Peterborough's Green Infrastructure & Biodiversity Supplementary
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Landscape Character Assessment
OUSE WASHES Landscape Character Assessment Kite aerial photography by Bill Blake Heritage Documentation THE OUSE WASHES CONTENTS 04 Introduction Annexes 05 Context Landscape character areas mapping at 06 Study area 1:25,000 08 Structure of the report Note: this is provided as a separate document 09 ‘Fen islands’ and roddons Evolution of the landscape adjacent to the Ouse Washes 010 Physical influences 020 Human influences 033 Biodiversity 035 Landscape change 040 Guidance for managing landscape change 047 Landscape character The pattern of arable fields, 048 Overview of landscape character types shelterbelts and dykes has a and landscape character areas striking geometry 052 Landscape character areas 053 i Denver 059 ii Nordelph to 10 Mile Bank 067 iii Old Croft River 076 iv. Pymoor 082 v Manea to Langwood Fen 089 vi Fen Isles 098 vii Meadland to Lower Delphs Reeds, wet meadows and wetlands at the Welney 105 viii Ouse Valley Wetlands Wildlife Trust Reserve 116 ix Ouse Washes 03 THE OUSE WASHES INTRODUCTION Introduction Context Sets the scene Objectives Purpose of the study Study area Rationale for the Landscape Partnership area boundary A unique archaeological landscape Structure of the report Kite aerial photography by Bill Blake Heritage Documentation THE OUSE WASHES INTRODUCTION Introduction Contains Ordnance Survey data © Crown copyright and database right 2013 Context Ouse Washes LP boundary Wisbech County boundary This landscape character assessment (LCA) was District boundary A Road commissioned in 2013 by Cambridgeshire ACRE Downham as part of the suite of documents required for B Road Market a Landscape Partnership (LP) Heritage Lottery Railway Nordelph Fund bid entitled ‘Ouse Washes: The Heart of River Denver the Fens.’ However, it is intended to be a stand- Water bodies alone report which describes the distinctive March Hilgay character of this part of the Fen Basin that Lincolnshire Whittlesea contains the Ouse Washes and supports the South Holland District Welney positive management of the area. -
Draft Whittlesey Neighbourhood Plan This Determination Statement
24 August 2021 Strategic Environmental Assessment Determination Statement: Draft Whittlesey Neighbourhood Plan This determination statement has been produced by Fenland District Council (FDC) as “responsible authority”, to meet the requirements of Regulation 9 of the Environmental Assessment of Plans and Programmes Regulations 2004. This Determination Statement forms a Submission Document for the purposes of neighbourhood planning, as required by The Neighbourhood Planning (General) Regulations 2012 (as amended) (reg. 15(e)(ii)). A Screening Assessment was undertaken by FDC during the preparation of the draft Whittlesey Neighbourhood Plan. As part of this assessment, FDC consulted the statutory bodies. The SEA Screening Report follows this Determination Statement. The Screening Report examines the strategic policy and environmental context relevant to Whittlesey, and presents the findings of the screening assessment. The report identifies that the draft Whittlesey Neighbourhood Plan does not seek to increase the overall quantum of growth beyond that which has already been permitted through the planning system. Other policies generally accord with the adopted Local Plan, the potential environmental effects of which were duly assessed through the plan-making process. The Screening Report was sent to consultation bodies for comment (13 July to 23 August 2021). Responses were received from Environment Agency, Historic England and Natural England. Through its response to the draft Screening Report consultation, Historic England concurred with the Council that the preparation of a Strategic Environmental Assessment is not required. Natural England confirmed it agrees with the report’s conclusions that the Whittlesey Neighbourhood Plan would not be likely to result in a significant effect on any European Site, either alone or in combination and therefore no further assessment work is required. -
Cambridgeshire ‘Flood & Water Supplementary Planning Document (SPD)
Cambridgeshire ‘Flood & Water Supplementary Planning Document (SPD) Habitats Regulations Assessment Cambridgeshire County Council, Cambridge City Council, East Cambridgeshire District Council, Fenland District Council, Huntingdonshire District Council, and South Cambridgeshire District Council August 2015 1 The need for an assessment The Cambridgeshire ‘Flood and Water’ Supplementary Planning Document (SPD) is being developed to provide guidance on flood risk and water management planning matters across Cambridgeshire. The local planning authorities (LPAs) for Cambridge City Council, East Cambridgeshire District Council, Fenland District Council, Huntingdonshire District Council and South Cambridgeshire District Council are producing this guidance jointly with Cambridgeshire County Council to provide a ‘countywide’ approach to development, specifically on flooding and water management (e.g. SuDS). All LPAs are committed to adopting the SPD following public consultation of the document. The SPD is subject to public consultation, which will be carried out during September and October 2015. It has been identified that an assessment is required in accordance with the Habitats Directive 92/43/EEC and Habitats Regulations 1994. These require a Habitats Regulations Assessment to be carried out for the SPD in order to determine any likely significant effects that it might have on the integrity of European nature conservation sites. These are designated as either Special Areas of Conservation (SACs) or Special Protection Areas (SPAs). Collectively the sites form part of a European network of protected areas known as Natura 2000, and Ramsar sites. The government requires that Ramsar sites are afforded the same level of protection as European sites. The sites in Cambridgeshire are set out in Appendix A. Advice from Natural England, following comments on an initial draft of this document, has been used to inform this assessment. -
Premises, Sites Etc Within 30 Miles of Harrington Museum Used for Military Purposes in the 20Th Century
Premises, Sites etc within 30 miles of Harrington Museum used for Military Purposes in the 20th Century The following listing attempts to identify those premises and sites that were used for military purposes during the 20th Century. The listing is very much a works in progress document so if you are aware of any other sites or premises within 30 miles of Harrington, Northamptonshire, then we would very much appreciate receiving details of them. Similarly if you spot any errors, or have further information on those premises/sites that are listed then we would be pleased to hear from you. Please use the reporting sheets at the end of this document and send or email to the Carpetbagger Aviation Museum, Sunnyvale Farm, Harrington, Northampton, NN6 9PF, [email protected] We hope that you find this document of interest. Village/ Town Name of Location / Address Distance to Period used Use Premises Museum Abthorpe SP 646 464 34.8 km World War 2 ANTI AIRCRAFT SEARCHLIGHT BATTERY Northamptonshire The site of a World War II searchlight battery. The site is known to have had a generator and Nissen huts. It was probably constructed between 1939 and 1945 but the site had been destroyed by the time of the Defence of Britain survey. Ailsworth Manor House Cambridgeshire World War 2 HOME GUARD STORE A Company of the 2nd (Peterborough) Battalion Northamptonshire Home Guard used two rooms and a cellar for a company store at the Manor House at Ailsworth Alconbury RAF Alconbury TL 211 767 44.3 km 1938 - 1995 AIRFIELD Huntingdonshire It was previously named 'RAF Abbots Ripton' from 1938 to 9 September 1942 while under RAF Bomber Command control. -
App C Corridor Assessment PAS.Pdf
England's Economic Heartland ASSESSMENT OF STRATEGIC CORRIDORS Appendix C to the ISA JUNE 2020 PUBLIC England's Economic Heartland ASSESSMENT OF STRATEGIC CORRIDORS Appendix C to the ISA TYPE OF DOCUMENT (VERSION) PUBLIC PROJECT NO. 70068182 DATE: JUNE 2020 WSP The Forum Barnfield Road Exeter, Devon EX1 1QR Phone: +44 1392 229 700 Fax: +44 1392 229 701 WSP.com PUBLIC QUALITY CONTROL Issue/revision First issue Revision 1 Revision 2 Revision 3 Revision 4 Remarks Sample Draft Draft For client Final Review Final for review Consultation Date April 2020 May 2020 May 2020 May 2020 June 2020 Prepared by Katie Dean Katie Dean Katie Dean Katie Dean Katie Dean Signature Checked by Sally Newbold Sophie Rice Sophie Rice Sophie Rice Sally Newbold Signature Authorised by Sally Newbold Sally Newbold Sally Newbold Ursula Stevenson Signature Project number 70068182 70068182 70068182 70068182 70068182 Report number 01 02 03 04 05 File reference ASSESSMENT OF STRATEGIC CORRIDORS PUBLIC | WSP Project No.: 70068182 June 2020 England's Economic Heartland CONTENTS 1 INTRODUCTION 8 1.1 INTRODUCTION 8 1.2 CORRIDOR SHORTLIST 8 1.3 ASSESSMENT APPROACH 9 2 ASSESSMENT FINDINGS 16 2.1 INTRODUCTION 16 2.2 OXFORDSHIRE - MILTON KEYNES CONNECTIVITY STUDY AREA 18 OVERVIEW 18 KEY SUSTAINABILITY FEATURES 19 2.3 NORTH - SOUTH CONNECTIONS (A1 REGION) 20 OVERVIEW 20 KEY SUSTAINABILITY FEATURES 21 2.4 LUTON – BEDFORD – NORTHAMPTONSHIRE 22 OVERVIEW 22 KEY SUSTAINABILITY FEATURES 23 2.5 OXFORD TO SWINDON/SOUTH WEST 24 OVERVIEW 24 KEY SUSTAINABILITY FEATURES 25 2.6 (LONDON) - BUCKINGHAMSHIRE-MILTON -
MEMBERS Bedfordshire Berkshire
MEMBERS The list of all members of the Southdown Sheep Society is updated monthly. Please note that due to data protection regulations only those members who have granted their permission have full information displayed. Please note also that whilst all current members are listed, not all members have stock for sale. Please contact the Southdown Sheep Society Office ([email protected] or 01986 782251) for more information Bedfordshire Drewery Rosemary, 01326 My Dream Flock Drysdale Mrs Sarah, 00977 Littlecote Hayes Sally, 01317 Horton Hush Paula, 01075 Pen Ash Mead Terry & Lesley, Holly Bar Farm, Hollingdon, 00738 Holly Bar Soulbury, Leighton Buzzard, Beds, LU7 0DN, Tel:01525 270135, Email:[email protected] Paton Anna, Tower View Farm, 2 Ravensden Road, 01037 Lawton Wilden, Bedfordshire, MK44 2QS, Tel:01234 772627, Mobile:07917 032150, Email:[email protected] Paynter H J, 00005 Broadreed Berkshire Anstie George, Glebe, Deadmore Lane, Newtown, 01152 Glebefield Newbury, Berkshire, RG20 9DL, Tel:01635 278339, Mobile:07973 394091, Email:[email protected] Backshall Robert H, 00286 Caesars Barber Matthew, 01345 Baaaber Stanley Clare & Ian, June Rose, Benson Holme, Padworth, 01006 Mousefields Nr Reading, Berkshire, RG7 4JR, Mobile:07778 766970 / 07786 708955, Email:[email protected] Buckinghamshire Aylward Veronica, 01279 Hobbs Hill Cooper B N, 00610 Glandore Geary Debbie, 01303 Petsoe Jack Joshua, 01361 Dovecote Kempthorne C & L, 01262 Turtlefields Sparke Messrs G & M, Warren Farm, Stewkley, Bucks, 01247 Northumbria LU7 0LU, Mobile: 07968 182020, Email:[email protected] Cambridgeshire Aves William A, 00994 Hill Top Dane Mr & Mrs L C, South Villa, 46 Great Fen Road, 00529 Great Fen Soham, Ely, Cambs, CB7 5UH, Tel:01353 721216, Mobile:07548 669529, Email:[email protected] Goldsworthy Esq. -
(Public Pack)Agenda Document for Cabinet, 20/04/2017 19:00
A meeting of the CABINET will be held in CIVIC SUITE 0.1A, PATHFINDER HOUSE, ST MARY'S STREET, HUNTINGDON, PE29 3TN on THURSDAY, 20 APRIL 2017 at 7:00 PM and you are requested to attend for the transaction of the following business:- Contact (01480) APOLOGIES 1. MINUTES (Pages 5 - 8) To approve as a correct record the Minutes of the meeting held on A Roberts 16th March 2017. 388015 2. MEMBERS' INTERESTS To receive from Members declarations as to disclosable pecuniary and other interests in relation to any Agenda item. 3. HUNTINGDONSHIRE LOCAL PLAN TO 2036 QUARTERLY UPDATE AND INFRASTRUCTURE PLANNING UPDATE (Pages 9 - 18) To consider a report by the Head of Development on progress of the C Kerr Local Plan preparation and on the main elements of the evidence 388430 base currently under preparation. 4. CAMBRIDGESHIRE FLOOD AND WATER SUPPLEMENTARY PLANNING DOCUMENT (Pages 19 - 284) To consider a report by the Planning Service Manager to which is J Campbell attached the draft Cambridgeshire Flood and Water Supplementary 388432 Planning Document. 5. A428 BLACK CAT TO CAXTON GIBBET IMPROVEMENTS (Pages 285 - 294) To consider a report by the Head of Development on the proposed C Kerr upgrading of the A428 Black Cat to Caxton Gibbet. 388430 S Bell 388387 6. FINDINGS OF THE CCTV TASK AND FINISH GROUP (Pages 295 - 300) To consider a report by the Overview and Scrutiny Panel A Green (Communities and Environment) on the findings of a study on CCTV. 388008 7. STRATEGIC REVIEW OF PARKING - PROJECT OVERVIEW (Pages 301 - 310) To consider a report by the Head of Operations on the terms of the G McDowell Strategic Review of Parking. -
Peterborough Flood Risk Management Strategy (FMS)
0 Peterborough Flood Risk Management Strategy (FMS) 27 1 28 Peterborough Flood Risk Management Strategy Flood Risk Management Strategy Production This document has been prepared by Peterborough City Council (the Lead Local Flood Authority) with input from the Environment Agency, Anglian Water, North Level District Internal Drainage Board, Middle Level Commissioners, Welland and Deeping Internal Drainage Board, Highway England and the Local Resilience Forum. This document has been prepared by collecting information over the last four years about flood risk in Peterborough and about the needs to build resilience against flooding. The following table sets out some of the major events that have contributed to the development of this strategy and the remaining stages required for finalisation and adoption. Stage Event Date Continuous involvement of Flood and 2010 - 2014 Water Management Partnership City Centre Flood Awareness Fair September 2011 Letters sent to all parish councils to invite September 2011 them to nominate flood wardens Issued community newsletter Spring 2012 Development of Flood and Water website April 2012 for residents and developers Evidence gathering - Thorpe Gate Residents meeting April 2012 significant community engagement Flood Awareness Fair – West Ward February 2013 Preparation of Flood and Water December 2012 – Management Supplementary Planning December 2013 Document Presentation to Scrutiny Commission for March 2013 Rural Communities Cambridgeshire Community Resilience April 2013 Event Peterborough Community Resilience -
Agenda Reports Pack
A meeting of the OVERVIEW AND SCRUTINY PANEL (SOCIAL WELL-BEING) will be held in CIVIC SUITE 0.1A, PATHFINDER HOUSE, ST MARY'S STREET, HUNTINGDON, CAMBS, PE29 3TN on TUESDAY, 5 MARCH 2013 at 7:00 PM and you are requested to attend for the transaction of the following business:- Contact (01480) APOLOGIES 1. MINUTES (Pages 1 - 6) To approve as a correct record the Minutes of the meeting of the Miss H Ali Panel held on 5th February 2013. 388006 2 Minutes. 2. MEMBERS' INTERESTS To receive from Members declarations as to disclosable pecuniary, non-disclosable pecuniary or non-pecuniary interests in relation to any Agenda Items. See Notes below. 2 Minutes. 3. NOTICE OF EXECUTIVE DECISIONS (Pages 7 - 10) A copy of the current Notice of Executive Decisions, which was Mrs H Taylor published on 20th February 2013 is attached. Members are invited to 388008 note the Decisions and to comment as appropriate on any items contained therein. 10 Minutes. 4. HINCHINGBROOKE HOSPITAL: PROGRESS AND PLANS (Pages 11 - 30) To receive an update on Hinchingbrooke Hospital’s progress and plans for the future. Mr John Pye and Dr J Challener, Non Executive Directors of Hinchingbrooke Trust Board, Ms Liz Pointing, Deputy Chief Executive of Hinchingbrooke Hospital and Mr Michael Watson, Head of Operations, Circle Healthcare, will be in attendance for this item. All Members of the Council have been invited to attend for discussion on this item. 60 Minutes. 5. HUNTINGDONSHIRE MATTERS To receive a presentation from the Corporate Team Manager on Mrs H Donnellan Huntingdonshire Matters. -
Annual Report and Accounts 2017-2018
The Wildlife Trust BCN Annual Report and Accounts 2017-2018 Some of this year’s highlights ___________________________________________________ 3 Chairman’s Introduction _______________________________________________________ 5 Strategic Report Our Five Year Plan: Better for Wildlife by 2020 _____________________________________ 6 Delivery: Wildlife Conservation __________________________________________________ 7 Delivery: Nene Valley Living Landscape _________________________________________________ 8 Delivery: Great Fen Living Landscape __________________________________________________ 10 Delivery: North Chilterns Chalk Living Landscape ________________________________________ 12 Delivery: Ouse Valley Living Landscape ________________________________________________ 13 Delivery: Living Landscapes we are maintaining & responsive on ____________________________ 14 Delivery: Beyond our living landscapes _________________________________________________ 16 Local Wildlife Sites _________________________________________________________________ 17 Planning __________________________________________________________________________ 17 Monitoring and Research ____________________________________________________________ 18 Local Environmental Records Centres __________________________________________________ 19 Land acquisition and disposal _______________________________________________________ 20 Land management for developers _____________________________________________________ 21 Reaching out - People Closer to Nature __________________________________________ -
Cambridgeshire Green Infrastructure Strategy
Cambridgeshire Green Infrastructure Strategy Page 1 of 176 June 2011 Contributors The Strategy has been shaped and informed by many partners including: The Green Infrastructure Forum Anglian Water Cambridge City Council Cambridge Past, Present and Future (formerly Cambridge Preservation Society) Cambridge Sports Lake Trust Cambridgeshire and Peterborough Biodiversity Partnership Cambridgeshire and Peterborough Environmental Record Centre Cambridgeshire County Council Cambridgeshire Horizons East Cambridgeshire District Council East of England Development Agency (EEDA) English Heritage The Environment Agency Fenland District Council Forestry Commission Farming and Wildlife Advisory Group GO-East Huntingdonshire District Council Natural England NHS Cambridgeshire Peterborough Environment City Trust Royal Society for the Protection of Birds (RSPB) South Cambridgeshire District Council The National Trust The Wildlife Trust for Bedfordshire, Cambridgeshire, Northamptonshire & Peterborough The Woodland Trust Project Group To manage the review and report to the Green Infrastructure Forum. Cambridge City Council Cambridgeshire County Council Cambridgeshire Horizons East Cambridgeshire District Council Environment Agency Fenland District Council Huntingdonshire District Council Natural England South Cambridgeshire District Council The Wildlife Trust Consultants: LDA Design Page 2 of 176 Contents 1 Executive Summary ................................................................................11 2 Background -
(Public Pack)Agenda Document for Growth, Environment And
Public Document Pack AB GROWTH, ENVIRONMENT AND RESOURCES SCRUTINY COMMITTEE WEDNESDAY 10 JANUARY 2018 7.00 PM Bourges/Viersen Room - Town Hall AGENDA Page No 1. Apologies for Absence 2. Declarations of Interest and Whipping Declarations At this point Members must declare whether they have a disclosable pecuniary interest, or other interest, in any of the items on the agenda, unless it is already entered in the register of members’ interests or is a “pending notification “ that has been disclosed to the Solicitor to the Council. Members must also declare if they are subject to their party group whip in relation to any items under consideration. 3. Minutes of Growth, Environment and Resources Scrutiny Committee 3 - 20 and Joint Scrutiny of the Budget Meetings Held on 1 November 2017 – Growth, Environment and Resources Scrutiny Committee 29 November 2017 – Joint Scrutiny of the Budget Meeting 4. Call In of any Cabinet, Cabinet Member or Key Officer Decisions The decision notice for each decision will bear the date on which it is published and will specify that the decision may then be implemented on the expiry of 3 working days after the publication of the decision (not including the date of publication), unless a request for call-in of the decision is received from any two Members of the relevant Scrutiny Committee. If a request for call-in of a decision is received, implementation of the decision remains suspended for consideration by the relevant Scrutiny Committee. There is an induction hearing loop system available in all meeting rooms. Some of the systems are infra-red operated, if you wish to use this system then please contact Paulina Ford on 01733 452508 as soon as possible.