Objectives of the Hirakud Dam Project Objectives of the Hirakud Dam Project The Hirakud Dam Project is a multipurpose Major project built across river Mahanadi at about 15.0 Km. upstream of Sambalpur town in the state of Orissa (i.e latitude 21˚-32’-00”N, longitude 83˚-52’-30”E) . This happens to be the first post independence major multipurpose river valley project in India. In 1945, it was decided, under the Chairmanship of Dr.B.R. Ambedkar, that the potentialities of river Mahanadi should be fruitfully and expeditiously investigated for multipurpose use. Central Water-ways Irrigation and Navigation Commission took up the work. The foundation stone of Hirakud Dam was laid by Sir Howthrone Lewis, the then Governor of Orissa, on 15th March 1946. The project was formally inaugurated by the first Prime Minister of independent India, Pandit Jawaharlal Nehru on 13th January 1957. Power generation along with water supply for irrigation started progressively from 1956 and full potential was achieved by 1966. Hirakud Dam is a composite structure of earth, concrete and masonry. The Main Dam, having overall length of 4.8 Km., spans between hills Lamdungri on left and Chandidungri on the right. The Dam is flanked by 21.0 Km. long earthen dykes both on left and right sides to close the low saddles beyond the abutment hills. It has the distinction of being the longest dam in Asia, 25.80 Km. long with Dam and Dykes taken together. It has also the rare distinction of forming the biggest artificial lake in Asia with a reservoir spread of 743.0 Kms.at full reservoir level. Hirakud Dam intercepts 83,400 Sq.Km. (32,200 sq.miles) of Mahanadi catchment .The reservoir has a live storage of 4,823 M.Cum ( present) with gross storage of 5,896 M.Cum (present) . Hirakud Dam project provides 1, 59,106 Ha. of Kharif and 1,08,385 Ha. of Rabi irrigation in the districts of Sambalpur, Bargarh, Bolangir and Subarnapur. The water released through power house irrigates further 2,51,000 Ha. of C.C.A in Mahanadi delta. Besides this the project provides flood protection to 9500 Sq.Km. of delta area in undivided districts of Cuttack and Puri. The completed cost of the project was Rs. 100.02 crores. in 1957. .
Recommended publications
  • Sonepur Was Awarded the Status of a District in April 1993 After Being Carved out from the Erstwhile Bolangir District and Was Renamed As Suvarnapur
    GROUND WATER INFORMATION BOOKLET OF SUVARNAPUR DISTRICT, ORISSA CENTRAL GROUND WATER BOARD MINISTRY OF WATER RESOURCE SOUTH EASTERN REGION, BHUBANESWAR DISTRICT AT A GLANCE Sl ITEMS STATISTICS No 1. GENERAL INFORMATION i) Geographical area (sq km) 2337 sq. km ii) Administrative Division 2 Number of Tehsil/Block 6 Number of Panchayat/villages 80 nos of gram panchayat iii) Population (as on 2011 census) 652107 iv) Average annual rainfall mm 1443.5mm 2. GEOMORPHOLOGY Major Physiographic units Undulating plains dotted with residual hills Major Drainage River Mahanadi, Tel and their tributaries 3. LAND USE (sq km) a) Forest area 410.00 b) Net sown area 1070.00 c) Cultivable area 4. MAJOR SOIL TYPES Alfisols and Vertisols 5. AREA UNDER PRINCIPAL CROPS 6. IRRIGATION BY DIFFERENT SOURCES (Area and Numbers of structures) Dug wells 5282 –DW with Tenda 512-DW with pumpset Tube well/ bore well 22 Tanks/Ponds Canals Other sources Net irrigated area Gross irrigated area 2119000 ha 7. NUMBERS OF GROUND WATER MONITORING WELLS OF CGWB (AS ON 31.3.11) 8. No of Dug well 30 9. No of Piezometers 10. PREDOMONANT GEOLOGICAL Precambrian crystalline FORMATIONS 11. HYDROGEOLOGY Major Water bearing Formation Granite, Khondalite, Charnokite, Quartzite Pre monsoon Depth to water level during 2.12 m-8.26 m 2011 Post monsoon Depth to water level during 1.06 m-3.18 m 2011 Long term water level trend in 10 years Pre monsoon (Rise 0.008-0.246 in m/yr m/yr Fall 0.001-7.85 m/yr) Post monsoon (Rise 0.001-0.349 m/yr Fall 0.002-0.248 m/yr) 12.
    [Show full text]
  • Defaulter-Private-Itis.Pdf
    PRIVATE DEFAULTER ITI LIST FOR FORM FILL-UP OF AITT NOVEMBER 2020 Sl. No. District ITI_Code ITI_Name 1 ANGUL PR21000166 PR21000166-Shivashakti ITC, AT Bikash Nagar Tarang, Anugul, Odisha, -759122 2 ANGUL PR21000192 PR21000192-Diamond ITC, At/PO Rantalei, Anugul, Odisha, -759122 3 ANGUL PR21000209 PR21000209-Biswanath ITC, At-PO Budhapanka Via-Banarpal, Anugul, Odisha, - 759128 4 ANGUL PR21000213 PR21000213-Ashirwad ITC, AT/PO Mahidharpur, Anugul, Odisha, -759122 5 ANGUL PR21000218 PR21000218-Gayatri ITC, AT-Laxmi Bajar P.O Vikrampur F.C.I, Anugul, Odisha, - 759100 6 ANGUL PR21000223 PR21000223-Narayana Institute of Industrial Technology ITC, AT/PO Kishor, Anugul, Odisha, -759126 7 ANGUL PR21000231 PR21000231-Orissa ITC, AT/PO Panchamahala, Anugul, Odisha, -759122 8 ANGUL PR21000235 PR21000235-Guru ITC, At.Similipada, P.O Angul, Anugul, Odisha, -759122 9 ANGUL PR21000358 PR21000358-Malayagiri Industrial Training Centre, Batisuand Nuasahi Pallahara, Anugul, Odisha, -759119 10 ANGUL PR21000400 PR21000400-Swami Nigamananda Industrial Training Centre, At- Kendupalli, Po- Nukhapada, Ps- Narasinghpur, Cuttack, Odisha, -754032 11 ANGUL PR21000422 PR21000422-Matrushakti Industrial Training Institute, At/po-Samal Barrage Town ship, Anugul, Odisha, -759037 12 ANGUL PR21000501 PR21000501-Sivananda (Private) Industrial Training Institute, At/Po-Ananda Bazar,Talcher Thermal, Anugul, Odisha, - 13 ANGUL PU21000453 PU21000453-O P Jindal Institute of Technology & Skills, Angul, Opposite of Circuit House, Po/Ps/Dist-Angul, Anugul, Odisha, -759122 14 BALASORE
    [Show full text]
  • Surface Water Quality Analysis Along Mahanadi River (Downstream of Hirakud to Delta)
    Published by : International Journal of Engineering Research & Technology (IJERT) http://www.ijert.org ISSN: 2278-0181 Vol. 7 Issue 07, July-2018 Surface Water Quality Analysis Along Mahanadi River (Downstream of Hirakud to Delta) Deba prakash satapathy1, Anil Kumar Kar2, Abhijeet Das3 1Associate Professor, C.E.T. Bhubaneswar 2Associate Professor, V.S.S.U.T, Burla 3Mtech Student, Civil Engg. Department, C.E.T, Bhubaneswar, Abstract: - In the present research program the status of The Mahanadi watershed is the most developed and pollution of water of a major river namely Mahanadi of Odisha urbanized region in the state of Odisha. The increasing (downstream of Hirakud dam) has been analyzed. The study deterioration of water quality of the watershed is mainly was conducted to assess and ascertain the physico-chemical attributed to the uncontrolled and improper disposal of properties of Mahanadi river water from sixteen different solid and toxic waste from industrial effluents, agricultural water quality monitoring stations of State Pollution Control Board. The analysis was carried out by taking certain runoff and other human activities. This alarming water important water quality determining parameters like pH, pollution not only causing degradation of water quality but Dissolved Oxygen (DO), Biological Oxygen Demand (BOD), also threatens human health and balance of aquatic Chemical Oxygen Demand (COD), Chloride, Total Dissolved ecosystem, and economic development of the state. Oxygen (TDS), Nitrate, Sulphates, Total Hardness (TH), In the present study, data matrix obtained during 14 years Electrical Conductivity (EC) and Fluoride. Analyzed monitoring program (2000 to 2014) is subjected to different parameters like pH, DO, TH, Chloride, Sulphate and TDS multivariate statistical approach to extract information were found within permissible limit prescribed by IS 10500 about the similarities or dissimilarities between sampling except Nitrate and Fluoride content which exceeds at some sites, and the influences of possible sources on water sites.
    [Show full text]
  • Placement Brochure 2018-19
    PLACEMENT BROCHURE 2018-19 Government College of Engineering Kalahandi, Bhawanipatna (A Constituent College of BPUT, Odisha) (http://gcekbpatna.ac.in/) • VISION & MISSION • STUDENT ACTIVITIES • GCEK AT A GLANCE • CLUBS • MESSAGE FROM THE PRINCIPAL • TRAINING AND PLACEMENT CELL • MESSAGE FROM THE PIC (T&P CELL) • PLACEMENT TEAM • INFRASTRUCTURE • HOW TO REACH @ GCEK • WHY RECRUIT US • T&P ACTIVITIES • DEPARTMENT DEMOGRAPHICS • OUR ALUMNI • COMPUTER SCIENCE & ENGINEERING • ACHIEVEMENTS • ELECTRICAL ENGINEERING • TRAINING AND INTERNSHIPS • MECHANICAL ENGINEERING • IN AND AROUND GCEK • CIVIL ENGINEERING • STUDENT COORDINATORS • BASIC SCIENCE & HUMANITIES • CONTACT US VISION MISSION • To produce high profile technical graduates with • To be an academic institution of excellence striving innovative thinking and technical skills to meet the persistently for advancement of technical education challenges of the society. and research in service to mankind. • To foster, promote and sustain scientific research in emerging fields of technology. • To establish interactions with leading technological institutions, research centres and industries of national and international repute. • To induct in each member of GCEK , the spirit of humanity , diligence and dedication to work for betterment of humankind. Government College of Engineering, Kalahandi was established in the year 2009 by an act of Govt. of Odisha and stands a humble spectacle where tradition meets modernisation, aspiration meets inspiration, where our aim is to keep scaling new heights. Functioning as a constituent college of BPUT, Odisha, the college offers 4 years Under Graduate B.Tech degree programme in Civil Engineering, Computer Science &Engineering, Electrical Engineering and Mechanical Engineering & Masters degree in Thermal Engineering and Power System Engineering. For structural enhancing the institute has been successful in keeping itself up to the standards by surpassing the expectation in producing a brand of engineers capable of adapting all over the world.
    [Show full text]
  • Mahanadi River Basin
    The Forum and Its Work The Forum (Forum for Policy Dialogue on Water Conflicts in India) is a dynamic initiative of individuals and institutions that has been in existence for the last ten years. Initiated by a handful of organisations that had come together to document conflicts and supported by World Wide Fund for Nature (WWF), it has now more than 250 individuals and organisations attached to it. The Forum has completed two phases of its work, the first centring on documentation, which also saw the publication of ‘Water Conflicts in MAHANADI RIVER BASIN India: A Million Revolts in the Making’, and a second phase where conflict documentation, conflict resolution and prevention were the core activities. Presently, the Forum is in its third phase where the emphasis of on backstopping conflict resolution. Apart from the core activities like documentation, capacity building, dissemination and outreach, the Forum would be intensively involved in A Situation Analysis right to water and sanitation, agriculture and industrial water use, environmental flows in the context of river basin management and groundwater as part of its thematic work. The Right to water and sanitation component is funded by WaterAid India. Arghyam Trust, Bangalore, which also funded the second phase, continues its funding for the Forums work in its third phase. The Forum’s Vision The Forum believes that it is important to safeguard ecology and environment in general and water resources in particular while ensuring that the poor and the disadvantaged population in our country is assured of the water it needs for its basic living and livelihood needs.
    [Show full text]
  • Hirakud RAP.Pdf
    DAM REHABILITATION AND IMPROVEMENT PROJECT CONSTRUCTION OF ADDITIONAL SPILLWAY OF HIRAKUD DAM, IN SAMBALPUR DISTRICT, ODISHA DRAFT RESETTLEMENT ACTION PLAN (RAP) Submitted by Department of Water Resources Government of Odisha June, 2018 Construction of Additional Spillway of Hirakud Dam under DRIP CONTENTS EXECUTIVE SUMMARY ................................................................................ i E.1 Background .............................................................................................................................. i E.2 Hirakud Dam Rehabilitation and Improvement ...................................................................... i E.3 Displacement of People ........................................................................................................... i E.4 Impacts ................................................................................................................................... ii E.5 Entitlement ............................................................................................................................. ii E.6 Consultation ........................................................................................................................... iii E.7 Implementation ..................................................................................................................... iv E.8 Monitoring and Evaluation .................................................................................................... iv E.9 Grievance Redressal Mechanism ..........................................................................................
    [Show full text]
  • Dam Rehabilitation and Improvement Project Construction of Additional Spillway at Hirakud Dam, in Sambalpur District, Odisha
    DAM REHABILITATION AND IMPROVEMENT PROJECT Public Disclosure Authorized CONSTRUCTION OF ADDITIONAL SPILLWAY AT HIRAKUD DAM, IN SAMBALPUR DISTRICT, ODISHA Public Disclosure Authorized ENVIRONMENTAL IMPACT ASSESSMENT Submitted By Public Disclosure Authorized Department of Water Resources Government of Odisha January, 2018 Public Disclosure Authorized CONTENTS Sl. No. TOPIC PAGE EXECUTIVE SUMMARY E-1 to E-25 E.1 INTRODUCTION E-1 E.2 NEED OF THE PROPOSED PROJECT E-1 E.3 NEED & OBJECTIVE OF EIA STUDY E-2 E.4 SCOPE OF THE STUDY E-2 E.5 DESCRIPTION OF PROJECT E-2 E.5.1 SALIENT FEATURES OF PROJECT E-3 E.6 ACTS, POLICY & INSTITUTIONAL FRAMEWORK E-5 E.7 BASELINE ASSESSMENT OF ENVIRONMENTAL COMPONENTS E-10 E.7.1 THE STUDY AREA E-10 E.7.2 SUMMARY OF BASELINE DATA E-10 E.8 STAKEHOLDERS AND PUBLIC CONSULTATION E-13 E.8.1 ISSUE DISCUSSED E-14 E.9 ANTICIPATED IMPACTS ON VARIOUS ENVIRONMENTAL E-18 COMPONENTS E.10 ANALYTICAL FINDINGS FROM IMPACT ASSESSMENT E-23 E.11 MITIGATION MEASURES E-23 E.12 ANALYSIS OF ALTERNATIVES E-23 E.13 ENVIRONMENTAL MANAGEMENT PLAN [EMP] E-24 E.13.1 ENVIRONMENTAL MONITORING PLAN [EMOP] E-24 E.13.2 ENVIRONMENT GRIEVANCE REDRESSAL MECHANISM E-24 E.13.3 INSTITUTIONAL ARRANGEMENT, TRAINING & CAPACITY E-24 BUILDING E.13.4 BUDGETARY SUPPORT E-25 CHAPTER-1: PROJECT DESCRIPTION C1-1 to C2-19 1.0 INTRODUCTION C1-1 1.1 HIRAKUD DAM ON RIVER MAHANADI C1-1 1.1.1 MAHANADI BASIN IN BRIEF C1-1 1.1.2 SALIENT FEATURES OF HIRAKUD DAM C1-2 1.1.3 DESIGNED MULTIPURPOSE BENEFITS C1-3 1.2 JUSTIFICATION OF THE PRESENT PROPOSAL C1-4 1.2.1 REVIEW OF DESIGN FLOOD C1-4 1.2.2 REVISED HYDROLOGY & ITS CONSEQUENCES C1-4 1.3 NEED OF THE PROPOSED PROJECT C1-5 1.4 ANALYSIS OF ALTERNATIVES C1-6 1.4.1 PRE-PROJECT DEVELOPMENT ALTERNATIVES C1-6 1.4.2 ENVIRONMENTAL ALTERNATIVE SCENARIO OF C1-8 IMPLEMENTATION & POST IMPLEMENTATION PHASES Sl.
    [Show full text]
  • Hirakud Dam Project
    GOVERNMENT OF INDIA ER COMMISSION REPORT OF THE ADVISORY COMMITTEE ON HIRAKUD DAM PROJECT * MARCH 1952 * Plt!Nl'ED IN INDIA BY THE MANAGER, GOVERNMENT OF INDIA PRESS, SIMlA IDRAKUD. 6th March, 1952, To The Secretary to the Government of India, Ministry of Natural ~esourcea and Scientific Research, ·NEw DELm. DEAR Sm, We the Members of the Advisory Committee on Hirakud Dam Project, appointed by the Go vt. o India vide Resolution No. DWII-12(24) dated the lOth January 1952, have reviewed the Revised Esti mates of the Hirakud Dam Project prepared by the Central Water and Power Commission, and submi· ~ our Report for the con..~iderati<?n of the Government. Th~ Committee met at Hira.kud on the 11th February and concluded its sitting on the 6th March 1952. During this period, it inspected the works under construction and the areas to be irrigated bot] in the Sambalpur District and the Delta lower down and interviewed several important officers of th1 Orissa State and the Hirakud Administration. · We wish to acknowledge the unfailing courtesy and cooperation r~ceived from Shri B. Sivaraman I.C.S., Commissioner, Northern Circle and Member, Board of Revenues, Orissa and his officers; Sill Kanwar Sain, I.S.E., Member (Designs) and Chief Engineer, Hirakud Dam Project, his Superintendin1 Engineers and Executive Engineers; Shri S. Sundararajan, Financial Adviser and Chief Accounts Officei Hirakud Dam Project; Dr. J. B. Mohanty, Secretary, River Valley Development Department, Orissa Mr. J. Shaw, I.S.E., Chief Engineer (Irrigation) Orissa; Shri R. L. Narayanan, ChiefEngineer (Electri city), Orissa ; Col.
    [Show full text]
  • Sedimentation Study of Hirakud Reservoir Through Remote Sensing Techniques
    Journal of Spatial Hydrology Volume 7 Number 1 Article 7 2007 Sedimentation Study of Hirakud Reservoir through Remote Sensing Techniques Follow this and additional works at: https://scholarsarchive.byu.edu/josh BYU ScholarsArchive Citation (2007) "Sedimentation Study of Hirakud Reservoir through Remote Sensing Techniques," Journal of Spatial Hydrology: Vol. 7 : No. 1 , Article 7. Available at: https://scholarsarchive.byu.edu/josh/vol7/iss1/7 This Article is brought to you for free and open access by the Journals at BYU ScholarsArchive. It has been accepted for inclusion in Journal of Spatial Hydrology by an authorized editor of BYU ScholarsArchive. For more information, please contact [email protected], [email protected]. Journal of Spatial Hydrology Vol.7, No.1, Spring 2007 Sedimentation Study of Hirakud Reservoir through Remote Sensing Techniques Saumitra Mukherjee*, Vijay Veer**, Shailendra Kumar Tyagi** and Vandana Sharma** Abstract Any reduction in water spread area at a specified elevation over a time period is indicative of sediment deposition at this level. This when integrated over a range of water stages helps in computing volume of storage lost through sedimentation. This study relates to estimation of capacity loss due to sedimentation of Hirakud reservoir, located in Orissa, India. Satellite data of 5 optimal dates corresponding to various water stages from minimum to maximum draw down levels were used in estimating the water spread areas. Simple ratiod (NIR/RED) image were generated to identify the water pixels and then verifying the standard FCC. The non-water pixels were then identified with the ratiod (GREEN/NIR) image and removed to have the total water spread.
    [Show full text]
  • Thermal Power Plants in Odisha
    Thermal Power Plants in Odisha Sl. Name Address & Contact Generation No. Person with E-mail-id Capacity in MW 1. M/s Aarti Steel Ltd. At-Ghantikhala, 80 Po- Mahakalabasta, Athagada, Cuttack Mr. Pritish Dash, Manager (Env.) [email protected] M-9437083942 2. M/s ACC Ltd. Bargarh Cement Works, 30 Cement Nagar, Bardol, Bargarh, Pin No. 768 038, Ph No. 91-6646-247161, Fax. 91-6646-246430 Mr. Debapratim Bhadra, Head- Energy & Env. debapratim.bhadra@accli mited.com M-9777447636 arupkumar.das@acclimite d.com 3. M/s Action Ispat & Power At: Pandripathar, 63 (P) Ltd. P.O. Marakuta, Dist-Jharsuguda, Pin No. 768202 Mr. BhabyaRanjan Nayak, Environment Dept. environment.bhabyaranja [email protected] Mr. Ranjan Sahu Asst. Env. Officer, M-7752023544 [email protected] om 4. M/s Bhushan Power & Vill-Thelkoloi, 370 Steel Ltd. P.O. Lapanga- 768232 Teh. Rengali, Dist-Sambalpur, Mr. Niranjan Parida, Dy. Manager, [email protected] M-9437150569 Sl. Name Address & Contact Generation No. Person with E-mail-id Capacity in MW 5. M/s Bhushan Steel Ltd. At- Narendrapur, 142 Meramundali, Dhenkanal Ph. No. 06762-300000 / 660002 / 660000, Fax. 91-011-66173997 Mr. Santosh Pattajoshi, Sr. Manager, santosh.pattajoshi@bhusha nsteel.com M-7077757663 ram.sharma@bhushansteel .com 6. M/s Bhushan Energy Ltd. At-Ganthigadia, 300 P.O. Nuahata, Via-Banarpal, Dist-Angul Pin No. 759128 Ph-6762-300000 Fax. 011-66173997 7. M/s Birla Tyres At/Po-Chhanpur, Kuruda, 20 Balasore-756056, Ph. No. 06782- 254621/254225, Fax.06782-254225 Mrs. Suchismita Patnaik, Team Member, suchismita_patnaik@birlaty re.com 8.
    [Show full text]
  • Odisha Review
    ODISHA REVIEW VOL. LXXIV NO.4 NOVEMBER - 2017 SURENDRA KUMAR, I.A.S. Commissioner-cum-Secretary LAXMIDHAR MOHANTY, O.A.S Director DR. LENIN MOHANTY Editor Editorial Assistance Production Assistance Bibhu Chandra Mishra Debasis Pattnaik Bikram Maharana Sadhana Mishra Cover Design & Illustration D.T.P. & Design Manas Ranjan Nayak Hemanta Kumar Sahoo Photo Kishor Kumar Sinha Raju Singh Manoranjan Mohanty Niranjan Baral The Odisha Review aims at disseminating knowledge and information concerning Odisha’s socio-economic development, art and culture. Views, records, statistics and information published in the Odisha Review are not necessarily those of the Government of Odisha. Published by Information & Public Relations Department, Government of Odisha, Bhubaneswar - 751001 and Printed at Odisha Government Press, Cuttack - 753010. For subscription and trade inquiry, please contact : Manager, Publications, Information & Public Relations Department, Loksampark Bhawan, Bhubaneswar - 751001. Rs.5/- Five Rupees / Copy E-mail : [email protected] Visit : http://odisha.gov.in Contact : 9937057528(M) CONTENTS Good Governance ... ... 1 Baliyatra : A Festival of Odisha's Ancient Maritime Trade Dr. Rabindra Nath Dash ... 13 Measuring Fiscal Performance of Indian States with Special Dr. Bibhuti Ranjan Mishra ... 17 Reference to Odisha Prof. Asit Ranjan Mohanty Kalinga and Champa : A Study in Ancient Maritime Relations Dr. Benudhar Patra ... 22 Paika Rebellion of 1817 : The First Independence War of India Akshyaya Kumar Nayak ... 27 Boita Bandana Festival and Water Pollution Dr. Manas Ranjan Senapati ... 32 Odisha Welcomes the World as Tourist But Bids Farewell as Friend Debadutta Rath ... 34 Exploring the Lost River(s) at Konark : Chirashree Srabani Rath, ... 39 A Multi-Disciplinary Approach Rashmi Ranjan Behera, Subhomay Jana, Priyadarshi Patnaik, and William K.
    [Show full text]
  • Climate Change, Migration and Adaptation in Deltas: Key Findings
    CLIMATE CHANGE, MIGRATION AND ADAPTATION IN DELTAS Key findings from the DECCMA project BANGLADESH UNIVERSITY JADAVPUR UNIVERSITY OF GHANA OF ENGINEERING & UNIVERSITY INDIA TECHNOLOGY CONTENTS Our approach and research activities 1 Why are deltas important? 6 What we have done 8 What we have done: economic modelling 10 What we have done: integrated assessment modelling 12 Present situation in deltas 14 At risk from climate change – sea level rise, coastal erosion, flooding, salinization 16 Deltas play a key role in national economies 18 Migration from rural areas to nearby urban areas is a continuing trend, driven largely by economic opportunity 20 Migration has consequences in both sending and receiving areas 22 Environment is a proximate cause of migration 23 Displacement and planned relocation 24 Adaptation is occurring now 30 Livelihood adaptations 31 Structural adaptations 33 Migration as an adaptation 34 Sub-optimal policy and implementation framework for migration and adaptation 36 Future situation in deltas 38 Impacts of 1.5OC temperature increase 40 Climate change will lead to significant economic losses by 2050 42 More adaptation will be needed 44 Modelling what determines adaptation decisions 46 Influential drivers of adaptation decisions by male- and female-headed households 47 Engagement and impact 50 Raising the profile of delta residents with parliamentarians (Volta) 52 Inputs to the Coastal Development Authority Bill (Volta) 53 Requested to provide inputs to policy and highlighting delta migration (Mahanadi) 54 Partnership with the West Bengal State Department of Environment (Indian Bengal delta) 55 Capacity building 56 Outputs 63 DECCMA team members 72 OUR APPROACH OUR APPROACH AND RESEARCH ACTIVITIES 4 5 1.
    [Show full text]