COMPANY PROFILE 2020

Günaydin, Downtown , Dubai MISSION TABLE OF CONTENTS

Section Contents Page

o be the premier provider of equipment and related services T for the foodservice and laundry industry. Our aim is not to 1. Past & Present 1 beat the competitors’ prices but to provide complete customer care. This starts with exceeding the customer’s expectations 2. Design Services 2 and is maintained by continually doing so and establishing a close working relationship in the process. 3. Equipment Specifications 3 4. Project Management 4

5. Quality Commitment 5

6. Installation & Maintenance 6

Appendices:

A. Products Range - Kitchen Equipment 7

B. Projects Overview 15 .

Company Profile Company Profile PAST AND PRESENT

TSSC Kitchen & Laundry Equipment Trading LLC was established as Technical Supplies and Services Co. LLC in 1961 as a trading company dealing in refrigeration parts and accessories. In 1993, the company was acquired by Basil Bahar who envisaged a need for a quality service provider for food service and laundry equipment in the local hospitality and catering market. Using the enhanced resources at his disposal and his past experience, he decided to diversify and established a division with the sole purpose of providing industrial food service and laundry equipment solutions to developers and operators in 1994.

The burgeoning hospitality sector of Dubai fuelled by the growth of the Emirate as a regional trading epicentre and popular tourist destination along with our determination to provide the best services, provided the environment conducive to TSSC’s rapid growth. In less than a decade, TSSC became the foremost provider of industrial kitchen and laundry solutions in Dubai.

Today, TSSC continues to provide complete customer care for the food service and laundry industry. From design of the facilities to installation of the wide ranging equipment required for operation and training the operators, TSSC can provide a onestop solution for discerning clients. Whether it is a single item or a complex facility involving specialised areas with numerous items, our solutions always include impeccable after sales service and the enviable resource of the vast experience and dedication of our management and personnel. Professionalism is instilled in our personnel at every level and is evident in every aspect of our work and in the results we have achieved. With a client base that is the who’s who of the Dubai food Miyako Japanese Restaurant, Hyatt Regency, Dubai service and hospitality industry, TSSC continues to be the forerunner in its competitive segment, striving to provide the best value for the client.

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 01 DESIGN SERVICES EQUIPMENT SPECIFICATION

We can provide a complete kitchen and laundry technical design consultancy through our We constantly monitor the market for the latest equipment, keeping abreast of the latest in-house CAD design department. Comprised of qualified and experienced personnel, we can technologies and quality standards. provide quick generation and turnaround of drawings giving developers and operators the ability to make decisions quickly. While we represent many manufacturers for various food service equipment, we can, maintain our independence when providing this service by offering alternatives to our own products if such For large and complex foodservice and/or laundry facilities, we work closely with leading is preferred by the client or the purpose. We are proud of the fact that the manufacturers design and management consultants from the UAE and overseas. Our clients benefit from represented by us are mostly market leaders in their respective segments and continue to share working with qualified industry professionals who have the experience required by an equal and even higher commitment to quality in their products & services. All our products developers, architects and catering professionals. have impeccable performance records and are continually specified by many leading catering professionals from over. With our associates and suppliers, we create cost effective designs and proposals. We design and specify installations that reflect the maximum value for the client, in terms of cost, Through our associate company TSSC (Sharjah), we are able to supply complete cold storage efficiency and practicality. solutions to the , catering and commercial markets.

Company Profile Company Profile 02 03 PROJECT MANAGEMENT QUALITY COMMITMENT

We have extended the planning, scheduling and controlling approach to include customer At TSSC, our commitment to quality is second to none. The majority of our product line is care at every step during and after the project life cycle. ISO 9000 approved and the manufacturers follow the highest international quality standards certified by the relevant regulatory authorities in their respective regions/ We oversee the project from design to hand over and training for the operators personnel. countries. We ensure that the quality of the equipment and installation matches the quality By utilizing our in-house resources as well as those of our associate companies and of the location and the expectation of the customer. specialised manufacturers/vendors, we ensure that the installation is completed on time, within budget, and to the client’s satisfaction. We have retained an independent quality management consultant to implement a continuous quality system into all our operations. For large projects, we insist on a full time project manager being on site until hand over of the installation. From the installation of a few pieces of equipment to complex larger Our engineers and technicians have undergone training at our key supplier’s facilities so as installations involving thousands of items for numerous speciality outlets, our project to ensure they meet their quality requirements as well. personnel bring a wealth of experience and skills honed by their years in the field to ensure timely and efficient execution of the project.

Company Profile Company Profile 04 05 INSTALLATION AND MAINTENANCE

Our installation and maintenance personnel are trained in and familiar with not just our own product range, but also with a wide variety of Food Service, Cold Storage and Laundry equipment employed in the market through other vendors.

Our engineers and technicians have undergone training at our key suppliers’ facilities to ensure that the installation is right the first time. We maintain a sizeable in-house inventory of spare parts to minimise any down time of our installed equipment.

We guarantee all our installations for one year, and all equipment is also backed by the respective manufacturers’ warranties for the same period. A 24-hour emergency callout service on all days is also available by calling 800-24-TSSC (8772) along with extended warranty and equipment maintenance services.

Our spare parts division works independently from other division to ensure availability of spare parts for all your foodservice and laundry equipment needs.

Company Profile 06 APPENDIX A PRODUCT RANGE - KITCHEN EQUIPMENT

Food Warming Equip- Weighing ment, Hot & Cold Deli Shelvings & Cooking Display, Cook Chill Scales System Food Carts Equipment Germany U.S.A U.S.A France

Cooking Bulk Coffee Brewers Cooking Refrigerated & Equipment & Water Boilers Equipment Heated Display Italy Holland U.K Italy Bulk Storage Fish Tanks for live Charbroiler & Automatic Juice Dishwashing seafood Convection Ovens Machines Machine Australia U.S.A Austria Italy Custom Made Pizza/ Butchery Combi Induction & Tandoor Ovens & Equipment Grill Steamers Warming Unit Australia Italy Germany U.S.A Professional Water Refrigerated & Refrigerated & Slicers Dispensers Heated Display Heated Display

Italy Germany New Zealand U.K Heated & Butchery Catering Solar Power Equipment Refrigerated Equipment Display Cases Kiosk U.S.A Germany Italy Austria

Cooking Cooking Baking Deck Equipment Equipment Cold Rooms Ovens Germany France China Germany Ice Cream Food Toasters, Kettles, Waffle Coffee Beans Irons, Coffee Machines, Machine Processor Scales, Juicers & Grills

Italy U.K Italy U.K Vegetable & Bulk Coffee Commercial Fruit Cutting Brewers & Dough Laundry Machine Boilers Mixers Machines Switzerland U.S.A Portugal Sweden Super Low Temperature Exhaust Filters Chest Freezers Denmark U.S.A Besh Turkish Kitchen, Dubai

Company Profile Company Profile 08 07 APPENDIX A PRODUCT RANGE - KITCHEN EQUIPMENT

Vacuum Display Buffet & Packing Ice Cubers / Cases Display Cases Machines Flakers Italy Italy Netherlands Japan/ Europe Hot Cooking Custom Fabrication Professional Storage Solu- Stainless Steel & tion / Shelving / Line Refrigeration Equipment Thermal Mixer Trolleys Italy Italy Italy Germany/ U.K Modular and Traditional Cooking Semi- Automatic Ice Cream Customised Refrig- Espresso Machines Equipment Freezers erated Equipment Italy U.K Austria Italy Cooking & Bakery Processing Bar Packaging Equipment Equipment Equipment Machine

Portugal Italy U.K Italy Ice Foodservice Grills and Management Fully Automatic Ovens Equipment & Solutions Coffee Machines Rotisseries U.S.A Switzerland Spain Germany Cooking Premium Fine Commercial Kitchen & Sous-Vide Japanese Chef Laboratory Refrigerators & Equipment Freezers / Chest Freezers Collection Knives Japan Germany U.S.A Austria/ Malaysia Demountable Extraction Refrigeration Dishwashing Equipment Ventilated Hood & Tepan Ceiling Griddle Systems Netherlands Germany Spain Germany Storage Commercial Pot Kitchen Refrigeration Shelving & Washer Equipment Ventilation Trolleys Sweden Finland Portugal U.S.A Bar & MKN Combi Beverage Charcoal Main Cooking Steamers Equipment Ovens Equipment U.S.A Germany Spain Germany

Ventless Kitchen Pizza Ovens Solutions Italy U.S.A Coya Restaurant, Four Seasons Hotel, Dubai

Company Profile Company Profile 06 09 10 APPENDIX A PRODUCT RANGE - KITCHEN EQUIPMENT

Stainless Steel Vegetable Baking Ovens Fabrication Oriental Washers, Mixer Waste Bins & Bakery Cooking Equipment & Peelers Equipment Indonesia Italy U.S.A Spain Dishwashing Waste Coffee Commercial- Machines Trolley & Disposal Accessories Solutions Juicers Germany Sweden U.S.A France Heated & Food Service Fully Automatic Sushi Display Equipment Refrigerated Food Carts Coffee Machines Japan Germany Sweden Denmark Waste Automatic Slicers, Mincers & Reduction Pancake Snack Line Bone Saw Equipment Machine Machines Ireland HongKong/ Austria U.K Italy Commercial Stainless Gas & Charcoal Snack Line & Refrigeration Steel / Solid Fuel Sanitation Equipment Fabrication Grills U.K Italy France Australia Custom Stainless Steel Butchery Automated Towel & Sake Fabrication Equipment Sushi Makers Warmer U.A.E France Japan Japan

Bakery Walk-in Blast Combi Ovens Equipment Coldrooms Chillers/Freezers Germany Sweden U.A.E Italy Food Processing Custom Made Pizza & Tandoor Fully Automatic Equipment Snack Line Ovens Coffee Machines France France U.K Denmark Bakery Equip- Shelving, ment, Dough Refrigeration Sheeters & Cooking Trolley & Equipent TowelDough & Sake Moulders Equipment Sanitation SwitzerlandWarmer France France U.S.A

The Atlantic Dubai

Company Profile Company Profile 12 11 APPENDIX A PRODUCT RANGE - KITCHEN EQUIPMENT

Microwave / Food Service Convection Equipment Ovens U.S.A Germany Planetary Dough Kitchen Mixers, Pastry Ventilation Mixers Denmark Netherlands Hotmix Food Proces- sors with Cooking & Wine Cabinets Cooling Systems

Singapore Italy

Mini Bar Cooking

Refrigerators Equipment

Italy U.S.A Bar & Beverage Bakery Ovens Equipment & Proofers

U.S.A Germany Cold Rooms / Refrigerated Oriental Cooking Cabinets Equipment U.K/ China HongKong

Instant Boiled / Chilled Water

Australia

University of Sharjah Men's Dining Hall, Sharjah

Company Profile Company Profile 14 13 APPENDIX C PROJECTS OVERVIEW

Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms

Name & Location Status

Mandarin Oriental, Sheikh Zayed Road, Dubai On-Going Le Meridien Mina Seyahi Renovations, Dubai On-Going

Hilton DoubleTree, Sharjah On-Going

VOX Cinema, City Centre Al Zahia Mall, Sharjah On-Going

The8 - , Dubai On-Going

Hunter & Barrel Restaurant, Dubai On-Going

Le Meridien Ile Maurice, Mauritius On-Going

Park Hyatt Lagoon, Dubai On-Going

University of Sharjah, Women’s Dining Hall On-Going

Dolphin Tower, , Dubai On-Going

Arboretum, Jumeirah Al Qasr, Madinat On-Going Jumeirah, Dubai

Renovation- HSBC Bank, Level 5, On-Going Dubai

Renaissance Hotel Business Bay, Dubai

CKitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 16 15 APPENDIX C PROJECTS OVERVIEW

Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms

Name & Location Status

Dubai Airport Concourse D, Business & First-Class Lounge, On-Going Dubai

Kazim Villa On-Going

Google Dubai Innovation Hub at Internet On-Going City

Lucky Fish On-Going

V15 Basement Kitchen On-Going (Private Villa)

Food Hall, Deira City Centre On-Going

Yotel Hotel, Business Bay On-Going

Kushi by Reif, Nakheel Mall, Dubai On-Going

Orfali Bros Restaurant On-Going

La Petite Maison, Riyadh, KSA On-Going

French Toast and Company Restaurant- On-Going Shorofat, KSA

RSG- Staff Camp, Jeddah, Kingdom of On-Going Saudi Arabia

Dolcezza, DIFC Dubai

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 18 17 APPENDIX C APPENDIX C PROJECTS OVERVIEW PROJECTS OVERVIEW

YEAR 2020 YEAR 2020 Projects Involving Supply & Installation of Foodservice & Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms Laundry Equipment and/or Coldrooms

Name & Location Completion Date Status Name & Location Completion Status Date

University of Sharjah, Men’s Dining Hall Sep, 2020 Completed Le Meridien Dubai, Main Kitchen Feb, 2020 Completed Renovation Works Saffron (Renovation), Atlantis The Aug, 2020 Completed Palm, Dubai 1762 Bakery & More, Nakheel Mall, Feb, 2020 Completed Dubai Intercontinental Indigo Hotel, Business Aug, 2020 Completed Bay, Dubai Cut Pizza Feb, 2020 Completed (Al Tayer Villa, Dubai) Residential Villa for Khalid Al Tayer, Aug, 2020 Completed Plot No. 6150572, Nadd Al Shiba Second, Dubai Roka, The Opus by Omniyat, Dubai Feb, 2020 Completed Pizza Al Taglio at Vox Cinemas, DCC, Aug, 2020 Completed Dubai Gudees Pizza Café, DIFC, Dubai Feb, 2020 Completed

The Food Hall at Al Areesh, Completed July, 2020 Carine Restaurant, Emirates Golf Club, Completed Feb, 2020 Dubai Kitchen 35, Deira City Center, Dubai July, 2020 Completed Muvi Cinema Cinema- Nakheel Mall Jan, 2020 Completed Dammam University of Wollongong Dubai, Dubai July, 2020 Completed Tea Lounge, Riyadh, Kingdom of Saudi Jan, 2020 Completed Knowledge Park Arabia Noodle House Restaurant, Nakheel Jan, 2020 Completed Nablus Eats, Dubai Mall June, 2020 Completed Mall Opus Hotel, Business Bay, Dubai Jan, 2020 Completed Tashas, Al Barsha, Dubai March, 2020 Completed Studio Republik, Dubai Jan, 2020 Completed VOX Cinema Al Qasr Mall, Riyadh, KSA March, 2020 Completed Le Burger, , Dubai Jan, 2020 Completed Filful, Marina Mall, Dubai March, 2020 Completed Hutong Restaurant, DIFC, Dubai Jan, 2020 Completed Muvi Cinemas Nakheel Mall, Dammam, March, 2020 Completed KSA VOX Cinemas Nizwa Grand Mall, Oman Jan, 2020 Completed Muvi Cinemas Mall of Arabia, Jeddah, March, 2020 Completed KSA Saud Bahwan VIP Kitchen, Muscat Jan, 2020 Completed Muvi Cinemas Al Hamra Mall, Riyadh, March, 2020 Completed KSA The Climbing Goat, Nakheel Mall, Dubai

Company Profile Company Profile 19 20 APPENDIX C PROJECTS OVERVIEW

YEAR 2019 Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms

Name & Location Completion Status Date

Dreamscape, MOE, Dubai Dec, 2019 Completed

Mercure Hotel Renovation (Main Dec, 2019 Completed Kitchen), Sheikh Zayed Road, Dubai

Amazone Café, Motor City, Dubai Dec, 2019 Completed

Restaurant Verde Dubai, Four Seasons Dec, 2019 Completed Resort Dubai Pai Thai, Jumeirah Al Qasr, Madinat Dec, 2019 Completed Jumeirah, Dubai Dubliners Refurbishment, Le Meridien Dubai Nov, 2019 Completed

Amazonico, DIFC, Dubai Nov, 2019 Completed

Home Bakery, Youth Hub Nov, 2019 Completed

Arabian Ranches Golf Club, Dubai Oct, 2019 Completed

3 Fils Restaurant, Pastry Room, Dubai Oct, 2019 Completed

Nasimi Beach Refurbishment, Atlantis Oct, 2019 Completed The Palm, Dubai The Rotisserie - One&Only Royal Oct, 2019 Completed Mirage, , Dubai

Hilton EMEA Head Quarters, Al Sep, 2019 Completed Habtoor City, Sheikh Zayed Road, Dubai Muvi Cinema, Mall of Arabia, Kingdom of Sep, 2019 Completed Saudi Arabia

VOX Cinema, Nakheel Mall, Palm Sep, 2019 Completed Jumeirah BU – Burgeronomy, Abu Dhabi, UAE

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 22 21 APPENDIX C APPENDIX C PROJECTS OVERVIEW PROJECTS OVERVIEW

YEAR 2019 YEAR 2019 Projects Involving Supply & Installation of Foodservice & Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms Laundry Equipment and/or Coldrooms

Name & Location Completion Status Name & Location Completion Status Date Date

Private Villa at Frond O, Palm Completed Aug, 2019 Grill Station, Souq Al Jubail March, 2019 Completed Jumeirah Sharjah Deira City Center Redevelopment Aug, 2019 Completed Home Bakery, Dubai Mall March, 2019 Completed The Noodle House, Residence, Dubai REIF Japanese Kushiyaki, Dar Wasl Mall, Aug, 2019 Completed Home Bakery, Galleria Mall, Al Barsha March, 2019 Completed Jumeirah Dubai Dubai 3BK Restaurant, Level 3, Armani Hotel, Aug, 2019 Completed Treehouse Juicery, Dubai Airport Feb, 2019 Completed , Dubai Terminal 3, Concourse B VOX Private Cinema, Kempinski Hotel, Aug, 2019 Completed Fraise BonBon Dubai Kiosk Feb, 2019 Completed MOE, Dubai Fix A Café, Dubai Airport Terminal 3, July, 2019 Completed Vox Cinema Mall, Al Qasr Riyadh, KSA Feb, 2019 Completed Concourse A Fix B Café, Dubai Airport Terminal 3, July, 2019 Completed IFFCO Beverage Bar @ Al Barsha Feb, 2019 Completed Concourse B Vida Residency, July, 2019 Completed Torno Subito, W Dubai - The Palm, Dubai Feb, 2019 Completed

B+G+1 Private Villa June, 2019 Completed Private Villa @ Nad Al Sheba Feb, 2019 Completed

Abu Bakr Siddiqui, Riyadh, KSA June, 2019 Completed Private Villa (Small Villa 1 & 2) Feb, 2019 Completed

Farzi Café, Mall of the Emirates June, 2019 Completed Nando's Feb, 2019 Completed

Reel Cinema, Dubai Mall, Phase 3 May, 2019 Completed Avli by Tashas, DIFC Dubai Jan, 2019 Completed

Vietnamese Foodies at Downtown April, 2019 Completed Tasha's Al Jalila, Umm Suqeim, Dubai Jan, 2019 Completed Dubai

Nuttela Bar, Vox Cinema, Mall of The April, 2019 Completed Grand Plaza Movenpick Media City, Jan, 2019 Completed Emirates, Dubai Dubai Completed Mercure Hotel Renovation, Sheikh March, 2019 Completed The Shore (External Bar), Atlantis The Jan, 2019 Zayed Road, Dubai Palm, Dubai The Edge (External Bar), Atlantis The Jan, 2019 Completed Grab it Convenient Store, Airport March, 2019 Completed Palm, Dubai Terminal 3

Company Profile Company Profile 23 24 APPENDIX C APPENDIX C PROJECTS OVERVIEW PROJECTS OVERVIEW

YEAR 2019 Projects Involving Supply & Installation of Foodservice & Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms Laundry Equipment and/or Coldrooms

Name & Location Completion Status Completion Date Name & Location Date Status Matagi Restaurant, Kempinski Oct, 2018 Completed Plato's Pantry, Atlantis The Palm, Jan, 2019 Completed Emerald Palace, Palm Jumeirah, Dubai Dubai Rooftop Speciality Restaurant, Sobe Jan, 2019 Completed Al Wadi Dessert Resort (Laundry Oct, 2018 Completed Lounge, Palm Jumeirah, W Hotel, Room), Ras Al Khaimah Dubai Latitude Restaurant Refurbishment, Completed Completed Oct, 2018 Akira Back, W Hotel - The Palm, Dubai Jan, 2019 , Dubai YEAR 2018 The Galliard, The Address Downtown, Oct, 2018 Completed Dubai Wavehouse, Atlantis The Palm Hotel, Dec, 2018 Completed Loacker Café, Oct, 2018 Completed Dubai Mezza House, Mirdiff, Dubai Dec, 2018 Completed Crank Gym, Al Qouz, Dubai Oct, 2018 Completed

Private Kitchen (Al Shamsi) Dec, 2018 Completed Vox Cinema, , Abu Dhabi Sep, 2018 Completed

The Address Downtown Dubai Reinstate- Dec, 2018 Completed ment, Dubai Boulevard Gunaydin, Dubai Mall Foodcourt, Sep, 2018 Completed Dubai The Address Hotel Dubai Mall Renova- Dec, 2018 Completed tion - BOH Area at Club Lounge Reel Cinema, The Spring Souk, Aug, 2018 Completed Springs Community, Dubai Flour & Stone, Dubai International Nov, 2018 Completed Airport, Concourse A Citibank, Dubai Aug, 2018 Completed Villamore Restaurant, Emerald Palace Nov, 2018 Completed Kempinski, Palm Jumeirah, Dubai Reel Cinema, Dubai Mall, Dubai Aug, 2018 Completed The Address Hotel Dubai Mall Renova- Oct, 2018 Completed tion - Lobby Lounge / Grab & Go Nutella, Dubai Airport Terminal 3, Aug, 2018 Completed Dubai Oct, 2018 Completed Private Villa @ Nad Al Sheba Grill Station at Souq Al Jubail, Sharjah Aug, 2018 Completed

Reel Cinema, The Pointe, Dubai Oct, 2018 Completed Lowe Restaurant, KOA Canvas, Dubai July, 2018 Completed

Private Villa (Small Villa 1 & 2) Oct, 2018 Completed DIFC Conference Center, Dubai June, 2018 Completed Night Lounge @ The Palm Jumeirah, Oct, 2018 Completed Emerald Palace, Kempinski Hotel Vox Cinema Mirdiff City Center June, 2018 Completed

Company Profile Company Profile 25 26 APPENDIX C APPENDIX C PROJECTS OVERVIEW PROJECTS OVERVIEW

Projects Involving Supply & Installation of Foodservice & Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms Laundry Equipment and/or Coldrooms

Completion Completion Name & Location Name & Location Date Status Date Status Vox Cinema Sharjah City Center June, 2018 Completed Big Smoke Burger, La Mer, Dubai Feb, 2018 Completed

STK Downtown, The Address Down- June, 2018 Completed Chickery, La Mer, Dubai Feb, 2018 Completed town, Dubai Completed Al Montazah Park, Sharjah June, 2018 The Love of Bread Organic Bakery, Feb, 2018 Completed Dubai Completed Sikka (S34), Dubai Airport Terminal 3 June, 2018 Filful Restaurant, Downtown Dubai, Feb, 2018 Completed Dubai

The Daily DXB, Dubai Airport Terminal June, 2018 Completed Home Bakery Kitchen, D3, Dubai Feb, 2018 Completed 3

Central Kitchen, Dubai Airport Termi- June, 2018 Completed Emirates Academy of Hospitality Feb, 2018 Completed nal 3 Management, Dubai Prime Gourmet, Spring Village Neighbors Coffee Shop, API Building, May, 2018 Completed Feb, 2018 Completed Dubai

Guy Fieri Kitchen & Bar and Dine-in Swiss International Scientific School, May, 2018 Completed Completed Cinema, Jebel Ali Recreation Club, Dubai Dubai, Middle High School & Auditorium Feb, 2018 Phase 3, Dubai Reel Cinema, Marina Mall Dubai April, 2018 Completed Nazr Private Villa, Dubai Feb, 2018 Completed

Jamies Oliver's Pizzeria, Jumeirah April, 2018 Completed Vox Cinema, Ajman City Center Jan, 2018 Completed Lake Towers, Dubai Flair No.5, The Ritz-Carlton, DIFC, Gate Village 09A-10, Four Seasons April, 2018 Completed Jan, 2018 Completed DIFC Dubai

Tranzeet DXB,Dubai Airport Terminal 3 March, 2018 Completed Nando's Ajman City Center Jan, 2018 Completed

Moon Bar, The Ritz-Carlton Ras Al March, 2018 Completed Crab Market Restaurant & Lounge, Jan, 2018 Completed Khaimah, Al Wadi Desert, Ras Al Khaimah DIFC, Dubai

Nandos, Sharjah City Centre March, 2018 Completed Traiteur Brunch (Bar and Pantry Mezza- Jan, 2018 Completed nine Floor), Park Hyatt Somewhere Restaurant, Dubai Mall March, 2018 Completed

1762 Stripped, Feb, 2018 Completed Renovation

Company Profile Company Profile 27 28 APPENDIX C APPENDIX C PROJECTS OVERVIEW PROJECTS OVERVIEW

YEAR 2017 YEAR 2017 Projects Involving Supply & Installation of Foodservice & Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms Laundry Equipment and/or Coldrooms Completion Completion Name & Location Date Status Name & Location Date Status Kona Grill Restaurant Bar & Oct, 2017 Completed Morimoto Dubai, Rennaisance Dec, 2017 Completed Lounge, Al Seef, Dubai Downtown Hotel, Dubai

The Farm House, The Ritz-Carlton Sep, 2017 Completed Completed Surf N Fries, Jumeirah Beach Road, Dec, 2017 Ras Al Khaimah, Al Wadi Desert Dubai Shababeek Restaurant, Al Qasba, Shar- Sep, 2017 Completed Kaheela Restaurant, The Ritz-Carlton Al Nov, 2017 Completed jah Wadi Desert Resort, Ras Al Khaimah Prime Gourmet, Gold & Diamond Park, Sep, 2017 Completed Completed STK Dubai JBR, Rixos Premium Dubai, Nov, 2017 Dubai The Walk, Jumeirah Beach Residence (Club Aug, 2017 Completed The Noodle House, Burjuman Mall Nov, 2017 Completed Kitchen Renovation), Dubai Al Dawar Revolving Restaurant, Hyatt Aug, 2017 Completed ZPizza, Bay Square, Dubai Nov, 2017 Completed Regency, Dubai Flamingo Room by tasha's, Jumeirah Al Aug, 2017 Completed Drift Beach Dubai Restaurant & Bar, One & Only Naseem Lagoon Royal Mirage, Dubai Nov, 2017 Completed Lock Stock & Barrel, Rixos Premium 1762 Gourmet Deli, Abu Dhabi Aug, 2017 Completed Completed Dubai, Jumeirah Beach Residence Nov, 2017 Nando's, IBN Batuta Mall, Dubai Aug, 2017 Completed Traiteur Brunch (Mezzanine Bar), Park Oct, 2017 Completed Hyatt Dubai Creek DWC Cold Storage Aug, 2017 Completed Hola, La Mer, Dubai Oct, 2017 Completed Plaj (Beach Bar & Kitchen), Jumeirah Aug, 2017 Completed 99 Shushi Bar & Restaurant, The Oct, 2017 Completed Zabeel Saray, The Palm Jumeirah Galleria, Al Maryah Island, Abu Dhabi Inner City Zoo (Nightclub), Rixos Aug, 2017 Completed Sweet Salvation, City Walk, Dubai Oct, 2017 Completed Premium Dubai, The Walk, JBR, Dubai Big Smoke Burger, Doha, Qatar Aug, 2017 Completed Reception Pantry, The Ritz-Carlton Al Wadi Oct, 2017 Completed Dessert Resort, Ras Al Khaimah Completed Seddiqi & Sons Headquarters, Umm Al Aug, 2017 Completed Turbine & Taps, Sheraton Hotel, Oman Oct, 2017 Sheif, Dubai Reel Cinema, Dubai Mall Aug, 2017 Completed La Petite Maison, The Galleria, Al Oct, 2017 Completed Maryah Island, Abu Dhabi Sean Connolly at , Down- Completed Completed July, 2017 Nusret Restaurant, Doha Qatar Oct, 2017 town Dubai

Company Profile Company Profile 30 29 APPENDIX C PROJECTS OVERVIEW

Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms

Completion Name & Location Date Status Play Restaurant (Refurbishment July, 2017 Completed 0f 36th Floor Kitchen), H Hotel, Dubai

Al Mander Lounge, Jumeirah Al July, 2017 Completed Naseem, Dubai

D Club Central Production Kicthen, Abu May, 2017 Completed Dhabi

Blaze Burgers, The Walk, JBR May, 2017 Completed

MAF Outlet Mall, Oman May, 2017 Completed

MAF Outlet Mall (MOE), Dubai May, 2017 Completed

City Centre, Muscat May, 2017 Completed

Nando's Jumeirah Lake Island April, 2017 Completed

Vox Cinema, Doha Qatar April, 2017 Completed

Dubai Golf Club Staff Canteen, Dubai April, 2017 Completed

Blacksmith Coffee Company, Saadiyat April, 2017 Completed Island, Abu Dhabi

Vox Cinema Mall of Egypt, Egypt April, 2017 Completed

Tasha's, The Outlet Village, Dubai March, 2017 Completed

Jet Café Boulevard March, 2017 Completed

Completed Amazonico DIFC, Dubai The Noodle House, Motor City, Dubai March, 2017

Coya Restaurant, Al Maryah Island, March, 2017 Completed Abu Dhabi

Company Profile Company Profile 31 32 APPENDIX C PROJECTS OVERVIEW

Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms

Name & Location Completion Status Date

Jones The Grocer, Mirdiff City March, 2017 Completed Center

Seven Sands (BOH), Etihad Museum, Feb, 2017 Completed Dubai

BBQ Delights Feb, 2017 Completed

Warehouse Gym Bar, Jumeirah Feb, 2017 Completed

Tasha's, Al Bateen, Abu Dhabi Feb, 2017 Completed

Johnny Rockets, Dubai Mall Feb, 2017 Completed

Caramel Restaurant, Oman Jan, 2017 Completed

Seven Sands (FOH), Etihad Museum, Dubai Jan, 2017 Completed

Leadership Institute, MAF Tower 1, Jan, 2017 Completed Dubai

Staff Dining, Opera House, Dubai Jan, 2017 Completed

Lima Restaurant, City Walk, Dubai Jan, 2017 Completed

China Grill, Four Seasons Hotel, Dubai

Company Profile 33 Company Profile 34 APPENDIX C PROJECTS OVERVIEW

YEAR 2016 Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Date

Morah Restaurant, JW Marriot Dec, 2016 Completed Marquis Tower B, Dubai Big Chef Restaurants, JBR The Beach Dec, 2016 Completed

Atlantic Restaurant, Souq Al Bahar Dec, 2016 Completed

Miyako Japanese Restaurant, Hyatt Nov, 2016 Completed Regency Dubai Roux Café, City Walk 2, Dubai Nov, 2016 Completed

N-Burger Show Kitchen, Dubai Parks, Dubai Nov, 2016 Completed

Tom's Deli, Dubai Parks, Dubai Nov, 2016 Completed

Operation Falapel, Motor City, Dubai Oct, 2016 Completed

Colors Café, Deira City Center, Dubai Oct, 2016 Completed

1762 Stripped, Jumeirah Lake Towers, Oct, 2016 Completed Dubai

Thanani Restauran, Ajman Oct, 2016 Completed

Play Restaurant (R&D Kitchen), H Sep, 2016 Completed Hotel, Dubai

Aji - The Palm Jumeirah, Club Vista Sep, 2016 Completed Mare, Palm Jumeirah, Dubai

Frosty's Grab & Go, Hyatt Regency Sep, 2016 Completed Dubai

Zaroob, , Dubai Sep, 2016 Completed W Dubai – Palm Jumeirah, Dubai Besh Turkish Restaurant, Sheraton Sep, 2016 Completed MOE, Dubai

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 36 35 APPENDIX C APPENDIX C PROJECTS OVERVIEW PROJECTS OVERVIEW

Projects Involving Supplies & Installation of Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Name & Location Completion Status Date Date

Nando's Bouti, Shams Boutik, Sep, 2016 Completed Four Seasons Hotel, DIFC, Dubai March, 2016 Completed Abu Dhabi Ruya Restaurant, Grosvenor House, Aug, 2016 Completed First and Business Class Lounges, March, 2016 Completed Dubai Dubai International Airport, Dubai

Aubaine Restaurant, City Walk, Dubai July, 2016 Completed Zero Gravity Bar, Dubai Feb, 2016 Completed

Le Royal Meridien Beach Resort & Spa July, 2016 Completed Mr. Osama Seddiqi's Villa BOH Kitch- Feb, 2016 Completed en, Dubai Cho Gao Restaurant, Concourse A, July, 2016 Completed Social House, Dubai Mall Feb, 2016 Completed Dubai Airport Terminal 3 Muchachas Mexican Cantina, Holiday Inn Express, July, 2016 Completed Vox Cinema Al Shindagha, Dubai Feb, 2016 Completed Al Safa, Dubai Zpizza, Al Barsha, Dubai July, 2016 Completed BU!, WTC Mall, Abu Dhabi Feb, 2016 Completed

Vox Cinema, Burjuman Mall Renovation, June, 2016 Completed Vox Cinema, Deira City Centre, Dubai Jan, 2016 Completed Dubai Fuchsia Restaurant, Bay Square, June, 2016 Completed Gaucho (Refurbishment), DIFC Jan, 2016 Completed Dubai Weslodge Saloon, JW Marquise, Dubai April, 2016 Completed

Prime Gourmet, Town Centre, April, 2016 Completed Jumeirah Tragaluz Restaurant, DIFC, Dubai April, 2016 Completed

Coriander Restaurant, WTC Mall, Abu March, 2016 Completed Dhabi

Goodies Pizza Café, Abu Dhabi March, 2016 Completed

Serendipity, City Walk, Dubai March, 2016 Completed

Brunswick Sports Club, Sheraton March, 2016 Completed Hotel MOE, Dubai

Company Profile Company Profile 37 38 APPENDIX C PROJECTS OVERVIEW

YEAR 2015 Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Date

Jumeirah Staff Dec, 2015 Completed Canteen, Dubai Lake View Restaurant, Dubai Creek Dec, 2015 Completed Golf & Yacht Club, Dubai (Outdoor BBQ & Bar) Hilton Garden Inn, Al Barsha, Dubai Dec, 2015 Completed

Serendipity 3 DFC, Dubai Dec, 2015 Completed

Katana Restaurant, Dubai Nov, 2015 Completed

Buddha Bar Restaurant & Bar Refurbishment, Nov, 2015 Completed Dubai Vox Cinema Nation Towers, Abu Dhabi Oct, 2015 Completed

Vox Cinema, MOE, Dubai Oct, 2015 Completed

Fume Downtown Dubai Oct, 2015 Completed

Zaroob, Golden Mile, Dubai Oct, 2015 Completed

Common Grounds, MOE, Dubai Oct, 2015 Completed

Olea Restaurant, Kempinski MOE, Oct, 2015 Completed Dubai

More Café, MOE, Dubai Oct, 2015 Completed

Social House Refurbishment Dubai Mall, Sep, 2015 Completed Dubai

Zahr El Laymoun, Souk Al Bahar, Aug, 2015 Completed Dubai Wavehouse, Dubai Zaroob Sheikh Zayed Road, Dubai July, 2015 Completed

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 40 39 APPENDIX C PROJECTS OVERVIEW

Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Date

Etihad Coffee Shop, Abu Dhabi July, 2015 Completed

MAF Majlis, Dubai June, 2015 Completed

Hyatt Place, Baniyas Square Dubai June, 2015 Completed

Dusty's Lounge, DIFC, Dubai June, 2015 Completed

Pi Dubai June, 2015 Completed

Vox Cinema, Burjuman Centre, Dubai May, 2015 Completed

Saud Bahwan Farm House, Oman May, 2015 Completed

Big Smoke Burger, BOXPARK, Dubai April, 2015 Completed

The Pantry Cafe, Bay Square, Dubai April, 2015 Completed

Retro Feast, The Beach, Dubai March, 2015 Completed

Unilever Training Kitchen, Dubai March, 2015 Completed

Butcha Restaurant, The Beach, Dubai Feb, 2015 Completed

NZ Group Central Kitchen, Dubai Jan, 2015 Completed

Swiss International Scientific School, Dubai

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 41 42 APPENDIX C APPENDIX C PROJECTS OVERVIEW PROJECTS OVERVIEW

YEAR 2014 Projects Involving Supplies & Installation of Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Name & Location Completion Status Date Date

Coya Restaurant, Four Seasons Dec, 2014 Completed COSI Restaurant at Dubai Inter- July, 2014 Completed Resort Dubai national Airport, Terminal 2, Dubai Nad Al Sheba (Warehouse Cold Dec, 2014 Completed Store), Dubai Warwick HotelDubai,Dubai July, 2014 Completed

Nusret Restaurant, Four Seasons Resort Dec, 2014 Completed Home Bakery,Dubai July, 2014 Completed Dubai BSBR Staff Housing Kitchen Equip- Nov, 2014 Completed BOCA Restaurant,Dubal June, 2014 Completed ment, Dubai

BSBR Staff Housing Laundry Equip- Nov, 2014 Completed Refurbishment of Staff Canteen at June, 2014 Completed ment, Dubai Mina A Salam, Dubal Four Seasons Resort Dubai Nov, 2014 Completed Refurbishment of Trilogy Night Club - Jambase June, 2014 Completed Restaurant, Dubai ROGO's (The Roller Coaster Restaurant), Oct, 2014 Completed Pacha Restaurant 1st & 2nd Leve,l Dubal June, 2014 Completed Yas Mall, Abu Dhabi

Vox Cinemas, Yas Mall, Abu Dhabi Oct, 2014 Completed VOX Quram, Oman June, 2014 Completed

Frioul Bistro De Luxe, Madinat Sep, 2014 Completed Pacha lblza, , Dubal May, 2014 Completed Jumeirah, Dubai Magnolia Bakery, The Baech, Dubai Sep, 2014 Completed VOX Muscat, Oman May, 2014 Completed

Zuma Restaurant, Dubai (Refurbsih- Sep, 2014 Completed Areej Cafe Food Truck, Saudi Arabia March, 2014 Completed ment) Courtyard by Marriot World Trade Aug, 2014 Completed Zuma Restaurant, Abu Dhabi Feb, 2014 Completed Center, Abu Dhabi

Dolcezza, DIFC Dubai Aug, 2014 Completed La Porte des lndes, Dubai Jan, 2014 Completed

Jumeirah Zabeel Saray, Dubai Aug, 2014 Completed

The Pantry, Al Wasl Square, Dubai Aug, 2014 Completed

Big Chef's Café & Brasserie, Jumeirah July, 2014 Completed Beach Residence, Dubai

Company Profile Company Profile 43 44 APPENDIX C PROJECTS OVERVIEW

YEAR 2013 Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Date

Dhow & Anchor Refurbishment, Dec, 2013 Completed Dubai Ocean View Hotel, Dubai Dec, 2013 Completed

Skydlve Bar, Dubai Dec, 2013 Completed

Movenpick Jumeirah, Dubal Nov, 2013 Completed

St. Tropez Bistro, MOE, Dubal Nov, 2013 Completed

VOX Cinema, Ras AI Khaimah Nov, 2013 Completed

Mint Leaf of London, DIFC, Dubai Oct, 2013 Completed

Nation Riviera, Abu Dhabi Oct, 2013 Completed

Ocean Basket, Mirdiff City, Centre, Oct, 2013 Completed Dubai Salero Taps & Bodega, Kempinski Oct, 2013 Completed Hotel, Dubai

UMI Restaurant, Ras Al Khaimah Oct, 2013 Completed

AI Markaz Restaurant, Hyatt Regency Oct, 2013 Completed Hotel, Dubai

BOA Restaurant, Abu Dhabi Oct, 2013 Completed

Burj AI Salam Bar, Sheraton Hotel, Dubai Oct, 2013 Completed

I love Fashion TV Cafe, Dubai Boule- Oct, 2013 Completed vard Gunaydin, Dubai I love Fashion TV Cafe, Sunset Mall Oct, 2013 Completed

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 46 45 APPENDIX C APPENDIX C PROJECTS OVERVIEW PROJECTS OVERVIEW

Projects Involving Supplies & Installation of Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Name & Location Completion Status Date Date

Bapas Bar, The H Hotel, Dubai Sep, 2013 Completed Claw Restaurant, Souq AI Bahar, June, 2013 Completed Dubai Café D' Alsace, Yas Marina, Abu Dhabi Completed Sep, 2013 The Ritz-Carlton Abu Dhabi, Grand June, 2013 Completed Canal (Abu Dhabi), (Waste Manage- ment System) Completed Caramel Restaurant, Abu Dhabi Sep, 2013 Franke Kitchen, Ras AI Khaimah May, 2013 Completed

Carrefour MOE (Shushi Counter), Sep, 2013 Completed Koffeecake Comer, Downtown Dubai May, 2013 Completed Dubai Sep, 2013 Completed Chamas Restaurant, Crowne Plaza, Downtown Dubai Development: The April, 2013 Completed Dubai Burj Khalifa, Dubai Pullman Hotel, Deira City Centre, Dubai Sep, 2013 Completed Marhaba Lounge,Dubai International Airport- April, 2013 Completed Terminal 2, Dubai Rozanah Lebanese Restaurant, Yas Marina, Sep, 2013 Completed Abu Dhabi Spin Dubai Restaurant, Wafi Mall, Dubai April, 2013 Completed The Els Club, Dubai Sep, 2013 Completed VOX Cinema Mercato, Dubai March, 2013 Completed Warehouse Gym Café, Dubai Sep, 2013 Completed VOX Cinema FCC, Fujairah Jan, 2013 Completed Almaz Restaurant, Abu Dhabi Aug, 2013 Completed

Emporio Armani Caffe, Abu Dhabi Aug, 2013 Completed

Magnolia Bakery, The Galleria, Aug, 2013 Completed Sowwah Square, Abu Dhabi

Noodle House, City Walk, Dubai Aug, 2013 Completed

The St. Regis, Abu Dhabi Aug, 2013 Completed

KOI Restaurant, St.Regis Saadiyat July, 2013 Completed Island Resort, Abu Dhabi

Cafe Court- Succa/Soho Grill, Wafi, June, 2013 Completed Dubai

Company Profile Company Profile 47 48 APPENDIX C PROJECTS OVERVIEW

YEAR 2012 Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Date

Le Meridien Dubai - Beef Bistro, Dec, 2012 Completed Dubai Movenpick Hotel, The Square AI Dec, 2012 Completed Mamzar, Dubai

Noodle House, Souk Madinat Jumeirah, Dec, 2012 Completed Dubai The Pizza Guys, Dubai Dec, 2012 Completed

Armani Caffe, Kuwait Oct, 2012 Completed

Pullman Hotel, Ground Floor - Deira City Centre, Sep, 2012 Completed Dubai Scott's Restaurant, Abu Dhabi Sep, 2012 Completed

Duqm City Hotel, Oman Aug, 2012 Completed

Lively CentralKitchen, Dubai May, 2012 Completed

1762 Deli Shop Limitless, Dubal April, 2012 Completed

Milk & Honey Meadows, Dubai April, 2012 Completed

Meydan Beach Club, Dubai March, 2012 Completed

Meydan Golf Club Restaurant & Sports March, 2012 Completed Bar, Dubai

Ocean Basket, Airport Terminal 3, Dubal Feb, 2012 Completed

Slices, Zayed University, Abu Dhabi Feb, 2012 Completed Sikka Cafe, Dubai

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 50 49 APPENDIX C PROJECTS OVERVIEW

YEAR 2011 Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Date

Pullman Hotel, Executive Dec, 2011 Completed Lounge- Deira City Centre, Dubai Slices, AI Mamoura B Tower, Abu Dec, 2011 Completed Dhabi

The St. Regis Saadiyat Island Resort, Dec, 2011 Completed Abu Dhabi Hilton Capital Grand - Brazilian & Nov, 2011 Completed Oriental Restaurant, Abu Dhabi Jumeirah AIQasr - Central Bakery & Nov, 2011 Completed Pastry Dubai Alfie's Restaurant - Jumeirah Emirates Towers, Oct, 2011 Completed Dubal Gaucho DIFC, Dubai Oct, 2011 Completed

Grand Hyatt - The Living Room & Oct, 2011 Completed Lounge, Dubai Mezza House, Dubai Oct, 2011 Completed

VOX Cinemas Marina Mall, Abu Dhabi Oct, 2011 Completed

1762 Deli Shop, DIFC, Dubai Aug, 2011 Completed

The Ivy Dubai, Dubai May, 2011 Completed

Presidential Flight Catering Facility, Feb, 2011 Completed Abu Dhabi

Burj Khalifa Level122 - Atmosphere Grill Jan, 2011 Completed & Lounge, Dubai

Mint Leaf of London, DIFC Dubai

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 52 51 APPENDIX C PROJECTS OVERVIEW

YEAR 2010 Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Date

One&Only, The Palm, Dubai Oct, 2010 Completed

Ritz Carlton Hotel & Limestone Sep, 2010 Completed House, DIFC, Dubai, (Custom Fabri- cated Wine Wall) La Petite Maison, DIFC, Dubai Sep, 2010 Completed

Le Meridien Dubai - Back of House and Sep, 2010 Completed Meeting Rooms, Plot 214-848, Dubai

VOX Cinemas Deira City Centre, Vox Sep, 2010 Completed Cafe, Dubai

Pullman Dubai,Mall of the Emirates Hotel, Aug, 2010 Completed Dubai Brunetti, DubalMall, Dubai April, 2010 Completed

Hyatt Regency - Emarati Kitchen, Dubai March, 2010 Completed

VOX Cinemas, Mirdif City Centre, March, 2010 Completed Dubai (Vox Cafe & Gold)

Gary Player Gold Club Academy and Jan, 2010 Completed Associated Buildings, Saadlyat Island, Abu Dhabi

Ibis Hotel & Offices, AI Riqqa, Dubai Jan, 2010 Completed

Scotts floating seafood Restaurant Ethiad Tower, Dubai

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 54 53 APPENDIX C APPENDIX C PROJECTS OVERVIEW PROJECTS OVERVIEW

YEAR 2009 YEAR 2008 Projects Involving Supplies & Installation of Projects Involving Supplies & Installation of Foodservice Equipment and/or Coldrooms Foodservice Equipment and/or Coldrooms

Name & Location Completion Status Name & Location Completion Status Date Date

Abu Dhabi Golf Club, Abu Dhabi Dec, 2009 Completed Rivington Grill, Souk AI Bahar, Dec, 2008 Completed Dubai Aloft, Abu Dhabi (Adnec) Dec, 2009 Completed Noodle House Shangri - La BTB, Abu Oct, 2008 Completed Dhabi

Caramel Restaurant and Lounge - Las Dec, 2009 Completed The Address, Downtown Burj Dubai, Sep, 2008 Completed Vegas, DIFC, Dubai Dubai Bice Mare, Souk AI Bahar, Dubal Aug, 2009 Completed Urbano, Souk AI Bahar, Dubai Aug, 2008 Completed

Bice Mare, Souk AI Bahar, Dubal Aug, 2009 Completed Zuma Restaurant DIFC, Dubai Aug, 2008 Completed

Ibis & Suite Hotel - AI Barsha, Dubai May, 2009 Completed Etihad Airways Business Class Lounge, June, 2008 Completed Abu Dhabi Airport Terminal 3 & Concourse 2, Dubai March, 2009 Completed Dubai Marina Yacht Club, Dubai June, 2008 Completed

DMCC AI Mas Tower, Dubai March, 2009 Completed Ibis & Novotel - City Centre Dubai April, 2008 Completed

Sheikh Hasher Palace Kitchen, Dubai March, 2009 Completed The Monarch Dubai - Empire Dubai Feb, 2008 Completed

Margaux Preparation Kitchen, DIP, Feb, 2009 Completed Completed Dubai Dubai World Trade Centre Apartment, Feb, 2008 Dubai Okku Restaurant Lounge - The Mon- Feb, 2009 Completed arch Dubai, Dubai Kuwait Food Co. (Americana) - Fish Jan, 2008 Completed Market Restaurant, Kuwait Warehouse - Le Meridien, Dubai Feb, 2009 Completed (Austmarine Live Sea Food Tanks & Arctic Merchandisers) Bang Bar, Souk AI Bahar, Dubai Jan, 2009 Completed

Margaux Restaurant, Souk AI Bahar, Jan, 2009 Completed Dubai

Mirai Restaurant, Souk AI Bahar, Dubai Jan, 2009 Completed

Ruth's Chris Steak House - The Monarch Jan, 2009 Completed Dubai, Dubai

Company Profile Company Profile 55 56 APPENDIX C PROJECTS OVERVIEW

YEAR 2007 Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms

Name & Location Completion Status Date

Arabian Coffee Company, FZCO - June, 2007 Completed Crowne Plaza Hotel, Dubai - Jinsui Japanese June, 2007 Completed Restaurant, Dubai

Steam Sum Dim Sum - Dubai Festival June, 2007 Completed City, Dubai

Rotana Executive Apartments - Burju- April, 2007 Completed man Extension, Dubai

Burj Al Arab - Bab Al Yam Restaurant March, 2007 Completed Refurbishment, Dubai

World Trade Center - Residence, Dubai March, 2007 Completed

Burj Dubai Development - The Palace, The Feb, 2007 Completed Old Town, Dubai

Noodle House Dubai Marina - Jumeirah Feb, 2007 Completed Group, Dubai

World Trade Center - Majlis & Zabeel Jan. 2007 Completed Pantry, Dubai

Olea And Noir AT Kempinski MOE Dubai

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 58 57 APPENDIX C PROJECTS OVERVIEW

YEAR 2006 Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms

Name & Location Completion Status Date

Dubai Creek Golf & Yacht Club - Dec, 2006 Completed Staff Canteen, Dubai Four Seasons Golf Club, Dubai Dec, 2006 Completed Festival City, Dubai

Jumeirah Beach Hotel - Lattitude, Dubai Dec, 2006 Completed

Kempinski Hotel - Blanc Du Heron, Nov, 2006 Completed Djibouti

Fairmont Hotel - Cascades Refurbishment, Oct, 2006 Completed Dubai (Buffet Counters and Live Cooking Station)

Bab Al Shams - New Restaurants Development, June, 2006 Completed Dubai Jumeirah Beach Hotel - Beach Comber, June, 2006 Completed Dubai Almaz by Momo, Harvey Nichols, Dubai April, 2006 Completed

Dubai Women’s Association, Dubai April, 2006 Completed

Hashi Japanese Restaurant for April, 2006 Completed Thomas Klein Int’l, Kuwait

Noodle House at DIFC - Jumeirah April, 2006 Completed Group, Dubai

HH Sheikha Mariam’s Palace - Kitchen Jan, 2006 Completed & Laundry, Dubai

Noodle House, Deira City Centre - Jan, 2006 Completed Jumeirah Group, Dubai

Chamas, Crown Plaza Hotel Dubai

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 60 59 APPENDIX C PROJECTS OVERVIEW

YEAR 2005 Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms

Name & Location Completion Status Date

Dubai Creek Golf & Yacht Club - Nov, 2005 Completed Aquarium Restaurant, Dubai

Le Meridien Dubai - Yalumba Restau- Oct, 2005 Completed rant & Main Kitchen, Dubai

One&Only Royal Mirage, Dubai Oct, 2005 Completed

Le Meridien Dubai, Dubai July, 2005 Completed (Guest Rooms Coffee Machine Solu- tion - Supply & Installation)

Yo! Sushi, Dubai April, 2005 Completed

Bab Al Shams, Dubai Jan, 2005 Completed

YEAR 2004

Hyatt Regency - Bistro Restaurant & Dec, 2004 Completed Martini Bar, Dubai

Qatar Airways - Catering Facility at Qatar Airport, Dec, 2004 Completed Qatar (Elro Cooking Equipment Installation)

Emirates Flight Catering Co., L.L.C, Dubai Sep, 2004 Completed (Vacuum Waste Disposal System)

Madinat Jumeirah Resort Phase III - Sep, 2004 Completed Souq & Souq Villas, Dubai

Madinat Jumeirah Souq - The Meat Sep, 2004 Completed Company, Dubai

Madinat Jumeirah Resort Phase III - July, 2004 Completed MPV & Banqueting, Dubai

Shangri-La Hotel - Amwaj Restaurant, March, 2004 Completed Courtyard Marriott_WTC Dubai Abu Dhabi

KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Company Profile 62 61 APPENDIX C APPENDIX C PROJECTS OVERVIEW PROJECTS OVERVIEW

YEAR 2003 YEAR 1999 Projects Involving Supply & Installation of Foodservice & Projects Involving Supply & Installation of Foodservice & Laundry Equipment and/or Coldrooms Laundry Equipment and/or Coldrooms

Name & Location Completion Status Name & Location Completion Status Date Date

Madinat Jumeirah - Staff Accom- Oct, 2003 Completed Le Meridien Mina Seyahi - DIMC, Dec, 1999 Completed modation, Dubai Dubai DWTC - Central Production Kitchen, May, 2003 Completed Burj Al Arab, Dubai Oct, 1999 Completed Ibis & Novotel, Dubai

Grand Hyatt, Dubai Feb, 2003 Completed Jumeirah Wild Wadi, Dubai June, 1999 Completed

Grand Hyatt Staff Accommodation, Feb, 2003 Completed One&Only Royal Mirage Hotel, Dubai April, 1999 Completed Dubai YEAR 1998 YEAR 2002 Jumeirah Beach Hotel - Staff Accommodation, Dec, 1998 Completed Le Meridien Dubai - Seafood Market, Dubai Dec, 2002 Completed Dubai (Austmarine Live Sea Food Tanks & Arctic Merchandisers) Oasis Beach Resort, Dubai Jan, 1998 Completed

Jumeirah Beach Hotel - The Apartment Aug, 2002 Completed Nightclub, Dubai YEAR 1997 Fairmont Hotel - Spectrum On One, Jan, 2002 Completed American University, Sharjah Dec, 1997 Completed Dubai Al Bustan Rotana Hotel, Dubai July, 1997 Completed YEAR 2000 YEAR 1996 Dubai Rulers Court - HH Sheikha Nov, 2000 Completed Mariam’s Palace, Dubai Wonderland Theme Park Restaurants, Nov, 1996 Completed Dubai Dubai International Hotel Aug, 2000 Completed Airport Concourse, Dubai (Kitchen & Holiday Inn Crowne Plaza, Abu Dhabi June, 1996 Completed Bar)

Jumeirah Beach Hotel - Marina, Dubai April, 2000 Completed YEAR 1995

Nov, 1995 Completed Jumeirah Emirates Towers - Agency, April, 2000 Completed Nad Al Sheba Golf & Racing Club, Scarlett & Et Sushi, Dubai Dubai

Le Meridien Dubai, Dubai Jan, 2000 Completed YEAR 1994

Dubai Creek Golf & Yacht Club, Dubai June, 1994 Completed

Company Profile Company Profile 63 64 CONTACT USOffice 1209, 12th Floor Contact Us Prime Tower Building, Business Bay P.O. Box 69, Dubai, UAE

TSSC Kitchen & Laundry Equipment Trading L.L.C

LOCATION Office 1209, 12th Floor Prime Tower Building, Business Bay P.O. Box 69, Dubai, UAE

[email protected]

FOR MORE DETAILS +971 4 343 1100 E-MAIL OR CALL Toll Free Service Hotline 800-24-TSSC (800-24-8772)

WEBSITE https://tsscdubai.com/

Tranzeet, Dubai

O ce address: O ce address: P.O. Box 136, P.C. 103 Aloula Bldg. 2nd Floor, O ce 208, 8428 King Fahed Road, Mohmdeah KCitchenompany & ProfileLaundry Equipment Trading LLC | Company Profile Bareeq Al Shatii, Sultanate of Oman 4250-12363, Riyadh, Kingdom of Saudi Arabia 65