TECHNOVATOR INTERNATIONAL LIMITED 同方泰德國際科技有限公司* (Incorporated in Singapore with Limited Liability) (Stock Code: 1206)

Total Page:16

File Type:pdf, Size:1020Kb

TECHNOVATOR INTERNATIONAL LIMITED 同方泰德國際科技有限公司* (Incorporated in Singapore with Limited Liability) (Stock Code: 1206) Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. Technovator TECHNOVATOR INTERNATIONAL LIMITED 同方泰德國際科技有限公司* (incorporated in Singapore with limited liability) (Stock Code: 1206) VOLUNTARY ANNOUNCEMENT SUCCESSFUL EXPANSION OF THE INTELLIGENT BUSINESS OF CHANGCHUN RAIL TRANSIT This announcement is made by Technovator International Limited (the “Company”, together with its subsidiaries, the “Group”) on a voluntary basis to inform the shareholders of the Company and potential investors about the latest business development of the Group. The board of directors of the Company (the “Board“) is pleased to announce that the Group has recently successfully entered into a contract regarding the “construction of Integrated Supervision and Control System for Changchun rail transit line 1 Phase 1” (the “Changchun Project”). The contract value amounts to approximately RMB98.72 million and the Changchun Project is scheduled for completion by the end of 2016. Pursuant to the Changchun Project, the Group will be responsible for overall integration of intelligent rail transit system such as systems design, software and hardware equipment, development and manufacturing, procurement, product supply, installation and commissioning, consisting of Integrated Supervision and Control System (ISCS), Building Automation System (BAS), and Access System, with the implementation of the Group’s proprietary ISCS platform. The Group’s overall competencies in the field of the Intelligent Rail Transit Business have been underscored by winning of the Changchun Project, which enabling the Group to pursue a sweeping business presence in Northeast China and facilitating its sustainable development in Changchun. * for identification purpose only – 1 – Currently, the Group has established its Intelligent Rail Transit Business presence across 15 cities with more than 40 routes, namely Beijing, Tianjin, Nanjing, Guangzhou, Harbin, Changchun, Dalian, Changsha, Shijiazhuang, Wuhan, Chongqing, Qingdao, Suzhou, Chengdu and Tehran in Iran, whilst Intelligent Rail Transit Network Command Center Business covers 3 first-tier cities including Beijing, Guangzhou, and Shenzhen as well as the Intelligent Intercity Passenger Railway Business including routes of Beijing–Tianjin, Shanghai–Nanjing, Shijiazhuang–Taiyuan, Wuhan–Guangzhou, Shanghai–Hangzhou, Zhengzhou–Xi’an and Hainan Eastern Ring. Shareholders of the Company and potential investors are advised to exercise caution when dealing in the shares of the Company. By the order of the Board Technovator International Limited Fan Xin Chairman Beijing, 29 February 2016 As at the date of this announcement, the executive directors of the Company are Mr. Zhao Xiaobo and Mr. Seah Han Leong; the non-executive directors of the Company are Mr. Fan Xin, Mr. Liu Tianmin and Mr. Wang Yinghu; and the independent non-executive directors of the Company are Mr. Fan Ren Da Anthony, Mr. Chia Yew Boon and Ms. Chen Hua. – 2 –.
Recommended publications
  • Successful Expansion of the Intelligent Business Of
    SUCCESSFUL EXPANSION OF A CONTRACT IN RESPECT OFTHE INTELLIGENT BUSINESS OF CHANGCHUN RAIL TRANSIT 29 February 2016 Press Release SUCCESSFUL EXPANSION OF THE INTELLIGENT BUSINESS OF CHANGCHUN RAIL TRANSIT (29 February 2016, Hong Kong) Technovator International Ltd. (“Technovator” or “the Group”, HKEx: 1206) is pleased to announce that the Group has recently successfully entered into a contract regarding the “construction of Integrated Supervision and Control System for Changchun rail transit line 1 Phase 1” (the “Changchun Project”). The Changchun rail transit line 1, with a total rail length of 40.65km. Pursuant to the Changchun Project, the Group will be responsible for overall integration of intelligent rail transit system such as systems design, software and hardware equipment, development and manufacturing, procurement, product supply, installation and commissioning, consisting of Integrated Supervision and Control System (ISCS), Building Automation System (BAS), and Access System, with the implementation of the Group’s proprietary ISCS platform. The contract value amounts to approximately RMB98.72 million and Changchun Project is scheduled for completion by the end of 2016. The Group’s overall competencies in the field of the Intelligent Rail Transit Business have been underscored by winning of the Changchun Project, which enabling the Group to pursue a sweeping business presence in Northeast China and facilitating its sustainable development in Changchun. There has been a very strong demand for safe and efficient forms of transportation attendant on the sizzling growth of the urban rail transit in recent years. As a leading integrated energy saving services provider, Technovator is engaged to propel the application of intelligent rail transit, and provide specialized solutions with focus on the variations in regional climate, customer demand and post-operation management.
    [Show full text]
  • 8Th Metro World Summit 201317-18 April
    30th Nov.Register to save before 8th Metro World $800 17-18 April Summit 2013 Shanghai, China Learning What Are The Series Speaker Operators Thinking About? Faculty Asia’s Premier Urban Rail Transit Conference, 8 Years Proven Track He Huawu Chief Engineer Record: A Comprehensive Understanding of the Planning, Ministry of Railways, PRC Operation and Construction of the Major Metro Projects. Li Guoyong Deputy Director-general of Conference Highlights: Department of Basic Industries National Development and + + + Reform Commission, PRC 15 30 50 Yu Guangyao Metro operators Industry speakers Networking hours President Shanghai Shentong Metro Corporation Ltd + ++ Zhang Shuren General Manager 80 100 One-on-One 300 Beijing Subway Corporation Metro projects meetings CXOs Zhang Xingyan Chairman Tianjin Metro Group Co., Ltd Tan Jibin Chairman Dalian Metro Pak Nin David Yam Head of International Business MTR C. C CHANG President Taoyuan Metro Corp. Sunder Jethwani Chief Executive Property Development Department, Delhi Metro Rail Corporation Ltd. Rachmadi Chief Engineering and Project Officer PT Mass Rapid Transit Jakarta Khoo Hean Siang Executive Vice President SMRT Train N. Sivasailam Managing Director Bangalore Metro Rail Corporation Ltd. Endorser Register Today! Contact us Via E: [email protected] T: +86 21 6840 7631 W: http://www.cdmc.org.cn/mws F: +86 21 6840 7633 8th Metro World Summit 2013 17-18 April | Shanghai, China China Urban Rail Plan 2012 Dear Colleagues, During the "12th Five-Year Plan" period (2011-2015), China's national railway operation of total mileage will increase from the current 91,000 km to 120,000 km. Among them, the domestic urban rail construction showing unprecedented hot situation, a new round of metro construction will gradually develop throughout the country.
    [Show full text]
  • China Railway Signal & Communication Corporation
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. China Railway Signal & Communication Corporation Limited* 中國鐵路通信信號股份有限公司 (A joint stock limited liability company incorporated in the People’s Republic of China) (Stock Code: 3969) ANNOUNCEMENT ON BID-WINNING OF IMPORTANT PROJECTS IN THE RAIL TRANSIT MARKET This announcement is made by China Railway Signal & Communication Corporation Limited* (the “Company”) pursuant to Rules 13.09 and 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited (the “Listing Rules”) and the Inside Information Provisions (as defined in the Listing Rules) under Part XIVA of the Securities and Futures Ordinance (Chapter 571 of the Laws of Hong Kong). From July to August 2020, the Company has won the bidding for a total of ten important projects in the rail transit market, among which, three are acquired from the railway market, namely four power integration and the related works for the CJLLXZH-2 tender section of the newly built Langfang East-New Airport intercity link (the “Phase-I Project for the Newly-built Intercity Link”) with a tender amount of RMB113 million, four power integration and the related works for the XJSD tender section of the newly built
    [Show full text]
  • Urban Transport of China Evaluation on the Convenience of Air–Rail
    Urban Transport of China No. 04 Citation: CUI Yanbo, LIANG XiaoJie, SUI Ling. Evaluation on the Convenience of air–rail Multimodal Transportation [J]. Urban Transport of China, 2019 (04): 73–79, 104. Evaluation on the Convenience of air–rail Multimodal Transportation CUI Yanbo, LIANG XiaoJie, SUI Ling China Academy of Transportation Science, Beijing 100029, China Abstract: Based on the connotation and practical significance of air–rail multimodal transportation (ARMT), this paper reviews the development of ARMT in major cities’ airports in China. In terms of facilities and operational services, the paper compares the convenience of transfer between air transportation and railway in different airports. With the subjective and objective comprehensive weighting method and the entropy weight method, the paper de- velops a subjective and objective comprehensive evaluation method for evaluating the convenience of ARMT. The development level of each indicator and the areas to be improved are systematically sorted out. In order to give full use to the efficiency of rail transit collecting and dispatching and to achieve the application of ARMT at a higher level and a wider scope, the paper provides planning suggestions: 1) actively build high-speed railway and intercity stations around the hub airports; 2) rationally plan all types of rail transit facilities; 3) optimize the strategy of train formation; 4) promote the integration of air transportation and railway sectors and create cooperative products and services. DOI: 10.13813/j.cn11-5141/u.2019.0411-en Keywords: transportation planning; air–rail multimodal transportation; subjective and objective comprehensive weighting method; entropy weight method 1 Background and theory greater.
    [Show full text]
  • Life Cycle Carbon Emission of Monorail Transit and Its Comparison in Operation Stage with Other City Transit Modes
    E3S Web of Conferences 272, 01013 (2021) https://doi.org/10.1051/e3sconf/202127201013 ICEPG 2021 Life cycle carbon emission of monorail transit and its comparison in operation stage with other city transit modes Teng Li1, Eryu Zhu1*, Haoran Liu1 1Dept. of Civil Engineering., Beijing Jiaotong University., Shangyuancun 3rd, Beijing, China, 100044 Corresponding author, Eryu Zhu, Professor of Bridge Department, Beijing Jiaotong University, Ph. D, China. Abstract. In this paper, carbon emissions of a monorail transit are calculated using the method of whole life cycle, which can be divided into four stages: material manufacturing stage, construction stage, operation stage and demolition stage. In the operation phase, the units are PKT (Passenger Kilometers Travelled) and VKT (Vehicle Kilometers Travelled), while in other three stages, the unit is 1 km. The results show that the carbon emissions from the 1km length monorail are 6271.204 tons. In addition, in the operation stage, it is found that the PKT index and VKT index of Chongqing monorail transportation are 0.07468 and 3.31933 respectively, far lower than those of subways in the same city. For PKT indicators of other rail transits, from small to large, they are light rail, tram, subway, APM and maglev. As for VKT indicators, from small to large, they are tram, light rail, subway, APM and maglev. The PKT index of Beijing subway is the lowest compared with that of other cities. subway, maglev, APM and trams, to find a lower carbon 1 Introduction emission transit mode, and to facilitate the adjustment of In recent years, with the continuous increase of urban the urban rail transit system and urban sustainable population density, the flow of people and goods between development, and to provide suggestions for government cities and the construction of rail transit are in full swing.
    [Show full text]
  • Satisfaction Analysis of Public Transport Facilities by Citizens -- Taking Changchun As an Example
    The Frontiers of Society, Science and Technology ISSN 2616-7433 Vol. 2, Issue 2: 71-76, DOI: 10.25236/FSST.2020.020217 Satisfaction Analysis of Public Transport Facilities by Citizens -- Taking Changchun as an Example Duo Liu, Xin Wang School of Business Administration, Jilin Normal University of Engineering and Technology, Changchun 130052, China ABSTRACT. Since the reform and opening up, China's social economy has developed rapidly. However, with the continuous acceleration of urbanization process and the continuous growth of population and means of transportation, China's public transport system is facing a severe test. At present, the academic satisfaction survey on transportation system is limited to all kinds of vehicles. This study mainly studies the satisfaction of Changchun citizens from the aspect of public transport facilities. According to the different modes of travel, the research mainly focuses on the relevant infrastructure such as bus, light rail, subway, bicycle, overpass, underpass, urban road, etc. After understanding the satisfaction status of public transport facilities, this paper analyzes the problems and causes of public transport facilities in Changchun City, and puts forward relevant countermeasures and suggestions. KEYWORDS: Public transport facilities; Satisfaction 1. Introduction After 40 years of reform and opening up, China's economic strength has been increasing, and the urbanization process has been further deepened. In this process, the existing urban public transport infrastructure can not meet the needs of urban development due to the large increase of population and the use of means of transport. People's travel satisfaction is greatly reduced, and the economic development of the city is also limited.
    [Show full text]
  • Discussion on Metro Section Measurement Method and Data Processing
    工程技术与管理·第 04 卷·第 05 期·2020 年 05 月 研究性文章 DOI: https://doi.org/10.26549/gcjsygl.v4i5.4173 Article Discussion on Metro Section Measurement Method and Data Processing Yonghai Yang Jiangbo Diwu Beijing Urban Construction Exploration & Surveying Design Research Institute Co., Ltd, Changchun, Jilin, 13022, China Abstract With the sustained and rapid development of China’s economy, more and more cities are carrying out rail transit construction. After the completion of the civil construction of the metro tunnel, there will be a certain degree of error between the spatial position of the main structure of the metro tunnel and the design value. In order to provide the basic data for the design of line and slope adjustment, it is nec- essary to measure the structural cross section and the bottom plate vertical section of the tunnel, station and viaduct, so as to ensure the normal operation of vehicles after the completion of the track. At present, the third round of Changchun rail transit construction plan (2019- 2024) has been approved by the National Development and Reform Commission. The construction projects include Changchun Urban Rail Transit Line 2 East extension, line 3 South extension, line 4 South extension, line 5 phase I, line 6 phase I, line 7 phase I and airport line phase I, with a total length of 116 km. There are many types of tunnel cross-section structure, and different design companies have different requirements for measurement. In addition, the measurement accuracy requirements are high, the task is heavy, and the time is short, which requires that the cross-section measurement operation is simple and convenient, and the data processing is accurate and efficient.
    [Show full text]
  • Interim Report
    Stock Code: 601668.SH INTERIM REPORT Cover Photo:Huoshenshan Hospital of Wuhan CHINA STATE CONSTRUCTION ENGRG. CORP. LTD INTERIM REPORT 2020 Huaping-Lijiang Expressway @CSCECNews @CSCECNEWS China Construction Fortune International Center, Building 3, Courtyard 5, Anding Road, Chaoyang District, Beijing, China Post Code: 100029 Tel: 86 10 8649 8888 E-mail: [email protected] http://www.cscec.com Back Cover Photo: CORPORATE VISION To be the investment and construction group with the most international competitiveness COPRORATE MISSION Expanding a happy living environment CONTENTS 1 IMPORTANT NOTES 2 SECTION I DEFINITIONS 3 SECTION II COMPANY PROFILE AND KEY FINANCIAL INDICATORS 6 SECTION III OVERVIEW OF BUSINESS OPERATIONS 15 SECTION IV DISCUSSION AND ANALYSIS OF BUSINESS OPERATION 33 SECTION V IMPORTANT MATTERS 52 SECTION VI CHANGES IN ORDINARY SHARES AND SHAREHOLDERS 56 SECTION VII INFORMATION RELATED TO PREFERENCE SHARES 58 SECTION VIII DIRECTORS, SUPERVISORS AND SENIOR MANAGEMENT 61 SECTION IX INFORMATION ON CORPORATE BONDS 61 SECTION X FINANCIAL REPORT 61 SECTION XI INDEX OF DOCUMENTS AVAILABLE FOR INSPECTION CHINA SECURITIES REGULATORY COMMISSION SHANGHAI STOCK EXCHANGE The Company prepared its 2020 Interim Report in accordance with relevant regulations and guidelines set forth by the China Securities Regulatory Commission and the Shanghai Stock Exchange, including the Standards for the Contents and Formats of Information Disclosure by Companies Offering Securities to the Public No. 3 – Contents and Formats of Semi-Annual Reports, the Shanghai Stock Exchange Listing Rules and other relevant regulations and guidelines. This is a free translation into English of a report issued in China and is provided solely for the convenience of English-speaking readers.
    [Show full text]
  • China's High-Speed Rail Development
    INTERNATIONAL DEVELOPMENT IN FOCUS China’s High-Speed Rail Development Martha Lawrence, Richard Bullock, and Ziming Liu © 2019 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington, DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org Some rights reserved 1 2 3 4 22 21 20 19 This work is a product of the staff of The World Bank with external contributions. The findings, interpre- tations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Nothing herein shall constitute or be considered to be a limitation upon or waiver of the privileges and immunities of The World Bank, all of which are specifically reserved. Rights and Permissions This work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) http:// creativecommons.org/licenses/by/3.0/igo. Under the Creative Commons Attribution license, you are free to copy, distribute, transmit, and adapt this work, including for commercial purposes, under the following conditions: Attribution—Please cite the work as follows: Lawrence, Martha, Richard Bullock, and Ziming Liu. 2019. China’s High-Speed Rail Development. International Development in Focus.
    [Show full text]
  • Results Announcement for the Year of 2020
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. 中國中鐵股份有限公司 CHINA RAILWAY GROUP LIMITED (A joint stock limited company incorporated in the People’s Republic of China with limited liability) (Stock Code: 390) RESULTS ANNOUNCEMENT FOR THE YEAR OF 2020 The board of directors (the “Board” or “Board of Directors”) of China Railway Group Limited (the “Company” or “China Railway”) is pleased to announce the audited results of the Company and its subsidiaries (the “Group”) for the year ended 31 December 2020. 1 CORPORATE INFORMATION Basic Information Stock Name: China Railway (A Share) China Railway (H Share) Stock Code: 601390 390 Stock Exchange on Shanghai Stock Exchange The Stock Exchange of which Shares are Listed: Hong Kong Limited Registered Address: 918, Block 1, No. 128, South 4th Ring Road West, Fengtai District, Beijing, People’s Republic of China Postal Code: 100070 Website: www.crec.cn E-mail: [email protected] Contact Details Name: He Wen Address: Block A, China Railway Square, No. 69 Fuxing Road, Haidian District, Beijing, People’s Republic of China Postal Code: 100039 Telephone: 86-10-5187 8413 Facsimile: 86-10-5187 8417 E-mail: [email protected] 1 2 SUMMARY OF ACCOUNTING DATA 2.1 Key Accounting Data Prepared under International
    [Show full text]
  • List of Bond Connect Securities 2021-09-01
    List of Bond Connect Securities 2021-09-23 Shanghai Clearing House (SHCH) Interest Period Interest Period Next Tentative Int. Pay. Freq. Zero CMU Issue Number Local Code ISIN Issue Description Issuer Issue Ccy Issue Size Issue Date Maturity Date Coupon Rate Start Date* End Date* Payment Date* (Mths) Coupon SH012100051 012100051 CND100042TV5 21 FOSUN HI TECH SCP 001 SHANGHAI FOSUN HIGH TECHNOLOGY CNY 2,000,000,000 2021-01-07 2021-09-29 4.55 2021-01-07 2021-09-29 2021-09-29 Single Payment No SH012100089 012100089 CND100042W87 21 JINKE PROPERTY GROUP CO SCP 001 JINKE PROPERTY GROUP CO LTD CNY 1,000,000,000 2021-01-08 2021-09-25 5.40 2021-01-08 2021-09-25 2021-09-25 Single Payment No SH012100355 012100355 CND100043KL3 21 FAR EASTERN LEASING SCP 001 FAR EASTERN LEASING CNY 1,000,000,000 2021-01-25 2021-10-22 3.30 2021-01-25 2021-10-22 2021-10-22 Single Payment No SH012100381 012100381 CND100043JX0 21 SHANGHAI BAOLONG IND DEV SCP001 SHANGHAI BAOLONG IND DEV CO CNY 440,000,000 2021-01-26 2021-10-23 5.70 2021-01-26 2021-10-23 2021-10-23 Single Payment No SH012101361 012101361 21 CHINA UNIVERSAL LEASING SCP 003 CHINA UNIVERSAL LEASING CO LTD CNY 1,000,000,000 2021-04-07 2021-09-30 3.25 2021-04-07 2021-09-30 2021-09-30 Single Payment No SH012101544 012101544 CND10004BG46 21 CHINA UNIVERSAL LEASING SCP 004 CHINA UNIVERSAL LEASING CO LTD CNY 500,000,000 2021-04-20 2021-12-16 3.45 2021-04-20 2021-12-16 2021-12-16 Single Payment No SH012101907 012101907 CND10004BFZ5 21 CN SOUTHERN POWER GRID SCP 008 CN SOUTHERN POWER GRID CNY 3,000,000,000 2021-05-21
    [Show full text]
  • The Capital of Jilin Province Was Founded Only 200 Years Ago, and Is Famed for Its Automobile Industry and Rolling Stock Production (CNR/CRRC Changchun)
    The capital of Jilin Province was founded only 200 years ago, and is famed for its automobile industry and rolling stock production (CNR/CRRC Changchun). The city was also the first in China to operate a LRT line and now offers the full gamut of urban rail provision - full metro, light rail and tram. Metro and Light Rail provision is jointly operated by Changchun Rail Transit Corporation with 5 lines and 96.3km of revenue service. 40.6km is underground, the remainder being elevated or at grade. Full Metro: Line 1/Line 2 (36.5km-fully underground) Although Changchun has been an ‘urban rail’ city since 2002, it was not until 2017 that full metro services began. Line 1 is 16.4km line (15 stations) running north-south from North Ring Road (for barrier free connection to Line 8- see below), via the main railway station to Hongzuizi in the south. The line has 2 stations within the main railway station area - the quaintly named ‘Northern stop of Changchun Station’ (Changchunzhanbei) is accessed via a huge, drab and confusing plaza in front of the Railway station, the confusion caused by scale and insufficient directional signage. This station is also served by LRT Line 4 but both facilities are currently unconnected and transfer requires new tickets and a lengthy walk. 700m south is the newly opened ‘Changchun Station’ where there is a nearby connection to LRT Line 3 station of the same name. As with Line 4 transfer, passengers have to exit the metro system to access the exterior LRT. Further south, the line passes Nanhu Lake and Weixing Square which will eventually provide barrier-free integration with LRT Line 3.
    [Show full text]