The Bellcord No 28
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Other Trams in the Bendigo Fleet
Other trams in the Bendigo Fleet The status of the trams in the list below are one of the following: A. In storage B. Being restored/awaiting restoration C. On static display at the tramways D. On loan or lease to other tramways Tram Number: Historic and technical details: #2 Status: In storage Maximum Traction Bogie Tram History: This tram first operated in Melbourne as Hawthorn Tramways Trust #20. With the formation of the Melbourne and Metropolitan Tramways Board, it became M&MTB # 126. It was sold to the SECV Geelong Tramways in 1947 to become #34. Upon the closure of the Geelong Tramways in 1956, the tram was transferred to Bendigo where it became #2. Builder: Duncan & Fraser, Adelaide, South Australia (1916) for the Hawthorn Tramways Trust as #20. Technical Information: Trucks - Brill 22E. Motors - 2 X 65 hp GE 201. Controllers - GE B23E. Braking - hand brakes and air operated manual-lapping valves. Weight - 16.0 tonnes. Length - 13.59 metres. #3 Status: Undergoing restoration at the main depot. Single Truck Battery Tram History: Tram services using these trams commenced in June 1890 but because of the inefficiency of the battery trams, the entire system was abandoned in September 1890 and the assets sold to the Bendigo Tramway Company Limited. Builder: Brush Electrical Engineering Company Limited, Loughborough, United Kingdom (1889) for the Sandhurst and Eaglehawk Tramway Company Limited (S&ETCo Ltd) as #3. Technical Information: The trams were powered by a single motor, with a wheel operated controller located on each platform. Braking was obtained by the use of a hand brake also located on each platform. -
Yarra Trams Temporary Exemptions Report 2018 FINAL
Temporary Exemptions Report Melbourne Tram Service Reporting period: 1 October 2017 to 30 September 2018 Contents Context 3 Introduction 4 Part A – Exemptions from the Transport Standards 6 2.1 (i) Access paths – Unhindered passage 6 2.1 (ii) Access paths – Unhindered passage 8 2.4 Access paths – Minimum unobstructed width 9 2.6 Access paths - Conveyances 20 4.2 Passing areas – Two-way access paths and aerobridges 21 5.1 Resting points – When resting points must be provided 27 6.4 Slope of external boarding ramps 28 11.2 Handrails and grabrails – Handrails to be provided on access paths 29 17.5 Signs – Electronic notices 30 Part B – Exemptions from the Premises Standards 31 H2.2 Accessways 31 H2.2 Accessways 32 H2.2 Accessways 33 H2.2 Accessways 34 H2.4 Handrails and grabrails 35 2 Context The Public Transport Development Authority trading as Public Transport Victoria (PTV), established under the Transport Integration Act 2010 (Vic), is the statutory authority responsible for managing the tram network on behalf of the State of Victoria. Pursuant to the Franchise Agreement – Tram between PTV and KDR Victoria Pty Ltd (trading as Yarra Trams) dated 2 October 2017, Yarra Trams is the franchise operator of the Melbourne metropolitan tram network. Yarra Trams is also a member of the Australasian Railway Association (ARA). On 1 October 2015, the Australian Human Rights Commission (AHRC) granted temporary exemptions to members of the ARA in relation to section 55 of the Disability Discrimination Act 1992 (Cth), various provisions of the Disability Standards for Accessible Public Transport 2002 (Transport Standards) and the Disability (Access to Premises – Buildings) Standards 2010 (Premises Standards). -
Public Transport Partnerships
PUBLIC TRANSPORT PARTNERSHIPS An Overview of Passenger Rail Franchising in Victoria March 2005 Department of Infrastructure PUBLIC TRANSPORT PARTNERSHIPS An Overview of Passenger Rail Franchising in Victoria March 2005 Public Transport Division Department of Infrastructure © State of Victoria 2005 Published by Public Transport Division Department of Infrastructure 80 Collins Street, Melbourne March 2005 www.doi.vic.gov.au This publication is copyright. No part may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968. Authorised by the Victorian Government, 80 Collins Street, Melbourne. Minister’s Foreword In February 2004, after the failure of the original privatisation framework, the Victorian Government entered into new franchise agreements with Melbourne’s public transport companies, Yarra Trams and Connex. These partnership agreements find the balance between government support for public transport in Melbourne and the operational expertise provided by experienced private rail operators. Almost one year on, the new arrangements are running smoothly, providing stability across the public transport system and giving a solid foundation for a range of improvements in service delivery. Some of the other benefits to passengers that stem from these agreements include: • Additional front-line customer service staff; • Increased security patrols; • Improved driver training programs; • All night New Year’s Eve services; • Additional rolling stock; and • Improved standards for the upkeep of transport facilities. The key themes of this summary report include the background to the failure of the original contracts, the renegotiations, the nature of the new partnership agreements and the challenges of the refranchising process. You can obtain the latest information about Melbourne’s public transport by visiting www.doi.vic.gov.au/transport I commend this report to you. -
Malvern Tramway Substation, Nomination
Engineers Australia Engineering Heritage Victoria Nomination Engineering Heritage Australia Heritage Recognition Program MALVERN TRAMWAY SUBSTATION April 2016 Front Cover Photograph Caption English Electric 1000 kW Rotary Converter. AC end of the machine with the exciter at the right hand end. See nameplate details below. Note that the AC voltage is adjusted to suit the desired 600 Volt output on the DC side. The unit transformer makes this adjustment. Images: Owen Peake. Heritage Recognition Nomination Malvern Tramway Substation Page 2 of 44 TABLE OF CONTENTS PAGE Table of Contents 3 1 Introduction 5 2 Heritage Nomination Letter 6 3 Heritage Assessment 7 3.1 Basic Data 7 3.2 Historical Notes 7 3.3 Heritage Listings 9 4 Assessment of Significance 10 4.1 Historical significance 10 4.2 Historic Individuals or Association 11 4.3 Creative or Technical Achievement 12 4.4 Research Potential 12 4.5 Social 13 4.6 Rarity 13 4.7 Representativeness 13 4.8 Integrity/Intactness 13 4.9 Statement of Significance 14 4.10 Area of Significance 15 5 Interpretation Plan 16 5.1 General Approach 16 5.2 The Virtual Interpretation Panel 16 5.3 Possible Interpretation themes for Virtual Interpretation Panels 17 6 References 18 7 Acknowledgments, Authorship and General Notes 19 7.1 Acknowledgments 19 7.2 Nomination Preparation 19 7.3 General Notes 19 Heritage Recognition Nomination Malvern Tramway Substation Page 3 of 44 Appendix 1 Schematic electrical Diagrams 20 Appendix 2 Images with Captions 22 Appendix 3 Maps 29 Appendix 4 Construction and Development of Rotary Converters 32 Appendix 5 EHA Magazine Article by Miles Pierce 34 Appendix 6 Explanatory Breakout Boxes to Accompany Miles Pierce Article in Appendix 5 36 Appendix 7 Details of DC Switchboard 37 Change Control 44 Heritage Recognition Nomination Malvern Tramway Substation Page 4 of 44 1 Introduction 1 The Malvern Tram Depot was originally established by the Prahran & Malvern Tramways Trust (PMTT) in 1909/10. -
TRAM ROUTE 86 CORRIDOR IMPROVEMENT PROJECT COMMUNITY REFERENCE GROUP – WESTGARTH Recommendation Report
TRAM ROUTE 86 CORRIDOR IMPROVEMENT PROJECT COMMUNITY REFERENCE GROUP – WESTGARTH Recommendation Report Background The Westgarth Community Reference Group for the Tram Route 86 Corridor Improvement Project was convened by Council to provide community input into the re-work of the Project. Seven nominees were selected by Council for the group and six members participated throughout the four meetings which were scheduled fortnightly over July/August 2009. This Report contains a summary of the discussions and debates that were held between group members over the four meetings. The Notes of each meeting are presented in Appendix 1. The Report is divided into sections; 1. The Recommendations 2. Other Considerations 3. Appendices The group wishes to record again its strong opposition to any proposals that result in the creation of any form of sliplane which has the effect of bringing High Street traffic in closer proximity to those houses located on High Street south of Westgarth Street. Council should be aware that in the course of this process an option was presented to the Reference Group and was seen as a breach of Council’s prior undertakings that a sliplane would not form part of any future considerations. The Recommendations In the first two meetings the group discussed the issues that were raised with the initial proposal for the Westgarth section. These included: Impact on businesses Improved public transport & Pedestrian Access vs Vehicle Access Disability Access and Safety (40km/h) Resident Amenity vs Public transport access Ruckers -
__History of Kew Depot and It's Routes
HISTORY OF KEW DEPOT AND ITS ROUTES Page 1 HISTORY of KEW DEPOT and the ROUTES OPERATED by KEW Compiled and written by Hugh Waldron MCILT CA 1500 The word tram and tramway are derived from Scottish words indicating the type of truck and the tracks used in coal mines. 1807 The first Horse tram service in the world commences operation between Swansea and Mumbles in Wales. 12th September 1854 At 12.20 pm first train departs Flinders Street Station for Sandridge (Port Melbourne) First Steam operated railway line in Australia. The line is eventually converted to tram operation during December 1987 between the current Southbank Depot and Port Melbourne. The first rail lines in Australia operated in Newcastle Collieries operated by horses in 1829. Then a five-mile line on the Tasman Peninsula opened in 1836 and powered by convicts pushing the rail vehicle. The next line to open was on 18/5/1854 in South Australia (Goolwa) and operated by horses. 1864 Leonard John Flannagan was born in Richmond. After graduating he became an Architect and was responsible for being the Architect building Malvern Depot 1910, Kew Depot 1915 and Hawthorn Depot 1916. He died 2nd November 1945. September 1873 First cable tramway in the world opens in Clay Street, San Francisco, USA. 1877 Steam tramways commence. Victoria only had two steam tramways both opened 1890 between Sorrento Pier to Sorrento Back Beach closed on 20th March 1921 (This line also operated horse trams when passenger demand was not high.) and Bendigo to Eaglehawk converted to electric trams in 1903. -
Inquiry Into Expanding Melbourne's Free Tram Zone
Submission to the Inquiry into Expanding Melbourne’s Free Tram Zone January 2020 Contents 1 Introduction ........................................................................................................................ 1 2 Expansion of the Free Tram Zone ....................................................................................... 1 2.1 Making the tram system more useful ......................................................................... 8 2.2 Expansion of useful public transport ........................................................................ 10 3 Full-time students ............................................................................................................. 12 3.1 Free public transport ................................................................................................. 12 3.2 Meeting student travel needs and reducing costly car dependence ....................... 13 4 Seniors .............................................................................................................................. 14 4.1 Free public transport ................................................................................................. 14 4.2 Mobility for older Victorians ..................................................................................... 14 5 New technologies ............................................................................................................. 15 5.1 Real-time info ........................................................................................................... -
Bellcord No 32
Number 32 December 2016 The Bellcord Journal of the Friends of Hawthorn Tram Depot Model of VR 34 (2016). Photos: Alexander Stoeckel RECENT DONATIONS The museum has received a donation from the estate of well-known tram enthusiast and Hawthorn museum guide, David Frost. Among the many items is this “O” gauge powered model of VR 34, built by A G Culpeffer-Cooke in January-March 1977. There is also an “HO” gauge W2 390. Both can be viewed in the museum’s display room. Thanks to our volunteer photographer Alexander for these captivating photos. The estate of Tom Murray, a Puffing Billy volunteer and Secretary of the Australian Railway Exploration Association, has donated printed tramway materials to the Melbourne, Ballarat and Sydney Tramway Museums. The Melbourne materials comprise a mix of notices and events. Cont’d page 2 Proudly sponsored by The Bellcord Page 2 December 2016 Among Tom’s collection is the following printed In This Issue notice for distribution to premises along a tram line to be rebuilt. It may have been received by Tom Recent Donations 1-2 when he lived in Toorak Road, Burwood. Armed Hold Up 2 Open Days 2017 2 It notes the relevant Acts of Parliament that Class reunion 3-4 authorise the works and acknowledges the upcoming Tramway ANZAC 5 inconvenience, including night shift and weekend Exhibition funding 5 work “when necessary”. Public notification of Our Collection 6 current day tramway work is quite similar, although Electrolysis 7-8 the work itself is completed in a much shorter time _________________________________________ frame. -
Growing Patronage - Think Tram?
GROWING PATRONAGE - THINK TRAM? Dennis Cliche Sam Reid ABSTRACT The emerging congestion crisis in Melbourne is underlined by Melbourne City Council’s recent prediction that visitation to the CBD will increase from current levels of around 690,000 people to one million people per day by 2017. Public transport has been identified as one of the keys to solving the demands of travel to and from the city, and to reducing the impact of traffic congestion. This has created a number of challenges for shaping patronage growth on Melbourne’s public transport network, and for making trams a competitive travel option for commuters - especially when a large proportion of the tram network shares road space with other vehicles and is caught in the congestion. The challenge of growing patronage on public transport not only requires incentives for behavioural change amongst commuters, but also for improvements to the level of service offered through tram speeds and frequency, and better access for mobility impaired passengers. This can be achieved through a program of service and infrastructure investments and by appealing to a concern for wider social responsibility (minimising the impact of car pollution, reducing congestion etc). Indeed, if public transport is to successfully address the broader issues of traffic congestion and city pollution, then it must provide the impetus for commuters to rethink their travel behaviours and create a modal shift. This paper will examine Yarra Trams’ approach to growing patronage on a tram system that shares its road space with other vehicles, and also discuss how the Think Tram program provides the foundation and the infrastructure to grow patronage by offering a service that delivers opportunities for a more consistent, accessible and efficient alternative to car travel. -
Docklands Mobility
D3 – The Arcade The – accessmelbourne.vic.gov.au Visit Visit limited mobility limited F4 – St Mangos Lane Mangos St – to Docklands Park. Docklands to access and facilities in the City of Melbourne. Melbourne. of City the in facilities and access for people with with people for streets and walk over the Collins Street Bridge Bridge Street Collins the over walk and streets our mobility maps and other information on on information other and maps mobility our C3 – Star Circus Star – Access and facilities facilities and Access station on the corner of Spencer and Collins Collins and Spencer of corner the on station Our access website o ers an online version of of version online an ers o website access Our P7 N6 For more information visit travellersaid.org.au visit information more For – Southern Cross Station Cross Southern – , to Harbour Esplanade. You can also exit the the exit also can You Esplanade. Harbour to G11 – Point Park Point – Southern Cross Station on 03 9670 2072 9670 03 on Station Cross Southern • over the Bourke Street Pedestrian Bridge Bridge Pedestrian Street Bourke the over Access Melbourne Access D5 Station, exit at the northern end to walk walk to end northern the at exit Station, – Piazza Docklands Drive Docklands Piazza – Flinders Street Station on 03 9610 2030 2030 9610 03 on Station Street Flinders • By train By – Take the train to Southern Cross Cross Southern to train the Take – C4 – Pear River Road and Studio Lane (corner) Lane Studio and Road River Pear – call Travellers Aid at: at: Aid Travellers call teletypewriter (TTY)” under phone type. -
Route 96 – SP2 YARRA TRAMS
Route 96 – SP2 YARRA TRAMS Heritage Impact Assessment IS168200 | Final 8 February 2018 Heritage Impact Assessment Route 96 – SP2 Project No: IS168200 Document Title: Heritage Impact Assessment Revision: Final Date: 8 February 2018 Client Name: YARRA TRAMS Project Manager: Michael Ford Author: Andrew Wilkinson and Jennifer Chandler File Name: \\Jacobs.com\anz\IE\Admin\03_Southern\Env_Spatial\10_Section_Resources\02_CH_Eco\CH\Proj ects\Victoria\Yarra Trams\Route 96\SP2\HIA Report\HIA Stop 21 update Feb 2018\IS168200 Route 96 - SP2 HIA V3_final.docx Jacobs Group (Australia) Pty Limited ABN 37 001 024 095 Floor 11, 452 Flinders Street Melbourne VIC 3000 PO Box 312, Flinders Lane Melbourne VIC 8009 Australia T +61 3 8668 3000 F +61 3 8668 3001 www.jacobs.com © Copyright 2018 Jacobs Group (Australia) Pty Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This report has been prepared on behalf of, and for the exclusive use of Jacobs’ Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this report by any third party. Document history and status Revision Date Description By Approved V1 25 Technical review Karen Mike Ford November Murphy 2016 V2 12 April 2017 Update from client comments Jennifer Mike Ford Chandler V3 8 February Updated with six shop awnings at Stop 21 Jennifer - 2018 Chandler V3 8 February Technical review of updates Karen 2018 Murphy IS168200 i Heritage Impact Assessment Contents Abbreviations ........................................................................................................................................................ -
T R a N S C R I
TRANSCRIPT LEGISLATIVE COUNCIL ECONOMY AND INFRASTRUCTURE COMMITTEE Inquiry into Expanding Melbourne’s Free Tram Zone Melbourne—Thursday, 9 July 2020 (via videoconference) MEMBERS Mr Enver Erdogan—Chair Mrs Bev McArthur Mr Bernie Finn—Deputy Chair Mr Tim Quilty Mr Rodney Barton Mr Lee Tarlamis Mr Mark Gepp PARTICIPATING MEMBERS Dr Matthew Bach Mr David Limbrick Ms Melina Bath Mr Andy Meddick Dr Catherine Cumming Mr Craig Ondarchie Mr David Davis Mr Gordon Rich-Phillips Necessary corrections to be notified to executive officer of committee Thursday, 9 July 2020 Legislative Council Economy and Infrastructure Committee 10 WITNESS Mr Ian Hopkins, Principal Advise\or, Network Planning, Yarra Trams. The CHAIR: Welcome to the Economy and Infrastructure Committee’s public hearing for the Inquiry into Expanding Melbourne’s Free Tram Zone. We welcome everyone who is watching the live broadcast. Before you can begin, Mr Hopkins, I would just like to read out a witness statement. All evidence taken at the hearing is protected by parliamentary privilege as provided by the Constitution Act 1975 and further subject to the provisions of the Legislative Council standing orders. Therefore the information you provide during this hearing is protected by law. However, any comment repeated outside the hearing may not be protected. Any deliberately false evidence or misleading of the committee may be considered a contempt of Parliament. All evidence is being recorded. You will be provided with a proof version of the transcript following the hearing. Transcripts will ultimately be made public and posted on the committee’s website. We welcome any opening comments, but I ask that they be kept to a maximum of 5 to 10 minutes to allow plenty of time for discussion.