LA QON 5812 Marmion

2016/17 Project Description – Black Spot Program

Forrest - Construct northbound acceleration lane at with Old Coast Road between 76.04 and 76.84 SLK remove roadside hazards and extend culverts - Kimberley Marmion Ave / Hepburn Ave - Intersection improvements extend all turning pockets and double right turns on south approach and add auxiliary thru lane - Construct right turn treatments and left turn tapers various intersections between 194.44 and 210.07 SLK - Construct south bound acceleration lane at intersection with Paris Road between 81.80 and 82.60 SLK North West Coastal Highway-Relocate/upgrade intersection with Olsen Road - 25.62SLK Paraburdoo Tom Price Road SLK 60.3 - 67.30 - Widen and seal 1m shoulders and install AEL - Region Coolgardie-Esperance Hwy - Overlay an correction of super elevation on curve SLK 364.60- 364.80SLK York Merredin Road Junction Rd and Ashton St Realignment & Widening Drainage Improvement Delineation & signs improvement - 66.65 - 67.15 SLK Collie Lake King Road Tincurrin Road - Widen pavement and shoulders through curve Extend culverts Improve delineation & signage Mitchell Fwy / Cedric St ramps - Intersection upgrade installation of additional lanes extend turning pockets traffic signal modifications for new layout. South Western Highway, McLeod Rd intersection-Install passing bulge on South Western Highway for west bound traffic , Morangup road – Improve road geometry, street lighting and Signs & Line marking Toodyay Road, Fernie Road – Upgrade intersection to include “B” type auxiliary lanes and remove roadside hazards to improve sight distance. Marmion Ave / Whitfords Ave - Intersection improvements extend turning pockets convert existing single left turn into double left turn on signalised Whitfords Ave approach Leach Hwy, North Lake Road – Intersection upgrade, installation of additional lines, extend turning pockets. , Beeliar Road – Intersection upgrade, , installation of additional lines, extend turning pockets Rural Post Fatal Crash Safety Treatments Metropolitan Post Fatal Crash Safety Treatments South Western Highway - Install safety barrier various locations between 187.38 and 210.97 SLK

1

LA QON 5812 Marmion

2016/17 Project Description – Other

Indian Ocean Drive - Construct 67Km of Seal Widening - 200-267 SLK Animal Hazard Mitigation Funding (4Year) / Drive - Upgrade Intersection to improve vehicle capacity and road safety. - Dualling between and North Rail Crossing Improvements State Roads (2014/15 - 2018/19 Program) – Project development – Reconstruct Bridge 24 and bridge 25 -Kimberley Region-Ord River Section-Reconstruct and Seal SLK 2897-2957 Port Hedland Road Duplication - Project Development Great Northern Highway-Kimberley Region-Turkey Creek Section-Reconstruct and Seal SLK 2957-3008 Electrical & ITS Asset Type Approval and Testing North West Coastal Highway - Seal Shoulders between Overlander Roadhouse and Wooramel Roadhouse - Materials Investigations Traffic Signal Pole Top Terminal Replacement and associated rehabilitation works Great Northern Highway - Development Activities Pavement Rehabilitation and design materials investigation Pinjarra Williams Road - Greenshill Hill Section - Realign and Widen between 14.00 and 16.00 SLK Smart Transport Communications Local Trans Initiatives Program Street Lighting Single Insulated Cable Replacement South Western Highway - Cookernup - Intersection improvements - Staggered Tee at Riverdale and Logue Brook Dam Roads between 101.40 and 101.78 SLK Minilya -Exmouth Road - Floodways - Waterways and concept design Rail Crossing Improvements AusLink Network (2014/15 - 2018/19 Program) Allocation for land and fencing needs for future projects - Shelley Bridge - widen to 6 lanes and provide footpath. - Ludlow Deviation - - Construct second carriageway 7.0m wide with 1.5m and 1.0m sealed shoulders between 31.25 and 43.67 SLK Bussell Highway - Capel to Ludlow Deviation section - Dual Carriageway - Construct second carriageway 7.0m wide with

2

LA QON 5812 Marmion

1.5m and 1.0m sealed shoulders between 26.73 and 31.25 SLK Traffic Control System Network Improvements (Includes IP Network Conversion) NBT Upgrade Equipment and Systems South Western Highway - Waroona to Harvey section - Widen to 7m with 1m sealed shoulders and construct passing lanes between 89.90 and 110.16 SLK Northam – Cranbrook Rd – Construct and primerseal 8m wide 166 to 170SLK Urban Highways - Road Use Improvements (including ITS) - South Replace Traffic Control Signal Lanterns with LED Technology Metropolitan Region - Drainage Improvements - Various Urban Highways Traffic Signal Controller Replacement passing lanes 00-169.20 SLK - project development Connection of Traffic Control Signals to our Fibre Optic Cable Network Pastoral Areas Hazard Mitigation Program Program funds available for Urgent Minor Works programming

3