SOMERSET FLOOD RISK MANAGEMENT COMMON WORKS PROGRAMME 2015/16

A) Background Following its establishment on 31st January 2015, the Rivers Authority (SRA) is committed to preparing a Common Works Programme (CWP), which will be updated annually. The CWP encompass all Flood Risk Management Authorities (FRMAs) in Somerset, and covers all inland flood risk management improvement schemes and maintenance works. It sets out information on schemes being undertaken using funding available to FRMAs through their conventional spending programmes, but also includes schemes and works being delivered using additional funding made available to the SRA. It includes:  All capital schemes however funded;  The established maintenance programmes of the Environment Agency, and Internal Drainage Boards;  the Enhanced Maintenance Programme - for details, see: www.somersetriversauthority.org.uk/about-us/board-and- partners/board-meetings-and-papers/?entryid108=97700  Relevant programmes of (SCC) as Lead Local Flood Authority and Highways Authority;  District Council and Water Company schemes.

B) Purpose 1. To share information with local communities and businesses about the schemes and works being undertaken; 2. To provide a basis for co-ordinating the planning and implementation of schemes, including developing efficiencies for joint delivery, and reporting on progress.

C) Change The CWP will be updated to take account of issues that emerge during the course of the year, and may be subject to change, reflecting the ability to respond to needs and opportunities, and the availability of funding, as they arise.

D) Prioritisation The CWP seeks to focus resources in areas where there is the greatest need, and where investment will bring the greatest benefits. The type of action taken to manage flood risk and drainage will depend on the severity of the risk, including factors such as the likelihood of flooding, the level of danger it would pose, its impact, and the feasibility of implementing a scheme or works to mitigate the risk.

CWPv1-1.doc 1

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) 1. Improvement Schemes - Environment Agency Joint Programme of Work attracting either Government Grant in Aid or Local Levy (WRFCC) funding (see map for EA schemes) www.somersetriversauthority.org.uk/about-us/board-and-partners/board-meetings-and-papers/?entryid108=97703 Brue to Carry out repairs to defence wall and EA 1 Mendip EA Main River 2015 - 2016 Cripps reinstate flood bank to defence level Brue Glastonbury to EA 1 Mendip Desilt and pull banks on EA Main River 2015 - 2016 Cripps EA 2 North Drain Mendip Carry out works to Lewis Drove Sluice EA Main River 2015 - 2016 Lewis Drove Tilting Weir - Gate major EA 2 North Drain Mendip EA Main River 2015 - 2016 mechanical maintenance Lewis Drove Tilting Weir - Replace EA 2 North Drain Mendip EA Main River 2015 - 2016 motor & gearbox Burnham - Highbridge Main Rivers EA 3 Specialist asset survey EA 2015 - 2016 Clyce and Sea Burnham - Highbridge Main Rivers EA 3 Sedgemoor Replace Mechanical components EA 2015 - 2016 Clyce and Sea Burnham - Outfall - 2 x tidal flaps and 4x vertical Main Rivers EA 4 Sedgemoor EA 2015 - 2016 Sluice gates major mechanical maintenance and Sea Burnham - Huntspill Outfall - Refurbish gate 1, 2 & 3 Main Rivers EA 4 Sedgemoor EA 2015 - 2016 Sluice painting and Sea Burnham - Huntspill Main Rivers EA 4 Sedgemoor Outfall - Refurbish tidal flap 2 EA 2015 - 2016 Sluice and Sea EA 5 Axe Lower Sedgemoor Reprofile bank slips EA Main River 2015 - 2016 Bank repairs to cover piles and repair EA 6 Tone Villages EA Main River 2015 - 2016 Deane rabbit holes South EA 7 River Cam Froglane stone pitching EA Main River 2015 - 2016 Somerset

CWPv1-1.doc 2

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) South EA 7 River Cam West Camel FAS Throttle Structure EA Main River 2015 - 2016 Somerset South EA 7 River Cam West Camel flap valves EA Main River 2015 - 2016 Somerset Tone - Taunton to Taunton EA 8 Children's Wood stone revetment EA Main River 2015 - 2016 Bradford Deane Tone - Taunton to Taunton EA 8 Replacement of gauge boards x 8 EA Main River 2015 - 2016 Bradford Deane River - General West EA 9 Abbey Mill Bridge 1 every 2 years EA Main River 2015 - 2016 Bridge Inspections Somerset For Bye Farm and Watersmeet 1 Washford River - General West EA 9 every 2 years. Query over ownership EA Main River 2015 - 2016 Bridge Inspections Somerset of both bridges. West EA 9 Washford River Deformed culvert with fracture EA Main River 2015 - 2016 Somerset to Blue Anchor West EA 10 Inspection of culvert EA Main River 2015 - 2016 Coast Somerset Taunton EA 11 Westford Stream Repairs to earth embankment EA Main River 2015 - 2016 Deane Taunton EA 11 Westford Reservoir Section 10 Improvements EA Main River 2015 - 2016 Deane West EA 12 Tree Catcher EA Main River 2015 - 2016 Somerset Mark Yeo - Whitehouse EA 13 Sedgemoor Stone out compound EA Main River 2015 - 2016 Pumping Station Mark Yeo - Stook House EA 13 Sedgemoor Gate - major mechanical maintenance EA Main River 2015 - 2016 Sluice Stanmoor Pumping Taunton Flood Defence (Diesel Pump) EA 14 EA Main River 2015 - 2016 Station S Deane Replace 2 pump starters

CWPv1-1.doc 3

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) Burnham - Brean Cross Main Rivers EA 15 Sedgemoor Refurbish tidal flap 2 painting EA 2015 - 2016 Sluice and Sea Cheddar Yeo Lower - EA 16 Cross Moor Pumping Sedgemoor Replace 2 x pressure transducers EA Main River 2015 - 2016 Station EA 16 Cheddar Yeo Lower Sedgemoor Reprofile bank slips EA Main River 2015 - 2016 Brue Cripps to Tidal Limit Replace 2 hydrostatic and 2 EA 17 Sedgemoor EA Main River 2015 - 2016 - Hackness Sluice ultrasonic level instruments Taunton EA 18 Curry Moor Reservoir Section 10 Improvements EA Main River 2015 - 2016 Deane Taunton EA 18 Curry Moor Pumping Station Improvements EA Main River 2020 - 2021 Deane Taunton EA 19 French Weir Remedials EA Main River 2015 - 2016 Deane Cannington Flood EA 20 Sedgemoor EA Main River 2015 - 2016 Defence Scheme South EA 21 Reservoir Section 10 Improvements EA Main River 2015 - 2016 Somerset Sowy Improvement EA 22 Scheme (Flood Action Sedgemoor EA Main Rivers 2015 - 2017 Plan) Stolford Flood Defence West EA 23 EA Sea 2015 - 2018 Scheme Somerset Steart Coastal EA 24 Sedgemoor EA Main River 2015 - 2019 Management Project Main Rivers Parrett Barrier Site (Flood EA 25 Sedgemoor Investigation / Scheme EA and Sea 2015 - 2021 Action Plan)

CWPv1-1.doc 4

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) Sedgemoor & Beer Wall (Flood Action EA 26 South Phases 2 and 3 (See also FRM 22) EA Main River 2015 - 2016 Plan) Somerset EA 27 River Scheme Mendip Improvements (Wallbridge) EA Main River 2016 - 2017 Main Rivers EA 28 Parrett Estuary Sedgemoor Cannington Bends EA 2016 - 2018 and Sea South EA 29 Henley Sluice EA Main River 2018 - 2019 Somerset Saltmoor Pumping Taunton EA 30 Improvements EA Main River 2018- 2 019 Station Deane Main Rivers EA 31 Dunball Sluice Sedgemoor Gates Refurbishment EA 2018 - 2019 and Sea West EA 32 Improvements EA Main River 2018 - 2019 Somerset Taunton EA 33 Taunton Flood Alleviation Improvements EA Main River 2020 - 2021 Deane West Sedgemoor South EA 34 Improvements EA Main River 2020 - 2021 Pumping Station Somerset Gold Corner Pumping EA 35 Sedgemoor Improvements EA Main River 2020 - 2021 Station West EA 36 Flood Defences Scheme EA Main River 2020 - 2021 Somerset Schemes EA 37 to EA 40 are provisional schemes

Parrett at Right South EA 37 Asset Improvements EA Main River 2018 - 2019 Bank Somerset Westmoor and EA 38 Mendip Asset Improvements EA Main River 2019 - 2020 Southmoor

CWPv1-1.doc 5

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) Parrett Left Bank South EA 39 Asset Improvements EA Main River 2019 - 2020 Langport Thorney Somerset Sedgemoor & EA 40 King’s Sedgemoor Drain South Asset Improvements EA Main River 2019 - 2020 Somerset Schemes EA 41 to 44 do not appear on the accompanying map

Bridge Maintenance EA 41 EA Main Rivers 2015 - 2021 Programme (Wessex) Water Level Management Plan Heavily Modified Water Body (Water EA 42 EA Main River 2015 - 2021 Framework Directive) Mitigation Measures (Wessex) Westmoor Favourable EA 43 Condition (Raised Water Mendip EA Main River 2016 - 2017 Level Areas remedial) EA 44 River Brue Fish Passage Improvements EA Main River 2016 - 2018

CWPv1-1.doc 6

Flood Risk Management Authority Flood Risk Timescale for Ref Project Name Location Description (Other Source Implementation Partners involved) 2. Improvement Schemes Internal Drainage Boards (Grant in Aid / Grant funded) (see map for IDB schemes) www.somersetriversauthority.org.uk/about-us/board-and-partners/board-meetings-and-papers/?entryid108=97703 Minehead investigations West Lowland IDB 1 Investigation into improvement works Parrett IDB 2015 - 2016 & improvements Somerset channel Improvements to water level control Lowland IDB 2 East and West Waste Mendip Axe / Brue IDB 2015 - 2016 structures channel

CWPv1-1.doc 7

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) 3. Improvement Schemes Internal Drainage Boards (IDB funded)

Lowland IDB 3 Church Road Sedgemoor Urban drainage improvements Axe / Brue IDB 2015 - 2016 channel Biddisham drainage Lowland IDB 4 Sedgemoor Drainage improvements Axe / Brue IDB 2015 - 2016 improvements channel Lowland IDB 5 & Alstone Sedgemoor Urban drainage improvements Axe / Brue IDB 2015 - 2016 channel Basonbridge drainage Lowland IDB 6 Sedgemoor Investigation into improvement works Axe / Brue IDB 2015 - 2016 investigations channel Merry Lane NRV in Improvements to water level control Lowland IDB 7 Sedgemoor Axe / Brue IDB 2015 - 2016 ordinary watercourse structures channel East & Pitland Rhyne Localised desilting on viewed rhynes Lowland IDB 8 Sedgemoor Axe / Brue IDB 2015 - 2016 desilting in the Axe Brue Area channel Surface water improvements in Axe / Brue IDB Lowland IDB 9 Brent Street culvert Sedgemoor 2015 - 2016 partnership with Parish Council (Wessex Water) channel Brents Rhyne & Black Lowland IDB 10 Sedgemoor Drainage improvements Axe / Brue IDB 2015 - 2016 Ditch improvements channel Lowland IDB 11 Edithmead Lane culvert Sedgemoor Drainage improvements Axe / Brue IDB 2015 - 2016 channel Perrymoor reservoir bank South Lowland IDB 12 Bank and spillway repairs Parrett IDB 2015 - 2016 repairs Somerset channel South Lowland IDB 13 Slabgate Weir inlet Security measures Parrett IDB 2015 - 2016 Somerset channel Lowland IDB 14 Drove culverts Sedgemoor Drainage improvements Parrett IDB 2015 - 2016 channel

CWPv1-1.doc 8

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) Podimore Pumping South Lowland IDB 15 Building refurbishment Parrett IDB 2015 - 2016 Station Somerset channel Long Load Floodbank South Lowland IDB 16 Investigation into improvement works Parrett IDB 2015 - 2016 investigations Somerset channel Chadmead culverts and Lowland IDB 17 Sedgemoor Drainage improvements Parrett IDB 2015 - 2016 channel improvements channel B&T Canal connection at Lowland IDB 18 Sedgemoor Investigation into improvement works Parrett IDB 2015 - 2016 Fordgate investigations channel Knapp Bridge Drove Taunton Lowland IDB 19 Drainage improvements Parrett IDB 2015 - 2016 culvert Deane channel

Schemes IDB 20 – 26 are Board wide schemes Parrett Health & Safety Improvements to water level control Lowland IDB 20 Parrett IDB 2015 - 2016 Improvements Project structures channel Lower Axe Health & Improvements to water level control Lowland IDB 21 Safety Improvements Sedgemoor Axe / Brue IDB 2015 - 2016 structures channel Project Lower Brue Health & Improvements to water level control Lowland IDB 22 Safety Improvements Sedgemoor Axe / Brue IDB 2015 - 2016 structures channel Project Railways and roads Survey work to inform future works Lowland IDB 23 Axe / Brue IDB 2015 - 2016 culverts survey programme channel Lowland IDB 24 Telemetry Installation of water level monitoring Axe / Brue IDB 2015 - 2016 channel Localised desilting to improve Axe Brue Viewed Rhyne Lowland IDB 25 conveyance on viewed rhynes in the Axe / Brue IDB 2015 - 2016 Dredging channel Axe Brue Area Lowland IDB 26 Parrett Telemetry Installation of water level monitoring Parrett IDB 2015 - 2016 channel

CWPv1-1.doc 9

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) 4. Improvement Schemes (Provisional) County Council Schemes as Lead Local Flood Authority (see map for local authority and water company schemes) www.somersetriversauthority.org.uk/about-us/board-and-partners/board-meetings-and- papers/?entryid108=97703 South Surface water drainage Surface FRM1 Bruton SCC 2015 - 2016 Somerset improvements Water Surface water drainage Surface FRM2 Croscombe Mendip SCC 2015 - 2017 improvements Water Surface Feasibility study into surface Water / FRM3 Rode Feasibility Mendip water/ordinary watercourse SCC 2015 - 2017 Ordinary improvements Watercourse Feasibility study into surface West water/ordinary watercourse Ordinary FRM4 Stogumber Feasibility SCC 2015 - 2016 Somerset improvements including upstream Watercourse storage Surface Water Management Plan to South Surface FRM5 Somerton SWMP inform future development and SCC 2015 - 2017 Somerset Water drainage improvements Surface Water Management Plan to South Surface FRM6 SWMP inform future development and SCC 2015 - 2017 Somerset Water drainage improvements Surface Surface Water Management Plan to Water / FRM7 Glastonbury SWMP Mendip inform current level of surface water SCC 2016 - 2016 Ordinary flood risk and drainage improvements Watercourse Taunton Surface FRM8 Ruishton Pumping station upgrade SCC 2015 - 2016 Deane Water

CWPv1-1.doc 10

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) Staunton Lane West Surface FRM9 Tree removal SCC 2015-2016 Minehead Somerset Water West Surface FRM10 Mineral Line Roadwater Spillway improvements SCC 2015-2016 Somerset Water West Surface FRM11 Wiliton Survey and drainage improvements SCC 2015-2016 Somerset Water West Surface FRM13 Monksilver Upgrade highway drains SCC 2015-2016 Somerset Water South Surface FRM14 Feasibility study SCC 2015-2016 Somerset Water Obridge (Allotments) Taunton Surface FRM15 Feasibility study SCC 2015-2016 Taunton Deane Water Church Lane, Surface FRM16 Sedgemoor Overflow improvements SCC 2015-2016 Water Long Lane Lukwell West Surface FRM17 Drainage improvements SCC 2015-2016 Bridge Somerset Water Orchard Rd West Surface FRM18 Drainage improvements SCC 2015-2016 Carhampton Somerset Water Surface Blue Anchor Road, West Water / FRM19 Drainage improvements SCC 2015-2016 Carhampton Somerset Ordinary Watercourse Lower Street Upton Surface FRM20 Mendip Surface water diversion SCC 2015-2016 Noble Water Long Close and Heron South Feasibility study and possible work to Surface FRM21 SCC 2015-2016 Way, Ilminster Somerset divert surface water runoff Water A372 Beer Wall (Flood South Phase 2 Culvert Improvement Works FRM22 SCC Main River 2015-2016 Action Plan) Somerset (See also EA26)

CWPv1-1.doc 11

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) 5. Improvement Schemes (Provisional) County Council Highway Drainage Schemes

Surface Water SM1 A39 Hill, Wells Mendip Highway drainage improvements SCC 2015-2016 (Highway) A362 Frome to Surface Water SM2 Mendip Highway drainage improvements SCC 2015-2016 Road (Highway) Wells Road (Avalon Surface Water SM3 Mendip Highway drainage improvements SCC 2015-2016 Estate), Glastonbvury (Highway) Surface Water SM4 Bath Road, Emborough Mendip Highway drainage improvements SCC 2015-2016 (Highway) Kilmersdon Hill to Surface Water SM5 Frome Road, Mendip Highway drainage improvements SCC 2015-2016 (Highway) Kilmersdon Cannards Grave Road, Surface Water SM6 Mendip Highway drainage improvements SCC 2015-2016 (Highway) Chilkwell Street, Surface Water SM7 Mendip Highway drainage improvements SCC 2015-2016 Glastonbury (Highway) Eastmead Lane, Surface Water SM8 Mendip Highway drainage improvements SCC 2015-2016 Walton (Highway) Old Wells Road, Surface Water SM9 Mendip Highway drainage improvements SCC 2015-2016 Glastonbury (Highway) Park Farm Road, Surface Water SM10 Mendip Highway drainage improvements SCC 2015-2016 Glastonbury (Highway) Parsonage Lane, Surface Water SM11 Mendip Highway drainage improvements SCC 2015-2016 Chilcompton (Highway) Post Box to Orchards Surface Water SM12 Mendip Highway drainage improvements SCC 2015-2016 Dilcheat (Highway)

CWPv1-1.doc 12

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) Wellow Lane, Norton St Surface Water SM13 Mendip Highway drainage improvements SCC 2015-2016 Philip (Highway) Wells Road, Rodney Surface Water SM14 Mendip Highway drainage improvements SCC 2015-2016 Stoke (Highway) Surface Water SM15 Welshmill Lane, Frome Mendip Highway drainage improvements SCC 2015-2016 (Highway) Crowcombe Road, Surface Water SM16 Sedgemoor Highway drainage improvements SCC 2015-2016 (Highway) A361 Taunton Road, Surface Water SM17 Sedgemoor Highway drainage improvements SCC 2015-2016 (Highway) A39 Bath Road, Surface Water SM18 Sedgemoor Highway drainage improvements SCC 2015-2016 (Highway) Webbington Road, Surface Water SM19 Sedgemoor Highway drainage improvements SCC 2015-2016 (Highway) Old A39 Road, Nether Surface Water SM20 Sedgemoor Highway drainage improvements SCC 2015-2016 Stowey (Highway) School Lane & Mill Surface Water SM21 Sedgemoor Highway drainage improvements SCC 2015-2016 Street, (Highway) Somerville Way, Surface Water SM22 Sedgemoor Highway drainage improvements SCC 2015-2016 (Highway) Crickham Lane, Surface Water SM23 Sedgemoor Highway drainage improvements SCC 2015-2016 (Highway) Ashley Avenue, Surface Water SM24 Sedgemoor Highway drainage improvements SCC 2015-2016 Burnham on sea (Highway) Road / Yeovil South Surface Water SM25 Marsh Road, Yeovil Highway drainage improvements SCC 2015-2016 Somerset (Highway)

South Surface Water SM26 Two Ash Hill, Tatworth Highway drainage improvements SCC 2015-2016 Somerset (Highway)

CWPv1-1.doc 13

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) A371 Cattle Hill, South Surface Water SM27 Highway drainage improvements SCC 2015-2016 Bratton Seymour Somerset (Highway) A372 Somerton Road / South Surface Water SM28 Meadow Close, Highway drainage improvements SCC 2015-2016 Somerset (Highway) Langport Cary Road / Church South Surface Water SM29 Highway drainage improvements SCC 2015-2016 Lane, Alford Somerset (Highway) Picts Hill / Tengore South Surface Water SM30 Highway drainage improvements SCC 2015-2016 Lane, High Ham Somerset (Highway) South Beech Lane, Stoke Surface Water SM31 Somerset Highway drainage improvements SCC 2015-2016 Trister (Highway)

Bridgehampton Road, South Surface Water SM32 Highway drainage improvements SCC 2015-2016 Chilton Cantelo Somerset (Highway) Clapton Lane, South Surface Water SM33 Highway drainage improvements SCC 2015-2016 Somerset (Highway) Closworth Road, South Surface Water SM34 Highway drainage improvements SCC 2015-2016 Closworth Somerset (Highway) East Lambrook Rd (Owl South Surface Water SM35 St) / Middle Lambrook, Highway drainage improvements SCC 2015-2016 Somerset (Highway) Kingsbury Episcopi Fairend, Buckland St South Surface Water SM36 Highway drainage improvements SCC 2015-2016 Mary Somerset (Highway) South Surface Water SM37 Ganges Hill, Fivehead Highway drainage improvements SCC 2015-2016 Somerset (Highway) Main Street / Bakers South Surface Water SM38 Highway drainage improvements SCC 2015-2016 Lane, Barrington Somerset (Highway) South Surface Water SM39 Park Road Bruton Highway drainage improvements SCC 2015-2016 Somerset (Highway)

CWPv1-1.doc 14

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) Parsonage Place Curry South Surface Water SM40 Highway drainage improvements SCC 2015-2016 Rivel Somerset (Highway) South Surface Water SM41 Pitfield Corner Rimpton Highway drainage improvements SCC 2015-2016 Somerset (Highway) South Surface Water SM42 Station Road Ilminster Highway drainage improvements SCC 2015-2016 Somerset (Highway) South Surface Water SM43 Stowey Road Pitney Highway drainage improvements SCC 2015-2016 Somerset (Highway) Thorney Road South Surface Water SM44 Highway drainage improvements SCC 2015-2016 Muchelney Somerset (Highway) South Surface Water SM45 Weston Lane Closworth Highway drainage improvements SCC 2015-2016 Somerset (Highway) Yeovil Marsh Road South Surface Water SM46 Highway drainage improvements SCC 2015-2016 Yeovil Somerset (Highway) Greens Hill (A358), Taunton Surface Water SM47 Highway drainage improvements SCC 2015-2016 Lydeard St Lawrence Deane (Highway) Minehead Road, Norton Taunton Surface Water SM48 Highway drainage improvements SCC 2015-2016 Fitzwarren Deane (Highway) Comeytrowe Road, Taunton Surface Water SM49 Highway drainage improvements SCC 2015-2016 Trull Deane (Highway) Curload Road, Stoke St Taunton Surface Water SM50 Highway drainage improvements SCC 2015-2016 Gregory Deane (Highway) Daws Green Road, Taunton Surface Water SM51 Highway drainage improvements SCC 2015-2016 Trull Deane (Highway) Fitzhead Road, Taunton Surface Water SM52 Highway drainage improvements SCC 2015-2016 Fitzhead Deane (Highway) Orchard Close / Taunton Surface Water SM53 Burchills Hill, Highway drainage improvements SCC 2015-2016 Deane (Highway) Wellington

CWPv1-1.doc 15

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) The Street / Dosters Taunton Surface Water SM54 Highway drainage improvements SCC 2015-2016 Lane, West Monkton Deane (Highway) West Bagborough Taunton Surface Water SM55 Road, West Highway drainage improvements SCC 2015-2016 Deane (Highway) Bagborough Windmill Lane / Taunton Surface Water SM56 Huntham Lane, Stoke Highway drainage improvements SCC 2015-2016 Deane (Highway) St Gregory West Leigh Lane, Taunton Surface Water SM57 Highway drainage improvements SCC 2015-2016 Lydeard St Lawrence Deane (Highway) Battletown / Station Rd West Surface Water SM58 / High St / Bridge Highway drainage improvements SCC 2015-2016 Somerset (Highway) Street, Dulverton Bowhays Cross to West Surface Water SM59 Highway drainage improvements SCC 2015-2016 Porch Elm Williton Somerset (Highway) Kitsford Gate to Blue West Surface Water SM61 Highway drainage improvements SCC 2015-2016 Gates Simonsbath Somerset (Highway) Queens Rd / Alexandra Rd / Warden Rd / West Surface Water SM63 Highway drainage improvements SCC 2015-2016 Queens Rd access Somerset (Highway) lanes, Minehead Ranscombe Road, West Surface Water SM64 Highway drainage improvements SCC 2015-2016 Wootton Courteney Somerset (Highway) Roebuck Gate Lane, West Surface Water SM65 Highway drainage improvements SCC 2015-2016 Crowcombe Somerset (Highway) Withypool Cross to West Surface Water SM66 Highway drainage improvements SCC 2015-2016 New Bridge, Withypool Somerset (Highway)

CWPv1-1.doc 16

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) 5. Improvement Schemes (Provisional) Disctrict Council Schemes as Local Drainage Authority

Taunton Taunton Deane DC1 Bradford-on-Tone River Tone Strategic Storage Main River 2015-2019 Deane BC Wirral Park Balancing Surface water / Maintenance and Upgrading to the DC2 Pond Pumping Station, Mendip Mendip DC ordinary 2015-2017 plant Glastonbury watercourse

CWPv1-1.doc 17

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved) 6. Improvement Schemes (Provisional) Water Company Schemes

2015 - 2020 (Note: Culverted Improvements to watercourse to allow this scheme may Wessex Water watercourse WW1 Field Way, Highbridge Sedgemoor greater capacity surface water sewer not have enough (SCC, IDB) and surface to alleviate flooding benefits to attract water sewers Grant in Aid) Water from a range of WW2 Sedgemoor Wessex Water sources 2015 - 2018 overloading the foul system Water from a range of WW3 Mark Vacuum Sedgemoor Wessex Water sources 2015 - 2017 overloading the foul system Water from a range of Yarley Cross sewer WW4 Mendip Wessex Water sources 2015 - 2016 sealing overloading the foul system

CWPv1-1.doc 18

Flood Risk Management Flood Risk Timescale for Ref Project Name Location Description Authority Source Implementation (Other Partners involved)

Other schemes currently being appraised

Taunton WW5  Bathpool Deane WW6  Berrow Sedgemoor WW7  Brean Sedgemoor WW8  Burnham Sedgemoor 2015- on. Delivery Water from a depends on cost WW9  Butleigh Mendip range of benefits and priority Taunton WW10  Cotford Wessex Water sources against other Deane overloading the schemes in Mendip WW11  Croscombe foul system Wessex Waters WW12  Frome Mendip region. WW13  Moorlands  Sedgemoor West WW14  Washford Somerset WW15  Westhay Sedgemoor

CWPv1-1.doc 19

7. Programme of Regular Maintenance Activities

Lead Flood Risk Flood Risk Description Management Authority Source

Minor improvements to assets:  Feasibility studies and scheme appraisal Main Rivers &  Detailed design and procurement of contracts and materials etc; and Environment Agency Sea  Delivery of works

Routine maintenance of assets:  Asset condition inspection;  System monitoring and operation;  Maintaining structures;  Grass cutting (hand or mechanical);  Weed control (mechanical and chemical)  Pest/vermin control and tree works;  Defence repairs; Main Rivers &  Work on flood storage reservoirs; Environment Agency Sea  Obstruction removal and debris clearance from rivers;  De silting and dredging;  Pumping operations;  Control of river water levels and flows on Main Rivers;  Consenting and enforcement;  Flood bank and channel reprofiling and reinstatement;  Environmental management.

CWPv1-1.doc 20

Emergency Incidents, Response and Recovery:  Issue flood warnings;  Raise awareness amongst staff and site operatives;  Monitor rainfall and water levels across Somerset;  Liaise with other Risk Management Authorities and emergency services; Main Rivers & Environment Agency  Implement pre-determined emergency response plans; Sea  Pre-plan resources deploy staff and equipment;  Open control rooms and manage/respond to incidents;  Work with partners on single agency and multi-agency responses.

Annual Core Activities  Weed cutting / desilting viewed rhynes;  Emergency incidents, response and recovery;  Operation of water level control structures; Lowland Axe Brue and Parrett IDBs  Land Drainage Act Management (consenting and enforcement); channel  Routine maintenance of assets;  Repair, refurbishment and replacement of assets.

Minor improvements to assets:  Replacement / installing of linear drainage units, chambers, covers, drain pipes and surface water sewers;  Surface water  Connections with new or existing installations;  SCC and  Replacement / installing of pipes outfalls to ditches, combination drainage units; groundwater  Undertake drainage system studies and CCTV investigations. 

CWPv1-1.doc 21

Routine maintenance of assets:  Cleaning and jetting of gullies;   Drainage channel clearing;   Manhole maintenance;  Surface water  Ditch/dyke cleansing;  SCC and  Inspection and maintenance of bridges and culverts;  groundwater  Catchpit cleansing;   Grip cutting and clearing. 

Minor improvements and maintenance of assets:  Undertake works on ordinary watercourses and liaise with riparian owners;   Bridge and culvert inspections and cleansing;   Removal of debris and blockages;  District and Borough Ordinary  Silt removal from channels and culverts;  Councils watercourses  Asset Inspections and Condition Assessments;   Operation and maintenance of pumping stations, outfalls and sluices. 

Major and Minor improvements to assets:  Investigation of root cause;   Feasibility studies and scheme appraisal (20 current schemes);  Wessex Water and South  Detailed design through in house and contract resource;  Public Sewers West Water  Delivery of works;   Provision of new assets. 

CWPv1-1.doc 22

Routine maintenance of assets:  Asset condition inspection;   Monitoring and response to telemetered assets;   Maintenance of sewers;  Wessex Water and South  Maintenance of pumping stations;  Public Sewers West Water  Maintenance of sewage treatment works;   Reactive response to issues arising from public assets;   Maintenance of adopted flood storage structures. 

CWPv1-1.doc 23