Appendix D. Service Plan

Total Page:16

File Type:pdf, Size:1020Kb

Load more

Plaistow Commuter Rail Extension Study APPENDIX D. SERVICE PLAN Alternatives Analysis Report – March 2015 New Hampshire Department of Transportation | Plaistow Commuter Rail Extension Study Plaistow Commuter Rail Extension Service Plan Plaistow Commuter Rail Extension Service Plan Introduction The Plaistow Commuter Rail Extension Service Plan is a component of the Plaistow Commuter Rail Extension Study, a New Hampshire Department of Transportation (NHDOT) study that is evaluating alternatives for extension of MBTA Commuter Rail service to the Plaistow, New Hampshire area. The study is being conducted in partnership with the Towns of Plaistow and Atkinson and the Rockingham Planning Commission and includes construction of a new train station and layover facility. The Plaistow Service Plan builds on existing MBTA service that currently terminates in Haverhill, Massachusetts and is necessary to understand the implications of extended Massachusetts Bay Transportation Authority (MBTA) commuter rail service on existing MBTA schedules, equipment, and other partner railroad’s operations. Methodology The Plaistow Commuter Rail Extension Service Plan assumes that all existing MBTA Commuter Rail service that currently terminates at Haverhill Station would be extended north to a new Plaistow area station upon opening of the station. Plaistow Station will act as the new terminal for Haverhill Line trains, with the station capable of handling a single train set at a time along an exclusive station track. It is also assumed that an exclusive station track and layover facility will be built in close proximity to the train station, allowing all train sets operating on the line to layover near the terminal. It is assumed that the Plaistow Station will be located south of Main Street in Plaistow, New Hampshire. For the purposes of developing the Service Plan, the Plaistow Main Street site is the northern most alternative site under consideration, allowing evaluation of the maximum impact to MBTA schedules and operations. Further refinement may be required upon selection of the preferred station and layover sites. A Train Performance Calculator (TPC) was used to estimate train speed between Haverhill Station and Plaistow Station. A TPC program determines train trip times based on existing MBTA rolling stock performance ability, condition of the track, and track geometry. A total of ten minutes, including a minute of pad time, was determined by the TPC model for the travel time from Haverhill Station to Plaistow Main Street. Schedule Development The goal in developing a new timetable for MBTA Haverhill Line operations was to minimize the impact to existing MBTA service while providing service to Plaistow, New Hampshire. Additionally, the Service Plan sought to minimize non-revenue train movements or train trips whose primary purpose is for train positioning, typically evidenced by off-peak (non-peak direction) trains that carry few passengers that would be possible with larger capacity layover facilities envisioned in Plaistow. 1 New Hampshire Department of Transportation | Plaistow Commuter Rail Extension Study Plaistow Commuter Rail Extension Service Plan The August 2014 MBTA Commuter Rail schedule for the Haverhill Line was used as the basis to survey MBTA operations. Currently, passengers on Trains 203 and 213 are bussed between Bradford and Haverhill stations and Trains 212 and 222 are bussed between Haverhill and Bradford stations due to restrictions on the Merrimack River Bridge between Haverhill and Bradford Stations; the Plaistow Extension Service Plan assumes that the Merrimack River Bridge will be repaired and trains will operate normally upon completion of Plaistow Station. Additionally, trains 203 and 213 provide for extra travel time between Lawrence and Bradford that is assumed to be eliminated in the Plaistow Service Plan. The service plan assumes trains will take ten minutes to travel from Haverhill to Plaistow, need at least 10 minutes of layover time in Plaistow, and take another ten minutes to travel from Plaistow back to Haverhill. Thus, the new service plan will increase Haverhill Line operations by approximately 20 minutes per round trip because the MBTA already allots at least ten minutes for train layover at Haverhill Station. Currently, all but seven trains have sufficient layover time at Haverhill Station to accommodate operations at Plaistow Station without having to change schedules. Results This proposed Service Plan would allow the majority of Haverhill Line services to maintain existing schedules, with trains beginning or ending runs ten minutes earlier than existing operations. A full Haverhill/Plaistow Line schedule is found in Appendix A, with the new MBTA and existing Amtrak service operations profiled. Five train operations will have to be modified in order to accommodate scheduled stops at Plaistow Station. Four southbound (Plaistow to North Station) changes due to existing turn times in Haverhill that do not allow for the added 20 minute trip time. The single northbound schedule change (North Station to Plaistow) accommodates a late arriving train in Plaistow. The necessary changes are not expected to impact other equipment operations at North Station. Also, trains in the Plaistow terminal tracks do not present conflicts as train operations are not frequent enough to conflict with other movements. Changes are summarized in Table 1 and Table 2 and are necessary due to short layover times currently at Haverhill Station. Additionally, two non-revenue operations will be eliminated through the Plaistow Extension Service Plan due to increased capacity of the train layover facilities in the Plaistow area. The MBTA currently runs a deadhead train from Haverhill to North Station and then to the Commuter Rail Maintenance Facility (CRMF) in Somerville at 1:25 AM and deadheads a train northbound to Haverhill at 4:00 AM. This train movement will be eliminated because train layover facilities will be constructed in Plaistow to store six train sets; currently only four train sets can layover in Bradford. With adequate layover space in Plaistow, trains will be able to terminate near the last station stop and reduce employee time and fuel useage. 2 New Hampshire Department of Transportation | Plaistow Commuter Rail Extension Study Plaistow Commuter Rail Extension Service Plan Table 1.1: Modified Southbound Train Movements Current Current Future Future Departure Arrival North Departure Arrival North Train Haverhill Station Plaistow Station Notes 210 8:55 AM 10:24 AM 9:05 AM 10:24 AM Train shuts down in North Station until 1:58 PM 212 9:44 AM 11:09 AM 9:41 AM 11:09 AM Elimination of Haverhill to Bradford Bus allows better schedule 218 2:40 PM 3:49 PM 2:40 PM 3:59 PM Allows for the 5:10 Lowell Line to depart at the same time 220 4:30 PM 5:40 PM 4:28 PM 5:40 PM Arrival at 5:40 allows for the departure of the 5:50 PM Lowell Line train 222 6:04 PM 7:25 PM 6:12 PM 7:25 PM Elimination of Haverhill to Bradford Bus allows better schedule 226 10:15 PM 11:23 PM 10:10 PM 11:28 PM Terminates at the Commuter Rail Maintenance Facility (CRMF) in Somerville Table 1.2: Modified Northbound Train Movement Current Future Departure Current Arrival Departure Future Arrival Train North Station Haverhill North Station Plaistow Notes 205 10:30 AM 11:38 AM 10:22 AM 11:40 AM Terminates at the CRMF in Somerville 3 New Hampshire Department of Transportation | Plaistow Commuter Rail Extension Study Plaistow Commuter Rail Extension Service Plan This page intentionally left blank 4 Plaistow/Haverhill Table A1. Appendix Future Plaistow Bradford Bradford Bradford Bradford Weekday Inbound Layover Layover Layover Layover Layover Proposed Equipment Set Set S Set J Set K Set L Set M Set B Set B Set U Set S Set N Set N Set Q Set Q Set B Set S Set I Set I Set S Plaistow Commuter New Hampshire Department of Transportation Proposed Proposed Proposed Proposed Non- Train Number 200AM 202AM 204AM 206AM 208AM 210AM 214AM 218 PM 218PM 220 PM 224 226PM 226PM 210 AM 212 AM 220PM 222 PM Revenue Depart Plaistow 4:55 5:28 6:00 6:36 7:20 9:05 9:41 11:50 2:40 4:28 6:12 8:19 10:10 Haverhill 5:05 5:38 6:10 6:46 7:30 9:05 9:15 9:51 12:00 2:40 2:50 4:30 4:38 6:22 8:29 10:15 10:20 1:25 AM Bradford 5:08 5:41 6:13 6:49 7:33 9:08 9:18 9:54F 12:03F 02:43F 02:53F 04:33F 04:41F 06:25F 08:32F 10:18F 10:23F Lawrence 5:19 5:52 6:24 7:00 7:44 9:19 9:28 10:14 12:14 2:54 3:04 4:44 4:52 6:36 08:43F 10:29F 10:34F Andover 5:24 5:57 6:29 7:06 7:51 9:24 9:34 10:19 12:19 2:59 3:09 04:49F 04:57F 06:44F 08:48F 10:34F 10:39F Ballardvale 05:30F 6:03 6:35 7:12 7:57 09:29F 9:39 10:25F 12:25F 03:05F 03:15F 04:55F 05:03F 06:50F 8:54 10:40F 10:45F Schedule Rail Commuter Proposed Line North Wilmington 05:37F 6:11 6:43 09:37F 9:47 10:32F 12:32F 0.1333333 3:22 9:01 10:47F 10:53F Extension ServiceRail Plan Wilmington 7:22 8:07 7:00 Anderson/ Woburn 8:12 05:11F 05:19F 7:04 Reading 5:44 6:19 6:51 9:44 9:54 10:39 12:39 3:19 3:29 9:08 10:54 10:59 Wakefield 5:50 6:25 6:57 VIA VIA 9:50 10:00 10:45 12:45 3:25 3:35 VIA VIA VIA 9:13 10:59 11:04 Greenwood 05:53F 6:28 7:00 LOW LOW 9:53 10:03 10:48F 12:48F 03:28F 03:38F LOW LOW LOW 09:16F 11:02F 11:07F Melrose Highlands 5:55 6:30 7:03 9:55 10:05 10:50 12:50 3:30 3:40 09:18F 11:04F 11:09F Melrose Cedar Park 5:57 6:32 7:05 9:57 10:07 10:52F 12:52F 03:32F 03:42F 09:20F 11:06F 11:11F Wyoming Hill 5:59 6:34 7:07 9:59 10:09 10:54F 12:54F 03:34F 03:44F 09:22F 11:08F 11:13F Malden Center 6:02 6:38 7:11 10:03 10:13 10:58 12:58 3:38 3:48 9:26 11:12 11:17 North Station 6:14 6:50 7:25 7:48 8:39 10:14 10:24 11:09 1:09 3:49 3:59 5:32 5:40 7:25 9:37 11:23 11:28 2:35 AM | Terminate Allows for Allows for Eliminate Plaistow CommuterExtension Rail Study at the North Eliminates the 5:10 the 5:50 Eliminates Operation CRMF; Station Haverhill Lowell Lowell Haverhill Terminate because Set I Shutdown to Line to Line to to at the Set S will begins Time until Bradford depart at depart at Bradford CRMF be able to normal 1:58 Bus the same the same Bus Layover in run time time Plaistow – Weekday Inbound Weekday 5 Rail Commuter Proposed Line Plaistow/Haverhill A2.
Recommended publications
  • Lowell Line Schedule (Effective May 20, 2019)

    Lowell Line Schedule (Effective May 20, 2019)

    LOWELL LINE Effective May 20, 2019 Keep in Mind: Monday to Friday This schedule will be effective from May Inbound to Boston AM PM 20, 2019 and will replace the schedule of October 29, 2018. ZONE STATION TRAIN # 300 302 304 306 308 310 208 312 314 316 318 320 322 324 326 328 330 332 334 336 338 340 342 344 346 348 Bikes Allowed Presidents’ Day and 4th of July operate on a Saturday service schedule. 6 Lowell 5:35 6:10 6:35 7:00 7:20 7:40 VIA 8:15 8:45 9:15 10:18 11:15 12:15 1:18 2:18 3:14 4:00 4:44 5:17 5:47 6:15 6:52 7:32 8:45 9:55 11:05 5 North Billerica 5:43 6:18 6:43 7:08 7:28 7:48 HAV 8:23 8:53 9:23 10:26 11:23 12:23 1:26 2:26 3:22 4:08 4:52 5:25 5:55 6:23 7:00 7:40 8:53 10:03 11:13 New Year’s Day, Memorial Day, Labor Day, Thanksgiving Day, and 3 Wilmington 5:51 6:26 6:51 7:16 7:36 7:56 - 8:31 9:01 9:31 10:34 11:31 12:31 1:34 2:34 3:30 4:16 5:00 5:33 6:03 6:31 7:08 7:48 9:01 10:11 11:21 Christmas Day operate on a Sunday 2 Anderson/Woburn 5:56 6:31 6:56 7:21 7:41 8:01 8:12 8:36 9:06 9:36 10:39 11:36 12:36 1:39 2:39 3:35 4:21 5:05 5:38 6:08 6:36 7:13 7:53 9:06 10:16 11:26 service schedule.
  • MIT Kendall Square

    MIT Kendall Square

    Ridership and Service Statistics Thirteenth Edition 2010 Massachusetts Bay Transportation Authority MBTA Service and Infrastructure Profile July 2010 MBTA Service District Cities and Towns 175 Size in Square Miles 3,244 Population (2000 Census) 4,663,565 Typical Weekday Ridership (FY 2010) By Line Unlinked Red Line 241,603 Orange Line 184,961 Blue Line 57,273 Total Heavy Rail 483,837 Total Green Line (Light Rail & Trolley) 236,096 Bus (includes Silver Line) 361,676 Silver Line SL1 & SL2* 14,940 Silver Line SL4 & SL5** 15,086 Trackless Trolley 12,364 Total Bus and Trackless Trolley 374,040 TOTAL MBTA-Provided Urban Service 1,093,973 System Unlinked MBTA - Provided Urban Service 1,093,973 Commuter Rail Boardings (Inbound + Outbound) 132,720 Contracted Bus 2,603 Water Transportation 4,372 THE RIDE Paratransit Trips Delivered 6,773 TOTAL ALL MODES UNLINKED 1,240,441 Notes: Unlinked trips are the number of passengers who board public transportation vehicles. Passengers are counted each time they board vehicles no matter how many vehicles they use to travel from their origin to their destination. * Average weekday ridership taken from 2009 CTPS surveys for Silver Line SL1 & SL2. ** SL4 service began in October 2009. Ridership represents a partial year of operation. File: CH 01 p02-7 - MBTA Service and Infrastructure Profile Jul10 1 Annual Ridership (FY 2010) Unlinked Trips by Mode Heavy Rail - Red Line 74,445,042 Total Heavy Rail - Orange Line 54,596,634 Heavy Rail Heavy Rail - Blue Line 17,876,009 146,917,685 Light Rail (includes Mattapan-Ashmont Trolley) 75,916,005 Bus (includes Silver Line) 108,088,300 Total Rubber Tire Trackless Trolley 3,438,160 111,526,460 TOTAL Subway & Bus/Trackless Trolley 334,360,150 Commuter Rail 36,930,089 THE RIDE Paratransit 2,095,932 Ferry (ex.
  • Changes to Transit Service in the MBTA District 1964-Present

    Changes to Transit Service in the MBTA District 1964-Present

    Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964.
  • Boston-Montreal High Speed Rail Project

    Boston-Montreal High Speed Rail Project

    Boston to Montreal High- Speed Rail Planning and Feasibility Study Phase I Final Report prepared for Vermont Agency of Transportation New Hampshire Department of Transportation Massachusetts Executive Office of Transportation and Construction prepared by Parsons Brinckerhoff Quade & Douglas with Cambridge Systematics Fitzgerald and Halliday HNTB, Inc. KKO and Associates April 2003 final report Boston to Montreal High-Speed Rail Planning and Feasibility Study Phase I prepared for Vermont Agency of Transportation New Hampshire Department of Transportation Massachusetts Executive Office of Transportation and Construction prepared by Parsons Brinckerhoff Quade & Douglas with Cambridge Systematics, Inc. Fitzgerald and Halliday HNTB, Inc. KKO and Associates April 2003 Boston to Montreal High-Speed Rail Feasibility Study Table of Contents Executive Summary ............................................................................................................... ES-1 E.1 Background and Purpose of the Study ............................................................... ES-1 E.2 Study Overview...................................................................................................... ES-1 E.3 Ridership Analysis................................................................................................. ES-8 E.4 Government and Policy Issues............................................................................. ES-12 E.5 Conclusion..............................................................................................................
  • Transportation & Shuttle Bus Schedule

    Transportation & Shuttle Bus Schedule

    A.M. ROUTES A.M. ROUTES CSW Morning Shuttle Mon Tue Wed Thur Fri CSW Morning Shuttle Mon Tue Wed Thur Fri Weston (Kendal Green) 7:55 7:55 7:55 7:55 7:55 Meets 7:50 am inbound MBTA Commuter Rail Fitchburg Line Weston (Kendal Green) 7:55 7:55 7:55 7:55 7:55 Meets 7:51 am inbound MBTA Commuter Rail Fitchburg Line CSW 8:00 8:00 8:00 8:00 8:00 CSW 8:00 8:00 8:00 8:00 8:00 Weston (Kendal Green) 8:15 8:15 8:15 8:15 8:15 Meets 8:13 am outbound MBTA Commuter Rail Fitchburg Line Weston (Kendal Green) 8:15 8:15 8:15 8:15 8:15 Meets 8:13am outbound MBTA Commuter Rail Fitchburg Line CSW 8:20 8:20 8:20 8:20 8:20 CSW 8:20 8:20 8:20 8:20 8:20 CSW 1 Mon Tue Wed Thur Fri CSW 1 Mon Tue Wed Thur Fri Newton (Riverside) 8:00 8:00 8:00 8:00 8:00 Connects with MBTA Green Line-D; Riverside Station Welcome Center NewtonNewton (Riverside) (Auburndale) 8:008:058:008:058:008:05 8:008:05 8:008:05 ConnectsConnects with w MBTA MBTA Commuter Green Line-D; Rail Framingham/Worcester Riverside Station parking Ln; Auburn lot St @ Village Bank NewtonCSW (Auburndale) 8:058:208:058:208:058:20 8:058:20 8:058:20 Connects with MBTA Commuter Rail Framingham/Worcester Line; corner of Grove St TRANSPORTATION CSWCSW 2 8:20Mon8:20Tue 8:20Wed 8:20Thur 8:20Fri CSWCambridge 2 (Alewife) Mon7:30Tue7:30Wed7:30 Thur7:30 Fri7:30 Connects with MBTA Red Line Alewife Station; Passenger Drop Off / Pick Up area CambridgeBelmont (Alewife) 7:307:407:307:407:307:40 7:307:40 7:307:40 ConnectsBelmont Centerwith MBTA at Leonard Red Line St and Alewife Concord Station; Ave Passenger Drop Off / Pick Up
  • MBTA Tariff and Statement of Fare and Transfer Rules

    MBTA Tariff and Statement of Fare and Transfer Rules

    MBTA Tariff and Statement of Fare and Transfer Rules Adopted by the Fiscal and Management Control Board June 6, 2016 Effective July 1, 2016 Revised June 15, 2018 Contents Introduction ................................................................................................................................ 3 MBTA Fare Media ...................................................................................................................... 3 CharlieCard ............................................................................................................................ 3 CharlieTicket .......................................................................................................................... 5 Paper Tickets ......................................................................................................................... 6 Cash ....................................................................................................................................... 6 Commuter Checks and benefit cards ...................................................................................... 7 mTicket ................................................................................................................................... 7 MBTA Fare Vending and Validation ........................................................................................... 8 Fare Vending Machines .......................................................................................................... 8 On-board Fareboxes .............................................................................................................
  • A Better Newburyport/Rockport Line

    A Better Newburyport/Rockport Line

    TRANSITMATTERS WINTER 2021 A Better Newburyport/Rockport Line Rapid, Reliable Transit For Chelsea, Lynn, and the North Shore Introduction This report analyzes potential infrastructure and service We wish to acknowledge the following TransitMatters improvements for the MBTA’s Newburyport/Rockport members who contributed to this report: Line, proposing upgrades and changes along its corridor. » Peter Brassard The FMCB’s resolution in November 2019 and recent » advocacy around improving service on the Newburyport/ Rob Cannata Rockport Line have increased interest in running » David Dimiduk frequent electrified rail service on the line. Many of the » Jay Flynn municipalities on the inner route are environmental » Jason Frost justice (EJ) communities, with residents forced to decide between infrequent, costly rail service or affordable but » David Houser slow bus service. The stations along the trunk should » Alon Levy get all-day high-frequency service, electrification, fare » Elizabeth Martin integration, and additional infill stations. These changes would provide similar frequency and station spacing as » Jackson Moore-Otto the Red Line branch to Braintree. » John Takuma Moody » Matt Robare » Asher Smith » Andrew Stephens » Jack Spence TransitMatters is a 501(c)(3) nonprofit dedicated to improving transit in and around Boston by offering new perspectives, uniting transit advocates, and informing the public. We utilize a high level of critical analysis to advocate for plans and policies that promote convenient, effective, and equitable transportation for everyone. Learn more & download other Regional Rail reports at: http://regionalrail.net A BETTER NEWBURYPORT/ROCKPORT LINE 1 Current Situation The Newburyport/Rockport Line, sometimes referred to as the “Eastern Route” or “Eastern Line”, is currently the third busiest line on the commuter rail, behind the Providence and Worcester Lines, and the busiest line on the north side of the MBTA Commuter Rail system.
  • [Docket No. FD 36472] CSX Corporation And

    [Docket No. FD 36472] CSX Corporation And

    This document is scheduled to be published in the Federal Register on 07/30/2021 and available online at FR-4915-01-P federalregister.gov/d/2021-16328, and on govinfo.gov SURFACE TRANSPORTATION BOARD [Docket No. FD 36472] CSX Corporation and CSX Transportation, Inc., et al.—Control and Merger— Pan Am Systems, Inc., Pan Am Railways, Inc., Boston and Maine Corporation, Maine Central Railroad Company, Northern Railroad, Pan Am Southern LLC, Portland Terminal Company, Springfield Terminal Railway Company, Stony Brook Railroad Company, and Vermont & Massachusetts Railroad Company AGENCY: Surface Transportation Board. ACTION: Decision No. 4 in STB Finance Docket No. 36472; Notice of Acceptance of Application and Related Filings; Issuance of Procedural Schedule. SUMMARY: The Surface Transportation Board (Board) is accepting for consideration the revised application filed on July 1, 2021, by CSX Corporation (CSXC), CSX Transportation Inc. (CSXT), 747 Merger Sub 2, Inc. (747 Merger Sub 2), Pan Am Systems, Inc. (Systems), Pan Am Railways, Inc. (PAR), Boston and Maine Corporation (Boston & Maine), Maine Central Railroad Company (Maine Central), Northern Railroad (Northern), Portland Terminal Company (Portland Terminal), Springfield Terminal Railway Company (Springfield Terminal), Stony Brook Railroad Company (Stony Brook), and Vermont & Massachusetts Railroad Company (V&M) (collectively, Applicants). The application will be referred to as the Revised Application. The Revised Application seeks Board approval under 49 U.S.C. 11321-26 for: CSXC, CSXT, and 747 Merger Sub 2 to control the seven railroads controlled by Systems and PAR, and CSXT to merge six of the seven railroads into CSXT. This proposal is referred to as the Merger Transaction.
  • North South Rail Link Feasibility Reassessment Appendices

    North South Rail Link Feasibility Reassessment Appendices

    Photo Source: Katie Manning / Unsplash 164 North South Rail Link Feasibility Reassessment Final Report January 2019 | Preferred Alignment and Construction Technology 9. Appendices Appendices | January 2019 North South Rail Link Feasibility Reassessment Final Report 165 Photo Source: Michael Hicks / Flickr 166 North South Rail Link Feasibility Reassessment Final Report January 2019 | Appendices A. Citations 1 Eighth in the US in 2017, Inrix Global Conges- 8 MassDOT, The Offcial Website of The Mas- 16 Central Transportation Planning Staff, Boston tion Rankings, http://inrix.com/press-releases/ sachusetts Department of Transportation - Rail Region Metropolitan Planning Organization, los-angeles-tops-inrix-global-congestion- & Transit Division, http://www.massdot.state. Memorandum: MBTA Commuter Rail Passenger ranking/; 10th in the US in 2017, TomTom Traffc ma.us/Transit/ Count Results, Dec. 21, 2012. Index, https://www.tomtom.com/en_gb/traffcin- 9 MassDOT, Tracker 2017: MassDOT’s Annual 17 Boston Region Metropolitan Planning Organiza- dex/list?citySize=LARGE&continent=ALL&coun Performance Report, http://www.massdot.state. tion, Long-Range Transportation Plan – Needs try=ALL ma.us/Portals/0/docs/infoCenter/performance- Assessment, www.ctps.org/lrtp_needs 2 Ridership Trends presentation, MassDOT Offce management/Tracker2017.pdf 18 According to Reconnecting America, a national of Performance Management and Innovation, 10 MBTA, The New MBTA, http://old.mbta.com/ nonproft that integrates transportation and February 27, 2017, http://old.mbta.com/upload- about_the_mbta/history/?id=970 community development, “Transit-oriented edfles/About_the_T/Board_Meetings/M.%20 development… is a type of development that %20Ridership%20Trends%20Final%20022717. 11 https://www.mbtafocus40.com/ includes a mixture of housing, offce, retail and/ pdf or other amenities integrated into a walkable 12 MassDOT, MBTA State of the Service: Com- neighborhood and located within a half-mile of 3 Massachusetts Institute of Technology, Data muter Rail, https://d3044s2alrsxog.cloudfront.
  • CTPS Technical Memo

    CTPS Technical Memo

    ON REG ST IO O N B BOSTON REGION METROPOLITAN PLANNING ORGANIZATION M Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair E N T R O I Tegin L. Teich, Executive Director, MPO Staff O T P A O IZ LMPOI N TA A N G P OR LANNING TECHNICAL MEMORANDUM DATE: December 17, 2020 TO: Congestion Management Committee FROM: Ryan Hicks, MPO Staff RE: 2017–18 Inventory of Park-and-Ride Lots at MBTA Facilities 1 INTRODUCTION The primary purpose of this memorandum is to present the results from the 2017–18 inventory of park-and-ride lots serving Massachusetts Bay Transportation Authority (MBTA) facilities. Comparisons with the 2006, 2010, and 2012–13 inventories are also included in this memorandum. In the spring and fall seasons between April 2017 and November 2018, Boston Region Metropolitan Planning Organization (MPO) staff inventoried MBTA, private, and town-operated parking facilities at 152 locations comprising 121 commuter rail stations, 27 rapid transit stations, two ferry terminals, and two express bus origin locations.1 Appendix A contains parking utilization rates for all of the parking lots that were inventoried. Information about parking fees and several maps that display inventoried data are found in Appendices B, C, D, and E. This memorandum has seven main sections and five appendices. The main sections of this memorandum are: 1. Introduction 2. Background 3. Inventory Results: Parking Utilization 4. Major Regional Park-and-Ride Lots 5. Inventory Results: Amenities 6. Conclusion 7. Next Steps Civil Rights, nondiscrimination, and accessibility information is on the last page. 1 Please note that some of the stations that were surveyed are located outside of the Boston Region MPO area.
  • North South Rail Link Feasibility Reassessment Chapter 4

    North South Rail Link Feasibility Reassessment Chapter 4

    4. Service Planning Service Planning | January 2019 North South Rail Link Feasibility Reassessment Final Report 41 Photo Source: Osman Rana / Unsplash 42 North South Rail Link Feasibility Reassessment Final Report January 2019 | Service Planning 4. Service Planning 4.1 Background and Previous Studies A key aspect of the Feasibility Reassessment Previous service planning efforts for the NSRL In the 2003 study, line pairings were developed process is the creation of service alternatives that project explored a number of alternatives, all for both two-track alternatives (one using the align with the vision of the NSRL, ensuring robust aiming for a 2025 build year. In addition to No Build Back Bay Portal and the other using the South service levels to effectively utilize the capacity of the and tunnel alternatives, the 2003 study examined Bay Portal) and for the four-track alternative. Both NSRL tunnels. This chapter describes the process two Transportation Systems Management (TSM) two-track alternatives connected the Lowell Line of designing, evaluating and selecting service plan alternatives that focused on enhancements to with Amtrak services on the Providence Line (as in alternatives for the NSRL project. The routings and existing transit systems. The two TSM alternatives this Feasibility Reassessment), with Amtrak trains frequencies chosen directly infuence ridership, were a dedicated shuttle bus service between North running up the Fairmount corridor in the South Bay operational costs, feet size, and base infrastructure and South Stations and increased service on the Portal alternative to achieve this pairing. The four- requirements for the overall project. MBTA Orange Line. This Feasibility Reassessment track alternative created through-running pairs for focuses on evaluating a No Build alternative, a every commuter rail line, including the Old Colony surface improvements only alternative, and several Lines.
  • Rapid Transit

    Rapid Transit

    LOWELL LINE HAVERHILL LINE NEWBURYPORT/ Fares OL ROCKPORT LINE Massachusetts Bay Transportation Authority OAK GROVE Lynn Rapid Transit/Key Bus Routes Map West Woodlawn Medford Malden Center 116 BL + + Revere 111 Center WONDERLAND RL Rapid Transit Wellington Rapid Bus + Rapid ALEWIFE 117 PRICE PER TRIP Local Bus Bus + Bus Arlington Assembly Chelsea Revere Transit Transit Heights 77 (opens fall 2014) Beach Fall September 5, 2015 - December 25, 2015 Davis Sullivan Bellingham Beachmont CharlieCard $1.60 $1.60 $2.10 $2.10 77 Square Sq Waltham Waverley Belmont Community Suffolk Downs CharlieTicket $2.10 $2.10 $2.65 $4.75*** Center Porter College FITCHBURG LINE 116 Orient Heights 73 GL 117 Charlestown Cash-on-Board $2.10 $4.20 $2.65 $4.75*** Harvard LECHMERE Navy Yard 71 73 E 71 C Wood Island Watertown H Science Park/West End A Student* $0.80 $0.80 $1.05 $1.05 Sq E R L Union Sq 1 E Airport S Watertown (Allston) T North Station O Yard 57 66 111 W Central N Senior/TAP** $0.80 $0.80 $1.05 $1.05 Harvard Ave WORCESTER LINE Long 57 C, E Maverick SL1 Wharf F North E Griggs St Packards Corner BOWDOIN R UNLIMITED TRIP PASSES R Rental Blue Line Kendall/MIT Y Allston St BL Car Center Babcock St 1 Haymarket Warren St 66 Pleasant St C, E 1-Day $12.00 $12.00 $12.00 $12.00 Newtonville Gov’t. Ctr Aquarium Washington St Closed for AIRPORT St. Paul St Charles/ renovation Long TERMINALS MGH Logan 7-Day $19.00 $19.00 $19.00 $19.00 Sutherland Rd BU West C, E Wharf South Ferry Chiswick Rd St.