1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 B A U E R GENERAL NOTES RENOVATION GENERAL NOTES DEFINITIONS & TERMINOLOGY A A 9. SYSTEMS: 18. PARTITIONS: 1. CONTRACTUAL OBLIGATION: THE GC SHALL COORDINATE THE LOCATION AND PARTITIONS EXTENDING TO THE STRUCTURE ABOVE SHALL BE 1. PROTECTION OF EXISTING TO REMAIN: 1. "TYPICAL": 6 1 5 THE GC SHALL ABIDE BY AND BE RESPONSIBLE FOR ALL INSTALLATION OF ALL BUILDING SYSTEMS AND EQUIPMENT. TIGHTLY SEALED. THE INTEGRITY OF RATED ASSEMBLIES AND THE CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR UNLESS NOTED OTHERWISE, MEANS IDENTICAL FOR ALL T 7 2 6 . 0 0 4 7 CONDITIONS, WHICH MATCH ORIGINAL CONDITION REQUIREMENTS STATED IN THE AIA DOCUMENT A201 - THE GC SHALL COORDINATE ALL BUILDING TRADES TO ASSURE SMOKE BARRIERS SHALL BE MAINTAINED AT CORNERS AND CARPET, FURNISHINGS, AND FINISHES IN EXISTING AREAS NOT F 7 2 6 . 4 8 9 1 INDICATED. GENERAL CONDITIONS (CURRENT ISSUE), UNLESS NOTED ALL REQUIRED CLEARANCES FOR OPERATION AND INTERSECTIONS OF LOWER PRIORITY PARTITIONS. ALL DESIGNATED FOR DEMOLITION OR NEW . THE 6 1 5 OTHERWISE. MAINTENANCE OF ALL EQUIPMENT AND SYSTEMS AS CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY HORIZONTAL AND VERTICAL FIRE AND/OR SMOKE BARRIERS, 2. "SIMILAR": REQUIRED BY CODE, THESE DOCUMENTS, OR INCLUDING ALL FLOOR STRUCTURES, SHALL BE CONTINUOUS DAMAGE CAUSED BY HIS WORK OR ANY SUBCONTRACTOR. 1 6 1 5 B IN PARTICULAR, THE CONTRACTOR SHALL MAINTAIN A DUST-FREE MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS B 2. GENERAL CONDITIONS: MANUFACTURER'S RECOMMENDATIONS ARE MET OR FROM OUTSIDE WALL TO OUTSIDE WALL, FROM ONE BARRIER ENVIRONMENT WITHIN THE MAGNET VAULT. NOTED. VERIFY DIMENSIONS AND ORIENTATION OF THE GC SHALL PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, EXCEEDED. LACK OF SPECIFIC DETAILS SHALL NOT BE AN TO ANOTHER, OR COMBINATION THEREOF. BARRIERS MUST CONDITIONS, WHICH VARY FROM TYPICAL OR SIMILAR TOOLS, UTILITIES, INSURANCE, TRANSPORTATION, AND PAY EXCUSE FOR IMPROPER INSTALLATION OF ANY MATERIAL, BE CONTINUOUS THROUGH CONCEALED SPACES AND 2. SCHEDULING CONDITION INDICATED. FOR ALL REQUIRED TAXES, PERMITS, AND SERVICES REQUIRED DEVICE, OR SYSTEM. WHERE DETAILS ARE NOT PROVIDED, THE INTERSTITIAL SPACES. SEAL COMPLETELY ALL OPENINGS WITH THE CONTRACTOR SHALL MEET WITH THE OWNER'S TO COMPLETE THE ENTIRE SCOPE OF WORK, WHETHER GC SHALL REFER TO THE PRINTED MANUFACTURER'S UL (OR OTHER TESTING AGENCY) APPROVED ASSEMBLIES AUTHORIZED REPRESENTATIVE WELL IN ADVANCE OF 3. "OPPOSITE HAND": TEMPORARY OR PERMANENT. ALL MATERIALS EXCEPT RECOMMENDATIONS FOR INSTALLATION GUIDLINES. ALL WHERE FIRE BARRIERS ARE PENETRATED OR ABUT OTHER FIRE CONSTRUCTION COMMENCEMENT TO: MEANS CONDITION IS MIRROR IMAGE OF DETAILED REFERENCED. 3 7 2 1 2 TEMPORARY FORMS ARE TO BE NEW, UNUSED AND OF THE INSTALLED SYSTEMS AND DEVICES ARE TO OPERATE QUIETLY BARRIERS, EXTERIOR WALLS, AND FLOORS ABOVE AND BELOW C C SPECIFIED QUALITY. THE GC SHALL MAINTAIN THE PROJECT AND WITHOUT EXCESSIVE VIBRATION. THIS INCLUDES BUT IS BARRIER. ALL FIRE BARRIERS ARE TO BE CONSTRUCTED A. SCHEDULE, SEQUENCE AND COORDINATE ALL WORK 4. "ALIGN": SITE IN A CLEAN AND ORDERLY FASHION. TOOLS AND NOT LIMITED TO THE FOLLOWING SYSTEMS; MECHANICAL, ACCORDING TO THE TESTING LABORATORY SPECIFICATIONS. MEANS ALIGNMENT OF SIMILAR COMPONENTS OF CONSTRUCTION (WALLS,JAMBS,ETC), WHICH ARE ADJACENT OR EQUIPMENT SHALL BE SECURED, AND ALL DEBRIS SHALL BE ELECTRICAL, LIGHTING, PLUMBING, AND TELEPHONE ALL SMOKE BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE B. MAINTAIN EXITS AND EGRESS WIDTHS REQUIRED BY THE COMPONENTS SHALL BE IN LINE WITH EACH OTHER REMOVED DAILY. THE GC SHALL MAINTAIN A VISITORS LOG. EQUIPMENT. RESISTANT CONSTRUCTION. CORRIDOR PARTITIONS, SMOKE CODES DURING ALL PHASES OF CONSTRUCTION ACROSS VOIDS. DIMENSIONS ARE NOT ADJUSTABLE UNLESS ALL VISITORS SHALL BE REQUIRED TO SIGN SUCH LOG. DATES STOP PARTITIONS, HORIZONTAL EXIT PARTITIONS, EXIT NOTED WITH PLUS/MINUS TOLERANCE. AND TIMES OF ENTERING AND EXITING THE SITE FOR ALL 10. CLEARANCES: ENCLOSURES, AND ALL FIRE RATED WALLS SHALL BE 3. CLEARANCES VISITORS SHALL BE NOTED. GC TO SECURE PROJECT SITE THE CONTRACTOR SHALL COORDINATE WITH ALL BUILDING THE CONTRACTOR SHALL VERIFY THAT NEW CEILINGS CAN BE PERMANENTLY IDENTIFIED WITH STENCILING. SUCH 5. "O.F.O.I.": D INSTALLED IN EXISTING SPACES TO CLEAR DUCTWORK AND D FROM UNAUTHORIZED ENTRY AT ALL TIMES. COORDINATE TRADES INVOLVED IN THE PROJECT FOR PREPARATION OF IDENTIFICATION SHALL BE ABOVE ANY DECORATIVE CEILING OTHER CONSTRUCTED ITEMS AND MAINTAIN FLOOR TO CEILING MEANS "OWNER FURNISHED, OWNER INSTALLED" LOCATION OF BARRICADES OR TEMPORARY FENCING WITH COMPOSITE SHOP DRAWINGS FOR EACH FLOOR TO INSURE AND IN CONCEALED SPACES. STENCILING TO BE IN RED HEIGHTS INDICATED ON DRAWINGS. IF DISCREPANCIES OCCUR THE DOCUMENTS AND OWNER. THE GC SHALL PROPER CLEARANCES FOR FIXTURES, DUCTS, CEILINGS, ETC, LETTERS, NO LESS THAN 4" TALL WITH A RED BAND EXTENDING DUE TO EXISTING CONDITIONS, CONSULT WITH THE 6. "U.N.O.": PHOTOGRAPH THE PROJECT SITE AND EXISTING CONDITIONS WHILE MAINTAINING THE SPECIFIED CEILING HEIGHTS NOTED THE LENGTH OF THE PARTITION. STENCILED IDENTIFICATION BEFORE PROCEEDING. MEANS "UNLESS NOTED OTHERWISE" PRIOR TO THE BEGINNING OF THE WORK. PHOTOGRAPHS ON THE DRAWINGS. CLARIFY ANY CONFLICTS WITH TO READ "(X) HOUR RATED FIRE AND/OR SMOKE BARRIER, SHALL BE TAKEN OF THE PROGRESS OF THE WORK AT ARCHITECT. PROTECT ALL OPENINGS". STENCILED IDENTIFICATION TO BE 4. MATERIAL ALIGNMENT 7. "O.F.C.I.": INTERVALS NO GREATER THAN 7 CALENDAR DAYS. POSITIONED TO BE READILY VISIBLE FROM BOTH SIDES OF THE THE FINISH FACE OF MATERIAL OF NEW PARTITIONS SHALL ALIGN MENAS "OWNER FURNISHED, CONTRACTOR INSTALLED" E PHOTOGRAPHS SHALL BE IN COLOR AND IDENTIFIED BY DATE 11. LOCATIONS: BARRIER AND SUCH THAT FROM ANY ACCESS POINT AT LEAST ON BOTH SIDES OF THE PARTITION WITH THE FACE OF THE E AND TIME OF DAY. MAINTAIN DIGITAL PHOTOGRAPH FILE ON ELECTRICAL PANELS, TELEPHONE EQUIPMENT, FIRE ONE IDENTIFICATION MARKER MAY BE READ. MATERIALS ON EXISTING COLUMNS, WALLS, OR PARTITIONS, 8. REFERENCES: SITE. DELIVER COMPLETED FILE TO THE ARCHITECT UPON EXTINGUISHERS, FIRE PULLS, LIGHTS/HORNS, SMOKE UNLESS NOTED OTHERWISE. ALL REFERENCES TO CONTRACTOR SHALL REFER TO GENERAL CONTRACTOR AND/OR SUB CONTRACTOR. ALL REFERENCES RECEIPT OF USE AND OCCUPANCY PERMIT. THE GC SHALL DETECTORS, THERMOSTATS, ETC, SHALL BE LOCATED IN 19. PENETRATIONS: TO THE OWNER SHALL MEAN THE OWNER OR THE OWNER'S MAINTAIN AN ON SITE STAGING AREA AND SHALL KEEP THE ACCORDANCE WITH REQUIREMENTS OF GOVERNING PENETRATIONS OF PIPES, TUBES, CONDUIT, WIRES, CABLES, 5. AS BUILT VERIFICATION AGENT. AGENCY APPROVED CONSTRUCTION DOCUMENTS, ALL AGENCIES. ANY LOCATION NOT SPECIFICALLY SHOWN DUCTS, VENTS, CABINETS, LIGHTING, AND OTHER FIXTURES THE CONTRACTOR SHALL VERIFY DIMENSIONS OF AS-BUILT LICENSING INFORMATION, VISITORS LOG, PHOTOGRAPH FILE, SHALL BE VERIFIED WITH ARCHITECT PRIOR TO ROUGH-OUT THROUGH FIRE RATED ASSEMBLIES SHALL BE INSTALLED AND CONDITIONS, AND NOTIFY THE ARCHITECT IN WRITING OF ANY DISCREPANCIES. ALL INFORMATION SHOWN ON THE F AND AT LEAST ONE SET OF REPRODUCIBLE CONSTRUCTION AND INSTALLATION. UNLESS OTHERWISE NOTED, THE ABOVE PROTECTED TO MAINTAIN FIRE RATING. F CONSTRUCTION DOCUMENTS IS BASED ON FIELD DOCUMENTS, TO BE MARKED CONCURRENTLY WITH THE PANELS AND/OR EQUIPMENT SHALL BE FULLY RECESSED & OBSERVATIONS AND/OR THE ORIGINAL CONSTRUCTION CONSTRUCTION, TO RECORD ACTUAL CONDITIONS OF THE SHALL MAINTAIN THE INTEGRITY OF WALL FIRE RATING 20. PROTECTION OF FLOOR SURFACES: DOCUMENTS OF THE FACILITY. CONSTRUCTION AND DEVICE INSTALLATIONS. DELIVER REQUIREMENTS. CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FOR COMPLETED REPRODUCIBLE RECORD SET TO THE ARCHITECT ALL FINISHED FLOOR SURFACES, EXISTING OR NEW 6. REMOVAL SURVEY UPON COMPLETION OF THE PROJECT. GC TO REMOVE AND 12. GOVERNING AGENCIES: INCLUDING BUT NOT LIMITED TO, CERAMIC TILE, VINYL TILE, THE CONTRACTOR SHALL SURVEY AND DETERMINE THE REMOVAL DISPOSE OF ALL WASTE AND DEBRIS FROM PROJECT SITE IN A THE GC AND ALL OF HIS FORCES SHALL COMPLY WITH ALL CONCRETE, ETC., THROUGHOUT THE CONSTRUCTION OF EXISTING CONSTRUCTION, EITHER WHOLE OR IN PART, AS LEGAL MANNER. UPON COMPLETION OF THE WORK, G REGULATIONS BY ANY GOVERNING AGENCY WITH PERIOD. REQUIRED FOR THE INSTALLATION OF THE NEW MECHANICAL, G PROVIDE PROFESSIONAL CLEANING SERVICE TO CLEAN THE JURISDICTION OVER THE PROJECT OR PROJECT SITE. PLUMBING AND ELECTRICAL WORK. PROJECT SITE, INTERIOR AND EXTERIOR, FOR FINAL 21. COMMUNICATION EQUIPMENT: OCCUPANCY. 13. PERMITS/INSPECTIONS: THE GC SHALL COORDINATE THE WORK HE IS RESPONSIBLE 7. CONSTRUCTION DEFECTS: UNLESS OTHERWISE PROVIDED IN THE CONTRACT FOR WITH THE OWNER'S COMMUNICATION SERVICE THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING OF 3. GRAPHICS: DOCUMENTS, THE CONTRACTOR SHALL SECURE AND PAY FOR PROVIDERS. COORDINATE THE LOCATION OF ALL SYSTEM ANY CONSTRUCTION DEFECTS FOUND IN UNCOVERING WORK EXISTING CONSTRUCTION (PARTITIONS , DOORS, PLUMBING THE BUILDING PERMIT AND OTHER PERMITS AND CONTOLS WITH THE ELECTRICAL SYSTEM INSTALLER, THE IN THE EXISTING CONSTRUCTION. FIXTURES, CASEWORK, EQUIPMENT, ETC.) IS INDICATED ON GOVERNMENTAL FEES, LICENSES AND INSPECTIONS OWNER, AND THE ARCHITECT PRIOR TO INSTALLATION. H 8. CORRECTING DEFECTIVE WORK H THE FLOOR PLANS, WITH LINES IN A LIGHTER SHADE NECESSARY FOR PROPER EXECUTION AND COMPLETION OF OWNER'S COMMUNICATION PROVIDER TO ASSURE THAT THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING (SCREENED). EXISTING WALLS TO REMAIN ARE POCHED. NEW WORK. THE CONTRACTOR SHALL COMPLY WITH AND GIVE JUXTAPOSING OF ELECTRICAL AND DATA LINES WILL NOT DEFECTIVE WORK IN EXISTING CONSTRUCTION WITHIN THE CONSTRUCTION IS INDICATED BY FULL INTENSITY (SOLID) NOTICES REQUIRED BY LAWS, ORDINANCES, RULES, RESULT IN INTERFERENCE, STATIC, OR IN ANY OTHER WAY LINES. ITEMS TO BE DEMOLISHED ARE INDICATED IN LIGHT LIMITS OF THE CONSTRUCTION AREA. THIS INCLUDES, BUT IS REGULATIONS, AND LAWFUL ORDERS OF PUBLIC AUTHORITIES DISRUPT THE NORMAL FUNCTION OF THE NOT LIMITED TO, UNEVEN SURFACES AND FINISHES AT PLASTER FINELY DASHED LINES. BEARING ON PERFORMANCE OF THE WORK. UPON DATA/COMMUNICATION SYSTEM(S). OR GYPSUM BOARD. THE CONTRACTOR SHALL PATCH AND COMPLETION OF THE WORK, THE CONTRACTOR SHALL REPAIR SURFACES TO MATCH NEW ADJACENT SURFACES. 4. INTERPRETATION: OBTAIN A USE AND OCCUPANCY PERMIT AS REQUIRED FROM 22. SUBSTRATE PREPARATIONS: I I THE ARCHITECT IS SOLELY RESPONSIBLE FOR THE DESIGN THE GOVERNING CODES. SUBMIT ONE COPY OF THE PERMIT ALL SUBSURFACES SHALL BE PROPERLY PREPARED BEFORE 9. PIPING INTERPRETATION OF THE CONSTRUCTION DOCUMENTS. TO THE OWNER WITH FINAL APPLICATION OF PAYMENT. APPLICATION OF FINISHES. CONTRACTOR SHALL ASSUME ALL PIPING ABOVE GRADE AND INSIDE THE BUILDING REQUIRED RESPONSIBILITY FOR SUBSTRATE CONDITIONS WHERE FINISHES BY THE CONSTRUCTION DOCUMENTS SHALL BE INSTALLED IN 5. DOCUMENT DISCREPANCIES: 14. LIFESAFETY TESTING: ARE APPLIED. AREAS WHERE IT WILL BE CONCEALED. THE CONTRACTOR SHALL WHENEVER THERE ARE DISCREPANCIES IN THE CONTRACT THE GC SHALL PROVIDE THE OWNER AND THE LOCAL FIRE CONSULT WITH THE ARCHITECT AND COORDINATE WITH OTHER DOCUMENTS, THE CONTRACTOR SHALL BASE HIS BID UPON DEPARTMENT WRITTEN NOTICE 96 HOURS IN ADVANCE OF 23. DIMENSION STANDARDS: TRADES TO PROVIDE FURRING FOR PIPING INSTALLED IN FINISH AREAS. THE BETTER QUALITY OR GREATER QUANTITY OF THE MATERIAL ANY LIFE SAFETY SYSTEM SHUT DOWN OR TESTING. THE GC DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A J OR WORK DESCRIBED. SHALL TELEPHONE THE FIRE DEPARTMENT IMMEDIATELY PRIOR +/- SYMBOL. ONLY NORMAL INDUSTRY STANDARD J 10. FIXTURE REMOVAL TO SUCH TESTING OR SHUT DOWN TO INFORM THEM OF TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM REMOVE MECHANICAL AND ELECTRICAL FIXTURES AND CAP OR 6. DRAWING SCALE: THE EXACT TIME OF THE ANTICIPATED ALARM CONDITION. DIMENSIONS INDICATED. DO NOT SCALE DRAWINGS. ALL THE CONTRACTOR SHALL NOT SCALE DRAWINGS. REMOVE EXISTING BRANCH LINES AS INDICATED IN THE THE GC SHALL NOTIFY THE FIRE DEPARTMENT IMMEDIATELY DIMENSIONS NOTED AS "CLEAR" SHALL MAINTAIN THE FULL MECHANICAL AND ELECTRICAL DOCUMENTS. UPON COMPLETION OF THE TEST OR SHUT DOWN TO SPACE INDICATED WITHOUT ENCROACHMENTS. ALL 7. FIELD CONDITIONS: RE-ESTABLISH EMERGENCY RESPONSE TO ALARM VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR 11. COORDINATION: THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS AND CONDITIONS. ELEVATION AT THE BASE OF THE ITEM INDICATED, UNLESS COORDINATE PLANS FOR NEW CONSTRUCTION W/ K VERIFY FIELD CONDITIONS AND SHALL CAREFULLY COMPARE NOTED OTHERWISE. WHERE WALLS, JAMBS, OR OTHER ITEMS DEMOLITION PLANS FOR EXTENT OF REMOVAL. REMOVE ONLY K SUCH FIELD MEASUREMENTS, CONDITIONS, AND OTHER 15. DOORS: ARE NOTED TO "ALIGN", THE FACE OF ITEMS INDICATED SHALL THOSE PORTIONS OF WALLS, FLOORS, CEILINGS, ETC. INFORMATION KNOWN TO THE CONTRACTOR WITH THE UNDERCUTTING OF DOORS SHALL BE DONE IN ACCORDANCE BE IN LINE WITH EACH OTHER TO FORM A STRAIGHT LINE, FREE NECESSARY TO ACCOMMODATE NEW CONSTRUCTION. CONTRACT DOCUMENTS BEFORE COMMENCING ACTIVITIES. WITH NFPA 80 (CURRENT ISSUE) TABLE 1-11.4. OF OFFSETS OR DEVIATIONS. FIELD VERIFY ALL DIMENSIONS. ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED UNLESS NOTED OTHERWISE, DIMENSIONS ARE ACTUAL, NOT SHALL BE REPORTED TO THE ARCHITECT AT ONCE. NO 16. BLOCKING: NOMINAL, AS FOLLOWS: ALLOWANCE WILL BE MADE ON BEHALF OF THE PROVIDE METAL STUD BLOCKING IN PARTITIONS BEHIND ALL CONTRACTOR OR SUBCONTRACTORS FOR FAILURE TO VISIT L WALL HUNG OR WALL MOUNTED EQUIPMENT, MILLWORK, COLUMNS - FROM CENTER LINE TO CENTERLINE L THE SITE. SHELVING, OR OTHER DEVICES. INTERIOR PARTITIONS- FROM STUD FACE TO STUD FACE CONCRETE/ MASONRY - FROM FINISH FACE TO FINISH FACE 8. CONSTRUCTION MEANS...PROCEDURES: 17. TOXIC MATERIAL: EXTERIOR WALLS - FROM EXTERIOR FACE TO INTERIOR FINISH THE GENERAL CONTRACTOR SHALL SUPERVISE AND DIRECT THE IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE FACE OF WALL WORK, USING THE CONTRACTOR'S BEST SKILL AND MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, ATTENTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE POLYCHLORINATED BIPHENYL (PCB) OR OTHER TOXIC MATERIAL, FOR AND HAVE CONTROL OVER CONSTRUCTION MEANS, M WHICH HAS NOT BEEN RENDERED HARMLESS, THE M METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AND FOR COORDINATING ALL PORTIONS OF WORK UNDER AFFECTED, SEAL OFF THE PERIMETER, AND REPORT THE THE CONTRACT, UNLESS CONTRACT DOCUMENTS GIVE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. OTHER SPECIFIC INSTRUCTIONS CONCERNING THESE NO NEW BUILDING MATERIAL SHALL CONTAIN ASBESTOS, MATTERS. ANY WORK THAT MUST BE REMOVED OR POLYCHLORINATED BIPHENYL (PCB) OR OTHER TOXIC RELOCATED DUE TO LACK OF COORDINATION OF THE TRADES MATERIAL AS DEFINED BY STATE AND FEDERAL REGULATORY IS SOLELY THE CONTRACTOR'S RESPONSIBILITY. THE AGENCIES. N CONTRACTOR SHALL MAINTAIN A SECURE SITE THROUGHOUT N THE CONSTRUCTION PROCESS. GENERAL NOTES

Sheet Number

O O

CONSTRUCTION DOCUMENTS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

www.baueraskewarchitecture.com 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 B A U E R 3.2 CEMENTITIOUS UNDERLAYMENT B. INSTALLATION B. GRID: MATCH EXISTING. A. FLOOR UNDERLAYMENT: SELF-LEVELING CEMENTITIOUS UNDERLAYMENT 1. INSTALL DOORS TO COMPLY WITH MANUFACTURER'S WRITTEN 1. INSTALL MATERIALS AND SUSPENSION SYSTEMS IN ACCORDANCE WITH SPECIFICATIONS: AS ,16758&7,216:'0$,6$ MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS, AND ASTM C DRAWING INDEX A 3. COMPRESSIVE STRENGTH: 3500 PSI AT 28 DAYS. 2. ,167$//),5(5$7(''225672&203/<:,7+1)3$ 636. COORDINATE INSTALLATION WITH LOCATION OF MECHANICAL AND A 4. FLEXURAL STRENGTH: 900 PSI AT 28 DAYS. 3. $/,*1$1'),7'2256,1)5$0(6:,7+81,)250&/($5$1&(6$1' ELECTRICAL WORK TO ENSURE PROPER LOCATIONS AND ANCHORAGE. GN.01 GENERAL NOTES TSU INTERIOR RENOVATION SPECIFICATIONS 5. SELF-LEVELING TIME: 15 MINUTES AT 65 DEG F. %(9(/60$&+,1('2256)25+$5':$5(6($/&87685)$&(6$)7(5 2. LEVEL CEILING TO WITHIN 1/8" IN 10' IN BOTH DIRECTIONS. SCRIBE AND CUT INDEX INDEX, SYMBOLS, SPECIFICATIONS 6 1 5 6. INITIAL SET TIME: APPROXIMATELY 2 HOURS AT 65 DEG F. FITTING AND MACHINING. PANELS TO FIT ACCURATELY. MEASURE AND LAYOUT TO AVOID LESS THAN T 7 2 6 . 0 0 4 7 PART 1 - GENERAL - NOT USED 7. FINAL SET TIME: APPROXIMATELY 3 HOURS AT 65 DEG F. 4. CLEARANCES: AS FOLLOWS, UNLESS OTHERWISE INDICATED: HALF PANEL UNITS. F 7 2 6 . 4 8 9 1 a. 1/8 INCH AT HEADS, JAMBS, AND BETWEEN PAIRS OF DOORS. LANDSCAPE PART 2 - EXISTING CONDITIONS 8. TENSILE BOND STRENGTH: APPROXIMATELY 163 PSI AT 28 DAYS. 3. REMOVAL AND REINSTALLATION AT EXISTING CEILINGS: REMOVE AND 6 1 5 9. COVERAGE: 25 SQUARE FEET AT 1/4" IN THICKNESS. b. 1/8 INCH FROM BOTTOM OF DOOR TO TOP OF DECORATIVE FLOOR STORE MATERIALS FOR REUSE WHEN ALLOWED. HANDLE WITH WHITE L1.01 SITE PLAN 2.1 DEMOLITION B. PRIMER: AS RECOMMENDED BY UNDERLAYMENT MANUFACTURER. FINISH OR COVERING. GLOVES AND AVOID DAMAGING CORNERS AND EDGES. CLEAN TILES AND L1.02 SITE PLAN C. INSTALLATION: c. 1/4 INCH FROM BOTTOM OF DOOR TO TOP OF THRESHOLD. GRID SYSTEM, WHICH HAVE BEEN REMOVED. PROVIDE ADDITIONAL A. GENERAL 1 6 1 5 B 1. COMPLY WITH MANUFACTURER'S INSTRUCTIONS FOR PREPARATION d. &203/<:,7+1)3$)25),5(5$7(''2256 MATERIALS TO COMPLETE THE WORK AND TO REPLACE DAMAGED EXISTING L1.03 SITE PLAN B 1. ITEMS INDICATED TO BE REMOVED AND SALVAGED REMAIN OF SUBSTRATE AND INSTALLATION OF UNDERLAYMENT. e. REPAIR, REFINISH, OR REPLACE FACTORY-FINISHED DOORS DAMAGED MATERIALS. NEW MATERIALS SHALL MATCH EXISTING MATERIALS AS L1.04 SITE PLAN DURING INSTALLATION, AS DIRECTED BY ARCHITECT. APPROVED. OWNER'S PROPERTY. REMOVE, CLEAN, AND DELIVER TO 2. CLEAN SUBSTRATE OF DUST, DEBRIS, OIL, SEALERS, CURING L1.05 PLANTING DETAILS COMPOUNDS, PAINT, POLYMER COATINGS OR OTHER FOREIGN (BOND 2.2 HOLLOW METAL DOOR FRAMES 4. ADJUST, CLEAN, AND TOUCH-UP ALL SYSTEM COMPONENTS. OWNER'S DESIGNATED STORAGE AREA. BREAKING) MATTER. A. $16,$&21&($/)$67(1,1*681/(6627+(5:,6(,1',&$7(' 9.3 VCT FLOORING: L2.01 SITE DETAILS 2. COMPLY WITH EPA REGULATIONS AND HAULING AND DISPOSAL 3. LEAK PREVENTION: FILL CRACKS AND VOIDS WITH CALKING TO 1. PROVIDE WITHIN HOLLOW METAL FRAMES INTERNAL CONDUIT AND A. ´648$5(7,/(0$18)$&785('%<$5067521*,03(5,$/7(;785( L2.02 SITE DETAILS REGULATIONS OF AUTHORITIES HAVING JURISDICTION. PREVENT SEEPAGE DURING UNDERLAYMENT PLACEMENT. STUBOUTS TO ACCOMMODATE FUTURE ACCESS CONTROL 1. COLORS: L2.03 SITE DETAILS 4. PRIME AREA WITH A BROOM APPLICATION OF PRIMER; ALLOW TO DRY WIRING/HARDWARE. a. VCT-1: 51899 "COOL WHITE" 3 7 2 1 2 3. OWNER WILL OCCUPY PORTIONS OF BUILDING IMMEDIATELY COMPLETELY PRIOR TO PLACEMENT OF UNDERLAYMENT. REMOVE 2. STEEL SHEET THICKNESS FOR INTERIOR DOORS: 0.053 INCH. b. VCT-2: 51820 "MARINA BLUE" L2.04 SITE DETAILS ADJACENT TO SELECTIVE DEMOLITION AREA. CONDUCT ALL PUDDLES AND THICK AREAS. 3. STEEL SHEET THICKNESS FOR EXTERIOR DOORS: 0.067 INCH. c. VCT-1: 51916 "DUTCH DELFT" C C SELECTIVE DEMOLITION SO OWNER'S OPERATIONS WILL NOT PART 4 - MASONRY - NOT USED 4. FABRICATE INTERIOR FRAMES WITH MITERED OR COPED AND 2. COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. ARCHITECTURAL BE DISRUPTED. PART 5 - METALS - NOT USED CONTINUOUSLY WELDED CORNERS. INSTALL IN PROPER RELATION TO ADJACENT WORK. D1.01 DEMOLITION PLAN PART 6 - WOOD, PLASTICS AND COMPOSITES - NOT USED 5. FABRICATE EXTERIOR FRAMES FROM METALLIC-COATED STEEL SHEET, 3. PREPARE SURFACES BY CLEANING, LEVELING AND PRIMING AS REQUIRED. 4. IT IS NOT EXPECTED THAT HAZARDOUS MATERIALS WILL BE 6.1 ROUGH WITH MITERED OR COPED AND CONTINUOUSLY WELDED CORNERS. TEST ADHESIVE FOR BOND BEFORE GENERAL INSTALLATION. LEVEL TO 1/8" LS.01 LIFE SAFETY PLAN ENCOUNTERED IN THE WORK. IF MATERIALS SUSPECTED OF A. PROVIDE FIRE RETARDANT TREATED OR STANDARD LUMBER COATED 6. +$5':$5(5(,1)25&(0(17)$%5,&$7($&&25',1*72$16,6',$ IN 10' TOLERANCE. A1.01 FLOOR PLAN CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO WITH AN APPROVED FIRE RETARDANT SEALER FOR CONCEALED WOOD WITH REINFORCEMENT PLATES FROM SAME MATERIAL AS FRAMES. 4. TILE FLOORING: INSTALL TILE WITH TIGHT JOINTS AND WITH ONE-WAY A2.01 REFLECTED CEILING PLAN NOT DISTURB; IMMEDIATELY NOTIFY ARCHITECT AND OWNER. BLOCKING, NAILERS, SUPPORT FRAMING ETC. 7. FRAME ANCHORS: NOT LESS THAN 0.042 INCH THICK. PATTERN. LAYOUT TO PREVENT LESS THAN 1/2 TILE UNITS. A3.01 CASEWORK ELEVATIONS & DETAILS OWNER WILL REMOVE HAZARDOUS MATERIALS UNDER A B. PROVIDE CONSTRUCTION GRADE (OR BETTER) WOOD FRAMING. 8. PROVIDE DOOR FRAME WITH TRANSOM AS INDICATED ON DRAWINGS. 5. SHEET FLOORING: INSTALL SHEETS WITH TIGHT JOINTS AND PATTERN IN SEPARATE CONTRACT. 6.2 PRE-MANUFACTURED CASEWORK B. INSTALLATION ADJOINING AREAS RUNNING IN THE SAME DIRECTION. LAYOUT TO MINIMIZE D A. PLASTIC-LAMINATE CABINETS: CUSTOM GRADE. 1. ,167$//+2//2:0(7$/)5$0(672&203/<:,7+$16,6',$ SEAMS AS APPROVED. MECHANICAL D 2. ),5(5$7(')5$0(6,167$//$&&25',1*721)3$ 6. CLEAN, POLISH, AND PROTECT. B. EXECUTION 1. WI TYPE OF CABINET CONSTRUCTION: FLUSH OVERLAY M0.01 HVAC LEGENDS & NOTES 2. LAMINATE CLADDING: HORIZONTAL SURFACES OTHER THAN TOPS, 3. INSTALL DOORS TO PROVIDE CLEARANCES BETWEEN DOORS AND FRAMES 9.4 BASE: 1. DEMOLISH ITEMS AS INDICATED ON THE DEMOLITION DRAWING. HGS; VERTICAL SURFACES, VGS; EDGES, PVC EDGE BANDING, 0.12 $6,1',&$7(',1$16,6',$ A. ´+,*+58%%(5%/$&.0$18)$&785('%<)/(;&225$33529(' M1.01 HVAC DEMOLITION PLAN 2. MAINTAIN SERVICES/SYSTEMS INDICATED TO REMAIN AND INCH THICK; SEMIEXPOSED SURFACES, THERMOSET DECORATIVE 4. PRIME-COAT TOUCHUP: IMMEDIATELY AFTER ERECTION, SAND SMOOTH SUBSTITUTE. M2.01 HVAC FLOOR PLAN PANELS. RUSTED OR DAMAGED AREAS OF PRIME COAT AND APPLY TOUCHUP OF 1. COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS PROTECT THEM AGAINST DAMAGE DURING SELECTIVE 3. DRAWER SIDES AND BACKS: SOLID HARDWOOD. &203$7,%/($,5'5<,1*5867,1+,%,7,9(35,0(586(*$/9$1,=,1* FOR INSTALLATION. INSTALL IN PROPER RELATION TO ADJACENT WORK. DEMOLITION OPERATIONS. BEFORE PROCEEDING WITH 4. RAWER BOTTOMS: HARDWOOD PLYWOOD REPAIR PAINT FOR METALLIC COATED SURFACES. 2. INSTALL BASE ON SOLID BACKING. BOND TIGHT TO VERTICAL SUBSTRATE PLUMBING DEMOLITION, PROVIDE TEMPORARY SERVICES/SYSTEMS THAT 5. HARDWARE: MANUFACTURERS HEAVY DUTY GRADE. 2.3 DOOR HARDWARE WITH CONTINUOUS CONTACT AT HORIZONTAL AND VERTICAL SURFACES. P0.00 PLUMBING SCHEDULES & NOTES E BYPASS AREA OF SELECTIVE DEMOLITION AND THAT MAINTAIN a. BUTT HINGES: 2-3/4-INCH 5-KNUCKLE STEEL HINGES MADE FROM A. BUTTS: HAGER 3. INSTALL TO MINIMIZE JOINTS. INSTALL BASE WITH JOINTS AS FAR FROM P1.01 PLUMBING PLAN DEMOLITION E CONTINUITY OF SERVICES/SYSTEMS TO OTHER PARTS OF THE 0.095-INCH- THICK METAL, SEMICONCEALED HINGES FOR OVERLAY B. LOCKSETS AND LATCHSETS: BEST 93KS CORNERS AS PRACTICAL. P2.01 UNDERGROUND PLAN NEW WORK BUILDING. '2256%+0$$% C. TRIM: ROCKWOOD 409 4. DO NOT USE PRE-MOLDED CORNERS. b. WIRE PULLS: BACK MOUNTED, SOLID METAL 5 INCHES LONG, 2-1/2 1. PROVIDE WALL MOUNTED TYPE ON ALL DOORS. WHERE WALL TYPES ARE 5. MITER INSIDE CORNERS. P2.02 PLUMBING PLAN NEW WORK 3. LOCATE, IDENTIFY, SHUT OFF, DISCONNECT, AND CAP OFF INCHES DEEP, AND 5/16 INCH IN DIAMETER. NOT APPLICABLE, PROVIDE OVERHEAD STOPS. 6. WRAP OUTSIDE CORNERS. USE GOUGE TOOL AND HEAT GUN TO MAKE UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS c. SHELF RESTS: TWIN PIN TYPE D. STOPS AND HOLDERS: ROCKWOOK CORNERS TIGHT AND CRISP. SERVING AREAS TO BE SELECTIVELY DEMOLISHED. d. DRAWER SLIDES: HEAVY DUTY GRADE, SIDE MOUNTING, FULL E. CLOSERS: DORMA LCN 7. SCRIBE AND FIT TO DOOR FRAMES AND OTHER INTERRUPTIONS. ELECTRICAL EXTENSION. F. THRESHOLDS: GASKETS, SWEEPS AND AUTOMATIC DOOR BOTTOMSK HAGAR, 8. CLEAN, POLISH, AND PROTECT. E0.01 ELECTRICAL LEGEND & NOTES 4. PROVIDE TEMPORARY BARRICADES AND OTHER PROTECTION e. '5$:(5/2&.6%+0$$( NATIONAL GUARD. 9.5 PAINT E1.01 LIGHTING PLAN REQUIRED TO PREVENT INJURY TO PEOPLE AND DAMAGE TO f. GROMMETS FOR CABLE PASSAGE THROUGH COUNTERTOPS: G. EXIT DEVICES DORMA, VONDUPRIN A. PROVIDE PAINTS MANUFACTURED BY SHERWIN WILLIAMS OR PPG PORTER F E2.01 POWER/FIRE ALARM PLAN F ADJACENT AND FACILITIES TO REMAIN. 2-INCH OD, MOLDED-PLASTIC GROMMETS AND MATCHING PLASTIC H. FLUSH BOLTS: NOT ALLOWED. 1. PRIMARY COLOR (PT-1): SW 7012 CREAM 5. PROVIDE AND MAINTAIN SHORING, BRACING, AND STRUCTURAL CAPS WITH SLOT FOR WIRE PASSAGE. I. OVERHAED DOOR STOPS: GLYNN-JOHNSON 2. ACCENT COLORS: REFLEX BLUE (TSU BLUE) OR PALACE BLUE, PPG PORTER g. ),1,6+(6>'$5.6$7,1%521=(%+0$@>%5,*+7%5$66 J. OTHER MANUFACTURERS: HARDWARE OF THE SAME TYPES, WEIGHT AND #6497- SUPPORTS AS REQUIRED TO PRESERVE STABILITY AND %+0$@>6$7,1&+520(%+0$25%+0$@>6$7,1 FUNCTION, APPROVED BY ARCHITECT, AND AS MANUFACTURED BY THE B. GYPSUM BOARD (SATIN FINISH) PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF 67$,1/(6667((/%+0$@ FOLLOWING MANUFACTURERS MAY BE BID; EXCEPT NO SUBSTITUTIONS 1. GYPSUM BOARD PRIMER: USG SHEETROCK FIRST COAT. GRAPHIC SYMBOL LEGEND: CONSTRUCTION AND FINISHES TO REMAIN OR CONSTRUCTION B. PLASTIC-LAMINATE COUNTERTOPS (INCLUDING WALL CAP): CUSTOM UNLESS PRE-APPROVED BY THE OWNER. 2. ),567&2$73$,176:352*5((1Œ,17(5,25/$7(;35,0(5 BEING DEMOLISHED. GRADE. 2.4 GLAZING B28W600 SERIES (4 MILS WET, 1.5 MILS DRY 1. LAMINATE GRADE: HGS FOR FLAT COUNTERTOPS SPACE NAME & NUMBER 6. PROVIDE TEMPORARY WEATHER PROTECTION TO PREVENT A. +($775($7(')/2$7*/$66$670&&21',7,21$ 81&2$7('  3. 6(&21'&2$73$,176:352*5((1Œ,17(5,25/$7(;(*6+(/ OFFICE 2. AT SINK: PROVIDE MARINE GRADE PLYWOOD CORES. &/$66 &/($5 .,1')7 )8//<7(03(5(' ó´7+,&. B20W651 G WATER LEAKAGE AND DAMAGE TO STRUCTURE AND INTERIOR 3. EDGE TREATMENT: SAME AS LAMINATE CLADDING ON HORIZONTAL B. INSTALLATION: C. CONCRETE MASONRY UNITS (SEMI-GLOSS) 100 G AREAS. SURFACES. 1. COMPLY WITH COMBINED RECOMMENDATIONS OF MANUFACTURERS OF 1. ),567&2$7),567&2$76:35(35,7(Š%/2&.),//(5%:  INTERIOR ELEVATION MARKER 1: DRAWING NUMBER 7. PROTECT WALLS, CEILINGS, FLOORS, AND OTHER EXISTING C. FURRING, BLOCKING, SHIMS, AND HANGING STRIPS: GLASS, SEALANTS, GASKETS, AND OTHER GLAZING MATERIALS, UNLESS SQ FT/GAL) SHEET NUMBER FINISH WORK THAT ARE TO REMAIN. ERECT AND MAINTAIN FIRE-RETARDANT-TREATED, SOFTWOOD OR HARDWOOD LUMBER, KILN MORE STRINGENT REQUIREMENTS ARE CONTAINED IN GANA'S "GLAZING 2. 6(&21'&2$76:352*5((1Œ,17(5,25/$7(;6(0,*/266 1 DRIED TO 15 PERCENT MOISTURE CONTENT. MANUAL." B20W651 DIRECTION DUSTPROOF PARTITIONS. COVER AND PROTECT FURNITURE, D. CABINET INSTALLATION: 2. SET GLASS LITES IN EACH SERIES WITH UNIFORM PATTERN, DRAW, BOW, D. FERROUS METAL (DOOR FRAMES): A7.01 FURNISHINGS, AND EQUIPMENT THAT HAVE NOT BEEN 1. INSTALL SO DOORS AND DRAWERS ARE ACCURATELY ALIGNED. AND SIMILAR CHARACTERISTICS. 1. ),567&2$76:352,1'8675,$/352&5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

www.baueraskewarchitecture.com Humboldt Plant Schedule

Group Qty Plant Key Botanical Name Common Name Hgt Sprd. Plant Size Root Spacing Notes

Trees 3 QL Quercus lyrata Overcup Oak 12' 6' 3" cal. B&B As Shown Full, well-branched, matched Central Plant Schedule

Group Qty Plant Key Botanical Name Common Name Hgt Sprd. Plant Size Root Spacing Notes

Trees 3 AS Acer saccharum 'Green Mountain' Sugar Maple 'Green Mountain' 12' 4' 3" cal. B&B As Shown Dense, well-branched, full crown 2 QP Quercus phellos Willow Oak 12' 6' 3" cal. B&B As Shown Dense, well-branched, full crown Dresden Plant Schedule

Group Qty Plant Key Botanical Name Common Name Hgt Sprd. Plant Size Root Spacing Notes

Trees 2 QN Quercus nuttallii Nuttall Oak 10' 5' 3" cal. B&B As Shown Dense, well-branched, full crown Martin Plant Schedule

Group Qty Plant Key Botanical Name Common Name Hgt Sprd. Plant Size Root Spacing Notes

Trees 3 CC Cercis canadensis Redbud 8' 4' 2" cal. B&B As Shown Multi-branched, single-trunk spec.