TORONTO CENTRAL WATERFRONT LEADING WITH LANDSCAPE

800 Hectares / 1977 Acres 25,000 Residential Units 40,000 Jobs $1.5 Billion Infrastructure CENTRAL WATERFRONT PUBLIC REALM DESIGN

DESIGN INNOVATION COMPETITION WEST 8 + DTAH

WATERS EDGE SLIP BRIDGES and DECKS GREAT STREET (ROAD+TRANSIT+TRAIL+PROMENADE)

QUEENS QUAY NEIGHBOURHOOD PARKS

WEST DONLANDS ST. LAWRENCE NEIGHBOURHOOD NEIGHBOURHOOD

CITYPLACE NEIGHBOURHOOD FORT YORK NEIGHBOURHOOD NEIGHBOURHOOD HARBOUR SQ NEIGHBOURHOOD

FUTURE LOWER DON LANDS NEIGHBOURHOOD BATHURST NEIGHBOURHOOD

LAKE PARK CORRIDORS AND DESTINATIONS

WEST DON LANDS ST. LAWRENCE NEIGHBOURHOOD

CN TOWER

SPADINA SHERBOUR YONGE SUGAR LOWER SLIP NE H2O LANDING BEACH PARK DON LANDS BATHURST PARK HARBOURFRONT QUAY

YORK LANDING

LAKE ONTARIO PARK

Rees Wavedeck

NEW NEIGHBOURHOODS

TRANSIT

Joint EA Study Area

Existing Conditions: 20m

• Historic buildings on east and west 20m sides of existing 20m right-of-way • Railroad

bridge=18.6m 18.6m wide between abutments EA Master Plan:

35.7m

35m

37m

18.6m 20m: East 36m: south of College EA Master Plan Typical Mid-Block Cross Section

24% Pedestrian Boulevards Final EA Typical Mid-Block Cross Section

60% Visually Expanded Zone without Automobiles

Vision

Queens Quay at Simcoe Today Simcoe Slip Simcoe Slip

South Side Transit – Pedestrian Priority (21 Signals) South Side Transit –Transit Priority (12 Signals) South Side Transit – Final Concept (14 Signals*)

WATER’S EDGE

Secondary Waterfront: Boulevard / Slip- Ends – Continuity along the Streetscape

Four WaveDecks along Queens Quay bind the streetscape to the slips:

PORTLAND WAVEDECK

SPADINA WAVEDECK

REES WAVEDECK

SIMCOE WAVEDECK

Water’s Edge Promenade Primary Waterfront – Continuity along the Water’s Edge

Five Bridges link a continuous water’s edge promenade:

SPADINA BRIDGE

PETER BRIDGE

REES BRIDGE

POLICE BRIDGE

SIMCOE BRIDGE

1.6km Timber Bridges Timber Bridge Concept

Water’s Edge Promenade – East Bayfront

Storm Water Management System Aquatic Habitat Schematic Design Storm Water Tanks, Aquatic Habitat and Boardwalk Parliament Slip DETAILS MAX. 8.3% - OPTION 2

HTO MOUND Queen’s Quay Section MAX. 8.3% - OPTION 2 MAX. 8.3% - OPTION 2

HTO MOUND MAX. 8.3% - OPTION 2

HTO MOUND MAX. 8.3% - OPTION 2

HTO MOUND MAX. 8.3% - OPTION 2

HTO MOUND MAX. 8.3% - OPTION 2

HTO MOUND MAX. 8.3% - OPTION 2

HTO MOUND MAX. 8.3% - OPTION 2

HTO MOUND MAX. 8.3% - OPTION 2

HTO MOUND THE EXPRESSWAY

THE OUTER HEADLAND

Waterfront Toronto $1.5 billion stimulus funding 2000 acres / 800 Hectares 170 acres parkland 20,000 residential units 40,000 jobs