Appendix 1

List of relevant projects completed by our team (as of January 2021)

№ Project name Year Results 1 Grid connection study of cascade of Shelek HPPs Approved by KEGOC JSC, 2011 Customer: KAZHYDRO LLP AZHK JSC, MINT RoK

2 Grid connection study of WPP with installed capaci- Approved by KEGOC JSC, ty of 48 MW on Arkalyk site 2011 MINT RoK, technical condi- Customer: SYNERGY ASTANA LLP tions are issued by KEGOC 3 Feasibility study for the construction of WPP with Approved by Gosexpertiza installed capacity of 48 MW on Arkalyk site 2011 and MINT RoK, individual Customer: SYNERGY ASTANA LLP tariff is defended 4 Feasibility study “Construction of OHTL 500 kV Approved by Gosexpertiza. – Aktogai – Taldykorgan – Alma” 2012 The project is under con- Customer: EnergoStroyProekt LLP struction on EPC basis. 5 Grid connection study of Agip KCO GTPP in Atyrau Approved by KEGOC JSC, region 2012 MINT RoK, technical condi- Customer: KAZNIPIENERGOPROM JSC tions are issued by KEGOC 6 Grid connection study of Uralsk GTPP with installed Approved by KEGOC JSC, capacity of 200 MW in West region 2013 MINT RoK, technical condi- Customer: Batys Power LLP tions are issued by KEGOC 7 Grid connection study of Badamsha WPP with in- Approved by KEGOC JSC, stalled capacity of 48 MW and future expansion to 2013 MINT RoK, technical condi- 96 MW in Aktobe region tions are issued by KEGOC Customer: SYNERGY ASTANA LLP 8 Approved by KEGOC JSC, Grid connection study of Merke HPPs with installed ZHES LLP, MINT RoK, capacity of 18 MW in Zhambyl region 2013 technical conditions are is- Customer: Taraz Green Power GENCO LLP sued by ZHES LLP 9 Grid connection study of Kokshetau CHP with in- Approved by KEGOC JSC, stalled capacity of 240 MW in Akmola region 2013 Kokshetau-Energo LLP, Customer: local authority - Akimat of Akmola region MINT RoK 10 External power supply study of Lomonosovskoe Approved by KEGOC JSC, deposit in Kostanai region 2013 technical conditions are is- Customer: Lomonosovskoe LLP sued by KEGOC 11 Approved by KEGOC JSC, Detailed design of 500 kV OHTL Ekibastuzskaya- Approved by RGP Gosex- Semey (line length 400 km) 2013 pertiza, the project is under Customer: EnergoStroyProekt LLP construction

1 № Project name Year Results

12 Analysis of Steady-State and Transient Stability of the Parallel Operations of Power Systems of the Final report is accepted and Kyrgyz Republic and the Republic of Tajikistan un- 2013 approved by USAID der CASA-1000 Project Customer: TETRA TECH on behalf of USAID 13 Approved by KEGOC JSC, Grid connection study of Semey CHP-3 with in- VKREK JSC, MINT RoK, stalled capacity of 180 MW in Akmola region 2013 technical conditions are is- Customer: Samruk-Energy JSC sued by VKREK JSC 14 Feasibility study for the construction of 500 kV Approved by Gosexpertiza. cross border OHTL Kazakhstan-Kyrgyzstan 2014 The project is under con- Customer: KEGOC JSC struction on EPC basis.

15 Pre-feasibility study for the connection of West Ka- PreFS is approved by the zakhstan power system with UPS of Kazakhstan 2014 customer - KEGOC JSC. Customer: KEGOC JSC

16 External power supply study of Aryskum Oil&Gas Approved by KEGOC JSC, deposit in Kyzylorda region 2014 technical conditions are is- Customer: PetroKazakhstan Kumkol Resources sued by KEGOC JSC 17 Approved by KEGOC JSC Grid connection study of Badamsha WPP with in- and ME RoK, technical stalled capacity of 100 MW in Aktobe region 2014 conditions are issued by Customer: EUROFINSA KZ LLP KEGOC 18 Approved by KEGOC JSC Grid connection study of Shayan WPP with installed and ME RoK, technical capacity of 100 MW in South Kazakhstan region 2014 conditions are issued by Customer: EUROFINSA KZ LLP KEGOC 19 Approved by KEGOC JSC, Grid connection study of Batyr SPP with installed MAEK-Kazatomprom LLP capacity of 2 MW in Mangistau region 2014 and ME RoK, technical Customer: Group Independent LLP conditions are issued by MAEK-Kazatomprom 20 Approved by KEGOC JSC, Grid connection study of Batyr SPP with installed GKP Mangistauenergo and capacity of 5 MW in Mangistau region 2014 ME RoK, technical condi- Customer: Best Group NS LLP tions are issued by GKP Mangistauenergo 21 Approved by KEGOC JSC, Grid connection study of Akshukur WPP with in- MREK JSC and ME RoK, stalled capacity of 5 MW in Mangistau region 2014 technical conditions are is- Customer: Best Group NS LLP sued by MREK JSC

2 № Project name Year Results

22 Approved by KEGOC JSC External power supply study of NPS-663 (Kaz- and Caspian Pipeline Con- transoil JSC) pumping station 2014 sortium JSC, technical con- Customer: Electroservice LLP ditions are issued by Caspi- an Pipeline Consortium JSC 23 Feasibility study for the construction of Balkhash- Approved by Gosexpertiza. skaya TPP grid connection objects 2014 The project is under con- Customer: KEGOC JSC struction on EPC basis

24 Grid connection study of Zhanazhol GTPP feeding Approved by KEGOC JSC Gas Processing Unit #3 in Aktobe region 2014 and ME RoK Customer: CNPC-Aktobemunaigas JSC

25 Grid connection study of Gas fired power plant 8х1,2 MW on North-west Kyzylkya Oil&Gas deposit Approved by KEGOC JSC 2015 Customer: PetroKazakhstan Kumkol Resources and ME RoK JSC 26 Elaboration of preliminary feasibility study for con- Accepted by the Customer struction of GTPP in Kyzylorda region 2015 Elaboration of feasibility Customer: "Turkuaz Invest" LLP study is planned 27 Feasibility study for the construction of WPP with installed capacity of 48 MW on Badamsha site 2015 Approved by Gosexpertiza Customer: «Arm Wind» LLP 28 Approved by distribution External power supply study of VNS-667 system operator - MREK (Kaztransoil JSC) water pumping station 2015 JSC, technical conditions Customer: Electroservice LLP are issued 29 Grid connection study of 24 MW small hydro power plants cascade on Tekes river in Rayimbek district Approved by KEGOC JSC, 2015 of Almaty region AZHK JSC and ME RoK Customer: «KazGidroKaskad» LLP 30 Grid connection study of 37.9 MW small hydro power plants cascade on Bayinkol river in Approved by KEGOC JSC 2015 Rayimbek district of Almaty region and AZHK JSC Customer: «KazGidroKaskad2» LLP 31 Grid connection study ap- Grid connection study and Feasibility study for the proved by KEGOC JSC, construction of WPP with installed capacity of 50 MREK JSC and ME RoK, MW on Fort-Shevchenko site in Mangistau 2015 technical conditions were region issued, FS approved by Customer: «CMI Green Energy» LLP Gosexpertiza 32 External power supply study of Komarovskiy gold deposit concentrator plant in Zhetikara town of Approved by grid owner 2015 Kostanay region company - KEGOC JSC Customer: «ASPMK-519» LLP

3 № Project name Year Results 33 Grid connection study of small HPP-2 on Lepsy riv- Approved by KEGOC JSC er in Almaty region 2015 and TATEK JSC Customer: «GES Lepsy-2» LLP 34 Grid connection study of small HPP on Kora river in Approved by KEGOC JSC Almaty region 2015 and Karatal-Transit LLP Customer: «Korinskaya GES» LLP 35 Feasibility study for Badamsha WPP with installed FS approved by Gosex- capacity of 48 MW in Aktobe region 2015 pertiza Customer: «ARM WIND» LLP

36 Grid connection study ap- Grid connection study and Feasibility study for the proved by KEGOC JSC, construction of SPP with installed capacity of 40 2015 ZhREK JSC, technical con- MW on Gulshat site in Karaganda region ditions issued, FS approved Customer: «KPM-Delta» LLP by Gosexpertiza 37 Grid connection study ap- Grid connection study and Feasibility study for the proved by KEGOC JSC, Second stage (50MW expansion) of SPP on 2015 technical conditions issued, Burnoe site in Zhambyl region FS approved by Gosex- Customer: «United Green Energy Limited» pertiza 38 Research on Renewable energy integration capabil- Research results approved ities of the Kazakstan power system at current and 2015 by the customer «KEGOC» future prospects JSC and Ministry of Energy Customer: «KEGOC» JSC 39 Balance approved by the Power and energy balance of the Kazakhstan pow- customer «KEGOC» JSC, er system for 2016-2022 period with long term fu- 2016 final report published on ture prospects till 2025, 2030 Transmission system op- Customer: «KEGOC» JSC erator official website 40 Grid connection study ap- Grid connection study and Feasibility study for the proved by KEGOC JSC, 50MW SPP on Baikonur in Kyzylorda region 2016 technical conditions issued, Customer: «United Green Energy Limited» FS approved by Gosex- pertiza 41 Grid connection study ap- Grid connection study and Feasibility study for the proved by KEGOC JSC, 50MW SPP Kapshagay-Solar in Almaty region 2016 technical conditions issued, Customer: «Reliable High Technologies» LLP FS approved by Gosex- pertiza 42 Grid connection study ap- Grid connection study for 10 MW gas piston power proved by KEGOC JSC and plant GPES-MTU in West-Kazakhstan region 2016 Aksaygazpromenergo LLP, Customer: «Condensate» JSC technical conditions issued

4 № Project name Year Results 43 Grid connection study ap- Grid connection study for 4.5 MW WPP in Kap- proved by KEGOC JSC and shagay Almaty region 2016 AZHK JSC, technical condi- Customer: «ANNAR» LLP tions issued 44 Approved by KEGOC JSC, Detailed design of 500 kV OHTL Semey - Aktogay Approved by RGP Gosex- (line length 400 km) 2016 pertiza, the project is under Customer: KEGOC JSC construction 45 Grid connection study ap- Grid connection study for 4.5 MW WPP in Nurly proved by KEGOC JSC and Almaty region 2016 AZHK JSC, technical condi- Customer: «Nurly WPP» LLP tions issued 46 Based on the results of the Technical-economical research for construction of research decision for con- solar power plant near the city of Shymkent 2016 struction of 16 MW SPP Customer: «Burnoe Solar-1» LLP Burzhar is made 47 External power supply study for gold mining com- Approved by KEGOC JSC, plex RG Gold in Akmola region 2016 technical conditions issued Customer: "RG Gold" LLP

48 External power supply study for ore min- Approved by KEGOC JSC, ing/processing comlex Masalskoe in Akmola region 2016 technical conditions issued Customer: "Kazgiprocvetmet" LLP

49 Grid connection study ap- Grid connection study and Feasibility study for the proved by KEGOC JSC, 100 MW SPP Kapshagay in Almaty region 2017 technical conditions issued, Customer: "ENEVERSE KUNKUAT" LLP FS approved by Gosex- pertiza 50 External power supply study and feasibility study for External power supply study external power supply objects for metallurgic com- approved by KEGOC JSC, plex based on Masalskoe iron ore deposit in Akmo- 2017 technical conditions issued, la region FS approved by Gosex- Customer: "Kazgiprocvetmet" LLP pertiza 51 Grid connection study ap- proved by KEGOC JSC and Grid connection study and Feasibility study for the OZhT LLP, technical condi- 16 MW SPP Burzhar in South-Kazakhstan region 2017 tions issued, FS approved Customer: «United Green Energy Limited» by out-of-departmental ex- pertise 52 Elaboration of external power supply options for Final report is accepted by Kazakhaltyn hydro-metallurgic company assets with the Customer. Step-by-step 2017 future prospects realization of given recom- Customer: «Kazakhaltyn Technology» LLP mendations is in progress 5 № Project name Year Results

53 Grid connection study ap- Grid connection study for 4.5 MW WPP Nurly-2 in proved by KEGOC JSC and Almaty region 2017 AZHK JSC, technical condi- Customer: «Nurly-2 WPP» LLP tions issued 54 Grid connection study ap- Grid connection study for Rudnichnye HPP in Ker- proved by KEGOC JSC and bulak district Almaty region 2017 Karatal Tranzit LLP, tech- Customer: «ASPMK-519» LLP nical conditions issued 55 Grid connection study for SPP Shalkiya in Kyzylor- Grid connection study da region 2017 approved by KEGOC JSC, Customer: «Shalkiya Solar (Шалкия Солар)» LLP technical conditions issued

56 Grid connection study ap- Grid connection study for 30.4 MW gas piston pow- proved by KEGOC JSC and er plant in Zhanaozen Mangistau region 2017 MREK JSC, technical con- Customer: «OralMunaiProm» LLP ditions issued

57 Detailed design for the second stage (50 MW Detailed design is finalized extension) of Burnoe Solar Power Plant in Zhambyl and approved by out-of- 2017 region departmental expertise. Customer: «United Green Energy Limited» Construction is finalized, the plant is commissioned. 58 Grid connection study ap- Grid connection study and Feasibility study for the proved by KEGOC JSC and waste treatment gas piston power plant in the city of 2017 ZhREK LLP, technical con- Kengir Karaganda region ditions issued, FS approved Customer: «Kazakh Santehproekt» LLP by Gosexpertiza 59 Actualization of power and energy balance for pow- Actualized power and ener- er system of the Republic of Kazakhstan with future gy balance was approved 2017 prospects till 2018-2024 and 2030 by Ministry of Energy (order Customer: «KEGOC» JSC №475 dated 25.12.2017) 60 Grid connection study ap- Grid connection study for HPP-2 on Chizha river in proved by KEGOC JSC and Almaty region 2017 Karatal Tranzit LLP, tech- Customer: «ASPMK-519» LLP nical conditions issued 61 Grid connection study ap- Grid connection study for 19 MW SPP in Zhambyl proved by KEGOC JSC and region 2018 Zhambyl Electric Grid LLP, Customer: «Aqyrtobe Solar» LLP technical conditions issued 62 Grid connection study ap- Grid connection study for 5 MW SPP in Zhambyl proved by KEGOC JSC and region 2018 Zhambyl Electric Grid LLP, Customer: «Zhalgyztobe Solar» LLP technical conditions issued

6 № Project name Year Results

63 Grid connection study ap- proved by KEGOC JSC and Grid connection study and a part of Feasibility study Zhezkazgan Electric Grid for waste utilization plant in Kengir village of Kara- LLP, technical conditions 2018 ganda region issued. Feasibility study is Customer: «Kazakhskiy Santehproekt» LLP finalized and approved by out-of-departmental exper- tise. 64 Detailed design is finalized Detailed design for 14 MW Zadarya Solar Power and approved by out-of- Plant in South-Kazakhstan region 2018 departmental expertise. Customer: «KazGreenTekSolar» LLP Construction is finalized, the plant is commissioned. 65 Grid connection study ap- proved by KEGOC JSC and Grid connection study and a part of Feasibility study Kazakhmys Distribution for Karyernoye gold extracting plant in Aktogai dis- LLP, technical conditions 2018 trict of Karaganda region issued. Feasibility study is Customer: «AK Altynalmas» JSC finalized and approved by out-of-departmental exper- tise. 66 Grid connection study ap- proved by KEGOC JSC and Grid connection study and a part of Feasibility study East-Kazakhstan Electric for copper extracting plant in district of Grid LLP, technical condi- 2018 East-Kazakhstan region tions issued. Feasibility Customer: «ASPMK-519» LLP study is finalized and ap- proved by out-of- departmental expertise. 67 Detailed design is finalized Detailed design for 50 MW Baikonyr Solar Power and approved by out-of- Plant in Kyzylorda region 2018 departmental expertise. Customer: «United Green Energy Limited» Construction is finalized, the plant is commissioned. 68 Grid study of Feasibility study "Reinforcement of Feasibility study is finalized West-Kazakhstan zone transmission grid" 2018 and approved by out-of- Customer: «EnergoStroyProekt» LLP departmental expertise 69 Grid connection study ap- proved by Kostanay Electric Grid connection study and a part of Feasibility study Grid LLP, technical condi- for 1-st grade lime production plant in Kostanay re- 2018 tions issued. Feasibility gion study is finalized and ap- Customer: «KITNG» LLP proved by out-of- departmental expertise.

7 № Project name Year Results 70 Peer review of the assessment report on current state of the emergency automatic protection system Report is finalized and ap- (EAPS) in Tajikistan due to cross-border intercon- 2018 proved by USAID and nection needs with Uzbekistan. stakeholders Customer: "ECODIT" LLC (on behalf of USAID)

71 Grid connection study ap- Grid connection study for 40 MW SPP in Panfilov proved by KEGOC JSC and district of Almaty region 2018 Managing Company Khor- Customer: «Blu Kazakistan» LLP gos East Gates LLP, tech- nical conditions issued 72 Grid connection study ap- Grid connection study for Zhairem extracting plant proved by KEGOC JSC and in Karaganda region 2018 Zhezkazgan Electric Grid Customer: «ASPMK-519» LLP LLP, technical conditions issued. 73 Grid connection study ap- Grid connection study for 3 MW SPP in Kapchagay proved by KEGOC JSC and city of Almaty region 2018 Alatau Zharyk Kompaniyasi Customer: «TechnoBazalt» LLP LLP, technical conditions issued. 74 Actualization of power and energy balance for pow- Actualized power and ener- er system of the Republic of Kazakhstan with future gy balance was approved 2018 prospects till 2019-2025 and 2030 by Ministry of Energy (order Customer: «KEGOC» JSC №10 dated 14.01.2019) 75 Detailed design is finalized Detailed design for 100 MW Nurgisa Solar Power and approved by out-of- Plant near the city of Kapchagay in Almaty region 2019 departmental expertise. Customer: «ENEVERSE KUNKUAT» LLP Construction is finalized, the plant is commissioned. 76 Grid connection study ap- Grid connection study for 50 MW WPP in Kostanay proved by KEGOC JSC and region 2019 Kostanay Electric Grid LLP, Customer: «ZHEL ELECTRIC» LLP technical conditions issued 77 Grid connection study for 50 MW SPP in Almaty re- Grid connection study ap- gion 2019 proved by KEGOC JSC, Customer: «MISTRAL ENERGY» LLP technical conditions issued

78 Grid connection study for 100 MW WPP in Akmola Grid connection study ap- region 2019 proved by KEGOC JSC, Customer: «ZHEL ELECTRIC» LLP technical conditions issued

79 Justifying calculations on power system integration Justifying calculations coor- of 43.6 MW WPP Fort-Shevchenko with power dinated with KEGOC JSC 2019 quality assessment and Mangistau Electric Grid Customer: "КТ Raremetal Company" LLP LLP. WPP is commissioned

8 № Project name Year Results

80 Grid connection study for 50 MW SPP Alma in Grid connection study ap- Almaty region 2019 proved by KEGOC JSC, Customer: «DORADO SERVICE GROUP» LLP technical conditions issued 81 Justifying calculations on power system integration of 100 MW Nurgisa Solar Power Plant near the city Justifying calculations coor- of Kapchagay in Almaty region 2019 dinated with KEGOC JSC. Customer: «ENEVERSE KUNKUAT» LLP SPP is commissioned

82 Grid connection study for 8.6 MW small hydro pow- Grid connection study ap- er plant on Koktal river in Almaty region proved by KEGOC JSC and 2019 Customer: "Zharyk-Energo" LLP local electric grid company, technical conditions issued

83 Grid connection study for 100 MW WPP near Grid connection study ap- Aktogay village in East-Kazakhstan region 2019 proved by KEGOC JSC, Customer: «ZHEL ELECTRIC» LLP technical conditions issued

84 Grid connection study for 4.95 MW WPP near Grid connection study ap- Ereimentau village in Akmola region proved by KEGOC JSC and 2019 Customer: "Ereimentau WPP" LLP Akmola electric grid LLP, technical conditions issued 85 Grid connection study for 10 MW WPP Zhangiz in Grid connection study ap- Mangistau region proved by KEGOC JSC and 2019 Customer: "WPP Service" LLP Mangistau electric grid LLP, technical conditions issued 86 Grid connection study for second phase (48 MW extension) of existing Badamsha 48 MW WPP in Grid connection study ap- Aktobe region 2019 proved by KEGOC JSC, Customer: "TECHNINCO ENGINEERING technical conditions issued CONTRACTORS" LLP 87 Grid connection study for Donskoy extracting plant Grid connection study ap- in Aktobe region 2019 proved by KEGOC JSC, Customer: "Batys Transit" JSC technical conditions issued

88 Grid connection study for Logistic Hub in Almaty re- Grid connection study ap- gion 2019 proved by KEGOC JSC, Customer: "Energo Stroy Company" LLP technical conditions issued 89 Pre-FS documentation for renewable energy source in preparation to RES auction - 50 MW solar power Based on Pre-FS documen- tation in the fall 2019 RES plants near the village of Shaulder in Turkestan re- 2019 gion auction was successfully Customer: UNDP Kazakhstan held 90 Author's supervision for the construction of SPP was successfully built Baikonyr SPP and commissioned Customer: "Baikonyr Solar" LLP 2020

9 № Project name Year Results Grid connection study for PP Eurochem-Fertilizers- Grid connection study ap- 91 Karatau in Zhambyl region 2020 proved by KEGOC JSC, Customer: ASPMK-519 LLP technical conditions issued 92 Author's supervision for the construction of 14 MW SPP was successfully built Zadarya SPP in the city of Arys, Turkestan region" 2020 and commissioned Customer: “KazGreenTekSolar” LLP 93 Detailed design of SPP 5 MW Arys in the Turke- Detailed design is finalized stan region 2020 and approved by out-of- Customer: Kazakhstan filial of URBASOLAR SAS departmental expertise 94 External power supply study of Ridder energy node Grid connection study ap- Customer: ASPMK-519 LLP proved by VKREK JSC and 2020 KEGOC JSC, technical con- ditions issued 95 Grid connection study for HPP at the Tasotkel res- Grid connection study ap- ervoir in the Shu district of the Zhambyl region 2020 proved by ZHES LLP and Customer: LLP "Company A&T-energo" KEGOC JSC, technical con- ditions issued 96 Grid connection study for the southern pits of the Grid connection study ap- site No. 2 "Tortkuduk" of "Moinkum" deposit "SP proved by "SP KATCO" LLP KATCO" LLP 2020 and KEGOC JSC, technical Customer: «ASPMK-519» LLP conditions issued 97 Development and approval of a comprehensive Programs were approved by testing program [1], “KEGOC” JSC. The WPP full-scale testing program [2], was successfully commis- Execution of justifying calculations on power system sioned. integration of WPP Badamsha-1 with power quality assessment [3], Development and approval of a Voltage testing 2020 program of WPP Badamsha-1 [4] and Voltage testing program of WPP Badamsha-1 with intermediate testing of new installed 110 kV bay #3 on Kimpersay substation [5] Customer: "TECHNINCO ENGINEERING CONTRACTORS" LLP 98 Grid connection study for 50 MW WPP in the city of Grid connection study ap- Ekibastuz, Pavlodar region. 2020 proved by KEGOC JSC, Customer: “AMPERA” LLP technical conditions issued 99 Execution of justifying calculations on power system Calculations approved by integration of SPP Baikonyr with power quality “KEGOC” JSC. The SPP Assessment into the power grid with an assessment 2020 was successfully commis- of electricity quality indicators sioned. Customer: UG ENERGY LIMITED

100 Grid connection study for 6x4,95 MW WPP near Grid connection study ap- Zhangiz-Tobe village, Zharminskiy district, East Ka- 2020 proved by VKREK JSC and zakhstan region KEGOC JSC, technical con- Customer: "Charsk Veter" LLP ditions issued

10 № Project name Year Results 101 Execution of justifying calculations on power system Calculations approved by integration of SPP Zadarya with power quality “KEGOC” JSC. The SPP Assessment into the power grid with an assessment 2020 was successfully commis- of electricity quality indicators sioned. Customer: Filial "Urbasolar SAS" 102 External power supply study of the Benkalinskoye Grid connection study ap- field due to increasing power consumption proved by MRET LLP and Customer: "Mining Company "Benkala" JSC 2020 KEGOC JSC, technical con- ditions issued 103 Grid connection options assessment within a The works are completed framework of "Support of the Implementations of and accepted by the Cus- Wind Auctions in Kazakhstan" 2020 tomer Customer: GOPA-International Energy Consultants GmbH 104 "Proposals for possible Solar power plant sites and The works are completed Wind power plant clusters in the Republic of Ka- and accepted by the Cus- zakhstan" 2020 tomer Customer: “BDC Consulting” LLP 105 Pre-feasibility study for the alternative energy The works are completed sources implementation in the internal networks of and accepted by the Cus- the enterprises "Copper Company Kounrad" LLP 2020 tomer and "Sary Kazna" LLP Customer: "Copper Company Kounrad" LLP 106 «Grid connection arrangements assessment for The works are completed «Wind clusters in Kazakhstan» 2020 and accepted by the Cus- Customer: “RNVEA SPP I” LLP tomer.

107 External power supply study of Vasilkovsky GOK in Grid connection study ap- Akmola region. 2020 proved by KEGOC JSC, Customer: «ASPMK-519» technical conditions issued

108 Feasibility assessment for the connection of small The works are completed capacity distributed renewable energy sources to and accepted by the Cus- the electric grid (Turkestan region in the area of op- 2020 tomer eration of "ОZhТ" LLP). Customer: UNDP Kazakhstan 109 Preparation of auction documentation for SPP 20 Grid connection study ap- MW in Kyzylorda and Turkestan regions. proved by KREK JSC, OZhT Customer: «FINANCIAL SETTLEMENT CENTER LLP and KEGOC JSC, tech- OF RE» LLP 2020 nical conditions issued. Auc- tions were successfully held in December 2020 110 Grid connection study for small hydro power plant Grid connection study ap- on the Koksu river in the Eskeldinsky district of the proved by TATEK JSC and Almaty region." 2020 KEGOC JSC, technical con- Customer: “VostokEkoEnergia” LLP, KOXU LLP ditions issued

11 № Project name Year Results

111 Grid connection study for +50 MW WPP near the Grid connection study ap- SS 500/220 kV Aktogay. proved by KEGOC JSC, Customer: Torangy Energy LLP 2020 technical conditions issued

112 Grid connection study for 50 MW WPP near the vil- Grid connection study ap- lage of Koyandy in the Akmola region" proved by Akmolinskaya Customer: "Arm Wind" LLP 2020 REK JSC and KEGOC JSC, technical conditions issued