Development Around Stations Exploring International Experience and Lessons for the UK

Total Page:16

File Type:pdf, Size:1020Kb

Development Around Stations Exploring International Experience and Lessons for the UK Development around stations Exploring international experience and lessons for the UK www.cbtthoughtleadership.org.uk Contents Introduction 3 Benefits development around stations can bring 4 Raise money for Network Rail 5 Meet housing goals 6 Case study: Switzerland and Geneva 7 New and reopened stations and lines as catalysts for growth 8 Regenerate communities through improving gateways 8 Case study: Fixing the Link 9 Case study: cycling to stations in the Netherlands 10 Improve liveability 11 Improving and investing in stations 12 Case study: Inverness and Aberdeen 14 Case study: Dundee 16 Case study: Dudley Port 16 Case study: Switzerland 16 Options for institutional structures 17 In house/public sector 17 Case study: Sweden, Jernhusen AB 18 Case study: the Netherlands 20 Private sector 21 Case study: East Japan Railway 22 Mixture of the two 23 Case study: Stockholm 24 How to judge success 25 Policy recommendations 26 References 28 Acknowledgements 29 Tracks 31 2 Introduction Several separate but related This report suggests that the themes have prompted this experience of railway administrations report: the need for more houses; in other countries shows that a a requirement for Network Rail longer-term approach has succeeded (NR) to reduce its debt; and the in addressing a variety of societal ever more urgent requirement problems as well as providing greater for developments to be genuinely revenues for the railway. sustainable. This report therefore looks at Sir Peter Hendy, NR’s chairman, ways of maximising the economic, responded to the Treasury’s social and environmental benefits pressure to reduce its debt by to be gained from treating railway planning to sell £1.8 billion worth stations as primary development of assets. Choosing this short-term hubs. It then offers a number of approach opens up a number of options for realising those benefits, questions. It can be argued that a and suggests ways in which their more considered approach could success can be measured. It lead to a higher return for NR and describes how other countries wider benefits for the railway and have addressed this and makes society at large. recommendations on ways forward. 3 Benefits development around stations can bring Rising populations, seemingly future, uplifting architecture and inexorable urbanisation and a health the engagement of a variety of crisis caused by vehicle pollution stakeholders. Benign modes of and obesity make railway stations transport are at the heart of the one of the most critical pieces of process, and many countries and infrastructure for the functioning conurbations realise that the of cities. They therefore have huge future lies in creating attractive, value. This is widely recognised, multi-purpose and largely car-free but there is huge disparity between spaces around transport hubs. By countries in the degree to which the capturing the rising property values opportunities have been embedded in from the synergies of good place- national or local policy. making, public investment can be funded by commercial gain through Successful long-term developments such mechanisms as business need ‘place-making’ based on rate supplements and developer thorough research, imaginative contributions.1 thinking about the needs of the 4 Raise money for have been carried out for decades, better to plan a bespoke depot on Network Rail usually at the insistence of the cheaper land and realise the value Treasury. Little or no thought of the urban site. was given to future needs or the Commercial developments at possibility of the revival of rail East Japan Railway has also stations and on railway land are as transport. Much of the low-hanging adopted this approach of relocating old as railways, but in Britain there fruit has gone, so more creative lower-value activities. For instance, was a presumption against railways ways have to be found to develop a shopping centre was built at becoming property developers; what remains. Hiratsuka station on land previously London’s Metropolitan Railway had occupied by a warehouse, while the to develop 3,000 acres along its line mall at Kawagoe was built on land at arm’s length, but such restraints One of the three areas that NR freed up by building an elevated have disappeared in the quest for is focusing on in its attempt to station. At Shinagawa a train depot cash. Despite decades of sales by raise £1.8 billion is understood to was moved further out of the city British Rail Property Board, there be passenger train maintenance and running lines realigned to are still substantial amounts of depots. There is little justification release land for development.2 railway-owned land, and identifying for having such depots on urban suitable sites for development land that could be redeveloped, The benefits of developing has become a priority for NR and apart from proximity to a workforce. brownfield sites rather than Transport for London (TfL). Providing there are suitably located booking-on points and sufficient consuming more countryside has been emphasised by Swiss The historic land-hungry nature of overnight stabling and cleaning studies. As Jacques Herzog of railways in urban areas provides the facilities near stations where trains Swiss architects Herzog and de industry with a legacy that can be start their journey, the maintenance Meuron said: ‘in our urban planning turned to great advantage. Changed can be done on low-value land. research for Switzerland, which we logistics, coupled with the decline Bombardier chose rural Barton- of traditional rail freight, has freed under-Needwood for its Central conduct at the Federal Institute up land. This has most commonly Rivers TMD to maintain Voyagers of Technology in Basel, we put a been converted to station car-parks, rather than an urban site. strong focus on already developed but there are other activities that but now neglected sites: abandoned do not require a high land-value Moreover, as many trains are rail yards…rail and tram depots location, such as train maintenance. lengthened to address rising and the like. On these sites we can Equally, rising land and rental demand, or new fleets introduced, condense the construction to create values make raft developments over the current facilities are often new urban places and provide more stations increasingly feasible. inadequate and would require residential and office space without significant investment to allow consuming any more land.’ Sales of what was thought to be a whole train to be lifted, for redundant railway land in Britain example. It might therefore be 5 Meet housing goals car-parks and many other surplus above and around Nine Elms station or underused sites. Rather than on the Northern line extension. selling land, TfL has chosen 13 The development will see the The urgent need for housing has partners, including house builders delivery of 332 new homes, 84 of led to an agreement between NR Barratt, Berkeley, Taylor Wimpey them affordable. It will also provide and the Homes and Communities and Redrow, with which to develop 5,332m2 of new office space, 902m2 Agency (HCA) to find potential sites, sites in joint ventures. Initially 75 of retail and leisure space as well reflecting the government’s wish ‘to ensure further opportunities are sites covering 300 acres are being as a new public square, pedestrian grasped to put stations at the heart worked on, of which two-thirds are and cycle connections, cycle parking of wider community regeneration’, in Zones 1 and 2. TfL’s wider plan is and disabled car-parking spaces. as former Secretary of State for to generate £3.4 billion in non-fare The development will improve local Transport Patrick McLoughlin revenue by 2023 to reinvest in facilities and provide new revenue expressed it. The National Planning the transport network through its for TfL to reinvest. Policy Framework3 looks to reduce property development framework. the need for travel and to develop TfL is fortunate to still have sites land around transport hubs, so The first sites include a long-derelict on this scale to redevelop, but the housing around stations meets such depot site at Parsons Green, plans ability to take a longer-term view policy criteria as using brownfield for 20 town houses on a strip of land is thanks to freehold ownership. land and sustainable development. close to fashionable Thurloe Square No train operating company (TOC) in South Kensington, land around has that benefit, and the principal The first fruits of the NR/HCA Southwark and Bermondsey stations attempt to overcome that handicap collaborations were announced in is earmarked for about 300 homes in Abellio’s Greater Anglia franchise April, for three sites: 2,500 homes apiece and other locations under has not been replicated in more and 100,000m2 of office space consideration are Harrow-on-the-Hill, recent franchises (it did form part are earmarked for a ‘sustainable Northwood and Kidbrooke. At Bond of the West Coast franchise until new community’ at York; a mix of Street flats are being built above that collapsed following Virgin’s offices, shops, restaurants, cinema, the new Crossrail station. Even TfL’s successful challenge). Taking over hotel and 49 homes at Taunton; Grade I listed headquarters building in February 2012, Abellio Greater and land around Swindon station at St James’s Park, designed by Anglia has stations on a 99-year has been identified for housing and Charles Holden, is being converted full repairing and insuring lease commercial development.4 into 89 apartments. But by far (FRI), designed to facilitate longer- the largest current development term and larger investments which The recent £44 million is Earl’s Court where TfL owns the would be passed on to successive modernisation of Manchester land around the exhibition centre. operators at the termination of the Victoria station, voted in 2009 A partnership with Capco will see franchise period.6 ‘the worst station in the country’, 7,500 homes built on 77 acres.
Recommended publications
  • Consultation Technical Report
    Making Meaningful Connections Consultation Technical Report East West Rail Consultation: 31 March – 9 June 2021 This document contains the full Consultation Technical Report, without the Appendices. To access the Appendices, please visit www.eastwestrail.co.uk 01. Introduction 18 - 26 07. Project Section B: Bletchley and the Marston Vale Line 100 - 229 1.1. Chapter Summary 18 7.1. Chapter Summary 101 1.2. East West Rail 19 7.2. Introduction 104 1.3. The Project 19 7.3. Service Concepts 109 1.4. Consultation 23 7.4. Bletchley Station 141 1.5. Technical Report 26 7.5. Fenny Stratford Additional Track 144 02. The Case for East West Rail 27 - 31 7.6. Level Crossings on the Marston Vale Line 146 2.1. Chapter Summary 27 7.7. Marston Vale Line Infrastructure Upgrade 228 2.2. The overall case for East West Rail 28 08. Project Section C: Bedford 230 - 299 2.3. Benefits of railways over road improvements 31 8.1. Chapter Summary 230 03. Project Objectives 32 - 42 8.2. Introduction 234 3.1. Chapter Summary 32 8.3. Bedford St Johns 238 3.2. Introduction 33 8.4. Bedford Station 250 3.3. Safety 34 8.5. North Bedford 268 3.4. Environment 34 8.6. Conclusion 297 3.5. EWR Services 34 09. Project Section D: Clapham Green to The Eversdens 300 - 371 3.6. Connectivity 36 9.1. Chapter Summary 301 3.7. Customer Experience and Stations 37 9.2. Introduction 303 3.8. Powering EWR Services 38 9.3. Option Development 306 3.9.
    [Show full text]
  • Annex G – Forming & Delivering a Strategy
    Swindon and Wiltshire Rail Study 09/05/2019 Reference number 107523 ANNEX G – FORMING & DELIVERING A STRATEGY SWINDON AND WILTSHIRE RAIL STUDY ANNEX G – FORMING & DELIVERING A STRATEGY IDENTIFICATION TABLE Client/Project owner Swindon and Wiltshire Local Enterprise Partnership Project Swindon and Wiltshire Rail Study Study Annex G – Forming & Delivering a Strategy Type of document Report Date 09/05/2019 File name Framework N/A Reference number 107523 Number of pages 33 APPROVAL Version Name Position Date Modifications Author J Jackson Associate 12/03/2019 Checked A Sykes Associate 13/03/2019 1 by Approved D Bishop Director 15/03/2019 by Author J Jackson Associate 09/05/2019 Checked A Sykes Associate 09/05/2019 2 by Approved A Sykes Associate 09/05/2019 by TABLE OF CONTENTS 1. INTRODUCTION 6 2. IDENTIFYING THE COMPONENTS OF THE STRATEGY 7 3. NETWORK-WIDE INITIATIVES 8 4. GREAT WESTERN MAINLINE 11 RECOMMENDATIONS 11 PHASE 0: 1 TPH WESTBURY – SWINDON 12 PHASE 1: 1 TPH SOUTHAMPTON CENTRAL – SWINDON 13 PHASE 2 & 2A: GREAT WESTERN CONNECT 14 PHASE 3: EXTENSION OF GREAT WESTERN CONNECT 16 DELIVERY OF GREAT WESTERN CONNECT 16 THE SOUTH COTSWOLDS LINE 17 5. BERKS & HANTS ROUTE 18 EXTENSION OF LONDON – BEDWYN SERVICES 18 DEVIZES PARKWAY 19 EXTENSION OF LONDON – WESTBURY SERVICES TO BRISTOL (PEAK ONLY) 19 ENHANCEMENT OF PADDINGTON – EXETER SERVICES TO HOURLY 19 DELIVERING AND ENHANCED BERKS & HANTS SERVICE 19 6. WEST OF ENGLAND LINE 21 SALISBURY – LONDON JOURNEY TIME REDUCTIONS 21 PORTON STATION 22 WILTON STATION 23 ANDOVER – LUDGERSHALL LINE 23 7. TRANS WILTS CORRIDOR 24 ASHTON PARK STATION 25 THE IMPACT OF METRO WEST 25 8.
    [Show full text]
  • Press Release NCC to Construct Public Transport Hub by E18 and Arninge
    Press release August 2, 2019 NCC to construct public transport hub by E18 and Arninge Station NCC has been commissioned by the Swedish Transport Administration to construct a weather-protected pedestrian walkway over European route E18 and the Roslagsbanan light rail line connecting the new Arninge Station with Arninge retail park. The assignment also includes redevelopment of the Arninge interchange, several new bus stops, bus lanes and water and wastewater works. The contract is valued at SEK 355 million. Arninge Station will become a public transport hub for the northeastern municipalities in Stockholm County and connect the Roslagsbanan light rail line, and the new Arninge station, with bus rapid transit (BRT) to Stockholm, Norrtälje and Vaxholm and local bus routes to Åkersberga, Vallentuna and Danderyd Hospital. Parking for bicycles and park- and-ride facilities will be build adjacent to the Arninge travel hub. NCC’s assignment includes the construction of a weather-protected pedestrian walkway over European route E18 and the Roslagsbanan light rail line, including elevators and escalators for easy and safe access to bus stops adjacent to the E18 and local buses as well as to the new Arninge station on the Roslagsbanan light rail line. “We are looking forward to a productive partnership with the Swedish Transport Administration and will place great emphasis on minimizing disruption during the construction phase. The contract encompasses the construction of new infrastructure, which will benefit public and sustainable transportation, as well as water and wastewater works, and is well aligned with the expertise we possess,” says Ingegerd Simonsson, Regional Manager NCC Infrastructure.
    [Show full text]
  • Steeple Claydon and Verney Junction EWR Phase 2 Newsletter
    East West Rail Phase Two Project Newsletter Steeple Claydon & Verney Junction, Autumn 2020 Welcome! Enabling works underway Welcome to the Autumn issue of the East West Rail Alliance project newsletter. I wanted to start by thanking everyone who took the time to read and share the last issue of the newsletter. We have seen an increase in the readership of the newsletter and have received feedback on the format with the level of information in the local update sections we introduced in issue two being positive. As you’ll read below, perhaps the most obvious progress we have made since the last newsletter can be seen in Bletchley, where our team has dismantled sections of the Bletchley Flyover ready for it to be rebuilt to modern standards. The dismantling has demanded a meticulous amount of Since the last issue of our newsletter, the Alliance has planning from our team, Network Rail operations, the been preparing many areas across the project footprint for train operating companies, local authorities and our main construction activities to begin. Highways environment agencies and I’m delighted to report all the improvements have been made, with roads widened, lifts were safely completed in line with our programme. passing bays on narrow roads put in place, and access We are now in the process of removing the final points for our site compounds installed. In addition, we elements of the structure that need to be removed have been constructing ‘haul roads’, which will enable before we can start the rebuild process in construction traffic to travel between certain areas of the November/later this year.
    [Show full text]
  • Loan 2915-Prc: Jiangxi Fuzhou Urban Integrated Infrastructure Improvement
    LOAN 2915-PRC: JIANGXI FUZHOU URBAN INTEGRATED INFRASTRUCTURE IMPROVEMENT BUS RAPID TRANSIT (BRT)/ NON-MOTORIZED TRANSPORT (NMT) DESIGN, IMPLEMENTATION AND OPERATION SUPPORT I. INTRODUCTION 1. Sustainably supporting rapid urbanization is a key development challenge for the PRC, where 300 million people are expected to move to cities by 2020. Such mass migration will require a major expansion of second-tier cities such as Jiangxi Fuzhou to relieve pressure on existing urban centers and provide economic opportunities for vast numbers of people now engaged in agriculture. Major investments in urban infrastructure, transport, and related services will be necessary to accommodate development in second-tier cities and support sustainable urbanization and inclusive growth. 2. Fuzhou is a prefectural level city in Jiangxi Province. It has a total population of 3.8 million, of which 1.0 million is urban. The Fuzhou urban district where the project is located has a current population of about 500,000 and is expected to grow to 750,000 by 2020. In 2012, the Asian Development Bank (ADB) approved a loan to support the city (i) inclusive growth and balanced development by promoting sustainable urbanization and (ii) resource efficiency and environmental sustainability by promoting efficient and sustainable urban transport. 3. The project includes the following five main outputs intended to substantially improve the urban transport system in Fuzhou. Output 1: Bus rapid transit system Output 2: Urban transport hub Output 3: Fenggang River greenway Output 4: Station access roads Output 5: Institutional strengthening and capacity building 4. Output 1: Bus rapid transit system. The BRT corridor will extend 12.2 km from the north of Fuzhou through the central business district to the urban transport hub at the new railway station (output 2).
    [Show full text]
  • Hen Chennai Central Becomes the City's Transport
    hen Chennai Central becomes the city's transport hub Urban intermodal integration will become a reality at the station when Metro Ra il becomes fu lly operational in a few years Sunttha Sekar these corridors. ''We aTe expecting the CH ENNAI: When the Metro PUBLIC TRANSPORT N'ET WORK foo tfall at the station to run Skywalk Rai l is ready to run, the Nearly every form of public ground transport - buses and trains (suburban, inter-State and mass rapid transit system) - will be to several lakhs," says an­ Chennai Central station lin ked to the Metro Ra il stat ion at Chennai Central other official. junction will be a classic case In a joint venture, Afoons closer to of urban intermodal and Transtonnelstroy integration. bagged the contract worth reality now Nearly every form of pub­ Rs. 1.566 crore from CMRL lie ground transport - buses to construct Chennai Cen­ Special Correspondent and trains (suburban, inter­ tral Metro along with eight State and mass rapid transit other stations. CHENNAI : The city's first pe· destrian skyw-dlk is closer system-MRTS) - will be AiqlOrl check-in linked to the Metro Rail sta­ to reality wit~ the first tion at Chennai Central. ulslatiOIl phase connecting six A few years down the line, This apart, CMRL also points geltin" clearance. when Metro Rail becomes plans to introduce airport The skywalk will come operational, this point will check-in facili ty at Central UI) along Poonamallee be the ideal interconnect fo r Metro station. According to Jligb Road and connect public transport in the city, CMRL offici als.
    [Show full text]
  • Slope Stability East West Rail Project, UK
    Slope Stability East West Rail Project, UK PROJECT SUMMARY PROJECT NAME: Network Rail’s upgrade of the line between Bicester, Bedford, Aylesbury and Milton Keynes PROJECT DATE: February 2020 CLIENT: CC Ground Investigations Ltd CONTRACTOR : Network Rail OVERVIEW MONITORING PRODUCTS USED The East West Rail project will provide Six piezometers were installed in VWP-3000 Standard piezometer new journey opportunities between boreholes – three at the top of the Used to monitor pore water pressure. central, southern and western embankment & three at the base. England. Wi-SOS 480 VW Single Channel Geosense engineers provided two Node The development – in two phases – days training on setting up the Logger for wireless connection of will introduce direct rail passenger Wi-SOS Gateway & single channel the vibrating wire piezometer to the services between Bedford and VW Nodes, using the G-log App to Gateway. Oxford, Milton Keynes and Oxford, connect the Nodes to the Gateway. and Milton Keynes and London The Wi-SOS Gateway was set up Wi-SOS 480 Gateway with sim card Marylebone via Aylesbury. for each borehole – Setting up the & solar panel kit Phase 2 of the Western Section seess engineering units by in-putting Central data acquisition logger the upgrade and reconstruction of the base readings & selecting the fitted with SIM card to provide GPRS existing but no longer in use sections correct calculation & renaming connection for remote access via web of line that link Bedford with Bicester, each borehole so they are easily browser. and Milton Keynes with Aylesbury. identifiable when logging onto the Gateway to view the data.
    [Show full text]
  • East West Rail Bedford to Cambridge Route Option Consultation
    East West Rail Bedford to Cambridge Route Option Consultation RESPONSE FROM BEDFORD BOROUGH COUNCIL March 2019 1 EAST WEST RAIL BEDFORD TO CAMBRIDGE ROUTE CONSULTATION RESPONSE FROM BEDFORD BOROUGH COUNCIL Final 11/3/19 Contents Executive Summary 3 1. Introduction and Purpose 5 2. Economic Impact of Route Options 6 3. Bedford Town Masterplan 9 4. Accessing Bedford 11 5. Enhancing National and International Connectivity Through Bedford Midland 13 6. Connectivity with HS2 16 7. Impact of Routes South of Bedford on Wixams 18 8. Route Engineering and Costs 20 9. Summary and Conclusions 21 List of Figures Figure 1 -Difference in GVA Between Bedford Midland Route and South of Bedford Route 7 Figure 2 - GVA Impact on Central Bedford 7 Figure 3 - GVA Impact of Future Service Developments 8 Figure 4 - Bedford Town Centre Masterplan 9 Figure 5 - Journey times in minutes from Cambridge to central Bedford locations 11 Figure 6 - Potential journey time benefits of interchange with EWR at Bedford Midland 14 Figure 7 - International connectivity through interchange at Bedford Midland 15 Figure 8 - Journey times modelled by Midlands Connect in Classic Compatible SOBC 16 Figure 9 - Journey time benefits through Bedford Midland with HS2 classic compatible services 17 Figure 10 - Location of Wixams Station 18 2 EAST WEST RAIL BEDFORD TO CAMBRIDGE ROUTE CONSULTATION RESPONSE FROM BEDFORD BOROUGH COUNCIL Final 11/3/19 Executive Summary Bedford Borough Council (the Council) has always been a strong supporter of East West Rail (EWR). The Council’s strategy is to work positively with the EWR Company and others to maximise its economic benefits.
    [Show full text]
  • CA OCT1513R23 East West Rail
    Division(s): All CABINET - 15 OCTOBER 2013 East West Rail Local Contributions Report by the Deputy Director of Environment & Economy Purpose of the Report 1. East West Rail is a major project to establish a strategic railway connecting Oxford with Central, Southern and Western England. The project is being promoted by the East West Rail Consortium – a group of local authorities and business partnerships with an interest in improving access to and from East Anglia, Milton Keynes South Midlands and the Oxfordshire knowledge economy growth areas. The Consortium is required to secure local contributions towards the scheme of £50m and this report details the proposed agreement and payment profile for Oxfordshire County Council to make a contribution of £11m. Overview 2. East West Rail is an infrastructure project that has both national importance and strategic significance for the Oxfordshire economy. The step change in connectivity that the scheme provides between Oxford, Bicester and onward to Milton Keynes and Bedford makes it a priority for delivery within the City Deal proposal. 3. The improved service between Oxford and Bicester will be a major step forward in realising the ambition of at least 4 trains per hour between Didcot (Science Vale), Culham, Oxford, Water Eaton (Oxford Parkway) and Bicester: a level of service that forms a core component of the Oxford Science Transit proposal within the City Deal. 4. The strategic significance of the scheme is recognised by local authorities across Oxfordshire through its inclusion in the Local Investment Plan approved by the Spatial Planning & Infrastructure Partnership. The County Council, Oxford City and Cherwell District are members of the East West Rail Consortium, the local authority partnership which is championing of the scheme helped secure Government support for its delivery.
    [Show full text]
  • Visual Analytics for Understanding Traffic Flows of Transport Hubs from Movement Data
    Visual Analytics for Understanding Traffic Flows of Transport Hubs from Movement Data Linfang Ding, Jian Yang, Liqiu Meng Lehrstuhl für Kartographie, Technische Universität München Abstract. Transport hubs such as airports, railway stations play an im- portant role in the transportation system and urban development. Under- standing the traffic flows of the transport hubs may help traffic engineers and policy makers to improve the transportation planning and support pas- sengers to efficiently plan their trips. However, analyzing the movement data is very challenging due to their large data volume, implicit spatiotem- poral relationship, and uncertain semantics. In this paper, we investigate effective visual analytics for exploring spatiotemporal, semantic patterns in the traffic flows in/out of the transport hubs. The contribution of this work is three fold: (1) we propose a visual analysis workflow incorporating data mining techniques and visualization methods to enable users visually ex- plore the spatiotemporal and semantic patterns in the traffic flows in/out of the transport hubs; (2) we use a spatial clustering method to extract signifi- cant places and categorize them to different functional regions based on the POI information; (3) we design a novel visual interface that enables the visual exploration of movement data at both an aggregated and an individ- ual level. The visual analytics framework is tested on a real world floating taxi data set in Shanghai. Preliminary experiments show that our proposed framework is feasible and can effectively support visual exploration and identify interesting traffic flow patterns. Keywords: Visual analytics, Traffic flow, Transport hubs 1. Introduction Transport hubs such as airports, railway stations play an important role in the transportation system and urban development.
    [Show full text]
  • Brunel Awards Winners Announced
    Modified version (16/8/2011) FOR IMMEDIATE RELEASE BRUNEL AWARDS WINNERS ANNOUNCED Washington, D.C./ Paris, 10 August 2011 – The Association of American Railroads (AAR) and the International Union of Railways (UIC), the worldwide association of cooperation for railway companies, jointly announced today that 44 projects from 12 nations have been recognized for design excellence in the 2011 Edition of the prestigious Brunel Awards International Railway Design Competition in judging recently completed in Washington, D.C. Over 150 entries were received from railway and government organizations throughout the world that own or operate railway services and/or manage rail infrastructure. Twenty projects received Brunel Awards, the highest level of recognition, while 24 others received Commendations. The U.S. and Japan won the most Brunel Awards with five each. Other nations receiving awards are Austria, China, Germany, Netherlands, Portugal, Spain, and Sweden. The official award ceremony will take place in Washington on Oct. 14, 2011 with representatives of the U.S. Department of Transportation, the AAR, the UIC, and the Watford Group making presentations to the winners. The Brunel Awards competition recognizes and promotes the best in railway architecture, engineering, landscape and environmental design, product design, locomotive and car design, graphic arts, and corporate branding amongst the world’s railways. Honorary Co-Chairs of the Brunel Awards Committee are the Hon. Joseph Szabo, FRA Administrator and AAR President and CEO Edward R. Hamberger. "This year‘s submissions from the rail industry are evidence of the tremendous commitment to quality in design and expertise in building and maintaining a true 21st Century rail network.
    [Show full text]
  • Western Section, East West Rail Bedford to Oxford, Milton Keynes to Aylesbury
    Western Section, East West Rail Bedford to Oxford, Milton Keynes to Aylesbury Period 4 Report: 23 June – 20 July, 2013 The East West Rail project continues to make steady progress to towards its goal of a new rail service between Bedford and Oxford, Milton Keynes and Aylesbury via Bletchley and Winslow and new services from Oxford and Water Eaton Parkway to London Marylebone. Phase 1 – Oxford to Bicester Town This section will deliver the benefits of a new station at Water Eaton Parkway, upgrades to the current stations at Islip and Bicester Town and a new service between Oxford and London Marylebone. Construction begins The works in this section are already very advanced with newt fencing and new badger setts being constructed along the route. The works will be carried out between August 2013 and March 2016 and will be delivered in the three stages. Newt fencing at Bicester Chord Stage 1 – Earth Works near Bicester Work to construct a new rail chord between the Oxford Line and Chilterns Main Line east of Bicester is due to start on site in early August 2013 for completion in July 2014. The works will include large earth moving activities with material being brought in by rail. Stage 2 – Bicester Chord Track Construction Work will begin in May 2014 to construct a new twin-tracked railway and supporting systems between the new chord through to the new station near Water Eaton Parkway. Work includes construction of a new station at Water Eaton Parkway, station upgrades and new footbridges to support level crossing closures included in the Transport and Works Act Order (TWAO).
    [Show full text]