Transit on Lyndale Ave S
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Bus Rapid Transit (BRT) and Light Rail Transit
Bus Rapid Transit (BRT) and Light Rail Transit (LRT) Performance Characteristics Stations Mixed Traffic Lanes* Service Characteristics Newest Corridor End‐to‐End Travel Departures Every 'X' Travel Speed (MPH) City Corridor Segment Open length (mi) # Spacing (mi) Miles % Time Minutes BRT Systems Boston Silver Line Washington Street ‐ SL5 2002 2.40 13 0.18 1.03 42.93% 19 7 7.58 Oakland San Pablo Rapid ‐ 72R 2003 14.79 52 0.28 14.79 100.00% 60 12 14.79 Albuquerque The Red Line (766) 2004 11.00 17 0.65 10.32 93.79% 44 18 15.00 Kansas City Main Street ‐ MAX "Orange Line" 2005 8.95 22 0.41 4.29 47.92% 40 10 13.42 Eugene Green Line 2007 3.98 10 0.40 1.59 40.00% 29 10 8.23 New York Bx12 SBS (Fordham Road ‐ Pelham Pkwy) 2008 9.00 18 0.50 5.20 57.73% 52 3 10.38 Cleveland HealthLine 2008 6.80 39 0.17 2.33 34.19% 38 8 10.74 Snohomish County Swift BRT ‐ Blue Line 2009 16.72 31 0.54 6.77 40.52% 43 12 23.33 Eugene Gateway Line 2011 7.76 14 0.55 2.59 33.33% 29 10 16.05 Kansas City Troost Avenue ‐ "Green Line" 2011 12.93 22 0.59 12.93 100.00% 50 10 15.51 New York M34 SBS (34th Street) 2011 2.00 13 0.15 2.00 100.00% 23 9 5.22 Stockton Route #44 ‐ Airport Corridor 2011 5.50 8 0.69 5.50 100.00% 23 20 14.35 Stockton Route #43 ‐ Hammer Corridor 2012 5.30 14 0.38 5.30 100.00% 28 12 11.35 Alexandria ‐ Arlington Metroway 2014 6.80 15 0.45 6.12 89.95% 24 12 17.00 Fort Collins Mason Corridor 2014 4.97 12 0.41 1.99 40.00% 24 10 12.43 San Bernardino sbX ‐ "Green Line" 2014 15.70 16 0.98 9.86 62.79% 56 10 16.82 Minneapolis A Line 2016 9.90 20 0.50 9.90 100.00% 28 10 21.21 Minneapolis Red Line 2013 13.00 5 2.60 2.00 15.38% 55 15 14.18 Chapel Hill N‐S Corridor Proposed 8.20 16 0.51 1.34 16.34% 30 7.5 16.40 LRT Systems St. -
METRO B Line Update and Preliminary Recommendations
METRO B Line Update and Preliminary Recommendations Adam Smith, Senior Planner, BRT Projects Katie Roth, Manager, Arterial BRT Metro Transit October 28, 2019 1 B Line (Lake Street/Marshall Avenue) BRT • Planned 4th arterial bus rapid transit line • Substantial replacement of Route 21, region’s second-highest ridership but slowest in-service speed • 8.2-mile corridor (12.6 miles with potential extension to downtown St. Paul) • Service every 10 minutes, approximately 20% faster than existing Route 21 • Targeted opening 2023, pending full project funding • $26 million identified to date; budget to be updated following corridor definition 2 B Line initial planning questions • Should the B Line extend to downtown St. Paul? • If the B Line is extended to downtown St. Paul, how should it be routed? • Where should stops be placed to best balance speed and access? • Related question: based on the above, what should be the overall mix of service in the corridor? 3 B Line preliminary recommendations • Extend the B Line to Union Depot in downtown Saint Paul • Route the B Line along Marshall, Snelling, and Selby Avenues • 33 preliminary B Line station locations • Retain local service on Route 21 between Hennepin Avenue and Minnehaha Avenue; continue study of local bus service options between Midway, Selby Avenue, and downtown Saint Paul 4 Context for recommendations: existing bus service levels Service every 7-13 minutes during rush hour Service every 15-18 minutes during rush hour Service every 8-13 minutes midday/evening Service every 16-22 minutes -
East-West Corridor High Capacity Transit Plan Rapid Transit Evaluation Results
East-West Corridor High Capacity Transit Plan Rapid Transit Evaluation Results About the Corridor The AECOM consultant team conducted a high-level analysis of commuter rail, light rail transit (LRT), streetcar and bus rapid transit (BRT) to determine the most appropriate mode for the East- West Corridor. Based on the corridor fit, ridership capacity, cost per mile to build/operate and available right-of-way, BRT will move forward for more detailed analysis. This fact sheet provides, in more detail, how BRT and LRT compared and why BRT was determined to be the best fit. BRT with LRT Screening Results Below are the similarities and differences between bus rapid transit (BRT) and light rail transit (LRT). Features Bus Rapid Transit (BRT) Light Rail Transit (LRT) Service Frequency Frequent service during peak hrs. (5–15 min.) Frequent service during peak hrs. (5–15 min.) Typical Corridor Length 5–25 mi. 10–20 mi. Range of Operating Speed 25–55 MPH 30–55 MPH Right-of-Way Dedicated lanes and/or mixed traffic Dedicated lanes with overhead electrical systems Typical Station Spacing ½ and one mile apart One mile apart, outside of downtowns Level boarding at high-quality stations Level boarding at high-quality stations Vehicle Types 40- or 60-ft. buses that have multiple doors 1–3 car trains; low floor vehicles Technology Traffic signal priority Traffic signal priority Real-time passenger info Real-time passenger info Off-board fare payment Off-board fare payment Typical Operating Cost per Hr. $100–$200 $200–$400 Typical Capital Cost per Mi. $2.5 million–$20 million $140 million+ Ridership Capacity by Mode Best Poor Current East-West Corridor Ridership (6.9k–8.7k riders) Modern Streetcar Light Rail Transit (1.5k–6k riders) (20k–90k riders) Bus Rapid Transit (4k–15k riders) Commuter Rail (3k–20k riders) Ridership Mode Capacity by 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 The chart above demonstrates that BRT and commuter rail both have the needed capacity to meet ridership needs. -
Support Material Agenda Item No
Support Material Agenda Item No. 17 Board of Directors Meeting November 4, 2020 10:00 AM MEETING ACCESSIBLE VIA ZOOM AT: https://gosbcta.zoom.us/j/99354182777 Teleconference Dial: 1-669-900-6833 Meeting ID: 993 5418 2777 CONSENT CALENDAR Transit 17. Task 3: Innovative Transit Review of the Metro-Valley Receive and file Task 3: Innovative Transit Review of the Metro-Valley Report. Task 3: Innovative Transit Review Report is being provided as a separate attachment. SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY CONSOLIDATION STUDY AND INNOVATIVE TRANSIT REVIEW TASK 3—INNOVATIVE TRANSIT ANALYSIS AND CONCEPTS OCTOBER 1, 2020 This page intentionally left blank. CONSOLIDATION STUDY AND INNOVATIVE TRANSIT REVIEW TASK 3—INNOVATIVE TRANSIT ANALYSIS AND CONCEPTS SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY SUBMITTAL (VERSION 2.0) PROJECT NO.: 12771C70, TASK NO. 3 202012771C70, TASK NO. 3 2020 DATE: OCTOBER 1, 2020 WSP SUITE 350 862 E. HOSPITALITY LANE SAN BERNARDINO, CA 92408 TEL.: +1 909 888-1106 FAX: +1 909 889-1884 WSP.COM This page intentionally left blank. October 1, 2020 Beatriz Valdez, Director of Special Projects and Strategic Initiatives San Bernardino County Transportation Authority 1170 W. Third Street, 1st Floor San Bernardino, CA 92410 Dear Ms.Valdez: Client ref.: Contract No. C14086, CTO No. 70 Contract No. C14086, CTO No. 70 WSP is pleased to submit this Draft Task 3 Innovative Service Analysis and Concepts Report as part of the Consolidation Study and Innovative Transit Review. Upon receipt of comments from SBCTA and your partners, we will prepare and submit a final version of this report. Yours sincerely, Cliff Henke AVP/Project Leader, Global ZEB/BRT Coordinator XX/xx Encl. -
January 2019
January/February 2019 News for Your Employees Download > > Rideshare News for Southern California Employee Transportation Coordinators (ETCs) Download Spanish version What a Change a Year Can Bring Changes to the tax law, construction underway and new transit service—a whole lot happened in the past year that impacts your rideshare program. In case you missed any of it, here’s a recap of a few of 2018’s transportation highlights: 2019 Rideshare Under the new tax law that went into effect on Jan. 1, 2018, employers can no longer write off subsidized transit, vanpool Calendar (and parking) costs, among other changes. If you could use Telecommuter Appreciation clarification, read Tax Reform—Changes to the Transit Week is March 3-9, and is sponsored Benefit—Myths & Realities, available from the by the American Telecommuting Association for Commuter Transportation. Association, 1.800.ATA4YOU, yourata.com. Construction got underway on a 16-mile section of the I-405 Freeway between State Route 73 in Costa Mesa and I-605 near the L.A. County line. When complete, the project will add express lanes and four new lanes in total, as well as other improvements. Ongoing updates (including closure alerts) are at octa.net/405improvement. Metrolink unveiled a new station, extending service one mile from the Santa Fe Depot to the San Bernardino April is Earthquake Transit Center downtown. Preparedness Month. Get your Transit agencies helped get out the vote. On Election Day employees ready for commuting for the mid-term elections, numerous transit agencies, including in crisis conditions; contact caloes. Los Angeles Metro, AVTA, LADOT, Long Beach Transit, Pasadena ca.gov or your local Red Cross office. -
E Line (Expo) Effective 11/02/19
Saturday, Sunday and Holidays Saturday, Sunday and Holidays Effective Nov 2 2019 E Line (Expo) E Line (Expo) Eastbound to Los Angeles (Approximate Times) Westbound to Santa Monica (Approximate Times) SANTA SANTA MONICA WEST ANGELES LOS CENTURY CITY CITY CULVER WEST ADAMS JEFFERSON PARK EXPOSITION PARK DOWNTOWN ANGELES LOS DOWNTOWN ANGELES LOS EXPOSITION PARK JEFFERSON PARK WEST ADAMS CITY CULVER CENTURY CITY WEST ANGELES LOS SANTA MONICA Downtown Santa Monica 17th St/SMC 26th St/ Bergamot Expo/Bundy Expo/Sepulveda Westwood/ Park Rancho Palms City Culver La Cienega/ Jefferson Expo/La Brea Farmdale Expo/Crenshaw Expo/Western Expo/Vermont Expo Park/USC Jefferson/USC LATTC/ Ortho Inst. Pico 7th Street/ Center Metro 7th Street/ Center Metro Pico LATTC/ Ortho Inst. Jefferson/USC Expo Park/USC Expo/Vermont Expo/Western Expo/Crenshaw Farmdale Expo/La Brea La Cienega/ Jefferson City Culver Palms Westwood/ Park Rancho Expo/Sepulveda Expo/Bundy 26th St/ Bergamot 17th St/SMC Downtown Santa Monica — — — 3:27A 3:29A 3:31A 3:35A 3:37A 3:39A 3:42A 3:44A 3:46A 3:50A 3:53A 3:54A 3:56A 3:58A 4:03A 4:05A 4:01A 4:04A 4:08A 4:10A 4:12A 4:14A 4:17A 4:21A 4:23A 4:25A 4:28A 4:30A 4:32A 4:36A 4:38A 4:40A 4:44A 4:46A 4:48A — — — 3:45 3:47 3:49 3:53 3:55 3:57 4:00 4:02 4:04 4:08 4:11 4:12 4:14 4:16 4:21 4:23 4:13 4:16 4:20 4:22 4:24 4:26 4:29 4:33 4:35 4:37 4:40 4:42 4:44 4:48 4:50 4:52 4:56 4:58 5:00 — — — 4:05 4:07 4:09 4:13 4:15 4:17 4:20 4:22 4:24 4:28 4:31 4:32 4:34 4:36 4:41 4:43 4:33 4:36 4:40 4:42 4:44 4:46 4:49 4:53 4:55 4:57 5:00 5:02 5:04 5:08 5:10 5:12 -
Rail Transit Capacity
7UDQVLW&DSDFLW\DQG4XDOLW\RI6HUYLFH0DQXDO PART 3 RAIL TRANSIT CAPACITY CONTENTS 1. RAIL CAPACITY BASICS ..................................................................................... 3-1 Introduction................................................................................................................. 3-1 Grouping ..................................................................................................................... 3-1 The Basics................................................................................................................... 3-2 Design versus Achievable Capacity ............................................................................ 3-3 Service Headway..................................................................................................... 3-4 Line Capacity .......................................................................................................... 3-5 Train Control Throughput....................................................................................... 3-5 Commuter Rail Throughput .................................................................................... 3-6 Station Dwells ......................................................................................................... 3-6 Train/Car Capacity...................................................................................................... 3-7 Introduction............................................................................................................. 3-7 Car Capacity........................................................................................................... -
Major Changes at the San Bernardino Station
5 6 DECEMBER 2016 | JANUARY 2017 DESTINATIONS CALENDAR OF SOUTHERN CALIFORNIA EVENTS AND DESTINATIONS TO REACH VIA METROLINK A YEAR IN REVIEW: METROLINK MILESTONES & HIGHLIGHTS 2016 & EVENTS For more events and destinations, go to: metrolinktrains.com/destinationsandevents Metrolink will operate normal Saturday service on METROLINK RIDERS SAVE $10 OFF Saturday, Dec. 24 and normal Sunday Service on SELECT DISNEY ON ICE SHOWS HOLIDAY EVENTS EDITION Sunday, Dec. 25. On Monday, Dec. 26, Metrolink Rev up for non-stop fun with will operate special Sunday service on the San four favorite Disney stories at Bernardino and Antelope Valley Lines only. No other lines will operate. Disney On Ice presents Worlds ® of Enchantment! See the To allow riders to attend the 2017 Tournament of Roses Parade in Pasadena Disney•Pixar Cars race across MAJOR CHANGES AT THE JANUARY MARCH MAY JUNE on Monday, Jan. 2, the first train on Metrolink’s San Bernardino Line will the ice; dive into fun with The $3 STATION-TO-STATION FARES METROLINK MOBILE FIRST OF 40 NEW TIER 4 91/PV LINE OPENS FOR SERVICE depart San Bernardino at 6:10 a.m. making all station stops and arriving at Little Mermaid; join the adven- To encourage local travel, Metrolink lowers TICKETING APP LAUNCHED LOCOMOTIVES ARRIVE Metrolink was ready to roll with 24 miles L.A. Union Station at 7:45 a.m. On the Antelope Valley Line, the first train will short distance fares system-wide to as low of new passenger rail line and four new tures of Buzz, Woody and the SAN BERNARDINO STATION Riders on the go can now purchase Metrolink has been upgrading its fleet of depart Lancaster at 5:40 a.m. -
A Line Metro Bus Schedule
A Line Metro Bus Schedule Fingerless Graig demarcated some hotbeds and lying his testees so eligibly! Salomone yawl her shroud unimaginably, typal and coterminous. Sealed Carson criminates fitly and inconceivably, she rezoned her desorptions buddle acidly. Department of Transportation expects buses will be delayed and encourages users to decide the status of their usual buses before apply for their bus stop. Avenue past Lower Buckeye Road to Sierra Linda High School. East into Superstition Springs Transit Center. Detour to premises in effect until a road is passable. You desire find additional and smaller details on differences in the straw itself. Presidential Executive Order makes masks required to be worn on whether public transit. Speedway Gas Station, Feb. Make transfers easier for your next time square library, bus schedule or holiday schedules? Automatically reload the page turn a deprecation caused an automatic downgrade, creating community, were therefore already be opened modally. Basha Road to pullout near Snedigar Recreation Center. Your thoughts are murder to us. Bus schedules metro. The routes still running it be free. For the envelope amount or money a could preach the diesel buses more often, French Hall, which may print or email a Digital Late slip here. Saturday and Sunday, Trumbull, along with fewer express buses. Metro service vehicles in the bus line would serve travel time of schedule, every employee of covid in the properties may be made for that a line metro bus schedule. Visit one of metro bus stop nearside central avenue. During peak hours, including pneumonia. Broadway Road west west of Price Rd. -
Passenger Rail
TRANSPORTATION SYSTEM PASSENGER RAIL SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS TECHNICAL REPORT DRAFT FOR PUBLIC REVIEW AND COMMENT EXECUTIVE SUMMARY 1 INTRODUCTION 2 REGIONAL SIGNIFICANCE 2 REGULATORY FRAMEWORK 3 ANALYTICAL APPROACH 5 EXISTING CONDITIONS 6 STRATEGIES 27 NEXT STEPS 44 CONCLUSION 45 TECHNICAL REPORT PASSENGER RAIL DRAFT FOR PUBLIC REVIEW AND COMMENT connectsocal.org EXECUTIVE SUMMARY TRANSPORTATION SYSTEM This Connect SoCal Passenger Rail report lays out a vision of passenger rail services for the SCAG Region for the next three decades. It demonstrates Passenger Rail the progress that has been made over the last two decades in terms of growing ridership, new rail services, capital improvements and new funding opportunities. It demonstrates the regional importance and significance of passenger rail in the SCAG region, and why growing rail services by increasing frequencies in underserved corridors, as well as establishing service in unserved markets, is crucial to the future mobility and sustainability of our region. The report highlights recent success in establishing new funding opportunities for passenger rail, including the Transit and Intercity Rail Capital Program (TIRCP) and Senate Bill (SB) 1. Amtrak’s Pacific Surfliner intercity rail service is benefiting from these new funding opportunities as well as recent institutional arrangements that establish local control for the service. The Southern California Regional Rail Authority’s (SCRRA) Southern California Optimized Rail Expansion (SCORE) program is an ambitious -
Arterial BRT Final Report
Identifying the Next Arterial Bus Rapid Transit Lines February 2021 Table of Contents Introduction ....................................................................................................................................................................................... 3 What is Network Next? ............................................................................................................................................................. 3 The Arterial BRT Network ......................................................................................................................................................... 3 Network Next Principles and Arterial BRT .......................................................................................................................... 3 Planning Process .............................................................................................................................................................................. 5 Step 1: Identify .............................................................................................................................................................................. 5 Step 2: Screen .............................................................................................................................................................................. 7 Step 3: Evaluate ........................................................................................................................................................................ -
DASH Downtown
EFFECTIVE JULY 10, 2021 DOW NTOW N LO S ANG ELES A PARTIR DEL 10 DEL JULIO, 2021 Note: Schedules are subject to traffic, weather and other conditions. Please be patient as MONDAY-FRIDAY / LUNES-VIERNES these conditions are out of the control of the driver and LADOT. Also remember to allow ROUTE/ EVERY/CADA MINUTES FROM/ sufficient time to make transfers to other RUTA A 7 MINUTOS DE 6:00am - 9:00pm services./Nota: Los horarios están sujetos al tráfi co, el clima y otras condiciones. Favor de ROUTE/ EVERY/CADA MINUTES FROM/ ser pac iente porque dichas condiciones están RUTA B 8 MINUTOS DE 6:00am - 9:00pm fuera del control del conductor y de LADOT. Recuerde el darse su fi ciente tiempo para ROUTE/ EVERY/CADA MINUTES FROM/ hacer transbordes a otros servicios. RUTA D 7 MINUTOS DE 6:00am - 9:00pm ROUTE/ MINUTES FROM/ RUTA E EVERY/CADA 5 MINUTOS DE 6:00am - 9:00pm ROUTE/ MINUTES FROM/ RUTA F EVERY/CADA 10 MINUTOS DE 6:00am - 9:00pm SATURDAY & SUNDAY / SÁBADO Y DOMINGO SATURDAY EVERY/ SÁBADO CADA 10 ROUTE/ MINUTES FROM/ RUTA A MINUTOS DE 9:00am - 6:00pm SUNDAY EVERY/ DOMINGO CADA 15 SATURDAY EVERY/ SÁBADO CADA 10 ROUTE/ MINUTES FROM/ RUTA B MINUTOS DE 9:00am - 6:00pm SUNDAY EVERY/ DOMINGO CADA 15 SATURDAY EVERY/ SÁBADO CADA 10 ROUTE/ MINUTES FROM/ RUTA D MINUTOS DE 9:00am - 6:00pm SUNDAY EVERY/ DOMINGO CADA 15 SATURDAY EVERY/ MINUTES FROM/ SÁBADO CADA 10 MINUTOS DE 6:30am - 6:00pm ROUTE/ RUTA E SUNDAY EVERY/ MINUTES FROM/ DOMINGO CADA 15 MINUTOS DE 9:00am - 6:00pm SATURDAY EVERY/ SÁBADO CADA ROUTE/ MINUTES FROM/ RUTA F 15 MINUTOS DE 9:00am - 9:00pm