Executive Summary EXECUTIVE SUMMARY 1.0 INTRODUCTION Sambalpur is located in the western part of Odisha, and is one of the largest and oldest cities in the state. It is the headquarters of Northern Revenue Division and of Mahanadi Coalfield Limited (MCL). It is situated about 300 km (190 mi) west of the state capital Bhubaneswar, 550 km (340 mi) west of Kolkata in West Bengal and 278 km (173 mi) east of Raipur in Chhattisgarh. It is on the bank of th e Mahanadi River . The city contains many famous temples, historic buildings and parks. Sambalpur is famous for premier educational institutes like Sambalpur University, Veer Surendra Sai Institute of Medical Sciences and Research (VIMSAR), Veer Surendra Sa i University of Technology (VSSUT), Gangadhar Meher University, Indian Institute of Management Sambalpur and Odisha State Open University (OSOU). Hirakud Dam, the longest earthen dam in the world and the largest artificial lake of Asia, is at Hirakud . The proposed ropeway project would connect from Jawahar Udyan to Gandhi Minar at Hirakud, Dist - Sambalpur, Odisha . 1.1 BACK GROUND OF PROMOTER In an effort to promote tourism, Mahanadi Coalfield Limited (MCL) has sanctioned Rs. 5 crore for construction of the first ropeway project in Sambalpur in January 2014. The proposed ropeway project would connect Nehru Park with Gandhi Minar at the Hirakud Dam site. Under its corporate social responsibility (CSR) initiative, MCL has boosted infrastructure development in t he periphery areas of its projects in Sundergarh, Jharsuguda and Angul districts . 1.2 SITE AND SURROUNDING The proposed ropeway project site is located at Hirakud Dam site , Dist - Sambalpur, Odisha . The Geographical co - ordinate of the project site is: Gandhi Minar: Latitude - 21° 32 ’ 38.73 ” N Longitude - 83 ° 53 ’ 17.77 ” E Nehru Garden: Latitude - 21° 32 ’ 23.12 ” N Longitude - 83 ° 53 ’ 19.30 ” E The project site is well connected with National Highway NH - 6. The nearest railway station is Sambalpur Railway station at a distance of approx 9.8 Km . 1.3 TECHNICAL DETAILS The ropeway system used in the alignment would be Mono - cable Pulsed Gondola 6 - Seater cabin system. The broad technical specification of the proposed ropeway will be . Table No. 1 : Technical Specification of Mono - Cable Pulsed Gondola Sl. No. Item Parameters 1 System Mono - cable Pulsed Gondola System 2 Direction of Operation Clockwise 3 Design Capacity, Persons Per 400 @ max speed Hour (PPH) 4 Line speed, m/sec 0.0 - 5.0 5 Horizontal distance, m 426.311 6 Vertical rise, m 120.000 7 Inclined length, m 442.816 8 Cabin capacity, seater 4 9 Alignment Straight 10 Line gauge, m 4.4 11 Cabin Group spacing, m 442.816 12 No. of cabins in line 0 13 No. of cabins in stations 4 14 Total no. of cabins 4 15 Type of cabin Fully enclosed cabin with lockable door, fabricated from Aluminum and Magnesium Alloy Section and Sheeting duly painted 16 Travel time one way, sec 85 17 Rope 36 mm, 6x19 Langs Lay, PP Core 1770 Grade 18 Location of Tension System Lower Station 19 Type of Tension System Hydraulic 20 Value of Tension 20.6 Tons 21 Location of Drive Gears Lower Station 22 Main Drive Motor, HP 75 23 Engine Drive for emergency, HP 20, Automotive engine with integral clutch 24 Line Rescue System Vertical by ladder, safety belt and independent arrangement 25 Stand by D.G. set @ Lower 125 Station, KVA 26 Stand by D.G. set @ Upper Nil Station for station lighting, KVA 27 Power Supply at Lower and 415V, 50 Cycles, 3 Phases by SEB Upper Station 28 Ambient Temp 0°C min and 47°C max 29 Relevant Standard IS 5228 1.4 REQUIREMENT FOR THE PROJECT: Area requirement: For this project - 1.2 Acres (0.75 Acres Forest Land) of land is required, which has already been acquired. Power requirement: The daily power requirement for the proposed ropeway is preliminarily assessed as 3 00 KW source from Odisha State Electricity Board. In order to meet emergency power requirements during the grid failure, there is provision of 1 no . of DG set having 125 KVA capacities for power back up in the ropeway Project. Water requirement: Fresh make up of 5.0 m 3 /day will be required for the project which will be sourced from Ground water. .
Recommended publications
  • Sonepur Was Awarded the Status of a District in April 1993 After Being Carved out from the Erstwhile Bolangir District and Was Renamed As Suvarnapur
    GROUND WATER INFORMATION BOOKLET OF SUVARNAPUR DISTRICT, ORISSA CENTRAL GROUND WATER BOARD MINISTRY OF WATER RESOURCE SOUTH EASTERN REGION, BHUBANESWAR DISTRICT AT A GLANCE Sl ITEMS STATISTICS No 1. GENERAL INFORMATION i) Geographical area (sq km) 2337 sq. km ii) Administrative Division 2 Number of Tehsil/Block 6 Number of Panchayat/villages 80 nos of gram panchayat iii) Population (as on 2011 census) 652107 iv) Average annual rainfall mm 1443.5mm 2. GEOMORPHOLOGY Major Physiographic units Undulating plains dotted with residual hills Major Drainage River Mahanadi, Tel and their tributaries 3. LAND USE (sq km) a) Forest area 410.00 b) Net sown area 1070.00 c) Cultivable area 4. MAJOR SOIL TYPES Alfisols and Vertisols 5. AREA UNDER PRINCIPAL CROPS 6. IRRIGATION BY DIFFERENT SOURCES (Area and Numbers of structures) Dug wells 5282 –DW with Tenda 512-DW with pumpset Tube well/ bore well 22 Tanks/Ponds Canals Other sources Net irrigated area Gross irrigated area 2119000 ha 7. NUMBERS OF GROUND WATER MONITORING WELLS OF CGWB (AS ON 31.3.11) 8. No of Dug well 30 9. No of Piezometers 10. PREDOMONANT GEOLOGICAL Precambrian crystalline FORMATIONS 11. HYDROGEOLOGY Major Water bearing Formation Granite, Khondalite, Charnokite, Quartzite Pre monsoon Depth to water level during 2.12 m-8.26 m 2011 Post monsoon Depth to water level during 1.06 m-3.18 m 2011 Long term water level trend in 10 years Pre monsoon (Rise 0.008-0.246 in m/yr m/yr Fall 0.001-7.85 m/yr) Post monsoon (Rise 0.001-0.349 m/yr Fall 0.002-0.248 m/yr) 12.
    [Show full text]
  • Defaulter-Private-Itis.Pdf
    PRIVATE DEFAULTER ITI LIST FOR FORM FILL-UP OF AITT NOVEMBER 2020 Sl. No. District ITI_Code ITI_Name 1 ANGUL PR21000166 PR21000166-Shivashakti ITC, AT Bikash Nagar Tarang, Anugul, Odisha, -759122 2 ANGUL PR21000192 PR21000192-Diamond ITC, At/PO Rantalei, Anugul, Odisha, -759122 3 ANGUL PR21000209 PR21000209-Biswanath ITC, At-PO Budhapanka Via-Banarpal, Anugul, Odisha, - 759128 4 ANGUL PR21000213 PR21000213-Ashirwad ITC, AT/PO Mahidharpur, Anugul, Odisha, -759122 5 ANGUL PR21000218 PR21000218-Gayatri ITC, AT-Laxmi Bajar P.O Vikrampur F.C.I, Anugul, Odisha, - 759100 6 ANGUL PR21000223 PR21000223-Narayana Institute of Industrial Technology ITC, AT/PO Kishor, Anugul, Odisha, -759126 7 ANGUL PR21000231 PR21000231-Orissa ITC, AT/PO Panchamahala, Anugul, Odisha, -759122 8 ANGUL PR21000235 PR21000235-Guru ITC, At.Similipada, P.O Angul, Anugul, Odisha, -759122 9 ANGUL PR21000358 PR21000358-Malayagiri Industrial Training Centre, Batisuand Nuasahi Pallahara, Anugul, Odisha, -759119 10 ANGUL PR21000400 PR21000400-Swami Nigamananda Industrial Training Centre, At- Kendupalli, Po- Nukhapada, Ps- Narasinghpur, Cuttack, Odisha, -754032 11 ANGUL PR21000422 PR21000422-Matrushakti Industrial Training Institute, At/po-Samal Barrage Town ship, Anugul, Odisha, -759037 12 ANGUL PR21000501 PR21000501-Sivananda (Private) Industrial Training Institute, At/Po-Ananda Bazar,Talcher Thermal, Anugul, Odisha, - 13 ANGUL PU21000453 PU21000453-O P Jindal Institute of Technology & Skills, Angul, Opposite of Circuit House, Po/Ps/Dist-Angul, Anugul, Odisha, -759122 14 BALASORE
    [Show full text]
  • Surface Water Quality Analysis Along Mahanadi River (Downstream of Hirakud to Delta)
    Published by : International Journal of Engineering Research & Technology (IJERT) http://www.ijert.org ISSN: 2278-0181 Vol. 7 Issue 07, July-2018 Surface Water Quality Analysis Along Mahanadi River (Downstream of Hirakud to Delta) Deba prakash satapathy1, Anil Kumar Kar2, Abhijeet Das3 1Associate Professor, C.E.T. Bhubaneswar 2Associate Professor, V.S.S.U.T, Burla 3Mtech Student, Civil Engg. Department, C.E.T, Bhubaneswar, Abstract: - In the present research program the status of The Mahanadi watershed is the most developed and pollution of water of a major river namely Mahanadi of Odisha urbanized region in the state of Odisha. The increasing (downstream of Hirakud dam) has been analyzed. The study deterioration of water quality of the watershed is mainly was conducted to assess and ascertain the physico-chemical attributed to the uncontrolled and improper disposal of properties of Mahanadi river water from sixteen different solid and toxic waste from industrial effluents, agricultural water quality monitoring stations of State Pollution Control Board. The analysis was carried out by taking certain runoff and other human activities. This alarming water important water quality determining parameters like pH, pollution not only causing degradation of water quality but Dissolved Oxygen (DO), Biological Oxygen Demand (BOD), also threatens human health and balance of aquatic Chemical Oxygen Demand (COD), Chloride, Total Dissolved ecosystem, and economic development of the state. Oxygen (TDS), Nitrate, Sulphates, Total Hardness (TH), In the present study, data matrix obtained during 14 years Electrical Conductivity (EC) and Fluoride. Analyzed monitoring program (2000 to 2014) is subjected to different parameters like pH, DO, TH, Chloride, Sulphate and TDS multivariate statistical approach to extract information were found within permissible limit prescribed by IS 10500 about the similarities or dissimilarities between sampling except Nitrate and Fluoride content which exceeds at some sites, and the influences of possible sources on water sites.
    [Show full text]
  • Hirakud RAP.Pdf
    DAM REHABILITATION AND IMPROVEMENT PROJECT CONSTRUCTION OF ADDITIONAL SPILLWAY OF HIRAKUD DAM, IN SAMBALPUR DISTRICT, ODISHA DRAFT RESETTLEMENT ACTION PLAN (RAP) Submitted by Department of Water Resources Government of Odisha June, 2018 Construction of Additional Spillway of Hirakud Dam under DRIP CONTENTS EXECUTIVE SUMMARY ................................................................................ i E.1 Background .............................................................................................................................. i E.2 Hirakud Dam Rehabilitation and Improvement ...................................................................... i E.3 Displacement of People ........................................................................................................... i E.4 Impacts ................................................................................................................................... ii E.5 Entitlement ............................................................................................................................. ii E.6 Consultation ........................................................................................................................... iii E.7 Implementation ..................................................................................................................... iv E.8 Monitoring and Evaluation .................................................................................................... iv E.9 Grievance Redressal Mechanism ..........................................................................................
    [Show full text]
  • Dam Rehabilitation and Improvement Project Construction of Additional Spillway at Hirakud Dam, in Sambalpur District, Odisha
    DAM REHABILITATION AND IMPROVEMENT PROJECT Public Disclosure Authorized CONSTRUCTION OF ADDITIONAL SPILLWAY AT HIRAKUD DAM, IN SAMBALPUR DISTRICT, ODISHA Public Disclosure Authorized ENVIRONMENTAL IMPACT ASSESSMENT Submitted By Public Disclosure Authorized Department of Water Resources Government of Odisha January, 2018 Public Disclosure Authorized CONTENTS Sl. No. TOPIC PAGE EXECUTIVE SUMMARY E-1 to E-25 E.1 INTRODUCTION E-1 E.2 NEED OF THE PROPOSED PROJECT E-1 E.3 NEED & OBJECTIVE OF EIA STUDY E-2 E.4 SCOPE OF THE STUDY E-2 E.5 DESCRIPTION OF PROJECT E-2 E.5.1 SALIENT FEATURES OF PROJECT E-3 E.6 ACTS, POLICY & INSTITUTIONAL FRAMEWORK E-5 E.7 BASELINE ASSESSMENT OF ENVIRONMENTAL COMPONENTS E-10 E.7.1 THE STUDY AREA E-10 E.7.2 SUMMARY OF BASELINE DATA E-10 E.8 STAKEHOLDERS AND PUBLIC CONSULTATION E-13 E.8.1 ISSUE DISCUSSED E-14 E.9 ANTICIPATED IMPACTS ON VARIOUS ENVIRONMENTAL E-18 COMPONENTS E.10 ANALYTICAL FINDINGS FROM IMPACT ASSESSMENT E-23 E.11 MITIGATION MEASURES E-23 E.12 ANALYSIS OF ALTERNATIVES E-23 E.13 ENVIRONMENTAL MANAGEMENT PLAN [EMP] E-24 E.13.1 ENVIRONMENTAL MONITORING PLAN [EMOP] E-24 E.13.2 ENVIRONMENT GRIEVANCE REDRESSAL MECHANISM E-24 E.13.3 INSTITUTIONAL ARRANGEMENT, TRAINING & CAPACITY E-24 BUILDING E.13.4 BUDGETARY SUPPORT E-25 CHAPTER-1: PROJECT DESCRIPTION C1-1 to C2-19 1.0 INTRODUCTION C1-1 1.1 HIRAKUD DAM ON RIVER MAHANADI C1-1 1.1.1 MAHANADI BASIN IN BRIEF C1-1 1.1.2 SALIENT FEATURES OF HIRAKUD DAM C1-2 1.1.3 DESIGNED MULTIPURPOSE BENEFITS C1-3 1.2 JUSTIFICATION OF THE PRESENT PROPOSAL C1-4 1.2.1 REVIEW OF DESIGN FLOOD C1-4 1.2.2 REVISED HYDROLOGY & ITS CONSEQUENCES C1-4 1.3 NEED OF THE PROPOSED PROJECT C1-5 1.4 ANALYSIS OF ALTERNATIVES C1-6 1.4.1 PRE-PROJECT DEVELOPMENT ALTERNATIVES C1-6 1.4.2 ENVIRONMENTAL ALTERNATIVE SCENARIO OF C1-8 IMPLEMENTATION & POST IMPLEMENTATION PHASES Sl.
    [Show full text]
  • Hirakud Dam Project
    GOVERNMENT OF INDIA ER COMMISSION REPORT OF THE ADVISORY COMMITTEE ON HIRAKUD DAM PROJECT * MARCH 1952 * Plt!Nl'ED IN INDIA BY THE MANAGER, GOVERNMENT OF INDIA PRESS, SIMlA IDRAKUD. 6th March, 1952, To The Secretary to the Government of India, Ministry of Natural ~esourcea and Scientific Research, ·NEw DELm. DEAR Sm, We the Members of the Advisory Committee on Hirakud Dam Project, appointed by the Go vt. o India vide Resolution No. DWII-12(24) dated the lOth January 1952, have reviewed the Revised Esti mates of the Hirakud Dam Project prepared by the Central Water and Power Commission, and submi· ~ our Report for the con..~iderati<?n of the Government. Th~ Committee met at Hira.kud on the 11th February and concluded its sitting on the 6th March 1952. During this period, it inspected the works under construction and the areas to be irrigated bot] in the Sambalpur District and the Delta lower down and interviewed several important officers of th1 Orissa State and the Hirakud Administration. · We wish to acknowledge the unfailing courtesy and cooperation r~ceived from Shri B. Sivaraman I.C.S., Commissioner, Northern Circle and Member, Board of Revenues, Orissa and his officers; Sill Kanwar Sain, I.S.E., Member (Designs) and Chief Engineer, Hirakud Dam Project, his Superintendin1 Engineers and Executive Engineers; Shri S. Sundararajan, Financial Adviser and Chief Accounts Officei Hirakud Dam Project; Dr. J. B. Mohanty, Secretary, River Valley Development Department, Orissa Mr. J. Shaw, I.S.E., Chief Engineer (Irrigation) Orissa; Shri R. L. Narayanan, ChiefEngineer (Electri city), Orissa ; Col.
    [Show full text]
  • Sedimentation Study of Hirakud Reservoir Through Remote Sensing Techniques
    Journal of Spatial Hydrology Volume 7 Number 1 Article 7 2007 Sedimentation Study of Hirakud Reservoir through Remote Sensing Techniques Follow this and additional works at: https://scholarsarchive.byu.edu/josh BYU ScholarsArchive Citation (2007) "Sedimentation Study of Hirakud Reservoir through Remote Sensing Techniques," Journal of Spatial Hydrology: Vol. 7 : No. 1 , Article 7. Available at: https://scholarsarchive.byu.edu/josh/vol7/iss1/7 This Article is brought to you for free and open access by the Journals at BYU ScholarsArchive. It has been accepted for inclusion in Journal of Spatial Hydrology by an authorized editor of BYU ScholarsArchive. For more information, please contact [email protected], [email protected]. Journal of Spatial Hydrology Vol.7, No.1, Spring 2007 Sedimentation Study of Hirakud Reservoir through Remote Sensing Techniques Saumitra Mukherjee*, Vijay Veer**, Shailendra Kumar Tyagi** and Vandana Sharma** Abstract Any reduction in water spread area at a specified elevation over a time period is indicative of sediment deposition at this level. This when integrated over a range of water stages helps in computing volume of storage lost through sedimentation. This study relates to estimation of capacity loss due to sedimentation of Hirakud reservoir, located in Orissa, India. Satellite data of 5 optimal dates corresponding to various water stages from minimum to maximum draw down levels were used in estimating the water spread areas. Simple ratiod (NIR/RED) image were generated to identify the water pixels and then verifying the standard FCC. The non-water pixels were then identified with the ratiod (GREEN/NIR) image and removed to have the total water spread.
    [Show full text]
  • Thermal Power Plants in Odisha
    Thermal Power Plants in Odisha Sl. Name Address & Contact Generation No. Person with E-mail-id Capacity in MW 1. M/s Aarti Steel Ltd. At-Ghantikhala, 80 Po- Mahakalabasta, Athagada, Cuttack Mr. Pritish Dash, Manager (Env.) [email protected] M-9437083942 2. M/s ACC Ltd. Bargarh Cement Works, 30 Cement Nagar, Bardol, Bargarh, Pin No. 768 038, Ph No. 91-6646-247161, Fax. 91-6646-246430 Mr. Debapratim Bhadra, Head- Energy & Env. debapratim.bhadra@accli mited.com M-9777447636 arupkumar.das@acclimite d.com 3. M/s Action Ispat & Power At: Pandripathar, 63 (P) Ltd. P.O. Marakuta, Dist-Jharsuguda, Pin No. 768202 Mr. BhabyaRanjan Nayak, Environment Dept. environment.bhabyaranja [email protected] Mr. Ranjan Sahu Asst. Env. Officer, M-7752023544 [email protected] om 4. M/s Bhushan Power & Vill-Thelkoloi, 370 Steel Ltd. P.O. Lapanga- 768232 Teh. Rengali, Dist-Sambalpur, Mr. Niranjan Parida, Dy. Manager, [email protected] M-9437150569 Sl. Name Address & Contact Generation No. Person with E-mail-id Capacity in MW 5. M/s Bhushan Steel Ltd. At- Narendrapur, 142 Meramundali, Dhenkanal Ph. No. 06762-300000 / 660002 / 660000, Fax. 91-011-66173997 Mr. Santosh Pattajoshi, Sr. Manager, santosh.pattajoshi@bhusha nsteel.com M-7077757663 ram.sharma@bhushansteel .com 6. M/s Bhushan Energy Ltd. At-Ganthigadia, 300 P.O. Nuahata, Via-Banarpal, Dist-Angul Pin No. 759128 Ph-6762-300000 Fax. 011-66173997 7. M/s Birla Tyres At/Po-Chhanpur, Kuruda, 20 Balasore-756056, Ph. No. 06782- 254621/254225, Fax.06782-254225 Mrs. Suchismita Patnaik, Team Member, suchismita_patnaik@birlaty re.com 8.
    [Show full text]
  • Institute Name Insti Address Insti St Ate
    CURRENT_A PPLICATION_ INSTI_ST NUMBER INSTITUTE_NAME INSTI_ADDRESS ATE INSTI_WEBSITE AT-RAMACHANDRAPUR, PO- BHATAPATNA, PS- BALIANTA, BHUBANESWAR, DIST-KHURDA, PH NO- 0674-2593909 POSTAL ADRESS-QR NO-C77/3,AT- OXFORD COLLEGE OF ENGINEERING AND PAILLASHPALI,NEAR AERODRUM 1-396061262 MANAGEMENT AREA,BHUBANESWAR,ORISSA Orissa www.oxfordbbsr.com ROYAL COLLEGE OF PHARMACY AND 1-396064362 HEALTH SCIENCES ANDHAPASARA ROAD Orissa www.royalcollegeofpharmacy.com AT/PO- KIREI SUNDARGARH ENGINEERING DIST-SUNDARGARH (ORISSA) 1-396093243 COLLEGE,SUNDARGARH PIN-770 073 Orissa www.secsundargarh.in BHUDHIST VILLA, NEBANEBADD BHUASANI TEMPLE SQUARSQUAREE, SIMILIPATNA, CHANDAKA, BHUBANESAWR, 1-396097313 NALANDA INSTITUTE OF TECHNOLOGY ORISSA. Orissa www.thenalanda.org AT: BADARAGHUNATHPUR, PO: MADANPUR 1-396118282 GANDHI ENGINEERING COLLEGE OFF NH 5 ON GAHIRA SQUARE Orissa www.gandhi.ac.in BIDYANAGAR MAHURA JANLA 1-396142211 C.V.RAMAN COLLEGE OF ENGINEERING BHUBANESWAR - 752054 Orissa www.cvraman.org RASANANDA JENA VIHAR,BHUAN PO: CHHAITANA DIST:PURI GHANASHYAM HEMALATA INSTITUTE OF PIN:752002 1-396168302 TECHNOLOGY & MANAGEMENT, PURI ORISSA Orissa www.ghitm.org SIJUA, PATRAPADA, NM INSTITUTE OF ENGINEERING & BHUBANESWAR 1-396715563 TECHNOLOGY ORISSA - 751019 Orissa www.nmiet.ac.in SILICON HILLS, PATIA, BHUBANESWAR, KHORDHA, ORISSA 1-396871541 SILICON INSTITUTE OF TECHNOLOGY PIN-751024 Orissa www.silicon.ac.in 361-A, PATRAPADA, BHUBANESWAR, PIN CODE- 751019, KHURDA, ORISSA, PHONE NO- 2472525, 2471416, E-MAIL: [email protected], WEB:WWW. 1-396881513 THE TECHNO SCHOOL TTS.AC.IN Orissa www.tts.ac.in AT/PO- BARAPADA, BHADRAK DIST- BHADRAK BHADRAK INSTITUTE OF ENGINEERING & PIN - 756113 1-396908458 TECHNOLOGY, BARAPADA, BHADRAK ORISSA, INDIA Orissa www.bietorissa.org GYAN VIHAR BARANG 1-398256892 SUBASSS INSTITUTES OFO TECHNOLOGYCOOG BHUBANESWARS OrissaO www.subas.edu.in PLOT NOT.4, SECTOR-A, ZONE-B, 1-398316451 CENTRE FOR IT EDUCATION MANCHESWAR INDUSTRIAL ESTATE Orissa www.cite.ac.in AT: R.
    [Show full text]
  • Hirakud Dam: Fifty Mournful Years
    Dams, Rivers & People 7 Hirakud Dam: Fifty Mournful Years Government’s false promises, rehabilitation and resettlement poor management of Hirakud of the displaced people were dam and the dissatisfaction of framed by the state farmers, displaced persons government. In the months of and the locals have led to the April and May of 1955, 57 people’s movement against villages of the “Hirakud budi the dam. The following essay anchal” (submerged area of not only brings into limelight Hirakud) were evicted with use the mismatch between of police force. Those who had objectives behind the ‘patta’s (written ownership of construction of the dam and land) got meager the actual output, but also compensation. People holds “Hirakud Dam” as a true depending upon the example of recklessness of community resources were left the Orissa government. The with empty hands. Their dam, which was essentially number would be 40,000- planned for flood 50,000. Till date, management in the delta of Orissa, irrigation, fishing and compensation could not reach 3540 families. hydropower production, now quenches thirst of th industries at the cost of the aforesaid objectives. This On 12 April 1948, late Pundit Jawaharlal Nehru, then poses greater threats to the livelihoods of thousands of Prime Minister of the nation laid the foundation stone of farmers who depend upon the water from the Hirakud the dam for the second time and Hirakud dam was reservoir. The dam which named as the “temple of the took shape from the tears The dam, which was essentially planned for modern India” by him.
    [Show full text]
  • Comprehensive Disaster Management Plan (Updated Strategic Plan for Disaster Management)
    DEPARTMENT OF WATER RESOURCES COMPREHENSIVE DISASTER MANAGEMENT PLAN (UPDATED STRATEGIC PLAN FOR DISASTER MANAGEMENT) MAHANADI- BURHABALANGA- PHAILIN-LEHAR-HELEN MAY’2018 BRAHAMANI-BAITARANI SUBARNAREKHA SOMETIMESDISASTERS AREINEVITABLE, BUTTIMELYTAKENPRECAUTIONARY MEASURES AND POST DISASTER RESCUE AND REHABILITATION ACTIVITIES MINIMISES THE LOSS TO A GREATER EXTENT. THE REPORT DESCRIBES THE STRATEGICPLANSFOR DISASTERMANAGEMENT BYSTATEWATERRESOURCES DEPARTMENT. DEPARTMENT O F WATER RESOURCES GOVERNMENT O F ODISHA DEPARTMENT OFWATER RESOURCES, GOVERNMENT OFODISHA COMPREHENSIVE DISASTER MANAGEMENT PLAN MAY’2018 Sl.No. Description of Items Page No. Chapter – 1: Introduction 1.1 Objective 1 1.2 Scope of the Plan 1 1.3 Overview of the Department 3 1.4 Acts, Rules and Policies governing the business of the department. 4 1.5 Institutional Arrangement for disaster management 4 1.5.1 Junior Engineer/Assistant Engineer 5 1.5.1.1 Pre-flood measures 5 1.5.1.2 Measures during flood 6 1.5.1.3 Post-flood measures 6 1.5.1.4 General 7 1.5.2 Assistant Executive Engineer (AEE) 7 1.5.2.1 Pre-flood measures 7 1.5.2.2 Measures during flood 8 1.5.2.3 Post-flood measures 8 1.5.2.4 General 9 1.5.3 Executive Engineer 9 1.5.3.1 Pre-flood measures 9 1.5.3.2 Measures during floods 9 1.5.3.3 Post-flood measures 10 1.5.3.4 General 10 1.5.4 Superintending Engineer 10 1.5.5 Chief Engineer / Chief Engineer & Basin Manager (CE & BM): 11 1.6 Preparation and implementation of departmental disaster management plan 12 Chapter – 2: Hazard, Risk and Vulnerability Analysis 2.1 Historical/past disaster/losses in the department 14 2.2 Emerging Concerns 22 Chapter-3: Capacity – Building Measures 3.1 Trainings and Capacity Building 23 3.2 Community Awareness and Community Preparedness Planning 23 3.3 Capacity Building of Community Task forces 24 3.4 Sustainable Management 25 3.5 Mitigation 25 3.6 DRR Master Planning for the Future 25 3.6.1 Community Engagement 26 3.6.2 Organizing Teams 26 3.7 Mitigation Capacity Building Needs & Workshop Planning 26 3.8 Workshop Planning.
    [Show full text]
  • Sambalpur-Ll 1 NR Buildi
    Name of the SI. Name of the Works Amount Remarks t& B ) Division No. Required (1) (2) (3) И) (5) Sambalpur-ll 1 N.R. Building such as concreting to ramp of UG 4.50 Boys hostel and painting works to Boys hostel No,5 of VIMSAR Burla 2 N.R. Building such as providing leak proofing 4.20 treatment to old central store of VIMSAR Burela 3 N.R. Building such as repair and renovation to 4.00 Old CT scan of VIMSAR Burla 4 N.R. Building such as U,G, Ladies hostel of 1.90 VIMSAR Burla 5 N.R. Building such as repair and renovaiton to 3.50 ТВ ward of VIMSAR Burla 6 N.R. Building such as repair to approach road 4.00 of Ladies hostel No.3 of VSS IMSAR Burla. 7 Administrative office Building such as leak 5.00 proof treatment of ITI at Hirakud 8 S/R such as Painting works outside of Boys 5.00 Hostel at Hirakud ( 1st Floor) 9 Sub-Collector office such as renovation of sub 4.50 register section. 10 N/R building such as repair & renovation to 5.00 the cancer ward of VIMSAR. 11 N/R building such as leak proof treatment to 5.00 Nursing SchooL,Burla . 12 N.R. Building such as providing plastic emulsion 2.80 paint and weather coat to Ladies Hostel No.1 of VIMSAR, Burla 13 N/R building such as Repair & Renovation to 4.90 PWD Subdivision office,Burla . 14 N/R building such as providing & fixing 4.60 designer tiles in front of PWD Subdivision off ice, Burla .
    [Show full text]