Black Spot Program

Total Page:16

File Type:pdf, Size:1020Kb

Black Spot Program LA QON 5812 Marmion 2016/17 Project Description – Black Spot Program Forrest Highway - Construct northbound acceleration lane at intersection with Old Coast Road between 76.04 and 76.84 SLK Victoria Highway remove roadside hazards and extend culverts - Kimberley Marmion Ave / Hepburn Ave - Intersection improvements extend all turning pockets and double right turns on south approach and add auxiliary thru lane South Western Highway - Construct right turn treatments and left turn tapers various intersections between 194.44 and 210.07 SLK Forrest Highway - Construct south bound acceleration lane at intersection with Paris Road between 81.80 and 82.60 SLK North West Coastal Highway-Relocate/upgrade intersection with Olsen Road - 25.62SLK Paraburdoo Tom Price Road SLK 60.3 - 67.30 - Widen and seal 1m shoulders and install AEL - Pilbara Region Coolgardie-Esperance Hwy - Overlay an correction of super elevation on curve SLK 364.60- 364.80SLK York Merredin Road Junction Rd and Ashton St Realignment & Widening Drainage Improvement Delineation & signs improvement - 66.65 - 67.15 SLK Collie Lake King Road Tincurrin Road - Widen pavement and shoulders through curve Extend culverts Improve delineation & signage Mitchell Fwy / Cedric St ramps - Intersection upgrade installation of additional lanes extend turning pockets traffic signal modifications for new layout. South Western Highway, McLeod Rd intersection-Install passing bulge on South Western Highway for west bound traffic Toodyay Road, Morangup road – Improve road geometry, street lighting and Signs & Line marking Toodyay Road, Fernie Road – Upgrade intersection to include “B” type auxiliary lanes and remove roadside hazards to improve sight distance. Marmion Ave / Whitfords Ave - Intersection improvements extend turning pockets convert existing single left turn into double left turn on signalised Whitfords Ave approach Leach Hwy, North Lake Road – Intersection upgrade, installation of additional lines, extend turning pockets. Stock road, Beeliar Road – Intersection upgrade, , installation of additional lines, extend turning pockets Rural Post Fatal Crash Safety Treatments Metropolitan Post Fatal Crash Safety Treatments South Western Highway - Install safety barrier various locations between 187.38 and 210.97 SLK 1 LA QON 5812 Marmion 2016/17 Project Description – Other Indian Ocean Drive - Construct 67Km of Seal Widening - 200-267 SLK Animal Hazard Mitigation Funding (4Year) Ocean Reef Road/Joondalup Drive - Upgrade Intersection to improve vehicle capacity and road safety. Gnangara Road - Dualling between Alexander Drive and Beechboro Road North Rail Crossing Improvements State Roads (2014/15 - 2018/19 Program) Albany Highway – Project development – Reconstruct Bridge 24 and bridge 25 Great Northern Highway-Kimberley Region-Ord River Section-Reconstruct and Seal SLK 2897-2957 Port Hedland Road Duplication - Project Development Great Northern Highway-Kimberley Region-Turkey Creek Section-Reconstruct and Seal SLK 2957-3008 Electrical & ITS Asset Type Approval and Testing North West Coastal Highway - Seal Shoulders between Overlander Roadhouse and Wooramel Roadhouse - Materials Investigations Traffic Signal Pole Top Terminal Replacement and associated rehabilitation works Great Northern Highway - Development Activities Pavement Rehabilitation and design materials investigation Pinjarra Williams Road - Greenshill Hill Section - Realign and Widen between 14.00 and 16.00 SLK Smart Transport Communications Local Trans Initiatives Program Street Lighting Single Insulated Cable Replacement South Western Highway - Cookernup - Intersection improvements - Staggered Tee at Riverdale and Logue Brook Dam Roads between 101.40 and 101.78 SLK Minilya -Exmouth Road - Floodways - Waterways and concept design Rail Crossing Improvements AusLink Network (2014/15 - 2018/19 Program) Allocation for land and fencing needs for future projects Leach Highway - Shelley Bridge - widen to 6 lanes and provide footpath. Bussell Highway - Ludlow Deviation - Dual Carriageway - Construct second carriageway 7.0m wide with 1.5m and 1.0m sealed shoulders between 31.25 and 43.67 SLK Bussell Highway - Capel to Ludlow Deviation section - Dual Carriageway - Construct second carriageway 7.0m wide with 2 LA QON 5812 Marmion 1.5m and 1.0m sealed shoulders between 26.73 and 31.25 SLK Traffic Control System Network Improvements (Includes IP Network Conversion) NBT Upgrade Equipment and Systems South Western Highway - Waroona to Harvey section - Widen to 7m with 1m sealed shoulders and construct passing lanes between 89.90 and 110.16 SLK Northam – Cranbrook Rd – Construct and primerseal 8m wide 166 to 170SLK Urban Highways - Road Use Improvements (including ITS) - South Replace Traffic Control Signal Lanterns with LED Technology Metropolitan Region - Drainage Improvements - Various Urban Highways Traffic Signal Controller Replacement Brand Highway passing lanes 00-169.20 SLK - project development Connection of Traffic Control Signals to our Fibre Optic Cable Network Pastoral Areas Hazard Mitigation Program Program funds available for Urgent Minor Works programming 3 .
Recommended publications
  • Metro Region
    Roads Under Main Roads Control - Metro Region (Indicative and Subject to Changes) Road Name (Name On Road or Main Roads Route Name Road or Route Start Terminus LG Start LG End Signs) Route_End_Terminus Airport Dr Airport Dr Tonkin Hwy Belmont To Near Searle Rd (900m) Belmont Welshpool Rd & Shepperton Albany Hwy Albany Hwy Victoria Park Chester Pass Rotary Albany Rd Albany Hwy & South Western Beeliar Dr * (North Lake Road Armadale Rd Armadale Rd Armadale Cockburn Hwy Once Bridge Is Completed) Beach St (Victoria Quay Beach St Link Queen Victoria St Fremantle Beach St Fremantle Access) Bridge St Guildford Rd North Rd Bassendean Market St Bassendean Albany Hwy 3k Nth Of Brookton Hwy Brookton Hwy Armadale Williams St Brookton Armadale Canning Hwy Canning Hwy Causeway Flyover Victoria Park Queen Victoria St (H31) Fremantle Causeway Albany Hwy Adelaide Tce Perth Shepperton Rd - Start Dual Victoria Park Charles St Wanneroo Rd Newcastle St Perth Wiluna St Vincent Rockingham Rd / Hampton Cockburn Rd Cockburn Rd Fremantle Russell Rd West Cockburn Road Sth Fremantle West Coast Hwy / Port Beach Curtin Av Walter Place Fremantle Claremont Crescent Cottesloe Rd East Pde Guildford Rd East Pde Perth Whatley Cr & Guildford Rd Perth East St Great Eastern Hwy James St Swan Great Eastern Hwy Swan Mandurah Rd & Stakehill Rd Ennis Av Melville Mandurah Hwy Patterson Rd Rockingham Rockingham West Garratt Rd Bridge Nth Garratt Rd Bridge Sth Garratt Rd Bridge Garratt Rd Bridge Bayswater Belmont Abutment Abutment Gnangara Rd Ocean Reef Upper Swan Hwy Ocean Reef &
    [Show full text]
  • Benefits to Western Australian Motorists from Taxes, Fees And
    REPORT TO RAC WA MARCH 2020 BENEFITS TO WESTERN AUSTRALIAN MOTORISTS FROM TAXES, FEES AND CHARGES ACIL ALLEN CONSULTING PTY LTD ABN 68 102 652 148 LEVEL NINE 60 COLLINS STREET MELBOURNE VIC 3000 AUSTRALIA T+61 3 8650 6000 F+61 3 9654 6363 LEVEL ONE 50 PITT STREET SYDNEY NSW 2000 AUSTRALIA T+61 2 8272 5100 F+61 2 9247 2455 LEVEL FIFTEEN 127 CREEK STREET BRISBANE QLD 4000 AUSTRALIA T+61 7 3009 8700 F+61 7 3009 8799 LEVEL SIX 54 MARCUS CLARKE STREET CANBERRA ACT 2601 AUSTRALIA T+61 2 6103 8200 F+61 2 6103 8233 LEVEL TWELVE, BGC CENTRE 28 THE ESPLANADE PERTH WA 6000 AUSTRALIA T+61 8 9449 9600 F+61 8 9322 3955 167 FLINDERS STREET ADELAIDE SA 5000 AUSTRALIA T +61 8 8122 4965 ACILALLEN.COM.AU REPORT AUTHORS JOHN NICOLAOU, EXECUTIVE DIRECTOR MARSHALL ROBERTS, ANALYST E: [email protected] E: [email protected] D: (08) 9449 9616 D: (08) 9449 9620 RELIANCE AND DISCLAIMER THE PROFESSIONAL ANALYSIS AND ADVICE IN THIS REPORT HAS BEEN PREPARED BY ACIL ALLEN CONSULTING FOR THE EXCLUSIVE USE OF THE PARTY OR PARTIES TO WHOM IT IS ADDRESSED (THE ADDRESSEE) AND FOR THE PURPOSES SPECIFIED IN IT. THIS REPORT IS SUPPLIED IN GOOD FAITH AND REFLECTS THE KNOWLEDGE, EXPERTISE AND EXPERIENCE OF THE CONSULTANTS INVOLVED. THE REPORT MUST NOT BE PUBLISHED, QUOTED OR DISSEMINATED TO ANY OTHER PARTY WITHOUT ACIL ALLEN CONSULTING’S PRIOR WRITTEN CONSENT. ACIL ALLEN CONSULTING ACCEPTS NO RESPONSIBILITY WHATSOEVER FOR ANY LOSS OCCASIONED BY ANY PERSON ACTING OR REFRAINING FROM ACTION AS A RESULT OF RELIANCE ON THE REPORT, OTHER THAN THE ADDRESSEE.
    [Show full text]
  • Perth and Peel @ 3.5 Million
    Perth and [email protected] The Transport Network March 2018 2 3 CONTENTS 1. Introduction 4 2. The transport network 6 2.1 Central sub-region 8 2.2 North-West sub-region 12 2.3 North-East sub-region 17 2.4 South Metropolitan Peel sub-region 23 2.5 Perth and Peel 2050 cycling and walking network 29 3. Implementation and monitoring 31 2 3 INTRODUCTION Today, the Perth and Peel regions stretch more As we move towards a population of 3.5 million, than 150 kilometres from Two Rocks in the north to we will require fundamental changes to the city’s 1Bouvard in the south and are home to more than transport network to service growth areas and keep two million people. It is estimated that if current trends Perth moving. sustain, that more than 3.5 million people will live in It is clear that we need to plan for a transport network Perth and Peel by 2050. that will drive urbanisation around infrastructure and In March 2018, the State Government released Perth enable high levels of accessibility for work, education and [email protected], a strategic suite of documents and other activities. A number of projects across the which present a long-term growth strategy for land Transport Portfolio will support efficient and effective use and infrastructure provision for the Perth and Peel movement of people and freight that is integrated with regions. land uses and links key economic and employment opportunities. The suite includes four detailed sub-regional land use planning and infrastructure frameworks: One of the Government’s key priorities to achieve moving people efficiently, while integrating with land 1.
    [Show full text]
  • Animal Alert
    ! Animal Alert Many of the major rural highways areunfenced due to the vast expanse of land, thereforeno barriers are A Guide to present to prevent wild or Main Roads rest areas pastoral animals wandering and roadside amenities across the road. ON MAJOR ROUTES IN WESTERN AUSTRALIA Be alert for animals on the road, particularly dusk and dawn. Watch out for warning signs on the road, different regions have different animals. Slow down and sound your horn if you encounter an animal. MWain Roads estern Australia Don Aitken Centre ,, Waterloo Crescent East Perth WA 6004 Phone138 138 | www.mainroads.wa.gov.au Please be aware that while every effort is made to ensure the currency of the information, data can be altered subsequent to original distribution and can also become quickly out- of-date. Information provided on this publication is also available on the Main Roads website. Please subscribe to the Rest Areas page for any updates. MARCH 2015 Fatigue is a silent killer on Western Australian roads. Planning ahead is crucial to managing fatigue on long A roadside stopping place is an area beside the road road trips. designed to provide a safe place for emergency stopping or special stopping (e.g. rest areas, scenic lookouts, Distances between remote towns can information bays , road train assembly areas). Entry signs indicate what type of roadside stopping place it is. Facilities be vast and in some cases conditions within each vary. can be very hot and dry with limited fuel, water and food available. 24 P Rest area 24 hour Information Parking We want you to enjoy your journey rest area but more importantly we want you to stay safe.
    [Show full text]
  • Federal Priorities for Western Australia April 2013 Keeping Western Australians on the Move
    Federal priorities for Western Australia April 2013 Keeping Western Australians on the move. Federal priorities for Western Australia Western Australia’s rapid population growth coupled with its strongly performing economy is creating significant challenges and pressures for the State and its people. Nowhere is this more obvious than on the State’s road and public transport networks. Kununurra In March 2013 the RAC released its modelling of projected growth in motor vehicle registrations which revealed that an additional one million motorised vehicles could be on Western Australia’s roads by the end of this decade. This growth, combined with significant developments in Derby and around the Perth CBD, is placing increasing strain on an already Great Northern Hwy Broome Fitzroy Crossing over-stretched transport network. Halls Creek The continued prosperity of regional Western Australia, primarily driven by the resources sector, has highlighted that the existing Wickham roads do not support the current Dampier Port Hedland or future resources, Karratha tourism and economic growth, both in terms Exmouth of road safety and Tom Price handling increased Great Northern Highway - Coral Bay traffic volumes. Parabardoo Newman Muchea and Wubin North West Coastal Highway East Bullsbrook Minilya to Barradale The RAC, as the Perth Darwin National Highway representative of Great Eastern Mitchell Freeway extension Ellenbrook more than 750,000 Carnarvon Highway: Bilgoman Tonkin Highway Grade Separations Road Mann Street members, North West Coastal Hwy Mundaring Light Rail PERTH believes that a Denham Airport Rail Link strong argument Goldfields Hwy Fremantle exists for Western Australia to receive Tonkin Highway an increased share Kalbarri Leinster Extension of Federal funding Kwinana 0 20 Rockingham Kilometres for road and public Geraldton transport projects.
    [Show full text]
  • Regional Roads Risking Lives
    Tuesday 13 October 2015 Regional roads risking lives RAC has today released its 12 month Risky Roads campaign scorecard, revealing that work still needs to be done on some of WA’s most dangerous regional roads. RAC General Manager Corporate Affairs, Will Golsby, said the scorecard looked at the progress made on the roads that were nominated by the community as the State’s riskiest roads 12 months ago. “We acknowledge and welcome the construction underway on some of the regional roads identified, but we’re extremely concerned that that work on the rest has not commenced,” Mr Golsby said. Last year, the WA community nominated 70 percent of the State’s riskiest roads to be in regional WA, including Bussell Highway in Capel, Toodyay Road from Red Hill to Toodyay, Great Eastern Highway from Coolgardie to Southern Cross, Great Northern Highway in Bindi-Bindi, Bruce Rock-Merredin Road in Merredin, South Western Highway in Manjimup, Indian Ocean Drive in Lancelin and Coalfields Highway in Collie. The 12 month scorecard reveals that Bussell Highway in Capel remains unchanged with poor road quality and a lack of overtaking opportunities, Bruce Rock-Merredin Road in Merredin needs improvement of its poor road quality and width, and Indian Ocean Drive in Lancelin is in desperate need of construction to improve the quality of its road and provide better overtaking opportunities. “These results highlight the need for the State Government to deliver more funding, but the current State Budget only confirms a reduction in spending. “This is on top of the huge backlog in road maintenance which was identified in 2009 by the Auditor General, and estimated to be $800 million.
    [Show full text]
  • BORR Southern Section EPA Updated Referral Spprtng Doc Rev2
    Bunbury Outer Ring Road Southern Section Updated Environmental Referral Supporting Document and Additional Information BORR-02-RP-EN-0014 Rev 2 October 2020 EXECUTIVE SUMMARY The Bunbury Outer Ring Road (BORR) is a planned Controlled Access Highway linking the Forrest Highway and Bussell Highway. BORR will be a high standard route for access to the Bunbury Port and facilitate proposed development to the east of the City of Bunbury. BORR provides an effective bypass of Bunbury for inter-regional traffic. The BORR Project comprises three sections: • ‘BORR Northern Section’ – Forrest Highway to Boyanup-Picton Road. • ‘BORR Central Section’ – Boyanup-Picton Road to South Western Highway, an existing four kilometre (km) section which was completed in May 2013, along with a three km extension of Willinge Drive southwards to South Western Highway. • ‘BORR Southern Section’ – South Western Highway (near Bunbury Airport) to Bussell Highway. The Commissioner of Main Roads Western Australia (Main Roads) is proposing to construct and operate the southern section of the BORR Project. Main Roads is referring the BORR Southern Section (the Proposal) to the Environmental Protection Authority (EPA) for a decision on assessment under Section 38 of the Environmental Protection Act 1986 (EP Act). The purpose of this document is to provide information to support the decision on assessment of the Proposal. The Proposal includes the construction and operation of 10.5 km of freeway standard, dual carriageway southwest of South Western Highway (south of Bunbury Airport) to Bussell Highway and a 3 km regional distributor from Bussell Highway at Centenary Road southeast to a grade separated interchange at the western end of Lilydale Road.
    [Show full text]
  • Driving in Wa • a Guide to Rest Areas
    DRIVING IN WA • A GUIDE TO REST AREAS Driving in Western Australia A guide to safe stopping places DRIVING IN WA • A GUIDE TO REST AREAS Contents Acknowledgement of Country 1 Securing your load 12 About Us 2 Give Animals a Brake 13 Travelling with pets? 13 Travel Map 2 Driving on remote and unsealed roads 14 Roadside Stopping Places 2 Unsealed Roads 14 Parking bays and rest areas 3 Litter 15 Sharing rest areas 4 Blackwater disposal 5 Useful contacts 16 Changing Places 5 Our Regions 17 Planning a Road Trip? 6 Perth Metropolitan Area 18 Basic road rules 6 Kimberley 20 Multi-lingual Signs 6 Safe overtaking 6 Pilbara 22 Oversize and Overmass Vehicles 7 Mid-West Gascoyne 24 Cyclones, fires and floods - know your risk 8 Wheatbelt 26 Fatigue 10 Goldfields Esperance 28 Manage Fatigue 10 Acknowledgement of Country The Government of Western Australia Rest Areas, Roadhouses and South West 30 Driver Reviver 11 acknowledges the traditional custodians throughout Western Australia Great Southern 32 What to do if you breakdown 11 and their continuing connection to the land, waters and community. Route Maps 34 Towing and securing your load 12 We pay our respects to all members of the Aboriginal communities and Planning to tow a caravan, camper trailer their cultures; and to Elders both past and present. or similar? 12 Disclaimer: The maps contained within this booklet provide approximate times and distances for journeys however, their accuracy cannot be guaranteed. Main Roads reserves the right to update this information at any time without notice. To the extent permitted by law, Main Roads, its employees, agents and contributors are not liable to any person or entity for any loss or damage arising from the use of this information, or in connection with, the accuracy, reliability, currency or completeness of this material.
    [Show full text]
  • SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget
    SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget South Coast Highway (Pfeiffer Road Reconstruct, widen, primer seal Completes RTTA co- $750,000 Great Southern to Cheynes Beach Section) and seal. funded project Region Total $750,000 Widen and reconstruct, seal Australind Roelands Link (Raymond Completes staged shoulders to 2.0m, install 1.0m $300,000 Road) project. central median. Widen and reconstruct, seal Pinjarra Williams Road (Dwellingup shoulders to 1.0m, install Completes staged $830,000 West) audible edge line and construct project. westbound passing lane. Staged project, Extend dual carriageway and construction in 2018/19 Bussell Highway/Fairway Drive construct roundabout at Fairway $5,800,000 with completion in Drive. 2019/20. Bussell Highway/Harewoods Road Construct roundabout. $150,000 Staged project. Widen and seal shoulders to South West South Western Highway (Harvey to 2.0m, install 1.0 central median, Region $520,000 Wokalup) improve batter slope and clear zone. South Western Highway/Vittoria Road Construct roundabout. $300,000 Staged project. Caves Road/Yallingup Beach Road Construct roundabout. $100,000 Staged project. Widen and seal shoulders to Pinjarra Williams Road (Dwellingup 1.0m, install barriers at selected $500,000 Staged project. East) locations and improve clear zone. South Western Highway (Yornup to Construct northbound passing $50,000 Staged project. Palgarup) lane. South Western Highway (Yornup to Construct southbound passing $50,000 Staged project. Palgarup) lane. Coalfields Highway/Prinsep Street Construct roundabout. $50,000 Staged project. Widen and reconstruct, seal shoulders, extend east bound Completes RTTA co- Coalfields Highway (Roelands Hill) passing lane, improve site $200,000 funded project.
    [Show full text]
  • P1368b-1370A Mr Paul Miles; Mr Dean Nalder GNANGARA ROAD
    Extract from Hansard [ASSEMBLY — Thursday, 17 March 2016] p1368b-1370a Mr Paul Miles; Mr Dean Nalder GNANGARA ROAD — REALIGNMENT Grievance MR P.T. MILES (Wanneroo — Parliamentary Secretary) [9.50 am]: My grievance is to the Minister for Transport, Hon Dean Nalder, and refers to a very similar matter raised earlier by the member for Girrawheen. It is important that we put across what has happened in this particular area. As most people in the northern suburbs know, for some time Gnangara Road has been a major distributor road to the industrial estate. In 2014, when residents were becoming alarmed at some of the traffic build-up there, we, in conjunction with the City of Wanneroo, were able to have the road reclassified. The road now is once again a local road and it comes under the jurisdiction, in that sense, of the City of Wanneroo. The big concern for the little enclave in the northern part of the suburb of Madeley—which is in the southern part of my electorate and bounds the electorates of both the member for Girrawheen and the member for Kingsley—is the realignment of Gnangara Road, which has to happen. It is one of those issues that the local authority has left on the backburner, not by choice but because it is a road that has just worked and people have just gone about their business. However, it is very clear that as more homes have been built in that area, the little enclave has tripled in size, especially with the private estate and private roads that are being built alongside.
    [Show full text]
  • 82452 JW.Rdo
    Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 WSD Item 9.1.19 H PP TONKIN HS HS HWY SU PICKERING BROOK HS ROE HS TS CANNING HILLS HS HWY MARTIN HS HS SU HS GOSNELLS 5 8 KARRAGULLEN HWY RANFORD HS P SOUTHERN 9 RIVER HS 11 BROOKTON SU 3 ROAD TS 12 H ROLEYSTONE 10 ARMADALE HWY 13 HS ROAD 4 WSD ARMADALE 7 6 FORRESTDALE HS 1 ALBANY 2 ILLAWARRA WESTERN BEDFORDALE HIGHWAY WSD THOMAS ROAD OAKFORD SOUTH WSD KARRAKUP OLDBURY SU Location of the proposed amendment to the MRS for 1161/41 - Parks and Recreation Amendment City of Armadale METROPOLITAN REGION SCHEME LEGEND Proposed: RESERVED LANDS ZONES PARKS AND RECREATION PUBLIC PURPOSES - URBAN Parks and Recreation Amendment 1161/41 DENOTED AS FOLLOWS : 1 R RESTRICTED PUBLIC ACCESS URBAN DEFERRED City of Armadale H HOSPITAL RAILWAYS HS HIGH SCHOOL CENTRAL CITY AREA TS TECHNICAL SCHOOL PORT INSTALLATIONS INDUSTRIAL CP CAR PARK U UNIVERSITY STATE FORESTS SPECIAL INDUSTRIAL CG COMMONWEALTH GOVERNMENT WATER CATCHMENTS SEC STATE ENERGY COMMISSION RURAL SU SPECIAL USES CIVIC AND CULTURAL WSD WATER AUTHORITY OF WA PRIVATE RECREATION P PRISON WATERWAYS RURAL - WATER PROTECTION ROADS : PRIMARY REGIONAL ROADS METROPOLITAN REGION SCHEME BOUNDARY OTHER REGIONAL ROADS armadaleloc.fig N 26 Mar 2009 Produced by Mapping & GeoSpatial Data Branch, Department for Planning and Infrastructure Scale 1:150 000 On behalf of the Western Australian Planning Commission, Perth WA 0 4 Base information supplied by Western Australian Land Information Authority GL248-2007-2 GEOCENTRIC
    [Show full text]
  • Memorandum of Understanding
    OCM118.1-04-12 MEMORANDUM OF UNDERSTANDING Between Peel Chamber of Commerce and Industry Incorporated And Main Roads, South West Region And Serpentine-Jarrahdale Shire With Regard to Discover Peel Project Billboards Key Principles The following principles underpin this Memorandum of Understanding: In the spirit of collaboration the two billboards owned by each of City of Mandurah, Serpentine-Jarrahdale Shire and the Shire of Murray (The Owners) located on the Forrest Highway will be maintained and used appropriately to achieve Royalties for Regions-funded Discover Peel project objectives, namely: i) to showcase the diverse regional destinations and attractions of the Peel Region; ii) to prompt and increase awareness of Peel destinations in order to entice travellers to the region’s diverse experiences; iii) to coordinate with and maximise the marketing collateral developed through the Discover Peel Project to ensure the ongoing sustainability of all marketing collateral iv) Local Government Authorities will own the billboards and be responsible for their ongoing integrity; v) the images will not become faded/tired/outdated/defaced; An annual review of billboard activity and this document will take place in January of each year. The billboards will not contain commercial advertising (promotion of regional iconic events are acceptable – to be installed a maximum of 4 weeks before the event and removed the first working day after the event has been held. The logo(s) or company name(s) of a sponsoring entity(s) or affiliation(s), shall not exceed 20% of the total area of the sign face). Amendments to this MOU will be negotiated and agreed by all parties.
    [Show full text]