10 Appendix A
Total Page:16
File Type:pdf, Size:1020Kb
Appendix A – Footway and Carriageway Improvement Schemes The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes. Machine Resurfacing – Contact Officer Mr Byron Lovell Road Name Parish Extent of Works Current Status A228 Colts Hill Capel Crittenden Road to B2017 To be programmed Surface Treatments – Contact Officer Mr Clive Lambourne Micro Surfacing Road Name Parish Extent of Works Current Status A262 GOUDHURST From A21 to Biddenden To be programmed ROAD Various J/w Benhall Mill Road to Programmed to FOREST ROAD Tunbridge Wells Bayham Road (Joint with commence on the 2018 SD) 23rd April 2019 for 2 days Maidstone Road to Queen To be programmed LUCKS LANE Paddock Wood Street (Leave out level crossing) Tunbridge Wells From the junction with the To be programmed A264 PEMBURY A21 Access roundabout ROAD (Tesco end) to the junction with Kingswood Road. Paddock Wood Mascalls Park Rd to "Kings To be programmed MAIDSTONE ROAD Barn" (Joint with last year's microsurfacing) Brenchley 50m west of Petteridge Programmed to BRENCHLEY ROAD Lane ("Myrtle Cottage") to commence on the Crook Road (Opposite 11th May 2019 for 2 Brenchley Memorial Hall) days Lamberhurst B2169 Furnace Lane to Programmed to CLAYHILL ROAD A21 Lamberhurst Quarter commence on the 29th April 2019 for 4 days Sandhurst A268 Queen Street, Programmed to BODIAM ROAD Sandhurst to KCC commence on the boundary with East Sussex 25th April 2019 for 4 ("THE MILL HOUSE") days CRITTENDEN ROAD Capel / Matfield Programmed to AND CHESTNUT From A228 Colts Hill to commence on the LANE Maidstone Road, Matfield 8th May 2019 for 4 days Tunbridge Wells KCC Boundary (East end Programmed to of Tunbridge Wells commence on the BAYHAM ROAD Crematorium) to Forest 24th April 2019 for 2 Road days Tunbridge Wells Between Sandown Park To be programmed BLACKHURST LANE and Academy entrance Pembury In front of Hospice and To be programmed MAIDSTONE ROAD near school. Speldhurst Penshurst Hill to 50m past To be programmed BARDEN ROAD Furzefields Speldhurst Lower Green Road to To be programmed ETHERINGTON HILL Gateway Lamberhurst Programmed to CLAYHILL ROAD Mount Pleasant Road bend commence on the past "Snaggs Well 25th April 2019 for 4 Cottages" to end of trees days Hawkhurst Programmed to NORTH HILL ROAD Delmonden Lane to A268 commence on the MA. 29th April 2019 for 1 day Tunbridge Wells To be programmed CROMWELL ROAD Whole Length Cranbrook End of HFS j/w Standen Programmed to MILL STREET Street ("Weald House") to commence on the AND SPONDEN LANE Sponden Lane ("Sponden 2nd May 2019 for 4 Oast") days Surface Dressing Road Name Parish Extent of Works Current Status A228 PEMBURY Pembury From Maidstone Road to To Be Programmed NORTHERN BYPASS Pembury Road STAPLEHURST ROAD Cranbrook / Headcorn Road/Green To Be Programmed Staplehurst Lane to Park Wood Lane Footway Improvement - Contact Officer Mr Neil Tree Mascalls Park Paddock Wood Entire length (Footway Protection) Completed The Greenways Paddock Wood Entire Length (Footway Protection) Completed Entire Length In Design Showfields Road Tunbridge Road (Footway Protection) (Subject to specialist contractor inspection) Entire Length In Design College Drive Tunbridge Wells (Footway Protection) (Subject to specialist contractor inspection) Entire Length In Design Concord Close Tunbridge Wells (Footway Protection) (Subject to specialist contractor inspection) .