Power Flow Diagram Gone Green 2014/15
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
IEA-RETD Rewind Offshore
Comparative Analysis of International Offshore Wind Energy Development REWIND OFFSHORE March 2017 ABOUT THE IEA RETD TECHNOLOGY COLLABORATION PROGRAMME The IEA Renewable Energy Technology Deployment Technology Collaboration Programme (IEA RETD TCP) provides a platform for enhancing international cooperation on policies, measures and market instruments to accelerate the global deployment of renewable energy technologies. IEA RETD TCP aims to empower policy makers and energy market actors to make informed decisions by: (1) providing innovative policy options; (2) disseminating best practices related to policy measures and market instruments to increase deployment of renewable energy, and (3) increasing awareness of the short-, medium- and long-term impacts of renewable energy action and inaction. For further information please visit: http://iea-retd.org or contact [email protected]. Twitter: @IEA_RETD IEA RETD TCP is part of the IEA Energy Technology Network. DISCLAIMER The IEA RETD TCP, formally known as the Technology Collaboration Programme for Renewable Energy Technology Deployment and formerly known as the Implementing Agreement for Renewable Energy Technology Deployment (IEA-RETD), functions within a Framework created by the International Energy Agency (IEA). Views, findings and publications of IEA RETD TCP do not necessarily represent the views or policies of the IEA Secretariat or of its individual Member Countries. COPYRIGHT This publication should be cited as: IEA RETD TCP (2017), Comparative Analysis of International Offshore Wind Energy Development (REWind Offshore), IEA Renewable Energy Technology Deployment Technology Collaboration Programme (IEA RETD TCP), Utrecht, 2017. Copyright © IEA RETD TCP 2017 (Stichting Foundation Renewable Energy Technology Deployment) AUTHORS Lead Authors: The Carbon Trust is an independent, expert partner that works with public and private section organizations around the world, helping them to accelerate the move to a sustainable, low carbon economy. -
An Heritage Impact Assessment and Historic Buildings Appraisal of the Rising Sun, Bamford, Derbyshire
An Heritage Impact Assessment and Historic Buildings Appraisal of the Rising Sun, Bamford, Derbyshire ARS Ltd Report 2017/151 OASIS archaeol5-304640 December 2017 Compiled By: Emma Grange and Michelle Burpoe Archaeological Research Services Ltd Angel House Portland Square Bakewell Derbyshire DE45 1HB Checked By: Clive Waddington MCIfA Tel: 01629 814540 Fax: 01629 814657 [email protected] www.archaeologicalresearchservices.com A Heritage Impact Assessment and Historic Buildings Appraisal of the Rising Sun, Bamford, Derbyshire A Heritage Impact Assessment and Historic Buildings Appraisal of the Rising Sun, Bamford, Derbyshire Archaeological Research Services Ltd Report 2017/151 December 2017 © Archaeological Research Services Ltd 2017 Angel House, Portland Square, Bakewell, Derbyshire, DE45 1HB www.archaeologicalresearchservices.com Prepared on behalf of: GiGi Developments Ltd Date of compilation: December 2017 Compiled by: Emma Grange and Michelle Burpoe Checked by: Clive Waddington MCIfA Local Planning Authority: Peak District National Park Authority Site central NGR: SK 19489 82837 i A Heritage Impact Assessment and Historic Buildings Appraisal of the Rising Sun, Bamford, Derbyshire EXECUTIVE SUMMARY Archaeological Research Services Ltd was commissioned by GiGi Developments Ltd to carry out a heritage impact assessment and historic buildings appraisal of the former Rising Sun Public House and Hotel, Bamford, Derbyshire. This heritage impact assessment and historic buildings appraisal has been commissioned ahead of the submission of a planning application for the proposed redevelopment of the site for hotel use with associated car parking to the side and rear. The assessment has identified that the majority of the Rising Sun complex is of a later date than the 18th century and is largely of little historical or architectural significance. -
Pembroke Power Station Environmental Permit
Environment Agency appropriate assessment: Pembroke Power Station Environmental Permit Report – Final v 2.5 - 1 - PROTECT - Environmental Permit EA/EPR/DP3333TA/A001 Executive summary Purpose An ‘Appropriate Assessment’ (AA) as required by Regulation 61 of the Conservation of Habitats and Species Regulations (in accordance with the Habitats Directive (92/43/EEC), has been carried out on the application for an environmental permit for a 2100 MW natural gas-fired combined cycle gas turbine (CCGT) power station, near Pembroke. This Appropriate Assessment is required before the Environment Agency can grant an Environmental Permit and consider the implications of the environmental permit on the Pembrokeshire Marine / Sir Benfro Forol Special Area of Conservation (SAC) and Afonydd Cleddau / Cleddau Rivers SAC. Approach The purpose of the AA is to ensure that the granting of an environmental permit does not result in damage to the natural habitats and species present on sites protected for their important wildlife. In this sense, the AA is similar to an environmental impact assessment with special focus on wildlife of international and national importance. In technical terms an, AA is a legal requirement to determine whether activities (not necessary for nature conservation) could adversely affect the integrity of the conservation site(s), either alone or in combination with other activities, and given the prevailing environmental conditions. It is required before the Agency, as a competent authority, can grant permission for the project. An adverse effect on integrity is one that undermines the coherence of a sites ecological structure and function, across its whole area, that enables the site to sustain the habitat, complex of habitats and/or levels of populations of the species for which the site is important. -
Rotherham Sheffield
S T E A D L To Penistone AN S NE H E LA E L E F I RR F 67 N Rainborough Park N O A A C F T E L R To Barnsley and I H 61 E N G W A L A E W D Doncaster A L W N ELL E I HILL ROAD T E L S D A T E E M R N W A R Y E O 67 O G O 1 L E O A R A L D M B N U E A D N E E R O E O Y N TH L I A A C N E A Tankersley N L L W T G N A P E O F A L L A A LA E N LA AL 6 T R N H C 16 FI S 6 E R N K Swinton W KL D 1 E BER A E T King’s Wood O M O 3 D O C O A 5 A H I S 67 OA A W R Ath-Upon-Dearne Y R T T W N R S E E E RR E W M Golf Course T LANE A CA 61 D A 6 A O CR L R R B E O E D O S A N A A S A O M L B R D AN E E L GREA Tankersley Park A CH AN AN A V R B ES L S E E D D TER L LDS N S R L E R R A R Y I E R L Golf Course O N O IE O 6 F O E W O O E 61 T A A F A L A A N K R D H E S E N L G P A R HA U L L E WT F AN B HOR O I E O E Y N S Y O E A L L H A L D E D VE 6 S N H 1 I L B O H H A UE W 6 S A BR O T O E H Finkle Street OK R L C EE F T O LA AN H N F E E L I E A L E A L N H I L D E O F Westwood Y THE River Don D K A E U A6 D H B 16 X ROA ILL AR S Y MANCHES Country Park ARLE RO E TE H W MO R O L WO R A N R E RT RT R H LA N E O CO Swinton Common N W A 1 N Junction 35a D E R D R O E M O A L DR AD O 6 L N A CL AN IV A A IN AYFIELD E OOBE E A A L L H R D A D S 67 NE LANE VI L E S CT L V D T O I H A L R R A E H YW E E I O N R E Kilnhurst A W O LI B I T D L E G G LANE A H O R D F R N O 6 R A O E N I O 2 Y Harley A 9 O Hood Hill ROAD K N E D D H W O R RTH Stocksbridge L C A O O TW R N A Plantation L WE R B O N H E U Y Wentworth A H L D H L C E L W A R E G O R L N E N A -
Future Potential for Offshore Wind in Wales Prepared for the Welsh Government
Future Potential for Offshore Wind in Wales Prepared for the Welsh Government December 2018 Acknowledgments The Carbon Trust wrote this report based on an impartial analysis of primary and secondary sources, including expert interviews. The Carbon Trust would like to thank everyone that has contributed their time and expertise during the preparation and completion of this report. Special thanks goes to: Black & Veatch Crown Estate Scotland Hartley Anderson Innogy Renewables MHI-Vestas Offshore Wind Milford Haven Port Authority National Grid Natural Resources Wales Ørsted Wind Power Port of Mostyn Prysmian PowerLink The Crown Estate Welsh Government Cover page image credits: Innogy Renewables (Gwynt-y-Môr Offshore Wind Farm). | 1 The Carbon Trust is an independent, expert partner that works with public and private section organizations around the world, helping them to accelerate the move to a sustainable, low carbon economy. We advise corporates and governments on carbon emissions reduction, improving resource efficiency, and technology innovation. We have world-leading experience in the development of low carbon energy markets, including offshore wind. The Carbon Trust has been at the forefront of the offshore wind industry globally for the past decade, working closely with governments, developers, suppliers, and innovators to reduce the cost of offshore wind energy through informing policy, supporting business decision-making, and commercialising innovative technology. Authors: Rhodri James Manager [email protected] -
Winter Outlook Report 2009/10
1st October 2009 Winter Outlook Report 2009/10 Winter Outlook Report 2009/10 Outlook for winter 2009/10 Introduction 1. This document, the final report, sets out our analysis and views for the coming winter (October 2009 to March 2010), and reflects responses received through the consultation process. Ofgem plans to hold a seminar for industry parties on 14 th October 2009 in London. The preliminary winter report and previous year final reports are published on our website at http://www.nationalgrid.com/uk/Electricity/SYS/outlook/ . Industry Feedback 2. We would like to thank the organisations that responded to the consultation. In all five responses were received, which we have reviewed and reflected in our final report. Whilst the formal consultation process has now closed, we continually seek feedback on our outlook reports to increase their usefulness to the industry and to reflect all changes in trends when they become apparent. To feedback comments on our outlook report please contact us at [email protected] . Roles and Responsibilities 3. The competitive gas and electricity markets in Great Britain have developed substantially in recent years and have successfully established separate roles and responsibilities for the various market participants. In summary, the provision of gas and electricity to meet consumer demands and contracting for capacity in networks is the responsibility of suppliers and shippers. National Grid has two main responsibilities: first, as the primary transporter, for ensuring there is adequate and reliable network capacity to meet anticipated transportation requirements; second, as system operator of the transmission networks, for the residual balancing activity in both gas and electricity. -
Swansea Bay City Region : a Renewable Energy Future Energy System Vision for 2035
Pen-y-Cymoedd wind farm photo credit Vattenfall Swansea Bay City Region : A Renewable Energy Future Energy system vision for 2035 April 2018 Report and analysis produced by Regen for the Institute of Welsh Affairs The IWA Re-energising Wales project is kindly supported by the Hodge Foundation, the Friends Provident Charitable Foundation and the Polden- Puckham Charitable Foundation. About the Institute of Welsh Affairs (IWA) The IWA is Wales’ leading independent think tank, working to make Wales better. Our role is to act as a catalyst to generate intelligent debate about Wales’ future. We are an independent charity with a broad membership base across the country. We bring people together so that ideas can collide and solutions can be forged. The Re-energising Wales project, which is being led by the IWA, is a three year programme of work that will provide evidence to supporting the project’s goals of showing how Wales could meet its future energy demands from renewable sources by 2035. This evidence will be used to support policy makers in Wales to achieve an overall objective to reduce energy-related greenhouse gas (GHG) emissions by 80% by 2035 based on 1990 emission figures . About Regen Regen is an independent not-for-profit that uses our expertise to work with industry, communities and the public sector to revolutionise the way we generate, supply and use energy. Regen passionately believes that sustainable energy has a vital role at the heart of a successful economy and thriving local communities. We are ambitious on the scale of our impact and aim to be the leading national experts in how to enable radical change in the energy system at a regional and local level. -
NORTHERN ARCHAEOLOGY TODAY YORK ARCHAEOLOGICAL TRUST MAGAZINE Issue 4
NORTHERN ARCHAEOLOGY TODAY YORK ARCHAEOLOGICAL TRUST MAGAZINE Issue 4 This issue: Arrochar Templeborough Lenton Priory Contents issue 4 November 2013 Welcome! In this issue we travel far and wide, from the majestic landscapes of Loch Long and Loch Lomond to Normandy, where the Friends of YAT investigated Norman architecture in a recent study tour. Hidden Heritage of a Landscape Vengeful Vikings and Reckless Rustlers 1 Closer to home, Trent & Peak Archaeology report on their recent work at Lenton Priory, a little-known house of the Cluniac order in Nottingham, while Lenton Priory, Nottingham 6 within York itself a small site at the former Purey Know Thy Place-Setting Cust Hospital gives us an intriguing glimpse of the Roman fortress of Eboracum and the buildings which Moralising Plates from Hungate 10 succeeded it. Purey Cust, York 15 Carrying on the Roman theme, we also hear from ArcHeritage about the re-evaluation of the fort at Templeborough Roman Fort 18 Templeborough following excavations in 2006–8. Following in the Footsteps of William 23 A Golden Oldie! Oral History update 28 Production & design: Lesley Collett Northern Archaeology Today is published twice a year: UK subscriptions £10.00 per year, Overseas subscriptions £14.00 (sterling) per year. To subscribe please send a cheque (payable to York Archaeological Trust) to: Christine Kyriacou, York Archaeological Trust, 47 Aldwark, York, YO1 7BX or telephone 01904 663000 with credit card details. Northern Archaeology Today is published by York Archaeological Trust. Editorial and contributors’ views are independent and do not necessarily reflect the official view of the Trust. Copyright of all original YAT material reserved: reproduction by prior editorial Cover picture: Walkover Survey on the isthmus between permission only. -
Templeborough to Rotherham Flood Alleviation Scheme – Resolution to Commence a Compulsory Purchase Order 4
ROTHERHAM BOROUGH COUNCIL – REPORT TO MEMBERS 1. Meeting: Cabinet Member for Economic and Development Services 2. Date: 22 January 2007 3. Title: Templeborough to Rotherham Flood Alleviation Scheme – Resolution to commence a compulsory purchase order 4. Programme Area: Economic and Development Services 5. Summary The implementation of the Templeborough to Rotherham Flood Alleviation Scheme (TRFAS) is a key project underpinning achievement of the Town Centre Renaissance Charter goals in terms of riverside uses. In order to carry out the scheme the diversion of the DOGSTAR gas main (Distribution Of Gas Stocksbridge Templeborough Aldwarke Roundwood) needs to be undertaken in the preferred alignment which is the cart track on the north side of the freight rail line at Centenary Riverside area. Despite extensive enquiries and searches, ownership of this track is uncertain and needs to be resolved in a timely manner. This report seeks a resolution to commence the procedures for the making of a Compulsory Purchase Order (“CPO”) in order to provide a wayleave for the gas main diversion for Corus, the owner of the pipe. This Resolution is a formal part of the CPO process. The purpose of this report is to inform the Cabinet Member of the progress of the TRFAS and to seek authority to pursue a CPO to facilitate the acquisition of interests and rights needed provide the preferred diversion alignment for the DOGSTAR gas main, part of the implementation of the TRFAS. 6. Recommendations 1. That approval is given to the making of a Compulsory Purchase Order pursuant to the provisions of Section 226(1)(a) of the Town and Country Planning Act 1990(“TCPA”) ( as amended by the Planning and Compulsory Purchase Act 2004) and having regard to the Human Rights Act 1998. -
The Business and Technology of the Sheffield Armaments Industry 1900
The business and technology of the Sheffield Armaments industry 1900-1930 CORKER, Chris Available from Sheffield Hallam University Research Archive (SHURA) at: http://shura.shu.ac.uk/15579/ This document is the author deposited version. You are advised to consult the publisher's version if you wish to cite from it. Published version CORKER, Chris (2016). The business and technology of the Sheffield Armaments industry 1900-1930. Doctoral, Sheffield Hallam University. Repository use policy Copyright © and Moral Rights for the papers on this site are retained by the individual authors and/or other copyright owners. Users may download and/or print one copy of any article(s) in SHURA to facilitate their private study or for non- commercial research. You may not engage in further distribution of the material or use it for any profit-making activities or any commercial gain. Sheffield Hallam University Research Archive http://shura.shu.ac.uk The Business and Technology of the Sheffield Armaments Industry 1900-1930 Christopher John Corker A thesis submitted in partial fulfilment of the requirements of Sheffield Hallam University for the degree of Doctor of Philosophy November 2016 Abstract This exploration of the Sheffield armaments industry focuses on four in-depth case studies of John Brown, Cammell-Laird, Thomas Firth and Hadfields to examine the business and technology of the industry. It builds on the work of Tweedale and Trebilcock on Sheffield and armaments, and advances the argument that during the period of study from 1900 to 1930, the city was one of the most important centres for armaments research and production anywhere in the world. -
Green Routes - November 2015 Finkle Street Old Denaby Bromley Hoober Bank
Langsett Reservoir Newhill Bow Broom Hingcliff Hill Pilley Green Tankersley Elsecar Roman Terrace Upper Midhope Upper Tankersley SWINTON Underbank Reservoir Midhopestones Green Moor Wortley Lea Brook Swinton Bridge Midhope Reservoir Hunshelf Bank Smithy Moor Green Routes - November 2015 Finkle Street Old Denaby Bromley Hoober Bank Gosling Spring Street Horner House Low Harley Barrow Midhope Moors Piccadilly Barnside Moor Wood Willows Howbrook Harley Knoll Top Cortworth Fenny Common Ings Stocksbridge Hoober Kilnhurst Thorncliffe Park Sugden Clough Spink Hall Wood Royd Wentworth Warren Hood Hill High Green Bracken Moor Howbrook Reservoir Potter Hill East Whitwell Carr Head Whitwell Moor Hollin Busk Sandhill Royd Hooton Roberts Nether Haugh ¯ River Don Calf Carr Allman Well Hill Lane End Bolsterstone Ryecroft Charltonbrook Hesley Wood Dog Kennel Pond Bitholmes Wood B Ewden Village Morley Pond Burncross CHAPELTOWN White Carr la Broomhead Reservoir More Hall Reservoir U c Thorpe Hesley Wharncliffe Chase k p Thrybergh Wigtwizzle b Scholes p Thorpe Common Greasbrough Oaken Clough Wood Seats u e Wingfield Smithy Wood r Brighthorlmlee Wharncliffe Side n Greno Wood Whitley Keppel's Column Parkgate Aldwarke Grenoside V D Redmires Wood a Kimberworth Park Smallfield l o The Wheel l Dropping Well Northfield Dalton Foldrings e n Ecclesfield y Grange Lane Dalton Parva Oughtibridge St Ann's Eastwood Ockley Bottom Oughtibridg e Kimberworth Onesacr e Thorn Hill East Dene Agden Dalton Magna Coldwell Masbrough V Bradgate East Herringthorpe Nether Hey Shiregreen -
Modified UK National Implementation Measures for Phase III of the EU Emissions Trading System
Modified UK National Implementation Measures for Phase III of the EU Emissions Trading System As submitted to the European Commission in April 2012 following the first stage of their scrutiny process This document has been issued by the Department of Energy and Climate Change, together with the Devolved Administrations for Northern Ireland, Scotland and Wales. April 2012 UK’s National Implementation Measures submission – April 2012 Modified UK National Implementation Measures for Phase III of the EU Emissions Trading System As submitted to the European Commission in April 2012 following the first stage of their scrutiny process On 12 December 2011, the UK submitted to the European Commission the UK’s National Implementation Measures (NIMs), containing the preliminary levels of free allocation of allowances to installations under Phase III of the EU Emissions Trading System (2013-2020), in accordance with Article 11 of the revised ETS Directive (2009/29/EC). In response to queries raised by the European Commission during the first stage of their assessment of the UK’s NIMs, the UK has made a small number of modifications to its NIMs. This includes the introduction of preliminary levels of free allocation for four additional installations and amendments to the preliminary free allocation levels of seven installations that were included in the original NIMs submission. The operators of the installations affected have been informed directly of these changes. The allocations are not final at this stage as the Commission’s NIMs scrutiny process is ongoing. Only when all installation-level allocations for an EU Member State have been approved will that Member State’s NIMs and the preliminary levels of allocation be accepted.