<<

Strategic Intermodal System Long Range Cost Feasible Plan FY 2029-2045

2018 EDITION PRESENT DAY COSTS DISTRICTDISTRICT 11 STRATEGIC INTERMODAL SYSTEM • Long Range Cost Feasible Plan • FY 2029-2045

Design Right of Way / Construction P3 Funds Other Funds IMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 33793331 USI-4 27 PalmWest Beachof US 27/ Hendry / SR 25 County Line SRPolk 80 / Osceola County Line 2,5000 18,0000 20,5000 16,99951,686 347,08030,480 398,7660 0 MGLANEFRTCAP 33803330 USI-4 27 GladesWest of / SRHighlands 570 / Polk County Parkway Line (West) SRWest 70 of US 27 / SR 25 3,0000 18,00099,360 21,00099,360 249,6805,444 1,656,00030,244 1,905,6800 0 MGLANEA2-6 3333 I-75 Collier/Lee County Line SR 78 0 136,800 136,800 271,300 1,710,000 271,300 0 MGLANE 33813333 USI-75 27 SouthCollier/Lee of Skipper County Rd. Line USSR 7898 1,2500 136,8001,500 136,8002,750 271,300954 1,710,0005,297 271,3000 0 MGLANEA2-6 3334 I-75 at North Jones Loop Rd 0 6,500 6,500 7,166 39,809 0 0 M-INCH 333533833334 I-75US 98 / US 441 at18th NorthUS Terrace 17/SR Jones 35 Loop Rd 38th Ave. 1,5000 7,5002,5006,500 7,5004,0006,500 15,4322,5007,166 85,73239,8096,204 0 0 M-INCHA2-4 33363335 FundedI-75 CFP Totals at CRUS 776/Harbor17/SR 35 View 0 6,5007,500 814,0806,5007,500 15,4327,166 39,80985,732 4,245,1390 Total CFP Funds=0 5,059,219M-INCH 33373336 I-75 at CR 776/Harbor769/Kings Highway View 0 6,500 6,500 7,166 39,809 0 0 M-INCH 33393337 I-75 Northat CR 769/Kings of University Highway Parkway CR 6 / Moccasin Wallow Rd. 0 60,4806,500 60,4806,500 175,2407,166 1,008,00039,809 1,183,2400 0 MGLANEM-INCH 33393338 I-75 NorthSouth of RiverUniversity Road Parkway CRSR 6816 / Moccasin Wallow Rd. 0 60,48034,200 60,48034,200 175,24064,538 1,008,000570,000 1,183,24064,538 0 MGLANE 33383463 I-75 SouthSR 681 of River Road SRNorth 681 of University Parkway 0 34,20049,014 34,20049,014 152,34164,538 570,000491,761 152,34164,538 0 MGLANE 34633332 I-75 SREast 681 of SR 951 NorthCollier of/ Lee University County ParkwayLine 0 49,01463,245 49,01463,245 152,341145,427 1,250,398491,761 152,341145,427 0 MGLANE 33321379 I-75SR 29 EastI-75 of SR 951 CollierOil Well / RdLee County Line 0 63,2454,333 63,2454,333 145,4275,200 1,250,39828,889 145,4270 0 MGLANEA2-4 3341 SR 29 Oil Well Rd. / CR 658 Sunniland Nursery Rd. 0 0 4,548 26,627 A2-4 1379 SR 29 I-75 Oil Well Rd 0 4,333 4,3330 5,200 28,889 4,5480 0 A2-4 3342 SR 29 Sunniland Nursery Rd. South of Agriculture Way 0 0 0 2,378 14,206 2,378 0 A2-4 3341 SR 29 Oil Well Rd. / CR 658 Sunniland Nursery Rd. 0 0 0 4,548 26,627 4,548 0 A2-4 3343 SR 29 South of Agriculture Way CR 846 0 0 0 5,628 20,543 5,628 0 A2-4 33463342 SR 29 FSunniland Rd Nursery Rd. NorthSouth of AgricultureCowbay Way Way 0 0 0 2,3780 47,89914,206 47,8992,378 0 A2-4 33483343 SR 3129 SRSouth 80 of Agriculture Way SRCR 78846 0 9,3500 9,3500 8,9145,628 20,5437,113 5,6280 0 A2-4 33493346 SR 3129 SRF Rd 78 CRNorth 78/River of Cowbay Rd Way 0 9560 9560 4,1910 47,8996,376 10,56747,899 0 A2-4 33503348 SR 31 CRSR 8078/River Rd CookSR 78 Brown Rd 0 3,0499,350 3,0499,350 10,6108,914 20,3247,113 30,9340 0 A2-4 33493354 SR 3160 SREast 78 of CR 630 CRPolk 78/River / Osceola Rd County Line 0 9560 9560 4,1917,830 35,0416,376 10,5677,830 0 A2-4 33503352 SR 3160 CRHillsborough 78/River Rd / Polk County Line CookCR 555 Brown / Agricola Rd Rd. 2,5000 19,5003,049 22,0003,049 10,61010,646 20,32459,146 30,9340 0 A2-4A2-6 33543353 SR 60 EastSR 60A of CR/ Van 630 Fleet Dr. PolkSR 25 / /Osceola US 27 County Line 3,0000 21,0000 24,0000 11,5687,830 35,04164,265 7,8300 0 A2-4A2-6 33523359 SR 6064 HillsboroughHardee / Highlands / Polk County Line CRUS 55527 / Agricola Rd. 2,5001,600 19,5004,500 22,0006,100 10,6462,803 59,14615,570 0 0 A2-6A2-4 3357 SR 64 US 17 SR 636 2,000 10,250 3,722 20,677 A2-4 3353 SR 60 SR 60A / Van Fleet Dr. SR 25 / US 27 3,000 21,000 24,00012,250 11,568 64,265 0 0 A2-6 3358 SR 64 Old Town Creek Rd. / CR 671 / Parnell Rd. Hardee / Highlands County Line 1,750 5,000 6,750 1,943 10,797 0 0 A2-4 3359 SR 64 Hardee / Highlands County Line US 27 1,600 4,500 6,100 2,803 15,570 0 0 A2-4 3367 SR 70 NW 38th Terrace US 98 1,200 1,700 2,900 3,061 8,713 0 0 A2-4 33633357 SR 7064 JeffersonUS 17 Avenue USSR 63627 2,0000 10,2502,879 12,2502,879 3,1163,722 19,19020,677 0 0 A2-4 33643358 SR 7064 USOld 27 Town Creek Rd. / CR 671 / Parnell Rd. CRHardee 29 / Highlands County Line 1,7500 2,4565,000 2,4566,750 3,0701,943 16,37110,797 0 0 A2-4 33653367 SR 70 CRNW 29 38th Terrace LonesomeUS 98 Island Road 1,2000 1,0831,700 1,0832,900 1,2993,061 7,2178,713 0 0 A2-4 33623363 SR 70 EastJefferson of SR Avenue 31 JeffersonUS 27 Avenue 3,5000 39,0002,879 42,5002,879 16,3363,116 196,86819,190 0 0 A2-4 33643361 SR 70 USManatee 27 County Line CRWest 29 of Peace River (American Legion Rd) 2,5000 18,5002,456 21,0002,456 14,6033,070 16,37192,893 0 0 A2-4 33653360 SR 70 CR 29675 LonesomeDeSoto County Island Line Road 3,0000 26,0001,083 29,0001,083 37,8061,299 130,8767,217 0 0 A2-4 33623366 SR 70 EastLonesome of SR 31Island Road JeffersonNW 38th TerraceAvenue 3,5004,000 39,00035,000 42,50039,000 16,33612,069 196,86867,050 0 0 A2-4 33613369 SR 70710 ManateeSherman WoodsCounty RanchLine WestOkeechobee of Peace / MartinRiver (American County Line Legion Rd) 2,5000 18,5000 21,0000 14,6037,399 92,89335,876 7,3990 0 A2-4 3370 SR 80 SR 31 / Arcadia Rd. Buckingham Rd. 1,500 4,500 6,000 2,057 11,429 0 0 A2-6 3360 SR 70 CR 675 DeSoto County Line 3,000 26,000 29,000 37,806 130,876 0 0 A2-4 3371 SR 82 SR 739 / Fowler Ave. Michigan Link Ave. 2,500 4,500 7,000 12,095 12,224 0 0 HWYCAP 3366 SR 70 Lonesome Island Road NW 38th Terrace 4,000 35,000 12,069 67,050 A2-4 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 39,0002,189 2,627 14,594 0 0 A2-6 33723369 SR 82710 MichiganSherman WoodsLink Ave. Ranch GatewayOkeechobee Blvd / Martin County Line 3,0000 9,0000 12,0000 4,6987,399 26,09935,876 7,3990 0 HWYCAPA2-4 33743370 USSR 8017 PalmettoSR 31 / Arcadia St. Rd. SRBuckingham 70 / Hickory Rd. St. 1,500750 4,500674 1,4246,000 2,057294 11,4291,634 0 0 HWYCAPA2-6 33753371 USSR 8217 SR 70739 / /Hickory Fowler St.Ave. SRMichigan 35 / DeSoto Link Ave. Ave. 2,500750 1,9654,500 2,7157,000 12,095858 12,2244,768 0 0 HWYCAP 3373969DISTRICTUSSR 8217 1 CopleyAlabama Drive Road NHomestead of CR 74 (Bermont Blvd. Rd) 1,0450 2,0002,189 2,1893,045 1,5412,627 14,5948,603 0 0 A2-6 33723376 SRUS 8217 MichiganMann Rd. Link Ave. GatewayMain St. Blvd 3,0001,250 9,0002,500 12,0003,750 4,6981,238 26,0996,875 0 0 HWYCAPA2-6 33743377 US 17 PalmettoMain St. St. SR 7060A / /Hickory Auto Zone St. Ln 1,000750 3,000674 4,000 294417 1,6342,316 0 0 HWYCAPA2-6 Design 1,424 Right of Way / Construction 0 P3 Funds Other Funds0 IMPRV 33753378ID US 1917 FACILITY SRI-275 70 Ramp/ Hickory St. FROM SRSkyway 35 / DeSotoBr. Hillsborough Ave. TO County Line 3,500750 1,9654,182 7,682 2,302858 12,7874,768 0 0 HWYCAPTYPEA2-6 PDE PE TOTAL2,715 ROW CON TOTAL 0 COST Begin Yr #Yrs TOTAL 0 3382969 US 2717 CopleyNorth of Drive Kokomo Rd. NPolk of CR/ Lake 74 (BermontCounty Line Rd) 1,0450 16,3202,000 16,3203,045 1,5416,664 108,7988,603 6,6640 0 HWYCAPA2-6 3379 US 27 Palm Beach / Hendry County Line SR 80 2,500 18,000 20,500 16,999 30,480 0 0 FRTCAP 33803376LEGENDUS 2717 GladesMann Rd. /NOTES Highlands County Line SRMain 70 St. 3,0001,250 18,000IMPROVEMENT2,500 21,0003,750 TYPES 5,4441,238 30,2446,875 0 0 A2-6 ACCESS: Access M-INCH: Modify Interchange 33813377 US 2717 SouthMain(1) St. of All Skipper values inRd. thousands of Present Day DollarsUSSR 60A98 (2017). / Auto Zone Ln 1,2501,000 1,5003,000 2,7504,000 954417 5,2972,316 0 0 A2-6 BRIDGE: Bridge N-INCH: New Interchange (2) All phase costs shown as supplied by each District. A1-3: Add 1 Lane to Build 3 33833378FY 2028/2029US 9819 -/ 2034/2035 US 441 18thI-275 TerraceRamp 38thSkyway Ave. Br. Hillsborough County Line 1,5003,500 2,5004,182 4,0007,682 2,5002,302 FRTCAP:12,7876,204 Freight Capacity0 NR: New Road 0 A2-4A2-6 (3) CON includes both Construction (CON52) and Construction Support (CEI). A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. 3382FY 2035/2036FundedUS 27 - 2039/2040 CFP Totals North(4) of ROW Kokomo includes Rd. both Right-of-Way Acquisition/MitigationPolk / Lake County (ROW43/45) Line and Right-of-Way Support. 0 16,320A2-6: Add 2 814,080Lanes16,320 to Build 6 6,664 108,798 4,245,1396,664 Total CFP Funds=0 5,059,219HWYCAP HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. A2-8: Add 2 Lanes to Build 8 FY 2040/2041 - 2044/2045 PTERM: Passenger Terminal System LEGEND (6) NOTESRevenue forecast provides separate values for PDE and PE than for ROW and CON. IMPROVEMENTA4-12: Add 4 Lanes to TYPESBuild 12 A1-AUX: Add 1 Auxilliary Lane ITS: Intelligent Transp. Sys STUDY: Study Mega Projects Phased Over Time (7) Other Funds - assumed to be toll revenue or partner funded. ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). A4-SUL: Add 4 Special Use Lanes MGLANE: Managed Lanes UP: Ultimate Plan BRIDGE: Bridge N-INCH: New Interchange (2) All phase costs shown as supplied by each District. A1-3: Add 1 Lane to Build 3 FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). A2-4: Add 2 Lanes to Build 4 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. 2018FY 2035/2036 Edition - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45)State and of Right-of-Way Department Support. of TransportationA2-6: Add 2 Lanes to Build 6 Page 1 A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. A2-8: Add 2 Lanes to Build 8 FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study Mega Projects Phased Over Time (7) Other Funds - assumed to be toll revenue or partner funded. A1-AUX: Add 1 Auxilliary Lane A4-SUL:A1-AUX: AddAdd 41 SpecialAuxilliary Use Lane Lanes MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 21

LEGEND NOTES IMPROVEMENT TYPES ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange (2) All phase costs shown as supplied by each District. A1-3: Add 1 Lane to Build 3 FY 2028/2029 - 2034/2035 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. A2-8: Add 2 Lanes to Build 8 FY 2040/2041 - 2044/2045 PTERM: Passenger Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study Mega Projects Phased Over Time (7) Other Funds - assumed to be toll revenue or partner funded. A1-AUX: Add 1 Auxilliary Lane A4-SUL: Add 4 Special Use Lanes MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 2 DISTRICT 1 Strategic Intermodal System

Design Right of Way / Construction 2045 COP3 SFundsT FEASIOtherBLE Funds PLANIMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 3331 I-4 West of US 27 / SR 25 Polk / Osceola County Line 0 0 0 51,686 347,080 398,766 0 MGLANE 3377 3331 3330 I-4 West of SR 570 / Polk Parkway (West) West of US 27 / SR 25 0 99,360 99,360 249,680 1,656,000 1,905,680 DDistrictistrict 1 0 MGLANE ¨¦§4 3333 I-75 3352 Collier/Lee County Line SR 78 0 136,800 136,8003382 271,300 1,710,000 271,300 0 MGLANE 3334 I-75 at North Jones Loop Rd 0 6,500 6,500 7,166 39,809 0 0 M-INCH 3335 I-75 3357 at US 17/SR 35 0 7,500 7,5003330 15,432 85,732 0 0 M-INCH 3336 I-75 at CR 776/Harbor View POLK 0 6,500 6,500 7,166 39,809 0 0 M-INCH 3362 3353 3337 I-75 at CR 769/Kings Highway 0 6,500 6,500 7,166 39,809 F0 Y 2028/2029 - FY 2044/0204M-INCH5 3339 I-75 North of University Parkway CR 6 / Moccasin Wallow Rd. 0 60,480 175,240 1,008,000 MGLANE 3360 (!60 60,4803376 1,183,240 0 3338 I-75 South of River Road SR 681 0 34,200 34,200 64,538 570,000 64,538LEGEND 0 MGLANE 3463 I-75 3378 SR 681 North of University Parkway 0 49,014 49,0143354 152,341 491,761 152,341 0 MGLANE 3332 I-75 East of SR 951 Collier / Lee County Line 0 63,245 63,245 145,427 1,250,398 145,427 0 MGLANE 3339 3359 Bridge, Interchange, Intersection Improvements 1379 SR 29 I-75 Oil Well Rd£17 0 4,333 4,333 5,200 28,889 0 0 A2-4 ¤ (Project with highest phase funded) 3341 SR 29 Oil Well Rd. / CR 658 Sunniland Nursery Rd. 0 0 4,548 26,627 A2-4 3361 33508 4,548 (! 0 3342 SR 29 Sunniland Nursery Rd. South of Agriculture Way 0 0 0 2,378 14,206 2,378 Construction & Mega Projects (CON) 0 A2-4 3375 3343 SR 29 South of Agriculture Way CR 846 0 0 33801 5,628 20,543 5,628 (! Right of Way (ROW) 0 A2-4 MANATEE HIGHLANDS 3346 SR 29 F Rd North of Cowbay Way OKEECHOBEE0 0 0 0 47,899 47,899 0 A2-4 3374 (! Preliminary Engineering (PE) 3348 SR 31 SR 80 SR 78 0 9,350 9,3503363 8,914 7,113 0 0 A2-4 HARDEE (! Project Development and Environmental (PDE) 3349 SR 31 3463 SR 78 CR 78/River Rd 0 956 3956364 4,191 6,376 10,567 0 A2-4 3350 SR 31 CR 78/River Rd Cook Brown Rd 0 3,049 3,049 10,610 20,324 30,934 0 A2-4 3338 PO70 3354 SR 60 East of CR 630 Polk / Osceola County Line ¤£27 0 0 33605 7,830 35,041 7,830Add Lanes, New Roads, etc. Improvemen0ts A2-4 DESOTO 3352 SR 60 3337 Hillsborough / Polk County Line CR 555 / Agricola Rd. 2,500 19,500 22,000 10,646 59,146 (Pro0ject with highest phase funded) 0 A2-6 3353 SR 60 SR 60A / Van Fleet Dr.75 SR 25 / US 27 3,000 21,000 3367 11,568 64,265 A2-6 ¨¦§ 24,000 0 Construction & Mega Projects (CON) 0 3359 SR 64 3336 Hardee / Highlands County LineSARASOTA US 27 1,600 4,500 2,803 15,570 A2-4 6,1003369 0 0 3357 SR 64 US 17 SR 636 2,000 10,250 12,250 3,722 20,677 0 Right of Way (ROW) 0 A2-4 969 3358 SR 64 Old Town Creek Rd. / CR 671 / Parnell Rd. Hardee / Highlands County Line 1,750 5,000 6,7503383 1,943 10,797 0 Preliminary Engineering (PE) 0 A2-4 ! GLADES 3367 SR 70 NW 38th Terrace (US 98 1,200 1,700 2,900 3,061 8,713 0 0 A2-4 3335 !( Project Development and Environmental (PDE) 3363 SR 70 Jefferson Avenue !(US 27 0 2,879 2,8793366 3,116 19,190 0 0 A2-4 3364 SR 70 3334 US 27 CR 29CHARLOTTE 0 2,456 2,456 3,070 16,371 0 0 A2-4 !( 3380 3365 SR 70 CR 29 Lonesome Island Road 0 1,083 1,083 1,299 7,217 0 Green Band - FY 2028/2029 to FY 20340/2035 A2-4 3350 29 1234 3362 SR 70 East of SR 31 Jefferson Avenue PO 3,500 39,000 42,500 16,336 196,868 0 0 A2-4 3379 Yellow Band - FY 2035/2036 to FY 2039/2040 3361 SR 70 3349 Manatee County Line West of Peace River (American Legion Rd) 2,500 18,500 21,000 14,603 92,893 10234 0 A2-4 3346 3360 SR 70 CR 675 DeSoto County LinePO80 3,000 26,000 29,000 37,806 130,876 10234 Blue Band - FY 2040/2041 to FY 2044/02045 A2-4 3366 SR 70 3348 Lonesome Island Road NW 38th Terrace 4,000 35,000 39,000 12,069 67,050 0 0 A2-4 3343 Mega Projects Phased Over Time 3369 SR 710 Sherman Woods Ranch Okeechobee / Martin County Line HENDRY 0 0 0 7,399 35,876 7,3991234 0 A2-4 3370 LEE 3370 SR 80 SR 31 / Arcadia Rd. Buckingham Rd. 1,500 4,500 6,0003342 2,057 11,429 0 0 A2-6 3371 SR 82 3371 SR 739 / Fowler Ave. Michigan Link Ave. PO82 2,500 4,500 7,000 12,095 12,224 0 #!$" Interstate Highway 0 HWYCAP 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 2,1893341 2,627 14,594 0 0 A2-6 (/ U.S. Highway 3372 SR 82 3372 Michigan Link Ave. Gateway Blvd 3,000 9,000 12,000 4,698 26,099 0 0 HWYCAP 1379 3374 US 17 3373 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0  State Highway 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. 750 1,965 2,715 858 4,768 0 0 HWYCAP 969 US 17 3333 Copley Drive N of CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 8,603 0 Toll Roads 0 A2-6 3376 US 17 Mann Rd. Main St. 1,250 2,500 3,750 1,238 6,875 0 0 A2-6 3332 3377 US 17 Main St. SR 60A / Auto Zone Ln ¨¦§75 1,000 3,000 4,000 417 2,316 0 0 A2-6 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 Existing Conditions for SIS Highw0ays A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 SIS Highways 0 HWYCAP COLLIER Other State roads LEGEND NOTES IMPROVEMENT TYPES ACCESS: Access PlaM-INCH:nned Add Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange (2) All phase costs shown as supplied by each District. FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation 20 10 PDE: Project0 Dev. Env. 20 FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger® Terminal SystemMiles (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study (7) Other Funds - assumed to be toll revenue or partner funded. Document Path: \\COdata\shares\CO\ISD\OTPP\Planning\SIS\ProjRecurring\Cfp\2018\MXD\SISCFP_D1.mxd Mega Projects Phased Over Time A1-AUX: Add 1 Auxilliary Lane MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 31 DISTRICTDISTRICT 221 STRATEGIC INTERMODAL SYSTEM • Long Range Cost Feasible Plan • FY 2029-2045

Design Right of Way / Construction P3 Funds Other Funds IMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 3331965 I-10I-4 WWest of SR-121of US 27 / SR 25 NassauPolk / Osceola C/L County Line 0 4,2500 4,2500 51,686921 347,08091,934 398,76692,855 0 MGLANE 3330950 I-10I-4 US-301West of SR 570 / Polk Parkway (West) SRWest 23-Cecil of US Commerce27 / SR 25 Ctr Pkwy 0 10,25099,360 10,25099,360 249,6800 1,656,000149,061 1,905,680149,061 0 MGLANE 33033333 I-10I-75 SR-23Collier/Lee County Line I-295SR 78 0 136,80021,250 136,80021,250 271,3003,950 1,710,000242,067 246,017271,300 0 MGLANE 3334948 I-10I-75 Duvalat North C/L Jones Loop Rd US-301 0 6,5000 6,5000 3,5887,166 61,05639,809 64,6440 0 MGLANEM-INCH 3335947 I-10I-75 Bakerat US 17/SRC/L 35 Duval C/L 0 7,500860 7,500860 15,4322,900 14,84985,732 17,7490 0 MGLANEM-INCH 3336946 I-10I-75 Wat CRof CR-125776/Harbor View W of SR-121 0 5,0506,500 5,0506,500 5,3917,166 59,74139,809 65,1320 0 MGLANEM-INCH 33093337 I-10I-75 at SR-121CR 769/Kings Highway 0 5,0006,500 5,0006,500 5,0007,166 14,20639,809 19,2060 0 M-INCH 11673339 I-295I-75 NNorth of Commonwealth of University Parkway NCR of 6 New/ Moccasin Kings Rd Wallow Rd. 0 60,4803,450 60,4803,450 175,2402,699 1,008,00061,240 1,183,24063,939 0 MGLANE 32613338 I-295I-75 I-95South of River Road SouthsideSR 681 Connector/SR-113 0 126,78134,200 126,78134,200 64,5380 1,458,740570,000 64,5380 0 MGLANE 11693463 I-295I-75 NSR of 681 Collins Rd Interchange NNorth of Commonwealth of University Parkway 7500 49,0143,765 49,0144,515 152,34116,204 271,507491,761 287,711152,341 0 MGLANE 11683332 I-295I-75 NEast of ofNew SR Kings951 Rd SCollier of I-95 / LeeN Interchange County Line 0 16,53863,245 16,53863,245 145,4273,785 1,250,398181,464 185,249145,427 0 MGLANE 11541379 I-75SR 29 atI-75 SR-121 (Williston Rd) Oil Well Rd 0 4,3330 4,3330 8,1365,200 28,8899,925 18,0610 0 M-INCHA2-4 33013341 I-75SR 29 SR-222Oil Well (NW Rd. /39th CR 658 Ave) US-441Sunniland (Alachua) Nursery Rd. 1,5150 13,1590 14,6740 5,3654,548 311,26526,627 5,3654,548 0 MGLANEA2-4 34193342 I-75SR 29 NSunniland of US-90 Nursery Rd. NSouth of I-10 of AgricultureInterchange Way 1,5150 15,5230 17,0380 2,3780 218,05414,206 2,3780 0 MGLANEA2-4 34183343 I-75SR 29 SR-121South of (Williston Agriculture Rd) Way SR-222CR 846 (NW 39th Ave) 0 33,0960 33,0960 5,7895,628 448,26520,543 454,0545,628 0 MGLANEA2-4 33123346 I-75SR 29 USF Rd 441 (Alachua) US-41/US-441North of Cowbay Ellisville Way 1,5150 17,9360 19,4510 1,8560 500,50747,899 47,8991,856 0 MGLANEA2-4 33053348 I-75SR 31 Marion/AlachuaSR 80 County Line SR-121/WillistonSR 78 Rd 0 21,2539,350 21,2539,350 5,2788,914 253,7937,113 259,0710 0 MGLANEA2-4 33143349 I-75SR 31 US-41/US-441SR 78 (Ellisville) NCR of 78/River US-90 Rd 1,5150 36,690956 38,205956 12,0554,191 515,3846,376 12,05510,567 0 MGLANEA2-4 33083350 I-95SR 31 SCR of 78/River Duval Co Rd Line SR-202Cook Brown (JT Butler Rd Blvd) 0 3,0490 3,0490 11,60210,610 455,10820,324 466,71030,934 0 MGLANEA2-4 33113354 I-95SR 60 I-10East of CR 630 SPolk of SR-115/ Osceola (MLK) County Line 0 12,1840 12,1840 7,8300 137,07335,041 137,0737,830 0 A4-12A2-4 33103352 I-95SR 60 atHillsborough SR-16 / Polk County Line CR 555 / Agricola Rd. 2,5000 19,500750 22,000750 10,6460 59,1467,776 7,7760 0 M-INCHA2-6 34453353 I-95SR 60 NSR of 60A SR-115 / Van (MLK) Fleet Dr. SSR of 25 SR-105 / US 27 1,5153,000 20,93721,000 22,45224,000 11,5680 294,20664,265 0 0 MGLANEA2-6 3359911 SR 2664 GilchristHardee / C/L- Highlands CR-337 County Line CR-26A-NewberryUS 27 Lane 1,6000 4,5000 6,1000 2,8030 19,98215,570 19,9820 0 A2-4 33023357 USSR 6417 CollinsUS 17 Rd NASSR 636 Birmingham Gate 2,0000 10,2501,125 12,2501,125 1,2503,722 19,00920,677 20,2590 0 A1-AUXA2-4 3358 FundedSR 64 CFP Totals Old Town Creek Rd. / CR 671 / Parnell Rd. Hardee / Highlands County Line 1,750 5,000 378,1726,750 1,943 10,797 2,593,8250 Total CFP Funds=0 2,971,997A2-4 3367 SR 70 NW 38th Terrace US 98 1,200 1,700 2,900 3,061 8,713 0 0 A2-4 3363 SR 70 Jefferson Avenue US 27 0 2,879 2,879 3,116 19,190 0 0 A2-4 3364 SR 70 US 27 CR 29 0 2,456 2,456 3,070 16,371 0 0 A2-4 3365 SR 70 CR 29 Lonesome Island Road 0 1,083 1,083 1,299 7,217 0 0 A2-4 3362 SR 70 East of SR 31 Jefferson Avenue 3,500 39,000 42,500 16,336 196,868 0 0 A2-4 3361 SR 70 Manatee County Line West of Peace River (American Legion Rd) 2,500 18,500 21,000 14,603 92,893 0 0 A2-4 3360 SR 70 CR 675 DeSoto County Line 3,000 26,000 29,000 37,806 130,876 0 0 A2-4 3366 SR 70 Lonesome Island Road NW 38th Terrace 4,000 35,000 39,000 12,069 67,050 0 0 A2-4 3369 SR 710 Sherman Woods Ranch Okeechobee / Martin County Line 0 0 0 7,399 35,876 7,399 0 A2-4 3370 SR 80 SR 31 / Arcadia Rd. Buckingham Rd. 1,500 4,500 6,000 2,057 11,429 0 0 A2-6 3371 SR 82 SR 739 / Fowler Ave. Michigan Link Ave. 2,500 4,500 7,000 12,095 12,224 0 0 HWYCAP 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 2,189 2,627 14,594 0 0 A2-6 3372 SR 82 Michigan Link Ave. Gateway Blvd 3,000 9,000 12,000 4,698 26,099 0 0 HWYCAP 3374 US 17 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. 750 1,965 2,715 858 4,768 0 0 HWYCAP 969 US 17 Copley Drive N of CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 8,603 0 0 A2-6 3376 US 17 Mann Rd. Main St. 1,250 2,500 3,750 1,238 6,875 0 0 A2-6 3377 US 17 Main St. SR 60A / Auto Zone Ln 1,000 3,000 4,000 417 2,316 0 0 A2-6 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 0 HWYCAP

LEGEND NOTES IMPROVEMENT TYPES ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange FY 2028/2029 - 2034/2035 (2) All phase costs shown as supplied by each District. A1-3: Add 1 Lane to Build 3 FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). A2-4: Add 2 Lanes to Build 4 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. A2-8: Add 2 Lanes to Build 8 FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study Mega Projects Phased Over Time (7) Other Funds - assumed to be toll revenue or partner funded. A1-AUX: Add 1 Auxilliary Lane A4-SUL:A1-AUX: AddAdd 41 SpecialAuxilliary Use Lane Lanes MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 431 DISTRICT 1 Strategic Intermodal System

Design Right of Way / Construction 2045 COP3 SFundsT FEASIOtherBLE Funds PLANIMPRV ID FACILITY FROM TO TYPE 3309 946 965 947 948 950 3303 1167 1168 PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 3331 I-4 West of US 27 / SR 25 Polk / Osceola County Line 0 0 0 51,686 347,080 398,766 0 MGLANE 3330 I-4 West of SR 570 / Polk Parkway (West) West of US 27 / SR 25 0 99,360 99,360 249,680 1,656,000 1,905,680 DDistrictistrict 2 0 MGLANE 3333 I-75 Collier/Lee County Line SR 78 0 136,800 136,800 271,300 1,710,000 271,300 0 MGLANE 3334 I-75 at North Jones Loop Rd 0 6,500 6,500 7,166 39,809 0 0 M-INCH 3335 I-75 at US 17/SR 35 0 7,500 7,500 15,432 85,732 0 0 M-INCH ¤£1 3336 I-75 at CR 776/Harbor View 0 6,500 6,500 7,166 39,809 0 0 M-INCH Nassau ¨¦§95 3337 I-75 at CR 769/Kings Highway 0 6,500 6,500 7,166 39,809 F0 Y 2028/2029 - FY 2044/0204M-INCH5 3339 I-75 North of University Parkway CR 6 / Moccasin Wallow Rd. 0 60,480 60,480«¬A1A 175,240 1,008,0003261 1,183,240 0 MGLANE 3338 I-75 South of River Road SR 681 0 34,200 34,200 64,538 570,000 64,538LEGEND 0 MGLANE ¨¦§75 Hamilton 3463 I-75 SR 681 North of University Parkway 0 49,014 49,014 152,341 491,761 152,341 0 MGLANE Madison 3445 3332 I-75 East of SR 951 Collier / Lee County Line 0 63,245 63,245 145,427 1,250,398 145,427 0 MGLANE Duval Bridge, Interchange, Intersection Improvements 1379 SR 29 I-75 Oil Well Rd 0 4,333 4,333 5,200 28,889 0 0 A2-4 ¨¦§10 ¤£90 (Project with highest phase funded) 3341 SR 29 Oil Well Rd. / CR 658 Sunniland Nursery Rd. 0 0 0 4,548 26,6273311 4,548 0 A2-4 £ ¤£301 (! 3342 SR 29 Sunniland Nursery Rd. South of Agriculture¤441 Way 0 0 0 2,378 14,206 2,378 Construction & Mega Projects (CON) 0 A2-4 Columbia (! 3343 SR 29 South of AgricultureSu Waywannee CR 846 Baker 0 0 0 5,628 20,543 5,628 Right of Way (ROW) 0 A2-4 3346 SR 29 F Rd North¤£4 of1 Cowbay Way 0 0 0 0 47,8991169 47,899 0 A2-4 (! Preliminary Engineering (PE) 3348 SR 31 SR 80 SR 78 10 0 9,350 9,350 8,914 7,113 0 0 A2-4 ¨¦§ 295 Taylor ¨¦§ «¬A1A (! Project Development and Environmental (PDE) 3349 SR 31 SR 78 CR 78/River Rd «¬121 0 956 956 4,191 36,376302 10,567 0 A2-4 3350 SR 31 ¤£98 CR 78/River Rd Cook Brown Rd 0 3,049 3,049 10,610 20,324 30,934 0 A2-4 ¤£27 «¬100 3354 SR 60 East of CR 630 Polk / Osceola County Line 0 ¤£170 0 7,830 35,041 7,830Add Lanes, New Roads, etc. Improvemen0ts A2-4 247 «¬ Union ¤£301 Clay 3352 SR 60 ¤£19 Hillsborough / Polk County Line CR 555 / Agricola Rd. 2,500 19,500 22,000 10,646 59,1463308 (Pro0ject with highest phase funded) 0 A2-6 3353 SR 60 SR 60A / Van Fleet Dr. SR 25 / US 27 3,000 21,000 24,000 11,568 64,265 0 0 A2-6 Bradford ¤£1 Construction & Mega Projects (CON) 3359 SR 64 Hardee / Highlands County Line US 27 1,600 4,500 6,100 2,803 15,570 0 0 A2-4 Lafayette 3312 3357 SR 64 US 17 SR 636 2,000 10,250 12,250 3,722 20,677 0 Right of Way (ROW) 0 A2-4 3358 SR 64 Old Town Creek Rd. / CR 671 / Parnell Rd. Hardee / Highlands County Line 1,750 5,000 6,750 1,943 10,797 0 Preliminary Engineering (PE) 0 A2-4 3367 SR 70 NW 38th Terrace US 98¤£27 1,200 1,700 2,900 3,061 8,713 0 0 A2-4 «¬21 ¨¦§95 3310 Project Development and Environmental (PDE) 3363 SR 70 Jefferson Avenue US 27 0 2,879 2,879 3,116 19,190 0 0 A2-4 3364 SR 70 US 27 GilchrCRist 29 0 2,456 2,456 3,070 16,371 0 0 A2-4 Alachua 3365 SR 70 CR 29 Lonesome Island Road ¤£441 «¬24 0 1,083 ¤£17 1,083 1,299«¬A1A 7,217 0 Green Band - FY 2028/2029 to FY 20340/2035 A2-4 «¬207 1234 3419 206 3362 SR 70 East of SR 31£19 Jefferson Avenue 3,500 10039,000 42,500 «¬16,336 196,868 0 0 A2-4 ¤ «¬ Yellow Band - FY 2035/2036 to FY 2039/2040 3361 SR 70 Manatee County Line West of Peace River (American Legion Rd) 2,500 18,500 21,000 14,603 92,893 10234 0 A2-4 3314 St. Johns 3360 SR 70 CR 675 DeSoto County Line 3,000 26,000 37,806 130,876 Blue Band - FY 2040/2041 to FY 2044/2045 A2-4 Dixie ¬26 29,000 10234 0 « 20 3366 SR 70 Lonesome Island Road NW 38th Terrace 4,000«¬ 35,000 39,000 12,069 67,050 0 0 A2-4 3301 Mega Projects Phased Over Time 3369 SR 710 Sherman Woods Ranch Okeechobee / Martin County Line Putnam0 0 0 7,399 35,876 7,3991234 0 A2-4 «¬24 ¨¦§75 3370 SR 80 911 SR 31 / Arcadia Rd. Buckingham Rd. 1,500 4,500 6,000 2,057 11,429 0 0 A2-6 3371 SR 82 SR 739 / Fowler Ave. Michigan Link Ave. 2,500 4,500«¬19 7,000 12,095 12,224 0 #!$" Interstate Highway 0 HWYCAP 3373 SR 82 3418 Alabama Road Homestead ¤£Blvd.27A 0 2,189 2,189 2,627 14,594 0 0 A2-6 (/ U.S. Highway 3372 SR 82 Michigan Link Ave. Gateway Blvd 3,000 9,000 12,000 4,698 26,099 0 0 HWYCAP Levy 3374 US 17 1154 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0  State Highway 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. 750 1,965 2,715 858 4,768 0 0 HWYCAP 969 US 17 3305 Copley Drive «¬24 N¤£ 1of9 CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 8,603 0 Toll Roads 0 A2-6 3376 US 17 Mann Rd. Main St. 1,250 2,500 3,750 1,238 6,875 0 0 A2-6 3377 US 17 Main St. SR 60A / Auto Zone Ln 1,000 3,000 4,000 417 2,316 0 0 A2-6 Existing Conditions for SIS Highways 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 SIS Highways 0 HWYCAP Other State roads LEGEND NOTES IMPROVEMENT TYPES Planned Add ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange (2) All phase costs shown as supplied by each District. FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). 20 10 0 20 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger® Terminal System Miles (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study (7) Other Funds - assumed to be toll revenue or partner funded. File: S:\ProjRecurring\Wpa\SIS\GIS\Projects\Tentative\Highway\1st5Year\wpai_d2.mxd Mega Projects Phased Over Time A1-AUX: Add 1 Auxilliary Lane MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation PagePage 5 51 DISTRICTDISTRICT 331 STRATEGIC INTERMODAL SYSTEM • Long Range Cost Feasible Plan • FY 2029-2045

Design Right of Way / Construction P3 Funds Other Funds IMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 34533331 CRI-4 2327 Transmitter Rd SRWest 30A of (US US 98)27 / 15th SR 25 St SRPolk 75 / (USOsceola 231) County Line 2,0050 0 2,0050 51,6860 347,0800 398,7660 0 MGLANEA2-4 33853330 EastI-4 Avenue PortWest Entrance of SR 570 / Polk Parkway (West) SRWest 30 of(US US 98B) 27 /15th SR 25 Street 7880 99,3601,050 99,3601,838 249,6800 1,656,0000 1,905,6800 0 MGLANEA2-4 33223333 I-10I-75 ECollier/Lee of Alabama County State LineLine WSR of78 SR 95 (US 29) 0 136,8004,426 136,8004,426 271,3006,000 1,710,00064,190 271,30070,190 0 MGLANEA2-6 33213334 I-10I-75 Santaat North Rosa Jones County Loop Line Rd SR 85 Ferdon Blvd 2,2000 14,7496,500 16,9496,500 7,1660 181,15639,809 0 0 M-INCHA2-6 34483335 I-10I-75 at US 17/SR90 West 35 9 Mile Rd Interchange 14,3000 7,5000 14,3007,500 15,4320 85,7320 0 0 M-INCHN-INCH 34643336 I-10I-75 Wat CRof SR776/Harbor 10 (US 90) View Leon Co Line / Ochlockonee River Bridge 2,8880 2,6406,500 5,5286,500 7,1660 22,09039,809 22,0900 0 M-INCHA2-6 33203337 I-10I-75 CRat CR 4 Antioch/PJ 769/Kings HighwayAdams Rd N of Raspberry Rd 0 3,9356,500 3,9356,500 20,0007,166 92,91539,809 112,9150 0 M-INCHN-INCH 33193339 I-10I-75 SRNorth 281 of Avalon University Blvd Parkway OkaloosaCR 6 / Moccasin County Wallow Line Rd. 3,3000 21,91360,480 25,21360,480 175,2400 1,008,000233,241 1,183,240233,241 0 MGLANEA2-6 34653338 I-10I-75 GadsdenSouth of RiverCo Line Road WestSR 681 of 263 Capital Circle 1,5750 34,2001,925 34,2003,500 64,538500 570,00035,998 36,49864,538 0 MGLANEA2-6 33233463 SRI-75 173 Blue Angel Pkwy SR 292681 Sorrento Rd SRNorth 30 (USof University 98) Parkway 0 49,0140 49,0140 152,34115,450 491,76144,125 152,34159,575 0 MGLANEA2-6 34523332 SRI-75 196 Main St/Bayfront Pkwy TaragonaEast of SR St951 SRCollier 30 (US / Lee 98) County E Chase Line 1,4610 63,2450 63,2451,461 145,4270 1,250,3980 145,4270 0 MGLANEPDE 33251379 SR 36829 23rd St USI-75 98 Flyover SROil 390Well St Rd Andrews Blvd 1,1000 3,0254,333 4,1254,333 36,2405,200 23,62128,889 59,8610 0 A2-6A2-4 33863341 SR 38929 EAST AVE SROil 30Well (US Rd. 98B) / CR 658 CRSunniland 2337 SHERMAN Nursery Rd. AVENUE 1,5750 2,1000 3,6750 4,5480 26,6270 4,5480 0 A2-4 33263342 SR 8529 S Ferdon Blvd SRSunniland 123 Roger Nursery J Clary Rd. Hwy SRSouth 8 (I-10) of Agriculture Way 1,8700 13,0900 14,9600 18,5002,378 108,71614,206 127,2162,378 0 A2-6A2-4 32453343 USSR 29231 SRSouth 20 of Agriculture Way I-10CR 846 3,4820 0 3,4820 5,6280 20,5430 5,6280 0 A2-6A2-4 33173346 USSR 29231 SouthF Rd of Pipe Line Road North of PennyCowbay Road Way 0 0 0 0 121,85347,899 121,85347,899 0 A2-6A2-4 34903348 USSR 3198 PortsideSR 80 Dr BergenSR 78 Rd 0 9,3500 9,3500 8,9140 96,0967,113 96,0960 0 A2-6A2-4 34963349 USSR 3198 EastSR 78 of R. Jackson Blvd HathawayCR 78/River Bridge Rd 0 9560 9560 8,0004,191 6,3760 10,5678,000 0 A2-6A2-4 34943350 USSR 3198 CountyCR 78/River Road Rd 30A BayCook County Brown Line Rd 0 19,2503,049 19,2503,049 10,00010,610 173,08020,324 183,08030,934 0 A2-6A2-4 34893354 USSR 6098 FallinEast of Waters CR 630 Dr MaryPolk / EstherOsceola Blvd County Line 0 0 0 20,0007,830 63,09435,041 83,0947,830 0 A2-6A2-4 34933352 USSR 6098 CRHillsborough 30A Calhoun / Polk Ave County Line AirportCR 555 /Rd Agricola Rd. 2,5000 19,5003,300 22,0003,300 10,6460 49,95959,146 49,9590 0 A2-6 34863353 USSR 6098 MandySR 60A /Lane Van Fleet Dr. NautilusSR 25 / US St 27 3,0000 21,0000 24,0000 11,5685,000 27,83664,265 32,8360 0 A2-6 34873359 USSR 6498 NautilusHardee / St.Highlands County Line R.US Jackson 27 Blvd 1,6000 4,5000 6,1000 6,0002,803 15,5700 6,0000 30,1640 A2-6A2-4 34613357 USSR 6498 BergrenUS 17 Rd ESR of 636 Ramble Bay Ln 2,0000 10,2504,400 12,2504,400 3,7220 20,6770 0 0 A2-6A2-4 34543358 USSR 6498 CROld 2327 Town Transmitter Creek Rd. / Rd CR 671 / Parnell Rd. TyndallHardee Dr/ Highlands County Line 3,5051,750 5,0000 3,5056,750 1,9430 10,7970 0 0 A2-6A2-4 34463367 USSR 7098 @NW SR 38th 293 TerraceDanny Wuerffel Way Interchange US 98 1,2000 11,0001,700 11,0002,900 3,0610 86,8708,713 0 0 N-INCHA2-4 34953363 USSR 7098 WaltonJefferson County Avenue Line BSRUS 27 79 S. Arnold Rd 1,5400 9,6252,879 11,1652,879 14,6823,116 136,26019,190 150,9420 0 A2-6A2-4 34883364 USSR 7098 SantaUS 27 Rosa County Line FallinCR 29 Waters Dr 0 2,4560 2,4560 12,7503,070 119,72716,371 132,4770 0 A2-6A2-4 34623365 USSR 7098 ECR of 29 Ramble Bay Ln OkaloosaLonesome County Island RoadLine 0 1,0830 1,0830 12,0001,299 7,2170 12,0000 0 A2-6A2-4 34273362 USSR 7098 BayshoreEast of SR Rd31 PortsideJefferson Dr Avenue 3,5000 39,0000 42,5000 16,3360 196,86885,224 85,2240 0 A2-6A2-4 3361 FundedSR 70 CFP Totals Manatee County Line West of Peace River (American Legion Rd) 2,500 18,500 158,01721,000 14,603 92,893 1,683,1470 Total CFP Funds=0 1,841,164######A2-4 3360 SR 70 CR 675 DeSoto County Line 3,000 26,000 29,000 37,806 130,876 0 0 A2-4 3366 SR 70 Lonesome Island Road NW 38th Terrace 4,000 35,000 39,000 12,069 67,050 0 0 A2-4 3369 SR 710 Sherman Woods Ranch Okeechobee / Martin County Line 0 0 0 7,399 35,876 7,399 0 A2-4 3370 SR 80 SR 31 / Arcadia Rd. Buckingham Rd. 1,500 4,500 6,000 2,057 11,429 0 0 A2-6 3371 SR 82 SR 739 / Fowler Ave. Michigan Link Ave. 2,500 4,500 7,000 12,095 12,224 0 0 HWYCAP 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 2,189 2,627 14,594 0 0 A2-6 3372 SR 82 Michigan Link Ave. Gateway Blvd 3,000 9,000 12,000 4,698 26,099 0 0 HWYCAP 3374 US 17 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. 750 1,965 2,715 858 4,768 0 0 HWYCAP 969 US 17 Copley Drive N of CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 8,603 0 0 A2-6 3376 US 17 Mann Rd. Main St. 1,250 2,500 3,750 1,238 6,875 0 0 A2-6 3377 US 17 Main St. SR 60A / Auto Zone Ln 1,000 3,000 4,000 417 2,316 0 0 A2-6 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 0 HWYCAP

LEGEND NOTES IMPROVEMENT TYPES ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange FY 2028/2029 - 2034/2035 (2) All phase costs shown as supplied by each District. A1-3: Add 1 Lane to Build 3 FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). A2-4: Add 2 Lanes to Build 4 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. A2-8: Add 2 Lanes to Build 8 FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study Mega Projects Phased Over Time (7) Other Funds - assumed to be toll revenue or partner funded. A1-AUX: Add 1 Auxilliary Lane A4-SUL:A1-AUX: AddAdd 41 SpecialAuxilliary Use Lane Lanes MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 641 DISTRICT 1 Strategic Intermodal System

Design Right of Way / Construction 2045 COP3 SFundsT FEASIOtherBLE Funds PLANIMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 3331 I-4 West of US 27 / SR 25 Polk / Osceola County Line 0 0 0 51,686 347,080 398,766 0 MGLANE 3330 I-4 West of SR 570 / Polk Parkway (West) West of US 27 / SR 25 0 99,360 99,360 249,680 1,656,000 1,905,680 DDistrictistrict 3 0 MGLANE 3333 I-75 Collier/Lee County Line SR 78 0 136,800 136,800 271,300 1,710,000 271,300 0 MGLANE 3334 I-75 at North Jones Loop Rd 0 6,500 6,500 7,166 39,809 0 0 M-INCH 3335 I-75 at US 17/SR 35 0 7,500 7,500 15,432 85,732 0 0 M-INCH 3336 I-75 at CR 776/Harbor View 0 6,500 6,500 7,166 39,809 0 0 M-INCH 3337 I-75 at CR 769/Kings Highway 0 6,500 6,500 7,166 39,809 F0 Y 2028/2029 - FY 2044/0204M-INCH5 3339 I-75 North of University Parkway CR 6 / Moccasin Wallow Rd. 0 60,480 60,480 175,240 1,008,000 1,183,240 0 MGLANE 3338 I-75 South of River Road SR 681 0 34,200 34,200 64,538 570,000 64,538LEGEND 0 MGLANE 3463 I-75 33SR1 6819 3321 3320 3326 North of University Parkway 3245 33017 49,014 49,014 152,341 491,761 152,341 0 MGLANE 3332 I-75 East of SR 951 Collier / Lee County Line 0 63,245 145,427 1,250,398 MGLANE 63,245 145,427Bridge, Interchange, Intersection Improv0ements 1379 SR 29 I-75 Oil Well Rd 0 4,333 4,333 5,200 28,889 0 0 A2-4 (Project with highest phase funded) ¤£29 2 3341 SR 29 Escambia Oil Well Rd. / CR 658 «¬85 Sunniland«¬ Nursery Rd. 0 0 0 4,548 26,627 4,548 0 A2-4 83 (! 3342 SR 29 Sunniland Nursery Rd. «¬South of AgricultureHolmes Way 0 0 0 2,378 14,206 2,378 Construction & Mega Projects (CON) 0 A2-4 Santa Rosa Jackson 3343 SR 29 3322 South of Agriculture Way CR 846 0 0 0 5,628 20,543 5,628 (! Right of Way (ROW) 0 A2-4 3346 SR 29 F«¬ Rd87 North of Cowbay Way 0 0 3464 30465 0 47,899 47,899 0 A2-4 (! ¤£90 (! Preliminary Engineering (PE) 3348 SR 31 3448 SR 80 ¨¦§10 SR 78 0 9,350 9,350 8,914 7,113 0 0 A2-4 Washington (! Project Development and Environmental (PDE) 3349 SR 31 SR 78 ¤£33CR1 78/River Rd 0 956 956 4,191 6,376 10,567 0 A2-4 3452 Walton 3350 SR 31 (!(!(! CR 78/River Rd Cook Brown Rd ¨¦§10 0 3,049Gadsden 3,049 10,610 20,324 30,934 0 A2-4 «¬87 Okaloosa ¤£319 3354 SR 60 East of CR 630 Polk / Osceola County Line 0 0 0 7,830¤£19 35,041 7,830Add Lanes, New Roads, etc. Improvemen0ts A2-4 3490 ¨¦§110 «¬85 «¬77 3352 SR 60 Hillsborough / Polk County Line CR 555 / Agricola Rd. «¬73 2,500 19,500 22,000 10,646 59,146 (Pro0ject with highest phase funded) 0 A2-6 !( 3353 SR 60 SR 60A / Van Fleet Dr. ( SR 25 / US 27 3,000 21,000 24,000 11,568 64,265 0 Construction & Mega Projects (CON) 0 A2-6 Bay «¬20 ¤£27 Jefferson 3359 SR 64 Hardee / Highlands County Line US 27 ¤£231 Calhoun 1,600 4,500Leon 6,100 2,803 15,570 0 0 A2-4 Right of Way (ROW) 3357 SR 64 US 17 SR 636 Li2,000berty 10,250 12,250 3,722 20,677 0 0 A2-4 71 3358 SR 64 Old Town Creek Rd. / CR 671 / Parnell Rd. Hardee¤£9 8/ Highlands County Line «¬ 1,750 5,000 6,750«¬363 1,943 10,797 0 Preliminary Engineering (PE) 0 A2-4 «¬65 «¬59 3367 SR 70 3323 NW 38th Terrace US 98 1,200 1,700 2,900 3,061 8,713 0 Project Development and Environmen0tal (PDEA2-4) 3363 SR 70 Jefferson Avenue US 27 0 2,879Wakulla 2,879 3,116 19,190 0 0 A2-4 3364 SR 70 3427 US 27 CR 29 0 2,456 2,456 3,070 16,371 0 0 A2-4 3365 SR 70 CR 29 Lonesome Island Road 0 1,083 1,083 1,299 7,217 0 Green Band - FY 2028/2029 to FY 20340/2035 A2-4 3461 1234 3362 SR 70 East of SR 31 Jefferson Avenue Gulf 3,500 39,000 42,500 16,336 196,868 0 0 A2-4 Yellow Band - FY 2035/2036 to FY 2039/2040 3361 SR 70 Manatee County Line West of Peace River (American Legion Rd) 2,500 18,500 21,0003453 14,603 92,893 10234 0 A2-4 3360 SR 70 CR 675 DeSoto County Line 3,000Franklin 26,000 29,000 37,806 130,876 10234 Blue Band - FY 2040/2041 to FY 2044/02045 A2-4 3366 SR 70 3462 Lonesome Island Road NW 38th Terrace 4,000 35,000 39,0003385 12,069 67,050 0 0 A2-4 £98 Mega Projects Phased Over Time 3369 SR 710 Sherman Woods Ranch Okeechobee / Martin County Line ¤ 0 0 0 7,399 35,876 7,3991234 0 A2-4 3370 SR 80 3488 3489 3493 3446SR3 3149 / 4Arcadia349 Rd.5 3486 3487 349Buckingham6 3325 Rd.3386 1,500 4,500 6,0003454 2,057 11,429 0 0 A2-6 3371 SR 82 SR 739 / Fowler Ave. Michigan Link Ave. 2,500 4,500 7,000 12,095 12,224 0 #!$" Interstate Highway 0 HWYCAP 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 2,189 2,627 14,594 0 0 A2-6 (/ U.S. Highway 3372 SR 82 Michigan Link Ave. Gateway Blvd 3,000 9,000 12,000 4,698 26,099 0 0 HWYCAP 3374 US 17 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0  State Highway 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. 750 1,965 2,715 858 4,768 0 0 HWYCAP 969 US 17 Copley Drive N of CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 8,603 0 Toll Roads 0 A2-6 3376 US 17 Mann Rd. Main St. 1,250 2,500 3,750 1,238 6,875 0 0 A2-6 3377 US 17 Main St. SR 60A / Auto Zone Ln 1,000 3,000 4,000 417 2,316 0 0 A2-6 Existing Conditions for SIS Highways 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 SIS Highways 0 HWYCAP Other State roads LEGEND NOTES IMPROVEMENT TYPES Planned Add ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange (2) All phase costs shown as supplied by each District. FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). 20 10 0 20 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. Miles FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger® Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study (7) Other Funds - assumed to be toll revenue or partner funded. Document Path: \\COdata\shares\CO\ISD\OTPP\Planning\SIS\ProjRecurring\Cfp\2018\MXD\SISCFP_D3.mxd Mega Projects Phased Over Time A1-AUX: Add 1 Auxilliary Lane MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation PagePage 7 71 DISTRICTDISTRICT 441 STRATEGIC INTERMODAL SYSTEM • Long Range Cost Feasible Plan • FY 2029-2045

Design Right of Way / Construction P3 Funds Other Funds IMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 11073331 I-595I-4 I-75West of US 27 / SR 25 SR-7Polk / Osceola County Line 0 0 0 51,6860 347,0800 398,7660 1,169,242 2029 16 0 MGLANE 34133330 I-95I-4 atWest Davie of SRBoulevard 570 / Polk Parkway (West) West of US 27 / SR 25 0 99,3600 99,3600 249,6800 1,656,00025,093 1,905,68025,093 0 MGLANEM-INCH 34093333 I-95I-75 S.Collier/Lee of Hallandale County Beach Line Boulevard N.SR of78 Hollywood Boulevard 0 136,8000 136,8000 271,30065,900 1,710,000163,822 229,722271,300 0 HWYCAPMGLANE 34103334 I-95I-75 at NorthStirling Jones Road Loop Rd 0 6,5000 6,5000 7,1660 39,8095,429 5,4290 0 M-INCH 34153335 I-95I-75 S.at ofUS Commercial 17/SR 35 Boulevard N. of Cypress Creek Road 0 7,5000 7,5000 58,30015,432 97,56185,732 155,8610 0 HWYCAPM-INCH 34143336 I-95I-75 at CROakland 776/Harbor Park Boulevard View 0 6,5000 6,5000 8,3007,166 33,75939,809 42,0590 0 M-INCH 34123337 I-95I-75 S.at ofCR Sheridan 769/Kings Street Highway N. of Griffin Road 0 6,5000 6,5000 7,1660 240,60139,809 240,6010 0 HWYCAPM-INCH 34043339 I-95I-75 BeckerNorth of Road University Parkway SR-70CR 6 / Moccasin Wallow Rd. 0 10,00060,480 10,00060,480 175,24010,000 1,008,000104,813 1,183,240114,813 0 HWYCAPMGLANE 33993338 I-95I-75 LintonSouth ofBoulevard River Road SR-80SR 681 6,0000 15,00034,200 21,00034,200 64,5385,000 416,201570,000 421,20164,538 0 MGLANE 34033463 I-95I-75 Martin/PalmSR 681 Beach County Line BeckerNorth of Road University Parkway 0 10,00049,014 10,00049,014 152,34110,000 168,168491,761 178,168152,341 0 HWYCAPMGLANE 34023332 I-95I-75 S.East of ofIndiantown SR 951 Road Martin/PalmCollier / Lee County Beach CountyLine Line 0 63,2452,815 63,2452,815 145,4270 1,250,39828,290 145,42728,290 0 HWYCAPMGLANE 34001379 I-95SR 29 SRI-75 80 CongressOil Well Rd Avenue (Overpass) 3,0000 6,0004,333 9,0004,333 10,0005,200 66,93328,889 76,9330 0 MGLANEA2-4 34163341 I-95SR 29 atOil Belvedere Well Rd. / Road CR 658 Sunniland Nursery Rd. 1,9000 3,0890 4,9890 6,0004,548 30,88726,627 36,8874,548 0 M-INCHA2-4 34013342 I-95SR 29 CongressSunniland Avenue Nursery (Overpass) Rd. BlueSouth Heron of Agriculture Boulevard Way 4,0000 10,0000 14,0000 5,0002,378 139,73014,206 144,7302,378 0 MGLANEA2-4 33973343 I-95SR 29 N.South of Broward of Agriculture Boulevard Way SunriseCR 846 Boulevard 1,9190 3,8370 5,7560 2,0005,628 38,56420,543 40,5645,628 0 HWYCAPA2-4 33983346 I-95SR 29 SR-84F Rd S.North of Broward of Cowbay Boulevard Way 5,0000 12,0000 17,0000 27,5000 276,75647,899 304,25647,899 0 HWYCAPA2-4 34053348 SR-710SR 31 Martin/OkeechobeeSR 80 County Line MartinSR 78 Powerplant Road 0 6,0009,350 6,0009,350 5,1258,914 57,2947,113 62,4190 0 A2-4 34073349 SR-710SR 31 BlueSR 78 Heron Boulevard CongressCR 78/River Avenue Rd 0 1,295956 1,295956 4,1910 13,0146,376 13,01410,567 0 HWYCAPA2-4 34173350 SR-714/MontereySR 31 Road atCR Florida 78/River East Rd Coast Railway Cook Brown Rd 2,1000 2,2123,049 4,3123,049 14,96910,610 22,11620,324 37,08530,934 0 GRASEPA2-4 33933354 SR-80SR 60 W.East of of Binks CR 630 Forest Drive W.Polk of / RoyalOsceola Palm County Beach Line Boulevard 1,9000 1,6090 3,5090 2,9407,830 16,24735,041 19,1877,830 0 HWYCAPA2-4 33943352 SR-80SR 60 W.Hillsborough of Royal Palm / Polk Beach County Boulevard Line I-95CR 555 / Agricola Rd. 6,0002,500 15,00019,500 21,00022,000 200,33210,646 1,580,62559,146 200,3320 0 HWYCAPA2-6 33963353 SR-80SR 60 US-27SR 60A / Van Fleet Dr. I-95SR 25 / US 27 3,0000 21,0002,274 24,0002,274 11,5680 13,30564,265 13,3050 0 A2-6ITS 33953359 SR-80SR 64 atHardee SR-7 / Highlands County Line US 27 1,4431,600 2,8864,500 4,3296,100 2,8030 28,86315,570 28,8630 0 M-INCHA2-4 33923357 USSR 6427 PembrokeUS 17 Road SWSR 636 26th Street (N. of Griffin Road) 3,0002,000 10,2506,000 12,2509,000 5,0003,722 76,62420,677 81,6240 0 SERVEA2-4 33913358 USSR 6427 (-Dade to Hendry) KromeOld Town Avenue Creek Rd. / CR 671 / Parnell Rd. EvercaneHardee / HighlandsRoad County Line 1,7500 3,7335,000 3,7336,750 1,9430 21,84110,797 21,8410 0 A2-4ITS 33893367 USSR 7027 (Miami-Dade, Broward) KromeNW 38th Avenue Terrace Broward/PalmUS 98 Beach County Line 5,0001,200 12,0001,700 17,0002,900 3,0610 286,3378,713 286,3370 0 FRTCAPA2-4 33903363 USSR 7027 (Palm Beach, Hendry) Broward/PalmJefferson Avenue Beach County Line EvercaneUS 27 Road 5,0000 12,0002,879 17,0002,879 30,6183,116 281,95719,190 312,5750 0 FRTCAPA2-4 3364 FundedSR 70 CFP Totals US 27 CR 29 0 2,456 184,0122,456 3,070 16,371 3,121,1890 1,169,242 Total CFP Funds=0 4,474,443A2-4 3365 SR 70 CR 29 Lonesome Island Road 0 1,083 1,083 1,299 7,217 0 0 A2-4 3362 SR 70 East of SR 31 Jefferson Avenue 3,500 39,000 42,500 16,336 196,868 0 0 A2-4 3361 SR 70 Manatee County Line West of Peace River (American Legion Rd) 2,500 18,500 21,000 14,603 92,893 0 0 A2-4 3360 SR 70 CR 675 DeSoto County Line 3,000 26,000 29,000 37,806 130,876 0 0 A2-4 3366 SR 70 Lonesome Island Road NW 38th Terrace 4,000 35,000 39,000 12,069 67,050 0 0 A2-4 3369 SR 710 Sherman Woods Ranch Okeechobee / Martin County Line 0 0 0 7,399 35,876 7,399 0 A2-4 3370 SR 80 SR 31 / Arcadia Rd. Buckingham Rd. 1,500 4,500 6,000 2,057 11,429 0 0 A2-6 3371 SR 82 SR 739 / Fowler Ave. Michigan Link Ave. 2,500 4,500 7,000 12,095 12,224 0 0 HWYCAP 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 2,189 2,627 14,594 0 0 A2-6 3372 SR 82 Michigan Link Ave. Gateway Blvd 3,000 9,000 12,000 4,698 26,099 0 0 HWYCAP 3374 US 17 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. 750 1,965 2,715 858 4,768 0 0 HWYCAP 969 US 17 Copley Drive N of CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 8,603 0 0 A2-6 3376 US 17 Mann Rd. Main St. 1,250 2,500 3,750 1,238 6,875 0 0 A2-6 3377 US 17 Main St. SR 60A / Auto Zone Ln 1,000 3,000 4,000 417 2,316 0 0 A2-6 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 0 HWYCAP

LEGEND NOTES IMPROVEMENT TYPES ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange FY 2028/2029 - 2034/2035 (2) All phase costs shown as supplied by each District. A1-3: Add 1 Lane to Build 3 FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). A2-4: Add 2 Lanes to Build 4 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. A2-8: Add 2 Lanes to Build 8 FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study Mega Projects Phased Over Time (7) Other Funds - assumed to be toll revenue or partner funded. A1-AUX: Add 1 Auxilliary Lane A4-SUL:A1-AUX: AddAdd 41 SpecialAuxilliary Use Lane Lanes MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 851 DISTRICT 1 Strategic Intermodal System

Design Right of Way / Construction 2045 COP3 SFundsT FEASIOtherBLE Funds PLANIMPRV ID FACILITY FROM TO TYPE INDIAN RIVER PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 3331 I-4 West of US 27 / SR 25 Polk / Osceola County Line 0 0 0 51,686 347,080 398,766 0 MGLANE 3330 I-4 West of SR 570 / Polk Parkway (West) West of US 27 / SR 25 0 99,360 99,360 249,680 1,656,000 1,905,680 DDistrictistrict 4 0 MGLANE 3333 I-75 Collier/Lee County Line «¬60SR 78 0 136,800 136,800 271,300 1,710,000 271,300 0 MGLANE 3334 I-75 at North Jones Loop Rd 0 6,500 6,500 7,166 39,809 0 0 M-INCH 3335 I-75 at US 17/SR 35 ¨¦§95 0 7,500 7,500 15,432 85,732 0 0 M-INCH 3336 I-75 at CR 776/Harbor View 0 6,500 6,500 7,166 39,809 0 0 M-INCH 3337 I-75 at CR 769/Kings Highway 0 6,500 6,500 7,166 39,809 F0 Y 2028/2029 - FY 2044/0204M-INCH5 3339 I-75 North of University Parkway CRS 6T. L/U CMoccasinIE Wallow Rd. 0 60,480 60,480 175,240 1,008,000 1,183,240 0 MGLANE 3338 I-75 South of River Road SR 681 0 34,200 34,200 64,538 570,000 64,538LEGEND 0 MGLANE 3463 I-75 SR 681 North«¬7 0of University Parkway 0 49,0143404 49,014 152,341 491,761 152,341 0 MGLANE 3332 I-75 East of SR 951 Collier / Lee County Line 0 63,245 145,427 1,250,398 MGLANE 63,245 145,427Bridge, Interchange, Intersection Improv0ements 1379 SR 29 I-75 Oil Well Rd 0 34,333403 4,333 5,200 28,889 0 0 A2-4 (Project with highest phase funded) 3341 SR 29 Oil Well Rd. / CR 658 Sunniland Nursery Rd. 0 0 0 4,548 26,627 4,548 0 A2-4 3402 (! 3342 SR 29 Sunniland Nursery Rd. South of Agriculture Way (! 0 0 0 2,378 14,206 2,378 Construction & Mega Projects (CON) 0 A2-4 3343 SR 29 South of Agriculture Way CR 846 0 34070 0 5,628 20,543 5,628 (! Right of Way (ROW) 0 A2-4 3346 SR 29 F Rd North of Cowbay Way 0 0 0 0 47,899 47,899 (! 0 A2-4 MARTIN Preliminary Engineering (PE) 3348 SR 31 SR 80 SR 78 0 39,350395 9,350 8,914 7,113 0 (! 0 A2-4 3349 SR 31 3SR4 1787 CR 78/River Rd «¬76 0 956 956 4,191 6,376 10,567 Project Development and Environmen0tal (PDEA2-4) 3350 SR 31 CR 78/River Rd Cook Brown Rd 0 33,049401 3,049 10,610 20,324 30,934 0 A2-4 3354 SR 60 3East40 5of CR 630 Polk / Osceola County Line 0 0 0 7,830 35,041 7,830Add Lanes, New Roads, etc. Improvemen0ts A2-4 3400 3352 SR 60 Hillsborough / Polk County Line CR 555 / Agricola Rd. «¬710 2,500 19,500 22,000 10,646 59,146 (Pro0ject with highest phase funded) 0 A2-6 3353 SR 60 SR 60A / Van Fleet Dr. SR 25 / US 27 3396 3,000 21,0003416 24,000 11,568 64,265 0 Construction & Mega Projects (CON) 0 A2-6 3359 SR 64 Hardee / Highlands County Line US 27 1,600 4,500 6,100 2,803 15,570 0 0 A2-4 3357 SR 64 US 17 SR 636 2,000 10,2503394 12,250 3,722 20,677 0 Right of Way (ROW) 0 A2-4 3358 SR 64 Old Town Creek Rd. / CR 671 / Parnell Rd. Hardee / Highlands County Line 1,750 5,000 6,750 1,943 10,797 0 Preliminary Engineering (PE) 0 A2-4 ¤£441 3393 3367 SR 70 NW 38th Terrace US 98 ! 1,200 1,700 2,900 3,061 8,713 0 Project Development and Environmen0tal (PDEA2-4) 3363 SR 70 Jefferson Avenue US 27 (! ( 0 2,879 2,879 3,116 19,190 0 0 A2-4 3399 3364 SR 70 US 27 CR 29 0 2,456 2,456 3,070 16,371 0 0 A2-4 3390 ¨¦§95 3365 SR 70 CR 29 Lonesome Island Road 0 11,083107 1,083 1,299 7,217 10234 Green Band - FY 2028/2029 to FY 20340/2035 A2-4 3362 SR 70 East of SR 31 ¤£27 Jefferson Avenue 3,500 39,000 42,500 16,336 196,868 0 0 A2-4 3391 PALM BEACH Yellow Band - FY 2035/2036 to FY 2039/2040 3361 SR 70 Manatee County Line West of Peace River (American Legion Rd) 2,500 18,5003415 21,000 14,603 92,893 10234 0 A2-4 3360 SR 70 CR 675 DeSoto County Line 3,000 26,000 29,000 37,806 130,876 10234 Blue Band - FY 2040/2041 to FY 2044/02045 A2-4 3366 SR 70 Lonesome Island Road NW 38th Terrace 4,000 35,0003414 39,000 12,069 67,050 0 0 A2-4 Mega Projects Phased Over Time 3369 SR 710 Sherman Woods Ranch Okeechobee / Martin County Line 0 0 0 7,399 35,876 7,3991234 0 A2-4 3370 SR 80 SR 31 / Arcadia Rd. Buckingham Rd. 1,500 34,500397 6,000 2,057 11,429 0 0 A2-6 3371 SR 82 SR 739 / Fowler Ave. Michigan Link Ave. 2,500 34,500398 7,000 12,095 12,224 0 #!$" Interstate Highway 0 HWYCAP 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 2,189 2,627 14,594 0 0 A2-6 (/ U.S. Highway 3372 SR 82 Michigan Link Ave. Gateway Blvd 3,000 39,000413 12,000 4,698 26,099 0 0 HWYCAP 3374 US 17 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0  State Highway 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. (!(! 750 31,965412 2,715 858 4,768 0 0 HWYCAP ¨¦§75 969 US 17 Copley Drive N of CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 8,603 0 Toll Roads 0 A2-6 3389 (!(!(! 3376 US 17 Mann Rd. Main St. 1,250 32,500410 3,750 1,238 6,875 0 0 A2-6 BROWARD 3377 US 17 Main St. SR 60A / Auto Zone Ln (! 1,000 3,000 4,000 417 2,316 0 0 A2-6 3392 Existing Conditions for SIS Highways 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,3203409 16,320 6,664 108,798 6,664 SIS Highways 0 HWYCAP Other State roads LEGEND NOTES IMPROVEMENT TYPES Planned Add ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange (2) All phase costs shown as supplied by each District. FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). 10 5 0 10 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. Miles FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger® Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study (7) Other Funds - assumed to be toll revenue or partner funded. File: S:\ProjRecurring\Wpa\SIS\GIS\Projects\Tentative\Highway\1st5Year\wpai_d4.mxd Mega Projects Phased Over Time A1-AUX: Add 1 Auxilliary Lane MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation PagePage 9 91 DISTRICTDISTRICT 551 STRATEGIC INTERMODAL SYSTEM • Long Range Cost Feasible Plan • FY 2029-2045

Design Right of Way / Construction P3 Funds Other Funds IMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 11873331 I-4 SRWest 435/Kirkman of US 27 / SRRd 25 MilePolk /N Osceola of SR 434 County Line 0 0 0 51,6860 347,0800 398,7660 1,142,887 2029 16 0 MGLANEUP 34303330 EllisI-4 Road / St. Johns Heritage Pkwy I-95West / ofJohn SR Rhodes570 / Polk Blvd Parkway (West) W.West of ofWickman US 27 / Rd.SR 25 0 99,3600 99,3600 249,68045,930 1,656,00039,701 1,905,68085,631 0 MGLANEA2-4 11943333 I-4I-75 Osceola/OrangeCollier/Lee County C/L Line WSR of78 SR 528/Beachline 0 136,8000 136,8000 271,3000 1,399,2201,710,000 1,399,220271,300 0 MGLANE 34973334 I-4I-75 at NorthDaryl Carter Jones LoopParkway Rd 0 6,5000 6,5000 65,5217,166 43,74539,809 109,2660 0 M-INCHN-INCH 11973335 I-4I-75 Seminole/Volusiaat US 17/SR 35 C/L 0.5 mi E of SR 472 0 7,5000 7,5000 36,92315,432 611,31085,732 648,2330 6,5780 MGLANEM-INCH 11963336 I-4I-75 Eat of CR SR 776/Harbor 434 View Seminole/Volusia C/L 0 6,5000 6,5000 7,1660 165,44339,809 165,4430 0 MGLANEM-INCH 11933337 I-4I-75 Polk/Osceoloaat CR 769/Kings C/L Highway Osceola/Orange C/L 0 6,5000 6,5000 7,1660 1,064,99139,809 1,064,9910 0 MGLANEM-INCH 34333339 I-75 CRNorth 484 of University Parkway CR 3186 / Moccasin Wallow Rd. 0 11,32560,480 11,32560,480 175,2400 1,008,00075,546 1,183,24075,546 0 MGLANEA2-8 34353338 I-75 CRSouth 484 of River Road CRSR 681318 3,0000 26,40034,200 29,40034,200 64,5380 570,0000 64,5380 0 MGLANEA4-SUL 34703463 I-75 SR 44681 Sumter/MarionNorth of University County Parkway Line 13,7390 49,0145,686 19,42549,014 152,3417,108 491,76137,390 152,34144,498 0 MGLANEA2-8 34723332 I-75 Sumter/MarionEast of SR 951 County Line CRCollier 484 / Lee County Line 0 22,10063,245 22,10063,245 145,42781,700 1,250,398161,000 242,700145,427 0 MGLANEA2-8 34741379 I-75SR 29 CRI-75 318 Marion/AlachuaOil Well Rd County Line 2,5000 8,0004,333 10,5004,333 5,2000 28,8890 0 0 A4-SULA2-4 34343341 I-75SR 29 CROil 318Well Rd. / CR 658 Marion/AlachuaSunniland Nursery County Rd. Line 0 6,0000 6,0000 24,0004,548 43,00026,627 67,0004,548 0 A2-8A2-4 34713342 I-75SR 29 FloridaSunniland Turnpike Nursery Rd. Sumter/MarionSouth of Agriculture County Way Line 2,5290 8,0000 10,5290 25,0002,378 200,00014,206 225,0002,378 0 MGLANEA2-4 34733343 I-75SR 29 Sumter/MarionSouth of Agriculture County Way Line CR 484846 9,6900 32,3000 41,9900 25,0005,628 125,00020,543 150,0005,628 0 MGLANEA2-4 34373346 I-75SR 29 Fat Rd End of NW 49TH ST EndNorth of ofNW Cowbay 35TH STWay 0 2,4000 2,4000 9,0190 16,00047,899 25,01947,899 0 N-INCHA2-4 34853348 I-75SR 31 atSR US80 27 SR 78 0 1,9509,350 1,9509,350 8,9140 13,0007,113 13,0000 0 M-INCHA2-4 34383349 I-95SR 31 atSR LPGA78 CR 78/River Rd 0 3,000956 3,000956 4,1910 20,0006,376 20,00010,567 0 M-INCHA2-4 34843350 I-95SR 31 atCR SR 78/River 44 Rd Cook Brown Rd 0 2,2503,049 2,2503,049 10,6100 15,00020,324 30,9340 0 M-INCHA2-4 34323354 I-95SR 60 atEast US of 1 CR 630 Polk / Osceola County Line 0 4,2000 4,2000 7,8300 28,00035,041 28,0007,830 0 M-INCHA2-4 34393352 I-95SR 60 atHillsborough Pioneer Trail / Polk County Line CR 555 / Agricola Rd. 2,5000 19,5002,775 22,0002,775 10,6460 18,50059,146 18,5000 0 N-INCHA2-6 34793353 I-95SR 60 SR 51860A / Van Fleet Dr. CRSR 25509 / /US Wickham 27 Rd 3,0000 10,34921,000 10,34924,000 11,5680 68,99664,265 68,9960 0 A2-8A2-6 34763359 I-95SR 64 PalmHardee Coast / Highlands Parkway County Line Flagler/St.US 27 Johns County Line 1,6000 22,5004,500 22,5006,100 2,8030 150,00015,570 150,0000 0 A2-8A2-4 34413357 NASASR 64 Parkway Bridge Replacement SRUS 40517 KSCSR 636 Visitor Center 2,0000 25,50010,250 25,50012,250 3,7220 85,00020,677 85,0000 85,0000 BRIDGEA2-4 34433358 SR 10064 Old KingsTown RdCreek Rd. / CR 671 / Parnell Rd. BelleHardee Terre / Highlands Pkwy County Line 1,7500 5,0000 6,7500 3,1701,943 31,70010,797 34,8700 0 A2-6A2-4 34423367 SR 32670 SRNW 25 38th / US Terrace 301 / US 441 OLDUS 98 US 301 / CR 200A 1,2000 1,4601,700 1,4602,900 5,8503,061 11,2108,713 17,0600 0 A2-4 18073363 SR 4070 CONEJefferson RD Avenue SRUS 1127 0 7,3652,879 7,3652,879 3,1160 49,09819,190 49,0980 0 A2-4 18083364 SR 4070 SRUS 1127 SRCR 1529 0 6,3382,456 6,3382,456 3,0700 42,25216,371 42,2520 0 A2-4 34233365 SR 4070 ECR OF 29 CR 314 CRLonesome 314A Island Road 0 12,1181,083 12,1181,083 26,2541,299 80,7887,217 107,0420 0 A2-4 34243362 SR 4070 CREast 314A of SR 31 LevyJefferson Hammock Avenue Rd. 3,5000 39,0001,398 42,5001,398 16,3362,738 196,8689,322 12,0600 0 A2-4 34403361 SR 4070 WilliamsonManatee County Line BreakawayWest of Peace Trail River (American Legion Rd) 2,5000 18,5000 21,0000 14,6030 22,99092,893 22,9900 0 A2-6A2-4 11993360 SR 52870 SRCR 524675 SRDeSoto 3 County Line 3,0000 26,0000 29,0000 37,8060 339,099130,876 339,0990 0 A2-6A2-4 34313366 SR 6070 PolkLonesome County Island Line Road USNW 441 38th Terrace 4,0000 29,40035,000 29,40039,000 12,0690 196,00067,050 196,0000 0 A2-4 34363369 USSR 71027 FloridaSherman Turnpike Woods RampsRanch - North EndOkeechobee of SR 19 / UrbanMartin Boundary County Line 6,0500 3,4500 9,5000 30,2897,399 51,96235,876 82,2517,399 0 A2-6A2-4 3370 FundedSR 80 CFP Totals SR 31 / Arcadia Rd. Buckingham Rd. 1,500 4,500 293,7726,000 2,057 11,429 5,588,7650 1,142,887 Total CFP Funds=0 7,025,424######A2-6 3371 SR 82 SR 739 / Fowler Ave. Michigan Link Ave. 2,500 4,500 7,000 12,095 12,224 0 0 HWYCAP 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 2,189 2,627 14,594 0 0 A2-6 3372 SR 82 Michigan Link Ave. Gateway Blvd 3,000 9,000 12,000 4,698 26,099 0 0 HWYCAP 3374 US 17 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. 750 1,965 2,715 858 4,768 0 0 HWYCAP 969 US 17 Copley Drive N of CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 8,603 0 0 A2-6 3376 US 17 Mann Rd. Main St. 1,250 2,500 3,750 1,238 6,875 0 0 A2-6 3377 US 17 Main St. SR 60A / Auto Zone Ln 1,000 3,000 4,000 417 2,316 0 0 A2-6 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 0 HWYCAP

LEGEND NOTES IMPROVEMENT TYPES ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange FY 2028/2029 - 2034/2035 (2) All phase costs shown as supplied by each District. A1-3: Add 1 Lane to Build 3 FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). A2-4: Add 2 Lanes to Build 4 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. A2-8: Add 2 Lanes to Build 8 FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study Mega Projects Phased Over Time (7) Other Funds - assumed to be toll revenue or partner funded. A1-AUX: Add 1 Auxilliary Lane A4-SUL:A1-AUX: AddAdd 41 SpecialAuxilliary Use Lane Lanes MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 1061 DISTRICT 1 Strategic Intermodal System

Flagler ¤£1 Design Right of Way / Construction 2045 COP3 SFundsT FEASIOtherBLE Funds PLANIMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL «¬100 3331 I-4 West of US 27 / SR 25 Polk / Osceola County Line 0 0 0 51,686 347,080 398,766 0 MGLANE ¨¦§95 3330 I-4 West of SR 570 / Polk Parkway (West) West of US 27 / SR 25 0 99,360 249,680 1,656,0003476 DDistrictistrict 5 MGLANE 3474 99,360 1,905,680 0 3333 I-75 Collier/Lee County Line SR 78 0 136,800 136,800 271,300 1,710,000 271,300 0 MGLANE 3334 I-75 at North Jones Loop Rd Marion (! 0 6,500 6,500 7,166 39,809 0 0 M-INCH 3434 ¤£27 3443 3335 I-75 at US 17/SR 35 ¤£17 0 7,500 7,500 15,432 85,732 0 0 M-INCH 3336 I-75 at CR 776/Harbor View 0 6,500 6,500 7,166 39,809 0 0 M-INCH 3337 I-75 3442 at CR 769/Kings(! Highway 0 6,500 6,500 7,166 39,809 F0 Y 2028/2029 - FY 2044/0204M-INCH5 (! «¬40 (! 3432 3339 I-75 North of University Parkway CR 6 / Moccasin Wallow Rd. 0 60,480 60,480 175,240 1,008,000 1,183,240 0 MGLANE 3338 I-75 3437 South of River Road SR 681 Volusia 0 34,200 34,200 64,538 570,000 64,538LEGEND 0 MGLANE 3463 I-75 SR 681 North of University Parkway 0 49,014 49,014 152,341 491,7613440 152,341 0 MGLANE 3332 I-75 East of«¬2 0SR0 951 Collier / Lee County Line 0 63,245 145,427 1,250,398 MGLANE 3435 63,245 145,427Bridge, Interchange, Intersection Improv0ements 1379 SR 29 I-75 Oil Well Rd 4 0 4,333 4,333 5,200 28,889 0 0 A2-4 ¨¦§ (! (Project with highest phase funded) «¬19 3341 SR 29 Oil Well Rd.¨¦§ 7/5 CR 658 Sunniland Nursery Rd. (!0 0 0 4,548 326,627438 4,548 (! 0 A2-4 3342 SR 29 3433 Sunniland Nursery Rd. South of Agriculture Way 0 0 0 2,378 14,206 2,378 Construction & Mega Projects (CON) 0 A2-4 Lake 3343 SR 29 South of Agriculture Way CR 846 0 0 0 5,628 20,543 5,628 (! Right of Way (ROW) 0 A2-4 3346 SR 29 3485 F Rd North of Cowbay Way 0 0 0 0 147,899807 47,899 0 A2-4 (! Preliminary Engineering (PE) 3348 SR 31 SR 80 SR 78 0 9,350 9,350 8,914 7,113 0 0 A2-4 (! Project Development and Environmental (PDE) 3349 SR 31 3423 SR 78 CR 78/River Rd 0 956 956 4,191 6,376 10,567 0 A2-4 1808 3350 SR 31 CR 78/River Rd Cook Brown Rd 0 3,049 3,049 10,610 20,324 30,934 0 A2-4 3354 SR 60 3424 East of CR 630 Polk / Osceola County Line 0 0 0 7,830 35,041 7,830Add Lanes, New Roads, etc. Improvemen0ts A2-4 3352 SR 60 Hillsborough / Polk County Line CR 555 / Agricola Rd. 2,500 19,500 10,646 59,146 A2-6 22,000 3439 (Pro0ject with highest phase funded) 0 3353 SR 60 SR 60AS /u mVanter Fleet Dr. SR 25 / US 27 3,000 21,000 24,000 11,568 64,265 0 Construction & Mega Projects (CON) 0 A2-6 3359 SR 64 3473 Hardee / Highlands County Line US 27 1,600 4,500 6,100 2,803 15,570 0 0 A2-4 Seminole Right of Way (ROW) 3357 SR 64 US 17 SR 636 2,000 10,250 12,250 3,722 320,677484 0 0 A2-4 3358 SR 64 3470 Old Town Creek Rd. / CR 671 / Parnell Rd. Hardee / Highlands County Line 1,750 5,000 6,750 1,943 10,797 0 Preliminary Engineering (PE) 0 A2-4 3367 SR 70 NW 38th Terrace US 98 1,200 1,700 2,900 3,061 8,713 0 Project Development and Environmen0tal (PDEA2-4) 3363 SR 70 3472 Jefferson Avenue ¤£2US7 27 0 2,879 (! 2,879 3,116 119,190197 0 0 A2-4 3364 SR 70 US 27 CR 29 0 2,456 2,456 3,070 16,371 0 0 A2-4 3365 SR 70 3471 CR 29 Lonesome Island Road «¬528 0 1,083 1,083 1,299 7,217 10234 Green Band - FY 2028/2029 to FY 20340/2035 A2-4 3362 SR 70 East of SR 31 Jefferson Avenue 3,500 39,000 42,500 16,336 196,8681196 0 0 A2-4 (! Orange Yellow Band - FY 2035/2036 to FY 2039/2040 3361 SR 70 Manatee County Line West of Peace River (American Legion Rd) 2,500 18,500 21,000 14,603 92,893 10234 0 A2-4 3436 3360 SR 70 CR 675 DeSoto County Line 3,000 26,000 29,000 37,806 130,876 10234 Blue Band - FY 2040/2041 to FY 2044/02045 A2-4 3366 SR 70 Lonesome Island Road NW 38th Terrace 4,000 35,000 39,000 12,069 367,050441 0 0 A2-4 Mega Projects Phased Over Time 3369 SR 710 1187 Sherman Woods Ranch Okeechobee / Martin County Line 0 0 0 7,399 35,876 7,3991234 0 A2-4 3370 SR 80 SR 31 / Arcadia Rd. Buckingham Rd. 1,500 4,500 6,000 2,057 11,429 0 0 A2-6 Osceola 1199 3371 SR 82 3497 SR 739 / Fowler Ave. Michigan Link Ave. ¤£192 2,500 4,500 7,000 12,095 12,224 0 #!$" Interstate Highway 0 HWYCAP 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 2,189 2,627 14,594 0 0 A2-6 (/ U.S. Highway 3372 SR 82 1194 Michigan Link Ave. Gateway Blvd 3,000 9,000 12,000 4,698 326,099479 0 0 HWYCAP 3374 US 17 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0  State Highway 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. £441 750 1,965 2,715 858 4,768 0 0 HWYCAP 1193 ¤ Toll Roads 969 US 17 Copley Drive N of CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 348,60330 0 0 A2-6 3376 US 17 Mann Rd. Main St. 1,250 2,500 3,750 1,238 6,875 0 0 A2-6 Brevard 3377 US 17 3431 Main St. SR 60A / Auto Zone Ln 1,000 3,000 4,000¨¦§95 417 2,316 0 0 A2-6 Existing Conditions for SIS Highways 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 SIS Highways 0 HWYCAP Other State roads LEGEND NOTES IMPROVEMENT TYPES Planned Add ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange (2) All phase costs shown as supplied by each District. FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). 10 5 0 10 60 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. «¬ A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger® Terminal System Miles (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study (7) Other Funds - assumed to be toll revenue or partner funded. Document Path: \\COdata\shares\CO\ISD\OTPP\Planning\SIS\ProjRecurring\Cfp\2018\MXD\SISCFP_D5.mxd Mega Projects Phased Over Time A1-AUX: Add 1 Auxilliary Lane MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation PagePage 11 111 DISTRICTDISTRICT 661 STRATEGIC INTERMODAL SYSTEM • Long Range Cost Feasible Plan • FY 2029-2045

Design Right of Way / Construction P3 Funds Other Funds IMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 32433331 PortI-4 Miami McArthurWest of US Causeway 27 / SR 25 PortMiamiPolk / Osceola County Line 0 0 0 51,6860 347,0800 398,7660 4,900 2029 17 0 MGLANEACCESS 3330928 PortI-4 Miami Tunnel-Phase 52 WatsonWest of IslandSR 570 / Polk Parkway (West) MacArthurWest of US Causeway27 / SR 25 Bridge 0 99,3600 99,3600 249,6800 1,656,0000 1,905,6800 599,412 2029 17 78,2220 MGLANENR 18523333 PortI-75 Miami Tunnel-Phase 82 WatsonCollier/Lee Island County Line MacArthurSR 78 Causeway Bridge 0 136,8000 136,8000 271,3000 1,710,0000 271,3000 542,137 2029 17 0 MGLANENR 18533334 PortMiamiI-75 Tunnel-Phase A8 Watsonat North Island Jones Loop Rd MacArthur Causeway Bridge 0 6,5000 6,5000 7,1660 39,8090 0 238,000 2029 14 0 M-INCHNR 32533335 I-75 at NWUS 17/SR 138th 35 St 0 7,500780 7,500780 15,4320 85,7327,800 7,8000 0 M-INCH 32493336 I-75 / HEFT Int. CDat CR Rd 776/Harbor View Miami Gardens Dr 0 2,2706,500 2,2706,500 7,1660 22,70039,809 22,7000 0 M-INCH 32563337 I-75 / Miami Gardens Dr. Int. Turnpikeat CR 769/Kings (HEFT) Highway NW 170th St. 0 5,7606,500 5,7606,500 7,1660 57,60039,809 57,6000 0 M-INCHUP 32543339 I-75 / SR 826 Int. I-75North of University Parkway SRCR 8266 / Moccasin Wallow Rd. 0 10,80060,480 10,80060,480 175,2400 1,008,000108,500 1,183,240108,500 0 MGLANEM-INCH 32523338 I-75 Corridor Improvements NWSouth 138th of River St Road SR 826681 0 34,2005,200 34,2005,200 64,5380 570,00052,000 52,00064,538 0 MGLANEUP 32473463 I-95I-75 USSR 6811 to Broward County line ManagedNorth of University Lanes / Capacity Parkway / Operations 0 700,00049,014 700,00049,014 152,3410 491,7610 152,3410 0 MGLANEUP 33883332 PalmettoI-75 Metrorail Intermodal Terminal Ph SREast 826 of atSR NW951 74 St Collier / Lee County Line 4,0000 10,00063,245 14,00063,245 145,4270 1,250,39865,000 145,42765,000 65,0000 MGLANEPTERM 32571379 SR 29826 Managed Lanes SRI-75 836 USOil 1Well Rd 0 61,0004,333 61,0004,333 5,2000 610,00028,889 610,0000 0 MGLANEA2-4 3341 FundedSR 29 CFP Totals Oil Well Rd. / CR 658 Sunniland Nursery Rd. 0 0 799,8100 4,548 26,627 923,6004,548 1,384,449 Total CFP Funds=0 3,107,859#######A2-4 3342 SR 29 Sunniland Nursery Rd. South of Agriculture Way 0 0 0 2,378 14,206 2,378 0 A2-4 3343 SR 29 South of Agriculture Way CR 846 0 0 0 5,628 20,543 5,628 0 A2-4 3346 SR 29 F Rd North of Cowbay Way 0 0 0 0 47,899 47,899 0 A2-4 3348 SR 31 SR 80 SR 78 0 9,350 9,350 8,914 7,113 0 0 A2-4 3349 SR 31 SR 78 CR 78/River Rd 0 956 956 4,191 6,376 10,567 0 A2-4 3350 SR 31 CR 78/River Rd Cook Brown Rd 0 3,049 3,049 10,610 20,324 30,934 0 A2-4 3354 SR 60 East of CR 630 Polk / Osceola County Line 0 0 0 7,830 35,041 7,830 0 A2-4 3352 SR 60 Hillsborough / Polk County Line CR 555 / Agricola Rd. 2,500 19,500 22,000 10,646 59,146 0 0 A2-6 3353 SR 60 SR 60A / Van Fleet Dr. SR 25 / US 27 3,000 21,000 24,000 11,568 64,265 0 0 A2-6 3359 SR 64 Hardee / Highlands County Line US 27 1,600 4,500 6,100 2,803 15,570 0 0 A2-4 3357 SR 64 US 17 SR 636 2,000 10,250 12,250 3,722 20,677 0 0 A2-4 3358 SR 64 Old Town Creek Rd. / CR 671 / Parnell Rd. Hardee / Highlands County Line 1,750 5,000 6,750 1,943 10,797 0 0 A2-4 3367 SR 70 NW 38th Terrace US 98 1,200 1,700 2,900 3,061 8,713 0 0 A2-4 3363 SR 70 Jefferson Avenue US 27 0 2,879 2,879 3,116 19,190 0 0 A2-4 3364 SR 70 US 27 CR 29 0 2,456 2,456 3,070 16,371 0 0 A2-4 3365 SR 70 CR 29 Lonesome Island Road 0 1,083 1,083 1,299 7,217 0 0 A2-4 3362 SR 70 East of SR 31 Jefferson Avenue 3,500 39,000 42,500 16,336 196,868 0 0 A2-4 3361 SR 70 Manatee County Line West of Peace River (American Legion Rd) 2,500 18,500 21,000 14,603 92,893 0 0 A2-4 3360 SR 70 CR 675 DeSoto County Line 3,000 26,000 29,000 37,806 130,876 0 0 A2-4 3366 SR 70 Lonesome Island Road NW 38th Terrace 4,000 35,000 39,000 12,069 67,050 0 0 A2-4 3369 SR 710 Sherman Woods Ranch Okeechobee / Martin County Line 0 0 0 7,399 35,876 7,399 0 A2-4 3370 SR 80 SR 31 / Arcadia Rd. Buckingham Rd. 1,500 4,500 6,000 2,057 11,429 0 0 A2-6 3371 SR 82 SR 739 / Fowler Ave. Michigan Link Ave. 2,500 4,500 7,000 12,095 12,224 0 0 HWYCAP 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 2,189 2,627 14,594 0 0 A2-6 3372 SR 82 Michigan Link Ave. Gateway Blvd 3,000 9,000 12,000 4,698 26,099 0 0 HWYCAP 3374 US 17 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. 750 1,965 2,715 858 4,768 0 0 HWYCAP 969 US 17 Copley Drive N of CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 8,603 0 0 A2-6 3376 US 17 Mann Rd. Main St. 1,250 2,500 3,750 1,238 6,875 0 0 A2-6 3377 US 17 Main St. SR 60A / Auto Zone Ln 1,000 3,000 4,000 417 2,316 0 0 A2-6 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 0 HWYCAP

LEGEND NOTES IMPROVEMENT TYPES ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange FY 2028/2029 - 2034/2035 (2) All phase costs shown as supplied by each District. A1-3: Add 1 Lane to Build 3 FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). A2-4: Add 2 Lanes to Build 4 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. A2-8: Add 2 Lanes to Build 8 FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study Mega Projects Phased Over Time (7) Other Funds - assumed to be toll revenue or partner funded. A1-AUX: Add 1 Auxilliary Lane A4-SUL:A1-AUX: AddAdd 41 SpecialAuxilliary Use Lane Lanes MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 1271 DISTRICT 1 Strategic Intermodal System

Design «¬7 Right of Way / Construction 2045 COP3 SFundsT FEASIOtherBLE Funds PLANIMPRV ID FACILITY FROM TO TYPE PDE !(!( PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL «¬860 3247 3331 I-4 West of US 27 / SR 25 Polk / Osceola County Line 0 ¬8260 0 51,686 347,080 398,766 0 MGLANE 3249 ¤£27 « District 6 3330 I-4 West of SR 570 / Polk Parkway (West) West of US 27 / SR 25 ¨¦§750 99,360 99,360«¬915 249,680 1,656,000 1,905,680 District 6 0 MGLANE !( !(!( 1853 3333 I-75 Collier/Lee County Line 3SR2 5786 0 136,800 136,800 271,300 1,710,000 271,300 0 MGLANE 3334 I-75 at North Jones Loop Rd 0 6,500 6,500 7,166 39,809 0 0 M-INCH 95 ¤£ 3335 I-75 at US 17/SR 35 3253 0 7,500 ¨¦§7,5001 15,432 185,732852 0 0 M-INCH 3336 I-75 at CR 776/Harbor View «¬821 0 !( 6,500 6,500 7,166 39,809 0 0 M-INCH 3337 I-75 at CR 769/Kings Highway 3252 0 6,500 6,500 7,166 939,80928 F0 Y 2028/2029 - FY 2044/0204M-INCH5 3339 I-75 North of University Parkway CR 6 / Moccasin Wallow Rd. 0 «¬826 60,480 60,480 175,240 1,008,000 1,183,240 0 MGLANE 3338 I-75 South of River Road 3SR2 56814 «¬997 0 34,200 34,200 64,538 570,000 64,538LEGEND 0 MGLANE 3243 3463 I-75 SR 681 North of University Parkway «¬836 0 49,014 49,014 152,341 491,761 152,341 0 MGLANE 3332 I-75 East of SR 951 3Collier388 / Lee County Line 0 63,245 63,245 145,427 1,250,398 145,427 0 MGLANE ¤£41 Bridge, Interchange, Intersection Improvements 1379 SR 29 I-75 Oil Well Rd 0 4,333 4,333 5,200 28,889 0 0 A2-4 3257 «¬821 (Project with highest phase funded) 3341 SR 29 Oil Well Rd. / CR 658 Sunniland Nursery Rd. 0 0 0 4,548 26,627 4,548 (! 0 A2-4 3342 SR 29 Sunniland Nursery Rd. South of Agriculture Way 0 0 0 2,378 14,206 2,378 Construction & Mega Projects (CON) 0 A2-4 (! 3343 SR 29 South of Agriculture Way CR 846 0 ¤£1 0 0 5,628 20,543 5,628 Right of Way (ROW) 0 A2-4 3346 SR 29 F Rd North of Cowbay Way «¬94 0 0 0 0 47,899 47,899 0 A2-4 Monroe «¬874 (! Preliminary Engineering (PE) 3348 SR 31 SR 80 SR 78 0 9,350 9,350 8,914 7,113 0 (! 0 A2-4 3349 SR 31 SR 78 CR 78/River Rd 0 956 956 4,191 6,376 10,567 Project Development and Environmen0tal (PDEA2-4) 3350 SR 31 CR 78/River Rd Cook Brown Rd 0 3,049 3,049 10,610 20,324 30,934 0 A2-4 3354 SR 60 East of CR 630 Polk / Osceola County Line 0 0 0 7,830 35,041 7,830Add Lanes, New Roads, etc. Improvemen0ts A2-4 «¬997 3352 SR 60 Hillsborough / Polk County Line CR 555 / Agricola Rd. 2,500 19,500 22,000 10,646 59,146 (Pro0ject with highest phase funded) 0 A2-6 3353 SR 60 SR 60A / Van Fleet Dr. SR 25 / US 27 3,000 21,000 24,000 11,568 64,265 0 Construction & Mega Projects (CON) 0 A2-6 3359 SR 64 Hardee / Highlands County Line US 27 1,600 4,500 6,100 2,803 15,570 0 0 A2-4 3357 SR 64 US 17 SR 636 2,000 10,250 12,250 3,722 20,677 0 Right of Way (ROW) 0 A2-4 3358 SR 64 Old Town Creek Rd. / CR 671 / Parnell Rd. HardeeMiami -/D Highlandsade County Line 1,750 5,000 6,750 1,943 10,797 0 Preliminary Engineering (PE) 0 A2-4 3367 SR 70 NW 38th Terrace US 98 «¬821 1,200 1,700 2,900 3,061 8,713 0 Project Development and Environmen0tal (PDEA2-4) 3363 SR 70 Jefferson Avenue US 27 0 2,879 2,879 3,116 19,190 0 0 A2-4 3364 SR 70 US 27 CR 29 0 2,456 2,456 3,070 16,371 0 0 A2-4 3365 SR 70 CR 29 Lonesome Island Road 0 1,083 1,083 1,299 7,217 10234 Green Band - FY 2028/2029 to FY 20340/2035 A2-4 3362 SR 70 East of SR 31 Jefferson Avenue 3,500 39,000 42,500 16,336 196,868 0 0 A2-4 Yellow Band - FY 2035/2036 to FY 2039/2040 3361 SR 70 Manatee County Line West of Peace River (American Legion Rd) 2,500 18,500 21,000 14,603 92,893 10234 0 A2-4 3360 SR 70 CR 675 DeSoto County Line 3,000 26,000 29,000 37,806 130,876 10234 Blue Band - FY 2040/2041 to FY 2044/02045 A2-4 3366 SR 70 Lonesome Island Road NW 38th Terrace 4,000 35,000 39,000 12,069 67,050 0 0 A2-4 Mega Projects Phased Over Time 3369 SR 710 Sherman Woods Ranch Okeechobee / Martin County Line 0 0 0 7,399 35,876 7,3991234 0 A2-4 3370 SR 80 SR 31 / Arcadia Rd. Buckingham Rd. 1,500 4,500 6,000 2,057 11,429 0 0 A2-6 3371 SR 82 SR 739 / Fowler Ave. Michigan Link Ave. 2,500 4,500 7,000 12,095 12,224 0 #!$" Interstate Highway 0 HWYCAP 3373 SR 82 Alabama Road Homestead Blvd. 0 2,189 2,189 2,627 14,594 0 0 A2-6 (/ U.S. Highway 3372 SR 82 Michigan Link Ave. Gateway Blvd 3,000 9,000 12,000 4,698 26,099 0 0 HWYCAP 3374 US 17 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0  State Highway 0 HWYCAP 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. 750 1,965 2,715 858 4,768 0 0 HWYCAP 969 US 17 Copley Drive N of CR 74 (Bermont Rd) 1,045 2,000 3,045 1,541 8,603 0 Toll Roads 0 A2-6 3376 US 17 Mann Rd. Main St. 1,250 2,500 3,750 1,238 6,875 0 0 A2-6 3377 US 17 Main St. SR 60A / Auto Zone Ln 1,000 3,000 4,000 417 2,316 0 0 A2-6 Existing Conditions for SIS Highways 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line ¤£1 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 SIS Highways 0 HWYCAP Other State roads LEGEND NOTES IMPROVEMENT TYPES Planned Add ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange (2) All phase costs shown as supplied by each District. FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). 6 3 0 6 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. Miles FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger® Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study (7) Other Funds - assumed to be toll revenue or partner funded. File: S:\ProjRecurring\Wpa\SIS\GIS\Projects\Tentative\Highway\1st5Year\wpai_d6.mxd Mega Projects Phased Over Time A1-AUX: Add 1 Auxilliary Lane MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 131 DISTRICTDISTRICT 771 STRATEGIC INTERMODAL SYSTEM • Long Range Cost Feasible Plan • FY 2029-2045

Design Right of Way / Construction P3 Funds Other Funds IMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 32633331 I-275I-4 atWest I-4 Flyoverof US 27 / SR 25 Polk / Osceola County Line 0 7,0000 7,0000 129,46551,686 347,08070,000 199,465398,766 0 MGLANEM-INCH 35063330 I-275I-4 SWest of SR of 60 SR to 570 Lois / PolkAve Parkway (West) SRWest 60 ofFrom US 27S of / SRI-275 25 to SR 589 0 99,3600 99,3600 249,6800 1,000,0001,656,000 1,000,0001,905,680 0 MGLANEM-INCH 35073333 I-275I-75 InnovationCollier/Lee CountyCorridor Line (Section 7/Part 2) SR 78 0 136,8000 136,8000 271,3000 1,710,000100,000 100,000271,300 0 HWYCAPMGLANE 32643334 I-275I-75 at NorthMLK Blvd Jones Loop Rd 0 6,500194 6,500194 7,1660 39,809646 6460 0 M-INCH 32653335 I-275I-75 at USHillsborough 17/SR 35 Avenue 0 7,500246 7,500246 15,4320 85,7322,456 2,4560 0 M-INCH 32663336 I-275I-75 at CRSligh 776/Harbor Avenue View 0 6,50087 6,50087 7,1660 39,809289 2890 0 M-INCH 32673337 I-275I-75 at BuschCR 769/Kings Boulevard Highway 0 6,500168 6,500168 7,1660 39,8091,678 1,6780 0 M-INCH 32683339 I-275I-75 atNorth Fowler of University Avenue Parkway CR 6 / Moccasin Wallow Rd. 0 60,480101 60,480101 175,2400 1,008,0001,014 1,183,2401,014 0 MGLANEM-INCH 32693338 I-275I-75 atSouth Fletcher of River Avenue Road SR 681 0 34,200163 34,200163 64,5380 570,0001,627 64,5381,627 0 MGLANEM-INCH 32703463 I-275I-75 atSR Bearss681 Avenue North of University Parkway 0 49,014186 49,014186 152,3417,500 491,76150,000 152,34157,500 0 MGLANEM-INCH 35083332 I-4I-75 SelmonEast of SR Connector 951 BranchCollier / Forbes Lee County Road Line 0 63,2450 63,2450 150,000145,427 1,647,2341,250,398 1,797,234145,427 0 MGLANE 32711379 I-4SR 29 BranchI-75 Forbes Road PolkOil Well Parkway Rd 0 58,5004,333 58,5004,333 21,6225,200 448,50028,889 470,1220 0 MGLANEA2-4 32733341 I-4SR 29 atOil McIntosh Well Rd. /Road CR 658 Sunniland Nursery Rd. 0 2520 2520 4,5480 26,627840 4,548840 0 M-INCHA2-4 32743342 I-4SR 29 atSunniland Branch ForbesNursery Rd. South of Agriculture Way 0 1240 1240 2,3780 14,2061,240 1,2402,378 0 M-INCHA2-4 32753343 I-4SR 29 atSouth Thonotosassa of Agriculture Road Way CR 846 0 1190 1190 5,6280 20,543396 5,628396 0 M-INCHA2-4 32763346 I-4SR 29 atF Rd Park Road North of Cowbay Way 0 1320 1320 0 47,8991,320 47,8991,320 0 M-INCHA2-4 32773348 I-4SR 31 atSR Mango80 Road SR 78 0 9,350102 9,350102 8,9140 1,0177,113 1,0170 0 M-INCHA2-4 14973349 I-4SR 31(EB) WSR of78 Orient Rd NB/SBCR 78/River I-75 Rd 0 9560 9560 50,0004,191 38,6746,376 88,67410,567 0 M-INCHA2-4 16343350 I-75SR 31 NCR of 78/River Fletcher Rd NCook of I-75/I-275 Brown Rd Apex 0 26,7483,049 26,7483,049 10,6100 20,3240 30,9340 0 MGLANEA2-4 16353354 I-75SR 60 SREast 56 of CR 630 CRPolk 54 / Osceola County Line 0 12,0190 12,0190 52,8077,830 60,09535,041 7,8300 0 MGLANEA2-4 32873352 I-75SR 60 NorthHillsborough of SR 52 / Polk County Line Hernando/SumterCR 555 / Agricola Rd. County Line 2,500750 19,5000 22,000750 10,6460 59,1460 0 0 A2-6PDE 32803353 I-75SR 60 atSR Big60A Bend / Van Road Fleet Dr. SR 25 / US 27 3,0000 21,0000 24,0000 11,5686,000 37,60764,265 43,6070 0 M-INCHA2-6 16323359 I-75SR 64 SHardee of US 301/ Highlands County Line NUS of 27 Fletcher Avenue 1,6000 296,6564,500 296,6566,100 160,0902,803 2,508,38915,570 160,0900 0 MGLANEA2-4 32813357 I-75SR 64 atUS Gibsonton 17 SR 636 2,0000 10,250663 12,250663 3,7220 20,6776,629 6,6290 0 M-INCHA2-4 32863358 I-75SR 64 NorthOld Town of Bruce Creek B. Rd. Downs / CR 671 / Parnell Rd. NorthHardee of / SRHighlands 52 County Line 2,0001,750 5,0000 2,0006,750 1,9430 10,7970 0 0 A2-4PDE 15053367 I-75SR 70 Pasco/HernandoNW 38th Terrace C/L SUS of 98 SR 50 1,2000 3,9391,700 3,9392,900 3,0610 39,3918,713 0 0 MGLANEA2-4 15063363 I-75SR 70 SJefferson of SR 50 Avenue Hernando/SumterUS 27 C/L 0 4,2072,879 4,2072,879 3,1160 21,70519,190 0 0 MGLANEA2-4 15083364 I-75SR 70 Hernando/SumterUS 27 C/L CR 476-B29 0 2,3192,456 2,3192,456 3,0700 23,18916,371 0 0 MGLANEA2-4 32783365 I-75SR 70 MoccasinCR 29 Wallow SouthLonesome of US Island 301 Road 0 43,5601,083 43,5601,083 8,0001,299 333,9607,217 341,9600 0 MGLANEA2-4 15013362 I-75SR 70 NEast of ofCR SR 54 31 NJefferson of SR 52 Avenue 3,5000 23,75439,000 23,75442,500 10,43716,336 118,769196,868 129,2060 0 MGLANEA2-4 15023361 I-75SR 70 NManatee of SR 52 County Line Pasco/HernandoWest of Peace River C/L (American Legion Rd) 2,5000 18,5004,848 21,0004,848 15,00214,603 68,50592,893 15,0020 0 MGLANEA2-4 15123360 SR 5070 BrooksvilleCR 675 ByPass LockhartDeSoto County Road Line 3,0000 26,0008,200 29,0008,200 10,28937,806 130,87641,000 10,2890 0 A2-6A2-4 15113366 SR 5070 (Cortez Blvd) SuncoastLonesome Pkwy Island Road CobbNW 38th Road Terrace 4,0000 35,0004,600 39,0004,600 19,50012,069 13,86867,050 33,3680 0 A2-6A2-4 32883369 SR 54710 atSherman Collier ParkwayWoods Ranch Okeechobee / Martin County Line 0 15,0000 15,0000 30,0007,399 100,00035,876 130,0007,399 0 M-INTA2-4 32893370 SR 6080 DoverSR 31 /Road Arcadia Rd. SRBuckingham 39 Rd. 1,5000 4,5000 6,0000 7,1002,057 76,99711,429 84,0970 0 A2-6 32903371 SR 6082 SR 39739 / Fowler Ave. PolkMichigan County Link Line Ave. 2,5000 5,6484,500 5,6487,000 28,50712,095 28,50712,224 57,0140 0 HWYCAPA2-6 32933373 SR 82686 / Roosevelt Boulevard I-275/SRAlabama 93Road WHomestead of 9th St N/MLKBlvd. St N 0 2,1890 2,1890 2,6270 94,68314,594 94,6830 0 M-INCHA2-6 32983372 USSR 8219 Pinellas/PascoMichigan Link Ave.County Line Pasco/HernandoGateway Blvd County Line 1,0003,000 9,0000 12,0001,000 4,6980 26,0990 0 0 HWYCAPSTUDY 15173374 US 1917 SPalmetto of Lake StSt. PinellasSR 70 / Hickory Trail (Tarpon St. Interchange) 7500 8,860674 8,8601,424 2940 87,9551,634 0 0 HWYCAPM-INT 32963375 US 1917 (SR 55) NSR of 70 Nebraska / Hickory Avenue St. SSR of 35 Timberlane / DeSoto Ave. Road 7500 1,9650 2,7150 8580 108,9724,768 108,9720 0 HWYCAPM-INT 1728969 US 4117 PendolaCopley Drive Point Rd SouthN of CR of 74 Causeway (Bermont Blvd Rd) 1,0450 2,0000 3,0450 1,5261,541 7,0998,603 8,6250 0 A2-6 33003376 US 1792 () westMann end Rd. of Gandy Bridge eastMain end St. of Gandy Bridge 1,2500 34,8812,500 34,8813,750 1,2380 348,8076,875 0 0 A2-6 3377 FundedUS 17 CFP Totals Main St. SR 60A / Auto Zone Ln 1,000 3,000 567,0264,000 417 2,316 4,949,0600 Total CFP Funds=0 5,516,086A2-6 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,682 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 0 HWYCAP

LEGEND NOTES IMPROVEMENT TYPES ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange FY 2028/2029 - 2034/2035 (2) All phase costs shown as supplied by each District. A1-3: Add 1 Lane to Build 3 FY 2028/2029 - 2034/2035 A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). A2-4: Add 2 Lanes to Build 4 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. A2-8: Add 2 Lanes to Build 8 FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study Mega Projects Phased Over Time (7) Other Funds - assumed to be toll revenue or partner funded. A1-AUX: Add 1 Auxilliary Lane A4-SUL:A1-AUX: AddAdd 41 SpecialAuxilliary Use Lane Lanes MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 1481 DISTRICT 1 Strategic Intermodal System

Design Right of Way / Construction 2045 COP3 SFundsT FEASIOtherBLE Funds PLANIMPRV ID FACILITY FROM TO TYPE PDE PE TOTAL ROW CON TOTAL COST Begin Yr #Yrs TOTAL 3331 I-4 West of US 27 / SR 25 Polk / Osceola County Line 0 0 1508 51,686 347,080 398,766 0 MGLANE 3330 I-4 West of SR 570 / Polk Parkway (West) West of US 27 / SR 25 0 99,360 99,360 249,680 1,656,000 1,905,680 DDistrictistrict 7 0 MGLANE 3333 I-75 Collier/Lee County Line SR 78 0 136,800 136,8001506 271,300 1,710,000 271,300 0 MGLANE 3334 I-75 at North Jones Loop Rd «¬44 0 6,500 6,500 7,166 39,809 0 0 M-INCH 3335 I-75 at US 17/SR 35 0 7,500 7,5001505 15,432 85,732 0 0 M-INCH ¤£19 3336 I-75 at CR 776/Harbor View Citrus 0 6,500 6,500 7,166 39,809 0 0 M-INCH 1502 3337 I-75 1512 at CR 769/Kings Highway 0 6,500 6,500 7,166 39,809 F0 Y 2028/2029 - FY 2044/0204M-INCH5 3339 I-75 North of University Parkway CR 6 / Moccasin Wallow Rd. 0 60,480 60,480 175,240 1,008,000 1,183,240 0 MGLANE 1501 3338 I-75 South of River Road SR 681 0 34,200 34,200 64,538 570,000 64,538LEGEND 0 MGLANE 1511 3463 I-75 SR 681 North of University Parkway 0 49,014 49,0141635 152,341 491,761 152,341 0 MGLANE 3332 I-75 East of SR 951 Collier / Lee County Line 0 63,245 145,427 1,250,398 MGLANE 63,245 145,427Bridge, Interchange, Intersection Improv0ements 1379 SR 29 I-75 Oil Well Rd 0 4,333 4,3331634 5,200 28,889 0 0 A2-4 3287 ¤£41 (Project with highest phase funded) 3341 SR 29 Oil Well Rd. / CR 658 Sunniland Nursery Rd. 0 0 0 4,548 26,627 4,548 (! 0 A2-4 3342 SR 29 Sunniland Nursery Rd. South of Agriculture Way 0 0 32700 2,378 14,206 2,378 Construction & Mega Projects (CON) 0 A2-4 3343 SR 29 3298 South of Agriculture Way CR 846 0 0 0 5,628 20,543 5,628 (! 0 A2-4 3269 Right of Way (ROW) 3346 SR 29 F Rd North of Cowbay Way (!50 0 0 0 0 47,899 47,899 0 A2-4 (! Preliminary Engineering (PE) 3348 SR 31 SR 80 SR 78 0 9,350 9,350 8,914 7,113 0 0 A2-4 3288 Hernando 3268 (! 3349 SR 31 SR 78 CR 78/River Rd 0 956 956 4,191 6,376 10,567 Project Development and Environmen0tal (PDEA2-4) 3350 SR 31 CR 78/River Rd ¤£19 Cook Brown Rd ¤£301 0 3,049 3,0493267 10,610 20,324 30,934 0 A2-4 3354 SR 60 3507 East of CR 630 Polk / Osceola County Line 0 0 0 7,830 35,041 7,830Add Lanes, New Roads, etc. Improvemen0ts A2-4 3352 SR 60 Hillsborough / Polk County Line CR 555 / Agricola Rd. 2,500 19,500 22,0003266 10,646 59,146 (Pro0ject with highest phase funded) 0 A2-6 3353 SR 60 SR 60A / Van Fleet Dr. SR 25 / US 27 Pasco ¨¦§75 3,000 21,000 24,000 11,568 64,265 0 0 A2-6 1517 3286 3265 Construction & Mega Projects (CON) 3359 SR 64 Hardee / Highlands County Line US 27 52 1,600 4,500 6,100 2,803 15,570 0 0 A2-4 «¬ Right of Way (ROW) 3357 SR 64 US 17 SR 636 2,000 10,250 12,2501632 3,722 20,677 0 0 A2-4 3358 SR 64 3296 Old Town Creek Rd. / CR 671 / Parnell Rd. Hardee / Highlands County Line 1,750 5,000 6,750 1,943 10,797 0 Preliminary Engineering (PE) 0 A2-4 3367 SR 70 NW 38th Terrace US 98 ¤£41 1,200 1,700 2,9003277 3,061 8,713 0 Project Development and Environmen0tal (PDEA2-4) 3363 SR 70 Jefferson Avenue US 27 0 2,879 2,879 3,116 19,190 0 0 A2-4 3264 3364 SR 70 US 27 «¬54 CR 29 !( 0 2,456 2,4563273 3,070 16,371 0 0 A2-4 3365 SR 70 CR 29 Lonesome Island Road 0 1,083 1,299 7,217 Green Band - FY 2028/2029 to FY 2034/2035 A2-4 (! 1,083 10234 0 3362 SR 70 East of SR 31 Jefferson Avenue 3,500 39,000 42,5003274 16,336 196,868 0 0 A2-4 3263 2¨¦§75 Yellow Band - FY 2035/2036 to FY 2039/2040 3361 SR 70 Manatee County Line West of Peace River (American Legion Rd) 2,500 18,500 21,000 14,603 92,893 10234 0 A2-4 !( 3275 3360 SR 70 CR 675 DeSoto County!( Line 3,000 26,000 29,000 37,806 130,876 0 Blue Band - FY 2040/2041 to FY 2044/02045 A2-4 !( ¤£301 1234 3366 SR 70 3506 Lonesome Island Road NW 38th Terrace!( 4,000 35,000 39,0003271 12,069 67,050 0 0 A2-4 !( !( 1234 Mega Projects Phased Over Time 3369 SR 710 Sherman Woods Ranch Okeechobee / Martin County Line!( 4 !( !( 0 0 0 7,399 35,876 7,399 0 A2-4 !( !( ¨¦§ 3370 SR 80 SR 31 / Arcadia Rd. ¤£19 Buckingham!( Rd. !(!(!(!( 1,500 4,500 6,0003276 2,057 11,429 0 0 A2-6 3300 !( 3371 SR 82 SR 739 / Fowler Ave. Michigan Link!( Ave. 2,500 4,500 7,000 12,095 12,224 0 #!$" Interstate Highway 0 HWYCAP 3373 SR 82 Alabama Road Homestead!( Blvd. 0 2,189 2,1893508 2,627 14,594 0 0 A2-6 (!60 (/ U.S. Highway 3372 SR 82 3293 Michigan Link Ave. 2¨¦§75 Gateway Blvd 3,000 9,000 12,000 4,698 26,099 0 0 HWYCAP 1497 3374 US 17 Palmetto St. SR 70 / Hickory St. 750 674 1,424 294 1,634 0  State Highway 0 HWYCAP !( «¬600 3375 US 17 SR 70 / Hickory St. SR 35 / DeSoto Ave. !( 750 1,965 2,7153290 858 4,768 0 0 HWYCAP 969 US 17 Copley Drive Pinellas N of CR 74 (Bermont Rd) Hillsborough 1,045 2,000 3,045 1,541 8,603 0 Toll Roads 0 A2-6 3376 US 17 Mann Rd. Main St. UV45 1,250 2,500 3,7503289 1,238 6,875 0 0 A2-6 3377 US 17 Main St. SR 60A / Auto Zone !(Ln 1,000 3,000 4,000 417 2,316 0 0 A2-6 Existing Conditions for SIS Highways 3378 US 19 I-275 Ramp Skyway Br. Hillsborough County Line 3,500 4,182 7,6821728 2,302 12,787 0 0 A2-6 3382 US 27 North of Kokomo Rd. Polk / Lake County Line 0 16,320 16,320 6,664 108,798 6,664 SIS Highways 0 HWYCAP 3281 Other State roads LEGEND NOTES ¨¦§75 «¬674 ¤£301 IMPROVEMENT TYPES Planned Add 3280 ACCESS: Access M-INCH: Modify Interchange (1) All values in thousands of Present Day Dollars (2017). BRIDGE: Bridge N-INCH: New Interchange (2) All phase costs shown as supplied275 by each District. FY 2028/2029 - 2034/2035 ¨¦§ A1-3: Add 1 Lane to Build 3 FRTCAP: Freight Capacity NR: New Road (3) CON includes both Construction (CON52) and Construction Support (CEI). 3278 10 5 0 10 A2-4: Add 2 Lanes to Build 4 GRASEP: Grade Separation PDE: Project Dev. Env. FY 2035/2036 - 2039/2040 (4) ROW includes both Right-of-Way Acquisition/Mitigation (ROW43/45) and Right-of-Way Support. A2-6: Add 2 Lanes to Build 6 HWYCAP: Highway Capacity SERVE: Add Svc/Front/CD (5) "P3 Funds" - Used to fund Public-Private Partnership projects over a specified number of years. Miles FY 2040/2041 - 2044/2045 A2-8: Add 2 Lanes to Build 8 PTERM: Passenger® Terminal System (6) Revenue forecast provides separate values for PDE and PE than for ROW and CON. A4-12: Add 4 Lanes to Build 12 ITS: Intelligent Transp. Sys STUDY: Study (7) Other Funds - assumed to be toll revenue or partner funded. File: S:\ProjRecurring\Wpa\SIS\GIS\Projects\Tentative\Highway\1st5Year\wpai_d7.mxd Mega Projects Phased Over Time A1-AUX: Add 1 Auxilliary Lane MGLANE: Managed Lanes UP: Ultimate Plan

2018 Edition State of Florida Department of Transportation Page 151 State of Florida Department of Transportation Systems Implementation Office 605 Suwannee Street • Tallahassee, FL 32399 www.dot.state.fl.us