Ceig Inspects Hyderabad Metro Rail Stations from Panjagutta to Nampally L&T Metro Rail (Hyderabad) Limited Hyderabad Metro Rail Administrative Building Hyderabad Metro Rail Depot, Uppal Main Road Uppal, Hyderabad – 500039 Press Release Issued by LTMRHL Corporate Communications Department LTMRHL/CCD/PR/80/10052018 CEIG INSPECTS HYDERABAD METRO RAIL STATIONS FROM PANJAGUTTA TO NAMPALLY L&T Metro Rail (Hyderabad) Limited is happy to announce that the Chief Electrical Inspector to Government of India (CEIG) for Hyderabad Metro Rail Project, Mr. DVS Raju has inspected 33kV and 415V Indoor Substations completed in six Hyderabad Metro Rail stations from Panjagutta, Irrumanzil, Khairtabad, Lakdi-ka-pul, Assembly and Nampally today. These stations are part of Corridor-I (Miyapur to L B Nagar) of the Hyderabad Metro Rail Project. This inspection is a part of the process for according the sanction for Energisation of stations which will facilitate the testing & commissioning activities of Railway Systems like Signalling, Tele Communication and Automatic Fare Collection etc. in this section. The above Metro Rail stations receive power at 33 kV voltage from 132/33/25 kV Receiving Substation (RSS) located at MGBS and Miyapur. After the inspection Mr. DVS Raju, CEIG said, “Commissioning of these Aux. Substations in Metro stations will further boost the progress and hasten up the completion of Metro Rail section between Ameerpet and LB Nagar of Corridor-I.” Mr. KVB Reddy, MD & CEO, LTMRHL stated, “This is an important development for Corridor-I. The commissioning of these six stations (Panjagutta to Nampally) auxiliary power supply is made available from Ameerpet to L B Nagar covering entire Corridor-I.” Mr. DVS Raju, CEIG, along with Mr. P. Srinivasa Murthy, Head - Electrical & MEP, LTMRHL, Mr. H S Ananda, Dy. Chief Electrical Engineer, HMRL & AECOM. About L&T Metro Rail (Hyderabad) Limited: L&T Metro Rail (Hyderabad) Limited is a subsidiary of Larsen & Toubro, an Indian multinational engaged in technology, engineering, construction, manufacturing and financial services with over USD 17 billion in revenue. It operates in over 30 countries worldwide. A strong, customer–focused approach and the constant quest for top- class quality have enabled L&T to attain and sustain leadership in its major lines of business for over seven decades. HYDERABAD 10th May 2018 .
Recommended publications
  • Dynamic Analysis of Metro Rail Supporting Structure
    IJISET - International Journal of Innovative Science, Engineering & Technology, Vol. 5 Issue 4, April 2018 ISSN (Online) 2348 – 7968 www.ijiset.com Dynamic Analysis of Metro Rail Supporting Structure Reshma Babu1 and Jobil Varghese2 1Civil Engineering Department, APJ Abdul Kalam Technological University, Mar Baselios Institute of Technology and Science Nellimatam, Ernakulam, India 2 Civil Engineering Department, APJ Abdul Kalam Technological University, Mar Baselios Institute of Technology and Science Nellimatam, Ernakulam, India Abstract stressed concrete „U‟ shaped girders with pile foundations. The accidental loads due to impact, earth quake or blast may Modern rolling stock of 2.9 m wide and having an axle exceed the design load for which the structure is designed in load of 15 tonnes is rolling over the metro. The „U- exceptional cases. In the present day scenario, with increased shaped‟ girder was cast at the Metro Casting Yard vulnerability of structures to such loads, requires some measures at Kalamassery. Fig. 1 shows the circular pillars. The to improve the resistance of the structures. This study presents a numerical study of the response of metro rail supporting structure pillars of 1.6 m diameter need to be located in the median that is the metro pillars under lateral impact load, seismic load of NH for Metro viaduct and span of each girder is 25m. and blast load using, finite element techniques and recommend some retrofitting methods based on a comparative analysis of FRP rib and concrete rib to overcome the adverse effect of impact loads. FRP rib is quite effective, so it can be preferred as a retrofitting method for columns.
    [Show full text]
  • Operations and Maintanence Syetems for Metro Railways
    GOVERNMENT OF INDIA MINISTRY OF URBAN DEVELOPMENT REPORT OF THE SUB-COMMITTEE ON OPERATIONS AND MAINTANENCE SYETEMS FOR METRO RAILWAYS NOVEMBER 2013 Sub-Committee on Operation & Maintenance Practices Ministry of Urban Development Final Report PREFACE 1) In view of the rapid urbanization and growing economy, the country has been moving on the path of accelerated development of urban transport solutions in cities. The cities of Kolkata, Delhi and Bangalore have setup Metro Rail System and are operating them successfully. Similarly the cities of Mumbai, Hyderabad and Chennai are constructing Metro Rail system. Smaller cities like Jaipur, Kochi and Gurgaon too are constructing Metro Rail system. With the new policy of Central Government to empower cities and towns with more than two million population With Metro Rail System, more cities and towns are going to plan and construct the same. It is expected that by the end of the Twelfth Five Year Plan, India will have more than 400 Km of operational metro rail network (up from present 223 Km Approximate). The National Manufacturing Competitiveness Council (NMCC) has been set up by the Government of India to provide a continuing forum for policy dialogue to energise and sustain the growth of manufacturing industries in India. A meeting was organized by NMCC on May 03, 2012 and one of the agenda items in that meeting was “Promotion of Manufacturing for Metro Rail System in India as well as formation of Standards for the same”. In view of the NMCC meeting and heavy investments planned in Metro Rail Systems, Ministry of Urban Development (MOUD) has taken the initiative of forming a Committee for “Standardization and Indigenization of Metro Rail Systems” in May 2012.
    [Show full text]
  • The Urban Morphology of Hyderabad, India: a Historical Geographic Analysis
    Western Michigan University ScholarWorks at WMU Master's Theses Graduate College 6-2020 The Urban Morphology of Hyderabad, India: A Historical Geographic Analysis Kevin B. Haynes Western Michigan University, [email protected] Follow this and additional works at: https://scholarworks.wmich.edu/masters_theses Part of the Human Geography Commons, and the Remote Sensing Commons Recommended Citation Haynes, Kevin B., "The Urban Morphology of Hyderabad, India: A Historical Geographic Analysis" (2020). Master's Theses. 5155. https://scholarworks.wmich.edu/masters_theses/5155 This Masters Thesis-Open Access is brought to you for free and open access by the Graduate College at ScholarWorks at WMU. It has been accepted for inclusion in Master's Theses by an authorized administrator of ScholarWorks at WMU. For more information, please contact [email protected]. THE URBAN MORPHOLOGY OF HYDERABAD, INDIA: A HISTORICAL GEOGRAPHIC ANALYSIS by Kevin B. Haynes A thesis submitted to the Graduate College in partial fulfillment of the requirements for the degree of Master of Science Geography Western Michigan University June 2020 Thesis Committee: Adam J. Mathews, Ph.D., Chair Charles Emerson, Ph.D. Gregory Veeck, Ph.D. Nathan Tabor, Ph.D. Copyright by Kevin B. Haynes 2020 THE URBAN MORPHOLOGY OF HYDERABAD, INDIA: A HISTORICAL GEOGRAPHIC ANALYSIS Kevin B. Haynes, M.S. Western Michigan University, 2020 Hyderabad, India has undergone tremendous change over the last three centuries. The study seeks to understand how and why Hyderabad transitioned from a north-south urban morphological directional pattern to east-west during from 1687 to 2019. Satellite-based remote sensing will be used to measure the extent and land classifications of the city throughout the twentieth and twenty-first century using a geographic information science and historical- geographic approach.
    [Show full text]
  • 2018-08-07 Hyderabad Metro Rail Records a New High in Ridership
    L&T Metro Rail (Hyderabad) Limited Hyderabad Metro Rail Administrative Building Hyderabad Metro Rail Depot, Uppal Main Road Uppal, Hyderabad – 500039 Press Release Issued by LTMRHL - Corporate Communications Department LTMRHL/CCD/PR/86/07082018 HYDERABAD METRO RAIL RECORDS A NEW HIGH IN RIDERSHIP • Last mile connectivity initiatives increase passenger loyalty • Soon to commence Ameerpet to LB Nagar section is expected to witness commendable growth in ridership • Clocks around 1,50,000 passengers L&T Metro Rail (Hyderabad) Limited is happy to announce an increasing trend in ridership and patronage by the citizens of Hyderabad. Recently, around 92 thousand passengers travelled in Metro System on a single day. Today Hyderabad Metro Rail clocked approximately 1.5 lakh passengers, which confirms that it is ‘the transportation lifeline’ for Hyderabadis. Another significant move is the shift of passengers from Token usage to Smart Card substantially. Percentage of Smart Card usage has gone up to around 50% and the total number of Smart Cards sold till date is around 2.75 lakhs. Increased ridership is attributed to passenger loyalty and particularly due to Last and First Mile Connectivity initiatives like: ✓ Increased co-ordination with TSRTC for providing better connectivity to Metro stations ✓ Availability of rent a bicycle /two-wheeler services at around 15 Metro Stations - Miyapur, JNTU, KPHB, Kukatpally, Ameerpet, Begumpet, Prakash Nagar, Rasoolpura, Paradise, Parade grounds, Secunderabad, Habsiguda, NGRI, Uppal, Nagole. These are available through Smart Bikes, PEDL, Metro Bikes & Drivezy ✓ Availability of self-driven Electric Vehicles at Miyapur station from Zoom car ✓ Availability of Petrol/Diesel self-driven vehicles at Miyapur & Parade Ground stations from Zoom car ✓ Parking facility at various metro stations is also an added advantage 1 Another offering by L&T Metro Rail is the Paradise Station Foot Over Bridge (FOB) which has provided seamless transfer to the Paradise Metro Station from the adjoining areas like Paradise Circle, P.G.
    [Show full text]
  • Chennai's New Metro
    Speeding toward the future: ...INDIA Chennai’s new metro India, with six of the Traffic congestion in Chennai, the capital city of the Indian fifty largest cities in State of Tamil Nadu, disrupts the lives of over 7 million the world, is a rapidly people who live and work in the area. To ensure sustainabil- developing market for ity in this rapidly urbanizing city, the Tamil Nadu govern- MRT projects. Because ment, along with the government of India, is constructing projects of this size ($3 billion+) require a 45 km metro rail system. When completed in 2015, the a blended approach, Chennai Metro is expected to significantly reduce travel time MRT PPPs have been and vehicular pollution. The cost of the Chennai Metro is developed or are about $4 billion, funded jointly by the government of India under development and the state of Tamil Nadu with a 60 percent loan from for the Delhi Airport the Japan International Cooperation Agency. IFC is transac- Line, Mumbai Metro, tion advisor to the Chennai Metro for the design and tender- Hyderabad Metro, and ing of an operations and maintenance (O&M) contract. Chennai Metro (a PPP K. Rajaraman, Managing Director of Chennai Metro Rail for O&M services). Limited (CMRL), spoke to Handshake about CMRL’s approach to contracting for such a large-scale MRT project. What was the impetus for the Chennai Metro? Shorter travel times and comfortable transportation throughout the city will directly impact economic produc- tivity and improve living standards. The metro will serve the two busiest corridors in Chennai and is expected to carry 700,000 passengers every day, beginning in 2015.
    [Show full text]
  • Symbiosis Institute of Business Management - Hyderabad GE - PIWAT Faqs
    Symbiosis Institute of Business Management - Hyderabad GE - PIWAT FAQs 1. What is GE-PIWAT? - GE-PIWAT is a selection process for the admission of students to MBAProgramme. It consists of Group Exercise, Personal Interview & Written Analysis Test. 2. When is the GE-PIWAT process scheduled for? - The GE-PIWAT sessions will be conducted on the following dates: th th th th th th th 10 ,​ 11 ,12​ ,​ 16 ,​ 17 ,​ 18 ​ and 19 ​ February 2017 ​ ​ ​ ​ ​ ​ ​ 3. Where is the GE-PIWAT process being held? - The GE-PIWAT process will be held at the SIBM-Hyderabadcampus. The address is as under Hyderabad Survey No. 292, Off Bangalore Highway (Old Highway road), NandigamaMandal, Village: Mamidipalli, District: Rangareddy, Near Hyderabad-509217, State: Telangana, India.Phone. 07093921231/32/33 4. How does one reach the campus? Route map is given below for reference. Google Maps can also be referred. 1. From Secunderabad Railway Station: http://bit.ly/2lj0QaY ​ 2. From Hyderabad(Nampally) Railway Station : http://bit.ly/2k0A4Ck ​ 3. From Mahatma Gandhi Bus Station, Hyderabad: http://bit.ly/2ldLjMT ​ 4. From Shamshabad( Rajeev Gandhi International Airport) : http://bit.ly/2li3exY ​ 5. From Shadnagar : http://bit.ly/2jWrXM0 ​ Symbiosis Institute of Business Management - Hyderabad 5. Will the institute provide free transport facilities? - The institute will providefree transport facility from Hyderabad city. Transport facility will be provided free of cost subject to the number of requisitions we receive. Your requisition should reach us at th [email protected] on or before 6 ​ February 2017. ​ ​ The buses that start to the campus from the city i.eLakdi-Ka-Pul Railway station parking bay and it will be travelling through AaramGhar Bus Stop and Shamshabad Main Raod(Near Karachi Bakery).
    [Show full text]
  • A1076 A2201 Jagjit Singh Sethi Prithvijit Singh Wz-30
    A1076 A2201 JAGJIT SINGH SETHI PRITHVIJIT SINGH WZ-30, MEENAKSHI GARDEN, NEAR SUBHASH TOWER 17,FLAT NO.603,SOUTH CLOSER NAGAR MERTRO STATION, NEW DELHI SECTOR-50,GURGOAN Contact: ----- Contact: 9810411980 ----- ----- NEW DELHI - 110018, Delhi GURGAON - 0, Haryana A1190 A2263 M.P. AGARWAL BHUPINDER SINGH 517, BRAHMANIPURA, RAJA RAM AGARWAL HOUSE NO. 22, SECTOR-3, CHANDIGARH- MARG, BEHIND JAIN MANDIR, BAHRAICH - (UP) Contact: ----- Contact: ----- ----- ----- BAHRAICH - 271801, Uttar Pradesh CHANDIGARH - 0, Chandigarh A1564 A2693 SHAMJIT SINGH SODHI MOHD. AFZAL E-352, GREATER KAILASH-II, 2ND FLOOR, NEW M/S KHAIR-UD-DIN SONS & CO., 7- EXTN DELHI- 110048 INDUSTRIAL ESTATE, JAMMU- 180 003 Contact: 9810592921 Contact: 191,2431390,09419141625 ----- ----- GREATER KAILASH-II - 110048, Delhi JAMMU - 180003, Jammu And Kashmir A1603 A3288 DR. ABUL FAZAL SYED KHALID HUSSAIN C/O- DR. A. F. FAIZY DEPTT. OF BIOCHEMISTRY, C-3/7, VASANT VIHAR, NEW DELHI J. N. MEDICAL COLLEGE, AMU, ALIGARH, UP Contact: 09756956133 Contact: ----- ----- ----- ALIGARH - 202002, Uttar Pradesh VASANT VIHAR - 110057, Delhi A2171 A3372 NARENDRA KUMAR MEHTA SATYAPADOO BHATTACHARYA 638,DDA SFS POCKET-I SECTOR22,DWARKA-I D-26/17 NARAD GHAT, VARANASI (U.P) NEW DELHI Contact: 9313573057 Contact: ----- ----- ----- DELHI - 110075, Delhi VARANASI - 0, Uttar Pradesh A3483 A5106 ASHOK KUMAR SINHA RAJIV BHATIA ASHOK MANSION , ANNIE BESANT ROAD, A-4/537,PACHIM VIHAR,NEW DELHI OPP- PATNA COLLEGE, PATNA- 100004 (BIHAR) Contact: ----- Contact: 9871811444 ----- ----- PATNA - 800004, Bihar PASCHIM VIHAR - 110063, Delhi A3655 A5126 H. C. PATHIK MOHD. G. ANSARI RAJA DY. DIR. SPORTS (RETD.) VILL & POST- ROHRU, 4107, MANDI STREET, NEAR PUL DISTT- SHIMLA HILLS, HIMACHAL PRADESH KAMBOH, SAHARANPUR (UP) Contact: ----- Contact: 09358971388 ----- ----- SHIMLA - 171207, Himachal Pradesh SAHARANPUR - 247001, Uttar Pradesh A4147 A5181 S.
    [Show full text]
  • ANSWERED ON:09.07.2014 METRO RAIL PROJECTS George Shri (Adv.) Joice;Panda Shri Baijayant "Jay"
    GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:278 ANSWERED ON:09.07.2014 METRO RAIL PROJECTS George Shri (Adv.) Joice;Panda Shri Baijayant "Jay" Will the Minister of URBAN DEVELOPMENT be pleased to state: (a) the current status of ongoing metro rail projects in the country including Pune and Kochi and the time schedule for their completion, project-wise; (b) whether some of the projects are facing delay and if so, the details of such projects and the reasons therefor; (c) whether some of these metro rail projects are causing traffic snarls and congestion and if so, the details thereof and the corrective action taken/being taken by the Government; and (d) the details of financial assistance, both national and international provided to these projects during the last three years and current year, project and year-wise? Answer THE MINISTER OF URBAN DEVELOPMENT (SHRI M. VENKAIAH NAIDU) (a): Central Government has not approved Pune Metro Rail Project. The details of ongoing metro rail projects, their current status and the time schedule for their completion, project-wise in the country are given below:- S.No. State Name of the Length Current Targeted Date Metro Rail Projects (in km) Status of completion 1 Delhi & Delhi MRTS Phase 55.697 The progress By March, 2016 National III Mukundpur- as on in stretches. Capital Yamuna Vihar 31.5.2014 Region (Gokuipuri) of civil (NCR) Janakpur West - 33.494 works Kalindikunj is 47.64% Central Secretariat 9.37 and the -Kashmere Gate overall Jahangirpuri - Badli 4.489 progress Extension to 13.875 is 34.46%.
    [Show full text]
  • Global Report Global Metro Projects 2020.Qxp
    Table of Contents 1.1 Global Metrorail industry 2.2.2 Brazil 2.3.4.2 Changchun Urban Rail Transit 1.1.1 Overview 2.2.2.1 Belo Horizonte Metro 2.3.4.3 Chengdu Metro 1.1.2 Network and Station 2.2.2.2 Brasília Metro 2.3.4.4 Guangzhou Metro Development 2.2.2.3 Cariri Metro 2.3.4.5 Hefei Metro 1.1.3 Ridership 2.2.2.4 Fortaleza Rapid Transit Project 2.3.4.6 Hong Kong Mass Railway Transit 1.1.3 Rolling stock 2.2.2.5 Porto Alegre Metro 2.3.4.7 Jinan Metro 1.1.4 Signalling 2.2.2.6 Recife Metro 2.3.4.8 Nanchang Metro 1.1.5 Power and Tracks 2.2.2.7 Rio de Janeiro Metro 2.3.4.9 Nanjing Metro 1.1.6 Fare systems 2.2.2.8 Salvador Metro 2.3.4.10 Ningbo Rail Transit 1.1.7 Funding and financing 2.2.2.9 São Paulo Metro 2.3.4.11 Shanghai Metro 1.1.8 Project delivery models 2.3.4.12 Shenzhen Metro 1.1.9 Key trends and developments 2.2.3 Chile 2.3.4.13 Suzhou Metro 2.2.3.1 Santiago Metro 2.3.4.14 Ürümqi Metro 1.2 Opportunities and Outlook 2.2.3.2 Valparaiso Metro 2.3.4.15 Wuhan Metro 1.2.1 Growth drivers 1.2.2 Network expansion by 2025 2.2.4 Colombia 2.3.5 India 1.2.3 Network expansion by 2030 2.2.4.1 Barranquilla Metro 2.3.5.1 Agra Metro 1.2.4 Network expansion beyond 2.2.4.2 Bogotá Metro 2.3.5.2 Ahmedabad-Gandhinagar Metro 2030 2.2.4.3 Medellín Metro 2.3.5.3 Bengaluru Metro 1.2.5 Rolling stock procurement and 2.3.5.4 Bhopal Metro refurbishment 2.2.5 Dominican Republic 2.3.5.5 Chennai Metro 1.2.6 Fare system upgrades and 2.2.5.1 Santo Domingo Metro 2.3.5.6 Hyderabad Metro Rail innovation 2.3.5.7 Jaipur Metro Rail 1.2.7 Signalling technology 2.2.6 Ecuador
    [Show full text]
  • GHMC - Annapurna Centers S
    GHMC - Annapurna Centers S. No Center Name I Madhapur 2 Sanath nagar a J Nims 4 Ameerpet 5 Erragadda 6 ESI 7 Ramanthapur 8 Venkat Reddy Nqgqt 9 Golnaka 10 Alicafe amberpet 11 Musheerabad 12 Fever Hospital 13 Amberpet t4 Manikeshwar nagar 15 Sundarayya park r6 Lalapet t7 Secunderabad 18 Gandhi Center 19 West maredpally 20 Begqqp4 2t sP Cellegq 22 opp islgq 23 Uppal busstop(S ecunderabad) 24 Toli chowki 25 Masab tank 26 Nbt nagar 27 Golkonda Fort 28 Mehdipatnam 29 Film nagar Eq!!!, 30 uppq! 31 Nachararn.E.S.l 32 Mallapur JJ Chilukanagar 34 Neredmet 35 Malkaj 36 East Anand Bagh 37 Meerpet HB colony 38 Vinayak nagar 39 Ayodya nagar,kapra 40 A.S.Rao Nagar 41 Ecil industrial area 42 Cherlapally 43 Pedda Cherlapally 44 X roads 45 Chinthalmet 46 Tadbund 47 48 kattedhan 49 50 Rakshapuram 51 Is sadan 52 Champapet 53 Bandlaguda 54 Midhani 55 Gachibowli 56 An adda 57 GHMC - Annapurna Centers S. No Center Name 58 Yellamabanda KP 59 Jagithgiri Gutta 60 Suraram 61 Mallareddy hospital 62 Kharkana 63 LalBazar 64 K.B.H.B phase 3 65 Kukatpally 66 Shobana Colony 67 Bowenpally ps 68 Hasmathpet,bowenpally 69 Kanajiguda 70 Alwal 7t Suchitra X roads 72 Bollaram 73 Alwyr.r x roads Chandanagar 75 Taranagar market 76 BHEL 77 Patancheru center 78 Khajaguda 79 Parvath nagar 80 Borabanda 81 Motinagar x Road 82 Yousufguda 83 Cancer center 84 Yousufguda ward office 85 Krishna nagar 86 Mangalhut 87 Puranapool 88 Petla burz Center 89 Begumbazar 90 CBS 9l City Civil Court 92 High court 93 Lal darwaja 94 Falaknuma raithu bazar 95 Asra hospital center 96 Charminar 97 Lakdi ka pul Dwaraka 98 Khairatabad 99 Liberty Circle 100 Dhama chawk 101 Mahankali Temple 102 Monda market 103 Addagutta West maredpally (Chilkalguda x-roads) 104 Chilakalguda 105 Varasiguda 106 Kachiguda t07 Lakdikapool PS 108 Assembly 109 Koti maternity Center 110 ENT Hospital 111 king koti tt2 Ram koti 113 Mehaboobia college tl4 Mehaboob gunj GHMC - Annapurna Centers S.
    [Show full text]
  • मुख्य आयुक्त का कायााऱय Office of the Chief Commissioner
    मख्ु य आयक्ु त का कायााऱय OFFICE OF THE CHIEF COMMISSIONER व‍त‍ु ंव‍स वावाकर‍व‍वामा‍ल‍ु ‍क,‍हैदराबाद‍क्षात्र GST & CUSTOMS:: HYDERABAD ZONE जा ंव टी भवन‍,ऱाऱबहादरु टाडियम रोि, बलारबाग, हैदराबाद– 500004 GST BHAVAN, LAL BAHADUR STADIUM ROAD: BASHEERBAGH: HYDERABAD-500004 C.No.IV/16/177/2018-CC(HZ)RTI Date : .10.2018 For the Quarter ending September,2018. Chief Commissioner /Director General / Director S.N Office/Location of Name and address of Name and address of the Jurisdiction Notified Officer o. the Comm’te the CPIO Appellate Authority for Payment of Fee 1 Chief Shri S. Mrithinjai Ms. Rashmi G, Information pertaining ACAO, Commissioner’s Deputy Commissioner, Joint Commissioner, GST to the office of the Chief Hyderabad Office, GST Bhavan, Bhavan, L.B. Stadium Road, Commissioner, Comm’te Hyderabad L.B.Stadium Road, Basheerbagh, Hyderabad- Hyderabad Zone Zone. Basheerbagh, 500004 Hyderabad – 500004 Phone No.040-23240725 Tele fax.: 040-23236924 email:- : ccu- [email protected] A. Commissioner / Addl. Director General Sl. Office/Location of Name and address of Name and address of the Jurisdiction Notified No the Comm’te the CPIO Appellate Authority Officer for Payment of Fee 1 Medchal GST Shri D. Srinivasulu, Shri K.Bala Kishan Raju, In respect of all matters Assistant Commissionerate Assistant Additional Commissioner, pertaining to the Chief Commissioner(Tech) Central Tax, Central Excise & jurisdiction of Accounts 2nd Floor, (I) (I)O/o the Service Tax, Officer, Room No. 204, Commissioner of H.No.11-4-649/B, H.No.11-4-649/B, Central Tax-Medchal Medchal Lakdi-ka-pul, Lakdikapul, Hyderabad - Commissionerate Commission Hyderabad 500004.
    [Show full text]
  • Hyderabad Metro Example
    Inclusive and Sustainable Mobility: Hyderabad Metro example NVS Reddy Managing Director, Hyderabad Metro Rail Ltd. Hyderabad Metro Rail project in PPP mode World’s largest Metro Rail project in PPP mode 3 high density traffic corridors (72 km) taken up in phase I Miyapur – L.B.Nagar (29 km; 27 Stns) Jubilee Bus Station – Falaknuma (15 km; 15 Stns ) Nagole – Raidurg (28 km; 24 Stns) Total no of stns – 66; Interchange stns - 3 Project Cost : Rs.14,132 Cr. (USD 2.17 bn) Rs.1,458 Cr. (USD 0.22 bn) (10%) as “Gap Funding” by GoI and balance by Concessionaire L&T (Rs.12,674 Cr. (USD 1.95 bn) i.e., 90%) Additional Rs. 3000 Cr. (USD 0.46 bn) by GoTS for land acquisition, shifting of utilities, R&R, pedestrian facilities, urban redesign, etc. CP: 35 yrs +25 yrs 269 acres (109 Ha) for 3 Depots and P&C areas at 32 stns (L&TMRHL – 17 & HMRL – 15) Property devpt through use of air space – property cannot be sold Lease rentals during CP to cross subsidize passenger service losses Revenue model: Avg. 50% from passenger fares; 45% from lease rentals; 5% Misc. (Advt.; parking etc.) Property + Rail system to revert to GoTS at the end of CP Hyderabad Metro Rail Corridors – Intermodal Integration, P&C areas & Street parking Miyapur 1 JNTU SP 3 Traffic corridors (72 km) in phase I. Cost: Rs.14, 132 Cr. (USD 2.17 bn) KPHB SP Kukatpally 1. Miyapur – L.B.Nagar : 29 km; 27 stns Balanagar 2. Jubilee Bus Station – Falaknuma : 15 km; 15 stns Moosapet SP 3.