Ottawa Relocation Resource Guide P a G E | 2
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Appendix 5 Station Descriptions And
Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint. -
4005 Strandherd Drive TIA Report
August 2019 4005 Strandherd Drive TIA Report 4005 Strandherd Drive TIA Strategy Report prepared for: grc Architects 47 Clarence Street, Suite 401 Ottawa, Ontario K1N 9K1 prepared by: 1223 Michael Street North Suite 100 Ottawa, ON K1J 7T2 August 13, 2019 476618-01000 Table of Contents 1. SCREENING FORM................................................................................................................................................................ 1 2. DESCRIPTION OF PROPOSED DEVELOPMENT .................................................................................................................... 1 2.1. PROPOSED DEVELOPMENT ......................................................................................................................................... 1 3. EXISTING CONDITIONS ......................................................................................................................................................... 3 3.1. AREA ROAD NETWORK ................................................................................................................................................ 3 3.2. PEDESTRIAN/CYCLING NETWORK .............................................................................................................................. 3 3.3. TRANSIT NETWORK ..................................................................................................................................................... 3 3.4. EXISTING STUDY AREA INTERSECTION ...................................................................................................................... -
Ward 16 Master THEME EN
Draft Budget 2020 – Ward 16 – River Councillor Riley Brockington Ward investments in 2020 Infrastructure • $31.2 million on infrastructure, including: o $5.5 million to rehabilitate Mooney’s Bay trunk sewer o $6.8 million for integrated road, sewer, and water work along Claymor and Senio avenues o $5.9 million for integrated road, sewer and water work along Larkin Street, Larose Avenue and Lepage Avenue o $8.8 million on structure renewal, including culverts along the Airport Parkway at Walkley Road, and O-Train overpasses at Heron Road, Riverside Drive and Walkley Road o $3.95 million to resurface Riverside Drive between Hunt Club and Walkley roads Transportation • $817 million to fund Stage 2 of Ottawa’s light-rail transit system, extending service to Limebank Station with a link to the Ottawa Macdonald–Cartier International Airport, adding 12 kilometres and eight stations along the Trillium Line, south of Greenboro Station • $125,000 to reconstruct sidewalks and curbs to improve road safety along McCarthy Road between Plante Drive and the rail crossing • $30,000 to apply high-friction asphalt on Prince of Wales Drive at Kochar Drive • $20,000 to repair streetlight cables at Kenzie Street and Leaside Avenue • $6,000 to replace streetlight poles on Riverside Drive at Malhotra Court Parks and facilities • $500,000 on renewal projects, including: o $85,000 for building improvements to the Water Services facility on Clyde Avenue o $80,000 for upgrades to the Deborah Anne Kirwan Pool o $270,000 for concrete walkways and retaining walls at -
2197 Riverside Drive
For Sublease 2197 Riverside Drive Impressive Common Area Upgrades Available space Highlights Suite 101 1,087 sf • Move-in ready space • Lots of natural light Net Rent • Three sound-proofed offices Contact Listing Agent • New Conference facility in the building • New lobby and elevators • Onsite parking Additional Rent • Public transit and food service amenities at your door $15.43 psf (2020 estimate) step • Bike paths, walking trails, and outdoor green space Lease Expiry • Key fob and security camera system May 31, 2025 Location Possession Ottawa South, Billings Bridge, with a short 10 minute Immediate commute to Downtown Ottawa. Avison Young Matthew Schultz Commercial Real Estate (Ontario) Inc. Brokerage Sales Representative, Principal 45 O’Connor Street, Suite 800 D 613 567 3478 Ottawa, ON K1P 1A4 [email protected] M 613 567 2680 E. & O.E.: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young. Pictures 2197 Riverside Drive, Ottawa Matthew Schultz Sales Representative, Principal avisonyoung.ca D 613 567 3478 [email protected] E. & O.E.: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young. Pictures 2197 Riverside Drive, Ottawa Map Patty’s Pub Transitway Brewer Park Bronson Avenue Bank Street Riverside Drive Vincent Massey Park Heron Road (Approximately, not to scale) Matthew Schultz Sales Representative, Principal avisonyoung.ca D 613 567 3478 [email protected] E. & O.E.: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young.. -
Project Synopsis
Final Draft Road Network Development Report Submitted to the City of Ottawa by IBI Group September 2013 Table of Contents 1. Introduction .......................................................................................... 1 1.1 Objectives ............................................................................................................ 1 1.2 Approach ............................................................................................................. 1 1.3 Report Structure .................................................................................................. 3 2. Background Information ...................................................................... 4 2.1 The TRANS Screenline System ......................................................................... 4 2.2 The TRANS Forecasting Model ......................................................................... 4 2.3 The 2008 Transportation Master Plan ............................................................... 7 2.4 Progress Since 2008 ........................................................................................... 9 Community Design Plans and Other Studies ................................................................. 9 Environmental Assessments ........................................................................................ 10 Approvals and Construction .......................................................................................... 10 3. Needs and Opportunities .................................................................. -
RIVER WARD CITY COUNCILLOR MARIA Mcrae's REPORT to THE
RIVER WARD CITY COUNCILLOR MARIA McRAE’S REPORT TO THE RIVERSIDE PARK COMMUNITY Wednesday, April 4, 2012 Emerald Ash Borer Information Sessions Do you want to learn more about how you can help slow the spread of emerald ash borer, an invasive species that is killing Ottawa’s ash trees? Please join me and City staff at an information session to learn more about what the City is doing to prevent the spread of the emerald ash borer and how you can help mitigate the impact of this insect on our ash trees. The presence of emerald ash borer poses a serious threat to 25 percent of the City’s forest cover located on both public and private properties. The information sessions are scheduled for: Date: April 12, 2012 Time: 4:00 to 8:00 p.m. Location: Ben Franklin Place, 101 Centrepointe Drive, Andrew Haydon Hall Date: April 23, 2012 Time: 4:00 to 8:00 p.m. Location: Jim Durrell Recreation Centre, 1264 Walkley Road, Ellwood Hall St. Patrick’s Home Construction My office worked with City of Ottawa Traffic Management staff to resolve concerns associated with construction activity at 2865 Riverside Drive (St. Patrick’s Home of Ottawa). To secure the safety of residents in the surrounding community, I ensured that the following actions were carried out: • Restriction of all vehicular traffic to the Riverside Drive entrance of the construction site. • A guarantee by the contractor that the fence removed without permission from Garner Avenue will be repaired, at their cost, when weather conditions permit. • The erection of “No Construction Traffic is Permitted” signs leading into Garner Avenue. -
2019 City Wide Development Charges Background Study
2019 City-Wide Development Charges Background Study Version for Public Consultation HEMSON C o n s u l t i n g L t d. March 15, 2019 Table of Contents List of Acronyms .......................................................................................... 1 Executive Summary ...................................................................................... 2 A. Purpose of 2019 Development Charges (DC) Background Study .. 2 B. City-Wide and Area-Specific DCs Have Been Calculated ............... 3 C. Development Forecast .................................................................... 4 D. Public Transit Ridership Forecast ................................................... 5 E. Calculated Development Charges .................................................. 5 F. Cost of Growth Analysis .................................................................. 6 G. Development Charges Administration & Policy Considerations ...... 7 I Purpose of 2019 Development Charges Background Study ............. 8 A. Introduction and Background .......................................................... 8 B. Legislative Context .......................................................................... 9 C. The 2019 DC Study is Intended to be an Interim Update ................ 9 D. Consultation And Approval Process ................................................ 9 E. Key Steps In Determining DCs for Future Development-Related Projects ......................................................................................... 10 F. Long-Term Capital -
Alexandra Bridge Replacement Project
Alexandra Bridge Replacement Project PUBLIC CONSULTATION REPORT OCTOBER TO DECEMBE R , 2 0 2 0 Table of Contents I. Project description .................................................................................................................................... 3 A. Background ........................................................................................................................................ 3 B. Project requirements ..................................................................................................................... 3 C. Project timeline ................................................................................................................................ 4 D. Project impacts ............................................................................................................................. 4 II. Public consultation process............................................................................................................ 5 A. Overview .............................................................................................................................................. 5 a. Consultation objectives ............................................................................................................ 5 b. Dates and times ............................................................................................................................ 5 B. Consultation procedure and tools .......................................................................................... -
Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa
Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa Updated March 8, 2021 Do you know the history behind a street name not on the list? Please contact us at [email protected] with the details. • - The Gloucester Historical Society wishes to thank others for sharing their research on street names including: o Société franco-ontarienne du patrimoine et de l’histoire d’Orléans for Orléans street names https://www.sfopho.com o The Hunt Club Community Association for Hunt Club street names https://hunt-club.ca/ and particularly John Sankey http://johnsankey.ca/name.html o Vanier Museoparc and Léo Paquette for Vanier street names https://museoparc.ca/en/ Neighbourhood Street Name Themes Neighbourhood Theme Details Examples Alta Vista American States The portion of Connecticut, Michigan, Urbandale Acres Illinois, Virginia, others closest to Heron Road Blackburn Hamlet Streets named with Eastpark, Southpark, ‘Park’ Glen Park, many others Blossom Park National Research Queensdale Village Maass, Parkin, Council scientists (Queensdale and Stedman Albion) on former Metcalfe Road Field Station site (Radar research) Eastway Gardens Alphabeted streets Avenue K, L, N to U Hunt Club Castles The Chateaus of Hunt Buckingham, Club near Riverside Chatsworth, Drive Cheltenham, Chambord, Cardiff, Versailles Hunt Club Entertainers West part of Hunt Club Paul Anka, Rich Little, Dean Martin, Boone Hunt Club Finnish Municipalities The first section of Tapiola, Tammela, Greenboro built near Rastila, Somero, Johnston Road. -
Details of Development Charge Capital Project Funding for the Period Ended December 31, 2017
City of Ottawa DOCUMENT 2 Details of Development Charge Capital Project Funding For the Period Ended December 31, 2017 2017 Total Growth-related Non-growth-related Total Account Number and Capital Project Description Transfers to/(from) Transfers to/(from) Capital Project Capital Projects ¹ Capital Projects ² ³ Budgeted Amount Category - Corporate Studies 112735 Policy Development & Urban Design - Profit Centre 21,794 0 21,394 902200 Servicing Studies Development Program (123,000) 200,000 2,622,000 903591 Planning Studies - Recreation 54,000 152,000 330,000 905384 DC By-Law - 2014 Study Update 355,300 0 1,874,000 906629 2015 Rural Servicing Strategy 38,000 129,000 257,000 907098 2014 Rural Servicing Strategy 18,000 140,000 200,000 907105 Infrastructure Master Plan(Sewer) (32) 10,000 11,000 907115 2013 Stormwater Master Planning 10,000 237,000 300,000 907483 2014 Infrastruct Master Plan(Stormwater) 20,000 238,000 300,000 908105 2016 Infrastructure Master Plan (Sewer) 21,000 142,000 284,000 Total - Corporate Studies Funding 415,062 1,248,000 6,199,394 Category - Library 904628 West District Library 187,000 1,500,000 10,000,000 904629 Riverside South Library - DC 27,000 114,000 600,000 904858 Library Radio Frequency Identificate 2015 36,000 1,007,000 2,102,000 906395 Collections 2012 379,000 145,000 1,000,000 907916 Collections 2011 (165) 48,089 963,525 908221 RFID (Const & Equip) 660,000 687,000 2,055,000 Total - Library Funding 1,288,835 3,501,089 16,720,525 Category - Protection (Fire & Police) 903142 Ottawa East Fire Station 4,080,000 -
Neighbourhood Watch Bulletin – December 8, 2014
Neighbourhood Watch Bulletin – December 8, 2014 This bulletin is prepared by the Wellington Community Police Centre (1064 Wellington St., 613-236-1222 ext. 5870) for distribution to area residents to promote safety and security in our neighbourhoods. Please distribute it to anyone who might be interested. Any questions or information concerning safety or security issues in your neighbourhood may be forwarded to [email protected]. 1. Holiday hours at OPS 2. Missing person 3. Male arrested for making threats 4. Shooting on Prince Albert Street 5. Shooting on Penny Drive 6. STEP in December 7. Seeking Nicholas Lalonde 1. Holiday hours at OPS The Ottawa Police Service would like to announce a change of service hours over the holidays – from December 24, 2014 to January 1, 2015 – for Front Desk Services at the following police stations: 3343 St-Joseph Boulevard (Orleans), 245 Greenbank Road (Nepean), 211 Huntmar Drive (Kanata), and 4561 Bank Street (Gloucester). 3343 St-Joseph Boulevard & 211 Huntmar Drive: December 24 ― 8AM to 4PM December 25 ― CLOSED ON STATUTORY HOLIDAY December 26 ― CLOSED ON STATUTORY HOLIDAY December 27-28 ― 8AM to 4PM December 29 ― 7AM to 9PM December 30 ― 7AM to 9PM December 31 ― 8AM to 4PM January 1 ― CLOSED ON STATUTORY HOLIDAY 245 Greenbank Road & 4561 Bank Street: December 24 ― 10AM to 5PM December 25 ― CLOSED ON STATUTORY HOLIDAY December 26 ― CLOSED ON STATUTORY HOLIDAY December 27-28 ― CLOSED December 29 ― 10AM to 5PM December 30 ― 10AM to 5PM December 31 ― 10AM to 5PM January 1 ― CLOSED ON STATUTORY HOLIDAY Ottawa Police Front Desk Services include making a report about a collision or incident, as well as criminal and police records checks. -
South Ottawa Roads, Playgrounds, Pathways, Studies, Real Estate Tapped for 2017 Cash South Ottawa Projects in 2017 Budget
South Ottawa roads, playgrounds, pathways, studies, real estate tapped for 2017 cash South Ottawa projects in 2017 budget Ottawa South News Dec 29, 2016 By Erin McCracken Dozens of projects in Ottawa’s southern wards have been tapped to receive 2017 budget dollars. Here’s a breakdown, ward by ward: Capital Ward Residents who live in or frequent the Billings Bridge and Heron Park neighbourhoods of Capital Ward can count on the addition of a new red light camera at Bank Street and Riverside Drive in the coming months. It’s just one of a number of items for that part of the ward that are included in the city’s 2017 budget. The design of a new pathway will be completed in 2017 to allow users of the Rideau River Eastern Pathway to walk or cycle under the south side of Billings Bridge at Bank Street and Riverside Drive. Construction is scheduled for 2018 and the cost is being shared with the National Capital Commission. “That means people going east-west along that multi-use pathway won’t have to come up and cross Bank Street anymore,” said Capital Coun. David Chernushenko. “It is safer, removes a number of movements, and there will be fewer people for drivers to keep an eye on.” inReadThat will complement plans to begin work on sections of the Rideau River Western Pathway in nearby Old Ottawa South, he said, adding that currently is a patchwork of trails to the University of Ottawa and on to Sandy Hill. Faircrest Heights, Alta Vista, Billings Bridge and Heron Park residents can also look forward to construction beginning on the Rideau Canal footbridge that will link Fifth Avenue in the Glebe with Clegg Street in Old Ottawa East.