Name Keren Rose Seddon

Total Page:16

File Type:pdf, Size:1020Kb

Name Keren Rose Seddon NAME KEREN ROSE SEDDON COMPANY TOWNLAND CONSULTANTS LTD CURRENT POSITION CHIEF EXECUTIVE OFFICER YEAR OF BIRTH 1951 NATIONALITY BRITISH KEY EXPERIENCE Ms Seddon is uniquely qualified in that she has had extensive planning experience in multi-disciplinary projects for both the Public and Private Sectors for 37 years. She has worked for Government in Hong Kong (HK) and the United Kingdom, and has detailed knowledge of planning procedures, standards and methodologies in both jurisdictions. In HK she has performed a variety of duties for the Territory Development Department of the HK Government including the preparation of Planning Briefs for major housing developments and as Secretary of the Steering Group of the Junk Bay East Coast Study covering controlled tip, after use, access, industry, typhoon shelter, village development, recreational pursuits and countryside protection. As Chief Executive Officer of TOWNLAND, which she established in 1985 and which is the largest Planning and Design Consultancy in HK, she oversees a large number of award winning land use planning studies, master planning projects, urban design, site planning, detail regulatory planning, concept architecture and landscape design projects. TOWNLAND also has the longest track record in HK in focussed Development Consultancy work (over 30 years). Ms Seddon, having developed for her profession in HK a significant role in Private Sector Development Consultancy, has been responsible for a long list of Planning Applications, Reviews, Appeals, Objections to Statutory Plans, Rezoning Requests and Lands Submissions, and has acted as Expert Witness in Judicial Reviews, S17B Appeals, Compulsory Sales Proceedings and Buildings and Liquor License matters. Ms Seddon established TOWNLAND‟s Jakarta Office in 1996; PT TOWNLAND International was incorporated in 1999 to lead TOWNLAND‟s Indonesia business; she established TOWNLAND‟s Shenzhen Office and TOWNLAND Consultants (Shenzhen) was incorporated in 2002 to serve TOWNLAND‟s expanding Client needs in Mainland China; she established TOWNLAND Consultants Pvt. Ltd. in India in 2008; and TOWNLAND Consultants (Chengdu) Ltd (Mainland China) in 2011. TOWNLAND was awarded a National “Foreign-Invested Enterprise Urban Planning Service Qualification Certificate” in Mainland China in 2011. Ms Seddon‟s particular specialisations include strategy formulation, options evaluation, site selection, development potential and implementation aspects. In addition she has provided planning support in buildings and lands matters, such as Buildings Appeal Tribunals, Exchanges, Modifications and interpretation of Lease Conditions. As Quality Director in TOWNLAND, Ms Seddon has a major role to play in maintaining quality standards in all of the various Divisions in the TOWNLAND Group of Companies. Country Experience : Hong Kong, Mainland China, Indonesia, India, Vietnam, Macau, The Philippines, Taiwan, Cambodia, The United Kingdom, Uzbekistan Islands in The S. Pacific and Atlantic Oceans, The Maldives, Thailand, South Korea, Malaysia, The Republic Cape Verde, Tunisia, East Timor, The United Arab Emirates, Benin - West Africa and Poland. EDUCATION/PROFESSIONAL QUALIFICATIONS 1974 Bachelor of Science (Honours) in Town Planning and Diploma in Town Planning - University of Wales, Institute of Science and Technology, U.K. 1978 Member of the Royal Town Planning Institute 1988 Member of the Hong Kong Institute of Planners 1993 Registered Professional Planner, Hong Kong S:\MANAGEMENT\PR Materials\CV\ENG\Keren Seddon.Doc 26 April, 2016 Page 1 of 12 KEREN ROSE SEDDON EXPERIENCE RECORD 1985 - To date Chief Executive Officer - Townland Consultants Limited QUALITY MANAGEMENT Responsible for the overall management and administration of TOWNLAND since its establishment in 1985 and subsequently for the TOWNLAND Group of Companies with offices in Hong Kong, Mainland China, Indonesia, India and Malaysia. In addition to providing overall strategic direction for the Group of Companies, Ms Seddon has particular responsibility as Quality Director for quality management of all professional output. In the Divisions under her control [(1) Planning Studies, (2) Development Consultancy, (3) Master Planning/Urban Design/ Site Planning/ Detail Regulatory Planning/ Concept Architecture/ Landscape Design and (4) ISO], there are a wide variety of key planning, design and quality management projects for the Private Sector (presently over 100 signed contracts ongoing in Development Consultancy/ Planning Studies/ Design Projects (HK) alone), together with a large number of major studies for Governments and Agencies such as the Asian Development Bank, World Bank, Urban Renewal Authority, HK, The HK Housing Society and the MTRC. Key management areas under her control within the Company include: STUDIES With the main emphasis on feasibility, land use planning, implementation and institutional planning, also public consultation, in-depth planning studies managed by Ms Seddon have included, for instance: (i) major public transport and infrastructural projects (eg. Land Use Planning for the Closed Area - F.S., Planning Department; North East New Territories New Development Areas. Planning and Engineering Study - Investigation, Civil Engineering and Development Department; award winning Shenzhen Metro Phase II Pre-feasibility Study (Lines 1, 2, 3 & 4 and Lines 1 and 3 Extensions); Shenzhen Metro Phase II Planning Study for Lines 1, 4, 11, 3, 6 and 2; Beijing LRT Feasibility Study; HK Islands District Sewerage Masterplan Additional Works; NW Kowloon Sewerage Stage III, Phase II and West Kowloon Stormwater Drainage Improvement Stage I; Territorial Sewerage Inflow and Infiltration Reduction Study; Kajang - Seremban Expressway Feasibility Study, Malaysia, Trans Peak Railway; Tai Wai Railway; Castle Peak Road Improvement between Area 2 and Ka Loon Tsuen, Tsuen Wan; Sham Tseng Link; Elevated Pedestrian Network, Kuala Lumpur; Central Kowloon Route; Tseung Kwan O Extension - Area 86 - for MTRC; Kowloon Tong KCRC Station Redevelopment; Tai Po Market KCRC Station Redevelopment; Container Terminals 4, 6, 7, 8, 9, 10 and 11; Railway Development Study Review for Railway Development Office HK); KCRC West Rail [packages TS100, 200 and 600 Northern Section, Western Section and Maintenance Depot and Detailed Design Contract DD600 (Kam Tim Depot and Station)]; KCRC Shatin New Town to Central HK Link: Preliminary Project Feasibility Study on the Fourth Harbour Crossing and Central West Extension (Southern Section); MTR East Kowloon/North Island Line Feasibility Study; Engineering Feasibility Study for Tseung Kwan O Port Development at Area 131, HK; Consultancy Study for Provision of Heliport Facilities; Preliminary Feasibility Study on Provision of Cycletrack and Related Supporting Facilities between Tuen Mun and Tsuen Wan and subsequent Investigation Studies for CEDD; Route 10-North Lantau to Yuen Long Highway Investigation and Preliminary Design Assignment and MTR Feasibility Study for Hong Kong Shatin Phase II Development); S:\MANAGEMENT\PR Materials\CV\ENG\Keren Seddon.Doc 26 April, 2016 Page 2 of 12 KEREN ROSE SEDDON EXPERIENCE RECORD (Cont'd) (ii) environmental studies (eg. Deep Bay Water Quality, Regional Control Strategy Study; EIA for Four Potential Housing Development Sites; Vetting of Submissions on Landfill Gas Hazards for Developments adjacent to Landfills; Restoration of Landfill Sites (Core Consultancy); Environmental Consultancy Agreement for Reprovisioning of Diamond Hill Crematorium; Outlying Islands Sewerage Master Plan Stage 2 Review Study; Preliminary Environmental Review (including Traffic Impact & Noise Impact Assessments) for Redevelopment of ex- HD Staff Quarters in Tin Wan, Aberdeen; and Asian Development Bank (ADB) and World Bank (WB) Projects in, for instance, Asia and the S. Pacific); (iii) urban renewal (eg. Tai Kok Tsui, Urban Renewal Study; Study on the Restructuring of Obsolete Industrial Areas (ROBINA); ROBINA Case Studies; Kwun Tong Town Centre Redevelopment; Former Land Development Corporation Industrial to Residential Rezoning Feasibility Study; and Shek Kip Mei Restructuring Study); (iv) rehabilitation (eg. Mt. Butler Quarry; Cha Kwo Ling Quarry; Lamma Quarry; and Anderson Road Quarry); (v) industry (eg. HK Science Park Study; Support to Industry on Environmental Matters Study; Study on the Provision of Industrial Premises and the Development of Planning Guidelines and Design Parameters for New Industrial Areas and Business Parks; Comprehensive Industrial Development in Daya Bay Economic and Technological Development Zone, Huizhou, Guangdong; and Singapore Buona Vista Science Park); (vi) retail (eg. Salisbury Garden and Peninsula underground extension, being HK‟s largest integrated underground retail/carpark complex; and Feasibility Study for underground development at Tsim Sha Tsui); (vii) housing [eg. award winning Market and Marketing Research for Senior Citizen Homes, Hong Kong; Lam Tin Housing Site Feasibility Study; Ngau Tam Mei New Town (100,000 persons); Sai Sha New Town (85,000 persons on 120.5 ha); HK Island South and Lamma Island Study; and Hong Kong Housing Society Feasibility Studies (Proposed Subsidized Housing Development at Ching Hiu Road, Sheung Shui; and Proposed Public Rental Housing Development at Shek Pai Wan Road)]; (viii) new town / new growth areas [eg. Planning Study on Lian Tong / Heung Yuen Wai Cross-boundary Control Point and its Associated Connecting Road in HK; Land Use Planning for the Closed Area, HK for Planning Department ; and
Recommended publications
  • Tseung Kwan O – Lam Tin Tunnel Terrestrial Archaeological Review and and Associated Works – Investigation Marine Archaeological Investigation (Final)
    Agreement No. CE 42/2008 (CE) Working Paper on Tseung Kwan O – Lam Tin Tunnel Terrestrial Archaeological Review and and Associated Works – Investigation Marine Archaeological Investigation (Final) Agreement No. CE 42/2008 (CE) Tseung Kwan O – Lam Tin Tunnel and Associated Works – Investigation Working Paper on Terrestrial Archaeological Review and Marine Archaeological Investigation (Final) Contents Page 1 INTRODUCTION ................................................................................................... 1 1.1 Background .................................................................................................... 1 1.2 Objectives of this Working Paper ................................................................... 2 1.3 Structure of this Paper .................................................................................... 3 2 ENVIORNMENTAL LEGISLATION AND STANDARDS................................... 5 2.1 Overview ....................................................................................................... 5 2.2 Enviornmental Impact Assessment Ordinance (Cap.499) ............................... 5 2.3 Technical Memorandum on Environmental Impact Assessment Process ........ 5 2.4 Antiquities and Monuments Ordinance (Cap.53) ............................................ 5 2.5 Hong Kong Planning Standards and Guidelines ............................................. 6 2.6 Guidelines for Cultural Heritage Impact Assessment ...................................... 6 2.7 Guidelines for Marine Archaeological
    [Show full text]
  • Sai Kung Community Care Fund
    Community Care Fund "Pilot Scheme on Support for Elderly Persons Discharged from Public Hospitals After Treatment" Approved Service Providers - List of Service Units (Transitional Community Care and Support Services) (Updated on 1 August 2019) Sai Kung District Home Care Day Care (location of S/N Agency Name Service Unit Name Address (Home Care Office) Serving District(s) Address (Day Care Centre) Serving District(s) Tel Fax Service Service service unit) Room 306A, 311-312 and 330-335, Room 311-312 and 330-335, Hong Haven of Hope Christian Haven of Hope Tsui Lam Day Training Kwun Tong, 1 Hong Lam House, Tsui Lam Estate, Lam House, Tsui Lam Estate, Tseung Kwun Tong, Sai Kung 5281 6325 2704 9282 Service Centre for the Elderly Sai Kung Tseung Kwan O, New Territories Kwan O, New Territories Sai Kung District Community Centre Sai Kung District Community Centre Sai Kung District Sai Kung District Community Centre Limited Jockey Club Integrated Limited Jockey Club Integrated Sai Kung 2 Sai Kung Sai Kung 2792 1762 2791 0247 Community Centre Limited Limited Services Centre, 8 Mei Yuen Street, Services Centre, 8 Mei Yuen Street, Sai Kung, New Territories Sai Kung, New Territories The Hong Kong Society for SAGE Tung Lin Kok Yuen Home for the 4/F, On Lam House. Tsui Lam Estate, 3 Sai Kung 2702 0066 2174 8043 the Aged Elderly / / Tseung Kwan O, New Territories Kwun Tong, Christian Family Service Shop 4, G/F, Choi Sing House, Choi Wong Tai Sin, 4 Mind Delight & Cognitive Training Centre / / 2793 2138 3572 0634 Centre Ha Estate, Kowloon Bay, Kowloon Sai Kung, Kowloon City Kwun Tong, Tung Wah Group of Henry G.
    [Show full text]
  • (Translation) Minutes of the 23 Meeting of the 4 Wan Chai District
    (Translation) Minutes of the 23rd Meeting of the 4th Wan Chai District Council Hong Kong Special Administrative Region Date: 7 July 2015 (Tuesday) Time: 2:30 p.m. Venue: District Council Conference Room, Wan Chai District Office, 21/F Southorn Centre, 130 Hennessy Road, Wan Chai, H.K. Present Chairperson Mr SUEN Kai-cheong, SBS, MH, JP Vice-Chairperson Mr Stephen NG, BBS, MH, JP Members Ms Pamela PECK Ms Yolanda NG, MH Ms Kenny LEE Ms Peggy LEE Mr Ivan WONG, MH Mr David WONG Mr CHENG Ki-kin Dr Anna TANG, BBS, MH Ms Jacqueline CHUNG Dr Jeffrey PONG 1 23 DCMIN Representatives of Core Government Departments Ms Angela LUK, JP District Officer (Wan Chai), Home Affairs Department Ms Renie LAI Assistant District Officer (Wan Chai), Home Affairs Department Ms Daphne CHAN Senior Liaison Officer (Community Affairs), Home Affairs Department Mr CHAN Chung-chi District Environmental Hygiene Superintendent (Wan Chai), Food and Environmental Hygiene Department Mr Nelson CHENG District Commander (Wan Chai), Hong Kong Police Force Ms Dorothy NIEH Police Community Relation Officer (Wan Chai District), Hong Kong Police Force Mr FUNG Ching-kwong Assistant District Social Welfare Officer (Eastern/Wan Chai)1, Social Welfare Department Mr Nelson CHAN Chief Transport Officer/Hong Kong, Transport Department Mr Franklin TSE Senior Engineer 5 (HK Island Div 2), Civil Engineering and Development Department Mr Simon LIU Chief Leisure Manager (Hong Kong East), Leisure and Cultural Services Department Ms Brenda YEUNG District Leisure Manager (Wan Chai), Leisure and
    [Show full text]
  • Geodiversity, Geoconservation and Geotourism in Hong Kong Global
    Proceedings of the Geologists’ Association 126 (2015) 426–437 Contents lists available at ScienceDirect Proceedings of the Geologists’ Association jo urnal homepage: www.elsevier.com/locate/pgeola Geodiversity, geoconservation and geotourism in Hong Kong Global Geopark of China Lulin Wang *, Mingzhong Tian, Lei Wang School of Earth Science and Resources, China University of Geosciences, Beijing 100083, China A R T I C L E I N F O A B S T R A C T Article history: In addition to being an international financial center, Hong Kong has rich geodiversity, in terms of a Received 22 November 2014 representative and comprehensive system of coastal landscapes, with scientific value in the study of Received in revised form 20 February 2015 Quaternary global sea-level changes, and esthetic, recreational and cultural value for tourism. The value Accepted 26 February 2015 of the coastal landscapes in Hong Kong was globally recognized when Hong Kong Global Geopark Available online 14 April 2015 (HKGG), which was developed under the well-established framework of Hong Kong Country Parks and Marine Parks, was accepted in the Global Geoparks Network (GGN) in 2011. With over 30 years of Keywords: experience gained from managing protected areas and a concerted effort to develop geoconservation and Coastal landscape geotourism, HKGG has reached a mature stage of development and can provide a well-developed Hong Kong Global Geopark Geodiversity example of successful geoconservation and geotourism in China. This paper analyzes the geodiversity, Geoconservation geoconservation and geotourism of HKGG. The main accomplishments summarized in this paper are Geotourism efficient conservation management, an optimized tourism infrastructure, a strong scientific interpretation system, mass promotion and education materials, active exchange with other geoparks, continuous training, and effective collaboration with local communities.
    [Show full text]
  • PWSC(2021-22)5 on 21 April 2021
    For discussion PWSC(2021-22)5 on 21 April 2021 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 705 – CIVIL ENGINEERING Transport – Ferry Piers 58TF – Improvement works at Kau Sai Village Pier 59TF – Improvement works at Lai Chi Chong Pier Members are invited to recommend to the Finance Committee – (a) the upgrading of 58TF to Category A at an estimated cost of $77.8 million in money-of-the-day (MOD) prices; and (b) the upgrading of 59TF to Category A at an estimated cost of $108.8 million in MOD prices. PROBLEM We need to carry out the following works – (a) 58TF for reconstruction of Kau Sai Village Pier to improve the berthing condition and facilities of the pier; and (b) 59TF for reconstruction of Lai Chi Chong Pier to improve the structural condition and facilities of the pier. /PROPOSAL ….. PWSC(2021-22)5 Page 2 PROPOSAL 2. The Director of Civil Engineering and Development, with the support of the Secretary for Development, proposes to upgrade the following projects to Category A – (a) 58TF at an estimated cost of $77.8 million in MOD prices for the reconstruction of Kau Sai Village Pier; and (b) 59TF at an estimated cost of $108.8 million in MOD prices for the reconstruction of Lai Chi Chong Pier. PROJECT SCOPE 3. Details of the above two projects are provided at Enclosures 1 and 2 respectively. -------------------------------------- Development Bureau April 2021 Enclosure 1 to PWSC(2021-22)5 58TF – Improvement works at Kau Sai Village Pier PROJECT SCOPE We propose to upgrade 58TF to Category A and the scope of works comprises – (a) reconstruction of the existing pier, including provision of ancillary facilities such as roof cover, lighting system, benches, solar panels, Wi-Fi device, etc.; and (b) environmental monitoring and mitigation measures for the proposed works.
    [Show full text]
  • Yiu Tung / Hing Tung Bus-Bus Interchange Scheme
    Yiu Tung / Hing Tung Bus-Bus Interchange Scheme Passengers who ride on Route 77 / 99 from Shau Kei Wan to Yiu Tung / Hing Tung need to present the same Octopus when getting on and off to enjoy a discount fare of $3.50 (Child / Senior$1.80). When boarding for the first leg, the fare for the whole first leg would be deducted; when the passenger presents the same Octopus card again when alighting, the difference between the whole fare and the section fare will be reimbursed. If the passenger only present the Octopus card once, the whole fare will be deducted. Hence, passengers must remember to present the same Octopus twice to enjoy the discount fare. In addition, please make sure your Octopus card has adequate value to pay for all the trips concerned before boarding. From Shau Kei Wan to Yiu Tung / Hing Tung First Journey on Available Area Octopus Section (Direction) Fare 77 / 99 from Shau Kei Wan Shau Kei Wan Bus Terminus to Tai Cheong Street, Shau Kei Wan Road Adult (stations on the way of your journey) $3.50 Child / Senior $1.80 Besides, passengers can enjoy Route 77/99 and Route 2X、18X、81、82、85、682、682A、682B、682D、682P、682X and 694 BBI Scheme to travel to Kennedy Town, Wan Chai, Yiu Tung Estate /Hing Tung Estate and Hing Wah Estate、Chai Wan and Siu Sai Wan. Passengers can enjoy a fare discount of $5.30 (Child / Senior $2.70) at maximum on second journey. Passengers can ride on Route 2X from Wan Chai Ferry to get a free interchange to Route 2A、77、99 and 722 to Yiu Tung Estate/Hing Tung Estate at Sai Wan Ho Station.
    [Show full text]
  • Application for Amendment of Plan Under Section 12A of the Town Planning Ordinance
    MPC Paper No. Y/H5/5B For Consideration by the Metro Planning Committee on 13.12.2019 APPLICATION FOR AMENDMENT OF PLAN UNDER SECTION 12A OF THE TOWN PLANNING ORDINANCE APPLICATION NO. Y/H5/5 Applicant Yuba Company Limited represented by AECOM Asia Limited Site 1, 1A, 2 and 3 Hillside Terrace, 55 Ship Street (Nam Koo Terrace), 1- 5 Schooner Street, 53 Ship Street (Miu Kang Terrace) and adjoining Government Land, Wan Chai, Hong Kong Site Area About 2,427.9m2 (including about 300m2 government land) Lease Inland Lot (IL) 2140, IL 1940, IL 2272 & Ext. IL 1564, IL1669, IL 2093 R.P. and IL 2093 s.A R.P. - Standard non-offensive trades clause (IL 2140) - Virtually unrestricted except non-offensive trades clause (the remaining ILs) Plan Draft Wan Chai Outline Zoning Plan (OZP) No. S/H5/27 (at the time of submission of the application) Draft Wan Chai OZP No. S/H5/28 currently in force (the zoning of the site remains unchanged) Zonings “Open Space” (“O”) (84%), “Residential (Group C)” (“R(C)”) (14%) and “Government, Institution or Community” (“G/IC”) (2%) Proposed To rezone the application site from “O”, “R(C)” and “G/IC” to Amendment “Comprehensive Development Area” (“CDA”) 1. The Proposal 1.1 The applicant proposes to rezone the application site (the Site) (Plan Z-1) from “O”, “R(C)” and “G/IC” to “CDA” to facilitate a development which comprises residential and commercial uses and preservation of the Grade 1 historical building of Nam Koo Terrace (NKT). The applicant submitted a Proposed Indicative Scheme in the current application to demonstrate that the proposed land uses and development parameters are acceptable.
    [Show full text]
  • List of Recognized Villages Under the New Territories Small House Policy
    LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN,
    [Show full text]
  • Explanatory Statement
    KWU TUNG NORTH OUTLINE DEVELOPMENT PLAN No. D/KTN/1A EXPLANATORY STATEMENT ODP No. D/KTN/1 Approved by CPLD on 17.10.2013 ODP No. D/KTN/1A Agreed by NT DipCon on 12.5.2020 Fanling, Sheung Shui & Yuen Long East District Planning Office Planning Department Kwu Tung North Outline Development Plan No. D/KTN/1A Explanatory Statement CONTENTS Page 1. Background ………………………………………………………………..1 2. Objectives and Authority of the Plan ……………………………………...2 3. The Planning Scheme Area ………………………………………………..3 4. Population .………………………………………………………………...6 5. Planning Themes and Urban Design and Landscape Framework .……..…6 6. Land Use Proposals ………………………………………………………15 7. Transport ………………………………………………………………….33 8. Environmental Considerations …………...……………………………….37 9. Cultural Heritage ………………………………………………………….41 10. Utility Services ……………………………………………………………41 11. Implementation ……………………………………………………….......43 Plan 1 : Kwu Tung North New Development Area Location Plan Plan 2 : Urban Design and Landscape Framework Plan 3 : Pedestrian Connections Plan Plan 4 : Cycle Track Network Plan Plan 5 : Transport Network Plan Appendix 1: Schedule of Requirement and Provision of G/IC Facilities and Open Space in Kwu Tung North New Development Area Appendix 2: Development Parameters of Major Development Sites in Kwu Tung North New Development Area Kwu Tung North Outline Development Plan No. D/KTN/1A Explanatory Statement 1. Background 1.1 The Territorial Development Strategy Review in 1990s first identified that there was potential for strategic growth in the North East New Territories (NENT). The Planning and Development Study on NENT commissioned in 1998 identified Kwu Tung North (KTN), Fanling North (FLN) and Ping Che/Ta Kwu Ling (PC/TKL) as suitable for New Development Areas (NDAs) development. The Hong Kong 2030: Planning Vision and Strategy, promulgated in 2007, recommended to proceed with the KTN and FLN NDAs, among others, to address the long-term housing demand and provide employment opportunities.
    [Show full text]
  • Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link
    Tseung Kwan O - 及 Lam Tin Tunnel Cross Bay Link Proposed Scheme – Consultation Digest Kwun Tong Tseung Kwan O Lam Tin Tiu Keng Leng TKO Town Centre South Yau Tong Junk Bay Lam Tin Interchange TKO Area 86 January 2012 Project Information Legends: Benefits Proposed Interchange • Upon completion of Route 6, the new road • The existing Tseung Kwan O Tunnel is operating Kai Tak Tseung Kwan O - Lam Tin Tunnel network will relieve the existing heavily near its maximum capacity at peak hours. The trafficked road network in the central and TKO-LT Tunnel and CBL will relieve the existing Kowloon Bay Cross Bay Link eastern Kowloon areas, and hence reduce travel traffic congestion and cater for the anticipated Kwun Tong Trunk Road T2 time for vehicles across these areas and related traffic generated from the planned development Yau Ma Tei Central Kowloon Route environmental impacts. of Tseung Kwan O. To Kwa Wan Lam Tin Tseung Kwan O Table 1: Traffic Improvement - Kwun Tong District Yau Tong From Yau Tong to Journey Time West Kowloon Area (Peak Hour) Current (2012) 22 min. Schematic Alignment of Route 6 and Cross Bay Link Via Route 6 8 min. Traffic Congestion at TKO Tunnel The Tseung Kwan O - Lam Tin Tunnel (TKO-LT Tunnel) At present, the existing Tseung Kwan O Tunnel is towards Kowloon in the morning is a dual-two lane highway of approximately 4.2km the main connection between Tseung Kwan O and Table 2: Traffic Improvement - Tseung Kwan O long, connecting Tseung Kwan O (TKO) and East urban areas of Kowloon.
    [Show full text]
  • The Hongkong and Shanghai Banking Corporation Branch Location
    The Hongkong and Shanghai Banking Corporation Bank Branch Address 1. Causeway Bay Branch Basement 1 and Shop G08, G/F, Causeway Bay Plaza 2, 463-483 Lockhart Road, Causeway Bay, Hong Kong 2. Happy Valley Branch G/F, Sun & Moon Building, 45 Sing Woo Road, Happy Valley, Hong Kong 3. Hopewell Centre Branch Shop 2A, 2/F, Hopewell Centre, 183 Queen's Road East, Wan Chai, Hong Kong 4. Park Lane Branch Shops 1.09 - 1.10, 1/F, Style House, Park Lane Hotel, 310 Gloucester Road, Causeway Bay, Hong Kong 5. Sun Hung Kai Centre Shops 115-117 & 127-133, 1/F, Sun Hung Kai Centre, Branch 30 Harbour Road, Wan Chai, Hong Kong 6. Central Branch Basement, 29 Queen's Road Central, Central, Hong Kong 7. Exchange Square Branch Shop 102, 1/F, Exchange Square Podium, Central, Hong Kong 8. Hay Wah Building Hay Wah Building, 71-85 Hennessy Road, Wan Chai, Branch Hong Kong 9. Hong Kong Office Level 3, 1 Queen's Road Central, Central, Hong Kong 10. Chai Wan Branch Shop No. 1-11, Block B, G/F, Walton Estate, Chai Wan, Hong Kong 11. Cityplaza Branch Unit 065, Cityplaza I, Taikoo Shing, Quarry Bay, Hong Kong 12. Electric Road Branch Shop A2, Block A, Sea View Estate, Watson Road, North Point, Hong Kong 13. Island Place Branch Shop 131 - 132, Island Place, 500 King's Road, North Point, Hong Kong 14. North Point Branch G/F, Winner House, 306-316 King's Road, North Point, Hong Kong 15. Quarry Bay Branch* G/F- 1/F, 971 King's Road, Quarry Bay, Hong Kong 16.
    [Show full text]
  • Legislative Council Brief -- Unusual Ground Settlement in Tseung Kwan O
    Ref. L/M(3) in WB(CR) 38/01/15(00) LEGISLATIVE COUNCIL BRIEF UNUSUAL GROUND SETTLEMENT IN TSEUNG KWAN O INTRODUCTION At the meeting of the Executive Council on 21 November 2000, the Council noted the investigation findings on the unusual ground settlement in Tseung Kwan O (TKO). BACKGROUND 2. Unusual ground settlement in the TKO reclamation was first reported in early 1999. A detailed investigation of the causes of the unusual settlement and its effect on existing buildings and other facilities has now been completed. 3. The extent of area affected by the unusual settlement, comprising mainly Tiu Keng Leng, TKO town centre, TKO Area 86 and the TKO Industrial Estate (TKOIE), is shown in Figure 1 at Annex A. The locations of existing residential buildings (in three zones) at the affected town centre are shown in Figure 2 at Annex B. MAGNITUDE OF SETTLEMENT AND LATEST STATUS 4. The magnitude of settlement varies in different areas. At Tiu Keng Leng and the part of town centre to the north of Tong Ming Street, the settlement was very small being in the range of only 70 to 80 mm measured since early 1999. Further south of the town centre between Tong Ming Street and Tong Tak Street, this settlement measured since early 1999 ranged from 150 to 270 mm. In other areas of TKO reclamation, including Area 86 and TKOIE, the settlement ranged from 50 to about 800 mm. 1 5. In almost all the areas, the highest rate of settlement (approximately 40 mm per month at the town centre and up to 160 mm per month for part of other areas) was recorded in the first six to nine months of 1999.
    [Show full text]