Remedial Environmental and Social Management Plans of Eight (8) Dams Under the Water Resources Development Programme

Total Page:16

File Type:pdf, Size:1020Kb

Load more

SEPTEMBER 2018 MINISTRY OF WATER DEVELOPMENT SANITATION AND ENVIRONMENTAL PROTECTION Remedial Environmental and Social Management Plans of Eight (8) Dams Under the Water Resources Development Programme ENVIRONMENTAL AND SOCIAL MANAGEMENT PLANS (ADDENDUM TO ALREADY APPROVED EBP’S BY ZEMA) ADDRESS COWI Zambia Limited Plot 45/5b Reedbuck Road, Off Kabulonga Road P.O.Box 34528 Lusaka Zambia TEL +260 211 26 53 78 +260 977 74 03 47 +260 977 74 03 50 FAX +260 211 26 53 80 EMAIL [email protected] SEPTEMBER 2018 WWW cowi.com MINISTRY OF WATER DEVELOPMENT SANITATION AND ENVIRONMENTAL PROTECTION Remedial Environmental and Social Management Plans of Eight (8) Dams Under the Water Resources Development Programme ENVIRONMENTAL AND SOCIAL MANAGEMENT PLANS PROJECT NO. DOCUMENT NO. 3037.03 1 VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED 0.2 September 2018 Report Pilila Chongo Litumelo Mate prss Derek Mwape IM Litumelo Mate 5 ESMP CONTENTS LIST OF ACRONYMS 10 1 Background 11 1.1 Purpose of the Report 12 2 Policy and Legal Framework 13 2.1 National and Policy and Legislation Framework 13 2.2 International Policies, Standards and Guidelines 14 2.3 Institutional Context for Project Implementation 15 3 Project Sites Scope of Work 16 4 Dam Specific Environment and Social Conditions and ESMP 18 4.1 Chikowa Dam 18 4.2 Kanyika Dam 25 4.3 Kawiko Dam 34 4.4 Makaba Dam 42 4.5 Nabowa Dam 46 4.6 Nachibanga Dam 51 4.7 Ndondi Dam 52 4.8 Ngolongozya Dam 54 6 ESMP 5 Environmental and Social Impacts 62 6 Environmental and Social Management Plan 72 7 Demobilisation and Restoration of the Dam Sites 157 8 Emergency Preparedness and Response Plans 161 8.1 Hazards 161 8.2 General Roles and Responsibilities in an Emergency Planning Response Situation 162 8.3 Local Emergency Authorities 163 8.4 Five Step Emergency Determination 164 8.5 EPRP Maintenance 169 9 Conclusion 170 Appendices 171 Appendix A Ministry and Institutional Roles 171 Appendix B Water Quality Results 177 Appendix C Attendace Registers 183 7 ESMP LIST OF FIGURES Figure 1: Site layout and centreline 18 Figure 2: These are characteristics of Saline and Sodic Soils 20 Figure 3: Mopani in the project area 20 Figure 4: Bush fires which wipe out most of the regenerates around the dam 21 Figure 5: The first and second storeys in the western part of the dam. 21 Figure 6: The first and second storey in the eastern fringe of the dam 22 Figure 7: Pictures of the previous spill-way which was washed away at Chikowa Dam 24 Figure 8: Weeds- Kauwa, Tenatena weed 24 Figure 9: Picture taken from a canoe ride; to show the extent of weed spread 25 Figure 10 Typical soil type surrounding Kanyika dam 27 Figure 11 Large and deep borrow pit created close to the dam (l) and geology of the area (r) 27 Figure 12 Maize cultivation along the banks of the stream 29 Figure 13 Bush fire impacts on the vegetation around the project area 29 Figure 14 Vegetable production downstream of the Kanyika stream 30 Figure 15 Location of Kawiko Dam site 34 Figure 16 Garden with crops around the dam 35 Figure 17 Typical soil profile at Kawiko Dam site 36 Figure 18 Hydrology and relief of Mwinilunga District 36 Figure 19 Source of Kakulu Stream 37 Figure 20 Kasulusi intermittent streams 37 Figure 21 Forest and vegetation around Kawiko site 38 Figure 22 Flora around the dam 43 Figure 23 Vegetable gardening within the fringes of the stream 44 Figure 24 Status of parts of the spillway 45 Figure 25 Status of the leakages at the base of the embankment 45 Figure 26 A Vegetable Mass on Nabowa Stream 47 Figure 27 Dark-brown ferrosol in the South-western fringe 48 Figure 28 First storey land cover around Nabowa dam during survey time in June 48 8 ESMP Figure 29 A truck carrying logs of the endangered rosewood tree that is logged around the dam area 49 Figure 30 Rosewood tree preserved at one of the village headmen in the project area 49 Figure 31 Vegetation cover at present 53 Figure 32 A family drawing water from the Ngolongozya dam 55 Figure 33 Status of the first and second storeys 56 Figure 34 Lower part of the transect around Ngolongozya dam 56 Figure 35 Excavated sand on the downstream side 60 Figure 36 Charcoal kilns along the fringes of the dam 60 Figure 37 Vegetable gardening along the dambo 65 9 ESMP LIST OF TABLES Table 1 Dam location, design parameters and status of implementation 17 Table 2 Fish species 22 Table 3: Fish species found in Kanyika Stream 30 Table 4 Type of birds found in the project area 31 Table 5 Snakes and reptiles around the project area 31 Table 6 Types of mammals around the project area 32 Table 7 Insect species of the project area 32 Table 8 Fish species of the Kakula Stream 39 Table 9 Birds found around the Kawiko Dam at different times of the year 39 Table 10 Snakes and reptiles found around the project area 40 Table 11 Mammals found in the project area 40 Table 12 Types of insects around the project area 41 Table 13 Birds found in the Project area 56 Table 14 Common Snakes found in the project area 57 Table 15 Fauna found in the project area 58 Table 16 Insects found in the project area 58 Table 17 72 Table 18 Kanyika Dam ESMP 84 Table 19 Kawiko Dam ESMP 95 Table 20 Makaba Dam ESMP 105 Table 21 Nabowa Dam ESMP 116 Table 22 Nachibanga Dam ESMP 127 Table 23 Ndondi Dam ESMP 136 Table 24 Ngolongozya Dam ESMP 146 Table 25 Proposed demobilisation and restoration Activities 157 10 ESMP LIST OF ACRONYMS AfDB African Development Bank ARAP Abbreviated Resettlement Action Plan CBD Convention on Biological Diversity CITES Convention on International Trade in Endangered Species CWUA Community Water User Association DC District Commissioner DERP District Emergency Response Plan DWO District Water Officer DWRD Department of Water Resources Development EMA Environmental Management Act EIA Environmental Impact Assessment EPB Environmental Project Brief EPRP Emergency Preparedness and Response Plan ESS Environmental and Social Safeguards ESIA Environmental and Social Impact Assessment ESMF Environmental and Social management Framework ESMP Environmental and Social Management Plan FAO Food Agricultural Organisation FC Feacal Coliform IFC International Finance Corporation MWDSEP Ministry of Water Development, Sanitation and Environmental Protection NWASCO National Water Supply and Sanitation Council PAPs Project Affected Persons PPE Personal Protective Equipment PS Performance Standard PWO Provincial Water Officer RAP Resettlement Action Plan RPF Resettlement Policy Framework TC Total Coliforms USD United States of America WARMA Water Resources Management Authority WRDP Water Resources Development Project ZEMA Zambia Environmental Management Council 11 ESMP 1 Background Despite Zambia’s significant arable land and water resources, and favourable climatic conditions that provide potential for expansion of agriculture, livestock and industrial sector, the country faces challenges in improving citizenry livelihoods with 60% of the population living below the poverty line. One of the challenges is the country’s vulnerability and constraints related to water availability and accessibility. Whilst water demand from different sectors increases, water availability is limited by hydrological variability worsened by floods and droughts, seasonal water shortages, and lack of infrastructure placing serious constraints on economic development. In order to address the challenges of water deficits particularly in the rural areas the Government of the Republic of Zambia received World Bank financing to support the Zambia Water Resources Development Project (WRDP). This programme is a response to the central features of the Government’s vision and strategy as described in the National Water Policy, its Vision 2030, the Integrated Water Resources Management and Water Efficiency Implementation Plan (2005-2030) and the National Development Plan (2013-15). The Project development objective is to support the implementation of an integrated framework for water resources management that promotes infrastructure development in support of economic growth, poverty reduction and climate resilience. The WRDP project has three components as follows: Component A whose objective is to enhance capacity at the national and regional level to address the challenges of water resources management in Zambia; Component B whose objective is to address the infrastructure deficit. This aims at providing support to development and rehabilitation of small-scale water resources infrastructure throughout the country; Component C’s objective is to strengthen the institutional capacity for water resources management and development. Component B, which is the focus of this report, has been under implementation since 2016. The DWRD personnel were fully engaged in identifying dam sites, designing and supervising construction of 12 dams in 6 provinces namely Copperbelt, Eastern, Luapula, and North Western, Southern, and Western provinces. In addition to the engineering tasks, the department conducted additional Environmental Impact Assessment (EIA) studies and drafted Environental Project Briefs (EPB’s), which were subsequently approved by ZEMA in 2017. The world bank required that a compliance audit be conducted and any remedial actions be defined and supplementary ESS be prepared. A consortium of consultants was contracted to conduct a review of the technical/engineering, environmental, and social aspects of 10 dams out of the 12. These dams are at different stages of completion. The generic ESMPs were prepared by DWRD. Generic ESMPs are important because they take into consideration overall dam construction and operation activities with impacts and mitigation measures. 12 ESMP They are supposed to be comprehensive and all inclusive of the required aspects. The Consultant observed some lapses in the prepared accompanying generic Environmental and Social Management Plans.
Recommended publications
  • Fostering Accountability and Transparency (FACT) in Zambia Quarterly Report

    Fostering Accountability and Transparency (FACT) in Zambia Quarterly Report

    Fostering Accountability and Transparency (FACT) in Zambia Quarterly Report January 1 to March 30, 2019 Youth Symposium Participants Outside FQM Trident Foundation Limited Offices after receiving training from one of FACT partners Submission Date: April 30, 2019 Submitted by: Chilufya Kasutu Agreement Number: Chief of Party AID-611-14-L-00001 Counterpart International, Zambia Email: [email protected] Submitted to: Edward DeMarco, USAID Zambia AOR This document was produced for review by the United States Agency for International Development, Zambia (USAID/Zambia). It was prepared by Counterpart International. ACRONYMS AND ABBREVIATIONS AOR Agreement Officer’s Representative ART Anti-Retroviral Treatment CCAs Community Conservation Areas CCPs Community Conservation Plans CFGs Community Forest Groups CEFTA Citizens Engagement in Fostering Transparency and Accountability COMACO Community Markets for Conservation CRB Community Resource Boards CSPR Civil Society for Poverty Reduction CSO Civil Society Organization DAC District Advocacy Committee DAMI District Alternative Mining Indaba DDCC District Development Coordinating Committee DEBS District Education Board Secretary DHO District Health Office DIM District Integrated Meetings EITI Extractive Industries Transparency Initiative ESSP Education and Skills Sector Plan FACT Fostering Accountability and Transparency FZS Frankfurt Zoological Society GPE Global Partnership for Education GRZ Government of the Republic of Zambia HCC Health Centre Committee HIV Human Immunodeficiency Virus LAG
  • Fifty Years of the Kasempa District, Zambia 1964 – 2014 Change and Continuity

    Fifty Years of the Kasempa District, Zambia 1964 – 2014 Change and Continuity

    FIFTY YEARS OF THE KASEMPA DISTRICT, ZAMBIA 1964 – 2014 CHANGE AND CONTINUITY. A case study of the ups and downs within a remote rural Zambian region during the fifty years since Independence. A descriptive analysis of its demography, geography, infrastructure, agricultural practice and present and traditional cultural aspects, including an account on the traditional ceremony of the installation of regional Headmen and the role and functions of the Kaonde clan structure. Dick Jaeger, 2015 [email protected] TABLE OF CONTENTS LIST OF MAPS AND FIGURES...........................................................................................................3 PART I 4 PREFACE – A WORD OF THANKS.....................................................................................................4 INTRODUCTION AND SUMMARY......................................................................................................6 CHAPTER 1. DEMOGRAPHIC CHANGES.......................................................................................10 ZAMBIA.............................................................................................................................10 KASEMPA DISTRICT........................................................................................................10 CHAPTER 2. AGRICULTURE............................................................................................................12 INTRODUCTION...............................................................................................................12
  • Economic Report 2000

    Economic Report 2000

    Republic of Zambia ECONOMIC REPORT 2000 Ministry of Finance and Economic Development Box 50062 Lusaka January 2001 Price K30,000 Table of Contents Chapter Topic Page 1 DEVELOPMENTS IN THE GLOBAL ECONOMY DEVELOPMENTS IN THE DOMESTIC ECONOMY Public Finance Monetary, banking and non-banking financial sector developments Consumer Price Developments Capital market developments Population, Labour and Employment Developments External Sector Developments External Aid External Debt and Debt Management Progress Towards Accessing the enhanced HIPC Initiative 2 SECTORAL PERFORMANCE Agriculture, forestry and fisheries sector Mining and Quarrying Sector Manufacturing sector Transport, Storage and Communications Energy and Water Developments Construction and Building Tourism Environment and Natural Resource Conservation Private Sector development Education Science, Technology and Vocational Training Health Community, Social and Personal Services Gender and Development Sport, Youth and Child Development1 3 PROSPECTS FOR 2001 Pa ge 2 Economic Report --- 2000 FOREWORD I am pleased to present the annual Economic Report for the year 2000. This report evaluates the performance of the economy during the year 2000. On 27 th January 2000, the Minister of Finance and Economic Development, Honourable Dr. Katele Kalumba, M.P., presented the 2000 National Budget to Parliament. The Budget highlighted the objectives and programmes of the Government for the year under review. Although the country experienced macroeconomic instability in the year 2000, it showed resilience by registering a positive growth rate of 3.5 percent compared to 2.0 percent in 1999. Positive developments in manufacturing, real estate and transport and communication sectors contributed to the growth. The growth was, however, against the backdrop of rising inflation and rapid depreciation of the Kwacha.
  • Environmental Project Brief

    Environmental Project Brief

    Public Disclosure Authorized IMPROVED RURAL CONNECTIVITY Public Disclosure Authorized PROJECT (IRCP) REHABILITATION OF PRIMARY FEEDER ROADS IN EASTERN PROVINCE Public Disclosure Authorized ENVIRONMENTAL PROJECT BRIEF September 2020 SUBMITTED BY EASTCONSULT/DASAN CONSULT - JV Public Disclosure Authorized Improved Rural Connectivity Project Environmental Project Brief for the Rehabilitation of Primary Feeder Roads in Eastern Province Improved Rural Connectivity Project (IRCP) Rehabilitation of Primary Feeder Roads in Eastern Province EXECUTIVE SUMMARY The Government of the Republic Zambia (GRZ) is seeking to increase efficiency and effectiveness of the management and maintenance of the of the Primary Feeder Roads (PFR) network. This is further motivated by the recognition that the road network constitutes the single largest asset owned by the Government, and a less than optimal system of the management and maintenance of that asset generally results in huge losses for the national economy. In order to ensure management and maintenance of the PFR, the government is introducing the OPRC concept. The OPRC is a concept is a contracting approach in which the service provider is paid not for ‘inputs’ but rather for the results of the work executed under the contract i.e. the service provider’s performance under the contract. The initial phase of the project, supported by the World Bank will be implementing the Improved Rural Connectivity Project (IRCP) in some selected districts of Central, Eastern, Northern, Luapula, Southern and Muchinga Provinces. The project will be implemented in Eastern Province for a period of five (5) years from 2020 to 2025 using the Output and Performance Road Contract (OPRC) approach. GRZ thus intends to roll out the OPRC on the PFR Network covering a total of 14,333Kms country-wide.
  • Final Report

    Final Report

    Ministry for Foreign Affairs, Finland FINAL REPORT Impact evaluation of Finland supported Environment and Natural Resources projects in Zambia December 2020 FCG International Ltd Acknowledgements The evaluation team and FCG, would like to thank everyone that participated in providing valuable information during this evaluation. We thank in particular the organisations that implemented the projects, in particular Forestry Department, PMTC and FAO. Even though all three evaluated projects closed down some time ago, they took time to give us valuable feedback and provided us with relevant reports and with contacts of beneficiaries and other project stakeholders. A special thank you to provincial and district level forestry staff in Muchinga and North Western Province. They supported the evaluation team in tracing and putting the team in touch with relevant stakeholders at both the district and the community level. The physical visits to the communities in Muchinga province were well organised and fruitful as a result of the efforts made by the district staff in Chinsali and Shiwangandu. Provincial staff and district forestry staff in Kasempa, Mwinilunga and Ikelengi districts in North Western Province were prepared to give feedback over the phone and travelled to two Community Forest Management Groups to allow the team to interview group members by phone. The evaluation team is grateful for all their efforts to support the evaluation. Thanks also go to the traditional leaders, men and women that took time to meet with and talk with the evaluation team. Their honesty and openness made it possible to gather critical insights into the changes in their lives. The team also expresses its appreciation to the Finnish Embassy and MFA Finland staff, who gave their time to provide information to support the evaluation.
  • Midterm Evaluation

    Midterm Evaluation

    Interim Performance Evaluation: Increasing Economic and Social Empowerment of Adolescent Girls and Women in Rural Zambia (EMPOWER) United States Department of Labor Bureau of International Labor Affairs Date: May 17, 2019 Author: Deborah Orsini, Management Systems International This report was prepared for the U.S. Department of Labor (DOL) under Contract Number 1605DC-18-F-00414. The views expressed are those of the author and should not be attributed to DOL, nor does mention of trade names, commercial products, or organizations imply endorsement of the same by the U.S. Government. Table of Contents Acknowledgments ............................................................................................................ii Acronyms ........................................................................................................................ iii Executive Summary ........................................................................................................ 5 Evaluation Conclusions ........................................................................................................... 6 Recommendations .................................................................................................................. 9 Project Description ........................................................................................................ 12 Project Context ......................................................................................................................12 Project Targets and Objectives ..............................................................................................13
  • Rp124 Cover.Pmd

    Rp124 Cover.Pmd

    LTC Research Paper Land Tenure, Land Markets, and Instituional Transformation in Zambia edited by Michael Roth with the assistance of Steven G. Smith University of Wisconsin-Madison 175 Science Hall 550 North Park Street Madison, WI 53706 http://www.ies.wisc.edu/ltc/ Research Paper LTC Research Paper 124, U.S. ISSN 0084-0815 originally published in October 1995 LAND TENURE, LAND MARKETS, AND INSTITUTIONAL TRANSFORMATION IN ZAMBIA edited by Michael Roth with the assistance of Steven G. Smith All views, interpretations, recommendations, and conclusions expressed in this paper are those of the authors and not necessarily those of the supporting or cooperating organizations. Andy recommendations or suggestions herein doe not represent the official position of the Government of Zambia. LTC Research Paper 124 Prepared for the Land Tenure Center University of Wisconsin-Madison October 1995 Copyright ® 1995 by the authors. All rights reserved. Readers may make verbatim copies of this document for non-commercial purposes by any means, provided that this copyright notice appears on all such copies. TABLE OF CONTENTS Page Lists of Tables and Figures vii List of Acronyms x Preface xi Chapter 1: Legal Framework and Administration of Land Policy in Zambia 1 I. Introduction 1 A. Issues 1 B. Outline of report 2 II. Colonial policy and settlement 4 III. Agrarian structure 5 IV. Arable land and crop expansion 7 V. Land tenure 14 A. Tenure on State Lands 15 B. Reserve and Trust Land administration 18 C. Urban, housing, and improvement areas 22 D. Agencies responsible for land policy 23 E. Subdivisions 24 VI.
  • C:\Users\Public\Documents\GP JOBS\Gazette No. 73 of Friday, 16Th

    C:\Users\Public\Documents\GP JOBS\Gazette No. 73 of Friday, 16Th

    REPUBLIC OF ZAMBIA Price: K5 net Annual Subscription: Within Lusaka—K200.00 Published by Authority Outside Lusaka—K230.00 No. 6430] Lusaka, Friday, 16th October, 2015 [Vol. LI, No. 73 GAZETTE NOTICE NO. 643 OF 2015 [5929855/13 Zambia Information and Communications Technologies Authority The Information and Communications Technologies Act, 2009 (Act No. 15 of 2009) Notice of Determination of Unserved and Underserved Areas Section 70 (2) of the Information and Communication TechnologiesAct No. 15 of 2009 (ICTAct) empowers the Zambia Information and Communications Technology Authority (ZICTA) to determine a system to promote the widespread availability and usage of electronic communications networks and services throughout Zambia by encouraging the installation of electronic communications networks and the provision for electronic communications services in unserved and underserved areas and communities. Further, Regulation 5 (2) of Statutory Instrument No. 38 of 2012 the Information and Communications Technologies (Universal Access) Regulations 2012 mandates the Authority to designate areas as universal service areas by notice in the gazette. In accordance with the said regulations, the Authority hereby notifies members of the public that areas contained in the Schedule Hereto are hereby designated as universal service areas. M. K. C. MUDENDA (MRS.) Director General SN Site Name Longtitude Latitude Elevation Province 1 Nalusanga_Chunga Headquarter Offices 27.22415 -15.22135 1162 Central 2 Mpusu_KankamoHill 27.03507 -14.45675 1206 Central
  • Observing the 2001 Zambia Elections

    Observing the 2001 Zambia Elections

    SPECIAL REPORT SERIES THE CARTER CENTER WAGING PEACE ◆ FIGHTING DISEASE ◆ BUILDING HOPE OBSERVING THE 2001 ZAMBIA ELECTIONS THE CARTER CENTER STRIVES TO RELIEVE SUFFERING BY ADVANCING PEACE AND HEALTH WORLDWIDE; IT SEEKS TO PREVENT AND RESOLVE CONFLICTS, ENHANCE FREEDOM AND DEMOCRACY, AND PROTECT AND PROMOTE HUMAN RIGHTS WORLDWIDE. THE CARTER CENTER NDINDI OBSERVING THE 2001 ZAMBIA ELECTIONS OBSERVING THE 2001 ZAMBIA ELECTIONS FINAL REPORT THE CARTER CENTER The Democracy Program One Copenhill Atlanta, GA 30307 (404) 420-5188 FAX (404) 420-5196 WWW.CARTERCENTER.ORG OCTOBER 2002 1 THE CARTER CENTER NDI OBSERVING THE 2001 ZAMBIA ELECTIONS 2 THE CARTER CENTER NDINDI OBSERVING THE 2001 ZAMBIA ELECTIONS TABLE OF CONTENTS Carter Center Election Observation Delegation and Staff ............................................................... 5 Terms and Abbreviations ................................................................................................................. 7 Foreword ......................................................................................................................................... 8 Executive Summary .......................................................................................................................... 10 Acknowledgments............................................................................................................................. 15 Background ......................................................................................................................................
  • An Assessment of the Status of Artisanal Goldmining in Northwestern Province, Zambia

    An Assessment of the Status of Artisanal Goldmining in Northwestern Province, Zambia

    Resource Insight Issue No 22. February 2021 Improved human conditions through good governance of the region’s resources. An Assessment of the Status of Artisanal Goldmining in Northwestern Province, Zambia Tobias Michelo and Edward Lange Southern Africa Resource Watch Southern Africa Resource Watch. Resource Insight, Issue Number: 22 An Assessment of the Status of Artisanal Goldmining in Northwestern Province, Zambia Table of Contents Acronyms 4 Executive summary 5 This report is published by the Southern Africa Resource Watch. Southern Africa Resource Watch 1. Introduction 8 (SARW) is an independent body that advocates and promotes human rights and environmental 1.1. Background of the study 8 protection in resource extraction activities by monitoring corporate and state conduct in a peaceful 1.2. Objectives of the study 9 and collaborative manner. 2. Methodology of the Study 9 2.1. Data Collection Methods 9 Published: February 2021 2.1.1. Desk review 10 2.1.2. Focus group discussions 10 Southern Africa Resource Watch President Place 2.1.3. Key informant interviews 10 1 Hood Avenue / 148 Jan Smuts Avenue (corner Bolton Road) 2.2. Sampling frame 11 Rosebank 2.3. Data analysis 11 PO Box 678, Wits 3. Limitations of the Research 12 2050 Johannesburg 4. Main Research Findings 12 South Africa 4.1. Mining in Zambia 13 4.1.1. National policy, institutional, and legislative framework 13 www.sarwatch.org 4.1.2. Gold mining in Zambia 14 4.1.3. Gold production in Zambia 15 Charcoal Ink Design and Layout: 4.1.4. Contribution of gold mining to the national economy 16 Cover Photography: Leo Klemm 4.1.5.
  • Kenya - Caucus Parliamentary Parliamentary National Assembly of Kenya National Assembly Hon

    Kenya - Caucus Parliamentary Parliamentary National Assembly of Kenya National Assembly Hon

    AFRICA 2019-2020 THE ICCF GROUP INTERNATIONALCONSERVATION.ORG COPYRIGHT INTERNATIONAL CONSERVATION CAUCUS FOUNDATION MISSION THE MOST ADVANCED TO ADVANCE SOLUTION IN CONSERVATION CONSERVATION GOVERNANCE BY WE BUILD POLITICAL WILL BUILDING The ICCF Group advances governments' leadership in conservation internationally by building political will POLITICAL WILL, within legislatures and supporting governments in the management of protected areas. PROVIDING ON-THE-GROUND CATALYZING CHANGE WITH KNOWLEDGE & EXPERTISE SOLUTIONS The ICCF Group supports political will by catalyzing strategic partnerships and knowledge sharing between policymakers and our extensive network. VISION TO PRESERVE THE WORLD'S MOST CRITICAL LANDSCAPES A WORLD The ICCF Group's international track record in legislative outcomes, public-private partnerships, & land WHERE management demonstrates that our unique model is emerging as a cost-effective, sustainable solution to PEOPLE AND conservation governance challenges. NATURE SUSTAIN AND NURTURE ONE ANOTHER 2019-2020 THE ICCF GROUP THE ICCF GROUP IN AFRICA EMPOWERING POLICYMAKERS &AND THE JUDICIARY The ICCF Group is working in East, Southern, and Central Africa to foster political will for conservation and support the sustainable management of natural resources. The ICCF Group has facilitated the establishment of parliamentary conservation caucuses in ten countries and is collaborating with each of these coalitions of policymakers to strengthen governance across several key natural resource sectors. The ICCF Group coordinates high-level political engagement with expertise on conservation strategies and solutions; facilitates interactions between U.S. and international policymakers, conservation organizations, and government agencies; and seeks to leverage and integrate resources in support of sustainable natural resource management policies. ICCF-supported caucuses enable, inform, and strengthen policymakers in their commitment to conservation.
  • Registered Voters by Gender and Constituency

    Registered Voters by Gender and Constituency

    REGISTERED VOTERS BY GENDER AND CONSTITUENCY % OF % OF SUB % OF PROVINCIAL CONSTITUENCY NAME MALES MALES FEMALES FEMALES TOTAL TOTAL KATUBA 25,040 46.6% 28,746 53.4% 53,786 8.1% KEEMBE 23,580 48.1% 25,453 51.9% 49,033 7.4% CHISAMBA 19,289 47.5% 21,343 52.5% 40,632 6.1% CHITAMBO 11,720 44.1% 14,879 55.9% 26,599 4.0% ITEZH-ITEZHI 18,713 47.2% 20,928 52.8% 39,641 5.9% BWACHA 24,749 48.1% 26,707 51.9% 51,456 7.7% KABWE CENTRAL 31,504 47.4% 34,993 52.6% 66,497 10.0% KAPIRI MPOSHI 41,947 46.7% 47,905 53.3% 89,852 13.5% MKUSHI SOUTH 10,797 47.3% 12,017 52.7% 22,814 3.4% MKUSHI NORTH 26,983 49.5% 27,504 50.5% 54,487 8.2% MUMBWA 23,494 47.9% 25,545 52.1% 49,039 7.4% NANGOMA 12,487 47.4% 13,864 52.6% 26,351 4.0% LUFUBU 5,491 48.1% 5,920 51.9% 11,411 1.7% MUCHINGA 10,072 49.7% 10,200 50.3% 20,272 3.0% SERENJE 14,415 48.5% 15,313 51.5% 29,728 4.5% MWEMBEZHI 16,756 47.9% 18,246 52.1% 35,002 5.3% 317,037 47.6% 349,563 52.4% 666,600 100.0% % OF % OF SUB % OF PROVINCIAL CONSTITUENCY NAME MALES MALES FEMALES FEMALES TOTAL TOTAL CHILILABOMBWE 28,058 51.1% 26,835 48.9% 54,893 5.4% CHINGOLA 34,695 49.7% 35,098 50.3% 69,793 6.8% NCHANGA 23,622 50.0% 23,654 50.0% 47,276 4.6% KALULUSHI 32,683 50.1% 32,614 49.9% 65,297 6.4% CHIMWEMWE 29,370 48.7% 30,953 51.3% 60,323 5.9% KAMFINSA 24,282 51.1% 23,214 48.9% 47,496 4.6% KWACHA 31,637 49.3% 32,508 50.7% 64,145 6.3% NKANA 27,595 51.9% 25,562 48.1% 53,157 5.2% WUSAKILE 23,206 50.5% 22,787 49.5% 45,993 4.5% LUANSHYA 26,658 49.5% 27,225 50.5% 53,883 5.3% ROAN 15,921 50.1% 15,880 49.9% 31,801 3.1% LUFWANYAMA 18,023 50.2%