character 88. Bedfordshire and Cambridgeshire Claylands Area profile: Supporting documents Introduction National Character Areas map As part of Natural England’s responsibilities as set out in the Natural Environment White Paper,1 Biodiversity 20202 and the European Landscape Convention,3 we are revising profiles for England’s 159 National Character Areas North (NCAs). These are areas that share similar landscape characteristics, and which East follow natural lines in the landscape rather than administrative boundaries, making them a good decision-making framework for the natural environment. Yorkshire & The North Humber NCA profiles are guidance documents which can help communities to inform West their decision-making about the places that they live in and care for. The information they contain will support the planning of conservation initiatives at a East landscape scale, inform the delivery of Nature Improvement Areas and encourage Midlands broader partnership working through Local Nature Partnerships. The profiles will West also help to inform choices about how land is managed and can change. Midlands East of Each profile includes a description of the natural and cultural features England that shape our landscapes, how the landscape has changed over time, the current key drivers for ongoing change, and a broad analysis of each London area’s characteristics and ecosystem services. Statements of Environmental South East Opportunity (SEOs) are suggested, which draw on this integrated information. South West The SEOs offer guidance on the critical issues, which could help to achieve sustainable growth and a more secure environmental future. -
Fens Biosphere: Map Justification, Full Report November 2019
Text to accompany Fens Biosphere Steering Group’s candidate map submission to UK Man & Biosphere Committee. Prepared in advance of the UK MAB Committee meeting to take place on 6 November 2019 The Fens Biosphere is being developed within the 'Water Works' project which is funded through the People's Postcode Lottery's Dream Fund (Lead partner project ‘Water Works’: Wildlife Trust for Bedfordshire, Cambridgeshire and Northamptonshire; Lead partner Biosphere development: Cambridgeshire ACRE). This document has been prepared with input from the Fens Biosphere Steering Group. Last updated: Cambridgeshire ACRE (MN), 29 October 2019 – V.3 About this document: This document has been prepared to accompany the preliminary map for the proposed Fens Biosphere reserve and its internal zonation. The key aim is to have this (draft) map approved by UK Man and Biosphere Committee (UK MAB) as a candidate Biosphere map, a key milestone in the process to nominate part of the Fens area as a new UK Biosphere reserve. This document sets out the Fens Biosphere partnership’s thinking behind the map creation in order to satisfy key UNESCO criteria around the geographical definition of a Fens Biosphere, including location and delimitation of the required three-layered zonation of the biosphere reserve i.e. core area, buffer zone and transition area. A Fens Biosphere proposal – timeline to date Since 2017 the partners involved in the Fens Biosphere Steering Group have been engaged in discussions with the UK Man and Biosphere Committee (UK MAB) and 1 the UNESCO MAB Secretariat in Paris about the development of a candidate Fens Biosphere map. -
(Restriction on Use of Lead Shot) (England) Regulations 1999
STATUTORY INSTRUMENTS 1999 No. 2170 ENVIRONMENTAL PROTECTION, ENGLAND The Environmental Protection (Restriction on Use of Lead Shot) (England) Regulations 1999 Made ---- 29th July 1999 Laid before Parliament 3rd August 1999 Coming into force 1st September 1999 The Secretary of State– having consulted the committee established(a) under section 140(5) of the Environmental Protection Act 1990(b); having published a notice in the London Gazette as required by section 140(6)(b) of that Act; having considered the representations made to him in accordance with that notice; considering it appropriate to make these Regulations for the purpose of preventing the substance or articles specified in them from causing pollution of the environment and harm to the health of animals; in exercise of the powers conferred on him by section 140(c) of the Environmental Protection Act 1990, and of all other powers enabling him in that behalf, hereby makes the following Regulations: Citation, commencement and extent 1.—(1) These Regulations may be cited as the Environmental Protection (Restriction on Use of Lead Shot) (England) Regulations 1999 and shall come into force on 1st September 1999. (2) These Regulations shall extend to England only. Interpretation 2. In these Regulations– “authorised person” means a person authorised under regulation 4(1) below; “lead shot” means any shot made of– (a) lead, or (b) any alloy or compound of lead where lead comprises more than 1% of that alloy or compound; “premises” includes any land, vehicle or vessel, but does not include premises used for residential purposes; “shot gun” means a smooth-bore gun but does not include any shot gun chambered for 9 millimetre or smaller rim-fire cartridges; (a) S.I. -
Local Environment Agency Plan
(HA-Anytia*? LGAfc to x 3 local environment agency plan BEDFORD OUSE (Lower Reaches) ; EARITH LEAP DECEMBER 1999 LETCHWORTH HITCHIN KEY FACTS AND STATISTICS Total Area: 1556 km2 Ground Levels: Min level: 2 m AOD Max level: 184 m AOD ADMINISTRATIVE DETAILS Environment Agency Organisation: Anglian Region (Central Area) Area Office at Brampton and Catchment (South) Office at Bedford. M a in T o w n s County Councils: (% of LEAP area) District & Borough Councils: Bedford Bedfordshire (47%) Bedford BC Biggleswade Cambridgeshire (40%) East Northamptonshire DC Flitwick Hertfordshire (10%) Huntingdonshire DC Letchworth Northamptonshire (3%) Mid-Bedfordshire DC Hitchin North Hertfordshire DC Huntingdon South Bedfordshire DC St Ives South Cambridgeshire DC St Neots Stevenage BC Water Utility Companies: (% of LEAP area) Internal Drainage Boards: Anglian Water Services Ltd (77%) Alconbury & Ellington Cambridge Water Company (12%) Bedfordshire & Ivel Three Valleys Water Company (11 %) Bluntisham Houghton & Wyton In addition, there are a number of properties which receive Over & Willingham no mains supply and rely on private supply boreholes Swavesey Flood Protection Navigation Length of statutory main rivers: 221 km Length of navigable rivers: 66.6 km Embanked main rivers: 32 km Area protected by embanked channel: 34.2 km2 Conservation Area of natural floodplain: 59.7 krrV Sites of Special Scientific Interest (SSSIs): 50 Fisheries Water dependent SSSIs: 26 Candidate Special Areas of Conservation Game (trout) fishery: 3 km (cSACs): 1 Cyprinid (coarse) -
A47 Wansford to Sutton EIA Scoping Report
A47 Wansford to Sutton EIA Scoping Report PINS project reference number: TR010039 Highways England document reference: HEWNSFRD-MMSJV-EGN-000-RP-LX-00002 Date: February 2018 Version: P02 A47 Wansford to Sutton Document Control Document Title EIA Scoping Report Originator Ben O’Hickey, Mott MacDonald Sweco Joint Venture Checker Jacqueline Fookes, Mott MacDonald Sweco Joint Venture Approver Giles Hewson, Mott MacDonald Sweco Joint Venture Authoriser Stefan Craciun, Mott MacDonald Sweco Joint Venture Distribution The Planning Inspectorate Document Status Final Revision History Version Date Description Author P01 December 2017 First Draft B. O’Hickey P02 February 2018 Final B. O’Hickey Reviewer List Name Role Jose Antonio Garvi- Senior Environmental Advisor, Highways England Serrano Alan Nettey Development Consent Order and Statutory Process Manager, Highways England Aaron Douglas Project Manager, Highways England Gavin Williams Geotechnical Advisor, Highways England Approvals Name Signature Title Date of Version Issue Guy Lewis Programme Leader The original format of this document is copyright to the Highways England. EIA Scoping Report Page 2 of 177 A47 Wansford to Sutton Table of Contents 1 Introduction 7 1.1 Purpose of the Report 7 1.2 Proposed Scheme Location 7 1.3 Proposed Scheme Overview 8 1.4 Approach to EIA Scoping 8 1.5 Legislative Context and the need for Environmental Impact Assessment 9 1.6 Approach to Assessment 10 1.7 Population and Human Health 12 1.8 Major Accidents and Disasters 13 1.9 Heat and Radiation 14 1.10 Transboundary