Hyderabad Rail Project Seamless Commuting will be a reality soon… - City of OpportunITies Known as the land of pearls, Hyderabad - the capital city of Andhra Pradesh has emerged as the hub of IT/ITES, Biotech, Pharma and Tourism sectors. Its strategic location, multilingual and cosmopolitan culture with investment-friendly economic policies makes it an ideal destination for corporates, entrepreneurs, academicians and homemakers alike. With increasing industrial development and IT service sectors, the city is on the verge of tremendous growth in population and traffic. The government has decided to meet this superlative growth with a well-planned public transportation infrastructure through RAIL PROJECT.

L&T in Metro The prestigious task of developing this project of national importance has been awarded to Larsen & Toubro Limited (L&T) - the USD 9.8 billion engineering, technology, construction and manufacturing organization. L&T has an impressive track record of executing major metro projects in the country. This involved construction of elevated and underground metro rail corridors, , composite railway construction works including station buildings and associated systems in this sector. HYDERABAD METRO Efficient, Safe & Reliable Public Transport System

This public-private partnership project will be implemented through a special purpose vehicle (SPV) “L&T Metro Rail (Hyderabad) Limited”. To be completed in a span of five years from the Appointed date, this project will be executed on a design, build, finance, operate and transfer (DBFOT) basis. The concession period for the project is 35 years, with an entitlement of further 25 years. Metro Network

Consisting of three high density corridors, Hyderabad Metro network will cover a total distance of 71.16 km involving 66 ultra-modern station buildings with state-of-the-art depots and complete infrastructure. ¾¾ Corridor - I - LB Nagar (28.87 km - 27 stations) ¾¾ Corridor - II JBS – Falaknuma (14.78 km - 16 stations) ¾¾ Corridor - III – Shilparamam (27.51 km - 23 stations) Financial Closure

L&T Metro Rail (Hyderabad) Limited, the SPV incorporated to implement Hyderabad Metro Project has achieved financial closure for the Project. The financial closure has been achieved in a record time of 6 months and is the largest fund tie up in for a non- power infrastructure PPP project. World Class Experts

The following Consultants are already on board: ¾¾ Independent Engineer - Louis Berger ¾¾ General Consultant - AECOM Feedback Ventures Consortium ¾¾ Programme Manager - Parsons Brinckerhoff ¾¾ Design / Traffic Consultant - L&T Ramboll

ADVANTAGE OF HYDERABAD METRO

¾¾ Elevated world-class station buildings at approximately every kilometre.

¾¾ Connects major offices, retail and residential areas - The two tracks (up and down lines) pass through the arterial roads of the city

¾¾ Connects major bus stations at Miyapur, MGBS, Koti, , and Jubilee Bus Station

¾¾ Integration with existing rail terminals at , and Nampally

¾¾ Link to MMTS services at Bharatnagar, Begumpet, Khairatabad, Malakpet & Falaknuma

¾¾ Feeder bus services to stations from different areas of the city is being planned by GoAP L&T Infrastructure Development SALIENT FEATURES

Projects Limited (L&T IDPL) ¾¾ Green & Eco-friendly mode of travel – reduces L&T Infrastructure Development Projects Limited carbon emission, fuel consumption and pollution an infrastructure development arm of L&T, has ¾¾ Faster, safer and comfortable air – conditioned been developing major infrastructure projects travel with reduced travel time on public private partnership mode with the Central and State Governments in India. L&T IDPL ¾¾ Ultra-modern coaches has 50 successful projects across many sectors ¾¾ High frequency of trains- reducing waiting time to its credit. Projects developed and targeted by L&T IDPL include metrorail, railways, highways ¾¾ User-friendly stations with lifts, staircases and and expressways, bridges, seaports/terminals, facilities for the disabled airports, urban infrastructure, rope ways, water ¾¾ Parking facility at25 strategic locations along the supply projects, sanitary engineering projects, bulk route material handling projects, power transmission ¾¾ Automatic ticket vending machines – reducing utilities, gas/oil pipelines, hydel power, and non- waiting time in queues and counters conventional energy projects. Hyderabad Metro is one of the largest developmental projects and this ¾¾ Automatic Fare Collection system-hassle free entry complex project with comprehensive engineering and exit from the stations services will be executed by L&T Metro Rail ¾¾ Essential Facilities at Stations- toilets, public (Hyderabad) Limited, the special purpose vehicle address and information system, telephones. appointed for implementation of the project.

L&T Metro Rail (Hyderabad) Limited Q3, 4th Floor, Cyber Towers, HITEC city, , Hyderabad - 500 081 Tel: +91-40-6729 5500; Fax: +91-40-2312 3001 L&T Infrastructure Development Projects Limited P.B. No.979, Mount PoonamalleeRoad, Manapakkam, Chennai - 600089 Tel: +91-44-2252 6060; Fax: +91-44-2252 8724; www.Lntecc.com

The perspective images published in this folder are purely conceptual only.