DIAGRAMMATIC © Crown copyright and database rights 2021 OS 100030649 Yarcombe Wood Dyke Brook

High St. 7 6 Downhead Steart Hill Steart Junction Wood 5 Camel Hill Annis 2 Hazlegrove Hill 3 Roundabout Camel A303 Gason Ln. A359 Cross Traits Ln. 1 Howell Hill 4 River Cam Plowage Ln. Podimore Church St. Wales

B3151

River Heathcote Rd. Bridgehampton Cam 0 500m

WorkRoyal Naval starting Air in 2021 Station,Podimore Roundabout/Camel Cross Junction/Downhead Lane Northern Haul Road 1 From September 2021 to November 2021 5 From September 2021 to October 2021 We will start clearing the site and put up fencing, then we’ll divert any utilities To the north of the existing A303, connecting Steart Hill to Hazlegrove roundabout, in the area. we will build a temporary road within the construction site boundary. This means we can move materials around the site without using local roads. Downhead Lane to Steart Hill 2 From August 2021 to October 2022 Camel Hill/Hazlegrove Roundabout YeoviltonWe will start by clearing the site, putting up fencing, building our compound and 6 From September 2021 to May 2023 relocating wildlife habitats. We will excavate and move earth so that we can build the We will start by clearing the site, putting up fencing, building our compound and new Steart Hill bridge and connecting roads. relocating wildlife habitats. We will then build a new entrance from Hazlegrove roundabout and create connecting link roads. Steart Hill Over Bridge 3 From September 2021 to May 2022 Hazlegrove Under Bridge We will start construction of a new bridge that will eventually span the new road and 7 From December 2021 to September 2022 connect the existing A303 with local roads. We will start work on the new Hazlegrove underbridge. This will allow the new to be carried over local roads and provide a new access to Hazlegrove school. Southern Haul Road and temporary bridge 4 From September 2021 to May 2022 Extent of the A303 Sparkford to Illchester scheme To the south of the existing A303, adjacent to Howell Hill, we will build a temporary road within the construction site boundary. This means we can move materials around Retained existing road the site without using local roads.