gfj;k.kk jkT; lw[kk jkgr ,oa ck<+ fu;a=.k cksMZ

51st MEETING AGENDA CHAIRMANSHIP: HON’BLE CHIEF MINISTER,

DATE:-04.01.2020 TIME:-03:00 P.M.

VENUE: CONFERENCE HALL, HARYANA NIWAS, SECTOR-3, CHD. Irrigation and Water Resources Department, Haryana Sinchai Bhawan, Sector-5, . Ph.No. : 0172-2582541, Fax No. 0172- 2567259 Email: [email protected], Official website: www.hid.gov.in

I N D E X Description Page No.

Notice for 51st meeting of Haryana State Drought Relief & Flood Control Board (HSDR&FCB) 1 List of Members and Special Invitees 2-5

ITEM NO. 1 : CONFIRMATION OF THE MINUTES OF 50th MEETING OF HSDR 6 &FCB ITEM NO. 2 : ACTION TAKEN REPORT OF 50th MEETING OF HSDR&FCB 7 ITEM NO. 3 : FLOOD REPORT FOR THE YEAR 2019 8-12 ITEM NO. 4 : NEW SCHEMES OF IRRIGATION AND WATER RESOURCES 13-14 DEPARTMENT FOR APPROVAL OF THE BOARD ITEM NO. 5 : REVIEW OF SCHEMES OF IRRIGATION AND WATER 15 st RESOURCES DEPARTMENT ONGOING PRIOR TO 51 MEETING OF HSDR&FCB ITEM NO. 6 : REVIEW OF ONGOING AND NEW SCHEMES UNDER HEAD- 16-17 DEPOSIT ITEM NO. 7 : REVIEW OF POSITION OF FUNDS WITH IRRIGATION AND WATER 18-19 RESOURCES DEPARTMENT ITEM NO. 8 : SCHEMES AND FUNDS POSITION OF PUBLIC HEALTH 20-35 ENGINEERING DEPARTMENT. ANNEXURE 1.1 : MINUTES OF 50TH MEETING OF HSDR&FCB 36-43 ANNEXURE 2.1 : ABSTRACT OF ALL SCHEMES ONGOING PRIOR TO 50TH 44 MEETING OF HSDR&FCB ANNEXURE 2.2 : ABSTRACT OF NEW SCHEMES APPROVED IN 50TH MEETING OF 45 HSDR&FCB ANNEXURE 2.3 : ABSTRACT OF ALL SCHEMES APPROVED UPTO 50TH MEETING 46 OF HSDR&FCB ANNEXURE 3.1 : RAINFALL DATA FOR THE YEAR 2019 47 ANNEXURE 3.2 : ANNUAL FLOOD PEAK DATA 48 ANNEXURE 3.3 : POSITION OF DRAINGE PUMPS 49 ANNEXURE 4.1 : ABSTRACT OF NEW PROPOSED FLOOD SCHEMES 50 ANNEXURE 4.2 : DETAILS OF NEW PROPOSED FLOOD SCHEMES 51-65 ANNEXURE 5.1 : DETAIL OF COMPLETED SCHEMES OF IRRIGATION AND WATER 66-77 RESOURCES DEPARTMENT ONGOING PRIOR TO 51st MEETING OF HSDR&FCB ANNEXURE 5.2 : DETAILS OF DROPPED SCHEMES OF IRRIGATION AND WATER 78-80 RESOURCES DEPARTMENT ONGOING PRIOR TO 51st MEETING OF HSDR&FCB ANNEXURE 5.3 : ABSTRACT OF ONGOING SCHEMES OF IRRIGATION AND WATER 81 RESOURCES DEPARTMENT IN 51st MEETING OF HSDR&FCB ANNEXURE 5.4 : DETAILS OF ONGOING SCHEMES OF IRRIGATION AND WATER 82-105 RESOURCES DEPARTMENT IN 51st MEETING OF HSDR&FCB ANNEXURE 6.1 : DETAILS OF ONGOING SCHEMES OF I&WRD UNDER DEPOSIT 106-108 HEAD

“gj cwan lap;] gj [ksr ikuh” Engineer-in-Chief, Irrigation & Water Resources Department Panchkula, Haryana. e-mail:[email protected]

Meeting

30.12.2019 at 03:00 P.M.

No. 4647 /Drainage/14/2020 Dated: 26.12.2019

From

Engineer-in-Chief, Haryana Irrigation and Water Resources Department, Sinchai Bhawan, Sector-5, Panchkula. Phone No. 0172-2582541 Fax No. 0172- 2567259

To

1. The Members 2. Special Invitees Haryana State Drought Relief & Flood Control Board (HSDR&FCB). (As per list enclosed)

Subject: 51st Meeting of Haryana State Drought Relief & Flood Control Board.

In this regard it is informed that the 51st Meeting of Haryana State Drought Relief & Flood Control Board (HSDR&FCB) is scheduled to be held on 30.12.2019 at 03:00 P.M. under the Chairmanship of Hon’ble Chief Minister, Haryana in Conference Hall, Haryana Niwas, Sector-3 . All Divisional Commissioners and Deputy Commissioners of the state are requested to join the meeting through video conference at their respective Headquarters alongwith the concerned Xens’.The agenda for the meeting can be downloaded from the official website “www.hid.gov.in”.

It is requested to kindly make it convenient to attend the above said meeting.

-Sd/-

Engineer in Chief, Irrigation and Water Resources Department, Haryana, Panchkula, Cum-Member Secretary, Haryana State Drought Relief &Flood Control Board

1 LIST OF MEMBERS

HARYANA STATE DROUGHT RELIEF &FLOOD CONTROL BOARD

OFFICIAL MEMBERS

1. Hon'ble Chief Minister, Haryana. Chairman

2. Irrigation and Water Resources Minister, Haryana. Vice Chairman

3. Finance Minister, Haryana. Member

4. Agriculture Minister, Haryana. -do-

5. Revenue & Disaster Management Minister, Haryana. -do-

6. Chief Secretary, Govt. of Haryana, Chandigarh. -do-

7. Additional Chief Secretary, Govt. of Haryana, -do- Animal Husbandry and Dairying Department, Chandigarh.

8. Additional Chief Secretary, Govt. of Haryana, -do- Revenue & Disaster Management Department, Chandigarh 9. Additional Chief Secretary, , -do- Agriculture Department, Chandigarh.

10. Additional Chief Secretary to Government of Haryana, -do- Forest & Wildlife Department, Chandigarh

11. Additional Chief Secretary, Government of Haryana, -do- Irrigation and Water Resources Department, Chandigarh.

12. Additional Chief Secretary, Government of Haryana, -do- Public Health Engineering Department, Chandigarh.

13. Additional Chief Secretary, Govt. of Haryana, Power Department, Chandigarh. -do-

14. Additional Chief Secretary, Govt. of Haryana, -do- PW (B&R) Department, Chandigarh.

15. Additional Chief Secretary, Govt. of Haryana, Member Finance Department, Chandigarh. 16. Additional Chief Secretary, Govt. of Haryana, -do- Planning Department, Chandigarh.

2 17. Principal Secretary, Govt. of Haryana, -do- Development and Panchayat Department, Chandigarh.

18. Principal Secretary, Govt. of Haryana, -do- Mines and Geology Department, Chandigarh. 19. Principal Secretary, Govt. of Haryana, -do- Town and Country Planning Department, Chandigarh.

20. Principal Secretary, Govt. of Haryana, -do- Urban Local Bodies Department, Chandigarh.

21. Commissioner, , Ambala. -do- 22. Commissioner, Division, Gurgaon. -do- 23. Commissioner, Division, Hisar. -do- 24. Commissioner, Division, Rohtak. -do- 25. Engineer-In-Chief, PW(B&R) Department, -do- Haryana, Sector-33, Chandigarh. 26. Engineer-In-Chief, -do- Public Health Engineering Department, Haryana, Panchkula. 27. Member (RM) Central Water Commission, -do- Room No. 212(S) SewaBhawan, R.K.Puram, New Delhi. 110066 28. Principal Chief Conservator of Forest, Haryana, Panchkula. -do- 29. Engineer-In-Chief, Member Irrigation and Water Resources Department Haryana, Panchkula. Secretary 30. Chief Engineer/YWS (North) Joint Member Irrigation and Water Resources Department, Haryana, Panchkula. Secretary 31. Chief Engineer/ YWS (South) Member Irrigation and Water Resources Department, Haryana, Delhi. 32. Chief Engineer/BWS, -do- Irrigation and Water Resources Department, Haryana, Panchkula. 33. Chief Engineer/LCU, -do- Irrigation and Water Resources Department, Haryana, Panchkula.

3

SPECIAL INVITEES

1. Principal Secretary to Chief Minister Haryana, Chandigarh. 2. Additional Principal Secretary-I to Chief Minister, Haryana, Chandigarh. 3. Additional Principal Secretary-II to Chief Minister, Haryana, Chandigarh. 4. Dy. Principal Secretary to Chief Minister, Haryana, Chandigarh 5. Principal Officer on Special Duty to Chief Minister Haryana, Chandigarh. 6. Officer on Special Duty to Chief Minister Haryana, Chandigarh. 7. Chairman & Managing Director, DISCOM (UHBVNL and DHBVNL), Panchkula. 8. Administrator, CADA, Panchkula. 9. Secretary, Revenue & Disaster Management Department, Haryana, Chandigarh. 10. Secretary, Irrigation and Water Resources Department, Haryana, Chandigarh. 11. Director General-cum- Secretary, Information, Public Relations & Cultural affairs, Haryana, Chandigarh. 12. Commander/Headquarter, Punjab, Haryana and Himachal Pradesh, Independent Sub Area, Western Command, Ambala Cantt. 13. Representative of National Highway Authority of , New Delhi-110075 14. Representative of Indian Meteorological Department, Regional Office, Chandigarh 15. Representative of Haryana Space Application Centre, Hisar 16. Chief Engineer / Co-ordination, Irrigation and Water Resources Department, Haryana, Panchkula. 17. Chief Engineer/Construction,Irrigation and Water Resources Department, Haryana, Panchkula. 18. Chief Engineer / CADA, Panchkula. 19. Deputy Commissioner, Ambala. 20. Deputy Commissioner, . 21. Deputy Commissioner, . 22. Deputy Commissioner, Fatehabad. 23. Deputy Commissioner, Gurgaon. 24. Deputy Commissioner, Hisar. 25. Deputy Commissioner, Jhajjar. 26. Deputy Commissioner, . 27. Deputy Commissioner, . 28. Deputy Commissioner, . 29. Deputy Commissioner, . 30. Deputy Commissioner, Mahendergarh at . 31. Deputy Commissioner, Mewat at Nuh. 32. Deputy Commissioner, . 33. Deputy Commissioner, Panchkula. 34. Deputy Commissioner, . 35. Deputy Commissioner, .

4 36. Deputy Commissioner, Rohtak. 37. Deputy Commissioner, . 38. Deputy Commissioner, Sonepat. 39. Deputy Commissioner, Nagar. 40. Superintending Engineer, Planning, Irrigation and Water Resources Department, Haryana, Panchkula. 41. Superintending Engineer, HKB Circle, Jagadhari. 42. Superintending Engineer, YWS Circle, Karnal. 43. Superintending Engineer, YWS Circle, Sonepat. 44. Superintending Engineer, YWS Circle, Delhi. 45. Superintending Engineer, YWS Circle, Faridabad. 46. Superintending Engineer, YWS Circle, Jind. 47. Superintending Engineer, SYL W.S. Circle, Ambala. 48. Superintending Engineer, BWS Circle, Kaithal. 49. Superintending Engineer, BWS Circle,Hisar. 50. Superintending Engineer, BWS Circle, Fatehabad. 51. Superintending Engineer, BWS Circle, Sirsa. 52. Superintending Engineer, YWS Circle, Rohtak. 53. Superintending Engineer, Jhajjar W.S. Circle, Jhajjar. 54. Superintending Engineer, YWS Circle, Bhiwani. 55. Superintending Engineer, LWS Circle, Bhiwani. 56. Superintending Engineer, JLN W.S. Circle, Rewari. 57. Superintending Engineer, JLN W.S. Circle, Narnaul. 58. Superintending Engineer, Work Shop Circle, Karnal. 59. Superintending Engineer/CDO, Irrigation and Water Resources Department, Haryana, Panchkula. 60. Executive Engineer/CDO-I, Irrigation and Water Resources Department, Haryana, Panchkula. 61. Executive Engineer/Drainage, Irrigation and Water Resources Department, Haryana, Panchkula. 62. Executive Engineer/Nabard, Irrigation and Water Resources Department, Haryana, Panchkula.

------

5 ITEM NO. 1

CONFIRMATION OF THE MINUTES OF 50thMEETING OF HSDR &FCB HELD ON 15.01.2019.

50th Meeting of Haryana State Drought Relief and Flood Control Board was held under the Chairmanship of Hon’ble Chief Minister, Haryana on 15.01.2019. The minutes of meeting (Annexure-1.1) were circulated vide letter No. 416-511 /Drainage/14/2019 Dated: 05.02.2019. No comments have been received from any quarter. It is requested that minutes may kindly be confirmed.

6 ITEM NO. 2

ACTION TAKEN REPORT ON THE DECISIONS TAKEN IN 50th MEETING OF HSDR & FCB HELD ON 15.01.2019

Sr. Issue Action Taken No 1. In the 50th Meeting of HSDR&FCB, Status of Schemes Approved in 50th Meeting of 165 New Schemes and 111 HSDR&FCB Total Amt. Completed In Yet Dropped Ongoing Schemes with Balance Schemes Schemes Progress to work were approved. Start New 165 163.73 94 46 18 07 Schemes Ongoing 111 250.63 70 28 09 04 Schemes

The detail at Annexure 2.1(pg. 44) and Annexure 2.2 (pg. 45). 2. Regarding balance amount pending Out of 08 nos. schemes, 03 Schemes are yet to with various department like HSVP, start and 01 no. scheme is in progress. It is further HSIIDC, ULB for the execution of mentioned that in spite of requesting the following deposit works. departments regarding requirement of funds the same is still pending. Rs. In Crores Sr. Name of Name of Work Amount not No. Department deposited 1. Haryana Cosnt. Retaining wall 1.00 Tourism in front of King Fisher Resort, Ambala 2. HSVP Satrod Mirka Drain, 5.00+0.55+8. Hisar+ Sarai 80 = (14.33) Aurangabad of Kassar Link Drain,+ lining & railing of Panipat Drain 3. HSIIDC Sarai Aurangabad 2.57 Kassar Link Drain 4. ULB Remodelling of 20.31 Panipat Drain. G.Total 38.21 The detail at Annexure 6.1 at pg no. 106 3. Regarding exploring the alternative In this regard policy on re-use of treated waste to re-use the water and not just water was framed by PHED and the same stands throwing into the drain. approved by the Govt. and the same has been notified vide no. 5/18/2018-3PH dated 30.10.2019. A comprehensive scheme has been prepared by I&WRD for the whole state for using treated waste water for irrigation using 747 cusecs treated water, cost of schemes is estimated to be Rs. 1098 crore and it is proposed to be executed in 05 years. 4. Regarding increase of scope of As per the report the flood schemes executed in scheme purposed to protect village these villages acted efficiently and protected the Kamalpur and Village Lal Chappar river banks from further erosion in spite of the on River Yamuna highest discharge received in River Yamuna this year i.e. 8.28 lac cusecs. 5. Regarding monitoring the flood A District Level Committee was constituted protection schemes by the District comprising a representative from D.C. Office to check Administration. the flood works having stone boulders components. The DLC checked the works and submitted its report. 7 ITEM NO. 3

FLOOD REPORT OF HARYANA FOR THE YEAR 2019

Haryana is a small landlocked state situated in the North West part of India and is bounded by Shivalik range in the North- East and river Yamuna in the East, Aravali range in the South-West and river Ghaggar in the West. River Yamuna form part of the boundary between Haryana & Uttar Pradesh and River Ghaggar between Haryana & Punjab. The total area of the state is 44.2 lac hectares out of which about 39.0 lac hectares is arable. Topographically, from drainage angle the entire state is divided into two parts i.e. area draining into Yamuna Sub Basin of Ganga Basin and area draining into Ghaggar Sub Basin of Indus Basin. Yamuna Sub Basin Drainage area of Yamuna Sub Basin comprises of area of Yamuna Nagar (part), Karnal, Panipat, Sonepat, Rohtak, Jhajjar, Rewari, Gurgaon, Mewat, Mahendergarh, Jind (part), Faridabad and Palwal districts. It covers about 40% area of the state and it drains into river Yamuna. Experiencing high flooding during heavy rainfall, diversion drains were constructed in the northern portion of this catchment out-falling into river Yamuna in the North of Delhi. Ujjina Diversion Drain was constructed to out-fall into river Yamuna in Haryana territory in the South of Delhi to check drainage congestion through Khaluka Regulator in Rajasthan. Due to the construction of a number of bunds in Rajasthan territory in catchment area of river Sahibi, Krishnawati, Dohan and Landoha Nalla originating from Aravali hills of Rajasthan, the flood problem in Rewari, Mahendargarh, Jhajjar and Mewat has now reduced considerably. The problem arises only when there is heavy downpour in low lying pockets and in such situation, dewatering is resorted to, on SOS basis. Important drains of Yamuna Sub Basin area are Nallah, Dhanaura Escape, Nissing Drain, Indri Drain, Main Drain No. 2, NaiNallah, Drain No. 8, Diversion Drain No. 8, Out-fall Drain No. 8, , Chhapra Drain, Meham-Lakhanmajra Drain, KCB Drain, Supplementary Drain, Nuh Drain, Ujjina Drain, Ujjina diversion Drain, Gaunchi Main Drain etc.

Ghaggar Sub Basin Remaining 60% area of the state drains into the Ghaggar Sub Basin of Indus Basin comprising of Yamuna Nagar (part), Panchkula, Ambala, Kurukshetra, Kaithal, Jind, Bhiwani, Hisar, Fatehabad and Sirsa districts. This area has a country slope towards river Ghaggar. The river Ghaggar enters Haryana State in district Panchkula from the foothills of Shivalik and flows in South- West direction to Rajasthan through Haryana and Punjab. River Tangri and Markanda merge in the Ghaggar River in . Ghaggar River and its tributaries create serious problems enroute in districts Ambala, Kurukshetra, Kaithal, Fatehabad and Sirsa. The Ghaggar River drains into 8 desert area of Rajasthan. Important drains of Ghaggar Sub Basin are Ganda Nallah, SYL Parallel Drain, Saraswati Drain, Kaithal Drain, Amin Drain, Pundri Drain No. 1, Pundri Drain No. 2, Kasan Drain, Kalwa-Kinana Drain, Padana Drain, Hansi Drain, Rori-Ghaggar Drain, RangoiKharif Channel cum Drain, RangoiNallah, Rangoi Diversion Drain. The Bass-Hisar-Ghaggar Drain is under implementation which will provide relief to the areas in Hisar, Fatehabad and Sirsa districts. A number of ring/protection bunds and embankments have been constructed with high level approaches and ramps to protect abadi of important towns and villages which otherwise could get marooned as a result of spillover from rivers/nallahs due to their location in flood belt of this basin. Beside this, Ottulake has also been deepened to store Ghaggar flood water to use the same in a number of Kharif channels in district Sirsa. Main drains, their capacity and out-fall source is as under:-

Sr. Name of Drain Capacity Out-fall No. Discharge in Cusec YAMUNA SUB BASIN 1 Main Drain No. 2 6325 River Yamuna 2 NaiNallah 2241 Drain No. 8 3 Diversion Drain NO. 8 7320 River Yamuna

4 West Jua Drain 500 Mangeshpur Drain 5 Drain No. 8 1537 Bhindawas lake/Drain 6 Out-fall Drain No. 8 4000 Dhansa out-fall Drain 7 KCB Drain 692 Mangeshpur Drain 8 Chandeni Drain 425 NuhDrain 9 Nuh Drain 1362 UjinaDrain 10 UjinaDrain 2200 Ujina Diversion Drain 11 Ujina Diversion Drain 2200 Gaunchi Main Drain 12 Gaunchi Main Drain 6655 River Yamuna

GHAGGAR SUB BASIN 1 Saraswati Drain 16660 A tributary of River Ghaggar 2 Kaithal Drain 213 River Ghaggar 3 Rangoi Diversion 4088 River Ghaggar Drain 4 HisarGhaggar 500 River Ghaggar multipurpose channel 5 MirpurChoe Drain 830 River Ghaggar 6 Amin Drain 2250 River Ghaggar 7 HisarGhaggar Drain 750 River Ghaggar 8 Baretta Drain 1380 River Ghaggar 9 SirhindChoe Drain 2454 River Ghaggar 10 RangoiNallah 7000 River Ghaggar

9 Flood situation in the year 2019 During 2019 Haryana received deficit –43.31% rainfall and district wise statement of rainfall during the monsoon of 2019, as collected from IMD, Chandigarh is given in Annexure 3.1. The rainfall received during the months of June, July, August and September 2019 was on the lower side of normal rainfall in state Haryana this year. Although no major flood situation was faced during the flood period of 2019. Apart from the maximum discharge received in river Yamuna i.e. 828072 Cusecs and the medium discharge received in other rivers was mainly due to heavy rainfall in the catchments of the river located in the states of Uttarakhand and Himachal Pradesh. The basin wise status of flood received during 2019 is given below:- Yamuna Sub Basin This year Highest flood discharge was recorded in river Yamuna at with maximum discharge of 08,28,072 cs. on 18.08.2019. This flood in river Yamuna passed safely but eroded some agricultural land along the river edge at location near village Lal Chappar, Jathlana, Unheri, Odri, Kamalpur in district . Apart from this the medium flood discharge was received in the tributaries of River Somb, Pathrala, Sadhaura and Markanda which eroded fertile agriculture land near villages Gadwali, Muzafat, Ranjitpur, Ramgarh Sawai, Chintpur, Rampur gainda and Khannuwala.The temporary remedial measures at some critical areas on river Somb and Pathrala to protect village abadi from flood were taken, although no substantial damages were observed. A medium flood discharge was also received in River Pathrala and its tributaries and some villages were effected like vill Manakpur, Arjun Majra, Rajpur, Dadupur Jattan and Mukaravpur. Apart from this, in district Karnal, some damages like scouring of fertile agricultural land, formation of loops in some complexes were reported. Although major damages due to flood were averted by initiating immediate flood preventive measures by deploying labour, machinery and material like wooden ballies, EC bags etc. The critical sites where temporary flood preventive measures where initiated are Chandrao complex, Garhpur complex, Kalsora complex, Nabiabad complex, Dabkoli, Shergarh tapu complex. The Kalsora complex experienced the worst impact from the heavy discharge received in river Yamuna, however the same was combat through various preventive measures. In districts Jhajjar, Rohtak, Jind, Narnaul and Rewari no problem of water logging in fields or flood was reported and hence no flood damages in these districts were noticed this year.

10 Ghaggar Sub Basin River Ghaggar comprises of various tributaries like Markanda, Tangri, Patiala Nadi, Merapur Choe drain and Para River. In district Panchkula no major losses were reported however some minor damages like scouring of river banks, water logging etc. were noticed in village Toda, Paploha; a landslide in the month of July 2019 occurred in vill. Khera Sitaram along Orian river. Although protection work of stone steining and laying of E.C bags was executed to provide immediate protection. Furthermore, the water level of increased to 476.80 mtr. on dated 18.08.2019, which was a considerable rise of more than 4 mtr. height in a span of one day; and the accumulated water was released gradually to avoid any adverse effect on the dam and upper reaches of .

In district Kaithal, the Ghaggar river crossed the level of 21.00 feet and the water spilled in the fields of villages namely Sihali and Ratta Khera. This year the maximum discharge received in River Ghaggar was 52,387 Cusecs (24.20 feet) on 18.07.19 and it crossed the danger level i.e. 23.00 feet. This huge discharge water logged the Pucca road leading to village Sihali-Ratta Khera and Mangra-Manjheri. The Ghaggar Bund from RD 117500 to 115000 was damaged and the same was protected by laying earth filled E.C bags. Due to flood received in river Ghaggar 300 acres crops at outlet of Saraswati Nala and along Ghaggar Bund (RD 105525-106125) were badly damaged near village Bhatain and Hansu Majra, some other villages effected during flood are Mohanpur, Bhusla, Budanpur, Arnoli, Banpur, Kamheri, Channa Agriyan, Ratta Khera lukman,Sadhipur in district Kaithal. Whereas in District Sirsa there was not much localized rainfall but the problem of water logging was reported in some villages like Patli Dabar, Narelkra-sikanderpur-Bajekan area due to heavy discharge received in River Ghaggar in the month of July, 2019 along with some local spells of rainfalls which added up to the discharge. However the problem was well tackled with the best efforts of Department. District Ambala experienced spells of heavy to extremely heavy rainfall this year in the month of July,2019 which resulted in water logging in various urban as well as low lying area. The intensity of rainfall and water logging was so high that District administration had to close various schools and colleges in the District Ambala. Apart from this the accumulated rain water entered the houses of various officers of HVPNL in Power Colony in Dhulkot along National Highway. The residents suffered loss of property and had to be rescued from the water logged residences via boats. On the direction of Deputy Commissioner Ambala the process of dewatering was initiated by the Irrigation department on emergent basis. Apart from this the problem of water logging was also reported in villages Machhonda, Chanderpuri, Sundernagar and some area along National highway. 11 The dewatering was done throughout so as to relieve the residents and temporary protection works were executed by laying Earth filled E.C bags for the protection of Shiv Colony in Kala Amb and to strengthen Babyal Bund along river Tangri. The maximum discharge observed in the main rivers during the year was as under:- Sr. River Discharge Site at Danger Maximum Date on which No. Level Discharge maximum Recorded Discharge in Cusec recorded 1 River Yamuna Hathni Kund Barrage 2,50,000 8,28,072 18.08.2019 2 River Ghaggar Panchkula Site 4A 20,000 19,240 18.08.2019 Gulha Cheeka (Kaithal) 51,733 52,387 18.07.2019 Khanauri (Sirsa ) 25,000 14,225 19.07.2019 Chandpur including Rangoi 25,000 12,800 21.07.2019 Nallah and JoyaNallah (Punjab) Downstream Ottu (Sirsa) 25,000 26,950 24.07.2019

3 River Markanda Mulana Bridge (Ambala) 50,000 64,530 18.08.2019 4 River Tangri Shahpur (Ambala) 34,000 26,605 18.08.2019

Further statement showing Annual Peak Flood Data of various sites since 2002 is given in Annexure 3.2. In Addition to this position of pumps along with the number of pumps purchased during 2018-19, for dewatering of flood water from low lying areas is given in Annexure 3.3.

12 ITEM NO. 4

New Schemes of Irrigation and Water Resources Department proposed for 51st meeting of HSDR&FCB.

During the monsoon season 2019, there were medium to high precipitation in the catchment areas of Yamuna and its tributaries, lying in some part of Uttarakhand and Himachal Pradesh. Maximum discharge of 8,28,072 cusecs was received in river Yamuna at the Hathni Kund Barrage (HKB) on 18.08.2019. In addition to the flood discharge of Yamuna, flood discharge of Rivers Somb and Pathrala were moderate during flood season 2019 and caused minimal damages. Some damages like erosion of land along the river edges, erosion of embankments, spilling of water occurred at a few places in District Yamunanagar but the damages were contained as the flood works executed before the onset of monsoon of 2019 performed well and efficiently. As such, preparedness for monsoon season 2020, meeting of State Level Committee under the Chairmanship of Engineer-in-Chief, Irrigation and Water Resources Department was held on 12.12.2019 wherein 203 schemes amounting to ₹ 198.31 Cr. were finalized for recommendation to HSTAC & HSDR&FCB. The schemes related to renovation of damaged bunds, procurement of pumps, construction of bunds, studs to protect village Abadis, V.R. Bridges on drains, Sump wells, Remodeling of Drains etc.. The schemes have been prepared after due consultation / recommendations of respective District Flood Control Committees under the Chairmanship of respective Deputy Commissioners and Chairman, Zila Parishad. The Department has further prioritized the works in such a way that the works proposed to be completed upto 30.06.2020 are taken as Short term, the works proposed to be completed upto 30.06.2021 are taken as Medium term and the works proposed to be completed upto 30.06.2022 are taken as Long term. The abstract of schemes so worked out is as under:- ₹ in Crores

Requirement of funds Sr. Type of No. of Estimated No. Schemes Schemes Cost Total 2020-21 2021-22 2022-23

Short term 1 (S) 120 70.54 70.54 70.54 0.00 0.00 Medium term 2 (M) 76 96.07 96.07 49.34 46.73 0.00

3 Long term (L) 7 31.70 31.70 11.45 11.34 8.91

TOTAL 203 198.31 198.31 131.33 58.07 8.91

13

The district wise abstract of total schemes along with their requirement of funds is given in Annexure 4.1. (Pg. no. 50). Further details of these schemes are given at Annexure 4.2 (Pg. no. 51) Haryana State Drought Relief and Flood Control Board is requested to kindly consider these schemes for approval and schemes will be taken up as per availability of funds during financial year 2020-21 and thereafter. All these schemes shall be taken up under State Plan Head 4711-Flood Control & Drainage

14 ITEM No.5

Review of Schemes of Irrigation and Water Resources Department ongoing prior to 51st Meeting of HSDR&FCB under head 4711 – Flood Control & Drainage

During the 50th Meeting of Haryana State Flood Control Board, 111 On-Going Schemes and 165 New Schemes under head 4711-Flood Control & Drainage were reviewed and approved. With the best efforts of the department, 164 schemes have been completed during the year (details at Annexure-5.1, Pg. no. 66). Further, 11 schemes approved in the 50th Meeting which could not executed due to various administrative and technical reasons are proposed to be dropped from the list of ongoing schemes (details at Annexure-5.2, Pg. no. 78). Apart from this, the department however, intends to continue with remaining 101 schemes (Abstract at Annexure 5.3, Pg. no. 81 and details at Annexure 5.4, Pg. no. 82) actually in progress or yet to start earlier approved and the funds to the tune of ₹ 258.83 Cr. are required to complete these schemes during the next three financial years as detailed below. Further, these schemes have also been reprioritized and identified as short term, medium term and long term schemes keeping in view their urgency of completion before the flood season. The abstract of schemes so worked out is as under:-

Table no. 5 ₹In Crore

Sr. Type of No. of Revised Requirement of funds Expenditure No Schemes Schemes Cost Total 2020-21 2021-22 2022-23 Short 1 21 62.55 23.74 38.81 38.81 0.00 0.00 Term Medium 2 63 123.19 31.43 91.76 45.88 45.88 0.00 Term Long 3 17 73.09 0.03 73.06 24.84 24.11 24.11 Term 4 Total 101 258.83 55.20 203.63 109.53 69.99 24.11

Haryana State Drought Relief &Flood Control Board is requested to consider the approval of these schemes. The schemes will be taken up on priority as per availability of funds during 2020-21 and thereafter.

15 Item No. 6 Review of On-Going and New Schemes of Irrigation and Water Resources Department under head- 8443-Irrigation Department Deposit Works. During the 50th meeting of HSDR&FCB 08 no. schemes under Deposit Head were approved; the brief status of the same is as under:- Sr. Name of District Name of Name of Scheme Status Remarks No. Circle 1 AMBALA SYL CIRCLE Constructing Retaining wall in the side Yet to Start Rs. 20.00 lac have been deposited AMBALA of three Nos. Air field drain in front of by Haryana Tourism. Balance King Fisher Resort Ambala City amount should be deposited soon. (Deposit Work of Haryana Tourism Corporation ) (120.00 Lakh) 2 HISSAR BWS CONSTRUCTION OF SATROD In Progress Expenditure incurred = 6.57 Cr. CIRCLE MIRKA DRAIN RD 0 TO 6450 AND HSVP deposited Rs. 6.00 Cr. HISAR DABRA LINK DRAIN RD 0 TO Balance funds still required to be 7525(DEPOSIT WORK OF HUDA). deposited by HSVP is Rs. 5.03 Cr.

3 Kurukshetra SYL CIRCLE Constg. of RCC rectangular open Completed Work Completed AMBALA drain of size 5.50`X2.75` parallel to Saraswati Creak for sewerage water disposal work Sector-13, U.E. Kurukshetra and 7` X3.50` from Public Health STP point to siphon Narwana Branch,. Funds are to be provided by HUDA and PHED. 4 Gurugram CONSTRUC Construction of RCC open Trough for Dropped Work proposed to be dropped as TION channelisation of Drain K funds not provided by HSVP. CIRCLE to L (Dhankot road to Njafgarh Drain) GURGAON 5 YWS Increasing capacity of Sarai Yet to Start HSIIDC was required to deposit CIRCLE Aurangabad Kassar Link Drain from 257.20 lacs but the requests have ROHTAK RD 0 to 34052 out falling into KCB been turned down. However the Drain at RD 8103-L including its HSVP has agreed to submit an extension and Sump Well Pump amount of Rs. 146.68 lac. House. Amounting 404.18 Lac. (HSIIDC share 257.20 lacs and HSVP share 146.68 lacs). 6 PANIPAT YWS Providing lining and railing of panipat Completed Balance amounting to Rs. 8.80 Cr. CIRCLE drain from RD 55673-27000. total cost is still pending from HSVP. KARNAL of the scheme RS. 37.80 crore fund is to be provided by HSVP. 7 PANIPAT YWS Remodelling of panipat drain by Dropped Funds still not deposited by ULB. CIRCLE providing lining and replacing of pucca Scheme proposed to be dropped. KARNAL structure from RD 55673 to 64400 (phase-2 costing rs. 20.31 crore).

8 FARIDABAD YWS PROVIDING LINING OF GAUNCHI Completed The work is completed CIRCLE DRAIN FROM RD 0-15534. FARIDABAD

02 no. schemes are yet to start due to non-submission of required funds from the departments HSVP, Haryana Tourism. Apart from this 01 no. scheme is in progress in district Hisar but could not be completed due to pending funds from the department HSVP, therefore the Board is requested to allow to complete this scheme from the funds allotted under State Plan-4711 head till the funds are received from HSVP, however in case of Sarai Aurngabad Kasar Link Drain no fund has been deposited till date from HSIIDC and HSVP in spite of several requests made to these departments, hence the Board may allow the department to drop this scheme in case the requisite funds are not received in FY-2020-21. A total sum of Rs. 37.69 Cr. is pending from these departments and the detail is given in the table on next page:-

16 (Rs. In Cr.) Name of Amount not Sr. No. Name of Work Department deposited Haryana Cosnt. Retaining wall in front of King 1 1.00 Tourism Fisher Resort, Ambala Satrod Mirka Drain, Hisar+ Sarai 5.00+0.55+8 2 HSVP Aurangabad of Kassar Link Drain,+ .80 = lining & railing of Panipat Drain (14.33) 3 HSIIDC Sarai Aurangabad Kassar Link Drain 2.57 4 ULB Remodelling of Panipat Drain. 20.31 G.Total 38.21

17 ITEM NO. 7 Review Position of Funds for Irrigation and Water Resources Department under head 4711- Flood Control & Drainage

As per details given in Item No. 4 and 5, Irrigation and Water Resources Department has proposed 203 New Schemes and intends to continue 101 Ongoing Schemes costing ₹ 198.31 crore and ₹ 258.83 crore (amount required for balance work) respectively under head 4711- Flood Control & Drainage. Now the department has made an exercise by prioritizing the schemes by identifying the period of completion i.e. the works proposed to be completed by 30.06.2020 are taken as short term, the works proposed to be completed by 30.06.2021 are taken as medium term; the works proposed to be completed by 30.06.2022 are taken as long term. Accordingly, requirement of funds for these schemes has been worked out is as under:-

Table-I: Requirement of funds: (₹in crore)

Requirement of funds Type of No. of Estimated Schemes Expenditure Schemes Schemes Cost 2020- Total 2021-22 2022-23 21 Short 21 62.55 23.74 38.81 38.81 0.00 0.00 Ongoing term (S) (In Medium Progress & 63 123.19 31.43 91.76 45.88 45.88 0.00 Yet To be term (M) Start) Long 17 73.09 0.03 73.06 24.84 24.11 24.11 term (L) Total 101 258.83 55.20 203.63 109.53 69.99 24.11 Short 120 70.54 0.00 70.54 70.54 0.00 0.00 term (S) New Medium Schemes 76 96.07 0.00 96.07 49.34 46.73 0.00 term (M) Long 7 31.70 0.00 31.7 11.45 11.34 8.91 term (L) Total 203 198.31 0.00 198.31 131.33 58.07 8.91 Short 141 133.09 23.74 109.35 109.35 0.00 0.00 term (S)

Grand Total Medium 139 219.26 31.43 187.83 95.22 92.61 0.00 term (M) Long 24 104.79 0.03 104.76 36.29 35.45 33.02 term (L) Total 304 457.14 55.20 401.94 240.86 128.06 33.02

18

During the FY 2019-20, Finance Department has allocated only Rs 120.00 Cr. in original budget estimate and additional amount of Rs. 30 Cr. was allocated during 1st Supplementary, as such total available budget till date is Rs. 150 Cr. against which Rs. 130.00 Cr. has already been utilized upto 30.11.2019 for completion of various flood schemes. The work on some ongoing schemes is in progress and the remaining are yet to be taken up. Accordingly, budget position so worked out is as under:-

Table-II: Budget Position (₹in crore)

Ongoing New Total Budget Schemes Schemes Requirement Available (Rs. In Cr.) Funds Required in 40.00 0.00 40.00 20.00 2019-20 Funds 150.00 required in (Tentative, 2020-21 however same 69.53 131.33 200.86 shall be approved in budget session-2020)

Total 109.53 131.33 240.86 170.00

The additional budget shall be demanded from the Planning/Finance Department under 1st &

2nd supplementary after observing the pace of actual execution of work and the expenditure incurred during FY 2020-21.

19 ITEM NO.8

AGENDA OF PUBLIC HEALTH ENGINEERING DEPARTMENT FOR

THE HARYANA STATE DROUGHT RELIEF & FLOOD CONTROL

BOARD.

Agenda for the Drought Relief and Flood Control Board Meeting

A) New proposals Description No. of Schemes

Total number of scheme 02 Annexure-A proposed

Total cost Rs.2733.13 lacs Annexure-A

B) Revised Cost Schemes Description No. of Schemes

Total number of schemes 01 Annexure-B to be revised

Total cost Rs.189.00 lacs to Annexure-B

Rs. 306.32 lacs

C) Status of Schemes Description No. of Schemes

Total No. of approved Schemes 23

No. of completed schemes 05 Annexure-C

No. of Ongoing Schemes 18 Annexure-D

D) Funds required for the financial year 2020-21 Rs. 16.02 Crore (at Annexure A, B & D) (for ongoing & upcoming project).

E) Physical Progress of the ongoing schemes is attached (at Annexure-E)

20 Annexure A (For upcoming project under Head Urban 4711 Flood) All Amount Rs. In Lacs Sr. Name of Name of Work Estimate Cost Requirement of fund No. Circle 2020-21 2021-22 2022-23

1 Hisar Rough cost estimate for 1456.00 550.00 600.00 306.00 shifting of existing storm water drain on Bagla road required due to land acquisition by HSVP Hisar at existing site of storm water drain in Sector-33 HISAR 2 Rohtak Laying of rising main Dl 1198.00 600.00 400.00 198.00 pipeline from HUDA complex and Sandasar disposal to Public Health Carrier Channel near second water works, Jhajjar road Rohtak under CM Announcement No. 24985 dt. 19.02.2019 Grand Total 2654.00 1150.00 1000.00 504.00

21 Annexure B (For revised cost schemes under Head Urban 4711 Flood)

All Amount Rs. In Lacs Sr. Name of Name of Work Estimate Cost Requirement of fund No. Circle 2020-21 2021-22 2022-23

1 Palwal Hodal - Proportionate cost 189.00 to 306.32 117.00 for SWD system by constructing RCC box drain along NH-2 [21/06/2018] - [10/01/2019]-[30/06/2020]

Grand Total 306.32 117.00 0.00 0.00

22 ANNEXURE C All Amt. Rs. in Lacs

Rural/Urban : Urban Program Name: Urban 4711 Flood , Expenditure upto 30/11/2019 Selection of Report : Closed Works Administrative Approval Date: From 06/06/1995 To 12/12/2019 Sr. Name of Work/Adm Approval status Adm. Exp Upto Funds Exp. Exp. Cumulative Exp. No Date/Start Dt./Work Closure Dt App.Amt 31/03/2019 During during During Upto November (Tech. 19- 20 November 19- 20 2019 San.Amt) 2019 Hisar Circle Hisar PHED No. 3 1 Hisar - Estimate for remodelling of existing Closed 280.00 279.84 0.16 0.00 0.00 279.84 storm water drain of old city area and 20/08/2019 (280.00) arrangement of DG set at Hisar[27/05/2016] -[01/12/2016]- [30/09/2019] Division Total 280.00 279.84 0.16 0.00 0.00 279.84 Circle Total 280.00 279.84 0.16 0.00 0.00 279.84 Kaithal Circle Kaithal PHED No. 1 2 Kaithal - Remodelling of Katcha Manas Closed 715.00 733.57 0.00 0.00 0.00 733.57 Drain from RD 10075 to RD 19164 passing 14/05/2019 through Kaithal Town(Deposit Work)[Revised dt.- 27/04/2017][03/05/2014] - [03/08/2014]-[31/03/2019] Division Total 715.00 733.57 0.00 0.00 0.00 733.57 Kurukshetra PHED 3 Kurukshetra - Estimate for construction of Closed 134.31 93.39 26.91 0.00 16.90 110.29 RCC Box type drain from Jai Bharti School 05/11/2019 (100.35) onward at Kurukshetra town.[27/04/2017] -[10/08/2017]- [30/09/2019] Division Total 134.31 93.39 26.91 0.00 16.90 110.29 Circle Total 849.31 826.96 26.91 0.00 16.90 843.87 Hisar Circle Hansi PHED 4 Narnaund - Rough cost est. construction of Closed 73.25 45.62 23.82 0.00 0.00 45.62 storm water disposal near Hisar major 13/12/2019 distry. covering Ward 4,6and7 [26/04/2018] -[]-[31/10/2019]

Division Total 73.25 45.62 23.82 0.00 0.00 45.62

Circle Total 73.25 45.62 23.82 0.00 0.00 45.62

Narnaul Circle Narnaul PHED No. 2 5 Narnaul - Est.for prov.,lowering of RCC Closed 209.35 172.67 0.00 0.00 0.00 172.67 pipe class NP3 to drain out the storm water 13/12/2019 in various mohalla of NNL Town(CM Announcement)[26/04/2016] - [09/02/2017]-[30/09/2019]

Division Total 209.35 172.67 0.00 0.00 0.00 172.67

Circle Total 209.35 172.67 0.00 0.00 0.00 172.67

Grand Total 1411.91 1325.09 50.89 0.00 16.90 1342.00

23 Annexure D (Ongoing schemes under Head Urban 4711 Flood) All Amt. Rs. in Lacs Sr. Name of Work/Adm status Adm. Exp Upto Funds Exp. Exp. Cumulativ Likely Funds No Approval Date/Start App.Amt 31/03/201 During during During e Exp. expenditure demand Dt./Work Closure Dt (Tech. 9 19- 20 Nov 19- 20 Upto Nov upto for year San.Amt) 2019 2019 31.03.2020 2020-21

Ambala Circle Ambala City PHED 1 Ambala City - Construction of In Progress 1093.62 746.33 120.00 0.00 0.00 746.33 746.33 200.00 Nala along G.T. Road from (1093.62) chowk to Banuri Nakka extension (RD 205.9 Km to 211.46 Km)[Revised dt.- 27/04/2017][21/03/2012] - [23/12/2013]- [30/09/2019] 2 Ambala City town- Estimate for In Progress 619.30 582.77 30.91 0.00 20.85 603.63 613.63 construction of RCC covered (619.30) storm water drain (Box Type) at Kalka Chowk area along HN- 1(Vidhan Sabha Matter)[26/04/2016] - [21/07/2016]- [30/09/2019] Division Total 1712.92 1329.10 150.91 0.00 20.85 1349.95 1359.96 200.00 Ambala PHED 3 Ambala Sadar - Laying of In Progress 52.45 0.00 50.00 0.00 0.00 0.00 50.00 800mm dia RCC storm water drainage extended pipe upto Mahesh Nagar drain for improvement drain[06/03/2019] -[]- [30/09/2020] Division Total 52.45 0.00 50.00 0.00 0.00 0.00 50.00 Circle Total 1765.37 1329.10 200.91 0.00 20.85 1349.95 1409.96 200.00 Bhiwani Circle Bhiwani PHED No. 1 4 Bhiwani - Est. for providing 5 In Progress 693.90 692.81 1.09 0.00 0.00 692.81 693.90 No. subsidiary pumping station for disposal of storm of various low lying area[30/06/2017] - [17/11/2017]- [30/06/2020]

5 Bhiwani : Estimate for In Progress 298.00 176.40 121.10 5.58 8.83 185.23 247.50 providing storm water drainage system including road gullies, intercepting manholes [27/05/2016] -[]- [30/09/2019] Division Total 991.90 869.21 122.19 5.58 8.83 878.03 941.40 Siwani PHED 6 Siwani - Prov. storm water In Progress 227.00 147.62 55.00 0.00 4.42 152.04 157.62 drainage system for (227.00) dewatering nearby Ladwani Pond at Parshuram Chowk Distt. Bhiwani[26/04/2018] - [01/06/2019]- [30/04/2020]

Division Total 227.00 147.62 55.00 0.00 4.42 152.04 157.62 Circle Total 1218.90 1016.83 177.19 0.00 13.25 1030.07 1099.02 Hisar Circle Hansi PHED 7 Hansi - Rough Cost Estimate In Progress 45.00 23.31 0.00 0.00 15.70 39.01 45.00 for providing storm water drainage for Yati Nagar and surrounding area Hansi town[27/04/2017] - [10/01/2019]- [30/09/2019] Circle Total 45.00 23.31 0.00 0.00 15.70 39.01 45.00

24 Annexure D (Ongoing schemes under Head Urban 4711 Flood) All Amt. Rs. in Lacs Sr. Name of Work/Adm status Adm. Exp Upto Funds Exp. Exp. Cumulativ Likely Funds No Approval Date/Start App.Amt 31/03/201 During during During e Exp. expenditure demand Dt./Work Closure Dt (Tech. 9 19- 20 Nov 19- 20 Upto Nov upto for year San.Amt) 2019 2019 31.03.2020 2020-21

Jhajjar Circle Jhajjar PHED No. 1 8 Beri - Laying of 600 mm i/d DI In Progress 31.15 26.49 4.66 0.00 0.00 26.49 31.15 rising main for Storm Water Disposal No.1 Point A to Drain No.8 [26/04/2018] - [03/09/2018]- [30/09/2019]

Circle Total 31.15 26.49 4.66 0.00 0.00 26.49 31.15

Kaithal Circle Kaithal PHED No. 1 9 Pundri - Upgradation of storm In Progress 513.10 307.79 120.00 0.00 36.45 344.24 477.79 35.00 water system Pundri Town (under CM announcement No. 10321)(CM Announcement)[Revised dt.- 21/06/2018][30/11/2015] - [11/08/2016]- [30/09/2019]

10 Supplementary estimate for In Progress 75.82 0.00 75.82 0.00 19.37 19.37 75.00 remodelling of Katcha Manas drain from Cheek road near Birpati Kund to Kaithal drain Balance [11/09/2019] - [15/09/2019]- [30/09/2021] Division Total 588.92 307.79 195.82 0.00 55.82 363.61 552.79 35.00 Circle Total 588.92 307.79 195.82 0.00 55.82 363.61 552.79 35.00 Palwal Circle Palwal PHED No. 3 11 Hodal - Proportionate cost for In Progress 189.00 0.00 189.00 63.20 180.22 180.22 189.00 117.00 SWD system by constructing (189.00) RCC box drain along NH-2 [21/06/2018] - [10/01/2019]- [30/06/2020] 12 Hodel-Providing storm water In Progress 418.00 305.22 58.84 11.26 83.08 388.29 418.00 drainage system by (418.00) constructing RCC drain[03/12/2016] - [21/04/2017]- [30/09/2019]

13 Palwal-Remodeling of existing In Progress 242.50 101.58 66.14 0.00 45.99 147.56 242.00 storm water drain and (242.50) construction of additional RCC box type drain for storm water system(CM Announcement)[22/07/2016] -[15/12/2016]- [30/09/2019]

Division Total 849.50 406.79 313.98 74.45 309.28 716.07 849.00 120.00 Circle Total 849.50 406.79 313.98 74.45 309.28 716.07 849.00 120.00 Rewari Circle Rewari PHED No. 1 14 Rewari - To provide storm In Progress 305.82 154.07 80.22 43.36 71.77 225.83 260.10 water drainage scheme for (305.82) balance existing drain/ Nallah from Bawal road to Garhi Bolani road(CM Announcement)[13/01/2016] -[01/05/2016]- [30/09/2019] Division Total 305.82 154.07 80.22 43.36 71.77 225.83 260.10 Circle Total 305.82 154.07 80.22 43.36 71.77 225.83 260.10

25 Annexure D (Ongoing schemes under Head Urban 4711 Flood) All Amt. Rs. in Lacs Sr. Name of Work/Adm status Adm. Exp Upto Funds Exp. Exp. Cumulativ Likely Funds No Approval Date/Start App.Amt 31/03/201 During during During e Exp. expenditure demand Dt./Work Closure Dt (Tech. 9 19- 20 Nov 19- 20 Upto Nov upto for year San.Amt) 2019 2019 31.03.2020 2020-21

Rohtak Circle Rohtak PHED No. 3 15 Rohtak – Providing storm In Progress 356.60 30.86 40.00 0.00 4.76 35.61 40.86 water drainage system parallel (356.60) to road from culvert Sector-3 to Sector-4 [27/04/2017] - [29/03/2018]- [30/09/2019] 16 Rohtak – Rehabilitation for In Progress 382.22 338.30 43.92 0.00 15.11 353.41 367.22 storm water RCC carrier (382.22) channel Hisar road and connecting to drain No.8.[27/04/2017] - [10/02/2018]- [30/09/2019] 17 Rohtak - Special repair and In Progress 98.50 29.09 48.80 0.00 10.21 39.30 57.09 desilting of 64` i/d storm (98.50) water line from PHED office to 2nd disposal Jhajjar road[26/04/2018] - [28/06/2018]- [30/04/2020] Division Total 837.32 398.25 132.72 0.00 30.07 428.32 465.17 Circle Total 837.32 398.25 132.72 0.00 30.07 428.32 465.17 Sonipat Circle Sonipat PHED No. 2 18 Ganaur - Providing Storm In Progress 1785.00 1171.40 70.00 0.00 0.40 1171.80 1221.8 100.00 Water Drainage System[24/11/2011] - [18/01/2012]- [30/09/2019] Division Total 1785.00 1171.40 70.00 0.00 0.40 1171.80 100.00 Circle Total 1785.00 1171.40 70.00 0.00 0.40 1171.80 1221.8 100.00 Grand Total 7426.98 4834.03 1095.28 123.39 517.14 5351.17 6078.23 452.00

26 ANNEXURE-E Physical progress of ongoing works for Flood Works

SN Name of work/ Adm Estt. Cost Upto date Physical Latest Status Likely date approval date expenditu scope of work of re as per completion estimate PHE Circle Ambala 1. PHED Ambala City Ambala City - 1093.62 746.33 Phase-1st 31.12.2020 Construction of Nala (1093.62) Construction of Work Work could along G.T. Road from drain 1400 mtr Completed not be Kalka chowk to Banuri Laying of RCC Work completed Nakka extension (RD pipe 2000 Mtr. Completed due to late 205.9 Km to 211.46 Phase-2nd clearance Km)[Revised dt.- Construction of Construction from Forest 27/04/2017][21/03/2012] - Drain 8’x4’ = of Drain 8’x4’ Deptt. In [23/12/2013]-[30/09/2019] 2165 Mtr. = 350 Mtr. June, 2018, (Balance = thereafter 1815) due to monsoon season. Also due to construction of fly over, the proposal needs to be changed and now instead of Open Drain, HDEP pipe is proposed for which proposal is under preparation. 2. Ambala City town- 619.30 603.63 RCC Storm 400 Mtr. Laid 31.3.2020 Estimate for construction (619.30) Water Drain and of RCC covered storm Size 2’-0” x 2’- commissione water drain (Box Type) at 0” d with other Kalka Chowk area along existing drain. HN-1(Vidhan Sabha 600 mm DI pipe Work Matter)[26/04/2016] - alongwith completed. [21/07/2016]-[30/09/2019] 900mm M.S. pipe 12 mm thick Const. of sump Work well of size completed 2.00Mtr. x 2.00Mtr. RCC Storm Work Water Drain 2’ – completed 6” x 1’-6” 700mm i/d RCC 1110 Mtr. pipe drain RCC pipe drain laid (Work

27 SN Name of work/ Adm Estt. Cost Upto date Physical Latest Status Likely date approval date expenditu scope of work of re as per completion estimate Completed) 1000mm i/d 550 Mtr. RCC pipe Drain Pipes laid. (Work Completed) Const. of RCC Work Circular completed collecting tank of 8.50 mtr. Dia Const. of 95% work Screening completed chamber of size 2.50x1.80x2.65 mtr. Const. of pump Work chamber of size completed 10` x 12` Cosnt. of 75 % work boundary wall completed and laying of Distribution system PHED, AmbalaCantt 3. Ambala Sadar - Laying of 52.45 0 Laying of The work was 31.03.2020 800mm dia RCC Storm 800mm RCC allotted the Water Drainage extended NP-3 Storm agency during pipe upto Mahesh Nagar Water pipe line the month of drain for improvement = 1000mm 07/2019. drain. During execution of work, there arises dispute by public. However, the RCC pipe have been arranged by agency at site. Now the execution work has been re- started and will be completed by 28.02.2020 Bhiwani Circle Bhiwani PHED No.1 4. Bhiwani- Estimate for 693.90 692.81  Pumping Work 28.02.2020 providing 5 No. subsidiary station for completed pumping station for disposal disposal - except rising of strom of various low 5 No. main lying area RCC box type connection drain 0.76 M x is pending near ROB 0.16 M Road

28 SN Name of work/ Adm Estt. Cost Upto date Physical Latest Status Likely date approval date expenditu scope of work of re as per completion estimate 150 mtr. with existing  RCC tank 18’ 600mm dia dia - pipe 1 No.  Pumping machinery - 2 No.  RCC box type drain 0.76 M x 0.16 M - 300 mtr.  RCC tank 18’ dia - 1 No.  Pumping machinery - 2 No.  RCC box type drain 0.76 M x 0.16 M - 350 mtr.  RCC tank 18’ dia - 1 No.  Pumping machinery - 2 No.  RCC box type drain 0.76 M x 0.16 M- 100 mtr.  RCC tank 18’ dia – 1 No.  Pumping machinery 2 No.  RCC box type drain 0.76 M x 0.16 M – 92 mtr.  RCC box type drain 0.76 M x 0.16 M- 92 mtr.  RCC tank 24’ dia – 1 No.  Pumping machinery – 2 No.

5. Bhiwani: Estimate for 298.00 185.23 Cost. Of type 86% work 31.03.2020 providing storm water drain 3200 completed drainage system mtr. including road gullies, 50% work intercepting manholes 230 mtr. completed (27/05/2016)-(1- RCC NP-3 pipe (30/09/2019) 600 mm

29 SN Name of work/ Adm Estt. Cost Upto date Physical Latest Status Likely date approval date expenditu scope of work of re as per completion estimate

Siwani PHED 6. Siwani - Prov. storm 227.00 152.04 Pump Chamber Pump 31.03.2020 water drainage system for -1 No. Chamber -0% dewatering nearby Collecting Collecting Ladwani Pond at Tank-1 No. Tank-40% Parshuram Chowk Distt. Screen Screen Bhiwani[26/04/2018] - Chamber-1 No. Chamber-0% [01/06/2019]-[30/04/2020] Open Drain-600 Open Drain- Rft. 90% Boundary Wall- Boundary 400 Rft Wall-0% P/Machinery-2 P/Machinery- No. 0% 450 mm i/d D.I. 450 mm i/d Piipe-2500 MTr. D.I. Piipe- 90% PHE Circle Hisar PHED Hansi 7. Hansi - Rough Cost 45.00 39.01 Const. of 90% work 31.03.2020 Estimate for providing Disposal, P/M, completed storm water drainage for DI pipes etc. Yati Nagar and surrounding area Hansi town [27/04/2017] Jhajjar Circle Jhajjar PHED No.1 8. Beri – Laying of 600 mm i/d 31.15 26.49 Rising main 28 250 mtr. 31.12.2019 DI rising main for Storm = 600 mm 5 Water Disposal No.1 Point A mtr to Drain No.8 [26/04/2018] – [30/04/2019--] Kaithal Circle Kaithal PHED No.1 9. Pundri - Upgradation of 513.10 344.24 Sub Head No. 30.06.2020 storm water system 1 :- Storm Land not Pundri Town (under CM Water available announcement No. Drainage from for 10321)(CM PHC-Kaithli IPS/MPS. Announcement) [Revised Gate - Baraat As per dt.- Ghar -Existing report of SE 21/06/2018][30/11/2015] - Disposal Kaithal the [11/08/2016]-[30/09/2019] works matter has 350 mm i/d 920 Mtr been taken RCC pipe = 920 up with mtr MLA Pundri 500 mm i/d 800 mtr and will be RCC pipe = 800 resolved mtr shortly. 250 mm i/d SW 520 mtr = 520 mtr Sub Head No.

30 SN Name of work/ Adm Estt. Cost Upto date Physical Latest Status Likely date approval date expenditu scope of work of re as per completion estimate 2 :- 600 mm DI Rising main & RCC NP3 Gravity pipe from Junction point to Pumping Station near Drain 600 mm i/d DI 1000 mtr pipe = 1000 mtr 1000 mm i/d 1600 mtr RCC pipe = 1600 mtr Const. of RCC - pillars NP3 = 650 No. Sub Head No. 3 :- Pumping Station Near Cranation Ground Construction of 100% work RCC collecting completed tank size 10.50 m x 2.50 mtr = 1 No. Non clog 100% work Sewage completed submetsible sewage pump set = 4 Nos. 11000 LPM Head- 15 M (65 HP) 1 No. Gen. Set - = 85.50 KVA 1 No. - Independent Feeder 1 No. Pump 100% work Chamber of completed size 3.05 x 4.57 m 4 No. Panel 100% work Board completed Pipe & specials 100% work completed 1 No. Staff - Quarter 41 sqm Const. of 100% work boundary wall = completed 300 mtr 600 mm i/d DI 100% work

31 SN Name of work/ Adm Estt. Cost Upto date Physical Latest Status Likely date approval date expenditu scope of work of re as per completion estimate pipe = 30 mtr completed Sub Head No. 4 :- Pumping Station Near Pond

Construction of DNIT under RCC collecting preparation tank size 4.25 m x 2.50 mtr = 1 No. Non clog Sewage submetsible sewage pump set = 4 Nos. 1700 LPM Head- 15 M (10 HP) 1 No. Gen. Set = 20 KVA 1 No. Pump Chamber of size 3.05 x 4.57 m 4 No. Panel Board 1 No. Staff Quarter 41 sqm Const. of boundary wall = 200 mtr 400 mm i/d DI pipe = 1470 mtr 10. Supplementary estimate 75.82 19.37 Construction of 800 Rft 31.03.2020 for remodelling of Katcha balance work Manas drain from Cheek for RCC Pucca road near Birpati Kund to Manad drain Kaithal drain Balance Point E-F size [11/09/2019] - 10'x7.50' = [15/09/2019]-[30/09/2021] 2986 Rft Palwal Circle Palwal PHED No.3

32 SN Name of work/ Adm Estt. Cost Upto date Physical Latest Status Likely date approval date expenditu scope of work of re as per completion estimate 11. Hodal - Proportionate 189.00 180.22 RCC box type RCC box 30.06.2020 cost for SWD system by drain against type drain Due to constructing RCC box main against main estimate drain along NH-2 estimate cost estimate cost [21/06/2018] -[]- Rs.670.00 lacs. cost revised [30/06/2020] i)0.60 M x 0.75 Rs.670.00 from Rs. m = 1000 M lacs. 189.00 lacs ii)0.90 M x 0.90 i)0.60 M x to Rs. m = 1000 M 0.75 m = -- 306.32 lacs iii)1.35 M x ii)0.90 M x due to 1.00 m = 700 M 0.90 m = -- increase in iv)1.50 M x iii)1.35 M x quantities 1.00 m = 200 M 1.00 m = -- of RCC v)2.00 M x 1.10 iv)1.50 M x work and m = 1300 M 1.00 m = -- Steel work vi)2.00 M x v)2.00 M x as per 1.10 m = 1570 1.10 m = approved M 1200 M design from vi)2.00 M x NIT 5770 M 1.10 m= 1550 Kurukshetr M a of the RCC Box Drain. 12. Hodel-Providing storm 418.00 388.30 (i) RCC box (i) RCC box 28.02.2020 water drainage system by type type drain = constructing RCC drain drain=3100m. 3050m. [03/12/2016] - (ii) Cutting of [21/04/2017]-[30/09/2019] road 13. Palwal-Remodeling of 242.50 147.56 (i) New RCC Drain = 2100 31.03.2020 existing storm water drain box Drain. M and construction of Size 0.90 M x (ii) Raising of additional RCC box type 0.90 M=2300 M Drain = 850 drain for storm water (ii) Raising of m. system (CM Drain = 1900 Announcement) m. [22/07/2016] - [15/12/2016]-[30/09/2019] Rewari Circle Rewari PHED No.1 14. Rewari - To provide storm 305.82 225.83 (i) RCC box type 870 mtr. 28.02.2020 water drainage scheme for drain 10’x3’ = drain balance existing drain/ 900 mtr. Nallah from Bawal road to constructed Garhi Bolani road(CM Announcement)[13/01/2016 ] -[30/06/2018]

Rohtak Circle Rohtak PHED No.3 15. Rohtak – Providing 356.60 30.86 Construction The existing 31.03.2020 storm water drainage of Disposal, bricks storm system parallel to Pumping water Sonipat road from Machinery, channel has

33 SN Name of work/ Adm Estt. Cost Upto date Physical Latest Status Likely date approval date expenditu scope of work of re as per completion estimate culvert Sector-3 to Rising main been Sector-4 (27/04/2017) 450mm, 582 extended on mtr. Lengths, the Const. of new upstream RCC carrier side in a channel length of (nallah) about 200 mtr. In addition a RCC pipe 400 mm storm water sewer has been laid in Ram Gopal Colony. Rest of the work could not be done due to non- availability of land by HSVP and the existing disposal of HSVP serve the purpose to take storm water. 16. Rohtak – Rehabilitation 382.22 338.30 Construction 1. Disposal 31.03.2020 for storm water RCC of Disposal, Constructed. carrier channel Hisar Pumping 2. Pumping road and connecting to Machinery, Machinery drain Rising main installation is No.8.(27/04/2017) 450mm, 980 in progress. mtr. Lengths, 3. Rising laying of RCC main laid. NP3 pipe line 4. RCC NP3 700mm, 1615 Pipe laid. Mtr. Lengths 5. Manholes and Constructed. construction of manholes 17. Rohtak - Special repair 98.50 29.09 Repair and 50% work 31.03.2020 and desilting of 64` i/d desilting of completed. storm water line from RCC NP2 64" PHED office to 2nd i/d Storm disposal Jhajjar road Water line (26/04/2018) Sonepat Circle Sonepat PHED No.2

34 SN Name of work/ Adm Estt. Cost Upto date Physical Latest Status Likely date approval date expenditu scope of work of re as per completion estimate 18. Ganaur - Providing Storm 1785.00 1171.40 (i) RCC box (i) Completed 30.06.2020 Water Drainage type drain = 10 (ii) Not Delayed due System[24/11/2011] - No. constructed to railway [18/01/2012]-[30/09/2019] (ii) RCC (iii) Not crossing. collecting tank = installed DNIT of 2 No. (iv) Not laying amounting (iii) P/ (v) The Rs. 70.00 Machinery = 4 railway lacs No. crossing work (approx.) is (iv) R/ main 900 recently under mm = 1500 mtr. completed observation (v) Railway in circle crossing = LS office.

35 Annexure-1.1 Minutes of 50th meeting of Haryana State Drought Relief & Flood Control Board (HSDR&FCB) held on 15.01.2019 under the Chairmanship of Hon’ble Chief Minister, Haryana.

The list of participants is at Annexure A. The Additional Chief Secretary, Revenue & Disaster Management Department, Haryana welcomed the Hon’ble Chief Minister, Hon’ble Finance minister, Haryana, and senior officers in the meeting. All Divisional Commissioners, Deputy Commissioners and Senior officers of I&WRD & PHED, who had joined in the meeting through video conference, were also welcomed. ACS, Revenue apprised the Board about the discussions held in 48th meeting of Haryana State Technical Advisory Committee (HSTAC) held on 15.01.2019 in the forenoon session. It was brought out that all the new schemes (except that of Jind Distt.) proposed for approval of the Board were discussed in detail. She further told that 10 new schemes and 2 schemes of distt. Yamunanagar with revised scope on the request of respective Deputy Commissioners were also considered by HSTAC and same were circulated as recommendation of HSTAC as supplementary agenda for consideration and approval of Board. (Supplementary agenda annexed as Annexure –B). The Principal Secretary (Irrigation & Water Resources Department) welcomed the Chairman and all the participants and further gave a brief account of the flood situation during 2018. The PS/I&WRD also informed about the efficiency and benefits of the flood protection works executed in previous years. The Engineer in Chief and Chief Engineer/LCU, IWRD briefed about the success stories of dewatering and land reclamation after the execution of schemes in village Dighal in District Jhajjar, Villages Shakkerpura and Singwa in District Hisar and he further stated that based on the past experiences this year similar new dewatering schemes are proposed in villages Dighal and Kondrawali. Thereafter, discussions/deliberations on the agenda items were held. The record of discussions and decisions are brought out as under:- Item No. 1: No comments were received from any quarter. The minutes of 49th meeting of HSDR&FCB held on 19.03.2018 were confirmed. Item No.2: Action Taken Report (ATR) was noted. Regarding Sr. no. 1 of (ATR), it was apprised that work of 117 schemes has been completed whereas work on 57 schemes are under progress. Furthermore, this year 15 schemes have been proposed to be dropped due to non- availability of land and other technical issues. The Hon’ble Chief Minister asked

36 the district administration to create awareness among farmers/public regarding the benefits of the schemes and the land holders must be encouraged to provide their land voluntarily at collector’s rate. He further desired that land holders should not hesitate in giving their land for flood protection works at collector rate. On Sr. no. 2 regarding balance payment from Urban Local Bodies for the deposit work of remodeling of Panipat Drain from Rd 55673 to 64400 (Phase-II) with estimated cost of Rs 13.55 Crore, the Principal Secretary, ULB agreed to provide the funds at the earliest. On Sr. no. 3 regarding exploring the alternatives to reuse the water and not just throwing into drain, it was informed that I&WRD has planned schemes for reutilization of flood water in districts Jhajjar and Panipat in association with Haryana State Pollution Control Board . On Sr. no. 4 regarding preparations to face serious Heat Wave conditions in Year 2018; the ACS, Revenue stated that due to well-coordinated efforts with I&WRD & PHED no causality or major damage occurred due to Heat wave in the State and no drought conditions were reported last year. On Sr. no. 5 regarding checking the quality of water before injecting into the ground water recharge or bore wells, it was brought out that required instructions were circulated to all concerned officers to ensure its compliance. On Sr. no. 6 regarding monitoring the flood protection schemes by the District Administration; the instructions regarding same were given to all concerned and the committee was constituted to check the flood protection works. Item No. 3: Flood report of Haryana for the year 2018 was noted. The PS/I&WRD pointed out that despite the fact that the State experienced 10.10 % deficit rain fall during monsoon 2018, some districts have still faced water logging problem due to accumulation of rain water in low laying fields & abadi area during the unprecedented rainfall of 22-23-24 September, 2018. The heavy rains during this period flooded about 2,30,000 acres, resulting in damage of crops. However, well-coordinated efforts of officers of I.W.R.D with Distt. Administration, the dewatering of fields were carried out efficiently. PS/ I&WRD further apprised that additional 245 pumps have been procured during 2018 and same were utilized for draining out the flood water in low lying areas timely and efficiently. Further procurement of some additional pumps has been proposed in this

37 year also. Apart from this river Yamuna received more than 6 lac cusecs of discharge which passed safely; however erosion of banks at few places along river were reported. It was desired that district administration shall clear the bills of private operators engaged for dewatering of fields at the earliest after arranging the funds from Revenue Department. The Position of pumps and new inventory that was added this year with IWRD were also discussed. The Chief Minister directed to compile and prepare a consolidated list of all inventories available with all departments in Haryana and the compiled information may be circulated to all concerned departments, for utilizing the same in case of occurrence of flood like situation anywhere in state. As regard to payment of compensation (Kharaba) to farmers, ACS Revenue informed that all the Deputy Commissioners have been directed to complete survey associated with District Agricultural Officers within three days and send the report to H.Q at the earliest. Further compensation to farmers shall be disbursed in association with agriculture department. Item No. 4: PS/I&WRD informed that HSTAC has recommended 153 schemes costing Rs. 152.77 Cr (cost later increased to Rs. 154.17 Crore) including supplementary schemes as circulated as Annexure-B for approval of the Board. The Chief Minister, Haryana directed that schemes pertaining to flood protection and drainage works only be proposed to the Board. The 12 schemes of District Jind were not discussed due to imposition of model code of conduct by Election Commission and the decision regarding the same shall be taken separately. The Board authorized the Chairman to consider the approval of schemes of on file after completion of election process in District Jind. The Chairman of the Board desired to know the actual reason behind lakhs of acre of land becoming unfit for agricultural purpose in Ellenabad in District Sirsa, The Deputy Commissioner Sirsa explained that this problem has occurred due to the rise in Ground Water Table in that region. The Addl. Chief Secretary, Agriculture added that to know the root cause and solution thereof, the manual mapping of the area has been done and the work to digitalize the same is in progress. However, a comprehensive solution in consultation with the experts shall also be proposed very soon. The Deputy Commissioner Bhiwani pointed out that 02 schemes are proposed to be dropped as the land owners refused to provide their land for execution of flood protection scheme. The Chairman directed that merely dropping the schemes should not be the intention but the affected people must also be persuaded to provide their land 38 where urgent flood protection schemes are required or otherwise the officers must provide an alternative solution to overcome the existing problem. The Finance Minister also pointed out that district administration must ensure that the culverts on National Highway should never be blocked; rather any obstruction to the flow of water must be removed immediately. The Deputy Commissioner Yamunanagar briefed to the Chairman that high flood discharge was received in river Yamuna in 2018 which affected various villages along river Yamuna. The agendas to protect these villages have been incorporated in this year’s proposals. However due to paucity of funds, the scheme proposed in the agenda to protect village Odri is inadequate; and the Board was requested to allow to increase the scope of work in district Yamunanagar at Sr. no.142 page no. 55 of main agenda as mentioned below:- “Agenda for construction of 1855 ft stone steining & 06 stone studs for the protection of village Odri from River Yamuna amounting to Rs. 195 Lacs (against the initial cost Rs.55.03 Lacs)” Finally, after detailed deliberations, 153 schemes amounting to Rs. 154.17 Crore were approved by the Board. Item No.5: The Principal Secretary (I&WRD) briefed the Board regarding the status of on-going schemes which were approved during 49th meeting of Haryana State Drought Relief & Flood Control Board held on 19.03.2018. It was informed that a total of 111 schemes with balance requirement of funds of Rs.148.12 Crore were discussed in the 48th meeting of HSTAC in the noon session and proposed to be carried forward for FY 2019-20 and thereafter. However, 15 schemes, approved in previous Board meetings were proposed to be dropped on account of unavailability of land and various administrative and technical reasons. Thence, 111 no. ongoing schemes with balance requirement of Rs. 216.34 Cr. for the next 03 financial years were also noted by the Board for continuation.

Item No.6: The PS/(I&WRD) informed the Board that 07 schemes approved in previous Board meetings under Deposit Head could not be taken up as the balance amount of Rs 79.84 Cr. is still pending with Haryana Urban Development Authority (HUDA) now HSVP, Municipal Corporation Panipat, Municipal Corporation Faridabad and HSIIDC. The

39 Principal Secretary, Town and Country Planning expressed his inability to provide the funds in view of the financial constraints of the Authority. However, during the last meeting it was decided that Irrigation & Water resources Department may clear the liability of contractors to avoid litigation. The I&WRD had cleared the liability from its own resources after approval from Hon’ble Chief Minister, Haryana, but the pending funds are yet to be deposited by the departments to reconcile the accounts to avoid any audit objection. The PS/Town & Country Planning and PS, Urban Local Bodies agreed to clear the current liability at the earliest. Item No. 7: It was informed by Principal Secretary (I&WRD) that during the FY 2018-19, Finance Department had allocated Rs 120.00 Crore in original budget estimate and out of that, Rs. 66.00 Crore has already been spent so far on various flood protection schemes. Further, the total requirement of budget for the financial year 2019-20 is as under:-

Sr. Schemes Amount required during 2019-20 No. (Rs. in Cr.) 1. New schemes (153) 154.17 2. Ongoing schemes (111) 148.11 Total 309.48 (*12 new schemes amounting to Rs. 15.69 Cr. in Distt Jind shall be taken up Separately after the culmination of model code of conduct)

Accordingly ACS, Finance was requested to allocate additional budget under head 4711-Flood Control & Drainage, so that Department is able to complete the maximum number of schemes on priority basis during the Financial Year 2019-20. The ACS, Finance brought out that allocation of budget of Rs. 309.48 Crore during Financial Year 2019-20 is subject to availability of funds. Initially, the budget of about Rs. 125.00 Cr. would be allocated for 2019-20. However, he assured that the requirement of additional funds, if any, will be reviewed at the time of supplementary budget as per performance of the department. The PS/I&WRD requested that as per the previous practice, the works approved by the Board, should be exempted from taking administrative approval of individual works and the concerned officers shall be allowed to take up approved flood works immediately without any further delay.

40 After deliberations, it was decided that I&WRD & PHED may start the works immediately as approval of the Board is de facto administrative approval. However regarding technical sanction of individual works, the same may be taken from the respective competent authorities, as the case may be.

Item No.8: The Principal Secretary, Public Health Engineering Department briefed about the Status of Schemes completed during 2018-19, on-going schemes and funds required to complete the ongoing works during 2019-20. Out of total 36 schemes approved, 13 schemes were completed during 2018-19 and 23 schemes were reported as in progress. To complete these 23 ongoing schemes, funds to the tune of Rs.2000.00 lacs are required during 2019-20. The Board approved the proposal of Public Health Engineering Department.

Additional Discussions:-

1. The Chairman of the Board, Hon’ble Chief Minister also directed the Irrigation and Water Resources Department to start the internal clearance and desilting of drains well before the monsoon and district administration shall provide MNREGA labour to the department for clearance of drains timely. I&WRD shall utilize the maximum funds available under MNREGA for clearance of drains and canals. District Administration and Irrigation Department shall certify that all the drains have been cleared as per requirement before 15th May 2019 to the Revenue and Irrigation Department respectively.

2. The Chairman of the Board mentioned that the schemes for construction of new bridges on rivers/rivulets must be taken up separately by the PWD (B&R) or Marketing Board as the case may be, and that such schemes should not be proposed before the HSDR&FCB.

The Hon’ble Chief Minister directed all the Deputy Commissioners to monitor the flood protection schemes, their effectiveness and ensure reliability and quality of works executed. The meeting was concluded with the message from Chairman to all members that “Hope for best but prepare for the worst”.

The meeting ended with a vote of thanks to the Chair. ------ooooo------

41 Annexure B Recommendation of the Meeting on 48th meeting of Haryana State Technical Advisory Committee on Drought Relief & Floods held under the Chairpersonship of Addl. Chief Secretary (Revenue & Disaster Management) on dated 15.01.2019 at Haryana Niwas, Sector-3, Chandigarh.

In order to finalize the agenda for the Haryana State Drought Relief & Flood Control Board meeting, the discussions regarding the new as well ongoing flood protection schemes were held with the concerned Deputy Commissioners; after the detailed deliberation with concerned officers the following Supplementary Schemes are recommended for addition in 50th meeting of Haryana State Drought Relief & Flood Control Board:-

(Rs. In Lacs) Sr. Name of Name of Name of Schemes S, M, Estimated Requirement of Funds Remarks No. Constituency Irrigation L Cost Circle 2019-20 2020-21 2021-22

Supplementary Schemes BWS Unit

District Panchkula 01 Kalka SYL Circle Double tier steining for the S 17.00 17.00 0.00 0.00 Recommended Ambala protection of village of by the village Jholuwal from Sirsa concerned River after flood 2018. Deputy Commissioner 02 Kalka SYL Circle, Three tier steining for the S 23.00 23.00 0.00 0.00 Recommended Ambala protection of village abadi by the of village Madhanwala from concerned River Madhanwali after Deputy flood 2018. Commissioner

District Hisar 03 Adampur BWS Circle Providing protection and M 80.25 40.25 40.00 0.00 Recommended Hisar restoration of capacity of by the Hisar Ghggar Multipurpose concerned channel (Drain) from RD Deputy 205230 to 269650 Commissioner

YWS (S) UNIT

District Sonipat 04 Sonipat YWS Circle, Providing protection at S 98.45 98.45 0.00 0.00 Recommended Sonipat Tikola Complex by by the constructing 01 No. new concerned stone stud and 1055 feet Deputy revetment on river Yamuna Commissioner A/F 2018 05 Gohana YWS Circle, To make pucca drain in S 16.00 16.00 0.00 0.00 Recommended Sonipat village Bhatgaon Dongran by the from Purbia Dera to concerned Bhatgaon Malyan i.e. Deputy providing brick lining on Commissioner side slope of Bhatgaon Dongran link Drain from RD 3500 to 5000 (CM Announcement code No. 23606)

42 Sr. Name of Name of Name of Schemes S, M, Estimated Requirement of Funds Remarks No. Constituency Irrigation L Cost Circle

2019-20 2020-21 2021-22 LIFT CANAL UNIT

District Rohtak

06 Kalanaur YWS Circle Laying underground PVC S 38.00 38.00 0.00 0.00 Recommended Rohtak pipeline at village pond by the Kateshra to Pilana Minor RD concerned 10700-R Deputy Commissioner 07 Kalanaur YWS Circle Constructing Sundana L 376.23 76.23 150.00 150.00 Recommended Rohtak pipeline pump house link by the drain from RD 0 to 5950 and concerned Bhutian Minor tail to Drain Deputy No. 8 pipe link drain from Commissioner RD 0 to 7250 outfall at RD 202000-L Drain No. 8 08 Kalanaur YWS Circle Procurement of PVC S 29.60 29.60 0.00 0.00 Item procured, Rohtak pipeline of 8 inch dia to Ex-Post Facto drain out flood water from approval the fields of village Gudhan required. and Katesra District Jhajhar

09 Jhajhar JWS Circle, Procurement of HDPE S 32.00 32.00 0.00 0.00 Item procured, Jhajhar pipeline 200 mm dia and Ex-Post Facto 160 mm dia in W.S Mech. approval Divn. Jhajhar required. District Bhiwani 10 LWS Circle, Procurement of 4 No. 10 cs. S 72.50 72.50 0.00 0.00 Item procured, Bhiwani Vertical pumps alongwith Ex-Post Facto motors of 50 HP, starters approval and 20 No. EP sets of 3 cs. required. Capacity YAMUNA WATER SERVICES(N) UNIT

District Yamuna Nagar

11 Radaur HKB Circle, Construction of 1730 feet S 108.47 108.47 0.00 0.00 Recommended Jagadhari stone steining for the (initial cost (Amount by the protection of village 27.47) raised Rs. concerned Kamalpur from River 81.00 Deputy Yamuna lacs). Commissioner in replacement of Agenda at serial No. 133 of original agenda (Amount raised Rs. 81.00 lacs). 12 Radaur HKB Circle, Construction of 06 Nos. S 181.00 181.00 00.00 00.00 Recommended Jagadhari stone stud and 700 feet (initial cost (Amount by the stone steining for 91.00) raised Rs. concerned protection of village Lal 90.00 Deputy Chappar from river Yamuna lacs). Commissioner in replacement of Agenda at serial No. 135 of original agenda. ( Amount raised Rs. 90.00 lacs) Total 954.03 614.03 190.00 150.00

43 Annexure 2.1 Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 49th meeting of HSDR & FCB

Head:Flood Protection Works (Rs in lacs) Approved in Meeting :42th,45th,46th,47th,48th,49th,

Sr. Name of Name of Circle No. of Schemes Estimated Expenditure In Prog. Yet to Start Completed Dropped No District Cost Incurred

S M L Total S M L Total S M L Total S M L Total

BWS 1 AMBALA SYL CIRCLE AMBALA 7 2 4 13 6769.77 1659.41 3 1 0 4 0 0 4 4 4 1 0 5 0 2 FATEHABAD BWS CIRCLE FATEHABAD 1 3 1 5 616.08 166.83 0 1 0 1 0 0 1 1 1 2 0 3 0 3 HISAR BWS CIRCLE HISAR 2 2 0 4 517.50 216.70 0 1 0 1 0 0 0 0 2 0 0 2 1 4 KURUKSHETRA SYL CIRCLE AMBALA 1 0 0 1 15.00 10.66 0 0 0 0 0 0 0 0 1 0 0 1 0 5 PANCHKULA SYL CIRCLE AMBALA 1 1 0 2 614.76 284.57 0 1 0 1 0 0 0 0 1 0 0 1 0

Total 12 8 5 25 8533.11 2338.17 3 4 0 7 0 0 5 5 9 3 0 12 1

CONSTRUCTION

6 GURGAON CONSTRUCTIO N CIRCLE 1 0 0 1 60.00 0.00 0 0 0 0 0 0 0 0 1 0 0 1 0 7 JHAJJAR CONSTRUCTIOGURGAON N CIRCLE 1 0 0 1 109.81 15.00 1 0 0 1 0 0 0 0 0 0 0 0 0 GURGAON 8 ROHTAK YWS CIRCLE ROHTAK 0 2 0 2 286.37 274.75 0 0 0 0 0 0 0 0 0 2 0 2 0 Total 2 2 0 4 456.18 289.75 1 0 0 1 0 0 0 0 1 2 0 3 0

LCU

9 BHIWANI LWS CIRCLE BHIWANI 1 1 0 2 544.05 248.93 0 0 0 0 0 0 0 0 1 1 0 2 0 10 JHAJJAR JWS CIRCLE JHAJJAR 4 1 1 6 1139.94 178.67 2 1 1 4 0 0 0 0 2 0 0 2 0 11 MAHENDRAGA JLN WS CIRCLE RH NARNAUL 2 1 0 3 431.12 241.12 0 1 0 1 0 0 0 0 2 0 0 2 0

12 REWARI JLN WS CIRCLE REWARI 1 0 0 1 60.00 0.00 0 0 0 0 0 0 0 0 1 0 0 1 0

13 ROHTAK YWS CIRCLE ROHTAK 5 7 1 13 1832.72 726.17 0 2 1 3 0 0 0 0 4 4 0 8 2 14 SONIPAT YWS CIRCLE ROHTAK 0 5 0 5 486.38 147.72 0 0 0 0 0 3 0 3 0 2 0 2 0

Total 13 15 2 30 4494.21 1542.61 2 4 2 8 0 3 0 3 10 7 0 17 2 PROJECT, ENVIRONMENT AND MATERIAL 15 KARNAL WORKSHOP CIRCLE 1 1 0 2 313.75 230.71 0 0 0 0 0 0 0 0 1 1 0 2 0 KARNAL Total 1 1 0 2 313.75 230.71 0 0 0 0 0 0 0 0 1 1 0 2 0 YWS(N)

16 BHIWANI YWS CIRCLE BHIWANI 3 0 1 4 403.15 191.00 2 0 0 2 0 0 1 1 1 0 0 1 0 17 JIND YWS CIRCLE JIND 5 0 0 5 1260.53 960.59 1 0 0 1 0 0 0 0 4 0 0 4 0 18 KARNAL YWS CIRCLE KARNAL 6 1 1 8 1488.82 484.85 0 0 1 1 0 0 0 0 6 1 0 7 0 19 PANIPAT YWS CIRCLE KARNAL 11 0 0 11 1369.94 1359.50 2 0 0 2 0 0 0 0 9 0 0 9 0 20 YAMUNANAGA HKB CIRCLE R JAGADHRI 2 2 0 4 2074.00 669.81 1 1 0 2 0 0 0 0 1 1 0 2 0

Total 27 3 2 32 6596.44 3665.75 6 1 1 8 0 0 1 1 21 2 0 23 0 YWS(S) 21 FARIDABAD YWS CIRCLE FARIDABAD 0 1 0 1 795.00 507.24 0 1 0 1 0 0 0 0 0 0 0 0 0 22 MEWAT YWS CIRCLE FARIDABAD 8 0 0 8 886.34 739.71 2 0 0 2 0 0 0 0 6 0 0 6 0 23 PALWAL YWS CIRCLE FARIDABAD 7 0 0 7 2343.75 1406.20 1 0 0 1 0 0 0 0 5 0 0 5 1 24 PANIPAT YWS CIRCLE SONEPAT 0 1 0 1 503.00 503.00 0 0 0 0 0 0 0 0 0 1 0 1 0 25 SONIPAT YWS CIRCLE SONEPAT 1 0 0 1 141.00 104.00 0 0 0 0 0 0 0 0 1 0 0 1 0

Total 16 2 0 18 4669.09 3260.15 3 1 0 4 0 0 0 0 12 1 0 13 1

Grand Total 71 31 9 111 25062.78 11327.14 15 10 3 28 0 3 6 9 54 16 0 70 4

44 Annexure 2.2 Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting of HSDR & FCB

Head:Flood Protection Works (Rs in lacs) Approved in Meeting :50th,

Sr. Name of District Name of Circle No. of Schemes Estimated Expenditure In Prog. Yet to Start Completed Dropped No Cost Incurred S M L Total S M L Total S M L Total S M L Total BWS 1 AMBALA SYL CIRCLE AMBALA 11 4 2 17 2332.34 403.00 1 2 0 3 0 2 2 4 10 0 0 10 0 2 FATEHABAD BWS CIRCLE FATEHABAD 0 3 0 3 103.57 28.49 0 0 0 0 0 1 0 1 0 2 0 2 0 3 HISAR BWS CIRCLE HISAR 6 1 0 7 550.00 180.40 2 0 0 2 0 0 0 0 3 1 0 4 1 4 KAITHAL BWS CIRCLE KAITHAL 3 1 0 4 123.07 103.31 0 1 0 1 0 0 0 0 3 0 0 3 0 5 KURUKSHETRA SYL CIRCLE AMBALA 6 1 1 8 777.83 60.92 0 0 0 0 0 0 0 0 4 0 0 4 4 6 PANCHKULA SYL CIRCLE AMBALA 12 1 0 13 522.92 319.15 0 1 0 1 0 0 0 0 12 0 0 12 0 7 SIRSA BWS CIRCLE SIRSA 3 0 0 3 50.79 25.83 0 0 0 0 0 0 0 0 3 0 0 3 0 Total 41 11 3 55 4460.52 1121.10 3 4 0 7 0 3 2 5 35 3 0 38 5 CONSTRUCTION 8 KAITHAL SARASWATI HERITAGE 1 0 0 1 36.21 0.00 1 0 0 1 0 0 0 0 0 0 0 0 0 CIRCLE 9 KARNAL SARASWATI HERITAGE 1 0 0 1 34.90 11.43 0 0 0 0 0 0 0 0 1 0 0 1 0 CIRCLE 10 KURUKSHETRA SARASWATIKURUKSHETRA HERITAGE 1 0 0 1 19.02 19.02 0 0 0 0 0 0 0 0 1 0 0 1 0 CIRCLE 11 ROHTAK YWSKURUKSHETRA CIRCLE ROHTAK 0 2 0 2 349.26 114.85 0 2 0 2 0 0 0 0 0 0 0 0 0 Total 3 2 0 5 439.39 145.30 1 2 0 3 0 0 0 0 2 0 0 2 0 LCU 12 BHIWANI LWS CIRCLE BHIWANI 0 1 0 1 277.00 89.05 0 1 0 1 0 0 0 0 0 0 0 0 0 13 Charkhi Dadri LWS CIRCLE BHIWANI 8 0 0 8 995.95 565.87 1 0 0 1 0 0 0 0 7 0 0 7 0 14 JHAJJAR JWS CIRCLE JHAJJAR 6 7 0 13 916.50 140.36 0 5 0 5 0 2 0 2 6 0 0 6 0 15 ROHTAK YWS CIRCLE ROHTAK 2 9 4 15 1345.17 30.35 0 3 0 3 0 4 4 8 2 2 0 4 0 16 SONIPAT YWS CIRCLE ROHTAK 0 1 1 2 332.00 0.00 0 0 0 0 0 1 1 2 0 0 0 0 0 Total 16 18 5 39 3866.62 825.63 1 9 0 10 0 7 5 12 15 2 0 17 0 PROJECT, ENVIRONMENT AND MATERIAL 17 KARNAL WORKSHOP CIRCLE 0 3 0 3 274.77 0.00 0 3 0 3 0 0 0 0 0 0 0 0 0 KARNAL Total 0 3 0 3 274.77 0.00 0 3 0 3 0 0 0 0 0 0 0 0 0 YWS(N) 18 BHIWANI YWS CIRCLE BHIWANI 0 2 1 3 664.36 220.74 0 2 0 2 0 0 1 1 0 0 0 0 0 19 JIND YWS CIRCLE JIND 3 9 0 12 1568.53 566.82 0 7 0 7 0 0 0 0 2 2 0 4 1 20 KARNAL YWS CIRCLE KARNAL 5 1 0 6 665.25 674.71 0 0 0 0 0 0 0 0 4 1 0 5 1 21 PANIPAT YWS CIRCLE KARNAL 3 6 0 9 684.88 249.77 0 5 0 5 0 0 0 0 3 1 0 4 0 22 YAMUNANAGAR HKB CIRCLE JAGADHRI 19 0 0 19 1192.71 956.82 0 0 0 0 0 0 0 0 19 0 0 19 0

Total 30 18 1 49 4775.73 2668.86 0 14 0 14 0 0 1 1 28 4 0 32 2 YWS(S) 23 FARIDABAD YWS CIRCLE FARIDABAD 3 2 0 5 808.69 488.80 0 2 0 2 0 0 0 0 3 0 0 3 0 24 MEWAT YWS CIRCLE FARIDABAD 1 4 0 5 1047.60 160.20 1 4 0 5 0 0 0 0 0 0 0 0 0 25 PALWAL YWS CIRCLE FARIDABAD 0 2 0 2 585.21 0.67 0 2 0 2 0 0 0 0 0 0 0 0 0 26 SONIPAT YWS CIRCLE SONEPAT 2 0 0 2 114.45 56.50 0 0 0 0 0 0 0 0 2 0 0 2 0

Total 6 8 0 14 2555.95 706.17 1 8 0 9 0 0 0 0 5 0 0 5 0 Grand Total 96 60 9 165 16372.98 5467.06 6 40 0 46 0 10 8 18 85 9 0 94 7

45 Annexure 2.3 Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting of HSDR & FCB

Head:Flood Protection Works (Rs in lacs)

Sr. Name of District Name of Circle No. of Schemes Estimated Expenditure In Prog. Yet to Start Completed Dropped No Cost Incurred S M L Total S M L Total S M L Total S M L Total BWS 1 AMBALA SYL CIRCLE 18 6 6 30 9102.11 2062.41 4 3 0 7 0 2 6 8 14 1 0 15 0 AMBALA 2 FATEHABAD BWS CIRCLE 1 6 1 8 719.65 195.32 0 1 0 1 0 1 1 2 1 4 0 5 0 FATEHABAD 3 HISAR BWS CIRCLE 8 3 0 11 1067.50 397.10 2 1 0 3 0 0 0 0 5 1 0 6 2 HISAR 4 KAITHAL BWS CIRCLE 3 1 0 4 123.07 103.31 0 1 0 1 0 0 0 0 3 0 0 3 0 KAITHAL 5 KURUKSHETRA SYL CIRCLE 7 1 1 9 792.83 71.58 0 0 0 0 0 0 0 0 5 0 0 5 4 AMBALA 6 PANCHKULA SYL CIRCLE 13 2 0 15 1137.68 603.72 0 2 0 2 0 0 0 0 13 0 0 13 0 AMBALA 7 SIRSA BWS CIRCLE 3 0 0 3 50.79 25.83 0 0 0 0 0 0 0 0 3 0 0 3 0 SIRSA Total 53 19 8 80 12993.63 3459.27 6 8 0 14 0 3 7 10 44 6 0 50 6 CONSTRUCTION 8 GURGAON CONSTRUCTION CIRCLE 1 0 0 1 60.00 0.00 0 0 0 0 0 0 0 0 1 0 0 1 0 GURGAON 9 JHAJJAR CONSTRUCTION CIRCLE 1 0 0 1 109.81 15.00 1 0 0 1 0 0 0 0 0 0 0 0 0 GURGAON 10 KAITHAL SARASWATI HERITAGE 1 0 0 1 36.21 0.00 1 0 0 1 0 0 0 0 0 0 0 0 0 CIRCLE KURUKSHETRA 11 KARNAL SARASWATI HERITAGE CIRCLE 1 0 0 1 34.90 11.43 0 0 0 0 0 0 0 0 1 0 0 1 0 KURUKSHETRA 12 KURUKSHETRA SARASWATI HERITAGE 1 0 0 1 19.02 19.02 0 0 0 0 0 0 0 0 1 0 0 1 0 CIRCLE KURUKSHETRA 13 ROHTAK YWS CIRCLE 0 4 0 4 635.63 389.60 0 2 0 2 0 0 0 0 0 2 0 2 0 ROHTAK Total 5 4 0 9 895.57 435.05 2 2 0 4 0 0 0 0 3 2 0 5 0 LCU 14 BHIWANI LWS CIRCLE 1 2 0 3 821.05 337.98 0 1 0 1 0 0 0 0 1 1 0 2 0 BHIWANI 15 Charkhi Dadri LWS CIRCLE 8 0 0 8 995.95 565.87 1 0 0 1 0 0 0 0 7 0 0 7 0 BHIWANI 16 JHAJJAR JWS CIRCLE 10 8 1 19 2056.44 319.03 2 6 1 9 0 2 0 2 8 0 0 8 0 JHAJJAR 17 MAHENDRAGAR JLN WS CIRCLE 2 1 0 3 431.12 241.12 0 1 0 1 0 0 0 0 2 0 0 2 0 H NARNAUL 18 REWARI JLN WS CIRCLE 1 0 0 1 60.00 0.00 0 0 0 0 0 0 0 0 1 0 0 1 0 REWARI 19 ROHTAK YWS CIRCLE 7 16 5 28 3177.89 756.52 0 5 1 6 0 4 4 8 6 6 0 12 2 ROHTAK 20 SONIPAT YWS CIRCLE 0 6 1 7 818.38 147.72 0 0 0 0 0 4 1 5 0 2 0 2 0 ROHTAK Total 29 33 7 69 8360.83 2368.24 3 13 2 18 0 10 5 15 25 9 0 34 2 PROJECT, ENVIRONMENT AND 21 KARNAL WORKSHOP 1 4 0 5 588.52 230.71 0 3 0 3 0 0 0 0 1 1 0 2 0 CIRCLE KARNAL Total 1 4 0 5 588.52 230.71 0 3 0 3 0 0 0 0 1 1 0 2 0 YWS(N) 22 BHIWANI YWS CIRCLE 3 2 2 7 1067.51 411.74 2 2 0 4 0 0 2 2 1 0 0 1 0 BHIWANI 23 JIND YWS CIRCLE 8 9 0 17 2829.06 1527.41 1 7 0 8 0 0 0 0 6 2 0 8 1 JIND 24 KARNAL YWS CIRCLE 11 2 1 14 2154.07 1159.56 0 0 1 1 0 0 0 0 10 2 0 12 1 KARNAL 25 PANIPAT YWS CIRCLE 14 6 0 20 2054.82 1609.27 2 5 0 7 0 0 0 0 12 1 0 13 0 KARNAL 26 YAMUNANAGAR HKB CIRCLE 21 2 0 23 3266.71 1626.63 1 1 0 2 0 0 0 0 20 1 0 21 0 JAGADHRI Total 57 21 3 81 11372.17 6334.61 6 15 1 22 0 0 2 2 49 6 0 55 2 YWS(S) 27 FARIDABAD YWS CIRCLE 3 3 0 6 1603.69 996.04 0 3 0 3 0 0 0 0 3 0 0 3 0 FARIDABAD 28 MEWAT YWS CIRCLE 9 4 0 13 1933.94 899.91 3 4 0 7 0 0 0 0 6 0 0 6 0 FARIDABAD 29 PALWAL YWS CIRCLE 7 2 0 9 2928.96 1406.87 1 2 0 3 0 0 0 0 5 0 0 5 1 FARIDABAD 30 PANIPAT YWS CIRCLE 0 1 0 1 503.00 503.00 0 0 0 0 0 0 0 0 0 1 0 1 0 SONEPAT 31 SONIPAT YWS CIRCLE 3 0 0 3 255.45 160.50 0 0 0 0 0 0 0 0 3 0 0 3 0 SONEPAT Total 22 10 0 32 7225.04 3966.32 4 9 0 13 0 0 0 0 17 1 0 18 1 Grand Total 167 91 18 276 41435.76 16794.20 21 50 3 74 0 13 14 27 139 25 0 164 11

46 Annexure 3.1

DISTRICT WISE MONSOON RAINFALL DATA AS RECEIVED FROM IMD, CHANDIGARH FOR THE YEAR 2019 (JUNE TO SEPTEMBER) District Jun-19 Jul-19 Aug-19 Sep-19 Total ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMAL Dep% 22.6 106.8 267.6 303.8 261.1 276.3 76.9 163.5 AMBALA 628.2 850.4 -26.13 26.9 35.2 98.5 122 54.1 119.8 3 57.4 BHIWANI 182.5 334.4 -45.42 5.7 41.7 149 190.1 124.9 228.2 60.3 118.6 FARIDABAD 339.9 578.6 -41.25 14.3 33.5 53.7 98.1 27.7 93.6 7 52.1 FATEHABAD 102.7 277.3 -62.96 4.6 42.5 148.2 179 97.3 193.3 34.6 88.5 GURGAON 284.7 503.3 -43.43 42.1 37.8 83.5 111.6 32.5 102.5 1.8 57.7 HISAR 159.9 309.6 -48.35 8.1 30.7 97.4 137.3 40.8 139.1 16 69.3 JHAJJAR 162.3 376.4 -56.88 22.2 41.3 92.2 139.7 71.8 135.1 11 84.9 JIND 197.2 401 -50.82 14.3 42.6 88 122.2 43 121.8 27 59.2 KAITHAL 172.3 345.8 -50.17 14.2 62.4 264.2 193.7 126.3 196.1 13.6 93.8 KARNAL 418.3 546 -23.39 30.8 70.7 252.3 184.8 62.5 167.4 38 76.7 KURUKSHETRA 383.6 499.6 -23.22 26.1 50.8 102.8 151.7 63.5 144.8 15.3 60.5 MAHENDRAGARH 207.7 407.8 -49.07 4 44.4 124.8 159 129.6 201.5 15.3 99.4 MEWAT 273.7 504.3 -45.73 1.7 31.7 102.1 140.9 93.8 168.3 53.3 85.7 PALWAL 250.9 426.6 -41.19 9.8 113.8 108 317.8 177.5 329.8 102.6 163.6 PANCHKULA 397.9 925 -56.98 6.8 58.4 87.3 163.3 78.3 173.4 12 85 PANIPAT 184.4 480.1 -61.59 14.4 37.9 152.4 150.3 117.9 169.2 33.9 74.7 REWARI 318.6 432.1 -26.27 7.8 53.2 88 179 42.5 187.6 3.3 82.2 ROHTAK 141.6 502 -71.79 27.5 24.8 113 89.1 39.4 66.6 3 30.8 SIRSA 182.9 211.3 -13.44 22.8 49.9 144.3 184.5 54.8 198 6.5 91.8 SONEPAT 228.4 524.2 -56.43 10.7 115.9 331 289.8 303.2 280.7 55.5 136.5 YAMUNA NAGAR 700.4 822.9 -14.89 AVERAGE 16.07 53.62 140.40 171.80 97.26 175.86 28.09 87.23 281.81 488.51 -43.31

47 Annexure 3.2

STATEMENT SHOWING ANNUAL FLOOD PEAK DATA AT VARIOUS SITES (Discharge in Cusecs) YEAR YAMUNA MARKANDA TANGRI RIVER GHAGGAR RIVER U/S JHANSA JANSUI 4-A Guhla Khanauri Chandpur D/S Ottu TAJEWALA Panchkula Cheeka 2002 3,11,174 59,000 26,890 17,862 45,096 on 14,900 9,850 5,850 on 14.8.02 On14.8.02 on 15.7.02 On 14.8.02 16.8.02 on 17.8.02 on17.8.02 on 16.9.02 2003 86,411 52,570 11,298 10,818 46,029 14,650 10,500 6,000 on 5.7.03 on 5.9.03 On4.9.03 on 1.7.03 On 5.9.03 on 5.9.03 on On8.9.03 2004 81,929 25,010 47,818 83,684 61,730 17,500 17,0007.9.03 20,700 on 18.8.04 on 17.8.04 On3.8.04 on 3.8.04 on 7.8.04 on 7.8.04 on 11.8.04 on 13.8.04 2005 1,56,000 55,500 23,427 17,862 45,403 14,800 6,850 7,500 on 5.7.05 on 6.7.05 on 5.7.05 On 5.7.05 on 7.7.05 on 8.7.05 on 9.7.05 on 11.7.05

2006 1,56,237 59,000 Leakage 33,822 on 36,440 11,300 4,600 - On23.7.06 on 27.7.06 9.7.06 on 27.7.06 On 29.7.06 on 29.7.06 2007 1,07,346 on 8,545 7,344 49,088 on 43,260 14,450 8,000 4,700 on 13.8.07 on 15.8.07 on 13.8.07 13.8.07 on 16.8.07 On17.8.07 on 18.8.07 18.8.07 2008 4,09,876 8,195 on 19,998 36,786on 50,454 18,250 13,550 - on 20.9.08 22.09.08 on 21.9.08 20.9.08 On22.9.08 On24.9.08 on 22.9.08 2009 4,30,454 9661 on 17,560 58,670on 49,174 12,575 12,800 8,050 On11.9.09 13.09.09 On 12.9.09 On14.9.09 On16.9.09 On16.9.09 On15.9.09 2010 7,44,507 10904 on 13.9.0945,458 58,667 on 63,460on 49,500 38,000 20,500 on 20.9.10 10.09.10 on 6.7.10 17.7.10 7.7.10 On 10.7.10 on 11.7.10 on 14.7.10 2011 6,41,462 9548 on 7,099 11,485 on 33,602 on 8,350 4,350 2,550 on 16.8.11 30.06.11 On1.7.11 8.7.11 25.7.11 On26.7.11 On26.7.11 on 28.8.11 2012 88201 7864 on 4731 7423on 28560 20020 4350 4930 on 4.8.12 31.07.12 On8.7.12 18.9.12 On20.9.12 On19.9.12 On21.9.12 On3.9.12 2013 8,06,464 9548 on 2509 22514on 26422 8000 6750 3750 on 17.06.13 16.08.13 On10.8.13 24.7.13 On18.6.13 On10.8.13 On18.8.13 On14.8.13 2014 128339 8529 on 110 114872 on 27582 on 6725 14450 on NIL on 16.7.14 20.07.14 on 25.7.14 15.8.14 21.7.14 on 21.7.14 9.9.14 2015 101360 on 8529 on 8100 on 11409 on 38441 on 13275 on 10500 on 8850 on 16.08.2015 02.08.15 14.08.2015 16.07.2015 14.07.2015 15.07.2015 15.07.2015 21.07.2015 2016 159219 on 8085 on Leakage 16090 on 13860 on 3450 on 2750 on 850 on 01.08.2016 11.08.16 13.08.2016 12.08.2016 13.08.2016 13.08.2016 15.08.2016 2017 147212 on 8529 on 10317 on 18323 on 26132 on 7100 on 4150 on 3060 on 02.09.2017 04.09.17 26.08.2017 19.08.2017 23.08.2017 04.09.2017 06.09.2017 17.09.2017 2018 605949 on 7975 on 3260 on 12751 on 45403 on 12800 on 12650 on 16500 on 28.07.2018 26.09.18 05.08.2018 13.08.2018 27.09.2018 29.09.2018 29.09.2018 30.09.2018 2019 828072 on 10943 on 17670 on 19240 on 52387 on 14225 on 12800 on 26605 on 18.08.2019 21.08.2019 16.07.2019 18.08.2019 18.07.2019 19.07.2019 21.08.2019 24.07.2019

48 Annexure 3.3

POSITION OF DRAINAGE PUMPS AS ON 30.11.2019

Name of Unit Total No. Capacity in Pumps in Capacity in Pumps of Pumps Cs. working Cs. under order repair

DIESEL MOBILE PUMPS BWS Unit 256 512 198 396 46 YWS Unit (N) 26 52 26 52 0 YWS Unit (S) 122 244 101 202 21 LCU Unit 290 580 210 420 80 TOTAL 694 1388 535 1070 147 ELECTRICAL MOBILE PUMPS BWS Unit 101 312 74 244 17 YWS Unit (N) 43 211 43 211 0 YWS Unit (S) 73 268 68 258 5 LCU Unit 400 1333 271 939 129 TOTAL 617 2124 456 1652 151 PERMANENT PUMPS BWS Unit 328 3030 287 2710 35 YWS Unit (N) 34 180 34 180 0 YWS Unit (S) 71 977 67 957 4 LCU Unit 207 1719 165 1444 42 TOTAL 640 5906 553 5291 81 G.Total (Diesel, 1951 9418 1544 8013 379 Electrical & VT Pumps)

Note: Pumps purchased, in I&WRD Haryana is as under: During the FY 2018-19 During the FY 2019-20 EP Sets = 70, DP Sets = 175, Total = 245 VT PUMPS =32 Sets =435 Cs.

49 Annexure 4.1 Districtwise Abstract of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs in lacs)

Sr. Name of District Name of Circle No. of Estimate Estimated Funds Required No Cost (S) (M) (L) Total 2020-21 2021-22 2022-23 BWS 1 AMBALA SYL CIRCLE AMBALA 18 8 1 27 4399.77 2183.32 1640.05 576.40 2 FATEHABAD BWS CIRCLE 0 7 1 8 469.98 256.27 198.26 15.45 FATEHABAD 3 KAITHAL BWS CIRCLE KAITHAL 3 3 0 6 244.92 184.92 60.00 0.00 4 KURUKSHETRA SYL CIRCLE AMBALA 6 3 0 9 271.26 192.28 78.98 0.00 5 PANCHKULA SYL CIRCLE AMBALA 17 1 0 18 600.44 560.44 40.00 0.00 6 SIRSA BWS CIRCLE SIRSA 4 0 0 4 111.23 111.23 0.00 0.00 Total 48 22 2 72 6097.60 3488.46 2017.29 591.85 CONSTRUCTION 7 KAITHAL SARASWATI HERITAGE 2 1 0 3 118.00 77.80 40.20 0.00 CIRCLE KURUKSHETRA

8 KARNAL SARASWATI HERITAGE 1 0 0 1 39.71 39.71 0.00 0.00 CIRCLE KURUKSHETRA

9 PANIPAT YWS CIRCLE SONEPAT 0 1 0 1 441.00 221.00 220.00 0.00

10 ROHTAK YWS CIRCLE ROHTAK 0 3 0 3 654.34 339.35 314.99 0.00 Total 3 5 0 8 1253.05 677.86 575.19 0.00 LCU 11 BHIWANI LWS CIRCLE BHIWANI 1 1 0 2 236.00 133.00 103.00 0.00 12 CHARKHI DADRI LWS CIRCLE BHIWANI 1 3 0 4 682.00 416.00 266.00 0.00 13 JHAJJAR JWS CIRCLE JHAJJAR 0 5 0 5 421.05 211.84 209.21 0.00 14 JHAJJAR YWS CIRCLE ROHTAK 0 1 0 1 81.00 41.00 40.00 0.00 15 MAHENDRAGARH JLN WS CIRCLE 0 1 0 1 658.14 329.14 329.00 0.00 NARNAUL 16 ROHTAK LWS CIRCLE BHIWANI 1 0 0 1 52.00 52.00 0.00 0.00 17 ROHTAK YWS CIRCLE ROHTAK 12 8 4 24 1319.76 646.33 436.38 237.05 18 SONIPAT YWS CIRCLE ROHTAK 0 1 0 1 108.00 54.00 54.00 0.00 Total 15 20 4 39 3557.95 1883.31 1437.59 237.05 PROJECT, ENVIRONMENT AND MATERIAL 19 JIND WORKSHOP CIRCLE 0 2 0 2 298.68 166.60 132.08 0.00 KARNAL Total 0 2 0 2 298.68 166.60 132.08 0.00 YWS(N) 20 BHIWANI YWS CIRCLE BHIWANI 1 1 0 2 159.50 124.25 35.25 0.00 21 JIND YWS CIRCLE JIND 0 3 1 4 937.53 438.27 437.27 62.00 22 KARNAL YWS CIRCLE KARNAL 7 2 0 9 1149.57 1110.07 39.50 0.00 23 PANIPAT YWS CIRCLE KARNAL 3 7 0 10 1236.00 793.00 443.00 0.00 24 YAMUNANAGAR HKB CIRCLE JAGADHRI 32 1 0 33 3049.00 2983.00 66.00 0.00

Total 43 14 1 58 6531.60 5448.59 1021.02 62.00 YWS(S) 25 FARIDABAD YWS CIRCLE 2 3 0 5 502.40 406.25 96.15 0.00 FARIDABAD 26 GURGAON YWS CIRCLE 0 1 0 1 16.00 8.00 8.00 0.00 FARIDABAD 27 MEWAT YWS CIRCLE 6 6 0 12 741.00 520.36 220.64 0.00 FARIDABAD 28 PALWAL YWS CIRCLE 0 3 0 3 663.29 365.00 298.29 0.00 FARIDABAD 29 SONIPAT YWS CIRCLE SONEPAT 3 0 0 3 169.00 169.00 0.00 0.00

Total 11 13 0 24 2091.69 1468.61 623.08 0.00 Grand Total 120 76 7 203 19830.57 13133.43 5806.25 890.90

50 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 BWS Dist:- AMBALA 1 AMBALA CANTT. SYL CIRCLE SCHEME FOR RAISING AND STRENGTHENING OF S 20.22 20.22 0 0 AMBALA RAMPUR SIRSHERI BUND FROM RD 900 TO 5150 FOR THE PROTECTION OF VILLAGE RAMPUR AND ADJOINING AREA 2 AMBALA CANTT. SYL CIRCLE SCHEME FOR CONSTRUCTING STONE STEINING S 51.85 51.85 0 0 AMBALA FOR THE PROTECTION OF ABADI OF AMBALA CANTT. FROM RIVER TANGRI FROM RD 4650 TO 5000 OF BABYAL BUND. 3 AMBALA CITY SYL CIRCLE SCHEME FOR CONSTRUCTING 656 FEET LONG S 53.1 53.1 0 0 AMBALA THREE TIER STONE STEINING FOR THE PROTECTION OF LMB TANGRI D/S NARWANA BRANCH AT RD 3344 TO 4000 VILLAGE GORSIAN 4 MULLANA SYL CIRCLE SCHEME FOR RESTORATION OF DESIGN SECTION S 20.71 20.71 0 0 AMBALA OF GOLA-GOLI BUND FOR THE PROTECTION OF ABADI AND AGRICULTURE LAND OF VILLAGE GOLA- GOLI AND NAHONI FROM RIVER BEGNA

5 MULLANA SYL CIRCLE SCHEME FOR RESTORATION OF DESIGN SECTION S 6.58 6.58 0 0 AMBALA OF GOKALGARH DRAIN FOR THE PROTECTION OF VILLAGE ABADI AND AGRICULTURE LANDA OF VILLAGE GOKALGARH. 6 MULLANA SYL CIRCLE SCHEME FOR RESTORATION OF DESIGN SECTION S 17.73 17.73 0 0 AMBALA OF TAMROLI BUND FOR THE PROTECTION OF ABADI AND AGRICULTURE LAND OF VILLAGE TAMROLI AND NAHOUNI FROM RIVER BEGNA.

7 MULLANA SYL CIRCLE SCHEME FOR CONSTRUCTING STONE STEINING S 39.92 39.92 0 0 AMBALA FOR THE PROTECTION OF ABADI OF VILLAGE ROLANHERI. 8 MULLANA SYL CIRCLE Scheme for constructing stone steining for the protection S 37.16 37.16 0 0 AMBALA agriculture land of village Gokalgarh from River Begna.

9 NARAINGARH SYL CIRCLE SCHEME FOR REPLENISHING OLD STONE STEINING S 15.08 15.08 0 0 AMBALA FOR THE PROTECTION OF TOKA GURUDWARA AND APPROACH ROAD OF GURUDWARA FROM ROON NADI. 10 NARAINGARH SYL CIRCLE SCHEME FOR REPLENISHING 5 NO. OLD STONE S 33.74 33.74 0 0 AMBALA STUDS FOR THE PROTECTION OF AGRICULTURAL LAND OF VILLAGE DEHAR FROM RIVER MARKANDA

11 NARAINGARH SYL CIRCLE SCHEME FOR REPLENISHING 1 NO. STONE STUD S 31.31 31.31 0 0 AMBALA AND CONSTRUCTING STONE STEINING FOR THE PROTECTION OF AGRICULTURE LAND OF VILLAGE SADIKPUR FROM RIVER BEGNA 12 NARAINGARH SYL CIRCLE SCHEME FOR CONSTRUCTING 3 NO. STONE STUDS S 22.51 22.51 0 0 AMBALA FOR THE PROTECTION OF AGRICULTURE LAND OF VILLAGE AMBLI FROM RIVER MARKANDA.

13 NARAINGARH SYL CIRCLE SCHEME FOR RESTORATION OF DESIGN SECTION S 29.39 29.39 0 0 AMBALA OF BANOUNDI BUND FOR THE PROTECTION OF ABADI AND AGRICULTURE LAND OF VILLAGE BANOUNDI AND TANDWAL FROM RIVER BEGNA

14 NARAINGARH SYL CIRCLE Scheme for const. stone steining for the protection of S 15.03 15.03 0 0 AMBALA Agriculture land of village Nagawan from River Begna.

51 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 15 NARAINGARH SYL CIRCLE Scheme for Const. stone steining for the protection of S 19.99 19.99 0 0 AMBALA agriculture land of village Batoura from River Begna.

16 NARAINGARH SYL CIRCLE Scheme for Const. stone steining for the protection of S 62.12 62.12 0 0 AMBALA agriculture land of village Laha from River Begna. 17 NARAINGARH SYL CIRCLE Scheme for Const. stone steining for the protection of S 42.89 42.89 0 0 AMBALA agriculture land of village Bhareri Khurd from River Begna. 18 NARAINGARH SYL CIRCLE Scheme for Const. 552 ft. long and 2 Nos. 3 tier stone S 41.23 41.23 0 0 AMBALA stud for the protection of agriculture land of village Nagouli from River Begna Total 560.56 560.56 0 0 19 AMBALA CANTT. SYL CIRCLE CONSTRUCTION OF UNDER GROUND RCC NP3 900 M 166.67 83 83.67 0 AMBALA MM dia PIPE LINE FROM SHAHPUR POND TO RIVER TANGRI TO PROTECT THE ABADI AND AGRICULTURE LAND OF VILLAGE SHAHPUR FROM FLOOD WATER. 20 AMBALA CANTT. SYL CIRCLE SCHEME FOR CONSTRUCTING RCC OPEN TROUGH M 435 235 200 0 AMBALA FROM RD 4000 TO 6000 AND RD 15000 TO 17000 OF MAHESH NAGAR DRAIN. 21 AMBALA CANTT. SYL CIRCLE Scheme for const. of RCC open troughs from RD 19500 M 705 305 400 0 AMBALA to 15335 and RD 14700 to 12877 on Ambala Drain.

22 AMBALA CITY SYL CIRCLE PROVIDING GATED INLET STRUCTURE AT RD 0 OF M 57.69 29 28.69 0 AMBALA BAKNOUR AREA DRAIN OUTFALLING IN RIVER TANGRI TO PROTECT THE ABADI AND AGRICULTURAL LAND OF VILLAGES METLAN, CHHOTI NIHARSI, KHANNA MAJRA AND BAKNOUR ETC. 23 AMBALA CITY SYL CIRCLE Scheme for purchase 05 nos. pumping sets of 5 Cs. M 48 27 21 0 AMBALA capacity, 05 nos. electric pumping sets of 2 Cs. capacity and 05 nos. sewerage pump of 3400 LPM, capacity for district Ambala as inventory for utilization in dewatering

24 MULLANA SYL CIRCLE SCHEME FOR RESTORATION OF DESIGN SECTION M 203.69 120 83.69 0 AMBALA OF MULLANA AND TANGAIL BUND FOR THE PROTECTION OF ABADI AND AGRICULTURE LAND OF VILLAGE MULLANA TANGAIL AND ROLANHERI FROM RIVER MARKANDA 25 MULLANA SYL CIRCLE SCHEME FOR RESTORATION OF DESIGN SECTION M 24.62 12.62 12 0 AMBALA AND CONSTRUCTING GATE STRUCTURE OF GHELLERY DRAIN AND GHELLERY LINK DRAIN FOR THE PROTECTION OF ABADI AND AGRICULTURE LAND OF VILLAGE HEMAMAJRA AND GHELLERY.

26 MULLANA SYL CIRCLE SCHEME FOR RESTORATION OF DESIGN SECTION M 22.14 11.14 11 0 AMBALA and PROVIDING GATE STRUCTURE OF HARDA HARDI, ALLAH PUR DRAIN FOR THE PROTECTION OF ABADI AND AGRICULTURE LAND OF VILLAGE HARDA-HARDI, ALLAHPUR, RAMPUR.

Total 1662.81 822.76 840.05 0 27 AMBALA CANTT. SYL CIRCLE CONSTRUCTING PANJOKHRA GHAGGAR LINK L 2176.4 800 800 576.4 AMBALA DRAIN BY PROVIDING RCC PIPE LINE BELOW THE SERVICE ROAD OF PANJOKHRA MINOR OUTFALLING IN AMBALA DRAIN. Total 2176.4 800 800 576.4 District Total (S+M+L) 4399.77 2183.32 1640.05 576.4 Dist:- FATEHABAD

52 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 28 TOHANA BWS CIRCLE Agenda note for constructing pipeline drains for M 67.43 50 17.43 0 FATEHABAD dewatering of floodwater of village Meond and Nathuwal from RD 0 to 6820 out falling into Rangoi Nallah at RD 1.90 Km Left side. 29 TOHANA BWS CIRCLE Agenda note for constructing pipeline drains for M 22.93 11.93 11 0 FATEHABAD dewatering of floodwater of village Meond Khurd from RD 0 to 2200 outfalling into Rangoi Nallah at RD 0.50 Km Left side 30 TOHANA BWS CIRCLE Agenda note for constructing pipeline drains for M 129.95 65.95 64 0 FATEHABAD dewatering of floodwater of village Hindalwala (Dhani Tailan) from RD 0 to 12200 outfalling into Rangoi Nallah at RD 6.35 Km Left side. 31 TOHANA BWS CIRCLE Agenda note for constructing pipeline drains for M 39.83 20 19.83 0 FATEHABAD dewatering of floodwater of village Rattatheh and Diwana from RD 0 to 3960 out falling into Rangoi Nallah at RD 10.35 Km Left side 32 TOHANA BWS CIRCLE Constructing pipeline drains for dewatering of floodwater M 33.46 17.46 16 0 FATEHABAD of village Dher from RD 0 to 3300 Linking existing hodi already constructed pipeline drain of Village Dher Outfalling into Rangoi Nallah at RD 6.35 Km Left Side.

33 TOHANA BWS CIRCLE Constructing pipeline drain for dewatering of flood water M 30.93 15.93 15 0 FATEHABAD of village Kanakhera from RD 0 TO 2552 Linking existing Hodi already comstructed pipeline drain Village Kanakhera out falling into Rangoi Nallah at RD 6.35 KM Right side. 34 TOHANA BWS CIRCLE Purchasing one no. Tata Hitachi ex 210 LC with M 90 50 40 0 FATEHABAD excavator (Long Boom).

Total 414.53 231.27 183.26 0 35 RATIA BWS CIRCLE Repairing of fall structure of bridge at RD 2000 Sirhind L 55.45 25 15 15.45 FATEHABAD Choe Drain.

Total 55.45 25 15 15.45 District Total (S+M+L) 469.98 256.27 198.26 15.45 Dist:- KAITHAL 36 GUHLA BWS CIRCLE Scheme for laying RCC pipe line to drain out the flood S 25.12 25.12 0 0 KAITHAL water of low lying area of village Urlana from RD 0-1800 and out fall in Ghaggar River.

37 GUHLA BWS CIRCLE Scheme for providing stone pitching from RD 105625 to S 23.18 23.18 0 0 KAITHAL 106125 on right side of Ghaggar Bund for protection of village Bhatian, Kheri-Daban and Hamu Majra

38 GUHLA BWS CIRCLE Scheme for providing 02 No. stone studs at RD 52550 to S 74.77 74.77 0 0 KAITHAL RD 52950 of Ghaggar Bund on left side of Ghaggar River for protection village Urlana, Kasour and Ramthali.

Total 123.07 123.07 0 0 39 GUHLA BWS CIRCLE Scheme for constructing inlet of Saraswati Creek outfall M 70.88 35.88 35 0 KAITHAL into Para River and strengthening of bank in a length of 1000 feet in D/S Side and 200 in U/S of proposed inlet.

53 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 40 KAITHAL BWS CIRCLE Requirement of 1 No. 100 KVA 3 PHASE LIQUID M 14 7 7 0 KAITHAL COOLED DG Set with AMF control panel with part No.243G0100A3L0Y2 at 1500 RPM for use in various Pump Houses alongwith Trolley. 41 PEHOWA BWS CIRCLE Scheme for laying RCC pipe line to drain out the flood M 36.97 18.97 18 0 KAITHAL water of low laying area of village Diwana from RD 0- 1500 and out fall into .

Total 121.85 61.85 60 0 District Total (S+M+L) 244.92 184.92 60 0 Dist:- KURUKSHETRA 42 PEHOWA SYL CIRCLE Scheme for repair of inlet at KM 23.650/L SYL Canal S 15.63 15.63 0 0 AMBALA 43 PEHOWA SYL CIRCLE Scheme for strengthening of Left Marginal Bund at RD S 18.41 18.41 0 0 AMBALA 37000 U/S of River Markanda Bridge to protect village bodha etc (by providing stone pitching/staining).

44 PEHOWA SYL CIRCLE Scheme for construction of drainage syphon at RD 4450 S 11 11 0 0 AMBALA Ismailabad Link Drain. 45 PEHOWA SYL CIRCLE Scheme for construction of drainage syphon at RD S 10.98 10.98 0 0 AMBALA 15000 Lukhi Minor Drain. 46 PEHOWA SYL CIRCLE Scheme for construction of 3 tier Stone Steining for S 17.88 17.88 0 0 AMBALA protection of RMB D/S Jhansa at RD 6000 for safety for village abadi and agriculture land of Rohti Nurpur Buchi Thaska Miraji, etc. 47 PEHOWA SYL CIRCLE Scheme for construction of inlet at KM 14.527/L of SYL S 26.76 26.76 0 0 AMBALA Canal. Total 100.66 100.66 0 0 48 PEHOWA SYL CIRCLE Scheme for replacement of 02 nos. 10Cs horizontal M 84.98 40 44.98 0 AMBALA Pumps with 01 no. 20Cs V.T. Pump and and 02 nos. 10Cs V.T. Pump at Permanent Pump House Lukhi in Water Services Mech. Sub Division Kurukshetra.

49 PEHOWA SYL CIRCLE Scheme for purchase of 01 No. Bolero Camper (New). M 8.54 4.54 4 0 AMBALA 50 THANESAR SYL CIRCLE Scheme for replacement of 02 nos. VT Pump of 05Cs M 77.08 47.08 30 0 AMBALA V.T. Pump with 02 nos.Pump of 10Cs and 01 nos. of 05Cs at PPH Budhera in W/S Mech. S/D KKR

Total 170.6 91.62 78.98 0 District Total (S+M+L) 271.26 192.28 78.98 0 Dist:- PANCHKULA 51 KALKA SYL CIRCLE Scheme for constructing 376ft (248 plus 128) double S 17.17 17.17 0 0 AMBALA tier steining for the protection for Vayayam Shala and abadi of village Kiratpur from river Baad Godam after flood 2019. 52 KALKA SYL CIRCLE Scheme for constructing 496ft double tier steining for the S 22.56 22.56 0 0 AMBALA protection of abadi of Ganga Colony Near Police Station Kalka from river Jhajjra after flood 2019.

53 KALKA SYL CIRCLE Scheme for constructing 200ft double tier steining and S 23.15 23.15 0 0 AMBALA 256ft three tier steining for the protection of abadi of ward no. 4 Manakpur Nanak Chand from river Jhajjra after flood 2019.

54 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 54 KALKA SYL CIRCLE Scheme for constructing 352ft double tier steining and S 17.55 17.55 0 0 AMBALA 160ft single tier steining for the protection of land from temporary bundhs for diversion of water flow for pumps house Nawa Nagar, Khokhran lift Irrigation scheme after flood 2019. 55 KALKA SYL CIRCLE Scheme for constructing 400ft (168 plus 136 plus 96) S 18.26 18.26 0 0 AMBALA double tier steining for the protection of village abadi and Sarswati Mandir at Balmiki Basti ward No. 1, Kalka from river Orian after flood 2019. 56 KALKA SYL CIRCLE Scheme for constructing 256 ft double tier steining for the S 15.63 15.63 0 0 AMBALA protection of abadi area of village Bharuli from river Talan wali nadi tributary of river Tangri after flood 2019.

57 KALKA SYL CIRCLE Scheme for constructing 416ft double tier steining and 3 S 17.35 17.35 0 0 AMBALA Nos. crated bed bars (Double tier) for the protection of school and agriculture land of village Badhor from river Tangri after flood 2019. 58 KALKA SYL CIRCLE Scheme for constructing 416ft three tier steining for the S 34.05 34.05 0 0 AMBALA protection of abadi of village Mandlaya from river Begna after flood 2019. 59 KALKA SYL CIRCLE Scheme for constructing 536ft double tier steining for the S 24.43 24.43 0 0 AMBALA protection of Link Road of to Rampur from river Tangri after flood 2019. 60 KALKA SYL CIRCLE Scheme of constructing 304ft four tier steining for the S 39.03 39.03 0 0 AMBALA protection of land near village-Burj Kotian, Panchkula from Ghaggar after flood 2019. 61 KALKA SYL CIRCLE Scheme for constructing 6 nos crated bed bars (double S 19.68 19.68 0 0 AMBALA tier) steining for the protection of agriculture land of village Toda from river Tangri after flood 2019

62 KALKA SYL CIRCLE Scheme for constructing 5 Nos. crated bed bars (Double S 19.58 19.58 0 0 AMBALA tier) for the protection of Agriculture Land of Village Damdama from river Kaushalya after flood 2019

63 PANCHKULA SYL CIRCLE Scheme for constructing 896ft four tier steining for the S 114.57 114.57 0 0 AMBALA protection of Golf Course, Panchkula from Ghaggar after flood 2019. 64 PANCHKULA SYL CIRCLE Scheme for constructing 256ft three tier steining for the S 20.97 20.97 0 0 AMBALA protection of village abadi in village Aasrewali from Aasrewali nadi tributary of river Ghaggar after flood 2019.

65 PANCHKULA SYL CIRCLE Scheme for constructing 128 plus 352 plus 376 ft three S 69.9 69.9 0 0 AMBALA tier steining for the protection of abadi area of village Belwali from Belwali nadi tributary of river Ghaggar after flood 2019. 66 PANCHKULA SYL CIRCLE Scheme for constructing 224ft double tier steining for the S 10.26 10.26 0 0 AMBALA protection of Abadi area of village Manakyan from river Manakyan wali nadi tributary of river Ghaggar after flood 2019. 67 PANCHKULA SYL CIRCLE Scheme for constructing 376ft three tier steining for the S 30.76 30.76 0 0 AMBALA protection of Rehod Bundh and agriculture land of Village Rehod from rivver Tangri after flood 2019. Total 514.9 514.9 0 0 68 PANCHKULA SYL CIRCLE Construction of Causeway and Steining in Village Tibbi at M 85.54 45.54 40 0 AMBALA Tibbi Wali Nadi Tributary of River Tangri After Flood 2019. Total 85.54 45.54 40 0 District Total (S+M+L) 600.44 560.44 40 0 Dist:- SIRSA

55 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 69 ELLENABAD BWS CIRCLE Agenda Note for Internal Clearance of HGMPD from RD. S 53.61 53.61 0 0 SIRSA 0-141000.

70 KALANWALI BWS CIRCLE Clearance of Patera, Sarkanda and Jal Khumbi from bed S 44.72 44.72 0 0 SIRSA and side slope of Rangoi Kharif Channel from 153600- 280700 an Desilting from RD 163000-180000.

71 KALANWALI BWS CIRCLE Internal clearance of Rori Ghaggar Drain from RD S 10.22 10.22 0 0 SIRSA 100000 to 130750 tail and its subsidiary Drains.

72 RANIA BWS CIRCLE internal clearance of Rania Link Drain from RD 0 to S 2.68 2.68 0 0 SIRSA 13000 tail.

Total 111.23 111.23 0 0 District Total (S+M+L) 111.23 111.23 0 0 Unit Total 6097.6 3488.46 2017.29 591.85 CONSTRUCTION Dist:- KAITHAL 73 KAITHAL SARASWATI Scheme for construction of inlet/causeway at RD S 13.9 13.9 0 0 HERITAGE 135500/L of BML-HB-BB-MPLC to protect agriculture CIRCLE land of Village Nouch. KURUKSHET RA 74 SARASWATI Scheme for construction of inlet/causeway at RD S 13.9 13.9 0 0 HERITAGE 208200/L of BML-HB-BB-MPLC to protect agriculture CIRCLE land of Village Kakaut, Pundri Etc. KURUKSHET RA Total 27.8 27.8 0 0 75 KAITHAL SARASWATI Flood agenda for procurement of one No. Crawler Type M 90.2 50 40.2 0 HERITAGE Hydraulic Excavator-220 (Long Boom) and 1 No. JCB CIRCLE (Excavator cum Loader) in Sarasvati Heritage Division KURUKSHET No. 3, Kaithal. RA Total 90.2 50 40.2 0 District Total (S+M+L) 118 77.8 40.2 0 Dist:- KARNAL 76 SARASWATI Scheme for construction of inlet at RD 308500/L of BML- S 39.71 39.71 0 0 HERITAGE HB-BB-MPLC to protect agriculture land of Village CIRCLE Fafdana, Thrii, Zabala Etc KURUKSHET RA Total 39.71 39.71 0 0 District Total (S+M+L) 39.71 39.71 0 0 Dist:- PANIPAT 77 ISRANA YWS CIRCLE Bring to design section of Hartari Drain and sepration of M 441 221 220 0 SONEPAT Drain from village pond and abadi area in village Hartari, Bursham and Didwari CM Ann. Code No. 22474.

Total 441 221 220 0 District Total (S+M+L) 441 221 220 0 Dist:- ROHTAK 78 ROHTAK YWS CIRCLE Agenda Note for Re-construction of VR Bridge at RD M 198.02 100 98.02 0 ROHTAK 44460 of Drain No. 8

79 ROHTAK YWS CIRCLE Agenda note for Re-construction of VR Bridge at RD M 78.7 39.35 39.35 0 ROHTAK 126200 of KCB Drain.

56 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 80 ROHTAK YWS CIRCLE Agenda note for Re-construction of VR Bridge at RD M 377.62 200 177.62 0 ROHTAK 139290 of Diversion Drain No. 8.

Total 654.34 339.35 314.99 0 District Total (S+M+L) 654.34 339.35 314.99 0 Unit Total 1253.05 677.86 575.19 0 LCU Dist:- BHIWANI 81 BAWANI KHERA LWS CIRCLE Agenda Note for providing Brick Pitching over Cement S 33 33 0 0 BHIWANI Concrete 1:3:6 on side slope and Toe wall in Bed of Kalinga Drain No-I from RD 0 to 1650 near village Abadi out falling at RD 250-L Kharak kalan Sub Minor.

Total 33 33 0 0 82 BAWANI KHERA LWS CIRCLE Agenda Note for providing Brick Pitching over Cement M 203 100 103 0 BHIWANI Concrete 1:3:6 on R-side, slope and Toe wall in Bed of Kharak Drain from RD 4500 to 15740 near village Abadi out falling at RD 8500-R Dadri Disty.

Total 203 100 103 0 District Total (S+M+L) 236 133 103 0 Dist:- CHARKHI DADRI 83 DADRI LWS CIRCLE Agenda Note for Drainage cum Irrigation Scheme for the S 150 150 0 0 BHIWANI village Bond Khurd along Bond Unn Road from RD 0 to 5400 outfall at RD 4500-R of Sanjarwas Minor.

Total 150 150 0 0 84 DADRI LWS CIRCLE Agenda Note for Drainage cum Irrigation Scheme for the M 226 113 113 0 BHIWANI village Mirch from RD 0 to 9600 outfall at RD 7500-R of Jai Shree Drain. 85 DADRI LWS CIRCLE Agenda of drainage cum irrigation scheme for the village M 178 89 89 0 BHIWANI Imlota from RD 0 to 7400 outfalling at RD 5000-L Badhwana Disty. 86 DADRI LWS CIRCLE Agenda of drainage cum irrigation scheme for the village M 128 64 64 0 BHIWANI Kanheti from RD 0 to 5400 outfalling at RD 9500-L Badhwana Disty. Total 532 266 266 0 District Total (S+M+L) 682 416 266 0 Dist:- JHAJJAR 87 BADLI JWS CIRCLE Agenda note for laying pipe line from RD 0 to 7850 off M 26.89 13.89 13 0 JHAJJAR take from RD 35800-L of Kasni minor.

88 BAHADURGARH YWS CIRCLE Flood Agenda note for purchasing one No. Tata Hitachi M 81 41 40 0 ROHTAK Ex 210 LC with excavator (long boom) for use in Water Services Division, Bahadurgarh 89 BERI JWS CIRCLE Agenda note for constructing Ditch Drain along Right M 240.42 120.21 120.21 0 JHAJJAR Side of Loharu Feeder from RD 0 to 32935 Outfalling into drain no 8 at RD 213000-R for taking discharge of Majra Siwana Link Drain.

90 JHAJJAR JWS CIRCLE Agenda note for constructing inlet with sump well M 20 10 10 0 JHAJJAR outfalling point of Khaparwas link drain at RD 5600-R JSB escape channel.

57 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 91 JHAJJAR JWS CIRCLE Agenda note for Purchase 1 No. 415 V, 800 A, 3 Phase, M 54.65 27.65 27 0 JHAJJAR 50 Hz. Motor control Centre L.T Panel with bus bar and 500 KVA Transformer 11/0.433 V, 3 Phase, 50 Hz , Oil immersed outdoor type, with all standard fittings and accessories having losses as per IS 1180 energy efficiency level-2 at Rewari Road Pump House in W.S Mech. Division, Jhajjar.

92 JHAJJAR JWS CIRCLE Agenda note for constructing of Mechanical Diesel M 79.09 40.09 39 0 JHAJJAR Workshop at Jhajjar for maintenance and up keeping of Diesel Engines in W.S Mech. Division, Jhajjar.

Total 502.05 252.84 249.21 0 District Total (S+M+L) 502.05 252.84 249.21 0 Dist:- MAHENDRAGARH 93 NANGAL JLN WS Agenda Note for providing stone pitching and M 658.14 329.14 329 0 CHOUDHRY CIRCLE Constructing spillway at various villages bunds in Nangal NARNAUL Choudhary Area. Total 658.14 329.14 329 0 District Total (S+M+L) 658.14 329.14 329 0 Dist:- ROHTAK 94 GARHI SAMPLA - YWS CIRCLE Agenda Note for Construction of permanent pump house S 13 13 0 0 KALOI ROHTAK at RD 136000/R JLN Feeder.

95 GARHI SAMPLA - YWS CIRCLE Agenda note for constructing Mattan Link Drain from RD S 22.49 22.49 0 0 KALOI ROHTAK 0 to 3000 outfalling into KCB Drain at RD 57000.

96 GARHI SAMPLA - YWS CIRCLE Agenda note for laying underground P.V.C Pipe line from S 13 13 0 0 KALOI ROHTAK fields of village Chiri to Chapra Drain at RD 18050/Right for dewatering flood water of village Chiri District Rohtak.

97 KALANAUR YWS CIRCLE Agenda Note for laying undeground PVC pipeline from S 9.2 9.2 0 0 ROHTAK fields to Drain No.8 at RD 141400/Right for Dewatering flood water of Village Madodhi, Dist Rohtak. (CM Announcement Code No. 24923) 98 KALANAUR YWS CIRCLE Agenda Note for laying underground P.V.C Pipe line from S 12.25 12.25 0 0 ROHTAK Baliyana Dhani to Drain No. 8 RD 148600 for dewatering flood water of village Patwapur, District Rohtak.(CM Announcement code No. 24925) 99 KALANAUR YWS CIRCLE Agenda note for laying underground P.V.C. Pipe line S 23.5 23.5 0 0 ROHTAK from fields of Meham Drain at RD 10500/L for dewatering flood waterof village Patwapur District Rohtak.

100 KALANAUR YWS CIRCLE Agenda Note for Construction of pump house for S 12.25 12.25 0 0 ROHTAK dewatering of Balmiki pond in village Kahanaur, District- Rohtak. (CM Announcement code No. 24922)

101 KALANAUR YWS CIRCLE Agenda note for construction of Embankment of Drain S 31 31 0 0 ROHTAK No.8 from RD 187000 to 188250

102 KALANAUR YWS CIRCLE Agenda note for laying underground P.V.C Pipe line from S 18.25 18.25 0 0 ROHTAK fields to Drain No 8 at RD 143500/Right for dewatering flood water of village Patwapur District. Rohtak. 103 MEHAM LWS CIRCLE Agenda Note for providing Brick Pitching over Cement S 52 52 0 0 BHIWANI Concrete 1:3:6 on Bed and side slope and Toe wall in Bed of Escape channel from RD 0 to 1100 offtake at RD 107200 tail Bhiwani Sub Branch.

58 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 104 MEHAM YWS CIRCLE Agenda Note for laying underground Pipeline and S 18 18 0 0 ROHTAK constructing Pump house at RD 68100/R Bhiwani Sub Branch. 105 MEHAM YWS CIRCLE Agenda Note for constructing temporary Pump House on S 18 18 0 0 ROHTAK Nindana, Momadpur link Drain which outfalls at RD 121000/L Meham Drain to drain out flood water.

106 ROHTAK YWS CIRCLE Agenda Note for laying underground P.V.C Pipe line from S 19.7 19.7 0 0 ROHTAK Dahar to Drain No 8 at RD 151500/R for dewatering flood water of village Patwapur, District Rohtak. (CM Announcement code no. 24926) Total 262.64 262.64 0 0 107 BERI YWS CIRCLE Agenda note for constructing temporary pump house of M 35.1 20 15.1 0 ROHTAK outfall point Dighal Link Drain.

108 GARHI SAMPLA - YWS CIRCLE Agenda note for providing regulation gates in Jassia link M 43 23 20 0 KALOI ROHTAK drain at outfall into drain no.08 at RD-99000/L

109 MEHAM YWS CIRCLE Agenda Note for controlling the sloughing problem of M 43 21.5 21.5 0 ROHTAK bank of Meham Drain by applying the Geosynthetic mat on side slope from RD 135000 to RD 135500 both side.

110 MEHAM YWS CIRCLE Agenda note for procurement of new pump for flood M 76 38 38 0 ROHTAK protection works at Nindana Pump House at RD 122000- L of Meham Drain in WS Mech Sub Division, Rohtak

111 MEHAM YWS CIRCLE Flood agenda note for re-construction of VR Bridge at M 30.16 15.16 15 0 ROHTAK RD 3460 of Kidoli Pahalapur Link Drain

112 ROHTAK YWS CIRCLE Agenda Note for purchasing 1 No. Jcb Machine wheel M 66.5 33.5 33 0 ROHTAK type, 1 No. Tractor, 1 No. Trolla for Rohtak water services division Rohtak.

113 ROHTAK YWS CIRCLE Agenda note for controlling the sloughing problem of M 57.24 23 34.24 0 ROHTAK bank of Kakrana Link Drain by applying synthetic mat on side slope from RD 0 to 3000 on both side bank.

114 ROHTAK YWS CIRCLE Agenda note for procurement of New Vehicle Mahindra M 7.33 4.33 3 0 ROHTAK Bolero Camper 2WD for loading and shifting of material and machinery in Sampla WS Division, Rohtak of Yamuna Water Services Circle, Rohtak.

Total 358.33 178.49 179.84 0 115 KALANAUR YWS CIRCLE Agenda note for construction of temporary pump house L 280.5 100 100 80.5 ROHTAK at RD 10574 Meham Drain crossing KahanaurDisty. at RD 141025.(CM Announcement code No. 24921)

116 KALANAUR YWS CIRCLE Agenda note for construction of temporary pump house L 186.66 62.66 62 62 ROHTAK at RD 37000 Meham Drain crossing Kalanaur minor at RD 24500. (CM Announcement code No. 24920)

117 KALANAUR YWS CIRCLE Agenda Note for construction of Kahanaur L 168.63 56.21 56.21 56.21 ROHTAK Pipeline Pump House Link Drain from RD 0 to 7850 outfall at RD 201000L of Drain No.8 118 MEHAM YWS CIRCLE Agenda note for constructing Cross Regulator at RD L 115 38.33 38.33 38.34 ROHTAK 73400 on Meham Drain.

Total 750.79 257.2 256.54 237.05 District Total (S+M+L) 1371.76 698.33 436.38 237.05

59 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 Dist:- SONIPAT 119 GOHANA YWS CIRCLE Procurement of 06 Nos.New Pumps of 10 Cusec M 108 54 54 0 ROHTAK Capacity For flood Protection Works at RD 95000-R of Bhutana Branch Sump-Well in W.S Mech Sub Division ,Gohana.( Total 108 54 54 0 District Total (S+M+L) 108 54 54 0 Unit Total 3557.95 1883.31 1437.59 237.05 PROJECT, ENVIRONMENT AND MATERIAL Dist:- JIND 120 JIND WORKSHOP Replacement/Renovation of 6 No. of V.T. Pumps of 10 M 166.08 100 66.08 0 CIRCLE Cs. capacity and 08 No. V.T. Pumps of 5 Cs. capacity KARNAL pumping sets with allied accessories in District Jind.

121 JIND WORKSHOP Procurement of 03 No. Diesel Generating sets of 320 M 132.6 66.6 66 0 CIRCLE KVA, 01 No. Diesel Generating sets of 250 KVA,03 KARNAL Diesel Generating sets of 125 KVA and 02 No. Diesel Generating Sets of 62.5 KVA for use in permanent pump houses in the event of power failure in District Jind.

Total 298.68 166.6 132.08 0 District Total (S+M+L) 298.68 166.6 132.08 0 Unit Total 298.68 166.6 132.08 0 YWS(N) Dist:- BHIWANI 122 BAWANI KHERA YWS CIRCLE PROJECT ESTIMATE FOR PROVIDING BRICK S 89 89 0 0 BHIWANI PITCHING OF SAIMAN DHANANA LINK DRAIN FROM RD 80575 TO 83575 OUTFALLING AT RD 55400/R BHIWANI GHAGGAR DRAIN Total 89 89 0 0 123 BAWANI KHERA YWS CIRCLE PROJECT ESTIMATE FOR EXTENSION OF 1-L JATAI M 70.5 35.25 35.25 0 BHIWANI DRAIN FROM RD 20000-21958 OUTFALLING AT RD 77265-R SAIMAN DHANANA LINK DRAIN Total 70.5 35.25 35.25 0 District Total (S+M+L) 159.5 124.25 35.25 0 Dist:- JIND 124 JIND YWS CIRCLE Agenda Note for Remodeling of Poli Pump House at M 144 72 72 0 JIND Design Capacity 66 Cusec to 110 Cusec at RD 420000-R Bhiwani Sub Branch (only civil work) amounting to Rs. 144.00 Lacs. 125 SAFIDON YWS CIRCLE Agenda Note for Laying Pipe line for Dewatering of field M 112.53 56.27 56.27 0 JIND water to Ditch Drain of Village Nimnabad including construction of Permanent Pump House to Rs.112.53lcs

126 SAFIDON YWS CIRCLE Flood Agenda for providing Brick pitching on both Side M 494 247 247 0 JIND from RD 0 to 8950 Padana drain including Reconstruction of 3 Nos. Bridges. Total 750.53 375.27 375.27 0 127 JIND YWS CIRCLE Agenda Note for providing brick pitching on both side of L 187 63 62 62 JIND Nizampur Bharon Khera Link Drain in sloughing reach RD 0 to 4000 including pucca structure.

Total 187 63 62 62 District Total (S+M+L) 937.53 438.27 437.27 62 Dist:- KARNAL

60 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 128 GHARAUNDA YWS CIRCLE Agenda for providing protection to Dakwala Complex by S 71.45 71.45 0 0 KARNAL constructing 1 No. new stone stud and repairing of 3 No. damaged stone stud on river Yamuna after flood 2019.

129 GHARAUNDA YWS CIRCLE Agenda for providing protection to Mustafabad Complex S 314.61 314.61 0 0 KARNAL by constructing 3 No. new stone stud and repairing of 7 No. damaged stone stud and constructing 1365’ stone revetment on river Yamuna after flood 2019

130 GHARAUNDA YWS CIRCLE Agenda for the work of providing protection to Kunda S 60.09 60.09 0 0 KARNAL Kalan complex by 4 no repairing of damaged stone stud on river Yamuna after flood 2019. 131 GHARAUNDA YWS CIRCLE Agenda for the work of providing protection to Sadarpur S 78.15 78.15 0 0 KARNAL complex by repairing 5 no. old damaged stone studs on Yamuna after flood 2019 132 GHARAUNDA YWS CIRCLE Agenda for repairing of spur at RD 238000 river Yamuna S 15.26 15.26 0 0 KARNAL embankment after flood 2019

133 INDRI YWS CIRCLE Agenda for providing protection to Shergarh Tapu S 263.17 263.17 0 0 KARNAL Complex by constructing 9 No. new stone studs on river Yamuna after flood 2019. 134 INDRI YWS CIRCLE Agenda for the work of providing protection to Kalsora S 257.84 257.84 0 0 KARNAL complex by 3 no repairing of damaged stone stud and constructing 840’ stone revetment on river Yamuna after flood 2019. Total 1060.57 1060.57 0 0 135 GHARAUNDA YWS CIRCLE Agenda for construction of outfall gate at RD 0 and sump M 50 30 20 0 KARNAL well at RD 13400 and remodeling of 01 No. culvert at RD 3300 of Bazida drain. 136 GHARAUNDA YWS CIRCLE Agenda for constructing cause way opposite RD 137310 M 39 19.5 19.5 0 KARNAL Kunjpura embankment on Dhanaura creek (based on sanctioned estimate for constructing causeway opposite RD 144200 of Kunjpura embankment on creek of Dhanaura escape).

Total 89 49.5 39.5 0 District Total (S+M+L) 1149.57 1110.07 39.5 0 Dist:- PANIPAT 137 SAMALKHA YWS CIRCLE Providing protection to Tamsabad Complex by repairing S 62 62 0 0 KARNAL 4 No. Old Stone Studs after Flood 2019

138 SAMALKHA YWS CIRCLE Providing protection to Nanhera Complex by repairing 5 S 158 158 0 0 KARNAL No. Old Stone Studs and 120 Ft long Constructing Revetment D/S of Stud No. 27 after Flood 2019

139 SAMALKHA YWS CIRCLE Providing protection to Mirzapur Complex by repairing 5 S 127 127 0 0 KARNAL No. Old Stone Studs and 275 Ft long Constructing Revetment U/S of Stud No. 10 after Flood 2019

Total 347 347 0 0 140 ISRANA YWS CIRCLE Bringing to design section of Try. Drain No. 1 from RD M 52 26 26 0 KARNAL 57800 to 56900 for separation of drain from village pond and abadi area in village Thirana 141 ISRANA YWS CIRCLE Bringing to design section of Brahman Majra Drain from M 96 48 48 0 KARNAL RD 1000 to 3500 for separation of drain from village pond and abadi area in village Brahman Majra

61 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 142 ISRANA YWS CIRCLE Bringing to design section of Bijawa-Chirana-Mundlana M 125 63 62 0 KARNAL Link Drain from R.D 22000 to 25200 for separation of Drain from village pond and abadi area in village Shahpur 143 ISRANA YWS CIRCLE Bringing to Design section of Gawalra Link Drain From M 107 54 53 0 KARNAL R.D 8200 To 4000 for Sepration of Drain from village pond and Abadi Area In village Gawalra 144 PANIPAT CITY YWS CIRCLE Bringing to Design section of Begampur Drain from RD M 66 33 33 0 KARNAL 7200 to 9000 for Separation of drain from village pond and abadi area in village Rajapur 145 PANIPAT RURAL YWS CIRCLE Bringing to Design section of Nohra Drain From RD M 101 51 50 0 KARNAL 17500 to 21000 for village Sodhapur and various colonies such as Dutta colony etc. 146 PANIPAT RURAL YWS CIRCLE Bringing to design section of Nohra Drain from RD 34000 M 342 171 171 0 KARNAL to 47000 and separation of drain from village pond and abadi area in village Binjhol and Dahar. (Ex-post facto sanction). Total 889 446 443 0 District Total (S+M+L) 1236 793 443 0 Dist:- YAMUNANAGAR 147 JAGADHRI HKB CIRCLE Constg. apron for connecting the RLDSE Bund from RD S 98 98 0 0 JAGADHRI 1700 to 1900 after Flood 2019 148 JAGADHRI HKB CIRCLE Constg. Apron for connecting the RLDSE Bund from RD S 466 466 0 0 JAGADHRI 3750 to 4270 after Flood 2019. 149 JAGADHRI HKB CIRCLE Repairing of Damaged Apron of Gorden Groyne at Vill S 315 315 0 0 JAGADHRI Tajewala after Flood 2019. 150 JAGADHRI HKB CIRCLE Protection of Old Tajewala Head by constructing Apron S 140 140 0 0 JAGADHRI around the Head after Flood 2019 151 SADHAURA HKB CIRCLE Providing 1200 ft. stone steining for the protection of S 29.36 29.36 0 0 JAGADHRI Agriculture land of Village Laharpur Dummawala from River Markanda. 152 YAMUNA HKB CIRCLE Providing 09 no. stone studs for the protection of S 218.51 218.51 0 0 NAGAR JAGADHRI agriculture land of village Gumthala Rao from River Yamuna. 153 YAMUNA HKB CIRCLE CONSTRUCTING 600 FT STONE STEINING FOR S 13 13 0 0 NAGAR JAGADHRI PROTECTION OF AZAT ASHRAM GAUSHALA FROM CHIKKEN KHOL (RIVER PATHRALA). 154 YAMUNA HKB CIRCLE CONSTRUCTING 1200 FT STONE STEINING FOR S 30 30 0 0 NAGAR JAGADHRI PROTECTION OF VILLAGE KALESAR and KALESAR MAHAMANTRA VALLEY FROM RIVER YAMUNA

155 YAMUNA HKB CIRCLE CONSTRUCTING 1000 FT STONE STEINING FOR S 15.17 15.17 0 0 NAGAR JAGADHRI PROTECTION OF AGRICULTURAL LAND AND ABADI OF VILLAGE MUKARAVPUR IN D/S OF MUKARAVPUR BRIDGE FROM PLASI KHOL (RIVER PATHRALA)

156 YAMUNA HKB CIRCLE CONSTRUCTING 550 FT STONE STEINING FOR S 8 8 0 0 NAGAR JAGADHRI PROTECTION OF VILLAGE NATHANPUR FROM KANSLI KHOL (RIVER PATHRALA). 157 YAMUNA HKB CIRCLE CONSTRUCTING 600 FT STONE STEINING FOR S 9.16 9.16 0 0 NAGAR JAGADHRI PROTECTION OF VILLAGE KOTRA KAHAN SINGH FROM RIVER PATHRALA 158 YAMUNA HKB CIRCLE CONSTRUCTING 1900 FT BUND WITH STONE S 44.39 44.39 0 0 NAGAR JAGADHRI PITCHING FOR PROTECTION OF VILLAGE MUKARVPUR AND ABADI IN THE U/S OF BRIDGE FROM PLASI KHOL (RIVER PATHRALA). 159 YAMUNA HKB CIRCLE PROVIDING 1400 Ft. STONE STEINING FOR S 44.71 44.71 0 0 NAGAR JAGADHRI PROTECTION OF AGRICULTURAL LAND AND ABADI NEAR GURUDWARA FROM LOHGARH KHOL.

62 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 160 YAMUNA HKB CIRCLE RESTORATION OF KHANNUWALA BUND FOR S 3.89 3.89 0 0 NAGAR JAGADHRI PROTECTION OF KHANNUWALA VILLAGE FROM RIVER SOMB. 161 YAMUNA HKB CIRCLE CONSTRUCTION OF 700 Ft. STONE STEINNING FOR S 17.11 17.11 0 0 NAGAR JAGADHRI PROTECTION OF VILLAGE ABADI OF VILLAGE SANGHOLI FROM TRIBUTARY OF SADHOURA RIVER. 162 YAMUNA HKB CIRCLE PROVIDING 300 Ft. STONE STEINNING FOR S 14.59 14.59 0 0 NAGAR JAGADHRI PROTECTION OF AGRICULTURAL LAND OF VILLAGE JAIRAMPUR AND DAMUPURA FROM RIVER SOMB.

163 YAMUNA HKB CIRCLE PROVIDING 436 FT. STONE STEINING FOR S 18.37 18.37 0 0 NAGAR JAGADHRI PROTECTION OF VILLAGE RAMPUR GAINDA BUND FROM RIVER SOMB. 164 YAMUNA HKB CIRCLE PROVIDING 06 NOs BED BARS FOR THE S 30.16 30.16 0 0 NAGAR JAGADHRI PROTECTION OF AGRICULTURE LAND OF RAMGARH SAWAI AND VILLAGE ABADI OF BANKAT FROM RIVER SOMB 165 YAMUNA HKB CIRCLE Construction of 07 Nos. stone studs and 450 ft. stone S 220.74 220.74 0 0 NAGAR JAGADHRI steining for the protection of village Tapu kamalpur from River Yamuna. 166 YAMUNA HKB CIRCLE Construction of 1400 ft. stone steining for the protection S 171.17 171.17 0 0 NAGAR JAGADHRI of village Lal Chaper from River Yamuna. 167 YAMUNA HKB CIRCLE Construction of 08 Nos. stone studs for the protection of S 187.22 187.22 0 0 NAGAR JAGADHRI village Bagwali from River Yamuna 168 YAMUNA HKB CIRCLE CONSTRUCTING 1000 FT BUND WITH STONE S 24 24 0 0 NAGAR JAGADHRI PITCHING FOR PROTECTION OF VILLAGE BANIYAWALA FROM KANSLI KHOL (RIVER PATHRALA). 169 YAMUNA HKB CIRCLE Providing protection to agriculture land from Flood water S 18 18 0 0 NAGAR JAGADHRI by providing Pump House in Village Shadipur in District Yamuna Nagar 170 YAMUNA HKB CIRCLE SCHEME FOR CONSTRUCTION OF 900 FT. STONE S 214.5 214.5 0 0 NAGAR JAGADHRI STEINING AND 06 NO. STONE STUDS FOR THE PROTECTION OF VILLAGE ODHRI FROM RIVER YAMUNA. 171 YAMUNA HKB CIRCLE Scheme for Providing 335 mtr. stone steining between S 189.3 189.3 0 0 NAGAR JAGADHRI studs for the protection of agriculture land and village abadi of village Gumthla from River Yamuna.

172 YAMUNA HKB CIRCLE SCHEME FOR THE CONSTRUCTION OF 5 NOS S 103.5 103.5 0 0 NAGAR JAGADHRI STONE STUDS FOR THE PROTECTION OF VILLAGE KANALSI FROM RIVER YAMUNA. 173 YAMUNA HKB CIRCLE SCHEME FOR REPLENISHMENT OF 3 NOS STONE S 60.69 60.69 0 0 NAGAR JAGADHRI STUD FOR THE PROTECTION OF VILLAGE MANDOLI FROM RYVER YAMUNA 174 YAMUNA HKB CIRCLE ESTIMATE FOR CONSTRUCTING 02 NO. STONE S 39.14 39.14 0 0 NAGAR JAGADHRI STUDS AND 600FT. STONE STEINING FOR PROTECTION OF VILLAGE BABURAMBASS FROM RIVER YAMUNA. 175 YAMUNA HKB CIRCLE ESTIMATE FOR CONSTRUCTING 02 NO. STONE S 45.39 45.39 0 0 NAGAR JAGADHRI STUDS AND 800FT. STONE STEINING FOR PROTECTION OF VILLAGE KALESAR FROM RIVER YAMUNA. 176 YAMUNA HKB CIRCLE SCHEME FOR CONSTRUCTING 05 NO. STONE S 48.45 48.45 0 0 NAGAR JAGADHRI STUDS FOR PROTECTION OF VILLAGE LAKKARMAI PARTAPPUR FROM RIVER YAMUNA. 177 YAMUNA HKB CIRCLE SCHEME FOR CONSTRUCTING 6 NO. STONE STUDS S 58.14 58.14 0 0 NAGAR JAGADHRI FOR THE PROTECTION OF VILL. KANNEWALA FROM RIVER YAMUNA.

63 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 178 YAMUNA HKB CIRCLE RESTORATION OF CHAUTANG NALLAH FROM RD S 20.34 20.34 0 0 NAGAR JAGADHRI 29800 TO 47400. Total 2916 2916 0 0 179 YAMUNA HKB CIRCLE REHABILITATION OF CHAUTANG NALLAH FROM RD M 133 67 66 0 NAGAR JAGADHRI 0 TO 136428 Total 133 67 66 0 District Total (S+M+L) 3049 2983 66 0 Unit Total 6531.6 5448.59 1021.02 62 YWS(S) Dist:- FARIDABAD 180 PRITHLA YWS CIRCLE Providing 06 no. stone studs and 1000ft. edge protection S 225 225 0 0 FARIDABAD to protect village abadi and its agricultre land of village Latipur Sahupura khadar after flood 2019.

181 TIGAON YWS CIRCLE Repairing 5 no. new stone studs to protect village abadi S 80 80 0 0 FARIDABAD and its agricultre land of village Rajpur Dungarpur and rainy well tubewell of Rajupr Dungarpur river complex after flood 2019 Total 305 305 0 0 182 BALABGARH YWS CIRCLE Reconstruction of central mechanical workshop at M 75 37.5 37.5 0 FARIDABAD ballabgarh in W.S. Mech. Sub Divn. Faridabad

183 FARIDABAD YWS CIRCLE Bolero camper 5 seater cabin mahendra. M 7.5 3.75 3.75 0 FARIDABAD

184 PRITHLA YWS CIRCLE Re-construcion of 1 no. Bridge at RD 220000 of Gaunchi M 114.9 60 54.9 0 FARIDABAD Main Drain

Total 197.4 101.25 96.15 0 District Total (S+M+L) 502.4 406.25 96.15 0 Dist:- GURGAON 185 GURGAON YWS CIRCLE Diesel truck- 7.8 ton payload with 17 ft length full frame M 16 8 8 0 FARIDABAD chasis (Eicher make), quantity-1(for Gurgaon )

Total 16 8 8 0 District Total (S+M+L) 16 8 8 0 Dist:- MEWAT 186 NUH YWS CIRCLE Flood agenda for internal clearance of silt and slush of S 9.3 9.3 0 0 FARIDABAD outfall channel RD.122200 of Gurgaon Canal at RD.0- 32250 187 NUH YWS CIRCLE Flood agenda for internal clearance of silt and slush of S 15.63 15.63 0 0 FARIDABAD outfall channel RD.146200 of Gurgaon Canal at RD.0- 18725 188 NUH YWS CIRCLE Flood agenda for Internal clearance of silt of outfall S 54.15 54.15 0 0 FARIDABAD channel RD.90000 of Gurgaon Canal from RD.0-19000.

189 NUH YWS CIRCLE Flood agenda for bringing design section of Landwa S 88 88 0 0 FARIDABAD Nallah from RD 0 to 26956 ft. (8216 Mtr.).

190 PUNHANA YWS CIRCLE Flood agenda for providing side slope pitching from RD S 25.63 25.63 0 0 FARIDABAD 4650 to 6650 of Hinganpur Link Drain

191 PUNHANA YWS CIRCLE Flood Agenda for Internal clearance of New Kot Drain S 51.65 51.65 0 0 FARIDABAD from RD.0-64964.

Total 244.36 244.36 0 0

64 Annexure 4.2 Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

Head:Flood Protection Works (Rs. in lacs)

Sr. Name of Name of Name of Work Short Est. Cost Requriments of funds No Constituency Irrigation Medium, Circle Long Term,(S/M /L) 2020-21 2021-22 2022-23 192 FIROZEPUR YWS CIRCLE Flood agenda for replacement of V.R. Bridge at RD. M 34 17 17 0 JHIRKA FARIDABAD 2400 of F.P. Jhirka Link Drain

193 NUH YWS CIRCLE Electrical Pumping set 3 cusec discharge with 20 HP M 16 8 8 0 FARIDABAD motors along with panel Kirloskar make quantity-10 for Distt Nuh 194 NUH YWS CIRCLE Flood Agenda for Reconstruction of V.R. Bridge at RD. M 167.23 100 67.23 0 FARIDABAD 18300 of Nuh Drain from village Ujina to Terakpur

195 PUNHANA YWS CIRCLE Flood Agenda for replacement of V.R. Bridge at RD.1350 M 34 17 17 0 FARIDABAD of North Possar Drain.

196 PUNHANA YWS CIRCLE Flood Agenda for replacement of V.R. Bridges at M 68 34 34 0 FARIDABAD RD.1826 and RD.4181 of Maryaka Drain

197 PUNHANA YWS CIRCLE Flood Agenda for re-construction of V.R Bridge at Km M 177.41 100 77.41 0 FARIDABAD 33.70 (from village Leherwari to Khera) of Ujina Diversion Drain in Distt. Nuh (Mewat). Total 496.64 276 220.64 0 District Total (S+M+L) 741 520.36 220.64 0 Dist:- PALWAL 198 HODAL YWS CIRCLE Bringing Design section of Ujina Diversion Drain from KM M 150 75 75 0 FARIDABAD 6.76 to 18.00

199 HODAL YWS CIRCLE Agenda for replacement of V.R.Bridge at KM 7.158 from M 375 200 175 0 FARIDABAD Vilage Khirbi to Hathana of U.D.D.

200 PALWAL YWS CIRCLE Agenda for Constructing Pucca Hump at RD 152000 of M 138.29 90 48.29 0 FARIDABAD Gaunchi Main Drain.

Total 663.29 365 298.29 0 District Total (S+M+L) 663.29 365 298.29 0 Dist:- SONIPAT 201 GANAUR YWS CIRCLE Providing Protection to Bega Complex by constructing 4 S 80 80 0 0 SONEPAT No. new stone studs on River Yamuna after flood 2019 in district Sonipat. 202 RAI YWS CIRCLE Providing protection at Tikola Complex by constructing 1 S 75 75 0 0 SONEPAT No. New stone stud and 350 ft revetment and repairing of 04 No. stone stud on River Yamuna after flood 2019 in District Sonipat. 203 RAI YWS CIRCLE Providing protection at Mimarpur Complex by Repairing S 14 14 0 0 SONEPAT of 02 No. stone stud on River Yamuna after flood 2019 in District Sonipat.

Total 169 169 0 0 District Total (S+M+L) 169 169 0 0 Unit Total 2091.69 1468.61 623.08 0 Grand Total 19830.57 13133.43 5806.25 890.9

65 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

BWS AMBALA 1 AMBALA CITY SYL CIRCLE Rehabilitation and up gradation of Pump House 47th S 230.40 100 % Completed AMBALA at RD 0 of Mahesh Nagar Drain to protect the abadi of Ambala Cantt , villages Boh, Babyal and Dalip Ghar etc. from River Tangri

2 AMBALA SYL CIRCLE Upgradation of existing pump house at Babyal 48th S 260.00 100 % Completed CANTT. AMBALA by providing 2No. VT Pumps of 50 Cuces each for the protection of village abadi of Boh, Babyal and Dalipgarh of Ambala Cantt

3 AMBALA CITY SYL CIRCLE Scheme for strengthening of Ghaggar bund by 49th S 120.83 100 % Completed AMBALA laying stone pitching over crated stone toe wall in reach rd 45620 to 47240 D/S inlet to protect abadi of village Devi Nagar/Ambala City from river Ghaggar (Near Drain Portion)

4 AMBALA CITY SYL CIRCLE Scheme for purchase of 1 No. Hydraulic 49th S 54.90 100 % Completed AMBALA Excavator (Long Boom) Model EX-200 LC Super fitted with Super long front END attachment and standard kit for use in SYL W.S. Division Ambala

5 MULLANA SYL CIRCLE Constructing stone steining for the protection of 50th S 23.24 100 % Completed AMBALA Abadi of village Kakkarkunda from River Markanda

6 MULLANA SYL CIRCLE Constructing stone steining for the protection of 50th S 11.91 100 % Completed AMBALA Abadi and agriculture land of village Rolanhari from River Markanda

7 NARAINGARH SYL CIRCLE Constructing stone steining for the protection of 50th S 28.24 100 % Completed AMBALA Abadi of Durga Colony in Kala –Amb from river Markanda 8 NARAINGARH SYL CIRCLE Constructing stone steining for the protection of 50th S 20.00 100 % Completed AMBALA agriculture land of village Pullewala from River Begna 9 NARAINGARH SYL CIRCLE Constructing stone stud for the protection of 50th S 42.91 100 % Completed AMBALA agriculture land of village Ambli from River markanda 10 NARAINGARH SYL CIRCLE Constructing stone steining for the protection of 50th S 50.00 100 % Completed AMBALA abadi of village Ramabagh Colony in Kala-Amb from river Markanda 11 NARAINGARH SYL CIRCLE Repair and replenishing old stone steining for 50th S 30.00 100 % Completed AMBALA the protection of abadi of village Kala-Amb from river Markanda 12 NARAINGARH SYL CIRCLE Repair and replenishing old stone steining for 50th S 18.21 100 % Completed AMBALA the protection of abadi of village Jiriwala from Sakroon Nadi 13 NARAINGARH SYL CIRCLE Constructing stone steining for the protection of 50th S 18.11 100 % Completed AMBALA Shamshanghat and agriculture land of village Nasrouli from Dhanana Chowe

14 NARAINGARH SYL CIRCLE Constructing stone steining for the protection of 50th S 7.20 100 % Completed AMBALA Dera on Ganda Nallah

15 AMBALA SYL CIRCLE Scheme for constructing cause way on field 49th M 90.00 100 % Completed CANTT. AMBALA road from village Ghasitpur to village Dukheri in District Total 1005.95 FATEHABAD 66 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

16 TOHANA BWS CIRCLE Providing protection to X-ing River Ghaggar 49th S 111.86 100 % Completed FATEHABAD Syphon RD 64050 Bhakra Main Branch 17 TOHANA BWS CIRCLE Constructing protection wall and pitching on 49th M 38.84 100 % Completed FATEHABAD side slope to provide protection to the bank of Rangoi Nallah at RD 9.35 Km (Construct on one side first) 18 TOHANA BWS CIRCLE Constricting 10 Nos Outlet/inlet at various sites 49th M 35.06 100 % Completed FATEHABAD of Rangoi Nallah 19 TOHANA BWS CIRCLE Agenda note for constructing pipeline drains for 50th M 19.14 100 % Completed FATEHABAD dewatering of floodwater of village Shakkerpura falling into Rangoi Nallah at RD 7.25 Km Right side 20 TOHANA BWS CIRCLE Agenda note for constructing pipeline drains for 50th M 12.64 100 % Completed FATEHABAD de-watering of floodwater of village Talwara outfalling into River Ghaggar U/S Bridge at Jakhal - Kullan Road District Total 217.54 HISAR 21 NARNAUND BWS CIRCLE Laying of pipe line and installation of 49th S 208.00 100 % Completed HISAR submersible pump set with solar system in village Singhwa behind sugar mill. (Issue MOU in similar cases) 22 HANSI BWS CIRCLE Protection of Hansi Drain by providing pitching 49th S 17.05 100 % Completed HISAR U/S and D/S of bridges and minor at various points.

23 HANSI BWS CIRCLE Bring to design section of HMPC Drain (RD 0 to 50th S 45.00 100 % Completed HISAR 38320) 24 NARNAUND BWS CIRCLE Bring to design section of BMPC Drain (RD 0 to 50th S 137.00 100 % Completed HISAR 155580)... 25 NARNAUND BWS CIRCLE Bring to design section of Puthi Mundhal Link 50th S 32.00 100 % Completed HISAR Drain (RD 0 to 60000). 26 ADAMPUR BWS CIRCLE Providing protection and restoration of capacity 50th M 80.25 100 % Completed HISAR of Hisar Ghggar Multipurpose channel (Drain) from RD 205230 to 269650 (Supplementary Scheme). District Total 519.30 KAITHAL 27 GUHLA BWS CIRCLE Scheme for constructing inlet at RD 100700 of 50th S 21.08 100 % Completed KAITHAL Ghaggar Bund to drain out the flood water of village namely Channa Jattan, Seon Majra, Duserpur and Bhatian. 28 KAITHAL BWS CIRCLE Scheme for replacement of pipe type bridge into 50th S 5.30 100 % Completed KAITHAL slab type bridge at RD 1936 of Old Manas Link Drain leading from village Qutabpur to Bhanpura. 29 KAITHAL BWS CIRCLE Scheme for re-construction of bridge at RD 50th S 12.50 100 % Completed KAITHAL 15750 on Mago Majri Link Drain leading from village Sirta to Kaithal. District Total 38.88 KURUKSHETRA 30 PEHOWA SYL CIRCLE SCHEME FOR CONSTRUCTION OF 49th S 15.00 100 % Completed AMBALA HUMP/FALL AT RD 300/200 OF JAKHWALA DRAIN TO PROTECT THE AGRICULTURE LAND OF VILLAGE JAKHWALA, TEOKAR, TANGOLI, PUNJAB AREA ETC

31 PEHOWA SYL CIRCLE Scheme for construction of V.R. Bridge at RD 50th S 50.60 100 % Completed AMBALA 13022 Sandholi Drain on Pehowa to Dera Fateh Singh Road. 32 PEHOWA SYL CIRCLE Scheme for construction of V.R. Bridge at RD 50th S 43.17 100 % Completed AMBALA 15300 Sandholi Drain on Pehowa to Pooja Colony Road. 67 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

33 THANESAR SYL CIRCLE Procurement of 1 No. Eicher Truck Tempo 50th S 18.77 100 % Completed AMBALA Model 1110 XP 34 THANESAR SYL CIRCLE Construction of sumpwell at RD 87000 of Sirsa 50th S 5.00 100 % Completed AMBALA Branch upstream at Budhera Complex.

District Total 132.54 PANCHKULA 35 PANCHKULA SYL CIRCLE Purchase of 2 no. Diesel driven Pump Set of 2 48th S 5.44 100 % Completed AMBALA Cs capacity for W/S Sub Dn Panchkula

36 PANCHKULA SYL CIRCLE Scheme for constructing 232 ft three tier 50th S 20.92 100 % Completed AMBALA steining for the protection of village Shamshan Ghat and Bataur Bundh of village Bataur from river Tangri after flood 2018

37 KALKA SYL CIRCLE Scheme for constructing 448 ft three tier 50th S 40.32 100 % Completed AMBALA steining for the protection of village abadi of village Natwal from river Tangri after flood 2018

38 PANCHKULA SYL CIRCLE Scheme for constructing 248 ft double tier 50th S 12.47 100 % Completed AMBALA steining, for the protection of village abadi of village Nada from Nada Choe tributary of river Ghaggar after flood 2018 39 PANCHKULA SYL CIRCLE Scheme for constructing 448 feet double tier 50th S 20.00 100 % Completed AMBALA steining for the protection of abadi area of village Manakyan from River Manakyan wali nadi tributary of river Ghaggar after flood 2018

40 PANCHKULA SYL CIRCLE Scheme for constructing 568 feet three tier 50th S 45.00 100 % Completed AMBALA steining for the protection of Rehod Bundh and agriculture land of village Rehod from River Tangri after flood 2018 41 KALKA SYL CIRCLE Scheme for constructing 512 feet double tier 50th S 25.62 100 % Completed AMBALA steining for the protection of Government school of village Mandalya from River Begna after flood 2018 42 KALKA SYL CIRCLE Scheme for constructing 536 feet three tier 50th S 60.88 100 % Completed AMBALA steining for the protection of village abadi of village Mirpur from Mirpur Wali Nadi tributary of River Tangri after flood 2018 43 KALKA SYL CIRCLE Scheme for constructing 4 No. bed bars and 50th S 60.47 100 % Completed AMBALA repair of damaged Ishar Nagar Drain to protect abadi and road of village Ishar Nagar and Himshikha from Ishar Nagar Drain and Kaushalya River after flood 2018

44 KALKA SYL CIRCLE Scheme for constructing 464 feet (296 plus 50th S 23.30 100 % Completed AMBALA 168) double tier steining for the protection of village abadi of village Paploha from River Baadgodam, tributary of River Sarsa after flood 2018 45 KALKA SYL CIRCLE Scheme for constructing 576 feet (328 plus 50th S 51.83 100 % Completed AMBALA 248) three tier steining for the protection of abadi of village Rampur Seori from River Jhajjra after flood 2018 46 KALKA SYL CIRCLE Double tier steining for the protection of village 50th S 17.00 100 % Completed AMBALA of village Jholuwal from Sirsa River after flood 2018 (Supplementry Scheme). 47 KALKA SYL CIRCLE Three tier steining for the protection of village 50th S 23.00 100 % Completed AMBALA abadi of village Madhanwala from River Madhanwali after flood 2018 (Supplementry Scheme). 68 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

District Total 406.25 SIRSA 48 ELLENABAD BWS CIRCLE Internal clearance of Hisar-Ghaggar 50th S 26.80 100 % Completed SIRSA Multipurpose Drain from RD. 0-141000 49 ELLENABAD BWS CIRCLE Bringing to design section and unloading of 50th S 14.54 100 % Completed SIRSA Bank of Hisar-Ghaggar Multipurpose Drain from RD. 111000-127000.

50 KALANWALI BWS CIRCLE Agenda Note for Internal clearance of Rori 50th S 9.45 100 % Completed SIRSA Ghaggar Drain from RD 100000 to 130750-Tail and its subsidiary Drains

District Total 50.79 Unit Total 2371.25 CONSTRUCTION GURGAON 51 GURGAON CONSTRUCTION Procurement of Earth Moving Machine for 49th S 60.00 100 % Completed CIRCLE GURGAON internal clearance of Drains (Supplementary Agenda).

District Total 60.00 KARNAL 52 NILOKHERI SARASWATI Construction of sumpwell and pumphouse at tail 50th S 34.90 100% Completed HERITAGE CIRCLE R.D116400 of Rakshinadi out falling into Sirsa KURUKSHETRA branch.

District Total 34.90 KURUKSHETRA 53 PEHOWA SARASWATI Construction of inlet at RD 116200 of Saraswati 50th S 19.02 100 % Completed HERITAGE CIRCLE Drain for protection of abadi of villages: KURUKSHETRA Bilochpura, Dhanipura, Urnai, Sainsa and Saraswati Khera etc.

District Total 19.02 ROHTAK 54 GARHI YWS CIRCLE Reconstruction of 01 no. V.R. Bridge at RD 49th M 153.19 100 % Completed SAMPLA - ROHTAK 56044 on drain no. 8 KALOI 55 MEHAM YWS CIRCLE Reconstruction of 01 no. V.R bridge at RD 49th M 133.18 100 % Completed ROHTAK 100000 on drain no. 8

District Total 286.37 Unit Total 400.29 LCU BHIWANI 56 BHIWANI LWS CIRCLE Agenda note for procurement of new earth 49th S 60.00 100 % Completed BHIWANI moving machine for internal clearance of drains and banks strengthening of canal and drain (Supplementary Agenda).

57 DADRI LWS CIRCLE Increasing capacity of Jai Shree Drain from RD 42th M 484.05 100 % Completed BHIWANI 0 to13500 outfalling at RD 89000-R Loharu Feeder.

District Total 544.05 Charkhi Dadri

69 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

58 DADRI LWS CIRCLE Increasing Capacity of Bond Drain and Brick 50th S 250.00 100 % Completed BHIWANI Pitching on one sides from RD 12000 to 20435 Bond Drain outfall at RD 6000-R of Bond Disty.

59 DADRI LWS CIRCLE Laying Underground Pipe Line in Jai Shree 50th S 231.00 100 % Completed BHIWANI Link Drain from RD 0 to 8200 outfall at RD 12700-L of Jai Shree Drain. 60 DADRI LWS CIRCLE Increasing Capacity of Nimri Malkosh Link Drain 50th S 137.00 100 % Completed BHIWANI from RD 0 to 12244 outfall at RD 2350-R of Bond Drain. 61 DADRI LWS CIRCLE Procurement of New Earth moving machine for 50th S 25.60 100 % Completed BHIWANI Internal clearance of drain and bank strengthening of Canal and drains in LWS circle Bhiwani specially for District Ch. Dadri

62 DADRI LWS CIRCLE Agenda Note for Purchase of Vechicle for flood 50th S 17.85 100 % Completed BHIWANI Dewatering work. 63 DADRI LWS CIRCLE Agenda Note for Purchase of 10 Cs. V.T. 50th S 115.00 100 % Completed BHIWANI Pumps for flood Dewatering.

64 DADRI LWS CIRCLE Procurement of 4 No. 10 cs. Vertical pumps 50th S 72.50 100 % Completed BHIWANI alongwith motors of 50 HP, starters and 20 No. EP sets of 3 cs. Capacity (Ex-Post Facto approval) District Total 848.95 JHAJJAR 65 JHAJJAR JWS CIRCLE Agenda note for procurement of new earth 49th S 180.00 100 % Completed JHAJJAR moving machine for internal clearance of drains and bank strengthening of Canal and Drain.

66 BERI JWS CIRCLE Agenda note for constructing Pump House 49th S 62.50 100 % Completed JHAJJAR Beldar Hut and purchasing new Pumps Motors, Control Panel and allied accessories at RD 216- R of JLN Feeder. 67 BERI JWS CIRCLE Agenda note for Proposed pipe line to dewater 50th S 9.31 100 % Completed JHAJJAR pond of village Dujana from RD 0 to 2200 outfalling into Beri Dujana Dhaur link drain at RD 38025 68 JHAJJAR JWS CIRCLE Agenda note for Constructing RCC Pipe culvert 50th S 15.00 100 % Completed JHAJJAR at RD 290550-R of Ditch Drain R/side of JLN Feeder 69 JHAJJAR JWS CIRCLE Agenda note for providing Geo Membrane to 50th S 20.14 100 % Completed JHAJJAR control sloughing in Pump House link drain along with slope of ramp of VR Bridge RD 297000-R of JLN feeder.

70 JHAJJAR JWS CIRCLE Agenda note for dewatering of flood water by 50th S 8.74 100 % Completed JHAJJAR reversible bore wells in village Kondrawali (on sample basis). 71 BERI JWS CIRCLE Agenda note for Dewatering of flood water by 50th S 8.74 100 % Completed JHAJJAR reversible bore-wells of village Dighal.

72 JHAJJAR JWS CIRCLE Procurement of HDPE pipeline 200 mm dia and 50th S 32.00 100 % Completed JHAJJAR 160 mm dia in W.S Mech. Divn. Jhajhar (Ex- Post Facto approval). District Total 336.43 MAHENDRAGARH 73 NANGAL JLN WS CIRCLE Constructing of Waste weir/spillway at Totaheri 48th S 312.47 100 % Completed CHOUDHRY NARNAUL Bund on Krishnwati River.

70 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

74 NARNAUL JLN WS CIRCLE Agenda note for procurement of new earth 49th S 30.00 100 % Completed NARNAUL moving machine for internal clearance of drains and banks strengthening of canal and drain (Supplementary Agenda).

District Total 342.47 REWARI 75 REWARI JLN WS CIRCLE Agenda note for procurement of new earth 49th S 60.00 100 % Completed REWARI moving machine for internal clearance of drains and banks strengthening of canal and drain (supplementary Agenda)

District Total 60.00 ROHTAK 76 MEHAM YWS CIRCLE Constructing Bharan Sub Link Drain from RD 0 48th S 28.60 100 % Completed ROHTAK to 2150 outfall at RD 5800-L Ajaib Bharan Link Drain.

77 BERI YWS CIRCLE Construction of Link Drain from Kharhar to 48th S 174.74 100 % Completed ROHTAK village Mandothi side drain.

78 MEHAM YWS CIRCLE Constructing Pump House at RD 122000/R 48th S 16.00 100 % Completed ROHTAK Meham Drain.

79 MEHAM YWS CIRCLE Brick Pitching of Bahu Akbarpur Link Drain from 49th S 18.20 100 % Completed ROHTAK RD 3750 to 4850 and inlet of Link Drain at RD 29750. 80 KALANAUR YWS CIRCLE Laying underground PVC pipeline at village 50th S 38.00 100 % Completed ROHTAK pond Kateshra to Pilana Minor RD 10700-R (Supplementary Scheme) 81 KALANAUR YWS CIRCLE Procurement of PVC pipeline of 8 inch dia to 50th S 29.60 100 % Completed ROHTAK drain out flood water from the fields of village Gudhan and Katesra (Ex-Post Facto approval ).

82 MEHAM YWS CIRCLE Agenda note for constructing vertical wall on left 49th M 31.30 100 % Completed ROHTAK side in south Behlaba Drain From RD 1110 to 1810.

83 ROHTAK YWS CIRCLE Agenda note for Procurement of New V.T 49th M 99.00 100 % Completed ROHTAK Pumps for flood protection works in W.S. Mech. Division, Rohtak.

84 GOHANA YWS CIRCLE Agenda note for construction of Civil structure 49th M 104.00 100 % Completed ROHTAK (pump house) and procurement of New Pumps for flood protection works at Banwasa Pump House RD 46000-R Chhapra Drain village Banwasa in W.S. Mech. Division, Rohtak.

85 ROHTAK YWS CIRCLE Agenda note for procurement of New Pumps for 49th M 332.00 100 % Completed ROHTAK flood protection works at nine number of Newly constructed pump houses at RD 46000-L Meham Drain, RD 46000-R Meham Drain, RD 47900-L Meham Drain, RD 47900-R Meham Drain, 62000-L Meham Drain, RD 63000-R Meham Drain RD 86000-R Meham Drain, RD 94000-R B.S.B. and RD 43000 Kahanaur Disty. in W.S. Mech. Division, Rohtak.

71 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

86 ROHTAK YWS CIRCLE Agenda Note for Replacement of V.R. Bridge 50th M 19.00 100 % Completed ROHTAK at RD 31200 of Jassia Drain. 87 ROHTAK YWS CIRCLE Agenda note for providing and laying 50th M 32.14 100 % Completed ROHTAK interlocking tiles from RD 105260 to 107200 BSB and from RD 107200 BSB to Meham Drain Pump House RD 73000-Left Side on service road. District Total 922.58 SONIPAT 88 BARODA YWS CIRCLE Agenda note for constructing vertical walls 49th M 115.44 100 % Completed ROHTAK Chhapra drain from RD 46000 to 48500 both sides.

89 BARODA YWS CIRCLE Agenda note for reconstruction of V.R. Bridges 49th M 41.35 100 % Completed ROHTAK at RD 4670 and 7130 Wazirpur Khandrai link drain.

District Total 156.79 Unit Total 3211.27 PROJECT, ENVIRONMENT AND KARNALMATERIAL 90 KARNAL WORKSHOP Procuring 10 no. V.T. Pumps (5 cs. capacity 45th S 80.00 100 % Completed CIRCLE KARNAL each) for for dewatering. (43rd). (45th)

91 JIND WORKSHOP Replacement/Renovation of V.T Pumps 48th M 233.75 100 % Completed CIRCLE KARNAL

District Total 313.75 Unit Total 313.75 YWS(N) BHIWANI 92 YWS CIRCLE 20 No. TV-2 DP set 14 HP to 16 HP, 20 no. 48th S 107.00 100 % Completed BHIWANI Submersible Pump set 20 HP8 stage, 10 no. V.T Pump 5 Cs discharge with motor of column height 10` and 2 no. Bolero Camper (5 seater cabin).

District Total 107.00 JIND 93 SAFIDON YWS CIRCLE JIND Brick Pitching in side slope and Bed in Head 48th S 275.43 100 % Completed Reach RD 128000 to RD 129000 and U/S and D/s of railway x-ing from RD 118100 to RD 119100 and Berm Cutting from RD 116000 to RD 128000 including construction of cattle ghat at RD 128800 of Nai Nallah Drain/ Indri Drain

94 JULANA YWS CIRCLE JIND Increasing capacity of Lizwana Pauli Drain from 49th S 345.00 100 % Completed RD 0 to 10000 including extension from RD 24800 to 26800 outfalling at RD 42000/R Bhiwani Sub Branch (Through Lift System)

95 JULANA YWS CIRCLE JIND Agenda note for Padana Kalwa-Kinana Link 49th S 272.00 100 % Completed Drain from RD 0 to 14700 out falling at RD 81000/R Sunder Sub Branch(Through Lift System). 96 JULANA YWS CIRCLE JIND Bringing to design section of Nandgarh 49th S 45.31 100 % Completed Sirsakheri Drain from RD 0 to RD 9600 falling at RD 18750/R Quilazafargarh Minor.

72 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

97 SAFIDON YWS CIRCLE JIND Agenda for bringing to Design Section Hadwa 50th S 51.89 100 % Completed Gangoli Link Drain from RD 0 to RD 36600 including Re-Construction of One No. Bridge

98 SAFIDON YWS CIRCLE JIND Agenda for Construction of Permanent Pump 50th S 7.00 100 % Completed House (Sump Well Only) at RD 4500/L Bhirtana Link Drain

99 JULANA YWS CIRCLE JIND Agenda for increasing capacity of Kalwa Kinana 50th M 51.00 100 % Completed Drain RD 0 to RD 19000 from 125 cs to 150 cs lifting at RD 81000/R Sunder Sub Branch

100 JULANA YWS CIRCLE JIND Agenda for Providing Brick Pitching in reach RD 50th M 50.44 100 % Completed 43250 to RD 43850 Kalwa Kinana Drain lifting at RD 81000/R Sunder Sub Branch.

District Total 1098.07 KARNAL 101 NILOKHERI YWS CIRCLE Replacement of existing pipe culvert at RD 49th S 92.60 100 % Completed KARNAL 35830 and 52050 and desilting from RD 51150 to RD 53150 including replacement of outlet at outfall point on Balu Link Drain 102 ASSANDH YWS CIRCLE Replacement of VR Bridge at RD 78600 Indri 49th S 100.95 100 % Completed KARNAL Drain 103 ASSANDH YWS CIRCLE Replacement of VR Brdige at RD 39600 Indri 49th S 167.28 100 % Completed KARNAL Drain 104 ASSANDH YWS CIRCLE Remodeling of Nai Nallah Drain Near Village 49th S 37.01 100 % Completed KARNAL Padha by providing earthen banks with pitching towards Panch Dev Tirth for maintaining the Sancity of Panch Dev Tirth 105 ASSANDH YWS CIRCLE Construction of permanent pump house on 49th S 77.35 100 % Completed KARNAL Bhakra Main Line Hansi Butana Canal Near Karnal Assandh Road for disposal of Flood Water of Village Uplana, Thari, Chorkarsa, Daachar for the year of 2018-19. 106 ASSANDH YWS CIRCLE Replacement of V.R. Bridge at RD 11010 of 49th S 19.77 100 % Completed KARNAL Sheikhupura Manchuri Drain. 107 INDRI YWS CIRCLE Agenda for the work of providing protection to 50th S 160.59 100 % Completed KARNAL Kalsora Complex by repairing 8 No. old damaged stone stud and constructing 610’ stone revetment on river Yamuna after flood 2018 108 INDRI YWS CIRCLE Agenda for the work of providing protection to 50th S 19.86 100 % Completed KARNAL Nabiabad Complex by repairing 3 No. damaged stone studs on river Yamuna after flood 2018

109 GHARAUNDA YWS CIRCLE Agenda for the work of providing protection to 50th S 155.10 100 % Completed KARNAL Jammukhala Complex by constructing 465’ stone revetment, 1 No. new stone stud and repairing of 4 No. stone studs on river Yamuna after flood 2018

110 GHARAUNDA YWS CIRCLE Agenda for the work of providing protection to 50th S 291.41 100 % Completed KARNAL Mustfabad Complex by constructing 726’ stone revetment and repairing of 6 No. stone stud on river Yamuna after flood 2018

111 ASSANDH YWS CIRCLE Replacement of VR Bridge at RD 0 of Assandh 49th M 24.12 100 % Completed KARNAL Bund Drain.

112 NILOKHERI YWS CIRCLE Replacement Of Existing Pipe Culverts At RD 50th M 35.64 100 % Completed KARNAL 33530 and RD 45050 Of Balu Link Drain 73 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

District Total 1181.68 PANIPAT 113 ISRANA YWS CIRCLE Protection against errosion of agriculture land of 48th S 39.04 100 % Completed KARNAL Dadlana village from flood and waste water flowing in Munak Drain by providing lining from RD 27360 to 28950.

114 SAMALKHA YWS CIRCLE Protection of village pond, land and Abadi of 48th S 149.89 100 % Completed KARNAL village Balana and Mandi from flood and waste chemical water flowing in Try. Drain no.4 by providing lining in drain in concerened villages

115 ISRANA YWS CIRCLE Protection of village pond, land and Abadi of 48th S 145.61 100 % Completed KARNAL village Shodhapur from flood and waste water flowing in Nohra Drain by providing lining in village

116 PANIPAT YWS CIRCLE Replacement/construction of Bridges at RD 49th S 424.06 100 % Completed RURAL KARNAL 134800 and 72500 on Main drain No. 2 117 ISRANA YWS CIRCLE Replacement of Bridges at RD 18156 and 49th S 44.03 100 % Completed KARNAL 28270 on Thirana Drain

118 ISRANA YWS CIRCLE Replacement of Bridges at RD 25300, 42320 49th S 79.10 100 % Completed KARNAL and 52450 on Try. Drain No. 2. 119 ISRANA YWS CIRCLE Replacing of VR Bridge at RD 21650, 47133 49th S 92.06 100 % Completed KARNAL and 48200 on Joshi Drain 120 ISRANA YWS CIRCLE Protection of village pond, land and abadi of 49th S 176.96 100 % Completed KARNAL village Waiser from flood and waste contaminated water flowing in Try. Drain No. 1 by providing lining from RD 39700 to 36200 (Water sample be taken before and after execution of scheme). 121 SAMALKHA YWS CIRCLE Replacement/construction of Bridges at RD 49th S 118.64 100 % Completed KARNAL 3035, 8830 and 68280 on Panipat Drain 122 SAMALKHA YWS CIRCLE Providing protection to Tamsabad complex by 50th S 46.66 100 % Completed KARNAL repairing 2 No. stone studs and construction of 486’ long revetment. 123 SAMALKHA YWS CIRCLE Providing protection to Mirzapur complex by 50th S 49.97 100 % Completed KARNAL repairing 3 No. stone studs and repair of Revetment 124 SAMALKHA YWS CIRCLE Providing protection to Nanhera Complex by 50th S 37.24 100 % Completed KARNAL repairing 3 No. old stone studs 125 ISRANA YWS CIRCLE Separation of village pond from flood and waste 50th M 108.32 100 % Completed KARNAL chemical water flowing in Try. Drain No. 1 and protection to village abadi in village Bhandari

District Total 1511.58 YAMUNANAGAR 126 RADAUR HKB CIRCLE Rehabilitation of Rakshi Nallah from RD 0 to 49th S 187.00 100 % Completed JAGADHRI 90000 (Supplementary Agenda)

127 YAMUNA HKB CIRCLE Agenda for construction of 1855 ft. stone 50th S 195.00 100 % Completed NAGAR JAGADHRI steining and 06 no. stone studs for the protection of village Odri from river Yamuna.

128 SADHAURA HKB CIRCLE Agenda for providing 03 Nos. Bed Bars for 50th S 19.91 100 % Completed JAGADHRI protection of village Rajpur Bund from river Pathrala. 129 RADAUR HKB CIRCLE Agenda for Construction of 1730 ft. Stone 50th S 108.47 100 % Completed JAGADHRI steining for the protection of village Kamalpur from river Yamuna. 74 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

130 RADAUR HKB CIRCLE Agenda for Construction of 02 Nos. stone studs 50th S 60.77 100 % Completed JAGADHRI and 230 ft. Stone steining for the protection of village Ramgarh/Bagwali from river Yamuna.

131 RADAUR HKB CIRCLE Agenda for construction of 6 No. stone studs 50th S 181.00 100 % Completed JAGADHRI and 700 feet stone steining for protection of village Lal Chappar from river Yamuna.

132 SADHAURA HKB CIRCLE Agenda for restoration of Rampur Jattan Bund 50th S 8.54 100 % Completed JAGADHRI on river Pathrala.

133 JAGADHRI HKB CIRCLE Agenda for constructing 1500 ft. bund with 50th S 44.55 100 % Completed JAGADHRI stone pitching for the protection of Village Shazadwala From Chikken Khol (River Pathrala ). 134 JAGADHRI HKB CIRCLE Agenda for construction of stone steining 50th S 77.43 100 % Completed JAGADHRI between studs and renovation of 02 nos. old stone studs for the protection of Village Mali Majra From River Yamuna. 135 JAGADHRI HKB CIRCLE Agenda for construction of stone steining 50th S 85.43 100 % Completed JAGADHRI between studs and renovation of 02 nos. old stone studs for the protection of Village Nawazpur From River Yamuna. 136 JAGADHRI HKB CIRCLE Agenda for Renovation 3000` old Bund with 50th S 77.10 100 % Completed JAGADHRI stone pitching for the protection of Village Mukaravpur From Plasi Khol (River Pathrala).

137 RADAUR HKB CIRCLE Agenda for providing 140 mtr. stone steining 50th S 48.87 100 % Completed JAGADHRI between studs for the protection of village Abadi of Gumthala Rao from River Yamuna after floods 2018 in District : Yamuna Nagar.

138 RADAUR HKB CIRCLE Agenda for providing 260 mtr. stone steining for 50th S 89.67 100 % Completed JAGADHRI the protection of village : Sandhala and Nagli from River Yamuna after floods 2018 in District : Yamuna Nagar.

139 JAGADHRI HKB CIRCLE Agenda for Constructing 400 ft. Stone Steining 50th S 30.40 100 % Completed JAGADHRI and 01 No. new stone stud for the protection of Village Mamdubass from River Yamuna.

140 YAMUNA HKB CIRCLE Agenda for construction of sump well at RD 50th S 9.00 100 % Completed NAGAR JAGADHRI 39000 R/s MLL to Drain Out Flood Water from Agricultural land in Village Sugh, District Yamuna Nagar after flood 2018

141 RADAUR HKB CIRCLE Agenda for providing 400 Mtr. stone pitching for 50th S 30.00 100 % Completed JAGADHRI the protection of village Gadholi Khurd at RD 7525 Left side of Chautang Nallah.

142 JAGADHRI HKB CIRCLE Agenda for Renovation of 300` old Stone 50th S 9.72 100 % Completed JAGADHRI Steining along with construction of 250` stone steining for the protection of Village Baniyawala From Chikken Khol (River Pathrala).

143 SADHAURA HKB CIRCLE Agenda for providing 328 feet Stone steining for 50th S 7.83 100 % Completed JAGADHRI protection of village abadi of village Nagli from river Pathrala. 144 JAGADHRI HKB CIRCLE Construction for 03 no. studs for the protection 50th S 59.02 100 % Completed JAGADHRI of village Kalesar from River Yamuna.

75 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

145 JAGADHRI HKB CIRCLE Construction of 250 feet steining and 02 no. 50th S 50.00 100 % Completed JAGADHRI stone studs for the protection of village Baburam Bass from River Yamuna. 146 RADAUR HKB CIRCLE Providing gates and gearing for X-regulation on 49th M 37.00 100 % Completed JAGADHRI Bubka Head on Chauntg and Rakshi Nallah.

District Total 1416.71 Unit Total 5315.04 YWS(S) FARIDABAD 147 TIGAON YWS CIRCLE Repairing of 7 Nos. stone studs to protect 50th S 85.75 100 % Completed FARIDABAD village abadi and agricultural land of village Dadasia/Kidawali River Complex A.F. 2018. 148 PRITHLA YWS CIRCLE 460 ft. edge protection to protect village abadi 50th S 31.01 100 % Completed FARIDABAD and agriculture land of village Mohna R/C after flood 2018 149 TIGAON YWS CIRCLE 6 no. Stone Studs to protect village Abadi and 50th S 137.41 100 % Completed FARIDABAD it`s agricultural land of village chandpur R/C A.F. 2018 District Total 254.17 MEWAT 150 PUNHANA YWS CIRCLE Construction of X-regulator in Ujina Diversion 47th S 600.00 100 % Completed FARIDABAD Drain near village Bichore (With 4 Nos. pump houses).

151 HATHIN YWS CIRCLE Extension to drain out the flood and seepage 49th S 4.65 100 % Completed FARIDABAD water of Gurgaon Canal accumulated in laying area of village Hasanpur, Kanali and Kherli- Jeeta outfalling at RD 1300 of Existing Flood Drain.

152 NUH YWS CIRCLE Scheme for construction kaccha cunneete to 49th S 2.80 100 % Completed FARIDABAD save agriculture land of vill. Devela Nangli from water logging and outfall in Rithat Drain at RD. 6000 153 NUH YWS CIRCLE Scheme for Tajpur (Ujina) earthen cunnittee 49th S 6.38 100 % Completed FARIDABAD from RD. 0 to 11200 to save agriculture land from water logging. 154 NUH YWS CIRCLE Scheme for Dhenkli village earthen cunnette 49th S 12.64 100 % Completed FARIDABAD from RD. 0 to 7250 to save agriculture land from water logging. 155 NUH YWS CIRCLE Scheme for Ujina village Pipe lines from RD.0 49th S 7.55 100 % Completed FARIDABAD to 2905 to save agriculture land from water logging. District Total 634.02 PALWAL 156 HODAL YWS CIRCLE CONSTRUCTION OF V.R. BRIDGE AT RD 49th S 177.51 100 % Completed FARIDABAD 105785 OF GAUNCHI MAIN DRAIN (FROM VILLAGE KONDAL TO GHELAB). 157 HATHIN YWS CIRCLE Replacement of V.R. Bridge at RD 82500 of 49th S 174.96 100 % Completed FARIDABAD GMD (Village Sevali to Khatela Sarai). The drawing for this bridge under preparation with CDO, Panchkula. 158 HODAL YWS CIRCLE Internal Clearance of GMD from RD 43300 to 49th S 390.91 100 % Completed FARIDABAD 229500 estimate is under observations 159 HODAL YWS CIRCLE Constructing Pucca Hump at KM 7.50 of UDD 49th S 155.23 100 % Completed FARIDABAD for providing Irrigation facilities in adjoining area of village Khirbi and recharging thereof ground water. The drawing received for comments and re-submitted to CDO for finalization.

76 Annexure 5.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Completed,

Sr. Name of Name of Irrigation Name of Work Appvd. (S/M/L) Est. Cost Phy. Status No Constituency Circle in Prog. meeting of HSFCB

160 PALWAL YWS CIRCLE Scheme for construction of 49th S 12.97 100 % Completed FARIDABAD Stone pitching to protect village abadi and Sidh Baba Temple of village Kushak on right side of village Kushak on right side of River Yamuna after flood 2018. District Total 911.58 PANIPAT 161 SAMALKHA YWS CIRCLE Agenda for construction of Bridge at RD 157330 49th M 503.00 100 % Completed SONEPAT of main Drain No. 2 District Total 503.00 SONIPAT 162 SONEPAT YWS CIRCLE Internal clearance of East Juan Drain from RD 0 49th S 141.00 100 % Completed SONEPAT to 89500 and providing pitching on sides from RD 49000 to 52000.

163 SONEPAT YWS CIRCLE Providing protection at Tikola Complex by 50th S 98.45 100 % Completed SONEPAT constructing 01 No. new stone stud and 1055 feet revetment on river Yamuna A/F 2018 (Supplementary Scheme) 164 GOHANA YWS CIRCLE To make pucca drain in village Bhatgaon 50th S 16.00 100 % Completed SONEPAT Dongran from Purbia Dera to Bhatgaon Malyan i.e. providing brick lining on side slope of Bhatgaon Dongran link Drain from RD 3500 to 5000 (CM Announcement code No. 23606) (Supplementary Scheme).

District Total 255.45 Unit Total 2558.22 Grand Total 14169.82

77 Annexure 5.2 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Dropped, Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Remarks Status No Constituenc Irrigation in booked Prog. y Circle meeting during year of HSFCB

BWS HISAR 1 NARNAUND BWS Rehabilitation of 50th S 121.00 0.00 100 % No work was done as per site Dropped CIRCLE Narnaund Drain requirement and the scheme is HISAR (RD 0 to 19689). required to be dropped.

2 BARWALA BWS Laying RCC pipe 49th M 96.26 0.00 0 % The scheme already dropped Dropped CIRCLE line for Kharkari as per discussed with ACS, HISAR Drain from RD 0 to Irrigation and WR Deptt. 5800 out-falling at RD 18900-R, Balsamand Branch.

District Total 217.26 0.00 KURUKSHETRA 3 PEHOWA SYL Scheme for 50th S 10.00 0.00 0 % Case has already been Dropped CIRCLE procurement of submitted to higher Authority AMBALA PVC pipeline for for dropping this scheme vide flood in District this office letter no. 7004-05/21- Kurukshetra W dated 18/10/2019

4 THANESAR SYL Replacement of 50th S 1.92 0.00 0 % Case has been submitted to Dropped CIRCLE one No. Diesel higher Authority for dropping AMBALA Welding Set 550 A this scheme vide this office (Moveable) letter no. 7004-05/21-W dated 18/10/2019

5 PEHOWA SYL Scheme for 50th M 125.00 0.00 0 % Technical bid submitted to Dropped CIRCLE remodeling of Competent authority and AMBALA Sandholi Drain Worthy CE/BWS, IandWR from RD 12000 to Department Panchkula issued RD 18000 to the direction that X-section of safeguard the the drain cannot reduced and abadi as well as this scheme will be dropped out agricultural area of in the next meeting of HSDR village Sandholi, and FCB received vide SE/SYL Sandhola, W/S Circle Ambala vide letter Asmanpur, no. 5523/81-A dated Pehowa etc. 14.05.2019 and case for dropping this scheme sent to the higher office vide this office letter no. 147 dated 03.06.2019.

78 Annexure 5.2 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Dropped, Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Remarks Status No Constituenc Irrigation in booked Prog. y Circle meeting during year of HSFCB

6 PEHOWA SYL Scheme for 50th L 523.37 0.00 0 % Agenda approved in meeting Dropped CIRCLE extension of for extension of Katcha Drain. AMBALA Ismailabad Link For execution of Katcha drain Drain (Katcha about 5.05 Acres land is to be Drain with land acquired. The report of acquisition) from demarcation of land received RD 17230 to RD from concerned Tehsildar but 27230 parallel to undersigned is not satisfied. Thaska Distributary Again demarcation was done from RD 36000 to on dated 03.06.2018 the report RD 26000. of Tehsildar has been received on dated 11/06/2019. The hearing was fixed on dated 23/10/2019 but no irrigator attend the hearing. Now next date of hearing is fixed on dated 04/11/2019.

District Total 660.29 0.00 Unit Total 877.55 0.00 LCU ROHTAK 7 BAHADURG YWS C.C. Concrete 48th S 116.86 22.00 20 % The scheme has been dropped. Dropped ARH CIRCLE lining in Abadi area ROHTAK of village Asaudha of West Jua drain from RD 29500 to 34500 8 BAHADURG YWS Flood agenda for 49th M 102.02 0.00 0 % Revised drawing Dropped ARH CIRCLE re-construction of approved.Extra quantity ROHTAK V.R. Bridge at RD submitted to CE/LCU vide this 31390 of West Jua office letter no. 1456/36-W Drain dated 15.10.2019. Revised flood agenda will be submitted in the next meeting of HSFCB.

District Total 218.88 22.00 Unit Total 218.88 22.00 YWS(N) JIND

79 Annexure 5.2 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: Dropped, Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Remarks Status No Constituenc Irrigation in booked Prog. y Circle meeting during year of HSFCB

9 JULANA YWS Providing 50th S 90.00 0.00 0 % As per site conditions, the Dropped CIRCLE Reinforced cement scheme has not been found JIND concrete truff in feasible and as per requirement Nizampur Bharon at site. Khara Ramkali drain from RD 0 TO RD 47100 out falling at RD 8650- L pf Padhana drain in sloughing reach RD 4000 TO rd 15000,including replacing of pipes culverts in slab culverts from RD 2800 to 4000( Balance work of scheme already approved in 47th meeting of HSDR and FCB.)

District Total 90.00 0.00 KARNAL 10 NILOKHERI YWS Agenda for 50th S 2.65 0.00 5 % Work held up due to dispute Dropped CIRCLE restoring left bank and the proposal to drop short KARNAL of Sambhli Link term scheme has been Drain from RD 0 to submitted to Deputy RD 6560 Commissioner, Karnal by XEN/KNL vide his office letter No.7366 -68/61-R Dt.02.07.2019

District Total 2.65 0.00 Unit Total 92.65 0.00 YWS(S) PALWAL 11 HATHIN YWS Utilization of Flood 49th S 193.91 0.00 0 % Dropped as the scheme Dropped CIRCLE Water by already exists. FARIDAB constructing Hump AD and Pump House on Gaunchi Main Drain at RD 97500 to Augment the Hathin Disty. To feed tail reach villages (Supplementary Agenda).

District Total 193.91 0.00 Unit Total 193.91 0.00 Grand Total 1382.99 22.00

80 Annexure 5.3 Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting of HSDR & FCB

Head:Flood Protection Works (Rs in lacs) Status: In Progress,Yet To Start,

Sr. Name of District Name of Circle No. of Schemes Estimated Expenditure Requirement of Funds In Prog. Yet to Start Completed Dropped No Cost Incurred

S M L Total Total 2020-21 2021-22 2022-23 S M L Total S M L Total S M L Total BWS 1 AMBALA SYL CIRCLE AMBALA 4 5 6 15 8096.16 1483.26 6612.92 3182.01 2311.49 1119.42 4 3 0 7 0 2 6 8 0 0 0 0 0 2 FATEHABAD BWS CIRCLE FATEHABAD 0 2 1 3 502.11 18.30 483.82 177.91 173.91 132.00 0 1 0 1 0 1 1 2 0 0 0 0 0 3 HISAR BWS CIRCLE HISAR 2 1 0 3 330.94 0.00 330.95 232.85 98.10 0.00 2 1 0 3 0 0 0 0 0 0 0 0 0 4 KAITHAL BWS CIRCLE KAITHAL 0 1 0 1 84.19 64.93 19.26 9.63 9.63 0.00 0 1 0 1 0 0 0 0 0 0 0 0 0 5 PANCHKULA SYL CIRCLE AMBALA 0 2 0 2 731.43 335.03 396.41 198.21 198.20 0.00 0 2 0 2 0 0 0 0 0 0 0 0 0

Total 6 11 7 24 9744.83 1901.52 7843.35 3800.61 2791.32 1251.42 6 8 0 14 0 3 7 10 0 0 0 0 0

CONSTRUCTION

6 JHAJJAR CONSTRUCTION CIRCLE 1 0 0 1 109.81 15.00 94.81 94.81 0.00 0.00 1 0 0 1 0 0 0 0 0 0 0 0 0 GURGAON 7 KAITHAL SARASWATI HERITAGE 1 0 0 1 36.21 0.00 36.21 36.21 0.00 0.00 1 0 0 1 0 0 0 0 0 0 0 0 0 CIRCLE 8 ROHTAK YWS CIRCLE ROHTAK 0 2 0 2 349.26 114.85 234.42 117.21 117.21 0.00 0 2 0 2 0 0 0 0 0 0 0 0 0

Total 2 2 0 4 495.28 129.85 365.44 248.23 117.21 0.00 2 2 0 4 0 0 0 0 0 0 0 0 0

LCU

9 BHIWANI LWS CIRCLE BHIWANI 0 1 0 1 277.00 89.05 187.96 93.98 93.98 0.00 0 1 0 1 0 0 0 0 0 0 0 0 0 10 Charkhi Dadri LWS CIRCLE BHIWANI 1 0 0 1 147.00 0.00 147.00 147.00 0.00 0.00 1 0 0 1 0 0 0 0 0 0 0 0 0 11 JHAJJAR JWS CIRCLE JHAJJAR 2 8 1 11 1720.01 119.59 1600.44 889.48 560.90 150.06 2 6 1 9 0 2 0 2 0 0 0 0 0 12 MAHENDRAGAR JLN WS CIRCLE H NARNAUL 0 1 0 1 88.65 11.24 77.42 38.71 38.71 0.00 0 1 0 1 0 0 0 0 0 0 0 0 0 13 ROHTAK YWS CIRCLE ROHTAK 0 9 5 14 2036.43 51.63 1984.81 754.88 740.03 489.90 0 5 1 6 0 4 4 8 0 0 0 0 0 14 SONIPAT YWS CIRCLE ROHTAK 0 4 1 5 661.59 0.00 661.60 285.52 282.69 93.39 0 0 0 0 0 4 1 5 0 0 0 0 0

Total 3 23 7 33 4930.68 271.51 4659.22 2209.57 1716.29 733.36 3 13 2 18 0 10 5 15 0 0 0 0 0

PROJECT, ENVIRONMENT AND MATERIAL 15 KARNAL WORKSHOP CIRCLE KARNAL 0 3 0 3 274.77 0.00 274.78 137.39 137.39 0.00 0 3 0 3 0 0 0 0 0 0 0 0 0

Total 0 3 0 3 274.77 0.00 274.78 137.39 137.39 0.00 0 3 0 3 0 0 0 0 0 0 0 0 0

YWS(N)

16 BHIWANI YWS CIRCLE BHIWANI 2 2 2 6 960.51 304.74 655.77 310.91 237.66 107.20 2 2 0 4 0 0 2 2 0 0 0 0 0 17 JIND YWS CIRCLE JIND 1 7 0 8 1640.99 657.58 983.42 535.92 447.50 0.00 1 7 0 8 0 0 0 0 0 0 0 0 0 18 KARNAL YWS CIRCLE KARNAL 0 0 1 1 969.74 3.38 966.36 328.56 318.90 318.90 0 0 1 1 0 0 0 0 0 0 0 0 0 19 PANIPAT YWS CIRCLE KARNAL 2 5 0 7 543.24 37.49 505.77 290.57 215.20 0.00 2 5 0 7 0 0 0 0 0 0 0 0 0 20 YAMUNANAGAR HKB CIRCLE JAGADHRI 1 1 0 2 1850.00 622.00 1228.00 1203.00 25.00 0.00 1 1 0 2 0 0 0 0 0 0 0 0 0

Total 6 15 3 24 5964.48 1625.19 4339.32 2668.96 1244.26 426.10 6 15 1 22 0 0 2 2 0 0 0 0 0

YWS(S)

21 FARIDABAD YWS CIRCLE FARIDABAD 0 3 0 3 1349.52 803.27 546.26 273.13 273.13 0.00 0 3 0 3 0 0 0 0 0 0 0 0 0 22 MEWAT YWS CIRCLE FARIDABAD 3 4 0 7 1299.92 275.69 1024.23 597.53 426.70 0.00 3 4 0 7 0 0 0 0 0 0 0 0 0 23 PALWAL YWS CIRCLE FARIDABAD 1 2 0 3 1823.47 513.99 1309.48 1017.21 292.27 0.00 1 2 0 3 0 0 0 0 0 0 0 0 0

Total 4 9 0 13 4472.91 1592.95 2879.97 1887.87 992.10 0.00 4 9 0 13 0 0 0 0 0 0 0 0 0

Grand Total 21 63 17 101 25882.95 5521.02 20362.06 10952.63 6998.55 2410.88 21 50 3 74 0 13 14 27 0 0 0 0 0

81 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 BWS AMBALA 1 AMBALA SYL Construction of 48th S 524.90 201.17 50 % 323.73 323.73 0.00 0.00 work in IP CANTT. CIRCLE main nallah from progress. AMBALA railway line near Initially village Nanhera work be upto nh-1 near executed by Shamshan gath in MC ward no. 16 Ambala. ambala cantt (MC MC Ambala Ambala). transferred the work to irrigation Deptt.

2 AMBALA SYL Constructing RCC 48th S 550.00 444.42 95 % 105.58 105.58 0.00 0.00 Work in IP CANTT. CIRCLE open Trough from progress. AMBALA RD 36000 to 30000 (Sub reach of Mahesh Nagar drain)

3 AMBALA SYL Scheme for 49th S 415.00 51.45 15 % 363.55 363.55 0.00 0.00 Work delay IP CANTT. CIRCLE constructing open due to Land AMBALA trough from RD record not 30000 to Gate at available in RD 26000 of LAO office Mahesh Nagar as well as drain in division office. Preparation of duplicate is in process. Work in progress.

4 AMBALA SYL Construction of 50th S 60.00 16.28 90 % 43.72 43.72 0.00 0.00 Work held IP CITY CIRCLE Inlet at KM 11.956 up due to AMBALA on Left Bank of water SYL Canal remaining in canal and the same will be completed after withdrawal of same.

5 AMBALA SYL Constructing 48th M 1850.00 513.02 40 % 1336.98 668.49 668.49 0.00 Due to IP CANTT. CIRCLE Machonda Drain by change in AMBALA laying NP3 hume alignment pipeline below and scope Machonda,Bara,Ko of work t Kachhuwa Road.

82 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 6 AMBALA SYL Purchase of land 50th M 75.00 0.00 0 % 75.00 37.50 37.50 0.00 Land YTS CANTT. CIRCLE for cunnettee D/S acquisition AMBALA of Mahesh Nagar involved. drain in a length of Alignment 1000 feet from RD is under 2132 to 3132 process

7 AMBALA SYL Constructing RCC 50th M 77.08 0.03 20 % 77.06 38.53 38.53 0.00 work in IP CITY CIRCLE open trough on progress AMBALA Singhawala drain from RD 6650 to 5750 8 AMBALA SYL Constructing RCC 50th M 592.00 1.44 0 % 590.56 295.28 295.28 0.00 Cost YTS CANTT. CIRCLE Open trough from revised as AMBALA RD 0 to 4000 of per Mahesh Nagar approved drain drawings and design and revised of HSR item of Mix design

9 AMBALA SYL Construction of 50th M 560.00 255.45 45 % 304.56 152.28 152.28 0.00 Flood IP CITY CIRCLE RCC Open Trough protection AMBALA from RD 19500 to 22500 on Ambala Drain, with extension RD 2300 to 1300. 10 AMBALA SYL Constructing 48th L 2224.00 0.00 0 % 2224.00 756.16 733.92 733.92 Land YTS CITY CIRCLE Singha Wala- acquisition AMBALA Sullar link Drain involved. from RD 0 to 29000 Alignment off take from approved. Singhawala drain land Detail at RD 0 and Outfall has been in Sullar Drain at uploaded RD 20100 on the e- bhumi portal

11 AMBALA SYL Constructing 47th L 108.23 0.00 0 % 108.24 36.80 35.72 35.72 ALIGNMEN YTS CITY CIRCLE Bhanokheri Ganda T AMBALA Nalla link Drain APPROVE from RD 0 to 3111 D ON out falling in Ganda 28.03.2016 Nalla at RD 31650 LAND DETAIL OF 1.18 ACRE UPLOADE D ON E- BHOOMI PORTAL AS PER NEW LAND PURCHAS E POLICY.

83 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 12 MULLANA SYL Scheme for 49th L 271.90 0.00 0 % 271.91 92.45 89.73 89.73 Land YTS CIRCLE constructing New purchase AMBALA Gola Goli Bund involved. from RD 0 to 4200 on U/S Side of existing bund for the protection of village Gola Goli on river Begna (If farmers provide land on collector Rate)

13 NARAING SYL Scheme for 49th L 69.61 0.00 0 % 69.61 23.67 22.97 22.97 Land YTS ARH CIRCLE constructing new purchase AMBALA Banaundi bund involved. from RD 0 to 1000 on upstream side of existing bund for the protection of village Banaoundi on river begna (If farmers provide land on collectors rate)

14 MULLANA SYL Constructing Tejan 50th L 273.44 0.00 0 % 273.45 92.97 90.24 90.24 Land YTS CIRCLE Drain from RD 0- acquisition AMBALA 8250 outfalling in involved. Ganda Nallah at Alignment RD 17150. (C.M. approved. Announcement No. land Detail 22934 dt 15-08- has been 2018) uploaded on the e- bhumi portal

15 AMBALA SYL Restoration of 50th L 445.00 0.00 0 % 445.00 151.30 146.85 146.85 estimate YTS CITY CIRCLE design approved. AMBALA section/pitching in Tender to village abadi area be open on and remodelling of 18/12/2019. 8 no. bridges of Ganda Nallah for the protection of village abadi and agriculture land of villages Kanwla, Jalbera, Lakhnour Sahib, Bara, Adhomajra, Ugara, Sakroan, Naggal and Segti etc.

District Total 8096.16 1483.26 6612.95 3182.01 2311.49 1119.42 FATEHABAD

84 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 16 TOHANA BWS Construction of 10 49th M 30.32 18.30 90 % 12.02 6.01 6.01 0.00 In Progress IP CIRCLE Nos bore-wells for FATEHAB recharging of flood AD water From the fields of village Sidhani. (May be done on experimental basis after studying Mansa/Sangrur models)

17 RATIA BWS Agenda Note for 50th M 71.79 0.00 0 % 71.80 35.90 35.90 0.00 The Design YTS CIRCLE remodelling / re- data FATEHAB construction of submitted AD bridge at RD 5640 to C.D.O for Barreta Drain on preparing Pucca road from the drawing village Nangal to Nangal Dhani Tehsil Ratia District Fatehabad

18 TOHANA BWS Construction of V.R 49th L 400.00 0.00 0 % 400.00 136.00 132.00 132.00 Design / YTS CIRCLE Bridge at RD 1.15 Drawing FATEHAB Km Rangoi Nallah approved AD and estimate under preparation

District Total 502.11 18.30 483.82 177.91 173.91 132.00 HISAR 19 HANSI BWS Procuring one No. 50th S 60.00 0.00 0 % 60.00 60.00 0.00 0.00 DSandD IP CIRCLE Poclaine 230 has opened HISAR Excavator. the tender andfinalisati on of purchase will be done after Model code of conduct.

20 HANSI BWS Procurement of 50th S 74.75 0.00 0 % 74.75 74.75 0.00 0.00 Bid opened IP CIRCLE HDPE 200 mm dia on GEM on HISAR pipe. dated 16/9/2019 and case is under process for approval of rates.

85 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 21 BARWALA BWS Agenda Note for 49th M 196.19 0.00 25 % 196.20 98.10 98.10 0.00 25% work IP CIRCLE pipe Drain No. 1 done and HISAR from RD 0 to RD work will be 9000 and completed Drain No. 2 From upto RD 0 to RD 2000 31.07.2019. for Village Ladwa out falling at RD 170200-L of New Siwani Feeder and RD 8114-L of O. P. Jindal Nalwa Disty respectively.

District Total 330.94 0.00 330.95 232.85 98.10 0.00 KAITHAL 22 KALAYAT BWS Scheme for laying 50th M 84.19 64.93 95 % 19.26 9.63 9.63 0.00 IP CIRCLE RCC NP3 pipe line KAITHAL along Batta Mr. from RD 33800 to 37500 to drain out the flood water of village Kharak Pandwa into Pundri Drain No. II at RD. 24410-L

District Total 84.19 64.93 19.26 9.63 9.63 0.00 PANCHKULA 23 PANCHKU SYL Constructon of box 47th M 609.32 279.13 55 % 330.20 165.10 165.10 0.00 Tender IP LA CIRCLE RCC drain for safe called AMBALA passage of flood/waste water from Barwala and Bataur (Panchkula) into River Tangri.

24 PANCHKU SYL Scheme for 50th M 122.11 55.90 95 % 66.22 33.11 33.11 0.00 IP LA CIRCLE Construction of AMBALA Causeway and steining in village Aasrewali at Aasrewali nadi tributary of river Ghaggar in

District Total 731.43 335.03 396.42 198.21 198.20 0.00 Unit Total 9744.83 1901.52 7843.40 3800.61 2791.32 1251.42 CONSTRUCTION JHAJJAR

86 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 25 BAHADUR CONSTR Constructing Ditch 49th S 109.81 15.00 80 % 94.81 94.81 0.00 0.00 As per the IP GARH UCTION Drain from KM site CIRCLE 31.915 to 46.185 condition GURGAO along NCR E/W is N Channel (Approved completed with condition that 100% and the water drained out of three would be utilized structure 02 for Irrigation) is completed and other 01 structure will be completed after NOC received from PWD BandR Deptt., diversion has also been constructed on this bridge and work will be completed upto 31.01.2020

District Total 109.81 15.00 94.81 94.81 0.00 0.00 KAITHAL 26 KAITHAL SARASW Scheme for 50th S 36.21 0.00 50 % 36.21 36.21 0.00 0.00 Work in IP ATI remodeling of flood Progress HERITAG inlets and repair of E CIRCLE adjoining lining at KURUKS RD 197400/L and HETRA RD233500/L of Bhakhra Main Line- Hansi Branch- Butana Branch- Multi Purpose Link channel

District Total 36.21 0.00 36.21 36.21 0.00 0.00 ROHTAK 27 ROHTAK YWS Agenda Note for 50th M 174.63 0.00 20 % 174.64 87.32 87.32 0.00 Work in IP CIRCLE reconstruction of progress. ROHTAK V.R. Bridge at RD 68000 Drain No. 8 28 ROHTAK YWS Agenda Note for 50th M 174.63 114.85 70 % 59.78 29.89 29.89 0.00 Work in IP CIRCLE reconstruction of prograss. ROHTAK V.R. Bridge at RD 94500 Drain No. 8 District Total 349.26 114.85 234.42 117.21 117.21 0.00 Unit Total 495.28 129.85 365.44 248.23 117.21 0.00 LCU BHIWANI

87 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 29 KALANAU LWS agenda note for 50th M 277.00 89.05 30 % 187.96 93.98 93.98 0.00 work in IP R CIRCLE laying underground progress BHIWANI pipeline in Gudhan and 30% link drain from RD completed 0 TO 9900 outfall at RD 129000-L OF Bond Disty.

District Total 277.00 89.05 187.96 93.98 93.98 0.00 Charkhi Dadri 30 DADRI LWS Agenda Note for 50th S 147.00 0.00 0 % 147.00 147.00 0.00 0.00 Finalisation IP CIRCLE purchase of EP will be done BHIWANI and DP sets for by DSandD flood Dewatering. in coming HPPC meeting.

District Total 147.00 0.00 147.00 147.00 0.00 0.00 JHAJJAR 31 JHAJJAR JWS Agenda note for 49th S 92.00 0.00 70 % 92.00 92.00 0.00 0.00 Work in IP CIRCLE constructing Pump progress. JHAJJAR House Beldar Hut rehabilitation of civil structures and fixing of steel grantings at 11 Nos. of flood pump houses .

32 JHAJJAR JWS Agenda note for 49th S 283.70 51.69 25 % 232.01 232.01 0.00 0.00 Work in IP CIRCLE providing Brick progress. JHAJJAR Lining on both banks of JLN Escape Channel KM 0.100 to KM 2.000 33 BERI JWS Agenda note for 49th M 67.00 0.00 25 % 67.00 33.50 33.50 0.00 Work in IP CIRCLE constructing Pump Progress. JHAJJAR House Beldar Hut and purchasing new Pumps Motors, Control Panel and allied accessories at RD 243-R of JLN Feeder.

34 BADLI JWS Agenda note for 50th M 169.17 19.50 15 % 149.68 74.84 74.84 0.00 Work in IP CIRCLE constructing Progress. JHAJJAR Dhakla Link Drain through (underground RCC Pipe Line) from RD 0 to 10000 outfalling into SLC at RD 20910-L (By lift)

88 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 35 BERI JWS Agenda note for 50th M 291.36 0.00 0 % 291.36 145.68 145.68 0.00 Alignment YTS CIRCLE constructing Majra- not finalised JHAJJAR Siwana-Dubaldhan due to Link Drain through objection of (underground RCC villagers Pipe Line) from RD 0 to 15000 outfalling into Loharu Feeder at RD 32935-R With interlinking of Village Ponds.

36 BADLI JWS Agenda note for 50th M 137.17 0.00 10 % 137.18 68.59 68.59 0.00 Work in IP CIRCLE constructing progress. JHAJJAR R/Bank of outfall Drain No. 8 (critical reaches) in Km. 2.258 to 6.800, Km. 11.00 to 18.500 and Km. 19.500 to 25.00

37 BERI JWS Agenda note for 50th M 27.35 0.00 25 % 27.36 13.68 13.68 0.00 Work in IP CIRCLE constructing progress. JHAJJAR Dubaldhan Link Drain (Through underground RCC Pipe Line) from RD 0 to 5000 outfalling inot Loharu Feeder at RD 19648-L.

38 BERI JWS Agenda note for 50th M 119.48 32.00 25 % 87.48 43.74 43.74 0.00 Work in IP CIRCLE constructing Beri- Progress. JHAJJAR Bishan Pipe Link Drain from RD 0 to 9500 outfalling into Drain No. 8 at RD 210000-L 39 JHAJJAR JWS Agenda for repair 50th M 17.07 0.00 0 % 17.08 8.54 8.54 0.00 Estimate YTS CIRCLE and rehabilitation of stands JHAJJAR existing Pumps, sanctioned. Motors, Control Tender will Panels and allied be called accessories and shortly. Transformer at Rewari Road Pump House in W.S. Mech. Division, Jhajjar for the year 2018-19.

40 BADLI JWS Agenda note for 50th M 60.97 16.40 30 % 44.58 22.29 22.29 0.00 Work in IP CIRCLE constructing of Progress. JHAJJAR Khudan Drain from RD o to 4000 outfalling at RD 17000-R Zahidpur Minor (By lift)

89 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 41 BADLI JWS Constructing 48th L 454.74 0.00 10 % 454.73 154.61 150.06 150.06 Work in IP CIRCLE underground Progress. JHAJJAR pressurized Subana Link Drain from KM 0 to 7.210 out falling at KM 2.300-R of outfall drain no. 8.

District Total 1720.01 119.59 1600.46 889.48 560.90 150.06 MAHENDRAGARH 42 NARNAUL JLN WS Agenda note 49th M 88.65 11.24 50 % 77.42 38.71 38.71 0.00 1. Case for IP CIRCLE construction D.R permission NARNAU Bridge at K.M to construct L 2.238 and 2.410 DR Bridge Guide Bund cum at km 2.410 Drain. stands submitted to NHAI Authority, Bhiwani. 2. Work of DR Bridge at km 2.238 is 100% completed

District Total 88.65 11.24 77.42 38.71 38.71 0.00 ROHTAK 43 ISRANA YWS Reconstruction of 48th M 132.00 51.28 85 % 80.72 40.36 40.36 0.00 Work in IP CIRCLE V.R. Bridge at RD progress ROHTAK 40200 Nai Nallah drain.

44 ROHTAK YWS Agenda note for 49th M 33.00 0.00 0 % 33.00 16.50 16.50 0.00 The IP CIRCLE Procurement of material will ROHTAK New Pump Sets for be procured flood protection by works in W.S. SE/Worksh Mech. Division, op, Circle, Rohtak. karnal. Indent placed by XEN, Mech. Rohtak to XEN, Proc., Panchkula.

90 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 45 ROHTAK YWS Agenda Note for 50th M 64.00 0.00 50 % 64.00 32.00 32.00 0.00 Mahindra IP CIRCLE Purchasing 1 No. Maxi Truck ROHTAK Excavator Loader has been and 1 No. received at Mahindra maxi site and Truck for Rohtak indent for 1 WS Dvn Rohtak. No. Excavator chain type replace long boom with stander boom length has been placed by DGSandD Haryana on dated 20.05.2019.

46 ROHTAK YWS Agenda Note for 50th M 40.00 0.35 0 % 39.66 19.83 19.83 0.00 Tender rate YTS CIRCLE Renovation of VR approved ROHTAK Bridge at RD letter of 112300 at Lakhan acceptance Majra Link Drain. issued to agency. Work will be started after recepit of direction from NGT.

47 GOHANA YWS Agenda Note for 50th M 18.94 0.00 50 % 18.94 9.47 9.47 0.00 50% work IP CIRCLE Restoring the bank has been ROHTAK of Tributary Drain completed No.4 from RD in village 51500 to 53000 Kasandi around village and Kasanda and RD remaining 53600 to 54200 work will be and 57000 to completed 57500 along shortly. Village Kasandi.( CM Announcement Code 23605 dated 17.09.2018 and 23940 dated 12.10.2018)

91 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 48 GOHANA YWS Agenda Note for 50th M 73.29 0.00 0 % 73.30 36.65 36.65 0.00 Indent YTS CIRCLE Purchase and placed to ROHTAK supply of special T procuremen and P Machine i.e. t division 1 No. JCB vide JS205LR with XEN/Gohan Excavator a No. 210/6- (Pocklain) for use M dated in Gohana WS 11.03.2019. division, Gohana. The case is with DSandD and tender were called only single agency come the mater of retendering in process with DSandD Chandigarh .

49 ROHTAK YWS Agenda Note for 50th M 76.00 0.00 0 % 76.00 38.00 38.00 0.00 Quantity YTS CIRCLE Procurement of submitted ROHTAK New Electric to CE/LCU Pannels for Flood vide this Protection Works in office letter WS Mech Division, no. Rohtak 643/180/6 W dated 18.03.2019.

50 ROHTAK YWS Agenda Note for 50th M 50.00 0.00 0 % 50.00 25.00 25.00 0.00 Indent IP CIRCLE Procurement of placed to ROHTAK New Electric Pump XEN/Procur Sets for Flood ement/PKL. Protection Works in WS Mech Division, Rohtak

51 MEHAM YWS Agenda Note for 50th M 64.64 0.00 0 % 64.64 32.32 32.32 0.00 Estimate YTS CIRCLE Improving Capacity under ROHTAK by widening of Civil process in structure (Pump division House) at RD-100 office. Left Meham Drain Pump House Village Bharan in WS Mech Division, Rohtak

92 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 52 MEHAM YWS Revised Agenda 49th L 645.00 0.00 40 % 645.00 219.30 212.85 212.85 Work in IP CIRCLE note for progress. ROHTAK constructing tail The regulator at RD 50 estimated at Mehem Drain cost out-falling into increased Drain No. 8 at RD to Rs. 177550 (Est. amt. 645.00 lac aproved in 49th against Rs. meeting was Rs. 484.00 484.00 lac and lacs) amt. now revised in 50th meeting= 645.00).

53 GARHI YWS Agenda Note for 50th L 27.23 0.00 0 % 27.24 9.26 8.99 8.99 Estimate YTS SAMPLA - CIRCLE Re-placement of sanctioned. KALOI ROHTAK Pipe Culvert into Tender VR Bridge at RD called and 35000 of Rohtak to be Link Drain. opened on 12.12.2019.

54 GARHI YWS Agenda Note for 50th L 164.10 0.00 0 % 164.09 55.79 54.15 54.15 Work will YTS SAMPLA - CIRCLE Construction of be start KALOI ROHTAK RCC Truff of after Baland Pump harvesting House Link Drain of Kharif from RD 0 to 3500. Crop.

55 ROHTAK YWS Agenda Note for 50th L 272.00 0.00 0 % 272.00 92.48 89.76 89.76 Estimate YTS CIRCLE Construction of under ROHTAK One Side Vertical process. wall on Left Side from RD 99400 to 102900 and laying interlocking tiles for service road from RD 99400 to 100760 Meham Drain (up to Pump House)

56 KALANAU YWS Constructing 50th L 376.23 0.00 0 % 376.24 127.92 124.16 124.16 1st part YTS R CIRCLE Sundana pipeline work tender ROHTAK pump house link called and drain from RD 0 to to be 5950 and Bhutian opened on Minor tail to Drain 12.12.2019. No. 8 pipe link 2nd part drain from RD 0 to work 7250 outfall at RD estimate 202000-L Drain No. submitted 8 (Supplementary to higher Scheme). authority for approval.

District Total 2036.43 51.63 1984.83 754.88 740.03 489.90 SONIPAT

93 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 57 BARODA YWS Reconstruction of 49th M 248.52 0.00 0 % 248.52 124.26 124.26 0.00 Tender YTS CIRCLE V.R. Bridges at RD rates ROHTAK 13000, 15780 of approved Chhapra Drain and work will be started shortly.. 58 BARODA YWS Agenda Note for 49th M 21.07 0.00 0 % 21.08 10.54 10.54 0.00 Estimate YTS CIRCLE constructing cross sanctioned. ROHTAK drainage work i.e. Tender aqueduct at RD rates 8300 on Dubheta approved. Drain Work will be started shortly. Agreement done on 08.03.2019. Notice has been given to the agency.

59 BARODA YWS Agenda note for 49th M 60.00 0.00 0 % 60.00 30.00 30.00 0.00 Drawing YTS CIRCLE reconstruction of approved. ROHTAK V.R. Bridges at RD Estimate 3050, 8870, 10180, sanctioned. 14100, 12780, Tender 15400 and Bhawar rates link drain. approved. Agreement done on 28.06.2019.

60 GOHANA YWS Agenda Note for 50th M 49.00 0.00 0 % 49.00 24.50 24.50 0.00 Drawing YTS CIRCLE Construction of 07 approved ROHTAK Nos. Civil for sump Structures (Sump wall. Wells) for Flood Protection Works at Various Flood Sites in WS Mech. Division, Rohtak.

61 GOHANA YWS Agenda Note for 50th L 283.00 0.00 0 % 283.00 96.22 93.39 93.39 Qty. YTS CIRCLE procurement of submitted ROHTAK New Pump for to CE/LCU Flood Protection vide this works at Various office letter Flood sites in WS no. Mech. Division, 644/180/6 Rohtak. W dated 18.03.2019

District Total 661.59 0.00 661.60 285.52 282.69 93.39 Unit Total 4930.68 271.51 4659.27 2209.57 1716.29 733.36 PROJECT, KARNALENVIRONMENT AND

94 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 62 KARNAL WORKSH Purchase of 40 50th M 171.00 0.00 10 % 171.00 85.50 85.50 0.00 Finalization IP OP number electric of rates will CIRCLE pumping sets of 5 be done by KARNAL cs. capacity for DS and D distt. Karnal and in coming Jind as inventory HPPC for utilization in meeting. emergency dewatering.

63 KARNAL WORKSH Procurement of 50th M 25.50 0.00 10 % 25.50 12.75 12.75 0.00 indent IP OP tempo excel pick received on CIRCLE up and truck tata 21/05/2019. KARNAL 407 in replacement sent to DS of condemned and D vehicles. Haryana on 12/06/2019 and DS and D asked for proprietary certificate ,accordingly indentor was asked for supplying the same for submission to DS and D Haryana. The same has been received on 07.11.2019 and same has been sent to DS and D by XEN/Procur ement and Disposal Division, Pkl. The case is now pending with DSandD.

95 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 64 KARNAL WORKSH Replacement/Reno 50th M 78.27 0.00 10 % 78.28 39.14 39.14 0.00 The tender IP OP vation of pumping rates has CIRCLE sets with allied been KARNAL accessories in approved district JIND . by Chief Engineer Project in favour of M/s KRP Engineering Pvt. Ltd. vide letter No. 453- 54/6/F- 11/Tender/ XEN(works) /P dated 20.09.2019. The agreement has been executed with the agency by XEN/W.S. (M) Division, Karnal and letter for proceeding of work has been issued to the Firm on 20.09.2019.

District Total 274.77 0.00 274.78 137.39 137.39 0.00 Unit Total 274.77 0.00 274.78 137.39 137.39 0.00 YWS(N) BHIWANI 65 TOSHAM YWS Flood Agenda for 49th S 44.00 14.00 30 % 30.00 30.00 0.00 0.00 D.G Set IP CIRCLE Purchase of New Received. BHIWANI Machinery for Regarding Flood Protection 20 EP sets Works During 2018- (3 Cs), the 19 case will be discussed in the upcoming HPPC meeting on dated 23.12.2019 for approval.

96 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 66 BHIWANI YWS Procurement of 49th S 110.00 70.00 65 % 40.00 40.00 0.00 0.00 H- IP CIRCLE New Earth Moving Excavator BHIWANI Machine for Received. internal clearance Tenders for of drains and bank the balance strengthening of work has canal/drain been called (Supplementary twice but no Agenda). bid received. Now DSandD has been requested for calling tender again on dated 04.12.2019.

67 BHIWANI YWS Agenda for 50th M 331.66 220.74 85 % 110.92 55.46 55.46 0.00 Work in IP CIRCLE Providing sump progress BHIWANI well, gates and and will be gearing on Bhiwani complete Ghaggar drain from by RD. 28345-165600 31.12.2019 out-falling at RD 384000-L Hisar Ghaggar Drain

97 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 68 BHIWANI YWS AGENDA FOR 50th M 150.00 0.00 0 % 150.00 75.00 75.00 0.00 Regarding IP CIRCLE PURCHASE OF VT pump BHIWANI NEW MACHINERY 20 Cs 01 FOR FLOOD no., VT PROTECTION pump 10 WORKS DURING Cs 07 no., 2019-20, 1 No. VT pump 5 AXIAL FLOW VT Cs 07 no.- PUMP 20 CS WITH supply MOTOR AND order has DELIVERY PIPE been WITH STARTER issued to PANEL, 7 NO`S. firm on AXIAL FLOW VT dated PUMP 10 CS WITH 13.09.2019 MOTOR AND and the DELIVERY PIPE material will WITH STARTER be supplied PANEL, 7 NO. by the firm AXIAL FLOW VT within four PUMP 5 CS WITH months. MOTOR AND DELIVERY PIPE Regarding WITH STARTER DP sets 2 PANEL AND 6 Cs 06 no. NO. DIESEL tenders has PUMPING SETS been called WITH ENGINE 10 and the HP AND PUMP OF case will be SIZE 4`X4`. discussed in the upcoming HPPC meeting on dated 23.12.2019 for approval.

69 BAWANI YWS Extension of 1-L 49th L 142.15 0.00 0 % 142.15 48.33 46.91 46.91 8.34 Acres YTS KHERA CIRCLE talu link drain form land BHIWANI rd 10198- 14050 acquisition outfalling at rd is involved. 26277- L siwana Shareholde talu link Drain (if rs are not shareholders agree interested to give land at to give their collectors rate) land on collector rate.

70 BAWANI YWS Agenda for 50th L 182.70 0.00 0 % 182.70 62.12 60.29 60.29 Alignment YTS KHERA CIRCLE Dewatering fields approved BHIWANI of village Badesra on by constructing 28.05.2019. Badesra Drain no. Survey 1 from RD 0 to work and 4500 and providing 3.58 Acres sumpwell for lifting Land of flood water purchase process in progress.

District Total 960.51 304.74 655.77 310.91 237.66 107.20 JIND

98 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 71 SAFIDON YWS Flood agenda note 49th S 322.79 234.38 75 % 88.41 88.41 0.00 0.00 work in IP CIRCLE for construction of progress JIND Head Regulator at and will be RD 354760/R completed B.M.L., Hansi by Branch , Butana 31/01/2020 Branch, M.P.L.C. and Inlet at RD 61000/R Hansi Branch including bringing to design section of New Nai Nallah Abondoned Drain from RD 0 to 3600.

72 JULANA YWS Agenda for 50th M 335.00 150.00 50 % 185.00 92.50 92.50 0.00 Tender IP CIRCLE increasing capacity Approved. JIND of Padana Bass Work in Link Drain from RD Progress 0 to RD 49900 and and will be its structure out completed falling at RD by 155580-L Bass 31.03.2020. Multipurpose Channel

73 JULANA YWS Agenda for 50th M 160.00 0.00 5 % 160.00 80.00 80.00 0.00 Regarding IP CIRCLE increasing capacity 04 no. 20 JIND of Karela Pump Cs VT House from 60 cs pump - to 120 cs. Supply order issued to Firm on Dated 19/9/2019 and work will be completed by 31.03.2020.

74 SAFIDON YWS Agenda for 50th M 268.00 180.00 95 % 88.00 44.00 44.00 0.00 Tender IP CIRCLE Increasing capacity rates JIND of Padana Drain approved. from RD 0 to RD Work in 52000 and bringing progress to Design Section and will be from RD 52000 to completed 92000 including Re- by Construction of 1 31/12/2019. No Bridge

99 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 75 SAFIDON YWS Agenda for laying 50th M 91.23 38.20 60 % 53.04 26.52 26.52 0.00 Tenders IP CIRCLE RCC Pipe Line rates JIND from fields of approved.B village Bhagkhera, alance Bangru and Work will Siwanamal be restarted including after Rabi constructing of Season and Pump House at RD will be 81400-L Padana completed Drain by 30.06.2020.

76 SAFIDON YWS Agenda for laying 50th M 53.97 0.00 10 % 53.98 26.99 26.99 0.00 Work is in IP CIRCLE RCC Pipe Line Progress.W JIND NP2 from fields of ork will be village Gangoli restarted including after Rabi constructing of Season and Pump House at RD will be 18500-L Hadwa completed Gangoli Link Drain by 30.06.2020.

77 SAFIDON YWS Agenda for Laying 50th M 110.00 55.00 60 % 55.00 27.50 27.50 0.00 Tender IP CIRCLE RCC Pipe Line for rates JIND De-watering of approved Lake/Dabbar Area and Work of Agricultural land will be of village restarted Siwanamal after Rabi including Season and constructing of will be Temporary Pump completed House at RD by 81400-L Padana 30.06.2020. Drain

78 SAFIDON YWS Agenda for 50th M 300.00 0.00 5 % 300.00 150.00 150.00 0.00 Regarding IP CIRCLE increasing capacity 10 No. 20 JIND of Pump House at Cs VT Outfall of Padana pump- Drain at Shamlo Supply Pump House at RD order 70000-R Sunder issued to Sub Branch from Firm on 120 Cs to 240 Cs Dated including Civil work 19/9/2019 and Work will be completed upto 31.03.2020.

District Total 1640.99 657.58 983.43 535.92 447.50 0.00 KARNAL

100 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 79 KARNAL YWS Agenda for 48th L 969.74 3.38 25 % 966.36 328.56 318.90 318.90 Work in IP CIRCLE connecting main Progress KARNAL drain no. 1 (Choti and will be Yamuna) to main completed drain no. 2 at RD by 68000 (CM 30/06/2020 announcement code no. 148960).

District Total 969.74 3.38 966.36 328.56 318.90 318.90 PANIPAT 80 PANIPAT YWS Protection of village 48th S 13.05 0.00 0 % 13.05 13.05 0.00 0.00 Work IP RURAL CIRCLE pond, agriculture started at KARNAL land and abadi of site but village Mehrana suspended from flood in due to court Mehrana Drain at case stay. existing alignment from RD 0 to 3900

81 SAMALKH YWS Purchase and 49th S 87.50 25.20 30 % 62.30 62.30 0.00 0.00 1. Bolero IP A CIRCLE supply of Special Camper KARNAL TandP Machine i.e. has been 1 No. Tata Hitachi purchased. EX200 Super Fitted 2. The ALE Pocklain and 1 No. Backhoe Tata Hitachi Model Loader of TH76 Excavator ACE cum Bachoke Company Loader fitted with has been standard delivered in attachment and 1 this office. No. Bolero Camper 3. 1 No. (Pick-Up) for use in Tata Hitachi Panipat Water Model Services Division, TH76 Panipat Excavator cum Bachoke Loader.Tec hnical specificatio n has been approved in STC meeting. Tender has been called and the case will be put up in the upcoming HPPC meeting for approval.

101 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 82 SAMALKH YWS Providing 50th M 212.53 0.00 5 % 212.54 106.27 106.27 0.00 Work in IP A CIRCLE protection to River progress KARNAL Yamuna and will be embankment in completed reach RD 18910 to upto 27410 in 31.03.2020. Pathargarh Complex by providing lining

83 PANIPAT YWS Bringing to design 50th M 64.42 12.29 65 % 52.14 26.07 26.07 0.00 Work in IP CITY CIRCLE section and Progress KARNAL strengthening of and will be banks of Main completed Drain No. 2, Munak by escape drain and 31/01/2020. old Munak drain for safe passage of design discharge.

84 ISRANA YWS Replacement/const 50th M 23.51 0.00 10 % 23.52 11.76 11.76 0.00 Work in IP CIRCLE ruction of syphon at Progress KARNAL RD 4670 of Shera and will be Link crossing completed Madlauda Minor by and replacement of 31/03/2020. bridge at RD 2750 on Shera Link Drain`

85 ISRANA YWS Separation of 50th M 45.68 0.00 10 % 45.68 22.84 22.84 0.00 Work in IP CIRCLE village pond from Progress KARNAL flood and waste and will be water flowing in completed Idyana Link Drain by and protection to 31/03/2020. village abadi in village Idyana 86 ISRANA YWS Separation of 50th M 96.55 0.00 45 % 96.56 48.28 48.28 0.00 Work in IP CIRCLE village pond from Progress KARNAL flood and waste and will be chemical water completed flowing in Try. by Drain No. 4 and 31/03/2020 protection to village abadi in village Chamrara

District Total 543.24 37.49 505.79 290.57 215.20 0.00 YAMUNANAGAR 87 JAGADHRI HKB Work of repair of 48th S 1800.00 622.00 45 % 1178.00 1178.00 0.00 0.00 45% work IP CIRCLE damaged portion of completed JAGADH Hathnikund and RI Barrage. balance work will be competed upto 30.04.2020.

88 SADHAUR HKB Construction of 49th M 50.00 0.00 30 % 50.00 25.00 25.00 0.00 Work in IP A CIRCLE Bridges on Progress JAGADH Chautang Nallah and will be RI from RD 0 to completed 136400. by 31.03.2020.

District Total 1850.00 622.00 1228.00 1203.00 25.00 0.00

102 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 Unit Total 5964.48 1625.19 4339.35 2668.96 1244.26 426.10 YWS(S) FARIDABAD 89 TIGAON YWS Construction of 48th M 795.00 507.24 90 % 287.76 143.88 143.88 0.00 work likely IP CIRCLE Sehatpur Drain to be FARIDAB with Brick lining completed AD with M.S Railing to upto Carry storm water 31.12.2018 from RD 11000 to 19000 and remodeling katcha reach from RD 0 to 11000.

90 BADKHAL YWS Construction of CC 50th M 283.37 117.45 70 % 165.92 82.96 82.96 0.00 IP CIRCLE open drain from RD FARIDAB 0 to 2000 and AD laying of RCC hume pipe from RD 2000 to 6000 of Badhkal escape channel for disposal of flood water and storm water of village Badhkal and Aakhir.

91 PRITHLA YWS Reconstruction of £ 50th M 271.15 178.58 80 % 92.58 46.29 46.29 0.00 IP CIRCLE no. bridges at RD FARIDAB 201500 , 191000 AD and 208500 of Gaunchi main drain.

District Total 1349.52 803.27 546.26 273.13 273.13 0.00 MEWAT 92 PUNHANA YWS RE-PLACEMENT 49th S 53.32 36.74 90 % 16.58 16.58 0.00 0.00 Work in IP CIRCLE OF 03 NOS. V.R. progress FARIDAB BRIDGES AT RD and likely to AD 6250, RD 10750 be AND RD 14850 OF completed MARYAKA DRAIN upto IN DISTRICT NUH 31.12.2019. CONNECTING VILLAGES (I) NAI TO SHINGAR (II) JHAROKHARI TO SHINGAR (III) MARYAKA TO SHINGAR RESPECTIVELY.

93 PUNHANA YWS Internal Clearance 49th S 199.00 78.75 95 % 120.25 120.25 0.00 0.00 Work IP CIRCLE and bringing upto completed FARIDAB design section AD (inner) from RD.22600 to 112600 of Ujina Drain.

94 FIROZEPU YWS Flood agenda for 50th S 34.00 0.00 20 % 34.00 34.00 0.00 0.00 In progress IP R JHIRKA CIRCLE replacement of V.R FARIDAB Bridge at RD 5700 AD of Ferozpur Jhirka Link Drain.

103 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 95 PUNHANA YWS Flood Agenda for 50th M 394.50 0.00 10 % 394.50 197.25 197.25 0.00 In progress IP CIRCLE Re-construction of FARIDAB D.R. Bridge on AD Ujina Drain at RD. 79266 for crossing from village Bhadas to Punhana 96 PUNHANA YWS Agenda for re- 50th M 320.74 160.20 90 % 160.54 80.27 80.27 0.00 In progress IP CIRCLE construction of V.R. FARIDAB Bridge at Km AD 24.885 (from village Nai to Nunera) of Ujina Diversion Drain in Distt. Nuh 97 NUH YWS Flood agenda for 50th M 127.00 0.00 5 % 127.00 63.50 63.50 0.00 In Progress IP CIRCLE Re-construction of FARIDAB V.R. Bridge at RD. AD 37150 of Nuh Drain

98 NUH YWS Flood agenda for 50th M 171.36 0.00 10 % 171.36 85.68 85.68 0.00 Work is in IP CIRCLE Re-construction of progress FARIDAB V.R. Bridge at RD. AD 58145 of Nuh Drain

District Total 1299.92 275.69 1024.23 597.53 426.70 0.00 PALWAL 99 PUNHANA YWS RE-PLACEMENT 49th S 1238.26 513.32 50 % 724.94 724.94 0.00 0.00 Work under IP CIRCLE OF 04 NO. V.R. progress of FARIDAB BRIDGES AT RD VRB km AD KM 12.208, KM 15.080. and 15.080, KM 18.935 Tender rate AND KM 21.953 of VRB OF UJINA 12.280 has DIVERSION DRAIN been IN DISTRICT approved PALWAL AND and work NUH will be CONNECTING started VILLAGES (I) shortly. BHULWANA TO Work of UMRALA (II) VRB km HODAL GARHI 18.935 and PATTI TO LALPUR 21.953 is (III) BICHHOR TO under LALPR (IV) progress. BICHHOR TO NUNERA RESPECTIVELY.

100 HATHIN YWS utilisation of flood 50th M 193.21 0.67 10 % 192.54 96.27 96.27 0.00 In progress IP CIRCLE water by FARIDAB constructing of AD hump and pump house on gaunchi main drain at RD 97500 to augment the hathin disty. to feed tail reach villages.

104 Annexure 5.4 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:Flood Protection Works (Rs. in lacs) Status: In Progress,Yet To Start,

Sr. Name of Name of Name of Work Appvd. (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation in booked Prog. Req. ncy Circle meeting during of year HSFCB 2020-21 2021-22 2022-23 101 HODAL YWS Agenda for 50th M 392.00 0.00 10 % 392.00 196.00 196.00 0.00 In progress IP CIRCLE replacement of 2 FARIDAB Nos. V.R. Bridge at AD RD. 10300 and RD. 12000 of Gaunchi Main Drain.

District Total 1823.47 513.99 1309.48 1017.21 292.27 0.00 Unit Total 4472.91 1592.95 2879.97 1887.87 992.10 0.00 Grand Total 25882.95 5521.02 20362.21 10952.63 6998.55 2410.88

105 Annexure 6.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:8443-Irrigation Department Deposit Works (Rs. in lacs)

Sr. Name of Name of Name of Work Appvd. in (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation meeting booked Prog. Req. ncy Circle of HSFCB during year

2020-21 2021-22 2022-23 BWS AMBALA 1 AMBALA SYL Constructing 50th L 120.00 20.00 0 % 100.00 34.00 33.00 33.00 Deposit YTS CITY CIRCLE Retaining wall in work AMBALA the side of three (100.00 Nos. Air field drain Lakh) in front of King Amount to Fisher Resort be Ambala City deposited (Deposit Work of by Haryana Haryana Tourism Tourism Corporation ) Corporation (120.00 Lakh) .

District Total 120.00 20.00 100.00 34.00 33.00 33.00 HISAR 2 HISSAR BWS CONSTRUCTION 46th S 1160.44 657.44 90 % 503.00 503.00 0.00 0.00 Work IP CIRCLE OF SATROD withheld HISAR MIRKA DRAIN RD due to non 0 TO 6450 AND submission DABRA LINK funds from DRAIN RD 0 TO HSVP. 7525(DEPOSITE Balance WORK OF HUDA). payment may be allowed to be made under Drainage Head-4711.

District Total 1160.44 657.44 503.00 503.00 0.00 0.00 KURUKSHETRA 3 THANESA SYL Constg. of RCC 45th L 4070.00 4070.00 100 % 0.00 0.00 0.00 0.00 Work Comple R CIRCLE rectangular open Completed ted AMBALA drain of size 5.50`X2.75` parallel to Saraswati Creak for sewerage water disposal work Sector-13, U.E. Kurukshetra and 7` X3.50` from Public Health STP point to siphon Narwana Branch,Jyotisar. Funds are to be provided by HUDA and PHED.

District Total 4070.00 4070.00 0.00 0.00 0.00 0.00 Unit Total 5350.44 4747.44 603.00 537.00 33.00 33.00 CONSTRUCTION GURGAON 4 BADSHAP CONSTRU Construction of 47th M 4837.00 0.00 0 % 4837.00 2418.50 2418.50 0.00 Work Droppe UR CTION RCC open Trough proposed to d CIRCLE for channelisation be dropped GURGAO of Badshahpur as funds not N Drain K to L provided by (Dhankot road to HSVP. Njafgarh Drain)

District Total 4837.00 0.00 4837.00 2418.50 2418.50 0.00 Unit Total 4837.00 0.00 4837.00 2418.50 2418.50 0.00 LCU ROHTAK

106 Annexure 6.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:8443-Irrigation Department Deposit Works (Rs. in lacs)

Sr. Name of Name of Name of Work Appvd. in (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation meeting booked Prog. Req. ncy Circle of HSFCB during year

2020-21 2021-22 2022-23 5 BAHADUR YWS Increasing 47th M 404.18 0.00 0 % 404.18 202.09 202.09 0.00 Deposit YTS GARH CIRCLE capacity of Sarai work of ROHTAK Aurangabad HUDA and Kassar Link Drain HSIDC. from RD 0 to Amount not 34052 out falling deposited into KCB Drain at by HUDA RD 8103-L and HSIDC. including its L-section extension and and drawing Sump Well Pump approved. House HUDA need to deposit 146.98 lacs and HSIDC need to deposit 257.20 lacs.

District Total 404.18 0.00 404.18 202.09 202.09 0.00 Unit Total 404.18 0.00 404.18 202.09 202.09 0.00 YWS(N) PANIPAT 6 PANIPAT YWS Providing lining 45th S 3780.00 2900.00 100 % 880.00 880.00 0.00 0.00 DEPOSIT Comple RURAL CIRCLE and railing of WORK OF ted KARNAL panipat drain from HUDA. RD 55673-27000. HUDA HAS total cost of the NOT scheme RS. 44.08 DEPOSITED crore fund is to be THE provided by HUDA. BALANCE AMOUNT OF RS.8.80 CRORE FOR EXECUTION OF THE SCHEME .

7 PANIPAT YWS Remodelling of 46th S 2031.00 0.00 0 % 2031.00 2031.00 0.00 0.00 deposite Droppe RURAL CIRCLE panipat drain by work of MC d KARNAL providing lining panipat/ULB and replacing of .MC/PANIPA pucca structure Thas not from RD 55673 to deposited 64400 (phase-2 the required costing rs. 20.31 amount to crore). execute the work.Now this work is under CM announcem ent and is being dealt seperately. Proposed to be dropped.

District Total 5811.00 2900.00 2911.00 2911.00 0.00 0.00 Unit Total 5811.00 2900.00 2911.00 2911.00 0.00 0.00

107 Annexure 6.1 Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:8443-Irrigation Department Deposit Works (Rs. in lacs)

Sr. Name of Name of Name of Work Appvd. in (S/M/L) Est. Cost Expdt. Phy. Total Bal Requriments of funds Remarks Status No Constitue Irrigation meeting booked Prog. Req. ncy Circle of HSFCB during year

2020-21 2021-22 2022-23 YWS(S) FARIDABAD 8 BALABGA YWS PROVIDING 45th S 1420.00 1420.00 100 % 0.00 0.00 0.00 0.00 Work Comple RH CIRCLE LINING OF Completed. ted FARIDABA GAUNCHI DRAIN D FROM RD 0- 15534. TOTAL COST OF THE PROJECT RS. 1510.0 LACS BEING SHARED BY HUDA MUNICIPAL CORP. FARIDABADD,URB AN LOCAL BODIES, IRRIGATION DEPARTMENT . AMOUNT SHARED BY VARIOUS DEPARTMENTS. HUDA 250.00 LACS, MCF- 255.00 LACS, IRRIGATION- 250.00.

District Total 1420.00 1420.00 0.00 0.00 0.00 0.00 Unit Total 1420.00 1420.00 0.00 0.00 0.00 0.00 Grand Total 17822.62 9067.44 8755.18 6068.59 2653.59 33.00

108