Leading with Landscape
Total Page:16
File Type:pdf, Size:1020Kb
TORONTO CENTRAL WATERFRONT LEADING WITH LANDSCAPE 800 Hectares / 1977 Acres 25,000 Residential Units 40,000 Jobs $1.5 Billion Infrastructure TORONTO CENTRAL WATERFRONT PUBLIC REALM DESIGN DESIGN INNOVATION COMPETITION WEST 8 + DTAH WATERS EDGE SLIP BRIDGES and DECKS GREAT STREET (ROAD+TRANSIT+TRAIL+PROMENADE) QUEENS QUAY NEIGHBOURHOOD PARKS WEST DONLANDS ST. LAWRENCE NEIGHBOURHOOD NEIGHBOURHOOD CITYPLACE NEIGHBOURHOOD EAST BAYFRONT FORT YORK NEIGHBOURHOOD NEIGHBOURHOOD HARBOUR SQ NEIGHBOURHOOD FUTURE LOWER DON LANDS NEIGHBOURHOOD BATHURST NEIGHBOURHOOD LAKE ONTARIO PARK CORRIDORS AND DESTINATIONS WEST DON LANDS ST. LAWRENCE NEIGHBOURHOOD CN TOWER SPADINA SHERBOUR YONGE SUGAR LOWER SLIP NE H2O LANDING BEACH PARK DON LANDS BATHURST PARK HARBOURFRONT QUAY YORK LANDING LAKE ONTARIO PARK Rees Wavedeck NEW NEIGHBOURHOODS TRANSIT Joint EA Study Area Existing Conditions: 20m • Historic buildings on east and west 20m sides of existing 20m right-of-way • Railroad bridge=18.6m 18.6m wide between abutments EA Master Plan: Cherry Street 35.7m 35m 37m 18.6m 20m: King Street East 36m: Spadina Avenue south of College EA Master Plan Typical Mid-Block Cross Section 24% Pedestrian Boulevards Final EA Typical Mid-Block Cross Section 60% Visually Expanded Zone without Automobiles Vision Queens Quay at Simcoe Today Simcoe Slip Simcoe Slip South Side Transit – Pedestrian Priority (21 Signals) South Side Transit –Transit Priority (12 Signals) South Side Transit – Final Concept (14 Signals*) WATER’S EDGE Secondary Waterfront: Boulevard / Slip- Ends – Continuity along the Streetscape Four WaveDecks along Queens Quay bind the streetscape to the slips: PORTLAND WAVEDECK SPADINA WAVEDECK REES WAVEDECK SIMCOE WAVEDECK Water’s Edge Promenade Primary Waterfront – Continuity along the Water’s Edge Five Bridges link a continuous water’s edge promenade: SPADINA BRIDGE PETER BRIDGE REES BRIDGE POLICE BRIDGE SIMCOE BRIDGE 1.6km Timber Bridges Timber Bridge Concept Water’s Edge Promenade – East Bayfront Storm Water Management System Aquatic Habitat Schematic Design Storm Water Tanks, Aquatic Habitat and Boardwalk Parliament Slip DETAILS MAX. 8.3% - OPTION 2 HTO MOUND Queen’s Quay Section MAX. 8.3% - OPTION 2 MAX. 8.3% - OPTION 2 HTO MOUND MAX. 8.3% - OPTION 2 HTO MOUND MAX. 8.3% - OPTION 2 HTO MOUND MAX. 8.3% - OPTION 2 HTO MOUND MAX. 8.3% - OPTION 2 HTO MOUND MAX. 8.3% - OPTION 2 HTO MOUND MAX. 8.3% - OPTION 2 HTO MOUND MAX. 8.3% - OPTION 2 HTO MOUND THE EXPRESSWAY THE OUTER HEADLAND Waterfront Toronto $1.5 billion stimulus funding 2000 acres / 800 Hectares 170 acres parkland 20,000 residential units 40,000 jobs Thank you / Merci Beaucoup.