2085 Hurontario St

Total Page:16

File Type:pdf, Size:1020Kb

2085 Hurontario St FOR LEASE $50 Visa Gift Cards for qualified tour & completed questionnaire $1.20 psf on the first 5 years 2085 HURONTARIO ST. ± 43,865 sf MISSISSAUGA, ON OFFICE SPACE AVAILABLE SOUTHGATE EXECUTIVE CENTRE For more information, please contact: Jeff Flemington, CCIM, SIOR, LEED AP Kurt Love, SIOR Hayden Jaworski Principal, Broker Vice President, Sales Representative Senior Associate, Sales Representative 905.283.2336 905.283.2341 905.283.2395 [email protected] [email protected] [email protected] 2085 Property Details FOR LEASE HURONTARIO ST. MISSISSAUGA, ON TOTAL AVAILABLE SPACE HIGHLIGHTS • Prime signage opportunity with QEW Ground Floor: 3,525 sf and Hwy 10 exposure • Built out model suites available Second Floor: 18,899 sf • Lobby and washroom renovations Third Floor: 5,716 sf complete, common areas underway Fourth Floor: 15,725 sf • 2nd and 3rd floor new washrooms & corridor in progress Fifth Floor: LEASED • New Elevators now operating Total: ± 43,865 sf • Currently installing new LED lighting throughout the common areas, including garage and outside PRICE • Widely accessible by Mississauga/GO Transit $16.50 psf (Years 1-5) Asking Rent: $18.50 psf (Years 6-10) Additional Rent: $16.23 psf (est. 2020) Improvement Allowance: Negotiable Parking: Underground ($50 monthly/spot) AERIAL CONFEDERATION PKWY CAMILLA RD QUEENSWAY HURONTARIO ST NORTH SERVICE RD QEW PREMIUM WAY SOUTH SERVICE RD 2085 FOR LEASE HURONTARIO ST. MISSISSAUGA, ON PHOTOS 2085 Floor Plan FOR LEASE HURONTARIO ST. MISSISSAUGA, ON FIRST FLOOR Client: Triovest Triovest HYDRO VAULT Version: Prepared: 11/24/2016 (NO ACCESS PROVIDED) FP1B Measured: 17/08/2016 GARBAGE 110 ROOM 2085 Hurontario Street Mississauga, Ontario MAIL. ROOM TELE. ROOM JAN. Floor 01 ROOM ELECTRICAL ROOM MECHANICAL ROOM FHC ELEV UP DN 101 New Food user Please Refer to WWR 101 Corresponding Area Chart ELEV re-location with possible patio extension 100 LEASED MWR ELEV ELEC. ELEC. LOBBY 103 This work product has been prepared by Extreme Measures Inc. pursuant to a contract with the Client for the sole benefit of and use by the Client. No third party may rely on this work product without the receipt of a reliance letter from Extreme Measures Inc. 0 10 20 feet Tel: 416.323.2858 Fax: 416.323.0855 [email protected] www.xmeasures.com AVAILABILITY Suite 100: 7,111 sf LEASED Suite 103: 3,525 sf Suite 110: 1,042 sf* LEASED 2085 Floor Plan FOR LEASE HURONTARIO ST. MISSISSAUGA, ON SECOND FLOOR 208 202 210 212 LEASED LEASED AVAILABILITY Suite 202: 8,266 sf Suite 208: 3,728 sf* Suite 210: 2,887 sf* Suite 212: 4,018 sf *Model suite All suites are contiguous to 18,999 sf 2085 Floor Plan FOR LEASE HURONTARIO ST. MISSISSAUGA, ON THIRD FLOOR 308 LEASED AVAILABILITY Suite 308: 5,716 sf 2085 Site Plan FOR LEASE HURONTARIO ST. MISSISSAUGA, ON FOURTH FLOOR LEASED AVAILABILITY Fourth Floor: 15,725 sf 2085 Transit FOR LEASE HURONTARIO ST. MISSISSAUGA, ON FUTURE INFRASTRUCTURE Construction commenced in 2018 Rapid, reliable, convenient transit 18 to the cities of Mississauga KILOMETRES and Brampton along the STEELES Hurontario corridor Connections to GO Transit’s Milton & Lakeshore West rail lines, Mississauga MiWay, Brampton Züm, and the Mississauga 19 STOPS Transitway BRT Carry more passengers than buses CITY CENTRE Reliable in adverse weather conditions HURONTARIO @ NORTH SERVICE RD Electrically powered with near-zero 2085 emissions HURONTARIO ST. Travelling on a Fare payment will be dedicated right- integrated with PRESTO Card of-way separate from system ensuring seamless regular traffic - increasing access between all transit reliability of travel times systems and decreasing congestion 2085 Location FOR LEASE HURONTARIO ST. MISSISSAUGA, ON TRANSIT ROUTES WITHIN 5 KM Britannia Rd W Creditview Rd Steeles Ave E 401 403 McLaughlin Rd 25C 2 407 Confederation Pkwy Mavis Rd Dundas St E QEW Hurontario St Kennedy Rd 410 103 45 46 Courtneypark Dr E 1 Derry Rd 47 101A Matheson Blvd W Lakeshore Rd E Burnhamthorpe Rd E Eglington Ave E 21R Cawthra Rd Queensway E Tomken Rd Dixie Rd TRANSIT ROUTES LEGEND GO Transit Stations MiWay 1 1 Lakeshore Cooksville Go 103 103 Hurontario 45/46/47 407 West Square One Transit Station 101A 101A Dundas Express 21R 21R Milton Port Credit GO Station 19 Hurontario 19C 2 2 Milton Trillium Heath Centre DRIVE TIMES 4 MINS QEW 10 MINS Cooksville GO Station 6 MINS Port Credit GO Station 13 MINS Square One Transit Station 8 MINS Trillium Health Centre 15 MINS Highway 403 2085 Amenities FOR LEASE HURONTARIO ST. MISSISSAUGA, ON AMENITIES MAP Britannia Rd W 403 Creditview Rd 401 McLaughlin Rd QEW Mavis Rd Dundas St E Confederation Pkwy Hurontario St Kennedy Rd 410 2085 Courtneypark Dr E HURONTARIO ST. MISSISSAUGA, ON Matheson Blvd W Lakeshore Rd E Burnhamthorpe Rd E Eglington Ave E Cawthra Rd Queensway E Tomken Rd Dixie Rd AMENITIES MAP LEGEND Subject Property Highways Roads Pharmacy Orthodontist Shopping & Retail 2085 Amenities FOR LEASE HURONTARIO ST. MISSISSAUGA, ON AERIAL OF CLOSEBY AMENITIES QUEENSWAY W QUEENSWAY W Walking distance to convenience plaza 2085 HURONTARIO ST HURONTARIO ST. Less than 1 QUEEN ELIZABETH WAY minute drive to QEW AMENITIES WITHIN 5 KM RADIUS 213 164 52 12 33 RESTAURANTS BANKS FITNESS CENTRES HOTELS GAS STATIONS Contact Avison Young is the real estate partner businesses trust for intelligent, integrated solutions. We deliver results that are aligned with your strategic business objec- tives, supporting real estate initiatives that add value and build competitive advantage for your organiza- Avison Young Commercial Real Estate (Ontario) Inc., Brokerage 77 City Centre Drive, Suite 301 Mississauga, Ontario, Canada L5B 1M5 T 905.712.2100 F 905.712.2937 www.avisonyoung.ca Starlight is dedicated to delivering superior investment results. We have developed an extensive network of local, national and international joint venture partners, financial institutions, brokers, property managers and other real estate professionals. Our network allows us to source, structure and execute compelling investment opportunities. Starlight is committed to partnerships with our investors and our industry. Starlight Investments 3280 Bloor Street West, Suite 1400 Toronto, Ontario, Canada, M8X 2X3 T 416.234.8444 F 416.234.8445 www.avisonyoung.ca For more information, please contact: Jeff Flemington, CCIM, SIOR, LEED AP Kurt Love, SIOR Hayden Jaworski Principal, Broker Vice President, Sales Representative Senior Associate, Sales Representative 905.283.2336 905.283.2341 905.283.2395 [email protected] [email protected] [email protected] The information contained herein was obtained from sources deemed reliable and is believed to be true; it has not been verified and as such, cannot be warranted nor form any part of any future contract..
Recommended publications
  • Print Directions (.Pdf)
    Coming from Sault Ste. Marie Take Hwy 17 (Trans Canada Highway) through Sudbury to North Bay. Turn North on Highway 11 and follow to New Liskard. Take highway 65 west to the village of Elk Lake. Turn left on Highway 560 west to Gowganda. Just past Gowganda turn left on Auld Reekie Camp Road. Coming from Southern Ontario (Niagara Falls area) Take the QEW (Queen Elizabeth Way) north. The QEW turns east after you go over the big bridge near Hamilton and heads towards Toronto. Drive to Oakville and right by the massive Ford auto plant (1 mile past Trafalgar Road) take the cut-off for Highway 403. Take Highway 403 to highway 401. Go East on the 401 until you reach the cut-off for highway 400 north. Follow the 400 north all the way to the city of Barrie. Just past the city of Barrie the 400 ends. It splits into highway 68 and highway 11. Take highway 11 to North Bay. Follow highway 11 through North Bay to New Liskard. Take highway 65 west to the village of Elk Lake. Turn left on Highway 560 west to Gowganda. Just past Gowganda turn left on Auld Reekie Camp Road. Coming from Ottawa or Montreal If coming from Montreal take Highway 40 across into Ontario and highway 40 to Ottawa becomes highway 417 to Ottawa. Follow 417 past Ottawa and past Kanata. About 4 miles past Kanata 417 takes a sharp turn north and turns into Highway 17 about 40 mile later. Follow highway 17 all the way to highway 11, which is just south of North Bay.
    [Show full text]
  • Table 31 Kitchener.Indd
    Kitchener CONTACT US Route number 30-31-33 Numéro du trajet Kitchener GO Train and Bus Schedule/ Gormley v: 202009 1 2 3 4 5 6 MISSISSAUGA / BRAMPTON 7 8 9 * 0 # 1-888-438-6646 Horaire des trains et des autobus GO 31 31A 31B 30 Maple 416-869-3200 31E 31F 31H 31 31B 31E 7 0 4 31J 31M Y 31H 31L 31N W RICHMOND H HILL TTY/ATS: 33 33A 33B 31N 31 31E 31H York Mills Richmond Hill 33D 33E Bramalea 1-800-387-3652 Transit 31L 31N Rutherford B R R Terminal A D M A D L IR E Etobicoke North Yorkdale A A V R Langstaff O D 31 31A 31B B Main St. N @ Bramalea Malton Barrie H 31M KT 30 31 33 U 31E 31F Richmond Bovaird Dr. W R O TORONTO N Hill T A R 33 33B 33D T M IO VAUGHAN R I A S S Weston Old Cummer F S T A I 33E 33F 33G L S G S TORONTO A A Steeles Ave. E @ First UGulf Blvd. / R G York gotransit.com/schedules R D A 33 33A 33B Brampton Steeles Ave. E @ RutherfordR Rd. S Kitchener D University Oriole Union Stn – 33E 1 31 31A 31B 40 Shopper’s Y H See Mississauga/Brampton inset Downsview HW W GO Bus Term. Kitchener World B Park 31E 31F 31H R York Mills A Hurontario St. @ Hwy 407 Y M A 7 L 0 Keele St. @ Bus Terminal 31J P E 4 Park & Ride 4 A Y R D W Hwy 401 2 R H T D Bloor S 33 33A 33B 33 33A 33B 7 D Etobicoke IR N A E V North Yorkdale E 33E O U 33E B Bus Terminal Q @GOtransitKT Guelph E 31 31A 31B 33 33C 33D Mount Weston TORONTO V 31 31A 31B A Pleasant S 31E 31F 31M 33E 33F 33G Union Stn – E 31M 31F Kitchener L T E S H Milton GO Bus Term.
    [Show full text]
  • 340 Traders Boulevard E Mississauga, On
    340 TRADERS BOULEVARD E MISSISSAUGA, ON AVAILABLE FOR LEASE 26,780 SF Freestanding Industrial Building HWY HWY 427 Property Highlights 410 • Fully Air-Conditioned Facility HWY • Functional Office Space 407 HWY • Gated Shipping Court 401 • Excellent Location With Easy Access to Highway 403, HWY HWY QEW 410 401 403 For more information please contact: Janse Rain Avison Young Principal, Sales Representative Commercial Real Estate (Ontario) Inc., Brokerage 905.283.2376 77 City Centre Drive, Suite 301 Mississauga, Ontario, Canada L5B 1M5 [email protected] T 905.712.2100 F 905.712.2937 340 TRADERS BOULEVARD E | MISSISSAUGA, ON FOR LEASE HIGHWAY 403 HIGHWAY 401 340 Traders Blvd E KENNEDY RD TRADERS BLVD E HURONTARIO ST MATHESON BLVD PROPERTY DETAILS Total Area 26,780 sf COMMENTS • Well maintained freestanding building located in Office Area 10% Trader Parks Industrial Area 90% • Shipping apron can accommodate multiple 53’ Clear Height 16.5’ - 22’ trailers • One of the three truck level doors can convert Shipping 3 Truck Level Doors into a 12’x12’ drive-in Possession Immediate • Clear height varies from 16.5’ to 22’ Zoning E2 • Warehouse has separate men’s and women’s $ Asking Net Rate $9.95 psf washrooms, as well as a lunchroom area $ Additional Rent $3.65 (Est. 2020) 340 TRADERS BOULEVARD E | MISSISSAUGA, ON FOR LEASE FLOOR PLAN TRADERS BLVD E Total Area: 26,780 sf Office Area: 10% Industrial Area: 90% KENNEDY RD S RD KENNEDY Please note this floor plan is for marketing purposes and is to be used as a guide only. All efforts have been made to ensure its accuracy at time of print.
    [Show full text]
  • Please Sign in So We Can Provide Updates and Information on Future Events
    HURONTARIO LIGHT RAIL TRANSIT PROJECT Welcome Please sign in so we can provide updates and information on future events. metrolinx.com/HurontarioLRT [email protected] @HurontarioLRT WHAT IS THE HURONTARIO LRT PROJECT? The Hurontario Light Rail Transit (LRT) Project will bring 20 kilometres of fast, reliable, rapid transit to the cities of Mississauga and Brampton along the Hurontario corridor. New, modern light rail vehicles will travel in a dedicated right-of-way and serve 22 stops with connections to GO Transit’s Milton and Lakeshore West rail lines, Mississauga MiWay, Brampton Züm, and the Mississauga Transitway. Metrolinx is working in coordination with the cities of Mississauga and Brampton and the Region of Peel to advance the Hurontario LRT project. Preparatory construction is underway. The project is expected to be completed at the end of 2022. The Hurontario LRT project is funded through a $1.4 billion commitment from the Province of Ontario as part of the Moving Ontario Forward plan. Allandale LAKE SIMCOE Waterfront OUR RAPID TRANSIT NETWORK Barrie South Innisfil SIMCOE Bradford East Gwillimbury Newmarket NewmarketSouthlakeHuron Heights Leslie TODAY AND TOMORROW GO Bus Terminal Hwy 404 Eagle LEGEND Mulock Main Mulock Savage Longford Aurora Lincolnville Every train, subway and bus helps to keep us moving, connecting us to the people and places Bloomington King City Stouffville GO Rail that matter most. As our region grows, our transit system is growing too. Working with 19th- Gamble Bernard Gormley municipalities across the Greater Toronto and Hamilton Area, and beyond, we’re delivering Kirby Elgin Mills Mount Joy Crosby Centennial new transit projects,making it easier, better, and faster for you to get around.
    [Show full text]
  • Land Use Study: Development in Proximity to Rail Operations
    Phase 1 Interim Report Land Use Study: Development in Proximity to Rail Operations City of Toronto Prepared for the City of Toronto by IBI Group and Stantec August 30, 2017 IBI GROUP PHASE 1 INTERIM REPORT LAND USE STUDY: DEVELOPMENT IN PROXIMITY TO RAIL OPERATIONS Prepared for City of Toronto Document Control Page CLIENT: City of Toronto City-Wide Land Use Study: Development in Proximity to Rail PROJECT NAME: Operations Land Use Study: Development in Proximity to Rail Operations REPORT TITLE: Phase 1 Interim Report - DRAFT IBI REFERENCE: 105734 VERSION: V2 - Issued August 30, 2017 J:\105734_RailProximit\10.0 Reports\Phase 1 - Data DIGITAL MASTER: Collection\Task 3 - Interim Report for Phase 1\TTR_CityWideLandUse_Phase1InterimReport_2017-08-30.docx ORIGINATOR: Patrick Garel REVIEWER: Margaret Parkhill, Steve Donald AUTHORIZATION: Lee Sims CIRCULATION LIST: HISTORY: Accessibility This document, as of the date of issuance, is provided in a format compatible with the requirements of the Accessibility for Ontarians with Disabilities Act (AODA), 2005. August 30, 2017 IBI GROUP PHASE 1 INTERIM REPORT LAND USE STUDY: DEVELOPMENT IN PROXIMITY TO RAIL OPERATIONS Prepared for City of Toronto Table of Contents 1 Introduction ......................................................................................................................... 1 1.1 Purpose of Study ..................................................................................................... 2 1.2 Background .............................................................................................................
    [Show full text]
  • Planning and Infrastructure Services Committee Item N1 for May 11, 2015
    Nll-l Ihe Region of Peel is theproud recipient of the National Quality Institute Order of IfRegion of Peel Excellence, Quality; theNational Quality Institute Canada Award of Excellence Gold Award, Wotting fe/i i/eu Healthy Workplace; anda 2008 IPAC/Dcloittc Public Sector Leadership ColdAward. R£CR»Y£D Ci.&'rlfOS f.ip.PT. APK I 0 2015 April 24, 2015 Resolution Number 2015-268 Mr. Peter Fay HEtf.KO.: RLE MC: City Clerk City of Brampton Planning and Infrastructure 2 Wellington Street West Services Committee Brampton, ON L6Y 4R2 Dear Mr. Fay: Subject: Ministry of Transportation Southern Highways Program 2014-2018 I am writing to advise that Regional Council approved the following resolution at its meeting held on Thursday, April 16, 2015: Resolution 2015-268 That the comments outlined in the report of the Commissioner of Public Works titled 'Ministry of Transportation Southern Highways Program 2014-2018* be endorsed; And further, that the Ministry of Transportation be requested to advance the planning, design and construction of highway improvements in and surrounding Peel Region listed in the "Planning for the Future Beyond 2018" section of the Southern Highways Program 2014-2018 to within the next five years, including Highways 401, 410, 427, Queen Elizabeth Way, Simcoe Area, GTA West Corridor and Niagara to GTA Corridor; And further, that the Ministry of Transportation be requested to plan for a further extension of Highway 427 to Highway 9; And further, that the Ministry of Transportation be requested to publish a long range sustainable transportation plan for Southern Ontario highways; And further, that a copy of the subject report be forwarded to the Ministry of Transportation, Ministry of Economic Development, Employment and Infrastructure, the Regions of York and Halton, the Cities of Brampton, Mississauga, Toronto and Vaughan, and the Town of Caledon, for information.
    [Show full text]
  • PLANNING JUSTIFICATION REPORT 30 EGLINTON AVENUE WEST | MARCH 2021 Sajecki Planning Inc
    PLANNING JUSTIFICATION REPORT 30 EGLINTON AVENUE WEST | MARCH 2021 Sajecki Planning Inc. TABLE OF CONTENTS 1.0 INTRODUCTION 4 2.0 SITE AND SURROUNDINGS 6 2.1 SUBJECT PROPERTY 7 2.2 PLANNING HISTORY 9 2.3 SURROUNDING LAND USES 9 2.4 SURROUNDING DEVELOPMENT APPLICATIONS 11 2.5 TRANSPORTATION NETWORK 13 3.0 PROPOSAL 16 3.1 DEVELOPMENT OVERVIEW 17 3.2 REQUIRED APPROVALS 27 3.3 PUBLIC CONSULTATION 27 4.0 POLICY AND REGULATORY CONTEXT 28 4.1 OVERVIEW 29 4.2 PLANNING ACT 29 4.3 PROVINCIAL POLICY STATEMENT 29 4.4 GROWTH PLAN FOR THE GREATER GOLDEN HORSESHOE 31 4.5 REGION OF PEEL OFFICIAL PLAN 34 4.6 CITY OF MISSISSAUGA OFFICIAL PLAN 38 4.7 CITY OF MISSISSAUGA ZONING BY-LAW 46 4.8 ADDITIONAL CONSIDERATIONS 47 5.0 SUPPORTING STUDIES AND REPORTS 50 5.1 TRAFFIC IMPACT STUDY 51 5.2 URBAN DESIGN STUDY 51 5.3 WIND STUDY 52 5.4 NOISE AND VIBRATION IMPACT STUDY 53 5.5 SHADOW STUDY 53 5.6 TREE INVENTORY AND PRESERVATION PLAN / ARBORIST REPORT 54 5.7 FUNCTIONAL SERVICING AND STORMWATER REPORT 54 5.8 PHASE 1 ENVIRONMENTAL SITE ASSESSMENT 55 5.9 HERITAGE IMPACT ASSESSMENT 55 5.10 HOUSING REPORT 56 6.0 PLANNING ANALYSIS 58 6.1 COMPLETE COMMUNITY 59 6.2 BUILT FORM AND DESIGN 59 6.3 HEIGHT AND DENSITY 60 7.0 CONCLUSION 62 APPENDICES APPENDIX A - SUBMISSION CHECKLIST APPENDIX B - DRAFT ZONING BY-LAW AMENDMENT APPENDIX C - DRAFT OFFICIAL PLAN AMENDMENT 1.0 INTRODUCTION Planning Justification Report: 30 Eglinton Avenue West Plaza Partners and Crown Realty Partners have On October 23, 2019 a pre-consultation meeting with retained Sajecki Planning Inc.
    [Show full text]
  • Cross-Boundary Transit Service Integration Pilot Project
    9.8 Date: May 25, 2021 Originator’s files: To: Chair and Members of General Committee From: Geoff Wright, P.Eng, MBA, Commissioner of Meeting date: Transportation and Works June 9, 2021 Subject Cross-Boundary Transit Service Integration Pilot Project Recommendation 1. That the report to General Committee entitled “Cross-Boundary Transit Service Integration Pilot Project” dated May 25, 2021 from the Commissioner of Transportation and Works be received for information. 2. That Phase 1 of the Service Integration Pilot Project recommendations for enhanced cross-boundary travel be received for information. Executive Summary The Ministry of Transportation has convened a Fare and Service Integration (FSI) Provincial-Municipal Table that includes representatives of all transit agencies and aims to improve connections and the customer experience for inter-municipal transit travel. The Toronto Transit Commission (TTC) has engaged a consultant team to develop an agency-driven FSI model to present to the Provincial-Municipal Table in partnership with surrounding transit agencies including MiWay. Currently MiWay, along with several other 905 agencies, are prohibited from providing local service within City of Toronto, resulting in TTC providing duplicate service for their residents. In addition, transit fares are not integrated between the TTC and MiWay. In partnership with the TTC, the Burnhamthorpe Road corridor has been selected for a transit service integration pilot project in the near-term (targeting fall 2021). 9.8 General Committee 2021/05/25 2 Background For decades, transit service integration has been discussed and studied in the Greater Toronto Hamilton Area (GTHA). The Ministry of Transportation’s newly convened Fare and Service Integration (FSI) Provincial-Municipal Table consists of senior representatives from transit systems within the Greater Toronto Hamilton Area (GTHA) and the broader GO Transit service area.
    [Show full text]
  • Congestion Charges Volume 1
    Congestion Charges Volume 1 THE PROBLEM OF URBAN CONGESTION IN CANADA The recent CAA study Grinding to a Halt: Evaluating Canada’s Worst Bottlenecks took a new perspective on a problem that Canadians know all too well: urban congestion is a growing strain on our economy and well-being. Canada’s worst traffic bottlenecks are almost as bad as bottlenecks in Chicago, Los Angeles and New York. Bottlenecks affect Canadians in every major urban area, increasing commute times by as much as 50%. This CAA briefing on investments in active transportation is one in a series that explore potential solutions to the problem of urban congestion in Canada. These briefings delve into solutions not only to highway congestion, but also to congestion on urban streets. Taken together the solutions explored in these briefings represent a toolkit to address this problem. The objective is to inform policy makers and the public about options to reduce congestion and key considerations for when and where a particular solution might be the right fit. Congestion charges are direct charges to road users and include traditional tolls, cordon charges and mobility charges (charges based on distance travelled). Congestion charges reduce congestion if they are set high enough to encourage drivers to take an alternate route, carpool, take transit, cycle, walk or forego their trips. Generally, the higher the charge, the greater the reduction in congestion. However, congestion charges can create some challenges: Congestion charges reduce congestion if they • They can be politically difficult to implement, because there can are set high enough to be winners and losers.
    [Show full text]
  • 38 Bus Time Schedule & Line Route
    38 bus time schedule & line map 38 Creditview View In Website Mode The 38 bus line (Creditview) has 2 routes. For regular weekdays, their operation hours are: (1) Northbound: 12:09 AM - 11:31 PM (2) Southbound: 12:28 AM - 11:49 PM Use the Moovit App to ƒnd the closest 38 bus station near you and ƒnd out when is the next 38 bus arriving. Direction: Northbound 38 bus Time Schedule 79 stops Northbound Route Timetable: VIEW LINE SCHEDULE Sunday 7:51 AM - 8:14 PM Monday 4:34 AM - 11:31 PM Cooksville Go Station Platform 6 Tuesday 12:09 AM - 11:31 PM Hillcrest Ave at Condo Rd 122 Hillcrest Avenue, Mississauga Wednesday 12:09 AM - 11:31 PM Confederation Pky South Of Hillcrest Ave Thursday 12:09 AM - 11:31 PM 3050 Confederation Pky, Mississauga Friday 12:09 AM - 11:31 PM Confederation Pky at Dundas St Saturday 12:09 AM - 11:01 PM 2600 Confederation Parkway, Mississauga Dundas St at Confederation Pky 2600 Confederation Parkway, Mississauga 38 bus Info Dundas St at Parkerhill Rd Direction: Northbound 3015 Parkerhill Rd, Mississauga Stops: 79 Trip Duration: 53 min Dundas St at Breakwater Court Line Summary: Cooksville Go Station Platform 6, 3045 Breakwater Crt, Mississauga Hillcrest Ave at Condo Rd, Confederation Pky South Of Hillcrest Ave, Confederation Pky at Dundas St, Dundas St at Clayhill Rd Dundas St at Confederation Pky, Dundas St at 3025 Clayhill Rd, Mississauga Parkerhill Rd, Dundas St at Breakwater Court, Dundas St at Clayhill Rd, Dundas St at Elmcreek Rd, Dundas St at Elmcreek Rd Dundas St at Mavis Rd, Dundas St W West Of Mavis 645 Dundas
    [Show full text]
  • Miway Service Changes Effective December 9, 2013: Date Posted: November 22, 2013
    MiWay Service Changes Effective December 9, 2013: Date Posted: November 22, 2013. Route 14 Lorne Park Weekday: The 5:43 am and 6:53 am westbound trips from Port Credit GO Station (STOP #0 3 1 4) will now depart at 5:40 am and 6:49 am, respectively. All westbound trips departing after 7:10 pm from Port Credit GO Station (STOP #0 3 1 4) will now depart five minutes later. The 6:26 am and 7:36 am eastbound trips from Clarkson GO Station (STOP #0 2 9 7) will now depart at 6:23 am and 7:32 am, respectively. All eastbound trips departing after 6:40 pm from Clarkson GO Station (STOP #0 2 9 7) will now depart five minutes later. Route 20 Rathburn Weekday: The 1:59 pm westbound trip from Islington Subway Station (STOP #1 6 3 2) will now depart at 2:00 pm. Route 24 Explorer Monday to Sunday: This route will now service the Airport Monorail Link Station. Visit miway.ca/terminalmaps for details. Route 38A Creditview-Argentia Sunday: Buses will depart stops every 45 minutes to match customer demand. Please visit miway.ca/schedules for new departure times. Route 39 Britannia Sunday: Buses will depart stops every 45 minutes to match customer demand. Please visit miway.ca/schedules for new departure times. Route 42 Derry Monday to Sunday: Weekday service frequencies have been improved. Buses will now depart stops every 13 minutes during the AM and PM rush hours and every 24 minutes during the midday. The 5:46 am Saturday eastbound trip from Meadowvale Town Centre (STOP #2 2 4 4) will now depart at 5:43 am to improve connections with Route 5 Dixie at Derry Road and Columbus Road.
    [Show full text]
  • Fact Sheet on the GTA West Multimodal Transportation Corridor
    GTA West Multimodal Transportation Corridor Fact Sheet GTA West Multimodal Transportation Corridor Geography From the Highway 401/407 interchange in Milton (West) to Highway 400 in King City (East) The Route Covering approximately 50 km and 16 interchanges – with plans to introduce a transitway and goods movement priority features Estimate Project Cost $6 billion Plans for a new 400-Series Highway spanning Halton, Construction Timeline Peel and York Regions aim to reduce travel times and Route Planning and Environmental support economic growth and job creation. Assessment Study expected to be complete by the end of 2022 Still in the planning stage, the preferred route is close to being chosen. This route will help better link the Ownership & Operation regions of the Greater Toronto Area (GTA) and support future office and industrial development. Owned and operated by the Province of Ontario © 2021 Avison Young Commercial Real Estate Services, LP, Brokerage. All rights reserved. E&OE: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young. Fact Sheet GTA West Multimodal Transportation Corridor Fact Sheet GTA West Multimodal Transportation Corridor The Corridor Taking Shape Industrial: The proposal calls for several features to prioritize – Longer speed change (merge) lanes Also known as Highway 413, the GTA West Multimodal Transportation Corridor project is intended to alleviate the movement of goods, helping to accommodate ‘just in time’ – Enhanced design to accommodate traffic congestion on Highway 401, The Queen Elizabeth Way (QEW) and Express Toll Route (ETR – Highway 407) delivery (i.e.
    [Show full text]