TRANSPORT DEPARTMENT NOTICE Special Traffic and Transport

Total Page:16

File Type:pdf, Size:1020Kb

TRANSPORT DEPARTMENT NOTICE Special Traffic and Transport TRANSPORT DEPARTMENT NOTICE Special Traffic and Transport Arrangements for the Celebration Events for the 20th Anniversary of the Establishment of the HKSAR and the Flag Raising Ceremony to be held in Wan Chai District from 29 June 2017 to 1 July 2017 Notice is hereby given that the following traffic and transport arrangements will be implemented on Hong Kong Island during the period as specified below to facilitate the celebration events for the 20th anniversary of the establishment of the HKSAR and the flag raising ceremony to be held in Wan Chai District from 29 June 2017 to 1 July 2017: I. Special Traffic Arrangements A. Road Closure (see Figure 1) (i) The following roads will be temporarily closed to all vehicular traffic from about 8.00 pm on 28 June 2017 to 12.00 noon on 1 July 2017 or until road closure is lifted: (a) The slip road leading from Harcourt Road eastbound to Performing Arts Avenue northbound; (b) Lung King Street; (c) All lay-bys on Lung Wui Road westbound; (d) All lay-bys on Lung Wo Road; and (e) The general pick-up/ drop-off and loading/ unloading area on Lung Wo Road north of Star Ferry Multi-Storey Car Park. (ii) The following roads will be temporarily closed to all vehicular traffic from about 12.01 am on 29 June 2017 to 12.00 noon on 1 July 2017 or until road closure is lifted: (a) Expo Drive; (b) Expo Drive East; (c) Expo Drive Central; (d) Road P2; (e) The section of Convention Avenue between Fenwick Pier Street and Expo Drive; (f) The section of Convention Avenue eastbound between Fleming Road and Tonnochy Road; (g) The section of Fleming Road northbound between Harbour Road and Convention Avenue; and (h) The section of Harbour Road between Fenwick Pier Street and Fleming Road will be intermittently closed. (iii) Stadium Path will be temporarily closed to all vehicular traffic from about 12.01 am on 30 June 2017 to 12.00 noon on 1 July 2017 or until road closure is lifted; and (iv) The section of Convention Avenue westbound between Fleming Road and Tonnochy Road, and the section of Fleming Road southbound between Convention Avenue and Harbour Road will be temporarily closed to all vehicular traffic from 1 about 6.00 am to 12.00 noon on 1 July 2017 or until road closure is lifted. B. Traffic Diversion (i) The following traffic diversion will be implemented from about 12.01 am on 29 June 2017 to 12.00 noon on 1 July 2017 or until road closure is lifted: (a) Traffic along Fenwick Pier Street eastbound will be prohibited from entering Convention Avenue eastbound, and will be diverted via Harbour Road eastbound; (b) Traffic along Fleming Road northbound must turn left onto Harbour Road westbound or turn right onto Harbour Road eastbound; (c) Traffic along Fleming Road flyover northbound must turn right onto Harbour Road eastbound; and (d) Traffic along Harbour Road westbound will be permitted to turn right onto the entrances of Hong Kong Convention and Exhibition Centre (HKCEC) and the Grand Hyatt Hong Kong, and the traffic from the exit of HKCEC will be permitted to turn right onto Harbour Road westbound. (ii) The following traffic diversion will be implemented from about 6.00 am to 12.00 noon on 1 July 2017 or until road closure is lifted: (a) Traffic along Hung Hing Road westbound must turn left onto Tonnochy Road southbound; and (b) Traffic along Tonnochy Road northbound must turn right onto Hung Hing Road eastbound. C. Temporary Restricted Zones The following road sections will be temporarily designated as restricted zones 24 hours daily from 12:01 am on 29 June 2017 to 11.59 pm on 1 July 2017: (i) the southern kerbside lane of Gloucester Road service road from a point about 10 metres east of its junction with Fenwick Street to a point about 65 metres east of the same junction; (ii) the southern kerbside lane of Gloucester Road service road from a point about 35 metres west of its junction with Fleming Road to a point about 90 metres west of the same junction; (iii) the southern kerbside lane of Gloucester Road service road from a point about 35 metres east of its junction with Fleming Road to a point about 65 metres east of the same junction; (iv) the southern kerbside lane of Gloucester Road service road from a point about 70 metres west of its junction with Stewart Road to a point about 100 metres west of the same junction; (v) the southern kerbside lane of Gloucester Road service road from a point about 10 metres west of its junction with Tonnochy Road to a point about 75 metres west of the same junction; (vi) the eastern kerbside lane of Stewart Road from its junction with Jaffe Road to a point about 35 metres north of the same junction; (vii) the western kerbside lane of Tonnochy Road from its junction with Jaffe Road to a point about 25 metres north of the same junction; and (viii) the southern kerbside lane of Lockhart Road from a point about 25 metres east of 2 its junction with Fleming Road to a point about 40 metres east of the same junction. II. Special Public Transport Arrangements A. Suspension of Bus Termini (i) The bus terminus on Expo Drive East will be suspended from about 12.01 am on 29 June 2017 to 11.59 pm on 1 July 2017 or until road closure is lifted; and (ii) The Wan Chai North Temporary Public Transport Interchange will be suspended from about 1.00 am on 29 June 2017 to 11.59 pm on 1 July 2017 or until road closure is lifted. B. Bus Diversion (i) XHT route no. 961 will omit Expo Drive East, terminate at and depart from the Wan Chai North Temporary Public Transport Interchange from about 12.01 am to 12.30 am on 29 June 2017; and (ii) The following bus routes will be diverted by phases from about 12.01 am on 29 June 2017 to 2.00 pm on 1 July 2017, or until road closure is lifted: Routes Direction Diversion Details CTB 5B To Causeway Bay / will be converted to circular service and the terminus at Eastern Hospital Road Kennedy Town outside Hong Kong Stadium will be converted as a pick-up/ drop-off stop. CTB 25A To Wan Chai via Hennessy Road westbound, Johnston Road eastbound and terminates at Johnston Road eastbound outside Methodist House. CTB 25A To Wan Chai departs from Johnston Road eastbound outside Methodist House, via Johnston Road eastbound, Fleming Road northbound and Hennessy Road eastbound. CTB 40 To Wan Chai / Wah will be converted to circular service: via Hennessy Road eastbound, Fenwick Fu Street southbound, Johnston Road eastbound, Fleming Road northbound and Hennessy Road westbound. CTB 40M To Admiralty / Wah will be converted to circular service: via Hennessy Road eastbound, Luard Road Fu northbound, Gloucester Road service road westbound, Gloucester Road westbound and Harcourt Road westbound. 3 Routes Direction Diversion Details CTB 780 and 788 To Eastern district / via Gloucester Road eastbound, Fleming Road northbound, Harbour Road NWFB 720 and Kowloon eastbound, Tonnochy Road northbound 722 and Hung Hing Road eastbound. XHT 104 and 641 NWFB 2A, 2X, To Wan Chai truncate at Hennessy Road westbound outside Hennessy Road Government 8, 8P and N8 Primary School. NWFB 2A, 2X, To Eastern district depart from Hennessy Road eastbound near Stewart Road. 8, 8P and N8 NWFB 15B To Wan Chai via Causeway Road eastbound, Hing Fat Street and terminates at Tin Hau Station Public Transport Interchange. NWFB 15B To the Peak departs from Tin Hau Station Public Transport Interchange, via King’s Road eastbound, Ngan Mok Street, Lau Li Street and King’s Road westbound. NWFB 18 and To Sheung Wan / via Gloucester Road westbound and Harcourt Road westbound. 18P Kennedy Town NWFB H1 To Tsim Sha Tsui via Harcourt Road eastbound, Gloucester Road eastbound and Cross Harbour (Day route) Tunnel. NWFB H1 To Tsim Sha Tsui via Lung Wo Road eastbound, Gloucester Road eastbound and Cross Harbour (Night route) Tunnel. NWFB N8P To Wan Chai / Siu via Gloucester Road westbound, Gloucester Road service road westbound, Sai Wan Fenwick Street southbound and Hennessy Road eastbound. XHT 307C, To Wan Chai truncate at Hennessy Road eastbound near Fleming Road. 960P, 960S and 961P XHT 621 To Central via Gloucester Road westbound, Gloucester Road service road westbound, Fenwick Street southbound and Hennessy Road westbound. 4 Routes Direction Diversion Details XHT 905 To Wan Chai via Harcourt Road eastbound, Cotton Tree Drive, Queensway eastbound, Tamar Street, Drake Street and terminates at Admiralty (West) Bus Terminus. XHT 905 To Lai Chi Kok departs from Admiralty (West) Bus Terminus, via Cotton Tree Drive, Queensway eastbound, Tamar Street, Harcourt Road westbound, Cotton Tree Drive flyover and Des Voeux Road Central westbound. XHT 905P, 978A To Wan Chai via Harcourt Road eastbound, Gloucester Road eastbound and truncate at Gloucester and 978B Road eastbound outside Immigration Tower. XHT 914P and To Tin Hau via Harcourt Road eastbound and Gloucester Road eastbound. 914X XHT 930 To Wan Chai via Hennessy Road eastbound, Tonnochy Road northbound, Gloucester Road service road westbound and terminates at Gloucester Road service road westbound outside City Mansion. XHT 930A and To Wan Chai via Queensway eastbound, Hennessy Road eastbound and truncate at Hennessy Road 930X eastbound near Fleming Road. XHT 930, 930A To Tsuen Wan depart from Gloucester Road service road westbound outside City Mansion, via and 930X Gloucester Road service road westbound, Stewart Road southbound and Hennessy Road westbound.
Recommended publications
  • The Globalization of Chinese Food ANTHROPOLOGY of ASIA SERIES Series Editor: Grant Evans, University Ofhong Kong
    The Globalization of Chinese Food ANTHROPOLOGY OF ASIA SERIES Series Editor: Grant Evans, University ofHong Kong Asia today is one ofthe most dynamic regions ofthe world. The previously predominant image of 'timeless peasants' has given way to the image of fast-paced business people, mass consumerism and high-rise urban conglomerations. Yet much discourse remains entrenched in the polarities of 'East vs. West', 'Tradition vs. Change'. This series hopes to provide a forum for anthropological studies which break with such polarities. It will publish titles dealing with cosmopolitanism, cultural identity, representa­ tions, arts and performance. The complexities of urban Asia, its elites, its political rituals, and its families will also be explored. Dangerous Blood, Refined Souls Death Rituals among the Chinese in Singapore Tong Chee Kiong Folk Art Potters ofJapan Beyond an Anthropology of Aesthetics Brian Moeran Hong Kong The Anthropology of a Chinese Metropolis Edited by Grant Evans and Maria Tam Anthropology and Colonialism in Asia and Oceania Jan van Bremen and Akitoshi Shimizu Japanese Bosses, Chinese Workers Power and Control in a Hong Kong Megastore WOng Heung wah The Legend ofthe Golden Boat Regulation, Trade and Traders in the Borderlands of Laos, Thailand, China and Burma Andrew walker Cultural Crisis and Social Memory Politics of the Past in the Thai World Edited by Shigeharu Tanabe and Charles R Keyes The Globalization of Chinese Food Edited by David Y. H. Wu and Sidney C. H. Cheung The Globalization of Chinese Food Edited by David Y. H. Wu and Sidney C. H. Cheung UNIVERSITY OF HAWAI'I PRESS HONOLULU Editorial Matter © 2002 David Y.
    [Show full text]
  • Street Point June 2019
    Street Point June 2019 Central Central 中環 1 Central Station Access A (World Wide House, Connaught Road) 中環站A出口(環球大廈干諾道) 2 Central Station Access B (World Wide House, Des Voeux Road C.) 中環站B出口(環球大廈德輔道中) 3 Central Station Access C (Wheelock House, Des Voeux Road C.) 中環站C出口(德輔道中會德豐) 4 Central Station Access E (Chater House) 中環站E出口(遮打大廈) 5 Central Station Access J3 (Next to the Hong Kong Club) 中環站J3出口(香港會所大廈旁) 6 Central Station Access K (Statue Square) 中環站K出口(皇后像廣場) 7 Hong Kong Station Access B1 香港站B1出口 8 Hong Kong Station Access C (Des Voeux Road C.) 香港站C出口(德輔道中) 9 Bridge across IFC to Central Ferry Pier 3 (To Discovery Bay) 中環國際金融中心(IFC)往愉景灣碼頭行人天橋 10 Bridge across IFC Phase 1, to Hang Seng Bank Headquarters Building 中環國際金融中心(IFC)一期通往恒生銀行總行天橋 11 Bridge across Exchange Square 中環交易廣場天橋 12 The Chinese Manufacturers' Association of Hong Kong, 24-25 Connaught Road C. 中環干諾道中24-25號香港中華總商會 13 34-37 Connaught Road Central 中環干諾道中34-37號 14 Bus stop at Jardine's House, Connaught Road C. 中環干諾道中怡和大廈巴士站 15 Hang Seng Building, Connaught Road C. 中環干諾道中恒生大廈 16 Bus Stop at Bank of China Tower 中環中銀大廈巴士站 17 The Junction of Wellington Street and Peel Street 中環威靈頓街與卑利街交界 18 Loke Yew Building, 44-46 Queen's Road Central 中環皇后大道中44-46號陸佑行 19 Man Yee Building 中環皇后大道中67號萬宜大廈 20 Queen's Road Central and Wyndham Street, Marks & Spencer's entrance 中環皇后大道中及雲咸街交界馬沙門口 21 Opposite to Hang Seng Bank Headquarters Building (Central Wet market) 中環恒生銀行總行對面(中環街市) 22 Central District Footbridge to Chinachem Golden Plaza 2 中環海港政府大樓往華懋廣場二期行人天橋 23 Entrance of Pedder Building 中環畢打行門口 24 The Junction of Hollywood Road and Elgin Street 中環荷李活道與伊利近街交界 25 St.
    [Show full text]
  • Hang Seng Bank Branch Location
    Hang Seng Bank Bank Branch Address 1. Wong Tai Sin Branch Shop No.121A, Level 1, Wong Tai Sin Plaza 2. MTR Kwai Fong Station (This branch was closed after July 31, 2021) Office 3. Metro City Branch Shop 211, Level 2, Metro City, Phase 1 4. Lok Fu Plaza Branch Shop G202, Lok Fu Plaza 5. Castle Peak Road Branch 339 Castle Peak Road 6. Quarry Bay Branch 989 King's Road 7. Polytechnic University Room VA207, The HK Polytechnic University Branch 8. Shau Kei Wan Branch Shop 6, 1/F, i-UniQ Residence, 295 Shau Kei Wan Road 9. Tai Po Branch 35 Kwong Fuk Road 10. Johnston Road Branch 142 Johnston Road 11. Taikoo Shing Branch Shop G15, G/F, Fu Shan Mansion, 25 Taikoo Shing Road 12. Tam Kung Road Branch 38 Tam Kung Road 13. 141 Prince Edward Road 141 Prince Edward Road Branch 14. Aberdeen Centre Branch 10 Nam Ning Street 15. Fanling Branch 9 Luen Hing Street, Luen Wo Market 16. Sheung Wan Branch Shop 9-10, 1/F, Tung Ning Building, 251 Des Voeux Road Central 17. Tsz Wan Shan Branch 63 Fung Tak Road 18. Tai Wai Branch 33 Tai Wai Road 19. Mei Foo Sun Chuen (Nassau 10 Nassau Street St) Branch Bank Branch Address 20. Mei Foo Sun Chuen (Nassau Shops Nos. N23-N25, G/F, Nos. 1-15, 2-24 Nassau St) Prestige Banking Centre Street, Mei Foo Sun Chuen 21. San Fung Avenue Branch 53 San Fung Avenue 22. San Fung Avenue Prestige 94 San Fung Avenue Banking Centre 23.
    [Show full text]
  • Cantoneseclass101.Com Cantoneseclass101.Com
    1 CantoneseClass101.com Learn Cantonese with FREE Podcasts Advanced Lessons 1-25 2 CantoneseClass101.com Learn Cantonese with FREE Podcasts Introduction This is Innovative Language Learning. Go to InnovativeLanguage.com/audiobooks to get the lesson notes for this course and sign up for your FREE lifetime account. The course consists of lessons centered on an audio blog that is completely in Cantonese. These audio blogs take you around China and introduce you to many different aspects of the country, including culture, history, folklore, arts, and more. These blogs will also teach you all about many different cities in China and what they are famous for. Along the way, you'll pick up sophisticated expressions and advanced grammar in this Audio Blog series presented entirely in Cantonese. The lesson starts with the Cantonese blog, which is all in Cantonese and at native speed. Finally, practice what you have learned with the review track. In the review track, a native speaker will say a word or phrase from the dialogue, wait three seconds, and then give you the English definition. Say the word aloud during the pause. Halfway through the review track, the order will be reversed. The English definition will be provided first, followed by a three-second pause, and then the word or phrase from the dialogue. Repeat the words and phrases you hear in the review track aloud to practice 2 pronunciation and reinforce what you have learned. Before starting the lessons, go to InnovativeLanguage.com/audiobooks to get the lesson notes for this course and sign up for your FREE lifetime account.
    [Show full text]
  • New World First Bus Services Limited Route & Fare Information
    New World First Bus Services Limited Route & Fare Information Route Termini Full Fare Sectional Fare HONG KONG ISLAND BUS ROUTE 2 Grand Promenade -Central (Macau Ferry) ♦ $4.10 Tai On Bldg to Grand Promenade $3.60 2A Yiu Tung Estate -Wanchai Ferry Pier ♦ $4.10 Tai Hong Hse. to Yiu Tun Estate $2.60 Wing Hing St. to Wanchai Ferry Pier $4.10 Shau Kei Wan -Wanchai Ferry Pier ♦ 2X $5.60 Hing Fat St. to Shau Kei Wan $4.40 (Express) Hoi An St to Shau Kei Wan $3.60 Pokfulam Rd to Central(Ferry Piers) $5.10 3A Central (Ferry Piers)-Felix Villas $5.30 Des Voeux Rd W. to Central(Ferry Piers) $4.10 Queen Mary Hospital to Central $4.40 Des Voeux Rd W. to Central $3.60 4 Wah Fu(South)-Central (Connaught Rd C) $5.30 Connaught Road Central to Wah Fu (S) $5.30 Queen Mary Hospital to Wah Fu (S) $4.10 Queen Mary Hospital to Centrall $4.40 4X Wah Fu(South)-Central (Connaught Rd C) $5.30 Connaught Road C. (westbound) to Wah Fu (S) $5.30 Queen Mary Hospital to Wah Fu (S) $4.10 - Wing Hing Street to Wanchai Ferry Pier $4.10 8 Heng Fa Chuen ♦ $6.10 Hing Fat St. to Heng Fa Chuen $4.40 Wanchai Ferry Pier Chai Wan Rd to Heng Fa Chuen $3.60 - Wing Hing Street to Wanchai Ferry Pier $4.10 8P Siu Sai Wan (Island Resort) ♦ $6.10 Hing Fat St. to Siu Sai Wan (Island Resort) $4.40 (Express) Wanchai Ferry Pier After IEC to Siu Sai Wan (Island Resort) $3.50 Shek O Rd/Tai Tam Rd toShek O $3.90 Big Wave Bay to Shek O $3.60 9 Shau Kei Wan -Shek O ♦ $6.90 Big Wave Bay to Shau Kei Wan $6.10 Tai Tam Rd/Chai Wan Rd to Shau Kei Wan $3.90 Shek O to Big Wave Bay $3.60 13 Central(City
    [Show full text]
  • 41912405 Masters Thesis CHEUNG Siu
    University of Queensland School of Languages & Comparative Cultural Studies Master of Arts in Chinese Translation and Interpreting CHIN7180 - Thesis Translation of Short Texts: A case study of street names in Hong Kong Student: Shirmaine Cheung Supervisor: Professor Nanette Gottlieb June 2010 ©2010 The Author Not to be reproduced in any way except for the purposes of research or study as permitted by the Copyright Act 1968 Abstract The topic of this research paper is “Translation of Short Texts: A case study of street names in Hong Kong”. It has been observed that existing translation studies literature appears to cater mainly for long texts. This suggests that there may be a literature gap with regard to short text translation. Investigating how short texts are translated would reveal whether mainstream translation theories and strategies are also applicable to such texts. Therefore, the objectives of the paper are two-fold. Firstly, it seeks to confirm whether there is in fact a gap in the existing literature on short texts by reviewing corpuses of leading works in translation studies. Secondly, it investigates how short texts have been translated by examining the translation theories and strategies used. This is done by way of a case study on street names in Hong Kong. The case study also seeks to remedy the possible paucity of translation literature on short texts by building an objective and representative database to function as an effective platform for examining how street names have been translated. Data, including street names in English and Chinese, are collected by way of systematic sampling from the entire data population.
    [Show full text]
  • Distribution Point.Indd
    Street Point May 2013 Central Central 中環 1 Central Station Access A (World Wide House, Connaught Road) 中環站A出口(環球大廈干諾道) 2 Central Station Access B (World Wide House, Des Voeux Road C.) 中環站B出口(環球大廈德輔道中) 3 Central Station Access C (Wheelock House, Des Voeux Road C.) 中環站C出口(德輔道中會德豐) 4 Central Station Access E (Chater House) 中環站E出口(遮打大廈) 5 Central Station Access J3 (Next to the Hong Kong Club) 中環站J3出口(香港會所大廈旁) 6 Central Station Access K (Statue Square) 中環站K出口(皇后像廣場) 7 Hong Kong Station Access B1 香港站B1出口 8 Hong Kong Station Access C (Des Voeux Road C.) 香港站C出口(德輔道中) 9 Bridge across IFC to Central Ferry Pier 3 (To Discovery Bay) 中環國際金融中心(IFC)往愉景灣碼頭行人天橋 10 Bridge across IFC Phase 1, to Hang Seng Bank Headquarters Building 中環國際金融中心(IFC)一期通往恒生銀行總行天橋 11 Bridge across Exchange Square 中環交易廣場天橋 12 The Chinese Manufacturers' Association of Hong Kong, 24-25 Connaught Road C. 中環干諾道中24-25號香港中華廠商會 13 34-37 Connaught Road Central 中環干諾道中34-37號 14 Bus stop at Jardine's House, Connaught Road C. 中環干諾道中怡和大廈巴士站 15 Bus stop at Statue Square, Connaught Road C. 中環干諾道中皇后像廣場巴士站 16 Hang Seng Building, Connaught Road C. 中環干諾道中恒生大廈 17 Bus Stop at Bank of China Tower 中環中銀大廈巴士站 18 Pedestrian Crossing outside Charter Garden (to Bank of China Tower) 中環遮打花園外往中銀大廈, 長江集團大廈行人過路線 19 Gloucester Tower, 11 Padder Street 中環告羅士打大廈(畢打街11號) 20 S.K.H. St. John's Cathedral beside 40 Bus Stop 中環花園道聖約翰座堂40號巴士站旁 (近長江集團中心, 花旗銀行大廈) 21 The Junction of Wellington Street and Peel Street 中環威靈頓街與卑利街交界 22 The Junction of Wellington Street and Pottinger Street 中環威靈頓街與砵甸乍街交界 23 Loke Yew Building, 44-46 Queen's Road Central 中環皇后大道中44-46號陸佑行 24 Man Yee Building 中環皇后大道中67號萬宜大廈 25 Queen's Road Central and Wyndham Street, Marks & Spencer's entrance 中環皇后大道中及雲咸街交界馬沙門口 26 The subway connecting Hang Seng Bank Headquarters and Central Market 中環恒生街市樓上行人隧道 27 Opposite to Hang Seng Bank Headquarters Building (Central Wet market) 中環恒生銀行總行對面(中環街市) 28 Central District Footbridge to Chinachem Golden Plaza 2 中環海港政府大樓往華懋廣場二期行人天橋 29 Entrance of Pedder Building 中環畢打行門口 30 The Junction of Hollywood Road and Elgin Street 中環荷李活道與伊利近街交界 31 St.
    [Show full text]
  • Transport Department Notice
    TRANSPORT DEPARTMENT NOTICE SPECIAL TRAFFIC AND TRANSPORT ARRANGEMENTS FOR NEW YEAR’S EVE ON 31 DECEMBER 2018 Notice is hereby given that the following special traffic and transport arrangements will be implemented on Hong Kong Island, Kowloon and the New Territories in connection with the New Year’s Eve on 31 December 2018: SPECIAL TRAFFIC ARRANGEMENTS HONG KONG ISLAND (A) ROAD CLOSURES AND TRAFFIC DIVERSIONS (a) Central (See Figure 1) (b) Lan Kwai Fong (See Figure 2) The following road sections will be closed to all vehicular traffic from 6.00 pm to 6.00 am on on the following day (Phase I). (1) D’Aguilar Street between Wellington Street and Wyndham Street; (2) Lan Kwai Fong; (3) Wing Wah Lane; (4) Wo On Lane; (5) Wellington Street between Wyndham Street and D’Aguilar Street; and (6) On Lan Street. Depending on the crowd and traffic situations, the following road sections will be closed to all vehicular traffic in addition to Phase I at any time from 7.00 pm to 6.00 am on the following day. (1) D’Aguilar Street between Queen’s Road Central and Wellington Street; (2) Wyndham Street between Glenealy and Queen’s Road Central; (3) Wellington Street between D’Aguilar Street and Cochrane Street; (4) Queen’s Road Central between Pedder Street and Pottinger Street; and (5) Stanley Street between D’Aguilar Street and Cochrane Street. (c) Tramway Lane will be closed to all vehicular traffic (except for franchised buses and taxi) from 7.00 pm to 2.00 am on the following day.
    [Show full text]
  • Route 933 Bus-Bus Interchange Scheme
    Routes 933 Bus-Bus Interchange Scheme This BBI Scheme is including Route 933. It is designed for passengers traveling between Hong Kong Island and New Territories. Passengers should use the same Octopus card to make interchange within prescribed time limit at the following bus stop to enjoy the fare discount. From New Territories to Hong Kong Island First Second Time Journey (Direction) Interchange Point Journey (Direction) Discount Fare Limit on on 933 Sai Wan Ho (Tai On Street) King's Road 2 Sai Wan Ho (Grand Adult Less $3, Child / 120 Promenade) Senior Less $1.5 933 Sai Wan Ho (Tai On Street) Lei King Road/ Tai On 2X Sai Wan Ho (Grand Adult Less $3, Child / 120 Street Promenade) Senior Less $1.5 933 Sai Wan Ho (Tai On Street) Shau Kei Wan Road 720 Sai Wan Ho (Grand Adult Less $3, Child / 120 Promenade) Senior Less $1.5 933 Sai Wan Ho (Tai On Street) King's Road 2A Yiu Tung Estate Adult Less $3, Child / 120 Senior Less $1.5 933 Sai Wan Ho (Tai On Street) King's Road 722 Yiu Tung Estate Adult Less $3, Child / 120 Senior Less $1.5 933 Sai Wan Ho (Tai On Street) King's Road 18X Shau Kei Wan Adult Less $3, Child / 120 Senior Less $1.5 933 Sai Wan Ho (Tai On Street) King's Road 77 Shau Kei Wan Adult Less $3, Child / 120 Senior Less $1.5 933 Sai Wan Ho (Tai On Street) King's Road 99 Shau Kei Wan Adult Less $3, Child / 120 Senior Less $1.5 933 Sai Wan Ho (Tai On Street) King's Road 608 Shau Kei Wan Adult Less $3, Child / 120 Senior Less $1.5 933 Sai Wan Ho (Tai On Street) King's Road 85 Braemar Hill Adult Less $3, Child / 120 Senior Less $1.5
    [Show full text]
  • List of Public Payphone Kiosks Authorised for Wi-Fi Installation by PCCW-HKT Telephone Limited Kiosk ID Location District Region
    List of Public Payphone Kiosks Authorised for Wi-Fi Installation by PCCW-HKT Telephone Limited Kiosk ID Location District Region HKT-1488 Caine Road. Outside Ho Shing House, near Central - Mid-Levels Escalators Central and HK Western HKT-1052 Caine Road. Outside Long Mansion Central and HK Western HKT-1042 Chater Road. Outside St George's Building, near Exit F, MTR's Central Station Central and HK Western HKT-1031 Chater Road. Outside Statue Square Central and HK Western HKT-1076 Chater Road. Outside Statue Square Central and HK Western HKT-1050 Chater Road. Outside Statue Square, near Bus Stop Central and HK Western HKT-1062 Chater Road. Outside Statue Square, near Court of Final Appeal Central and HK Western HKT-2321 Chater Road. Outside Statue Square, near Prince's Building Central and HK Western HKT-2323 Chater Road. Outside Statue Square, near Prince's Building Central and HK Western HKT-1915 Connaught Road Central. Outside Shun Tak Centre Central and HK Western HKT-1325 Connaught Road West. Outside Block 2, Connaught Garden Central and HK Western HKT-1231 Connaught Road West. Outside Kai Fat Building Central and HK Western HKT-1376 Des Voeux Road Central / Wing Lok Street. Outside Golden Centre Central and HK Western HKT-1086 Des Voeux Road Central. Outside Statue Square, near Court of Final Appeal Central and HK Western HKT-1036 Des Voeux Road Central. Outside Statue Square, near Prince's Building Central and HK Western HKT-1071 Des Voeux Road Central. Outside Statue Square, near Prince's Building Central and HK Western HKT-2320 Des Voeux Road Central.
    [Show full text]
  • Review of Operations
    REVIEW OF OPERATIONS (1) LAND BANK Total land bank of 17 As at 30th June 2002, the land bank of Sino Group increased to million square feet 17 million square feet from 15 million square feet in the previous financial year due to new site acquisitions mainly for residential development. The Group’s land bank comprises a well-diversified portfolio of properties: residential (39%), commercial (34%), industrial (14%), car parks (9%) and hotels (4%). Most of the residential developments currently under construction are located in popular locations throughout the territory and are conveniently served by various modes of transportation including railway and subway lines. Sports, recreational and entertainment facilities are also available in the clubhouses. During the financial year, the Group acquired 7 plots of land located in fast growing new towns in Hong Kong and a 19% interest in a commercial project in Shanghai thereby increasing the land bank by about 2.6 million square feet of attributable gross floor area. The Group’s commercial buildings and car parks are mainly held for long-term investment, generating a stable stream of recurrent income for the Group. The following table shows the breakdown of the Group’s land bank as at 30th June, 2002. By Location and Usage Residential Commercial Industrial Car Park Hotel Total Area Percentage (Gross Floor Area in Square Feet) New Territories 3,258,813 1,408,322 469,649 1,112,610 — 6,249,394 37% Kowloon 1,506,067 2,002,435 1,927,999 391,452 — 5,827,953 34% China and Singapore 1,241,428 1,226,386
    [Show full text]
  • Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways
    CB(4)538/17-18(03) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Latest Progress of Enhancement of MTR Station Facilities Purpose This paper briefs the Subcommittee on the latest progress of the enhancement of station facilities by the MTR Corporation Limited (“MTRCL”). Background 2. The MTRCL is committed to providing safe, reliable and smooth railway service for over 5 million passenger trips per day. The public demand and expectation over the MTRCL as the major transport operator has been on the rise over the years. To maintain quality railway service, the MTRCL invests billions of dollars1 annually in enhancing, revitalising and maintaining its railway assets and infrastructure, including enhancing the facilities at the 93 stations under the current railway network. 3. In enhancing our station facilities, the MTRCL attaches great importance to the views of passengers and stakeholders in the community. We also strive to overcome the constraints at each station caused by its unique features, history, construction parameters, and usable areas. In our endeavour for continuous improvement by learning from past experience, the MTRCL seeks to improve the design and planning for future stations to give more convenience to passengers. 4. The ensuing paragraphs highlight the key improvement works carried out at our stations. 1 The MTRCL invested over 6 billion dollars in 2014 in enhancing, revitalising and maintaining its railway assets and infrastructure. This investment has increased significantly per year to over 8 billion dollars in 2016, which accounts for more than 40% of the 17.7. billion dollars revenue from the Corporation’s Hong Kong transport operations.
    [Show full text]