Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Andhra Pradesh 1.18 Infra Visakhapatanam Providing Basic Infrastructure facilities at 1 28135092B145 2.40 1.18 - - NA - - - 28-Sep-2006 Srinagar (Visakhapatnam), Andhra Pradesh -- NA -- Andhra Pradesh 3616 DUs with Infrastructure facilities in 45.14 3616 Visakhapatanam 2 28135092B1875 Aganampudi in GVMC Area (Andhra Pradesh) 90.71 45.14 - - 3616 - 3,335 281 28-Feb-2009 under JNNURM ------Andhra Pradesh 1024 DUs with Infrastructure facilities in 13.77 1024 Visakhapatanam 3 28135092B1876 Kommadi in GVMC Area (Andhra Pradesh) 27.68 13.77 0.00 - 1024 - 983 41 28-Feb-2009 under JNNURM ------Andhra Pradesh 2080 DUs with Infrastructure in 24.32 2080 Visakhapatanam 4 28135092B1877 Paradesipalemin Sy. No. 178 Poor Settlement 48.79 24.32 - - 2080 - 1,983 97 28-Feb-2009 in GVMC Area, Andhra Pradesh. ------Andhra Pradesh Revised project for providing relocation 544 6.26 544 Visakhapatanam 5 28135092B4976 DUs with infrastructure in Paradesipalemin Sy 12.75 6.26 - - 544 - 544 - 28-Feb-2009 No. 179 poor settlements in GVMC area. ------Andhra Pradesh 1839 Houses with infrastructure facilities in 24.29 1839 Visakhapatanam 6 28135092B1879 Parwada in GVMC area (Andhra Pradesh) 48.88 24.29 - - 1839 - 1,627 212 28-Feb-2009 under JNNURM. ------Andhra Pradesh Infrastructure facilities to 5 Poor Settlements in 47.33 Infra Visakhapatanam GVMC Area. (Agampudi. Duvvada. Sy No. 27. 7 28135092B4329 95.28 47.33 - - NA - - - 27-Apr-2007 Sy No.179 and VAMBAY Colony -- Madhurwada) -- NA Andhra Pradesh Infrastructure facilities to 11 poor Settlement in 46.48 Infra Visakhapatanam GVMC area Pedagantyada, Gangaram, 8 28135092B4328 94.83 46.48 - - NA - - - 27-Apr-2007 Bhanujithota, TGR Nagar, Sebastain Colonly, -- Agnampudi (UPH) and Rasalamma colony. -- NA Andhra Pradesh 2.7 Infra Visakhapatanam Providing Infrastructure facilities to Yetapallem 9 28135092B21 5.50 2.7 - - NA - - - 28-Sep-2006 (Visakhapatnam) Andhra Pradesh -- -- NA Andhra Pradesh Revised project for 7968 DUs with 48.29 7968 Visakhapatanam 10 28135092B3688 infrastructure to 6 poor settlements in GVMC 167.12 48.29 - - 6971 997 6,730 241 28-Sep-2006 (Package-II), Andhra Pradesh ------Andhra Pradesh BSUP project in steel plant rehabilitation 13.73 Infra Visakhapatanam 11 28135092B655 colony at Vadlapudi in GVMC, Visakhapatnam, 28.00 13.73 - - NA - - - 11-Oct-2006 Andhra Pradesh -- -- NA Andhra Pradesh Revised project 7352 DUs with infrastructure 45.33 7352 Visakhapatanam 12 28135092B4348 to 22 poor settlements in GVMC (Package-I), 142.28 45.33 - - 7232 120 7,134 98 28-Sep-2006 Andhra Pradesh ------318.81 24423 Sub-total of Visakhapatanam for 12 project(s) 764.22 318.81 0.00 - 23306 1,117 22,336 970 -- -- Andhra Pradesh 15000 DUs Rehabilitation of flood victims of 118.67 13760 Vijayawada 13 28165071B124 River Krishna and Budameru Vagu along with 372.90 129.37 - 10.69 12896 768 12,320 576 28-Sep-2006 Infra in VMC area of Andhra Pradesh. -- -- 96 Andhra Pradesh 1.85 Infra Vijayawada Detailed Designs and Estimations for BSUP, 14 28165071B149 3.81 1.85 - - NA - - - 11-Oct-2006 Circle-I area Vijayawada, Andhra Pradesh -- -- NA Andhra Pradesh 3200 DUs BSUP at Gollapudi Jakkampudi 41.15 2688 Vijayawada 15 28165071B1798 Villagae in Vijaywada Muncipal Corporation 98.05 36.74 - - 768 - 220 548 21-Feb-2009 Phase-I, Andhra Pradesh -- -- 1920 Andhra Pradesh 3200 DUs BSUP at Jakkampudi Village in 13.72 896 Vijayawada 16 28165071B1799 Vijaywada Muncipal Corporation Phase-II, 36.54 24.49 - 10.78 512 384 512 - 21-Feb-2009 Andhra Pradesh ------Andhra Pradesh Providing G+3 Group Housing and Basic 29.19 832 Vijayawada 17 28165071B204 Services for Urban Poor in slums located in 90.20 45.84 - 16.65 832 - 832 - 19-Oct-2007 Circle_I, of VMC, Andhra Pradesh. ------Andhra Pradesh Detailed Designs and Estimation for BSUP 24.61 Infra Vijayawada 18 28165071B269 Circle-II, Vijayawada, Andhra Pradesh (Infra 71.97 29.04 - 4.44 NA - - - 02-Feb-2007 only). -- -- NA Andhra Pradesh Detailed designs and estimation for BSUP 8.14 Infra Vijayawada 19 28165071B270 Circle-II&III areas. Vijayawada, Andhra 20.73 12.86 - 4.72 NA - - - 02-Feb-2007 Pradesh -- -- NA Andhra Pradesh Project for repairs to 3373 DUs under 3.43 3373 Vijayawada 20 28165071B616 VAMBAY in Ajit Singh Nagar, Vijayawada, 6.86 3.87 - 0.44 3373 - 3,373 - 13-Feb-2008 Andhra Pradesh ------

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress 240.75 21549 Sub-total of Vijayawada for 8 project(s) 701.06 284.06 - 47.72 18381 1,152 17,257 1,124 -- 2016 Andhra Pradesh Project of Housing Development at 54.13 1800 Tirupati 21 28235192B4973 Vikruthamala Layout for construction of 1800 73.03 54.13 - - 984 - - 984 28-Mar-2012 DUs at Tirupati, Andhra Pradesh -- 10.14 816 Andhra Pradesh 3360 DUs with Infrastructure to Slum dwellers 58.94 3360 Tirupati 22 28235192B4768 at relocation site at Padipera and Avilala-I, 99.24 58.61 - - 3360 - 1,435 1,925 20-Jan-2012 Tirupati, Chittor Distt, Andhra Pradesh -- 5.16 -- 113.07 5160 Sub-total of Tirupati for 2 project(s) 172.27 112.75 - - 4344 - 1,435 2,909 15.3 816 672.64 51132 Total of Andhra Pradesh for 22 project(s) 1,637.55 715.62 0.00 47.72 46031 2,269 41,028 5,003 including 12 project(s) which are completed 15.3 2832 Arunachal Pradesh 40.59 752 Itanagar 752 DUs BSUP project for Karsingsa, 23 12041861B1735 45.15 40.59 ------11-Feb-2009 Itanagar, Arunachal Pradesh -- -- 752 Construction and Improvement of Shelter for Arunachal Pradesh 3.36 100 Itanagar Urbam poor/ Safai Karamcharis at Papu 24 12041861B521 4.10 3.36 - - 100 - 100 - 06-Oct-2007 Nallah, Naharlagun, Itanagar, Arunachal -- Pradesh -- -- Arunachal Pradesh Project -- -- Itanagar Construction of Relocation 96 Dwelling Units Cancelled on 25 12041861B4975 ------28-Mar-2012 at Nirjuli, Arunachal Pradesh, (Phase-II). dated -- 20-May-14 -- -- Arunachal Pradesh 10.52 144 Itanagar Construction of 144 DUs at Nirjuli, 26 12041861B4268 11.68 10.52 - - 144 - 144 - 09-Nov-2011 Banderdeva, Itanagar, Arunachal Pradesh ------54.46 996 Total of Arunachal Pradesh for 3 project(s) 60.94 54.46 - - 244 - 244 - including 1 project(s) which are completed -- 752 Assam 1028 Dwelling Units Integrated Housing & 49.04 1028 Guwahati 27 18061685B1733 Infrastructure development of Slums in 54.49 24.52 15.26 ------11-Feb-2009 Guwahati, Phase-II, Assam -- -- 1028 Assam 48.56 1232 Guwahati 1232 Dwelling Units Basic Services to urban 28 18061685B511 53.95 48.56 24.28 - 416 - 416 - 05-Feb-2008 poor at 3 Slums at Guwahati, Assam -- 8.88 816 97.6 2260 Total of Assam for 2 project(s) 108.44 73.08 39.53 - 416 - 416 - 8.88 1844 Bihar Construction of 96 Dwelling Units at Khagaul 0.69 64 Patna 29 10283693B476 Phase-I under Patna Urban Agglomeration, 1.52 0.26 - - 64 - 64 - 26-Sep-2007 Bihar ------Bihar Project -- -- Patna Construction of 176 DUs at Danapur Phase-I Cancelled on 30 10283693B479 0.47 - 0.47 -- - - - 26-Sep-2007 under Patna Urban Agglomeration, Bihar dated -- 20-May-14 -- -- Bihar Project -- -- Patna Construction of 480 DUs at Danapur Phase-II Cancelled on 31 10283693B483 1.29 - 1.29 -- - - - 29-Oct-2007 under Patna Urban Agglomeration, Bihar dated -- 20-May-14 -- -- Bihar Construction of 496 DUs at Phulwari sharif 2.03 192 Patna 32 10283693B470 Phase-I under Patna Urban Agglomeration, 4.48 1.31 - - 192 - 192 - 26-Sep-2007 Bihar ------Bihar Project -- -- Patna Construction of 416 DUs for Adalatganj, Patna Cancelled on 33 10283693B1746 1.96 - 1.96 -- - - - 20-Feb-2009 City, Bihar dated -- 20-May-14 -- -- Bihar Project -- -- Patna Construction of 832 DUs for Sector-2, West Cancelled on 34 10283693B1748 3.61 - 3.61 -- - - - 20-Feb-2009 Patna (Phase-V), Bihar dated -- 20-May-14 -- -- Bihar Project -- -- Patna Construction of 832 DUs for Sector-2, South Cancelled on 35 10283693B1752 3.61 - 3.61 -- - - - 20-Feb-2009 Patna (Phase-VI), Bihar dated -- 20-May-14 -- -- Bihar Project -- -- Patna Construction of 928 DUs Sector-3, Phase-VI, Cancelled on 36 10283693B1753 3.94 - 3.94 -- - - - 20-Feb-2009 South Patna, Bihar dated -- 20-May-14 -- -- Bihar Project -- -- Patna Construction of 928 DUs for Sector-03, Phase- Cancelled on 37 10283693B1749 3.94 - 3.94 -- - - - 20-Feb-2009 V, West Patna, Bihar dated -- 20-May-14 -- --

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Bihar Project -- -- Patna Construction of 928 DUs for Sector-4, Phase- Cancelled on 38 10283693B1750 3.94 - 3.94 -- - - - 20-Feb-2009 V, West Patna, Bihar dated -- 20-May-14 -- -- Bihar Project -- -- Patna 928 DUs BSUP Scheme Sector 4, Phase-VI, Cancelled on 39 10283693B1754 3.94 - 3.94 -- - - - 20-Feb-2009 South Patna, Bihar dated -- 20-May-14 -- -- Bihar Project -- -- Patna 992 DUs BSUP Scheme Sector-1, Phase VI, Cancelled on 40 10283693B1751 4.18 - 4.18 -- - - - 20-Feb-2009 South Patna, Bihar dated -- 20-May-14 -- -- Bihar Project -- -- Patna 992 DUs BSUP Scheme for Sector-1 Phase-V, Cancelled on 41 10283693B1747 4.18 - 4.18 -- - - - 20-Feb-2009 West Patna, Bihar dated -- 20-May-14 -- -- Bihar Project -- -- Patna Construction of 2000 Dwelling Units at Patna Cancelled on 42 10283693B486 5.66 - 5.66 -- - - - 06-Oct-2007 City Phase-II, Bihar dated -- 20-May-14 -- -- Bihar Project -- -- Patna Construction of 2500 Dwelling Units at Patna Cancelled on 43 10283693B485 7.07 - 7.07 -- - - - 06-Oct-2007 City Phase-I, Bihar dated -- 20-May-14 -- -- Bihar 2.34 224 Patna Construction of 2736 DUs at Patna City Phase- 44 10283693B478 5.24 7.15 - 4.81 224 - 224 - 29-Oct-2007 III, Bihar ------Bihar Project -- -- Patna Construction of 4112 DUs at Patna City Phase- Cancelled on 45 10283693B481 12 - 12.00 -- - - - 28-Nov-2007 IV, under Patna Urban Agglomeration, Bihar dated -- 20-May-14 -- -- 5.07 480 Sub-total of Patna for 3 project(s) 11.25 68.51 - 64.60 480 - 480 - -- -- Bihar Project -- -- Bodh Gaya Construction of 2000 Dwelling Units at Bodh Cancelled on 46 10350821B423 9.68 - 9.68 -- - - - 09-Jan-2008 Gaya (Phase-I), Bihar dated -- 20-May-14 ------Sub-total of Bodh Gaya for 0 project(s) - 9.68 - 9.68 ------5.07 480 Total of Bihar for 3 project(s) 11.25 78.19 - 74.27 480 - 480 - including 3 project(s) which are completed -- -- Chandigarh 42.12 2720 Chandigarh Revised project for Rehabilitation of 6368 slum 47 04010931B5288 105.90 72.02 8.12 29.90 2720 - 2,720 - 28-Nov-2006 families under phase-I, Chandigarh ------Chandigarh 151.21 10016 Chandigarh Revised Project for Rehabilitation of 10016 48 04010931B5148 300.43 151.21 10016 - 9,806 210 14-Dec-2006 slum families under phase-II, Chandigarh ------Chandigarh 98.99 4960 Chandigarh Revised Project for Rehabilitation of 9344 slum 49 04010931B5149 251.14 148.9 4960 - - 4,960 14-Dec-2006 families under phase-III, Chandigarh ------Chandigarh Construction of Sewage Treatment Plant 8.62 Infra Chandigarh (STP) for 8448 DUs at Dhanas under Slum 50 04010931B4428 11.55 6.9 4.74 - NA - - - 29-Dec-2011 Rehabilitation Project of 19360 Flats at -- Chandigarh. -- NA 300.94 17696 Total of Chandigarh for 4 project(s) 669.02 379.03 12.86 79.81 17696 - 12,526 5,170 -- -- Chhattisgarh 23.03 888 Raipur Construction of 888 Dwelling Units at Naya 51 22113940B1795 28.79 23.03 - 0.00 888 - 888 - 21-Feb-2009 Raipur, Chhattisgarh ------Chhattisgarh 29.6 976 Raipur Revised Project for Construction of 976 52 22113940B4994 41.64 23.68 - - 896 64 896 - 08-Feb-2010 Dwelling Units Raipur, Phase-II, Chhattisgarh -- 16.24 16 Chhattisgarh 23.04 1780 Raipur Curtailed BSUP project for Raipur, Project-1 53 22113940B5189 31.57 31.27 - 8.23 1736 - 1,604 132 28-Nov-2006 for Location 1-15, Chhattisgarh -- -- 44 Chhattisgarh 31.11 2336 Raipur Curtailed BSUP project for Raipur (CG), Phase- 54 22113940B5190 38.89 31.11 - - 2336 - 2,326 10 28-Nov-2006 1 Project-2 for Location 16-30, Chhattisgarh ------Chhattisgarh 34.02 3408 Raipur Curtailed BSUP project for Raipur (CG), Phase- 55 22113940B5191 42.59 53.12 12.70 19.10 3318 - 3,241 77 28-Nov-2006 1 Project 3 for Location 31-45, Chhattisgarh -- -- 90

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Chhattisgarh 14.6 1496 Raipur Curtailed BSUP project for Raipur (CG), Phase- 56 22113940B5192 18.75 22.33 4.55 7.73 1270 - 1,265 5 28-Nov-2006 1 Project 4 for Location 46-61, Chhattisgarh -- -- 226 Chhattisgarh 9.35 288 Raipur Construction of 512 Dwelling Units at Raipur 57 22113940B4691 11.88 7.46 3.31 - 288 - 288 - 23-Mar-2012 (CG), DPR-I, Chhattisgarh -- 3.31 -- Chhattisgarh Project -- -- Raipur Construction of 1648 Dwelling Units at Raipur Cancelled on 58 22113940B4690 13.58 - 13.58 -- - - - 23-Mar-2012 (CG), DPR-II, Chhattisgarh dated -- 20-May-14 -- -- Chhattisgarh 36.85 1120 Raipur Construction of 2048 Dwelling Units at Raipur 59 22113940B4689 47.04 29.48 17.64 - 296 - 158 138 23-Mar-2012 (CG), DPR-III Chhattisgarh -- 12.63 824 Chhattisgarh 18.17 568 Raipur Construction of 1040 Dwelling Units at Raipur 60 22113940B4688 23.07 14.53 8.68 - 308 - - 308 23-Mar-2012 (CG), DPR-IV Chhattisgarh -- 6.21 260 219.77 12860 Total of Chhattisgarh for 9 project(s) 284.22 249.6 46.87 48.65 11336 64 10,666 670 including 2 project(s) which are completed 38.39 1460 Delhi Construction of 4 Storeyed 288 EWS Housing 3.77 288 Delhi 61 07081192B484 for Slum Dwellers at Sector 16B, site No.3 7.99 3.77 - - 288 - - 288 14-Mar-2008 Dwarka, Delhi ------Delhi Construction of 4 Storeyed low cost Housing 9.73 736 Delhi 62 07081192B482 (736 DUs) for Slum Dwellers at Sector 16B, 20.46 9.73 0.00 - 736 - 338 398 14-Mar-2008 site No.2, Dwarka, Delhi ------Delhi 7.87 240 Delhi Construction of 240 EWS dwelling units for 63 07081192B4449 21.89 7.87 - - 240 - - 240 10-Jun-2011 Slum dwelleres at Bakarwala, Delhi. -- 5.9 -- Delhi 11.84 704 Delhi 704 Dwelling Units, Slum Relocation Project at 64 07081192B1398 28.87 11.84 - - 704 - - 704 22-Oct-2008 Bawana, Delhi. ------Delhi Construction of 980 (G+4) 5-Storeyed EWS 23.42 980 Delhi 65 07081192B3551 houses for Slum Dwellers at Sector 16-B Ph-II. 50.69 23.42 0.00 - 980 - - 980 10-Mar-2011 Dwarka. -- 5.85 -- Delhi Construction of 1180 (G+4) Five Storeyed 25.1 1060 Delhi 66 07081192B3550 EWS houses for Slum Dwellers at site No. A-3, 52.50 25.14 0.00 0.05 1060 - - 1,060 10-Mar-2011 Sultanpuri, Delhi. ------Delhi 40.96 2144 Delhi 2144 Dwelling Units for "Slum Relocation 67 07081192B1397 98.45 40.96 - - 2144 - 560 1,584 22-Oct-2008 Project at Baproula. Phase-II Delhi. ------Delhi 3868 Dwelling Units for Urban Poor at 46.17 3868 Delhi 68 07081192B471 Bawana, Narela and Bhorgarh, Delhi Under 113.27 46.17 0.00 - 3868 - 585 3,283 13-Jun-2007 BSUP. ------Delhi 58.56 7104 Delhi 7104 DUs Revised project for Slum Relocation 69 07081192B4977 132.83 55.18 0.00 - 7104 - 718 6,386 13-Jun-2007 Project at Ghoogha and Baproula, Delhi. ------Delhi 46.32 2840 Delhi 4740 Dwelling Units Relocation of slum at 70 07081192B477 117.47 38.66 - - 2840 - - 2,840 27-Dec-2007 Narela Phase-III, Near Siraspur Village, Delhi ------Delhi Project -- -- Delhi Slum Relocation Project - 3600 EWS Housing Cancelled on 71 07081192B4974 22.72 - 22.72 -- - - - 28-Mar-2012 at Khanjawla, Delhi dated -- 20-May-14 -- -- Delhi 4560 DUs for Construction of 5 Storeyed Low 115.52 4560 Delhi 72 07081192B3389 Cost Housing for Slum Dwellers at 254.56 92.42 35.26 ------30-Dec-2010 Poothkhurd. Phase-II (Bawana-III). -- -- 4560 Delhi Construction of 5 Storeyed (6480 DUs) Low 97.66 3840 Delhi 73 07081192B3708 Cost Housing for Slum Dwellers at 207.77 148.32 - 50.66 3840 - - 3,840 13-Jun-2007 Poothkhurd. Ph-I (Bawana-3) ------Delhi 173.48 7400 Delhi Construction of 7400 DUs (G+4) EWS houses 74 07081192B3552 366.84 157.03 - - 7400 - - 7,400 10-Mar-2011 at Pkt-II, Bhalaswa, Jahangir Puri, Delhi. -- 39.92 -- Delhi Construction 7620 DUs of 5-Storeyed EWS 192.96 7620 Delhi 75 07081192B3391 Housing for Slum Dwellers at Savada Ghevra- 407.69 192.96 0.00 - 7620 - - 7,620 03-Jun-2008 Phase-3, Delhi -- 48.24 --

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Delhi 7720 DUs (G+4) Low Cost Housing for Slum 159.75 6300 Delhi 76 07081192B3390 Dwellers at Poothkhurd Phase-III, (Bawana- 339.72 97.88 ------30-Dec-2010 III), Delhi -- -- 6300 Delhi 8420 DUs (G+4) Five storeyed EWS housing 149.95 5740 Delhi 77 07081192B4448 for Slum dwelleres at Tikri Kalan, Phase-I, 334.18 175.97 - 26.02 -- - - - 10-Jun-2011 Delhi -- -- 5740 Delhi Project -- -- Delhi 6512 DUs "Slum Relocation Project at Cancelled on 78 07081192B472 17.42 - 17.42 -- - - - 06-Dec-2007 Samaspur", DelhiI (DSIIDC), Delhi dated -- 28-Mar-12 -- -- Delhi Project -- -- Delhi 9312 DUs "Slum Relocation Project at Cancelled on 79 07081192B473 25.43 - 25.43 -- - - - 06-Dec-2007 Deramandi", New Delhi I (DSIIDC), Delhi dated -- 27-Apr-11 -- -- Delhi Project -- -- Delhi EWS 6144 DUs "Slum Relocation Project at Cancelled on 80 07081192B474 19.17 - 19.17 -- - - - 20-Dec-2007 Jonapur", DelhiI (DSIIDC) dated -- 30-May-11 -- -- Delhi Project Construction of 4 Storeyed 1200 EWS -- -- Delhi Cancelled on 81 07081192B480 Housing for Slum Dwellers at Sector 23, 3.93 - 3.93 -- - - - 14-Mar-2008 dated Rohini Extn, Delhi -- 27-Apr-11 -- -- Delhi Project -- -- Delhi 480 Dwelling Units, Slum Relocation Project at Cancelled on 82 07081192B1399 2.58 - 2.58 -- - - - 22-Oct-2008 Nangali Sarkarwati, Najafagrh, Delhi. dated -- 27-Apr-11 -- -- Delhi Project -- -- Delhi 592 Dwelling Units, Slum Relocation Project at Cancelled on 83 07081192B475 2.03 - 2.03 -- - - - 20-Dec-2007 Neb Sarai, Delhi (DSIIDC) dated -- 27-Apr-11 -- -- 1163.04 55424 Total of Delhi for 16 project(s) 2,555.17 1220.56 35.26 169.99 38824 - 2,201 36,623 99.91 16600 Goa Project -- -- Panaji Construction of 155 Dwelling Units, BSUP Cancelled on 84 30013592B468 1.15 - 1.15 -- - - - 27-Feb-2008 project at Panaji City, GOA dated -- 20-May-14 ------Total of Goa for 0 project(s) - 1.15 - 1.15 ------Gujarat Construction of 8000 EWS houses at various 47.64 8000 Ahmedabad 85 24070049B338 locations in peripheral Areas of Ahemadabad 98.13 47.64 - - 8000 - 8,000 - 28-Sep-2006 Phase-I, Gujarat ------Gujarat 5664 EWS houses for the Urban Poor at 8 42.26 5664 Ahmedabad 86 24070049B339 locations of Vastral & Nikol near Peripheral 87.06 42.26 - - 5664 - 5,664 - 29-Dec-2006 areas of Ahmedabad (Ph-II), Gujarat ------Gujarat 18976 EWS houses at various locations in 164.31 18960 Ahmedabad 87 24070049B340 Ahmedabad Municipal Corporation (Phase-I), 338.47 164.45 - 0.14 18928 32 18,928 - 02-Feb-2007 Gujarat ------Gujarat 1184 EWS houses at various locations in 20 1184 Ahmedabad 88 24070049B4048 Ahmedabad Municipal Corporation (Phase-II), 40.00 20 - - 1184 - 1,184 - 12-Sep-2011 Gujarat -- 4 -- Supplementry DPR for construction of social Gujarat infrastructure works which was not taken up 1.87 Infra Ahmedabad 89 24070049B4049 earlier sanctioned DPR for 18976 Houses 3.73 1.87 - - NA - - - 12-Sep-2011 (phase-1) for Urban Poor at various locations -- -- NA in AMC, Ahmedabad. 276.07 33808 Sub-total of Ahmedabad for 5 project(s) 567.40 276.21 - 0.14 33776 32 33,776 - 4 -- Gujarat Project In-situ development for slum dwellers BSUP -- -- Rajkot Cancelled on 90 24093967B2270 Housing Schemes construction of new 2624 ------08-Feb-2010 dated DUs at Rajkot, Gujarat -- 12-Sep-11 -- -- Gujarat Revised In-situ development for slum dwellers 26.43 1512 Rajkot 91 24093967B5208 for construction of new 1512 Dwelling Units at 75.50 26.43 - - 736 776 736 - 12-Sep-2011 Rajkot, Gujarat ------Gujarat Revised project (1808 DUs) at different EWS 11.35 1808 Rajkot 92 24093967JB7129 Housing proposed at reserved plots of Town 23.38 12.44 - 1.09 1808 - 1,808 - 02-Feb-2007 planning Schemes at Rajkot. ------Gujarat Revised- 3168 DUs Relocation of flood 29.19 3168 Rajkot affected slum dwellers at various EWS 93 24093967JB7128 63.28 29.19 0.00 - 3168 - 3,168 - 13-Feb-2008 reserved plots of Town planning Schemes at -- Rajkot. 5.69 --

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress 66.97 6488 Sub-total of Rajkot for 3 project(s) 162.16 68.05 0.00 1.09 5712 776 5,712 - 5.69 -- Gujarat Construction of 740 DUs under 10.18 740 Surat 94 24224611B1616 Redevelopment scheme at Kamrunagar 23.76 10.18 - - 740 - 740 - 21-Jan-2009 Vasahat, Surat (DPR-IX), Gujarat -- 2.04 -- Gujarat 1176 DUs Redevelopment of Bhimnagar 12.84 1176 Surat 95 24224611B1617 Vasahat. R.S. No. 150. Udhana- Udyognagar 29.48 12.84 - - 1176 - 1,176 - 21-Jan-2009 Sangh, Surat, Gujarat -- 2.57 -- Gujarat Construction of 2240 Houses at 4-Locations of 28.39 2240 Surat 96 24224611B2448 Surat City Under JNNURM, Surat (DPR-X), 60.95 28.39 - - 2240 - 2,240 - 16-Feb-2010 Gujarat ------Gujarat Upgradation of Physical Environment at 5.04 Infra Surat 97 24224611B3668 location of DPR-II, III, IV, V & VI (Part) at 10.58 5.04 2.59 - NA - - - 30-Mar-2011 Kosad & Bhestan- Surat (DPR-XI), Gujarat -- -- NA Gujarat 544 Houses for redevelopment of Ektanagar 7.45 544 Surat 98 24224611B3669 Vavi Vasahat and Ektanagar adajan Surat 17.03 7.45 - 0.00 544 - 544 - 30-Mar-2011 (DPR-XII), Gujarat ------Gujarat 28 5424 Surat 5424 Dwelling Units, Relocation of slums in 99 24224611B586 56.45 28 - - 5424 - 5,424 - 28-Sep-2006 Surat (DPR-II) (MC Surat), Gujarat ------Gujarat 31.37 5572 Surat 5572 Dwelling Units Relocation of Slums in 100 24224611B587 62.74 31.37 - - 5572 - 5,572 - 11-Oct-2006 Surat (DPR-I), Gujarat ------Gujarat 34.29 5280 Surat 5280 DUs for Urban Poor at Kosad (DPR-III), 101 24224611B588 72.03 34.29 - 0.00 5280 - 5,280 - 28-Nov-2006 Surat Municipal Corporation, Gujarat ------Gujarat 43.55 6752 Surat 6752 DUs for Urban Poor at Kosad (DPR-IV), 102 24224611B589 91.50 43.55 - - 6752 - 6,752 - 28-Nov-2006 Surat Municipal Corporation, Gujarat ------Gujarat 45.83 7200 Surat 7392 Dwelling Units for Urban Poor at Kosad 103 24224611B590 96.31 47.06 - 1.22 7200 - 7,200 - 29-Dec-2006 (H4-H5)- (DPR-V), Surat, Gujarat ------Gujarat DPR-VI Slum Relocation - 4032 Houses for 29.93 4032 Surat 104 24224611B591 Urban Poor at 11 various locations of Surat, 61.66 29.93 - - 4032 - 4,032 - 26-Sep-2007 Gujarat ------Gujarat Construction of 7704 Housing Units for Urban 54.37 7704 Surat 105 24224611B592 Poor at 15 various locations at Surat (DPR- 114.25 54.37 - - 7704 - 7,704 - 13-Sep-2007 VII), Gujarat ------331.26 46664 Sub-total of Surat for 12 project(s) 696.73 332.48 2.59 1.22 46664 - 46,664 - 4.61 -- Gujarat 55.72 5664 Vadodara 5664 DUs Development and Upgradation of 106 24194971B1618 114.78 55.72 - - 5664 - 5,664 - 21-Jan-2009 Slums Phase-II, 2008- 10, Vadodara, Gujarat ------Gujarat 6096 DUs in-situ project of Housing 74.83 6096 Vadodara 107 24194971B2269 Development and Upgradation of Slums 155.24 74.83 0.00 - 6096 - 6,096.00 - 08-Feb-2010 Phase-III : 2009-11, Vadodara, Gujarat -- 21.98 -- Gujarat Revised Projcet for "Housing Development 33.96 5392 Vadodara 108 24194971B3868 and Upgradation of Slums (5392 DUs) Phase- 73.50 33.96 - - 5392 - 5,392 - 29-Dec-2006 1: 2006-08", Vadodara ------Gujarat Supplementry DPR for BSUP Phase-1 0.64 Infra Vadodara 109 24194971B3848 (Anganwadi and Compoundwall), Vadodara, 1.31 0.64 - - NA - - - 17-Jun-2011 Gujarat -- -- NA Gujarat Construction of 2336 DUs of Housing 44.15 2336 Vadodara 110 24194971B4748 Development and up gradation of slums at 92.84 44.15 - - 2336 - 2,336 - 23-Mar-2012 Vadodara, Phase-IV, Gujarat ------Gujarat 2208 DUs in-situ project of Housing 41.21 2208 Vadodara 111 24194971B4749 Development and Upgradation of slums Phase- 87.87 41.21 0.00 - 2208 - 2,208 - 23-Mar-2012 V : 2012-2014 ------250.51 21696 Sub-total of Vadodara for 6 project(s) 525.54 250.51 0.00 - 21696 - 21,696 - 21.98 --

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Gujarat 62.49 2448 Porbandar Construction of new 2448 DUs at RS. No. 112 24115187B4028 81.25 62.49 - - 2448 - 1,187 1,261 18-Aug-2011 603/p of Bokhira, Porbandar.", Gujarat -- 12.5 -- 62.49 2448 Sub-total of Porbandar for 1 project(s) 81.25 62.49 - - 2448 - 1,187 1,261 12.5 -- 987.3 111104 Total of Gujarat for 27 project(s) 2,033.08 989.75 2.59 2.45 110296 808 1,09,035 1,261 including 21 project(s) which are completed 48.78 -- Haryana 8.89 928 Faridabad 1280 DUs- Urban Renewal Project at Bapu 113 06191431B489 18.32 12.26 - 3.37 928 - 140 788 28-Nov-2006 Nagar, Faridabad, Haryana ------Haryana 18.91 1968 Faridabad 1968 DUs- Urban Renewal project at Dabua 114 06191431B491 38.96 18.91 1.91 - 1968 - 202 1,766 28-Nov-2006 Colony, Faridabad, Haryana ------27.81 2896 Total of Haryana for 2 project(s) 57.28 31.18 1.91 3.37 2896 - 342 2,554 -- -- Himachal Pradesh Project -- -- Shimla Ashiana- a Housing Scheme for the Poor of Cancelled on 115 02114397B575 1.76 - 1.76 -- - - - 21-Mar-2007 Shimla town (252 DUs), Himachal Pradesh dated -- 20-May-14 -- -- Himachal Pradesh 5.14 176 Shimla Ashiana-II a Housing Scheme for the poor of 116 02114397B577 6.42 5.61 2.34 0.47 118 - 118 - 27-Feb-2008 Shimla town" Dhalli-2, Himachal Pradesh -- -- 58 5.14 176 Total of Himachal Pradesh for 1 project(s) 6.42 7.37 2.34 2.23 118 - 118 - -- 58 J&K 28.64 811 Jammu 811 DUs Rehabilitation of Urban Poor families 117 01131936B1730 33.41 22.81 8.94 - 580 165 580 - 10-Feb-2009 at 21 locations in Jammu City -- 8.49 66 J&K 1.23 36 Jammu 36 DUs Rehablitation of slum dwellers at 118 01131936B1729 1.44 1.23 0.35 - 36 - 36 - 10-Feb-2009 Bhagwati Nagar Jammu City. ------J&K 11.53 608 Jammu 608 DUs Rehabilitation of Slum Dwellers of 119 01131936B533 14.25 8.65 - - 64 272 64 - 07-Nov-2007 Rajiv Nagar, Jammu City -- -- 272 41.4 1455 Sub-total of Jammu for 3 project(s) 49.09 32.69 9.29 - 680 437 680 - 8.49 338 J&K 19.69 622 Srinagar 622 DUs Housing for Urban Poor project of 120 01034559B1728 22.38 9.85 0.76 - 287 335 287 - 10-Feb-2009 Srinagar city, J&K. ------J&K 73.36 4600 Srinagar 4600 DUs on Rehabiliation & Resettlement of 121 01034559B580 90.93 18.34 - - 170 4,330 170 - 29-Oct-2007 Slum Dwellers of Dal at Srinagar city, J&K. -- -- 100 93.05 5222 Sub-total of Srinagar for 2 project(s) 113.30 28.18 0.76 - 457 4,665 457 - -- 100 134.44 6677 Total of J&K for 5 project(s) 162.39 60.87 10.05 - 1137 5,102 1,137 - 8.49 438 Jharkhand Project -- -- Dhanbad 672 Dwelling Units BSUP project at Dhanbad Cancelled on 122 20121253B1297 2.45 - 2.45 -- - - - 03-Jun-2008 Phase-III, Jharkhand dated -- 20-May-14 -- -- Jharkhand Project -- -- Dhanbad 442 Dwelling Units BSUP project at Dhanbad Cancelled on 123 20121253B1302 1.98 - 1.98 -- - - - 14-Aug-2008 Phase-IV, Jharkhand dated -- 20-May-14 -- -- Jharkhand Project -- -- Dhanbad 658 Dwelling Units BSUP project at Dhanbad Cancelled on 124 20121253B3548 3.09 - 3.09 -- - - - 10-Mar-2011 Phase-V, Jharkhand dated -- 20-May-14 -- -- Jharkhand Project -- -- Dhanbad 758 Dwelling Units BSUP project at Dhanbad Cancelled on 125 20121253B487 2.44 - 2.44 -- - - - 05-Feb-2008 Phase-I, Jharkhand dated -- 20-May-14 -- -- Jharkhand 0.48 32 Dhanbad 1090 Dwelling Units BSUP project at Dhanbad 126 20121253B488 1.01 4.08 - 3.60 26 6 26 - 27-Feb-2008 Phase-II, Jharkhand ------

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress 0.48 32 Sub-total of Dhanbad for 1 project(s) 1.01 14.04 - 13.56 26 6 26 - -- -- Jharkhand Project -- -- Jamshedpur 336 Dwelling Units BSUP project at Cancelled on 127 20181939B1871 1.8 - 1.80 -- - - - 26-Feb-2009 Jamsedpur Phase-1. Jharkhand dated -- 20-May-14 -- -- Jharkhand Project 2888 DUs at Jamshedpur Phase-II to be -- -- Jamshedpur Cancelled on 128 20181939B3528 implemented by Jamshedpur Notified Area 11.46 - 11.46 -- - - - 04-Mar-2011 dated Committee, Jharkhand -- 20-May-14 -- -- Jharkhand Project -- -- Jamshedpur 952 DUs at Jamshedpur. Phase-II (Adityapur). Cancelled on 129 20181939B3549 4.73 - 4.73 -- - - - 10-Mar-2011 District East Singhbhum. Jharkhand dated -- 20-May-14 ------Sub-total of Jamshedpur for 0 project(s) - 17.99 - 17.99 ------Jharkhand 7.73 315 Ranchi 856 Dwelling Units BSUP project at Ranchi 130 20144029B1303 10.14 5.25 - - 315 - 315 - 30-Jul-2008 (Phase-IV), Jharkhand ------Jharkhand 6.46 228 Ranchi 1080 Dwelling Units BSUP project at Ranchi 131 20144029B1541 8.47 7.64 3.43 1.19 198 30 198 - 29-Dec-2008 (Phase-V), Jharkhand ------Jharkhand 7.03 270 Ranchi 1622 Dwelling Units BSUP project at Ranchi ( 132 20144029B1613 9.22 10.55 3.14 3.53 257 13 257 - 21-Jan-2009 Phase-VI), Jharkhand ------Jharkhand 1616 Dwelling Units for Ranchi (Greater 12.83 820 Ranchi 133 20144029B565 Ranchi Development AgencyPhase I), 17.32 6.32 - - 744 76 744 - 24-Jan-2008 Jharkhand ------Jharkhand 2358 Dwelling Units for Ranchi (Greater 13.36 607 Ranchi 134 20144029B567 Ranchi Development Agency Phase-II), 17.37 12.98 - - 569 38 569 - 05-Feb-2008 Jharkhand ------Jharkhand 1396 Dwelling Units for Ranchi (Greater 4.63 218 Ranchi 135 20144029B569 Ranchi Development Agency Phase-III), 6.07 7.41 - 2.78 210 8 210 - 27-Feb-2008 Jharkhand ------52.03 2458 Sub-total of Ranchi for 6 project(s) 68.60 50.15 6.57 7.50 2293 165 2,293 - -- -- 52.5 2490 Total of Jharkhand for 7 project(s) 69.60 82.18 6.57 39.05 2319 171 2,319 - including 1 project(s) which are completed -- -- Karnataka 8.72 464 Bengaluru (BBMP) 464 Dwelling Units Challaghatta Slum area in 136 29200467B1612 19.19 7.85 - - 464 - 220 244 21-Jan-2009 Bengaluru Phase-III, Karnataka -- 0.02 -- Karnataka 100 DUs at Bhovi Colony, AK colony, SG 1.39 100 Bengaluru (BBMP) 137 29200467B1677 Palya slum area, Bengaluru (Phase-III), 3.05 1.39 - - 100 - 100 - 30-Jan-2009 Karnataka ------Karnataka 4.56 208 Bengaluru (BBMP) Construction of 208 DUs at Hakkipikki colony 138 29200467B1678 10.03 4.1 - - 208 - 208 - 30-Jan-2009 slum for the Bengaluru, Karnataka. ------Karnataka Revised project for 310 DUs at Laxmanrao 4.29 310 Bengaluru (BBMP) 139 29200467B4068 Nagar in lieu of Mahalingeshwara slum, 9.45 3.86 - - 310 - 310 - 30-Jan-2009 Bengaluru ------Karnataka 4.48 208 Bengaluru (BBMP) 208 Dwelling Units at Nagareshwara 140 29200467B1680 9.85 4.48 - - 208 - 208 - 30-Jan-2009 Nagenahalli slum area, Bengaluru, Karnataka ------Karnataka Revised project for 320 DUs at Vinobha slum, 6.82 320 Bengaluru (BBMP) 141 29200467B4070 Ambedkar slum & Munira Yappa slum in lieu 15.00 6.13 - - 320 - 320 - 30-Jan-2009 of Roshan nagar slum area in Bangaluru. ------Karnataka Revised project for 256 DUs at Bhemmakuppe 5.38 256 Bengaluru (BBMP) 142 29200467B4069 sy no. 73 in lieu of Veerabhadranagar slum, 11.84 4.84 - - 256 - 256 - 30-Jan-2009 Bangalore ------Karnataka 880 houses (G+3) and development works at 17.13 880 Bengaluru (BBMP) 143 29200467B1796 Bhuvaneshwarinagar, Uttarahalli, Bangalore, 37.68 15.41 - - 880 - 622 258 21-Feb-2009 Karnataka -- 1.71 -- Karnataka 480 DUs at Kanteeravanagara slum, 100 DUs 6.74 487 Bengaluru (BBMP) at Rajeevnagar slum and 100 DUs at 144 29200467B5188 14.84 8.48 - 1.73 487 - 487 - 21-Feb-2009 Govindarajanagar slum in Bangalore city -- (Phase-3) -- --

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Karnataka 90.09 11603 Bengaluru (BBMP) Revised project of BSUP Covering 28 slums 145 29200467B3628 261.17 90.09 - - 11603 - 11,494 109 28-Nov-2006 (11603 DUs) in Bengaluru, Phase-I, Karnataka ------Karnataka 120 DUs Redevelopment of 5 Identified slums 2.19 120 Bengaluru (BBMP) 146 29200467B387 by BMP Pilot Slums for 2 slums namely 4.38 1.97 0.33 - 120 - 120 - 21-Mar-2007 Kalyani and Jasma Bhavan, Karnataka ------Karnataka 160 DUs - BMP Pilot Slums at Kodihalli, 2.67 160 Bengaluru (BBMP) Bakashi Garden & Netaji subash Chandra 147 29200467B389 5.35 2.41 0.40 - 160 - 160 - 27-Apr-2007 Bose Slum- Malleshwaram (3 slum locations), -- Karnataka -- -- Karnataka Revised Basic Services to the urban poor 22.98 1524 Bengaluru (BBMP) 148 29200467B4168 BBMP slums (Ph-1) 16 slums (1524 DUs) in 52.87 20.68 - - 1524 - 1,524 - 18-May-2007 Bangalore City. ------Karnataka Revised BSUP Scheme for Urban Poor 56.49 3151 Bengaluru (BBMP) 149 29200467B3928 covering 16 slum area (3151 DUs) in 124.28 50.84 - - 3151 - 2,903 248 28-Nov-2007 Bengaluru, Ph-II, Karnataka ------Karnataka Project -- -- Bengaluru (BBMP) Relocation (170 DUs) Housing for Artisans at Cancelled on 150 29200467B4648 ------28-Feb-2012 Doddabidarikallu, Bangalore, Karnataka dated -- 20-Jan-14 -- -- 233.93 19791 Sub-total of Bengaluru (BBMP) for 14 project(s) 578.95 222.53 0.73 1.73 19791 - 18,932 859 1.73 -- Karnataka Revised project for construction of 1040 DUs 34.74 1040 Mysuru 151 29263214B5309 at Ekalavya Nagar Slum Ph-III, Mysore, 47.98 31.26 - - 1040 - 1,040 - 30-Jan-2009 Karnataka ------Karnataka 38.08 1806 Mysuru 1806 DUs for Mysore City Phase-IV by Mysore 152 29263214B1881 52.36 34.27 - - 1783 - 1,783 - 28-Feb-2009 Muncipal Corporation at Karnataka -- -- 23 Karnataka Mysore Phase-1 -Rehabilitation of 20 selected 33.13 2788 Mysuru 153 29263214B3568 slums in Mysore city under JnNURM, 67.58 33.13 - - 2788 - 2,788 - 11-Oct-2006 Karnataka ------Karnataka 65.42 2500 Mysuru Mysore Phase-II -Rehabilitation of 46 selected 154 29263214B3588 90.93 65.42 0.00 - 2500 - 2,500 - 06-Oct-2007 slums in Mysore City under JnNURM. ------171.36 8134 Sub-total of Mysuru for 4 project(s) 258.85 164.08 0.00 - 8111 - 8,111 - -- 23 405.29 27925 Total of Karnataka for 18 project(s) 837.80 386.62 0.73 1.73 27902 - 27,043 859 including 12 project(s) which are completed 1.73 23 Kerala 1728 DUs (new 1531 & renovation houses 10.7 1279 Kochi 155 32082498B448 197) BSUP Programme for Kochi (Ph-I) Kerala 21.40 11.98 2.86 1.28 1262 - 1,262 - 27-Feb-2007 . -- -- 17 Kerala 49.41 7650 Kochi 8086 Dwelling Units Kochi City Phase-II, 156 32082498B446 98.82 52.22 10.24 2.82 6659 534 6,350 309 27-Dec-2007 Kerala -- -- 457 Kerala 576 DUs (127 new, 217 upgrade & 232 1.91 474 Kochi 157 32082498B449 individual toilet) at Kochi Corporation, Phase- 3.82 1.68 0.53 - 467 - 473 - 24-Jan-2008 III, Kerala -- 0.53 7 62.02 9403 Sub-total of Kochi for 3 project(s) 124.04 65.88 13.64 4.09 8388 534 8,085 309 0.53 481 Kerala 2680 DUs BSUP Programme for 26.02 2337 Thiruvananthapuram 158 32145163B594 Thirunananthapuram Municipal Corporation, 32.52 26.85 5.60 0.83 2017 - 2,017 - 21-Mar-2007 Phase-II, Kerala -- -- 320 Kerala 340 DUs (new 233 & renovation 107 houses) 2.81 229 Thiruvananthapuram 159 32145163B593 for Thirunananthapuram (Ph-I) Municipal 3.70 3.02 0.94 0.21 213 - 226 - 27-Feb-2007 Corporation, Kerala -- -- 16 Kerala 22.72 1082 Thiruvananthapuram 1369 DUs (1035 new & 334 upgrade houses) 160 32145163B1731 28.82 28.06 10.20 5.34 758 267 773 - 10-Feb-2009 at Thiruvanthapuram, Ph-IV, Kerala -- -- 57 Kerala 99.88 8728 Thiruvananthapuram 8798 DUs (new 8565 & improvement of 233 161 32145163B595 124.84 90.62 32.52 - 6646 1,822 5,954 692 27-Dec-2007 units)at Thiruvanthapuram, Ph-III, Kerala -- -- 260 151.42 12376 Sub-total of Thiruvananthapuram for 4 project(s) 189.88 148.56 49.26 6.38 9634 2,089 8,970 692 -- 653

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress 213.44 21779 Total of Kerala for 7 project(s) 313.92 214.44 62.90 10.48 18022 2,623 17,055 1,001 0.53 1134 Madhya Pradesh Construction of 212 DUs with Infrastructure 1.27 212 Bhopal 162 23320727B407 Inderpuri (Kalpna Nagar), Bhopal, Madhya 2.54 1.27 - 0.00 212 - 212 - 30-Mar-2006 Pradesh ------Madhya Pradesh 512 Houses with Infrastructure Including 4.68 512 Bhopal 163 23320727B408 Development of (Weekly Market), Kotra, 9.36 4.68 - - 512 - 512 - 30-Mar-2006 Shabri Nagar, Bhopal, Madhya Pradesh ------Madhya Pradesh 896 DUs development of Residential Colony 4.1 608 Bhopal 164 23320727B414 for Slum Dwellers at Indra Nagar (Phase-II), 9.11 4.54 - 0.43 608 - 608 - 02-Feb-2007 Bhopal, Madhya Pradesh ------Madhya Pradesh Construction of 1440 DUs with Infrastructure 8 1440 Bhopal 165 23320727B405 Facilities at Shyam Nagar, Bhopal, Madhya 16.00 8 - - 1440 - 1,440 - 30-Mar-2006 Pradesh ------Madhya Pradesh 1216 DUs Development of Residential colony 7.77 1216 Bhopal 166 23320727B411 for slum dwellers at Indira Nagar, Madhya 17.10 7 - - 1216 - 1,216 - 29-Dec-2006 Pradesh ------Madhya Pradesh 1848 DUs for resettlement of Slum Areas 5.21 864 Bhopal 167 23320727B410 Ganga Nagar and Aradhna Nagar at Kotra, 11.56 10.03 - 4.82 864 - 864 - 14-Dec-2006 Sultanabad, Bhopal, Madhya Pradesh ------Madhya Pradesh 1872 DUs Rehabillition of Slum Dwellers at 10.92 1632 Bhopal 168 23320727B402 Baba Nagar Slum By Bhopal MC, Shahpura, 23.20 12.52 0.00 1.61 1632 - 1,632 - 14-Dec-2006 Madhya Pradesh . ------Madhya Pradesh Slum and poor locality integrated area 19.17 Infra Bhopal 169 23320727B395 Development Scheme Ph-1, Bhopal, Madhya 39.50 19.17 0.00 - NA - - - 11-Oct-2006 Pradesh -- -- NA Madhya Pradesh Slum and poor locality integrated area 19.96 Infra Bhopal 170 23320727B398 Development Scheme Ph-2, Bhopal, Madhya 41.11 19.96 0.00 - NA - - - 11-Oct-2006 Pradesh -- -- NA Madhya Pradesh 2299 DUs for Slum Redevelopment and 7.16 740 Bhopal 171 23320727B1745 Rehablitation of identified Slums Part-II, 15.05 11.13 - 3.96 740 - 595 145 20-Feb-2009 Bhopal, Madhya Pradesh ------Madhya Pradesh Project Construction of 3600 DUs with infrastructure -- -- Bhopal Cancelled on 172 23320727B403 facilitise at Rashanpura, Bhopal, Madhya 5.86 - 5.86 -- - - - 30-Mar-2006 dated Pradesh -- 20-May-14 -- -- Madhya Pradesh Resettlement of slum (Atal Ayub Nagar, Police 23.39 3248 Bhopal lines, Koh-e-fiza, Kechi Chola new Belar to 173 23320727B416 49.62 21.57 - - 3248 - 3,248 - 29-Dec-2006 Bajpai Nagar slum) at Idgah Hills, Madhya -- Pradesh -- -- Madhya Pradesh Redevelopment of identified slums (Arjun 16.45 2272 Bhopal 174 23320727B418 Nagar, Bheem Nagar, Madrasi Colony & 33.90 22.99 - 6.54 2272 - 2,272 - 14-Dec-2006 Rahul Nagar) in Bhopal, Madhya Pradesh ------Madhya Pradesh 2858 DUs for Slum Redevelopment and 6.08 655 Bhopal Rehablitation of identified slums Part-I (Bharat 175 23320727B1744 12.76 6.63 - 0.55 655 - 655 - 20-Feb-2009 Mata Nagar, Naya Basera & Arjun Nagar), -- Madhya Pradesh -- -- 134.16 13399 Sub-total of Bhopal for 13 project(s) 280.81 155.34 0.00 23.77 13399 - 13,254 145 -- -- Madhya Pradesh Revised project at Scheme No.134 . & 6.21 885 Indore 176 23261846B4978 Scheme no 78-I and 155 (Revised locations) 13.23 5.59 - - 885 - 885 - 28-Sep-2006 at Indore, Madhya Pradesh ------Madhya Pradesh Construction of 4132 DUs Slum 13.91 1916 Indore 177 23261846B518 Redevelopment Scheme at different Location 28.72 22.49 - 8.59 1904 12 1,904 - 02-Feb-2007 Indore, Madhya Pradesh ------Madhya Pradesh 3000 DUs Slum redevelopment and 38.83 3000 Indore 178 23261846B1868 rehabilitation of identified Slums, Indore, 81.54 34.95 - - 3000 - 3,000 - 26-Feb-2009 Madhya Pradesh ------58.95 5801 Sub-total of Indore for 3 project(s) 123.48 63.03 - 8.59 5789 12 5,789 - -- -- Madhya Pradesh Slum Rehabilitation of Chui Khadan madia & 3.12 528 Jabalpur 179 23391864JB6250 area behind burn Company Shyma Prasad 7.01 5.31 - 2.20 528 - 528 - 11-Oct-2006 Mukerjee Ward, Jabalpur City. ------

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Madhya Pradesh Construction of 2076 Houses with Basic 4.82 864 Jabalpur 180 23391864JB6256 Infrastructure facilities in Jabalpur, 10.56 10.41 - 5.60 864 - 864 - 28-Aug-2006 (Bagradafai), Madhya Pradesh ------Madhya Pradesh Revised project for Construction of 2136 9.63 1664 Jabalpur 181 23391864JB6229 Houses with Infrastructure in Jabalpur (Lal 19.81 11.12 0.00 1.50 1664 - 1,664 - 28-Aug-2006 Kuan), Madhya Pradesh ------Madhya Pradesh Revised detailed project of Basor Mohali, 6.81 1152 Jabalpur 182 23391864JB6253 Choudhary Mohalla, Baldu Kori ki Dafai Siddh 14.36 11.41 0.47 4.60 1152 - 1,152 - 11-Oct-2006 Baba ward, Jabalpur City. -- 5.07 -- 24.37 4208 Sub-total of Jabalpur for 4 project(s) 51.73 38.26 0.47 13.89 4208 - 4,208 - 5.07 -- Madhya Pradesh 13.26 1320 Ujjain Construction of 1320 DUs Slum Rehabilitation 183 23214882B597 17.41 11.94 - - 1320 - 1,320 - 13-Sep-2007 Scheme of Ujjain, Madhya Pradesh ------13.26 1320 Sub-total of Ujjain for 1 project(s) 17.41 11.94 - - 1320 - 1,320 - -- -- 230.75 24728 Total of Madhya Pradesh for 21 project(s) 473.44 268.56 0.47 46.25 24716 12 24,571 145 5.07 -- Maharashtra Revised project for Construction of 219 DUs in 4.82 219 Nagpur 184 27093250B4991 Panch Zopda and Gopal Nagar Slums of 10.61 3.86 0.03 - 214 5 213 1 10-Feb-2009 Nagpur, Maharashtra -- 0.91 -- Maharashtra 5.67 279 Nagpur Construction of 279 DUs in Jat Tarodi Slum in 185 27093250B1537 12.42 5.67 1.95 - 279 - 135 144 29-Dec-2008 Nagpur, Maharashtra -- 1.13 -- Maharashtra Revised project for Construction of 456 DUs in 3.27 287 Nagpur 186 27093250B4992 5 slums of North Nagpur in Nagpur 9.60 5.81 - 2.54 284 3 234 50 28-Nov-2006 Maharashtra. ------Maharashtra Construction of 360 DUs in 1-slum namely 6.28 260 Nagpur 187 27093250B4750 New Pandharbodi slum at Nagpur, 14.29 5.02 1.88 - 201 59 201 - 23-Mar-2012 Maharashtra -- 1.54 -- Maharashtra Revised project for 365 DUs in Gopal Nagar 9.32 365 Nagpur 188 27093250B4990 and Bh. Anand Kausalyayan Nagar slums in 26.85 9.32 1.02 - 365 - 365 - 20-Feb-2009 Nagpur Maharashtra -- 5.89 -- Maharashtra 376 DUs in 2 slum namely Bezonbagh-II 8.36 255 Nagpur 189 27093250B4751 (Gautam Nagar) and Lumbini Nagar Slum at 19.03 6.69 2.53 - 247 8 247 - 23-Mar-2012 Nagpur, Maharashtra -- 1.76 -- Maharashtra Revised project for construction of 630 DUs in 2.38 125 Nagpur 190 27093250B4989 Savitribai Phule Nagar & Adivasi Gond Toli 7.43 5.97 - 3.59 125 - 125 - 21-Jan-2009 slum, Nagpur, Maharashtra ------Maharashtra 850 DUs in 3 slum namely Sravasthi Nagar, 22.31 850 Nagpur 191 27093250B4752 Sanjay Nagar and Sewadal Nagar at Nagpur, 50.79 22.31 7.92 - 788 62 788 - 23-Mar-2012 Maharashtra -- 13.38 -- Maharashtra Revised project for 1017 DUs in Indira Nagar, 19.37 1017 Nagpur 192 27093250B4993 Indiramata Nagar, Wanjara and Bokar Nagar 56.88 19.37 3.87 - 1017 - 1,017 - 15-Jan-2009 slums in Nagpur Maharashtra -- 3.87 -- Maharashtra 37.07 Infra Nagpur Integrated Civic Infrastructure Development 193 27093250B617 120.81 27.8 12.47 - NA - - - 18-May-2007 Project (ICIDP) Phase. I, Nagpur, Maharashtra -- -- NA Maharashtra Revised project for 1694 Houses at 4- 14.75 544 Nagpur 194 27093250B5268 locations of Nagpur City for Rehabilitation of 37.48 45.72 6.14 30.97 544 - - 544 21-Feb-2009 Urban/Poor- PPP Scheme. ------Maharashtra Project -- -- Nagpur 858 DUs for Jai Bajarang Nagar, Kumbhar Toli- Cancelled on 195 27093250B1727 5.15 - 5.15 -- - - - 10-Feb-2009 I & 2 slums, Maharashtra dated -- 23-Mar-12 -- -- Maharashtra Project 2603 DUs Integrated Rehabilitation Project for -- -- Nagpur Cancelled on 196 27093250B445 the urban poors staying in slums in Nagpur ------28-Nov-2006 dated (North), Maharashtra. -- 12-Sep-11 -- -- 133.58 4201 Sub-total of Nagpur for 11 project(s) 366.21 162.68 37.80 42.25 4064 137 3,325 739 28.49 -- Maharashtra Implementation of Integrated housing Projects 23.58 788 Nanded Waghala 197 27153294B1620 (788 DUs) at Nanded City. Dist. Nanded. 32.43 23.58 8.49 0.00 632 119 632 - 28-Jan-2009 Maharashtra. (DPR-VIII) -- 37 --

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Maharashtra Implementation of Integrated Housing Projects 28.96 1002 Nanded Waghala 198 27153294B1622 (1002 DUs) at Nanded City. Distt. Nanded. 39.82 28.96 11.29 - 748 233 748 - 28-Jan-2009 Maharashtra -- 7.24 21 Maharashtra Implementation of Integrated Housing projects 30.56 958 Nanded Waghala 199 27153294B1623 (958 DUs) at Nanded City. Distt. Nanded. 42.02 30.56 11.42 - 785 158 772 13 28-Jan-2009 Maharashtra (DPR-V) -- -- 15 Maharashtra Implementation of Integrated Housing Projects 38.87 1183 Nanded Waghala 200 27153294B1621 (1183 DUs) at Nanded city. Dist. Nanded. 53.44 32.33 7.31 - 951 206 950 1 28-Jan-2009 Maharashtra (DPR-VI) -- 3.18 26 Maharashtra Implementation of Integrated Housing projects 51.91 1567 Nanded Waghala 201 27153294B1625 (1567 DUs) at Nanded City. Distt. Nanded. 71.38 44.26 9.07 - 1297 242 1,297 - 28-Jan-2009 Maharashtra (DPR-IX) -- 5.33 28 Maharashtra Implementation of Integrated Housing projects 55.91 1621 Nanded Waghala 202 27153294B1624 (1621 DUs) at Nanded City. Distt. Nanded. 76.87 46.25 7.78 - 1210 400 1,201 9 28-Jan-2009 Maharashtra (DPR-IV) -- 4.32 11 Maharashtra 70.41 3655 Nanded Waghala 4132 DUs Revised in DPR-I Development of 203 27153294B453 92.42 79.6 - 9.19 3613 6 3,432 181 29-Dec-2006 Slums at Nanded, Maharashtra -- -- 36 Maharashtra 1678 DUs Implementation of Integrated 71.87 1678 Nanded Waghala 204 27153294B4674 Housing Projects at Nanded City, Dist, 94.33 57.5 11.15 - 1060 596 1,027 33 20-Mar-2012 Nanded, Maharashtra -- 19.76 22 Maharashtra 2100 DUs for Urban Poor at Nanded Taroda 71.56 2100 Nanded Waghala 205 27153294B2208 (KH&BK) new area of NWCMC, Nanded, 124.77 71.56 8.07 - 1843 245 1,586 257 25-Nov-2009 Maharashtra (DPR-X) -- -- 12 Maharashtra Project Construction of 5136 DUs for Urban Poor at -- -- Nanded Waghala Cancelled on 206 27153294B2248 Nanded Textile Mill slum area of Nanded, 33.77 - 33.77 -- - - - 18-Dec-2009 dated Nanded District, Maharashtra -- 20-May-14 -- -- Maharashtra Implementation of Integrated Housing Projects 165.1 6441 Nanded Waghala 207 27153294B455 (7820 DUs) at Nanded City, Dist. Nanded, 211.54 200.45 - 35.35 6441 - 5,966 475 20-Dec-2007 Maharashtra (DPR-II) ------608.73 20993 Sub-total of Nanded Waghala for 10 project(s) 839.00 648.81 74.58 78.31 18580 2,205 17,611 969 39.83 208 Maharashtra Project -- -- Nashik 180 DUs Implementation of BSUP at Bhagur Cancelled on 208 27203348B4673 1.07 - 1.07 -- - - - 20-Mar-2012 town, Nashik Region, Maharashtra dated -- 20-May-14 -- -- Maharashtra 400 DUs Revised project for Reloation of slum 3.56 400 Nashik 209 27203348B5249 dwellers at Satpur Area, Nashik under BSUP, 9.77 3.92 - 0.36 400 - 307 93 28-Nov-2006 Maharashtra ------Maharashtra 720 DUs for the urban poor staying in slums 6.79 720 Nashik on public purpose lands & elogically 210 27203348B459 15.04 6.79 - - 720 - 280 440 28-Nov-2006 dangerous locations in Nashik (S.No. -- 814/815), Maharashtra -- -- Maharashtra 9.91 1120 Nashik Revised project for construction of 1120 DUs 211 27203348B5250 27.28 9.91 0.00 - 1120 - 1,104 16 28-Nov-2006 at Panchavati area, Nashik, Maharashtra. ------Maharashtra 1840 DUs for the Urban poor staying in slums 9.05 960 Nashik on public purpose lands & elogically 212 27203348B460 20.06 13.01 - 3.96 960 - 695 265 28-Nov-2006 dangerous locations in Nashik (S. No-907), -- Maharashtra -- -- Maharashtra 1460 DUs (Revised)Relocation of slum 14.6 1460 Nashik 213 27203348B5248 dwellers at New Nashik, Nashik East-West 37.63 16.59 - 1.99 1460 - 1,060 400 28-Nov-2006 Area, Nashik, Maharashtra ------Maharashtra 4160 DUs for the Urban poor staying in slums 26.39 2800 Nashik on public purpose lands & elogically 214 27203348B458 58.49 29.41 - 3.02 2800 - 911 1,889 28-Nov-2006 dangerous locations in Nashik (S. No-809), -- Maharashtra -- -- Maharashtra 400 DUs for the Urban poor staying in slums Project -- -- Nashik on public purpose lands & elogically Cancelled on 215 27203348B462 ------28-Nov-2006 dangerous locations in Nashik (Bhimwadi), dated -- Maharashtra 12-Sep-11 -- -- Maharashtra 2400 DUs for the Urban poor staying in slums Project -- -- Nashik on public purpose lands & elogically Cancelled on 216 27203348B463 ------28-Nov-2006 dangerous locations in Nashik (Shivajiwadi), dated -- Maharashtra 12-Sep-11 -- -- 70.3 7460 Sub-total of Nashik for 6 project(s) 168.28 80.7 0.00 10.40 7460 - 4,357 3,103 -- --

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Maharashtra 822 DUs Implementation of Basic Services for 15.65 822 Navi Mumbai 217 27213372B508 Urban Poor Scheme (BSUP) at Thane, 34.43 15.65 3.92 - 822 - 822 - 13-Feb-2008 Maharashtra ------Maharashtra Project -- -- Navi Mumbai 600 DUs BSUP project for Ulhasnagar. Cancelled on 218 27213372B1724 4.02 - 4.02 -- - - - 03-Feb-2009 Mumbai (DPR-I), Maharashtra dated -- 20-Jan-14 -- -- Maharashtra Project -- -- Navi Mumbai Construction of 1280 DUs at Belivali, Kulgaon Cancelled on 219 27213372B3988 ------12-Jul-2011 Badlapur, Thane district, Maharashtra (MMR) dated -- 21-Jan-16 -- -- Maharashtra 1195 DUs Implementation of Integrated Project -- -- Navi Mumbai Housing Projects at Kalyan Dombivli Muncipal Cancelled on 220 27213372B2232 7.89 - 7.89 -- - - - 04-Dec-2009 Corporation Area, Dist. Thane, Maharashtra dated -- Ph-III 20-May-14 -- -- Maharashtra 35.15 1634 Navi Mumbai Construction of 1634 DUs BSUP Scheme for 221 27213372B1538 77.33 35.15 17.57 - 904 730 - 904 29-Dec-2008 Kulgaon Badlapur, Distt. Thane, Maharashtra ------Maharashtra Project -- -- Navi Mumbai Construction of 1728 DUs at Kharval, Kulgaon Cancelled on 222 27213372B4008 ------12-Jul-2011 Badlapur, Thane district, Maharashtra (MMR) dated -- 21-Jan-16 -- -- Maharashtra Implementation of Integrated Housing Projects 47.62 1756 Navi Mumbai 223 27213372B2233 at Kalyan Dombivli Muncipal Corporation Area, 124.03 47.62 17.72 ------04-Dec-2009 District Thane, Maharashtra, Phase-IV -- -- 1756 Maharashtra 47.39 1841 Navi Mumbai 2376 New DUs at Kalyan Dombivili Municipal 224 27213372B1685 104.25 47.39 17.48 - 273 - 108 165 30-Jan-2009 Cor, Are, Distt Thane, Maharashtra -- 16.81 1568 Maharashtra 4179 DUs Proposal for LIG Houses for EWS/ 71.23 4179 Navi Mumbai 225 27213372B502 LIG Housing Scheme under BSUP, Mumbai, 163.15 71.23 0.00 - 4179 - 3,823 356 14-Dec-2006 MHADA (Maharashtra) ------

Maharashtra Revised Integrated Rehabilitation Project for 83.36 3973 Navi Mumbai Urban Poor Staying in Slums on public 226 27213372B5128 166.72 96.96 10.64 13.60 2701 - 2,701 - 28-Nov-2006 purpose land ecologically dangerous location -- of nalla banks on 155.62 kms in Thane. -- 1272

Maharashtra Additional fund for the additional cost of Project -- -- Navi Mumbai construction due to change in BUA for the Cancelled on 227 27213372B2289 ------06-Jan-2010 approved 9426 DU at Thane Municipal dated -- Corporation. Thane 28-Feb-12 -- -- Maharashtra 114.2 6832 Navi Mumbai Construction of 6832 Transit Shelters at 228 27213372B500 245.54 114.2 0.00 - 6832 - 6,552 280 14-Dec-2006 Mumbai under JnNURM, Maharashtra ------Maharashtra Construction of 4136 DUs in Jantanagar & 64.97 2351 Navi Mumbai 229 27213372B2148 Kashi Church slums in Mira Bhayandar, 158.91 51.98 11.70 - 1146 - - 1,146 11-Nov-2009 Greater Mumbai, Maharashtra -- 23.4 1205 Maharashtra Implementation of Integrated Housing project 87.17 4591 Navi Mumbai 230 27213372B506 at Kalyan Dombivli Municipal Corp area, 191.08 87.17 8.92 - 2644 - 1,367 1,277 06-Dec-2007 District Thane, Mumbai, Maharashtra -- 9.87 1947 Maharashtra Proposal for LIG Houses for Textile Mill 247.46 12000 Navi Mumbai Workers and Transit Shelter for tenants of old 231 27213372B504 737.78 247.46 - - 10165 - 9,158 1,007 14-Dec-2006 dilapidated building at Mumbai . MHADA -- (Maharashtra) -- 1835 Maharashtra Project 13600 DUs Integrated Rehabilitation Project -- -- Navi Mumbai Cancelled on 232 27213372B495 for the Urban Staying in Slum of Municipal 34.86 - 34.86 -- - - - 28-Nov-2006 dated lands in new Mumbai, Maharashtra -- 12-Sep-11 -- -- Maharashtra Project 896 DUs Integrated Delivery in Prakash Nagar -- -- Navi Mumbai Cancelled on 233 27213372B3849 and Swami Nagar, Ambarnath (MMR), Thane 5.66 - 5.66 -- - - - 17-Jun-2011 dated destrict, Maharashtra -- 20-May-14 -- -- Maharashtra 49.11 1142 Navi Mumbai 1142 DUs (DPR-IV) Implementation of BSUP 234 27213372B4755 98.22 12.28 - - 528 - 528 - 06-Mar-2012 at Daighar and Kausa, Thane, Maharashtra -- -- 614 Maharashtra 26.04 612 Navi Mumbai 1160 DUs (DPR-III) Redevelopment of slum at 235 27213372B4754 52.07 20.83 0.00 - 612 - 285 327 06-Mar-2012 Naupada under BSUP, Thane, Maharashtra -- 8.49 -- Maharashtra Project 792 DUs Integrated Delivery of BSUP in Rajiv -- -- Navi Mumbai Cancelled on 236 27213372B4672 Gandhi & Balkrishna Nagar, Ulhasanagar, ------20-Mar-2012 dated (DPR-II) Maharashtra -- 20-Jan-14 -- -- 889.35 41733 Sub-total of Navi Mumbai for 12 project(s) 2,153.50 900.34 87.96 66.02 30806 730 25,344 5,462 58.58 10197

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Maharashtra Project 448 DUs for the Urban Poor staying in slums -- -- Pune Cancelled on 237 27253875B507 on public purpose lands in Pimpri Chinchwad 6.85 - 6.85 -- - - - 28-Nov-2006 dated (Udhyognagar Slum), Maharashtra. -- 20-May-14 -- -- Maharashtra Revised proposal of Night Shelter Dormitories 2.63 Infra Pune 238 27253875JB6708 project for the Urban in Pune under BSUP, 5.39 2.54 1.88 - NA - - - 14-Dec-2006 Maharashtra -- -- NA Maharashtra Revised Street Vendors Rehabilitation Project 1.17 Infra Pune 239 27253875JB6709 for the Urban in Pune Under BSUP, 2.52 3.14 - 1.97 NA - - - 28-Nov-2006 Maharashtra -- -- NA Maharashtra 10.75 560 Pune 672 Dwelling Units BSUP project at Pimpri 240 27253875B1794 23.65 12.9 1.07 2.15 560 - - 560 21-Feb-2009 Chinchwad (Pune), Maharashtra ------Maharashtra Revised in Integrated Rehabilitation Project for 6.23 560 Pune 241 27253875JB6690 Urban Poor staying in slums on public purpose 13.75 14.37 0.00 8.15 560 - 336 224 28-Nov-2006 lands in Pimpri Chinchwad (Milindnagar Slum). ------Maharashtra 6.57 720 Pune 1840 DUs BSUP project at Pimpri Chindwad 242 27253875B503 13.79 16.78 - 10.21 720 - 560 160 28-Sep-2006 (Project-III), Pune, Maharashtra ------

Maharashtra Revised in Integrated Rehabilitation Project for 8.64 784 Pune the Urban Poor staying in slums on public 243 27253875JB6751 19.23 12.14 - 3.50 784 - 672 112 28-Nov-2006 purpose lands in Pimpri Chinchwad -- (Ajantanagar Slum) under BSUP. -- --

Maharashtra Revised in Integrated Rehabilitation Project for 11.36 1008 Pune the Urban Poor staying in slums on public 244 27253875JB6691 25.11 16.38 0.31 5.02 1008 - 672 336 28-Nov-2006 purpose lands in Pimpri Chinchwad -- (Vetalnagar Slum). -- -- Maharashtra Revised in Integrated Rehabilitation Project for 16.3 1456 Pune the Urban Poor staying in slums on public 245 27253875JB6749 36.25 16.43 - 0.13 1456 - 1,232 224 28-Nov-2006 purpose lands in Pimpri Chinchwad -- (Vithalnagar Slum). -- -- Maharashtra Curtailed Integrated Rehabilitation Project for 15.31 1344 Pune 246 27253875B5308 the Urban Poor staying in slums in ecologically 32.92 15.31 - - 1344 - 1,278.00 66.00 28-Nov-2006 dangerous locations in the Pune (Warje Slum). ------Maharashtra 4960 DUs Integrated Rehabilitation Project for 11.67 1280 Pune the urban poor living in dangerous locations in 247 27253875B499 24.51 33.92 - 22.25 1280 - 1,040 240 28-Sep-2006 Pimpri chindwad (Project-I), Pune, -- Maharashtra -- -- Maharashtra 4960 DUs Integrated Rehabilitation Project for 17.51 1920 Pune the urban poor living in dangerous locations in 248 27253875B501 36.77 45.23 0.00 27.72 1540 - 1,280 260 28-Sep-2006 Pimpri chindwad (Project -II), Pune, -- Maharashtra -- 380 Maharashtra Revised 2408 DUs Integrated Rehabilitation 19.92 2408 Pune 249 27253875B5348 Project at Hadaspur in PMC area, Pune, 39.83 24.81 - 4.90 2408 - 1,433.00 975.00 28-Aug-2006 Maharashtra ------Maharashtra Insitu Slum Rehablitation in the City of Pune at 64.01 4000 Pune 250 27253875B1694 Yerwada, Parvati, Mundhwa, Ghorpadi & 140.82 64.01 4.80 - 3651 20 3,528 123 05-Feb-2009 Kothrud Slum, Pune, Maharashtra -- -- 329 Maharashtra Revised in Integrated Rehabilitation Project for 114.04 6720 Pune Urban Poor Generation of Affordable Housing 251 27253875JB6753 228.08 112.43 0.00 - 5934 84 4,326 1,608 06-Oct-2007 Stock for the urban Poor and EWS in Pimpri -- Chinchwad. -- 702 Maharashtra Project 5040 DUs in Pimpri Chinchwad Sector-12 at -- -- Pune Cancelled on 252 27253875B1859 Bhosari, Pune on the basis of PPP, ------24-Feb-2009 dated Maharashtra -- 12-Sep-11 -- -- Maharashtra 1680 DUs at Lohagaon for the urban poor Project -- -- Pune staying at slums falling under road widening, Cancelled on 253 27253875B496 4.1 - 4.10 -- - - - 28-Sep-2006 hill top/ slopes and canal sides in Pune dated -- Maharashtra 12-Sep-11 -- -- Maharashtra 4480 DUs at Hingne- Kothrud for the urban Project -- -- Pune poor staying at slums falling under road Cancelled on 254 27253875B498 10.91 - 10.91 -- - - - 28-Sep-2006 widening, hill top/ slopes and canal sides in dated -- Pune Maharashtra 12-Sep-11 -- -- Maharashtra Project 1792 DUs for the Urba Poor staying in Slums -- -- Pune Cancelled on 255 27253875B514 in elogically dangerous locations in Pune 5.15 - 5.15 -- - - - 28-Nov-2006 dated (Kondhwa Slum), Maharashtra -- 12-Sep-11 -- -- 306.1 22760 Sub-total of Pune for 14 project(s) 642.61 417.4 8.07 113.00 21245 104 16,357 4,888 -- 1411 2008.07 97147 Total of Maharashtra for 53 project(s) 4,169.60 2209.93 208.41 309.97 82155 3,176 66,994 15,161 including 4 project(s) which are completed 126.89 11816

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Manipur 43.91 1250 Imphal 256 14062753B1732 1250 DUs BSUP Project for Imphal, Manipur 51.23 43.91 0 - 1250 - 1,250 - 11-Feb-2009 ------43.91 1250 Total of Manipur for 1 project(s) 51.23 43.91 0.00 - 1250 - 1,250 - including 1 project(s) which are completed -- -- Meghalaya 168 Houses in 5 notified slums ie Mawah, 4.74 48 Shillong 257 17064395B1725 Lower Mawprem, Demseiniong, Kynjat phutbol 6.08 12.44 - 7.70 48 - 48 - 03-Feb-2009 & Pynthorumkhrah, Shillong ------Meghalaya 300 Housing for EWS & Urban Poor including 12.31 300 Shillong 258 17064395B573 slum rehabilitation at Nongmynsong. Shillong 16.68 12.31 2.69 - 48 - 48 - 27-Dec-2007 (Ph-II), Meghalaya -- -- 252 Meghalaya 300 Housing for EWS and Urban Poor 11.47 300 Shillong 259 17064395B571 including Slum rehabiliation at Nongmynsomg, 13.76 11.47 0.00 0.00 208 - 206 2 21-Aug-2007 Shillong (Ph-I), Meghalaya -- -- 92 28.51 648 Total of Meghalaya for 3 project(s) 36.53 36.21 2.69 7.70 304 - 302 2 -- 344 Mizoram 23.57 320 Aizawl 320 Dwelling Units Durtlang BSUP Housing 260 15030057B1880 26.24 23.57 - - 320 - 260 60 28-Feb-2009 Project, Aizawl, Mizorm ------Mizoram 27.63 368 Aizawl 368 Dwelling Units, BSUP Scheme at 261 15030057B1734 30.75 27.63 0.00 - 368 - 170 198 11-Feb-2009 Rangvamual, Aizawl, Mizoram ------Mizoram 28.53 408 Aizawl Revised (Combined) project for Lawipu 262 15030057B5368 34.03 28.53 - - 408 - 408 - 07.03.08 & 13.11.07 Housing project (408 DUs), Aizawl, Mizoram 28-Feb-2013 -- -- 79.73 1096 Total of Mizoram for 3 project(s) 91.02 79.73 0.00 - 1096 - 838 258 -- -- Nagaland Revised project- Housing Development in 105.6 3504 Kohima 263 13072513B4988 relocation and in-situ up-gradation of slums at 133.08 105.6 26.40 - 3436 - 1,992 1,444 14-Dec-2006 Kohima (3504 DUs), Nagaland -- -- 68 105.6 3504 Total of Nagaland for 1 project(s) 133.08 105.6 26.40 - 3436 - 1,992 1,444 -- 68 Odisha 5.41 192 Bhubaneswar 192 Dwelling Units, BSUP Scheme for the 264 21170733B1860 7.45 5.41 - - 192 - 192 - 24-Feb-2009 town of Bhubaneswar, Odisha ------Odisha 21.5 939 Bhubaneswar 1135 DUs, BSUP Scheme for Bharatpur 265 21170733B420 29.60 24.06 8.69 2.56 890 - 890 - 20-Dec-2007 Vikash Nagar at Bhubaneswar, Odisha -- -- 49 Odisha 753 DUs for Dumuduma (Raghunath Nagar, 15.04 660 Bhubaneswar 266 21170733B419 Suka Vihar, Satya Nagar, Sastri nagar, 20.77 11.51 - - 470 - 470 - 20-Dec-2007 Barabari) at Bhubaneswar, Odisha -- -- 190 Odisha 1.35 73 Bhubaneswar 73 Dwelling Units for Nayapalli Sabar Sahi 267 21170733B422 1.92 1.36 0.63 0.00 66 - 66 - 26-Sep-2007 Slum at Bhubaneswar, Odisha -- -- 7 43.3 1864 Sub-total of Bhubaneswar for 4 project(s) 59.74 42.33 9.32 2.56 1618 - 1,618 - -- 246 Odisha 0.99 47 Puri 60 Dwelling Units for Mattitota and Mishranolia 268 21183885B522 1.37 1.01 0.77 0.02 33 - 33 - 26-Sep-2007 Sahi Slum at Puri, Odisha -- -- 14 Odisha 3.89 170 Puri 295 Dwelling Units for the town of Puri (Phase- 269 21183885B524 5.35 3.37 1.90 - 127 - 127 - 13-Feb-2008 II), Odisha -- -- 43 4.88 217 Sub-total of Puri for 2 project(s) 6.71 4.39 2.67 0.02 160 - 160 - -- 57 48.18 2081 Total of Odisha for 6 project(s) 66.45 46.72 11.99 2.58 1778 - 1,778 - including 1 project(s) which are completed -- 303 Puducherry 4.25 168 Puducherry Construction of 168 Multistories tenements at 270 34023821B492 6.60 4.25 - - 168 - 168 - 07-Mar-2008 Kuruchikulam (Vazhakulam), Puducherry ------

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Puducherry Construction of 1660 Houses with 8.03 262 Puducherry 271 34023821B2068 Infrastructure facilities for SC Beneficiaries of 14.52 12.72 - 4.69 262 - 262 - 15-Jul-2009 Puducherry. ------Puducherry 1136 DUs with infrastructure at Lambert 22.12 896 Puducherry 272 34023821B490 Saravanan Nagar, Reddiyar Palayam, Oulgret 29.63 21.04 0.00 - 816 - 432 384 06-Oct-2007 Municipality, Puducherry -- -- 80 34.41 1326 Total of Puducherry for 3 project(s) 50.74 38.02 0.00 4.69 1246 - 862 384 -- 80 Punjab 1.15 128 Amritsar 320 DUs for Slum Development 3 Slums at 273 03020172B353 2.32 2.88 - 1.73 128 - 91 37 26-Sep-2007 Rasoolpur, Amritsar City, Punjab -- 0.72 -- Punjab 19.23 880 Amritsar Slum Relocation Project for 1328 Dwelling 274 03020172B4971 38.46 23.28 11.96 4.05 880 - - 880 28-Mar-2012 Units under BSUP at Amritsar, Punjab -- 16.01 -- 20.38 1008 Sub-total of Amritsar for 2 project(s) 40.78 26.16 11.96 5.78 1008 - 91 917 16.73 -- Punjab 4832 DUs for Slum Development (Bhagat 25.01 3632 Ludhiana 275 03092778B409 Singh nagar, Rajiv Gandhi), Ludhiana City, 50.09 33.27 - 8.26 3442 - 1,672 1,770 26-Sep-2007 Punjab -- -- 190 Punjab Project -- -- Ludhiana Slum Relocation Project for 896 Dwelling Units Cancelled on 276 03092778B4972 4.78 - 4.78 -- - - - 28-Mar-2012 at Ludhiana, Punjab dated -- 20-Feb-14 -- -- 25.01 3632 Sub-total of Ludhiana for 1 project(s) 50.09 38.05 - 13.04 3442 - 1,672 1,770 -- 190 45.39 4640 Total of Punjab for 3 project(s) 90.87 64.21 11.96 18.82 4450 - 1,763 2,687 16.73 190 Rajasthan 17.15 1082 Ajmer 1082 Dwelling Units for Basic Services to 277 08210060B351 64.45 42.28 - 25.14 1082 - 715 367 21-Mar-2007 Urban Poor in Ajmer Puskar, Rajasthan ------17.15 1082 Sub-total of Ajmer for 1 project(s) 64.45 42.28 - 25.14 1082 - 715 367 -- -- Rajasthan 42.48 2892 Jaipur 2892 Dwelling Units on Relocation of 14 Slums 278 08121891B2988 87.50 42.48 - - 2892 - 47 2,845 29-Sep-2010 under JDA for Jaipur, Rajasthan -- 8.5 -- Rajasthan 45.63 2922 Jaipur Construction of 2922 DUs for Relocation of 17 279 08121891B3008 94.00 45.63 - - 2922 - 571 2,351 23-Sep-2010 Slums under JDA in Jaipur, Rajasthan ------Rajasthan Project -- -- Jaipur 12000 Dwelling Units for Sanjay Nagar Batta Cancelled on 280 08121891B3608 9.75 - 9.75 -- - - - 21-Mar-2007 Basti, Jaipur, Rajasthan. dated -- 12-Sep-11 -- -- 88.11 5814 Sub-total of Jaipur for 2 project(s) 181.50 97.86 - 9.75 5814 - 618 5,196 8.5 -- 105.25 6896 Total of Rajasthan for 3 project(s) 245.95 140.14 - 34.89 6896 - 1,333 5,563 including 2 project(s) which are completed 8.5 -- Sikkim 21.78 202 Gangtok Integrated Housing & Slum development for 281 11041513B1619 25.17 21.78 7.08 - 169 - 58 111 28-Jan-2009 Notified Slum area Rangpo Gangtok-I -- -- 33 Sikkim Integrated Housing and Slum Development of 2.79 52 Gangtok 282 11041513B493 old Slaughter House Area, Gangtok (Phase I), 3.25 2.79 0.70 - 52 - 52 - 07-Nov-2007 Sikkim ------Sikkim Integrated Development of Housing & Slum 4.49 Infra Gangtok 283 11041513B1690 development of old slaughter House Area 5.16 4.49 1.27 - NA - - - 30-Jan-2009 Gangtok, Phase-II, Sikkim -- -- NA 29.06 254 Total of Sikkim for 3 project(s) 33.58 29.06 9.05 - 221 - 110 111 -- 33 Tamilnadu 2.44 189 Chennai 189 Dwelling Units for Anakaputhur 284 33020988B1721 4.88 2.44 - - 189 - 189 - 03-Feb-2009 Kancheepuram, Chennai, Tamilnadu ------

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Tamilnadu 1.87 191 Chennai 191 DUs BSUP Project for Poonamallee. 285 33020988B1722 3.74 1.87 - 0.00 191 - 191 - 03-Feb-2009 Thirivallur. Tamil Nadu ------Tamilnadu 3.05 276 Chennai 276 DUs for Pammal Municipality. 286 33020988B1720 6.56 3.05 - - 276 - 276 - 03-Feb-2009 Lancheepuram. Chennai, Tamilnadu ------Tamilnadu 3.55 440 Chennai 440 Dwelling Units for Slums in Thiruverkadu. 287 33020988B1723 7.10 3.55 - - 440 - 440 - 03-Feb-2009 Thiruvallur. Tamil Nadu ------Tamilnadu 5.09 827 Chennai 827 Houses & Infrastructure facilitise for 288 33020988B427 10.19 5.09 - - 566 - 748 - 27-Feb-2007 Alandur Municipality, Chennai, Tamilnadu -- -- 261 Tamilnadu Construction of 10452 tenements with 203.38 10452 Chennai 289 33020988B443 infrastructure facilities (Ph-I) at Perumbakkam, 440.61 203.38 - - 9064 - 9,064 - 28-Nov-2007 Chennai, Tamilnadu -- -- 1388 Tamilnadu Construction of 1370 houses and 50.71 1370 Chennai 290 33020988B442 Infrastructure facilities for Chennai corporation. 127.44 50.71 - - 1158 - 1,158 - 29-Oct-2007 Tamil Nadu. -- -- 212 Tamilnadu 1.26 197 Chennai Construction of 197 New houses Mangadu 291 33020988B435 2.52 1.26 0.00 - 197 - 197 - 02-Feb-2007 Townpanchayat. (Kancheepuram) Tamilnadu ------Tamilnadu 300 new houses & 98 up gradation and 3.32 398 Chennai 292 33020988B1520 infrastructure facilities for PALLAVARAM 6.64 3.32 - - 398 - 398 - 29-Dec-2008 (CMA). Kancheepuram. Tamilnadu ------Tamilnadu Revised project for Construction of 217 New 1.19 217 Chennai 293 33020988B5108 houses Sembakkam Town Panchayat 2.37 1.19 - - 217 - 217 - 02-Feb-2007 (Kancheepuram) Chennai T.N. -- 0.18 -- Tamilnadu Project Construction of 396 New houses Pallikaranai -- -- Chennai Cancelled on 294 33020988B439 Town Panchayat (Kancheepuram) Chennai 0.6 - 0.60 -- - - - 02-Feb-2007 dated (Tamilnadu) -- 08-Mar-13 -- -- Tamilnadu Construction of 398 houses with infrastructure 4.75 398 Chennai 295 33020988B1519 facilities for Avadi Muncipality, Tiruvallur, 9.50 4.75 - - 398 - 398 - 29-Dec-2008 Tamilnadu ------Tamilnadu Construction of 405 New houses 1.73 405 Chennai 296 33020988B437 Thiruneermalai Town Panchayat. TN 3.45 1.72 - - 405 - 405 - 02-Feb-2007 (Kancheepuram) Chennai ------Tamilnadu 690 DUs with infrastructure facilities for 7.53 690 Chennai 297 33020988B1536 Tambaram Muncipality (CMA), 15.06 7.53 - - 690 - 690 - 29-Dec-2008 Kancheepuram, Tamilnadu ------Tamilnadu Revised project for Construction of 500 New 2.39 500 Chennai 298 33020988B5109 houses Kundrathur Town Panchayat, Tamil 4.78 2.39 0.00 - 500 - 500 - 02-Feb-2007 Nadu, (Chennai) -- 0.6 -- Tamilnadu Construction of 9476 tenements at 159.73 9476 Chennai 299 33020988B444 Perumbakkam (Phase-II), at Chennai, 374.24 159.73 - - 9476 - 9,476 - 09-Jan-2008 Tamilnadu ------Tamilnadu Construction of 9936 slum tenements with 96.26 9936 Chennai 300 33020988B441 Infrastructure facilitise at Ezhil Nagar, 257.54 96.26 - - 9936 - 9,936 - 02-Feb-2007 Chennai, Tamilnadu ------Tamilnadu 433 Houses and Infrastructure facilitise for 2.42 433 Chennai 301 33020988B429 Madhavaram Municipality, Chennai 5.43 2.42 - - 433 - 433 - 27-Feb-2007 Metropolitan Area, Tamil Nadu ------Tamilnadu 182 Housing with Infrastructure for Minjur 1.22 182 Chennai 302 33020988B440 Town Panchayat, Chennai Metropolitan Area, 2.43 1.22 - - 182 - 182 - 02-Feb-2007 Tamil Nadu. ------Tamilnadu Provision of Infrastructure facilities for 186 34.55 Infra Chennai 303 33020988B1626 Slums (Ph-II) in Chennai Corporation, 72.63 34.55 0.00 - NA - - - 28-Jan-2009 Tamilnadu -- -- NA Tamilnadu 0.85 Infra Chennai Provision of Infrastructure facilitise for 304 33020988B432 1.70 0.85 0.00 - NA - - - 02-Feb-2007 Thiruvottiyur Municipality, Chennai, Tamilnadu -- -- NA Tamilnadu Provision of Infrastructure facilitise for 0.47 Infra Chennai 305 33020988B433 kathivakkam Municipality, Chennai 0.93 0.46 - - NA - - - 27-Feb-2007 Metropolitan Area Tamil nadu -- -- NA

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Tamilnadu 414 Houses (295 New & 119 Upgradation) 2.38 414 Chennai 306 33020988B431 with Infrastructure for Ambattur Municipality, 4.75 2.38 - - 414 - 414 - 27-Feb-2007 Chennai Metropolitan Area, Tamil Nadu. ------Tamilnadu Construction of 500 houses and providing 7.89 500 Chennai 307 33020988B4671 infrastructure facilities for Avadi Municipality 15.79 7.89 0.00 - 500 - 500 - 13-Mar-2012 (Phase-II), Tamilnadu ------598.02 37491 Sub-total of Chennai for 23 project(s) 1,380.27 598.61 0.00 0.60 35630 - 35,812 - 0.78 1861 Tamilnadu 0.46 39 Coimbatore Construction of 39 Houses for Saravanampatty 308 33121103B1531 0.92 0.46 - 0.00 39 - 39 - 29-Dec-2008 Town Panchayat. Coimbatore. Tamilnadu ------Tamilnadu Construction of 129 New houses for 1.38 129 Coimbatore 309 33121103B1526 Periyanaickenpalayam Town Panchayat. 2.77 1.38 - - 129 - 129 - 29-Dec-2008 Coimbatore. Tamil Nadu ------Tamilnadu Construction of 129 houses for Veerapandi 1.37 129 Coimbatore 310 33121103B1529 (N0-4) Town Panchayat. Coimbatore. 2.74 1.37 - - 129 - 129 - 29-Dec-2008 Tamilnadu ------Tamilnadu 1.46 131 Coimbatore Construction of 131 new houses for Vellalore 311 33121103B1530 2.92 1.46 - - 131 - 131 - 29-Dec-2008 Town Panchayat, Coimbatore, Tamilnadu ------Tamilnadu 1.55 135 Coimbatore Construction of 135 New houses for Idigarai 312 33121103B1523 3.10 1.55 - - 135 - 135 - 29-Dec-2008 Town panchayat, Coimbatore, Tamil Nadu ------Tamilnadu 15.56 1608 Coimbatore Construction of 1608 Houses with Infra at 313 33121103B451 41.03 15.56 - - 1608 - 1,608 - 02-Feb-2007 Ammankulam in Coimbatore City, Tamilnadu ------Tamilnadu Construction of 179 DUs with infrastructure in 1.96 179 Coimbatore 314 33121103B1542 Goundampalayan. Muncipality. Coimbatore, 3.95 1.96 - - 179 - 179 - 05-Jan-2009 Tamilnadu ------Tamilnadu Construction of 2232 Slum tenments at 20.69 2232 Coimbatore 315 33121103B450 Ukkadam Sewrage farm at Coimbatore City, 55.36 20.69 - - 2232 - 2,232 - 02-Feb-2007 Tamilnadu ------Tamilnadu Construction of 300 houses and providing 3.36 300 Coimbatore 316 33121103B1522 infrastructure facilities for Kurichi. 6.75 3.36 - 0.00 300 - 300 - 29-Dec-2008 Coimabatore. Tamilnadu ------Tamilnadu Construction of 303 New Houses for 3.17 303 Coimbatore 317 33121103B1521 Kuniamuthur Muncipality. Coimbatore. 6.37 3.17 - - 303 - 303 - 29-Dec-2008 Tamilnadu ------Tamilnadu Construction of 36 houses with Infrastructure 0.46 36 Coimbatore 318 33121103B1527 for Vedapatti Town Panchayat, Coimbatore, 0.91 0.46 0.01 - 36 - 36 - 29-Dec-2008 Tamilnadu ------Tamilnadu Construction of 41 New houses for 0.48 41 Coimbatore 319 33121103B1524 Kannampalayam Town Panchayat. 0.95 0.48 - 0.00 41 - 41 - 29-Dec-2008 Coimbatore. Tamilnadu ------Tamilnadu Construction of 57 New houses for 0.69 57 Coimbatore 320 33121103B1528 Veerkeralam Town Panchayat. Coimbatore. 1.38 0.69 - - 57 - 57 - 29-Dec-2008 Tamilnadu ------Tamilnadu Construction of 88 New houses with Infra for 1.04 88 Coimbatore 321 33121103B1525 Madukkarai Town Panchayat, Coimbatore, 2.09 1.04 - - 88 - 88 - 29-Dec-2008 Tamilnadu ------Tamilnadu Construction of 9600 Tenements and 63.69 7048 Coimbatore 322 33121103B457 infrastructure facilities (Phase-III) at Ukkadam, 135.68 63.69 - 0.00 7048 - 5,072 1,976 29-Oct-2007 Coimbatore., Tamilnadu -- 0.03 -- Tamilnadu Construction of 10973 houses and 96.59 10973 Coimbatore 323 33121103B454 Infrastructure facilities (Phase-II) for 199.94 96.59 - - 8213 1,733 8,213 - 21-Mar-2007 Coimbatore, Tamil Nadu -- -- 1027 Tamilnadu 28.66 2907 Coimbatore 2907 DUs with Infrastructure at Coimbatore 324 33121103B452 58.82 28.66 - - 2907 - 2,907 - 27-Feb-2007 (Phase-I) for 18 Slums, Tamil Nadu ------242.56 26335 Sub-total of Coimbatore for 17 project(s) 525.67 242.56 0.01 0.00 23575 1,733 21,599 1,976 0.03 1027

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Tamilnadu Construction 1566 Houses with Infrastructure 14.17 1566 Madurai 325 33242809B412 facilities at Rajakkur Periyar Nagar in Madurai, 39.77 14.17 - - 1566 - 1,566 - 02-Feb-2007 Tamilnadu ------Tamilnadu Construction of 227 new houses for 2.33 227 Madurai 326 33242809B1532 thirupparankundram Muncipality. Madurai. 4.69 2.33 - - 227 - 227 - 29-Dec-2008 Tamilnadu ------Tamilnadu 236 houses and providing infrastruture 2.46 236 Madurai 327 33242809B1533 facilities for Avaniapuram Muncipality, 4.94 2.46 - - 236 - 236 - 29-Dec-2008 Madurai, Tamilnadu ------Tamilnadu Construction of 413 New houses for 3.99 413 Madurai 328 33242809B1534 Tirumangalam Muncipality. Madurai. 7.99 3.99 0.00 0.00 413 - 413 - 29-Dec-2008 Tamilnadu ------Tamilnadu Construction of 485 new houses with 5.18 485 Madurai 329 33242809B1535 infrastructure for Anaiyur Muncipality, Madurai. 10.38 5.18 - 0.00 485 - 485 - 29-Dec-2008 Tamilnadu ------Tamilnadu Construction of 2515 Houses with 13.42 2515 Madurai 330 33242809B413 Infrastructure Package-I for 21 Slums at 26.86 13.42 - - 2515 - 2,515 - 02-Feb-2007 Madurai Ph-I, Tamilnadu ------Tamilnadu 50.92 9563 Madurai 9563 houses and Infrastructure facilitise (Ph-II) 331 33242809B415 103.58 50.92 - - 6088 3,475 6,088 - 27-Feb-2007 for Madurai Corporation, Tamil Nadu ------Tamilnadu 0.79 80 Madurai 80 houses and infrastructure for Paravai Town 332 33242809B1499 1.60 0.79 - - 80 - 80 - 24-Dec-2008 Panchayat, Madurai, Tamilnadu ------Tamilnadu 78 houses and providing infrastructure 0.8 78 Madurai 333 33242809B1500 facilities for Sholavandan Town Panchayat, 1.72 0.8 0.00 - 78 - 78 - 24-Dec-2008 Madurai, Tamilnadu ------Tamilnadu 43 houses and providing infrastructure 0.46 43 Madurai 334 33242809B1498 facilities for Vilangudi Town Panchayat, 0.95 0.46 - - 43 - 43 - 24-Dec-2008 Madurai, Tamilnadu ------Tamilnadu Construction of 10688 houses and 87.13 10688 Madurai 335 33242809B417 infrasrructure facilities (Ph-III) for Madurai, 176.75 87.13 - - 7515 3,173 7,515 - 29-Oct-2007 Tamilnadu ------181.64 25894 Sub-total of Madurai for 11 project(s) 379.21 181.64 0.00 0.00 19246 6,648 19,246 - -- -- 1022.22 89720 Total of Tamilnadu for 51 project(s) 2,285.16 1022.82 0.01 0.60 78451 8,381 76,657 1,976 including 13 project(s) which are completed 0.81 2888 Telangana Revised- 23239 DUs with infrastructure in 107.97 21594 Hyderabad GHMC area and Ranga Reddy Districts. 336 28051819B5088 315.47 116.2 14.52 8.22 21522 - 19,020 2,502 30-Mar-2006 Phase-I by GHMC, Hyderabad under the -- 49000 DUs BSUP Project. -- 72 Telangana Revised- 25761 DUs with infrastructure in 128.81 25761 Hyderabad GHMC area and Ranga Reddy Districts, 337 28051819B5089 414.62 128.81 - - 25761 - 24,236 1,525 30-Mar-2006 Phase-II by GHMC, Hyderabad under the -- 49000 DUs BSUP Project. -- -- Telangana Revised- 4550 DUs with infrastructure facilities 59.3 4550 Hyderabad 338 28051819B4088 in GHMC area and Ranga Reddy Districts, by 120.27 59.3 12.19 - 4542 - 2,255 2,287 13-Feb-2008 GHMC, Hyderabad, Telangana -- -- 8 Telangana Providing Infrastructure Development of 24.86 Infra Hyderabad 339 28051819B1356 Houses Constructed Under VAMBAY Intrenal 49.73 24.86 - - NA - - - 30-Mar-2006 Roads & Site Leveling Etc, Telangana -- -- NA Telangana Revised project Phase-I for construction of 31.37 1952 Hyderabad 340 28051819JB6688 1976 DUs and provision of infrastructure 65.38 31.37 5.37 - 1584 - 537 1,047 29-Dec-2008 facilities by GHMC, Telangana -- 5.37 368 Telangana Revised project Phase-III for 1942 DUs and 22.44 1494 Hyderabad 341 28051819JB6689 provision of infrastructure facilities by in GHMC 46.76 25.84 0.00 3.39 1184 - 220 964 29-Dec-2008 area, Ranga Reddy Districts, Telangana -- -- 310 Telangana Revised project Phase-II for construction of 26.49 1616 Hyderabad 342 28051819JB6748 1712 DUs with infrastructure facilities by 53.64 31.45 9.31 4.96 992 - 244 748 29-Dec-2008 GHMC, Telangana -- -- 624 Telangana Revised project Phase-IV for the construction 18.62 1184 Hyderabad 343 28051819JB6868 of 1576 DUs with Infrastructure facilities in 37.58 33.82 1.96 15.20 1142 - 282 860 29-Dec-2008 GHMC area, Telangana -- -- 42

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Telangana Revised project Phase-V for 2756 DUs with 40.88 2740 Hyderabad 344 28051819JB6755 infrastructure facilities in GHMC area and 82.42 48.13 4.78 7.25 2548 - 480 2,068 30-Jan-2009 Ranga Reddy Districts, Telangana -- -- 192 Telangana Revised project Phase-VI for construction of 41.93 2755 Hyderabad 345 28051819JB6757 2755 DUs with infrastructure in GHMC area 84.49 47.97 16.20 6.05 2739 - 269 2,470 30-Jan-2009 and Ranga Reddy Districts, Telangana -- -- 16 Telangana Revised project Phase-VII for 2800 Houses 42.64 2800 Hyderabad 346 28051819B1676 with infrastructure facilities in GHMC area & 86.17 48.08 6.22 5.45 2096 - 1,828 268 30-Jan-2009 Ranga Reddy Districts Telangana -- -- 704 Telangana Revised project (Jawaharnagar & Gachi Bowli) 32.72 2048 Hyderabad 347 28051819JB6895 Phase-VIII for construction of 2328 DUs in 67.81 33.92 8.88 1.20 1360 - 739 621 24-Feb-2009 GHMC area by GHMC, Telangana -- -- 688 Telangana Revised project Phase-IX for 2352 DUs with 21.98 1384 Hyderabad 348 28051819JB6869 infrastructure in GHMC area and Ranga 45.80 23.9 5.23 1.92 762 - 112 650 24-Feb-2009 Reddy Districts, Telangana -- -- 622 Telangana Revised project Phase-X for construction of 40.95 2512 Hyderabad 349 28051819JB6758 2624 DUs with infrastructure in GHMC area by 82.80 40.95 6.30 0.00 1968 - 451 1,517 24-Feb-2009 GHMC, Telangana -- 6.3 544 Telangana Revised project for provision of infrastructure 11.32 Infra Hyderabad 350 28051819B4888 facilities in the slums of MCH divisions I to IV, 22.65 11.32 - 0.00 NA - - - 30-Mar-2006 by GHMC, Hyderabad, Telangana -- -- NA Telangana Revised project for provision of infrastructure 14.94 Infra Hyderabad 351 28051819B4889 facilities in the slums of MCH Divisions V to 29.88 14.94 - - NA - - - 30-Mar-2006 VIII, by GHMC, Hyderabad, Telangana -- -- NA Telangana Revised project for provision of infrastructure 13.17 Infra Hyderabad 352 28051819B4890 facilities in the slums of MCH divisions IX to 26.34 13.17 - - NA - - - 30-Mar-2006 XII, by GHMC, Hyderabad, Telangana -- -- NA 680.39 72390 Sub-total of Hyderabad for 17 project(s) 1,631.81 734.03 90.97 53.64 68200 - 50,673 17,527 11.67 4190 680.39 72390 Total of Telangana for 17 project(s) 1,631.81 734.03 90.97 53.64 68200 - 50,673 17,527 including 5 project(s) which are completed 11.67 4190 Tripura 13.96 256 Agartala 256 Dwelling Units for Mouza Kunbanjan Slum 353 16010039B335 16.73 13.96 - - 256 - 256 - 27-Apr-2007 Improvement Scheme at Agartala, Tripura ------13.96 256 Total of Tripura for 1 project(s) 16.73 13.96 - - 256 - 256 - -- -- Uttar Pradesh 25.2 1172 Agra Revised in Sanctioned DPR- BSUP project at 354 09150042JB6881 54.42 25.2 0.00 - 1172 - 1,172 - 14-Feb-2009 Agra (1172 DUs), Uttar Pradesh -- 0.43 -- Uttar Pradesh 24.17 1285 Agra Revised in Sanctioned DPR- BSUP project at 355 09150042JB6878 52.21 24.17 - - 1285 - 1,285 - 14-Feb-2009 Agra (1285 DUs), Uttar Pradesh -- 2.14 -- Uttar Pradesh 14.99 2151 Agra Revised in Sanctioned DPR- BSUP project at 356 09150042JB6879 32.38 14.99 0.00 - 2151 - 2,151 - 21-Feb-2009 Agra (2151 DUs), Uttar Pradesh -- 2.91 -- Uttar Pradesh 37.55 1908 Agra Revised in Sanctioned DPR- BSUP project at 357 09150042JB6877 81.12 37.55 - - 1908 - 1,908 - 03-Feb-2009 Agra (1908 DUs), Uttar Pradesh -- 10.64 -- Uttar Pradesh 12.37 484 Agra Revised in Sanctioned DPR- BSUP project at 358 09150042JB6880 26.71 12.37 - - 484 - 484 - 03-Feb-2009 Agra (484 DUs), Uttar Pradesh -- 0.16 -- Uttar Pradesh 14.08 737 Agra Revised in Sanctioned DPR- BSUP project at 359 09150042JB6888 30.41 14.08 - - 737 - 737 - 21-Feb-2009 Agra (737 DUs), Uttar Pradesh -- 0.27 -- Uttar Pradesh 24.64 1360 Agra 1360 DUs BSUP Scheme for the city of Agra, 360 09150042B1299 51.98 24.64 0.00 - 610 - - 610 30-Jul-2008 (Phase-III), Uttar Pradesh -- -- 750 Uttar Pradesh 59.47 3640 Agra Construction of 3640 Dwelling Units at 361 09150042B1300 127.27 59.47 9.87 - 2592 - - 2,592 30-Jul-2008 Naraich, Agra, Uttar Pradesh -- -- 1048

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Uttar Pradesh 6.78 608 Agra 608 DUs for Integrated Development of Kanshi 362 09150042B336 14.79 6.78 - - 608 - 435 173 13-Feb-2008 Ram Taj Nagari Phase-II, Agra, Uttar Pradesh ------Uttar Pradesh 632 DUs Integrated Development of Manniya 7.88 632 Agra 363 09150042B337 Shri Kanshi Ram Jee Kalindi Vihar I & II, Agra, 19.04 7.88 0.97 - 425 - - 425 14-Mar-2008 Uttar Pradesh -- -- 207 227.12 13977 Sub-total of Agra for 10 project(s) 490.33 227.12 10.84 - 11972 - 8,172 3,800 16.56 2005 Uttar Pradesh 3.42 233 Allahabad BSUP Scheme for the construction of 233 DUs 364 09450101B1740 7.39 3.42 - - 233 - 70 163 14-Feb-2009 in Naini, Allahabad, Uttar Pradesh. -- 0.85 -- Uttar Pradesh 4.64 210 Allahabad 210 DUs Revised in Sanctioned DPR - BSUP 365 09450101JB6889 10.02 5.26 - 0.62 210 - 210 - 14-Feb-2009 Project at Allahabad, Uttar Pradesh ------Uttar Pradesh 5.52 345 Allahabad Revised BSUP Project at Allahabad (345 366 09450101JB7049 11.92 5.52 - - 345 - 345 - 03-Feb-2009 DUs), Dist Lucknow, Uttar Pradesh -- 1.08 -- Uttar Pradesh 6.41 438 Allahabad Revised in Sanctioned DPR- BSUP Project at 367 09450101JB6890 13.85 8.14 - 1.73 438 - 438 - 03-Feb-2009 Allahabad City, Dist. Alllahabad, UP. ------Uttar Pradesh 0.32 56 Allahabad Revised in Sanctioned DPR - BSUP Project at 368 09450101JB7159 0.71 0.38 - 0.06 56 - - 56 29-Dec-2006 Allahabad, (56 DUs) Uttar Pradesh ------20.31 1282 Sub-total of Allahabad for 5 project(s) 43.88 22.71 - 2.40 1282 - 1,063 219 1.94 -- Uttar Pradesh 5.56 292 Kanpur Revised in Implementation of BSUP Project at 369 09342214JB6870 12.00 6.49 - 0.93 283 - 283 - 21-Feb-2009 Kanpur (343 DUs), Uttar Pradesh -- -- 9 Uttar Pradesh 6.29 284 Kanpur Revised in Implementation of BSUP Project at 370 09342214JB6872 13.58 9.13 - 2.84 284 - 284 - 03-Feb-2009 Kanpur (284 DUs), Uttar Pradesh ------Uttar Pradesh 11.67 439 Kanpur Revised in Implementation of BSUP Project at 371 09342214JB6875 24.39 16.99 - 5.32 436 - 436 - 03-Feb-2009 Kanpur (439 DUs), Uttar Pradesh -- -- 3 Uttar Pradesh 10.78 554 Kanpur Revised in Implementation of BSUP Project at 372 09342214JB6871 23.27 13.61 - 2.83 480 - 480 - 21-Feb-2009 Kanpur (554 DUs), Uttar Pradesh -- -- 74 Uttar Pradesh 4.64 234 Kanpur Revised in Implementation of BSUP Project at 373 09342214JB6873 9.88 10.8 - 6.16 234 - 234 - 26-Feb-2009 Kanpur (234 DUs), Uttar Pradesh ------Uttar Pradesh 8.8 499 Kanpur Revised in Implementation of BSUP Project at 374 09342214JB6874 19.01 13.22 - 4.42 483 - 483 - 21-Feb-2009 Kanpur (499 DUs), Uttar Pradesh -- -- 16 Uttar Pradesh 11.21 604 Kanpur Revised in Implementation of BSUP Project at 375 09342214JB6894 23.89 14.72 - 3.51 570 - 570 - 26-Feb-2009 Kanpur (604 DUs), Uttar Pradesh -- -- 34 Uttar Pradesh 11.05 683 Kanpur Revised in Implementation of BSUP Project at 376 09342214JB6876 23.86 13.2 - 2.15 663 - 663 - 21-Feb-2009 Kanpur (683 DUs), Uttar Pradesh -- -- 20 Uttar Pradesh Revision in Sanctioned DPR – BSUP project at 13.43 677 Kanpur 377 09342214JB6968 Kanpur - (854 Dus to 677 Dus) , Dist. Kanpur, 28.60 16.93 - 3.51 642 - 642 - 24-Feb-2009 UP -- -- 35 Uttar Pradesh Revision in Sanctioned DPR – BSUP project at 9.9 504 Kanpur 378 09342214JB6949 Kanpur - (871 DUs to 504 DUs) , Dist. Kanpur, 21.10 12.86 - 2.95 497 - 497 - 28-Feb-2009 UP -- -- 7 Uttar Pradesh Revision in Sanctioned DPR – BSUP project at 13.08 681 Kanpur 379 09342214JB6969 Kanpur - (887 Dus to 681 Dus) , Dist. Kanpur, 28.25 16.98 - 3.90 669 - 669 - 21-Feb-2009 UP -- -- 12 Uttar Pradesh 5.63 646 Kanpur Revised in Implementation of BSUP project at 380 09342214JB6760 12.39 6.8 - 1.17 646 - 646 - 26-Sep-2007 Kanpur (646 DUs) Phase II, Uttar Pradesh ------

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Uttar Pradesh 0.29 32 Kanpur Revised in Implementation of BSUP project at 381 09342214JB6728 0.63 6.87 - 6.58 32 - 32 - 26-Sep-2007 Kanpur (32 DUs) Phase III, Uttar Pradesh ------Uttar Pradesh Project 544 DUs Integrated Rehabilitation Project for -- -- Kanpur Cancelled on 382 09342214B534 the Urban Poor Staying in Slums in Kanpur, 1.01 - 1.01 -- - - - 02-Feb-2007 dated Uttar Pradesh -- 26-Sep-13 -- -- 112.32 6129 Sub-total of Kanpur for 13 project(s) 240.85 159.6 - 47.28 5919 - 5,919 - -- 210 Uttar Pradesh 5.96 336 Lucknow 336 DUs for the town of Chak Malhauri. 383 09272776B1698 12.56 5.96 - - 304 - 304 - 03-Feb-2009 Lucknow, Uttar Pradesh -- -- 32 Uttar Pradesh Revision in Sanctioned DPR – BSUP project at 9.19 364 Lucknow 384 09272776JB6948 Lucknow - (487 Dus to 364 Dus) , Dist. 19.86 9.24 - 0.05 364 - 364 - 03-Feb-2009 Lucknow, UP ------Uttar Pradesh 12.94 593 Lucknow Revised in Implementation of BSUP project at 385 09272776JB6754 27.95 12.94 - - 593 - 593 - 03-Feb-2009 Lucknow (593 DUs), Uttar Pradesh -- 0.45 -- Uttar Pradesh 13.48 1488 Lucknow 1488 DUs Revised BSUP Project at Lucknow, 386 09272776JB6110 26.96 13.48 - - 1488 - 1,428 60 29-Dec-2006 Uttar Pradesh ------Uttar Pradesh 5.4 Infra Lucknow Additional Infrastructure component in BSUP 387 09272776B3028 11.67 5.4 - - NA - - - 05-Aug-2010 Scheme of Lucknow, Uttar Pradesh. -- -- NA Uttar Pradesh 4.68 181 Lucknow Revised in Sanctioned DPR- BSUP project for 388 09272776JB7048 10.11 4.68 - - 181 - 181 - 03-Feb-2009 181 DUs at Lucknow City, Uttar Pradesh -- 0.21 -- Uttar Pradesh Revised in Implementation of BSUP Scheme 22.47 2432 Lucknow 389 09272776JB6730 at Lucknow (2432 DUs) Distt. Lucknow, Uttar 48.53 61.64 - 39.17 2432 - 2,382 50 13-Sep-2007 Pradesh ------Uttar Pradesh Project -- -- Lucknow BSUP Scheme under Relocation 1408 DUs at Cancelled on 390 09272776B1699 5.87 - 5.87 -- - - - 03-Feb-2009 Nai Basti, Lucknow, Uttar Pradesh dated -- 26-Sep-13 -- -- Uttar Pradesh 2.82 176 Lucknow Under Relocation. 176 DUs at UMRAO HATA. 391 09272776B1700 5.95 2.82 - - 152 - 128 24 03-Feb-2009 NISHATGANJ. Lucknow, Uttar Pradesh -- -- 24 76.94 5570 Sub-total of Lucknow for 8 project(s) 163.59 122.04 - 45.10 5514 - 5,380 134 0.66 56 Uttar Pradesh 51.15 1580 Mathura Revised project at Radheshyam Colony, (1580 392 09143011JB6975 69.05 51.15 14.52 - 1542 - 1,542 - 21-Feb-2009 DUs) Dist Mathura, Uttar Pradesh -- 2.21 38 Uttar Pradesh Revision in Sanctioned DPR – BSUP project at 5.14 157 Mathura 393 09143011JB6971 Bhainsbahora, (530 dus to 157 dus) Dist 6.94 8.66 - 3.52 157 - 157 - 28-Feb-2009 Mathura, UP ------Uttar Pradesh Revision in Sanctioned DPR – BSUP project at 8.99 274 Mathura 394 09143011JB6974 Navneet Nagar, (534 dus to 274 dus) Dist 12.14 13.14 - 4.15 274 - 274 - 28-Feb-2009 Mathura, UP ------Uttar Pradesh Revision in Sanctioned DPR – BSUP project at 10.58 265 Mathura 395 09143011JB6972 Gopal Nagar, (560 dus to 265 dus) Dist 14.28 17.61 - 7.03 265 - 265 - 03-Feb-2009 Mathura, UP ------Uttar Pradesh Revision in Sanctioned DPR – BSUP project at 21.04 482 Mathura 396 09143011JB6973 Laxmi Nagar, (608 dus to 482 dus) Dist 28.41 21.04 5.04 - 482 - 482 - 03-Feb-2009 Mathura, UP -- 0.14 -- Uttar Pradesh 3.71 108 Mathura 108 DUs BSUP Scheme at Jaisinghpura. 397 09143011B1484 5.01 3.71 0.93 - 108 - - 108 16-Dec-2008 Mathura, Uttar Pradesh -- 0.93 -- Uttar Pradesh 2.16 156 Mathura Revised DPR – BSUP project at Govindpur, 398 09143011JB6970 2.97 3.33 - 1.17 96 - 96 - 29-Dec-2006 (156 DUs) Dist Mathura, Uttar Pradesh -- -- 60 102.77 3022 Sub-total of Mathura for 7 project(s) 138.80 118.65 20.49 15.87 2924 - 2,816 108 3.27 98

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Uttar Pradesh 8.94 500 Meerut 500 DUs BSUP Scheme at Achronda and 399 09073035B1855 22.18 8.94 - - 500 - 500 - 24-Feb-2009 Kanshi, Meerut, Uttar Pradesh ------Uttar Pradesh 14.82 629 Meerut 629 DUs BSUP Scheme for the City of Meerut, 400 09073035B1697 30.98 14.82 - - 589 - 589 - 03-Feb-2009 Uttar Pradesh -- -- 40 Uttar Pradesh 11.01 632 Meerut 632 Dus BSUP Scheme for Abdullapur & 401 09073035B1856 27.32 11.01 - - 632 - 632 - 24-Feb-2009 Karimnagar, Meerut, Uttar Pradesh ------Uttar Pradesh 14.91 677 Meerut 677 DUs BSUP Project at Meerut, Uttar 402 09073035B1715 31.66 14.91 - 0.00 677 - 677 - 03-Feb-2009 Pradesh. ------Uttar Pradesh Implementation of 852 DUs (681 new & 171 14.36 852 Meerut 403 09073035B1857 Upgrade) BSUP Scheme at Meerut. Uttar 30.45 14.36 - 0.00 840 - 840 - 24-Feb-2009 Pradesh. -- -- 12 Uttar Pradesh 13.8 694 Meerut 694 DUs BSUP project for Meerut City, Uttar 404 09073035B1714 28.84 13.8 - - 694 - 694 - 03-Feb-2009 Pradesh. ------Uttar Pradesh 18.04 723 Meerut 723 DUs BSUP Scheme for Meerut City, Uttar 405 09073035B1696 37.70 18.04 - - 723 - 723 - 03-Feb-2009 Pradesh ------Uttar Pradesh 15.98 731 Meerut 731 DUs BSUP Project at Meerut, Uttar 406 09073035B1716 34.71 15.98 - 0.00 722 - 722 - 03-Feb-2009 Pradesh -- -- 9 Uttar Pradesh Project for construction of 768 DUs with 15.83 768 Meerut 407 09073035B1695 infrastructure facilities at Meerut, Distt. Meerut, 33.08 15.83 - - 760 - 760 - 03-Feb-2009 Uttar Pradesh -- -- 8 Uttar Pradesh 10.81 1008 Meerut 1008 Dwelling Units at Lohiya Nagar 408 09073035B1301 23.56 10.81 - - 1008 - 909 99 30-Jul-2008 (Relocation), Meerut, Uttar Pradesh ------Uttar Pradesh 8.37 744 Meerut BSUP scheme for the Meerut City Ph-II (744 409 09073035B428 18.25 8.37 - - 712 - 712 - 07-Mar-2008 DUs), Uttar Pradesh -- -- 32 Uttar Pradesh 13.88 655 Meerut BSUP Scheme for construction of insitu 655 410 09073035B1702 29.01 13.88 0.00 0.00 650 - 650 - 03-Feb-2009 DUs for the City of Meerut, Uttar Pradesh -- -- 5 Uttar Pradesh 14.93 2000 Meerut Integrated Upgradation and Housing Project 411 09073035B426 32.84 14.93 - - 2000 - 2,000 - 29-Dec-2006 for 5 slums Meerut, Uttar Pradesh ------Uttar Pradesh Revised in Sanctioned DPR- BSUP Project at 3.14 160 Meerut 412 09073035JB7069 Kidwai Nagar, (160 DUs) Meerut, Uttar 7.39 3.14 - - 160 - 160 - 30-May-2011 Pradesh -- 1.94 -- 178.83 10773 Sub-total of Meerut for 14 project(s) 387.97 178.83 0.00 0.00 10667 - 10,568 99 1.94 106 Uttar Pradesh 12.44 677 Varanasi Revised in Implementation of BSUP project at 413 09675005JB6731 26.88 12.44 4.74 - 677 - 677 - 26-Feb-2009 Varanasi (677 DUs), Uttar Pradesh -- 2.41 -- Uttar Pradesh 19.07 1167 Varanasi Revised in Implementation of BSUP project at 414 09675005JB6729 41.20 19.7 7.28 0.63 1083 - 1,083 - 03-Feb-2009 Varanasi (1167 DUs), Uttar Pradesh -- -- 84 Uttar Pradesh 8.53 558 Varanasi Revised in Implementation of BSUP project at 415 09675005JB6733 18.42 8.61 2.70 0.09 472 - 472 - 03-Feb-2009 Varanasi (558 DUs), Uttar Pradesh -- -- 86 Uttar Pradesh 10.73 575 Varanasi Revised in Implementation of BSUP project at 416 09675005JB6759 23.18 10.73 4.77 - 575 - 575 - 03-Feb-2009 Varanasi (575 DUs), Uttar Pradesh -- 2.79 -- Uttar Pradesh 10.61 638 Varanasi Revised in Implementation of BSUP project at 417 09675005JB6734 22.91 10.61 5.01 - 559 - 559 - 26-Feb-2009 Varanasi (638 DUs), Uttar Pradesh -- 3.14 79 Uttar Pradesh 9.6 612 Varanasi Revised in Implementation of BSUP project at 418 09675005JB6732 20.74 10.62 2.56 1.02 564 - 564 - 03-Feb-2009 Varanasi (612 DUs), Uttar Pradesh -- -- 48

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress Uttar Pradesh Revised in BSUP Scheme for Jaiprakash 1.88 135 Varanasi 419 09675005JB6891 Nagar slum in the city of Varanasi. Distt. 4.05 1.88 0.55 - 135 - 135 - 10-Dec-2008 Varanasi. UP -- 0.1 -- Uttar Pradesh Revised in BSUP Scheme for Maheshpur 1.87 115 Varanasi 420 09675005JB6892 Slum in the City of Varanasi. Distt. Varanasi. 4.04 1.87 0.65 - 115 - 115 - 10-Dec-2008 UP -- 0.25 -- Uttar Pradesh 3.39 225 Varanasi Revised in BSUP Scheme for Rupanpur slum 421 09675005JB6893 7.33 3.39 1.19 - 225 - 225 - 10-Dec-2008 in the City of Varanasi. Distt. Varanasi. UP -- 0.46 -- Uttar Pradesh 1.62 144 Varanasi Revised BSUP Project at Newada NAT BASTI 422 09675005JB7068 3.49 1.62 0.64 - 144 - 144 - 27-Feb-2008 (144 DUs), Varanasi, Uttar Pradesh -- 0.32 -- 79.74 4846 Sub-total of Varanasi for 10 project(s) 172.24 81.48 30.09 1.73 4549 - 4,549 - 9.46 297 798.04 45599 Total of Uttar Pradesh for 67 project(s) 1,637.66 910.43 61.42 112.39 42827 - 38,467 4,360 including 5 project(s) which are completed 33.83 2772 Uttarakhand 1.1 28 Dehradun 28 Dwelling Units for Shanti kusth Ashram 423 05051187B1687 1.37 1.1 0.49 - 26 2 26 - 30-Jan-2009 (Main Basti) Dehradun, Uttrakhand ------Uttarakhand 1.16 34 Dehradun 34 Dwelling Units for Rotary Kussthrog 424 05051187B1686 1.63 1.16 0.70 - 28 6 28 - 30-Jan-2009 Ashram, Dehradun, Uttrakhand -- 0.58 -- Uttarakhand 1.12 27 Dehradun 27 Dwelling Units for Ram Mandir Kusth 425 05051187B1688 1.64 1.12 0.29 - 27 - 27 - 30-Jan-2009 Ashram (Malin Basti) Dehradun, Uttrakhand ------Uttarakhand Project -- -- Dehradun 80 Dwelling Units (Revised) for Khala Basti, Cancelled on 426 05051187B5328 0.73 - 0.73 -- - - - 20-Dec-2007 Dehradun, Uttrakhand dated -- 20-May-14 -- -- Uttarakhand 4.85 148 Dehradun 148 Dwelling Units at Kaath Bangla Slum 427 05051187B465 6.23 3.88 ------20-Dec-2007 (Malin Basti), Deharadun, Uttrakhand -- 2.67 148 Uttarakhand Project -- -- Dehradun 160 Dwelling Units (Revised) at Chaksha Cancelled on 428 05051187B5329 1.64 - 1.64 -- - - - 30-Jan-2009 Nagar, Dehradun, Uttrakhand dated -- 20-May-14 -- -- Uttarakhand 240 Dwelling Units Slum Upgradation of 2.04 56 Dehradun 429 05051187B2271 Niranjanpur, Barhmpuri, Phase-1 Dehradun, 2.60 2.19 2.04 0.15 56 - - 56 08-Feb-2010 Uttrakhand ------Uttarakhand 2.44 64 Dehradun 224 Dwelling Units for Ram Nagar Slum (Main 430 05051187B2288 3.31 4.27 0.91 1.83 64 - - 64 27-Jan-2010 Basti), Dehradun., Uttrakhand ------Uttarakhand Project 421 Dwelling Units for Slum upgradation of -- -- Dehradun Cancelled on 431 05051187B2468 Niranjanpur, Barhmpuri, Phase-II. Dehradun, 3.26 - 3.26 -- - - - 05-Mar-2010 dated Uttrakhand -- 20-May-14 -- -- 12.71 357 Sub-total of Dehradun for 6 project(s) 16.79 19.34 4.44 7.61 201 8 81 120 3.25 148 Uttarakhand Construction of 96 DUs for Pandewala, 2.9 96 Hardwar 432 05131726B513 Haridwar for the State of Uttrakhand, under 3.62 2.9 0.79 - 96 - - 96 13-Feb-2008 BSUP ------2.9 96 Sub-total of Hardwar for 1 project(s) 3.62 2.9 0.79 - 96 - - 96 -- -- Uttarakhand 7.43 200 Nainital 200 DUs Detailed Project Report (DPR) for 433 05113264B603 9.30 7.43 3.71 - 180 - 120 60 27-Feb-2008 Durgapur, Nainital, Uttrakhand -- -- 20 Uttarakhand Project Construction of 141 DUs and Infrastructure -- -- Nainital Cancelled on 434 05113264B2469 works for slum Dwellers at Naryan Nagar, 1.74 - 1.74 -- - - - 22-Feb-2010 dated Nainital, Uttarakhand -- 23-Mar-12 -- -- 7.43 200 Sub-total of Nainital for 1 project(s) 9.30 9.17 3.71 1.74 180 - 120 60 -- 20 23.03 653 Total of Uttarakhand for 8 project(s) 29.71 31.41 8.95 9.35 477 8 201 276 3.25 168

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress 400 DUs for the town of Durgapur Phase-II, 5.77 400 Asansol 435 19090262B1546 Distt. Bardhaman, Asansol Urban Region, 11.55 5.77 - - 400 - 400 - 15-Jan-2009 West Bengal ------West Bengal 5.63 702 Asansol 1024 Dwelling Units for the town of Kulti 436 19090262B5174 11.99 8.22 - 2.58 273 - 273 - 29-Dec-2006 Asansol, West Bengal. -- 0.97 429 West Bengal 5.21 673 Asansol 1057 DUs for the town of Jamuria Municipality 437 19090262B583 11.46 5.21 1.56 - 390 - 390 - 21-Mar-2007 (Phase-I), Asansol, West Bengal -- 1.12 283 West Bengal 4.65 520 Asansol 977 DUs for the town of Raniganj Municipality 438 19090262B582 10.24 4.37 - - 511 - 511 - 21-Mar-2007 (Phase-I), Asansol, West Bengal -- -- 9 West Bengal 6.54 550 Asansol 1169 Dwelling Units for the town of Jamuria 439 19090262B381 13.08 5.23 - - 217 64 217 - 24-Jan-2008 (Phase-II) under JnNURM, West Bengal -- 1.76 269 West Bengal 8.98 754 Asansol 1306 DUs for the town of Raniganj (Phase-II) 440 19090262B394 17.97 7.78 - - 552 4 552 - 05-Feb-2008 under Asansol region, West Bengal. -- -- 198 West Bengal 1371 DUs Low Cost Housing for Urban Poor in 5.09 434 Asansol 441 19090262B357 Asansol under BSUP of JnNURM, West 10.70 8.05 1.20 2.95 396 - 396 - 29-Dec-2006 Bengal -- -- 38 West Bengal 17.89 912 Asansol 912 Relocation DUs for the Town of Durgapur 442 19090262B3429 35.78 17.89 - - 504 - 504 - 25-Feb-2011 (Phase-IV), Burdwan. West Bengal. -- -- 408 West Bengal Project -- -- Asansol 1616 DUs BSUP Scheme for the town of Cancelled on 443 19090262B1738 5.58 - 5.58 -- - - - 13-Feb-2009 Durgapur, Bardhaman, West Bengal dated -- 28-Feb-12 -- -- West Bengal 12.4 966 Asansol 1937 Dwelling Units for the town of Kulti Phase- 444 19090262B611 24.80 12.43 - 0.03 375 - 375 - 27-Feb-2008 II, West Bengal -- -- 591 West Bengal 29.08 2232 Asansol 2232 Dwelling Units for the town of Asansol 445 19090262B1736 58.16 29.08 10.27 - 1903 - 1,903 - 13-Feb-2009 Phase-II, Barddhaman, West Bengal. -- 7.27 329 West Bengal Rehabilitation of Slums in Asansol, Asansol 44.46 4000 Asansol 446 19090262B355 Urban Area (through ADDA), (Phase-I) West 88.95 44.46 - - 4000 - 4,000 - 28-Nov-2006 Bengal ------West Bengal Rehabilitation of Slums in Durgapur Phase-I, 53.01 4000 Asansol 447 19090262B356 Asansol Urban Area (through ADDA), West 106.02 53.01 0.90 0.00 3899 - 3,899 - 28-Nov-2006 Bengal -- -- 101 West Bengal 65.43 4626 Asansol 4626 Dwelling Units for the town of Asansol 448 19090262B1737 130.86 65.43 - - 4626 - 4,626 - 13-Feb-2009 Phase-III, Bardhaman, West Bengal ------264.17 20769 Sub-total of Asansol for 13 project(s) 531.56 272.52 13.93 11.15 18046 68 18,046 - 11.12 2655 West Bengal 1.04 128 Rehabilitation of 2 Slums in 449 19712527B576 2.28 1.04 - - 128 - 128 - 27-Feb-2007 Municipality (Phase-I), Kolkata, West Bengal. ------West Bengal 0.97 120 Kolkata Housing project in Rishra Municipal 450 19712527B558 1.94 1.09 - 0.12 120 - 120 - 02-Feb-2007 Area Ph-I (1-Slum), West Bengal ------West Bengal 1.2 136 Kolkata 136 DUs for Bally Housing Project in Bally 451 19712527B578 2.65 1.2 - 0.00 136 - 136 - 21-Mar-2007 Municipality (Ph-I), Kolkata, West Bengal ------West Bengal 1.33 78 Kolkata 78 Dwelling Units for (Relocation), 452 19172527B1540 2.66 1.33 - - 78 - 78 - 29-Dec-2008 KMA, Kolkata, West Bengal -- 0.27 -- West Bengal Rehabilitation of 1 slums in 1.37 162 Kolkata 453 19712527B581 Municipality Ph-I (210 DUs), Kolkata, West 3.02 1.33 - - 162 - 162 - 27-Feb-2007 Bengal ------West Bengal 1.96 202 Kolkata 202 DUs for the town of (Phase-I) 454 19712527B354 3.92 2.16 0.01 0.19 202 - 202 - 09-Jan-2008 in Kolkata Metropolitan Area, West Bengal ------

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress West Bengal 1.96 190 Kolkata 190 DUs BSUP Scheme for the town of Budge 455 19712527B598 4.32 1.96 0.28 - 190 - 190 - 21-Mar-2007 Budge Phase-I, West Bengal -- 0.49 -- West Bengal Project -- -- Kolkata 288 DUs Relocation slums in Cancelled on 456 19712527B559 0.65 - 0.65 -- - - - 29-Dec-2006 Municipal Corp (Ph-II) Kolkata, West Bengal dated -- 28-Feb-12 -- -- West Bengal Project 220 DUs for Slum dwellers at KMC Ward No. -- -- Kolkata Cancelled on 457 19712527B379 94, Jhorobasti Kolkata, West 0.71 - 0.71 -- - - - 24-Jan-2008 dated Bengal -- 28-Feb-12 -- -- West Bengal Project -- -- Kolkata 256 DUs Integrated Housing Project for Slum Cancelled on 458 19712527B346 0.94 - 0.94 -- - - - 27-Dec-2007 Dwellers of (Phase-II), West Bengal dated -- 20-May-14 -- -- West Bengal 0.59 64 Kolkata 416 DUs Rehabilitation of slums in 459 19712527B551 1.27 1.91 - 1.32 64 - 64 - 14-Dec-2006 Housing Project at Kolkata, West Bengal ------West Bengal BSUP Scheme for the town of Baruipur Phae-I 4.85 543 Kolkata 460 19712527B344 (543 DUs), Kolkata region KMDA, West 10.08 4.85 - - 543 - 543 - 07-Nov-2007 Bengal ------West Bengal 631 DUs Rehabilitation of 5 slums in 4.32 586 Kolkata 461 19712527B572 Municipality (Phase-I) Kolkata, 9.50 4.32 1.56 - 586 - 586 - 27-Feb-2007 West Bengal -- 0.83 -- West Bengal 5.38 240 Kolkata 240 DUs for the Town of (Phase- 462 19172527B3412 10.77 5.38 - - 240 - 240 - 17-Feb-2011 2), North 24 Paraganas, West Bengal ------West Bengal 2.51 320 Kolkata Revised project for the town of 463 19172527JB6896 6.44 2.51 1.50 0.00 -- - - - 21-Mar-2007 Municipality (Ph-I) Kolkata, West Bengal. -- -- 320 West Bengal 0.47 55 Kolkata Revised in BSUP Scheme for the town of 464 19172527JB6710 1.61 1.26 - 0.79 55 - 55 - 02-Feb-2007 South (Phase-I), West Bengal ------West Bengal 5.36 364 Kolkata 428 DUs for the town of Konnagar Phase-II, 465 19172527B1692 10.73 4.73 - - 364 - 364 - 05-Feb-2009 (Kolkata MA), West Bengal ------West Bengal 5.65 478 Kolkata 550 Dwelling Units for the town of 466 19712527B385 11.31 4.88 0.56 - 432 - 432 - 27-Feb-2008 (Phase-II) under Kolkata Region, West Bengal -- -- 46 West Bengal 1.14 84 Kolkata 500 DUs for the town of Bidhannagar Phase-II, 467 19172527B1870 2.28 1.7 - 0.56 52 - 52 - 26-Feb-2009 North 24 Paragans. West Bengal -- -- 32 West Bengal 6.89 562 Kolkata 562 DUs for the town of Phase-II, 468 19712527B345 13.78 6.37 0.83 - 521 - 521 - 27-Dec-2007 Kolkata Region KMDA, West Bengal -- -- 41 West Bengal 882 DUs Rehabilitation of 1 Slum in 6.19 858 Kolkata 469 19712527B574 Champdany Municipality (Phase-I), Kolkata, 13.61 6.36 0.13 0.17 858 - 858 - 27-Feb-2007 West Bengal ------West Bengal 868 DUs Rehabilitation of 3 Slums in 6.54 868 Kolkata 470 19712527B547 Municipality Area Phase-I, Kolkata, West 14.38 6.54 - - 868 - 868 - 02-Feb-2007 Bengal ------West Bengal 740 DUs Rehabilitation of 16 Slums in 4.68 526 Kolkata 471 19712527B543 Municipality Area Phase-I, 10.29 4.94 0 0.26 526 - 526 - 02-Feb-2007 Kolkata, West Bengal ------West Bengal 2.75 297 Kolkata 748 DUs for the town of Dum Dum, Kolkata 472 19712527B602 7.99 3.46 - 0.71 297 - 297 - 26-Sep-2007 Region KMDA, West Bengal ------West Bengal Housing for Urban Poor within Kolkata 7.3 1184 Kolkata 473 19712527B557 Municipal Corporation (KEIP), (1184 DUs) 17.22 7.3 - - 1184 - 1,184 - 27-Feb-2007 Kolkata, West Bengal -- 1.38 -- West Bengal 4.62 720 Kolkata BSUP Scheme for the town of Khardah, (1246 474 19172527B5168 10.90 6.55 - 1.93 720 - 720 - 29-Dec-2006 DUs), West Bengal -- 1.83 -- West Bengal 8.34 721 Kolkata 721 DUs Rehabilitation of 6 slums in North 475 19712527B546 16.68 8.34 - - 721 - 721 - 29-Dec-2006 Dum Dum (Phase-I), Kolkata, West Bengal ------

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress West Bengal 8.37 562 Kolkata 562 DUs BSUP Scheme for Phase-I, 476 19172527B1739 16.74 8.37 - - 562 - 562 - 13-Feb-2009 24 Pargana (North), Kolkata, West Bengal ------West Bengal 7.72 1006 Kolkata 1103 DUs BSUP Scheme for the town of 477 19172527B5173 15.57 8.46 2.59 0.74 1002 - 1,002 - 21-Mar-2007 Pujali, Phase-I, West Bengal . -- 1.62 4 West Bengal 8.9 899 Kolkata 899 DUs Rehabilitation of 13 Slums in Kalyani, 478 19712527B552 17.81 8.9 - - 899 - 899 - 29-Dec-2006 (Phase-I), Kolkata, West Bengal ------West Bengal Rehabilitation of 6 slums in the town of 8.96 797 Kolkata 479 19712527B560 Phase-I, North 24 Paraganas, West 17.91 8.96 - - 797 - 797 - 29-Dec-2006 bengal ------West Bengal 787 DUs Integrated Development of 9.01 787 Kolkata 480 19712527B541 Rehabilitation of 10 slums in Kanchrapa 18.03 9.01 0.00 - 787 - 787 - 29-Dec-2006 (Phase-I) Kolkata, West Bengal ------West Bengal 8.57 973 Kolkata Rehabilitation of 9 slums in Gopalpur 481 19712527B544 18.85 8.57 - - 960 - 960 - 02-Feb-2007 Municipality Phase-I, Kolkata, West Bengal -- -- 13 West Bengal 10.01 958 Kolkata 958 DUs Improvement of Slum in Gayeshpur 482 19712527B548 20.03 10.01 2.77 - 958 - 958 - 28-Nov-2006 through KMDA, Kolkata, West Bengal ------West Bengal 10.65 858 Kolkata 858 DUs for the town of Hooghly Chinsurah 483 19712527B380 21.30 10.65 - - 838 - 838 - 24-Jan-2008 (Ph-II) under Kolkata Region, West Bengal -- -- 20 West Bengal 10.84 1286 Kolkata Rehabilitation of 25 slums in Kotrung 484 19712527B561 21.67 10.84 0.73 - 1228 - 1,228 - 29-Dec-2006 Municipality (Phase-I) Kolkata, West Bengal -- -- 58 West Bengal 1253 Dwelling Units for the town of 11.86 1253 Kolkata 485 19172527B5169 Municipality Phase-I, Kolkata, 24.54 11.86 0.00 - 1253 - 1,253 - 29-Dec-2006 West Bengal. -- 1.84 -- West Bengal 13.41 1412 Kolkata 1412 DUs Rehabilitation of 6 slums in Kalyani 486 19712527B562 26.82 13.41 - - 1412 - 1,412 - 29-Dec-2006 (Phase-II), Kolkata, West Bengal ------West Bengal 13.41 500 Kolkata 500 DUs for the town of (Phase-2), 487 19172527B3414 26.82 13.41 - - 500 - 500 - 17-Feb-2011 North 24 Paraganas, West Bengal. ------West Bengal 1526 DUs for 29 slums in 3 clusters in the 13.32 1526 Kolkata 488 19712527B400 towns of North Barrackpore, Kolkata region 28.01 13.32 - - 1487 - 1,487 - 13-Sep-2007 KMDA, West Bengal -- 3.33 39 West Bengal 1341 DUs BSUP Scheme Scheme for the 12.7 1341 Kolkata 489 19712527B600 town of Bansberia Phase-1, Kolkata, West 28.07 12.7 1.65 - 1334 - 1,334 - 21-Mar-2007 Bengal -- -- 7 West Bengal Project -- -- Kolkata BSUP Scheme (1160 Dwelling Units) for the Cancelled on 490 19712527B347 3.53 - 3.53 -- - - - 27-Dec-2007 town of , West Bengal dated -- 28-Feb-12 -- -- West Bengal 13.44 2021 Kolkata 2021 Dwelling Units for the town of Hooghly 491 19712527B585 29.65 13.44 - - 1996 - 1,996 - 21-Mar-2007 Chinsurah Phase-I, Kolkata, West Bengal -- -- 25 West Bengal Revised- 1177 DUs in the town of 15.2 1177 Kolkata 492 19712527B376 Chandernagore Phase-III, Distt. Hooghly, 30.41 15.2 - - 1177 - 1,177 - 14-Mar-2008 West Bengal. ------West Bengal 9.47 1019 Kolkata 1738 DUs for the town of Kamarhati 493 19172527B5171 18.99 12.75 - 3.28 1019 - 1,019 - 02-Feb-2007 Municipality Phase-I, Kolkata, West Bengal. -- 2.56 -- West Bengal 7.26 496 Kolkata 1108 DUs for the town of Bally Ph-2, Kolkata 494 19172527B1869 14.52 8.11 - 0.85 496 - 496 - 26-Feb-2009 Metropolitan Area, West Bengal ------West Bengal 16.38 1120 Kolkata 1120 DUs BSUP Scheme for the town of 495 19172527B1691 32.76 16.38 - - 975 - 975 - 05-Feb-2009 (Kolkata MA), West Bengal -- -- 145 West Bengal 1130 DUs for the town of Ph-II. 4.78 330 Kolkata 496 19172527B1614 Distt. 24 Parganas ( South), Kolkata 14.42 4.78 - - 330 - 330 - 21-Jan-2009 Metropolitan Area, West Bengal -- 0.69 --

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress West Bengal 16.78 1330 Kolkata 1330 DUs for the town of Khardah (Phase-II), 497 19712527B375 33.55 16.78 - - 1330 - 1,330 - 09-Jan-2008 Kolkata, West Bengal ------West Bengal 9.76 799 Kolkata 1434 DUs for the town of Barrackpore (Phase- 498 19712527B397 19.52 8.76 - - 799 - 799.00 - 05-Feb-2008 II) under Kolkata region, West Bengal ------West Bengal 17.75 1206 Kolkata 1206 DUs for the town of (Phase-II) 499 19712527B377 35.51 17.75 - - 974 - 974 - 14-Mar-2008 under Kolkata region, West Bengal -- 4.44 232 West Bengal Revised project for 1905 DUs in the town of 19.56 1905 Kolkata 500 19712527B550 Chandernagore Ph-I, Distt. Hooghly, West 39.13 19.56 - - 1905 - 1,905 - 29-Dec-2006 Bengal ------West Bengal 1435 DUs for the town of Madhyamgram 19.87 1435 Kolkata 501 19712527B350 Phase-II in Kolkata Metropolitan Area, West 39.73 19.87 1.23 - 1435 - 1,435 - 09-Jan-2008 Bengal ------West Bengal 20.65 1643 Kolkata 1643 Dwelling Units for the town of Rishra 502 19712527B399 41.29 20.65 - - 1643 - 1,643 - 05-Feb-2008 (Phase-II) under kolkata region, West Bengal ------West Bengal 2848 DUs for Nonadanga Housing Project 20.86 2848 Kolkata 503 19712527B563 (KMDA) Kolkata Metropolitan Development 41.72 20.86 - - 2848 - 2,656 192 29-Dec-2006 Authority, West Bengal ------West Bengal Integrated Development of slums in 19.17 2120 Kolkata 504 19712527B570 Municipality Area (Ph-I) (7-slums), Kolakata, 42.18 19.17 0.01 - 2120 - 2,120 - 27-Feb-2007 West Bengal. ------West Bengal 21.9 899 Kolkata 899 DUs in 17 slums for Titagarh Municipal 505 19172527B3428 43.81 21.9 0.55 - 899 - 899 - 25-Feb-2011 Area Phase-II, Kolkata, West Bengal -- 10.95 -- West Bengal 15.55 1250 Kolkata 1788 DUs for the town of 506 19712527B388 34.87 16.68 - 1.13 1230 - 1,230 - 07-Mar-2008 (Phase-II) under Kolkata Region, West Bengal -- -- 20 West Bengal Revised BSUP Scheme for the Town of 15.88 1700 Kolkata 507 19172527B5388 Panihati Phase-I (1700 DUs), KMDA, West 37.55 15.88 - - 1666 - 1,666 - 27-Feb-2007 Bengal -- 3.97 34 West Bengal 24.33 2002 Kolkata 2002 DUs for the town of Serampore (Phase- 508 19712527B386 51.24 24.33 0.00 - 2002 - 2,002 - 27-Feb-2008 II) under Kolkata region, West Bengal ------West Bengal 20.86 2017 Kolkata Rehabilitation of 15 slums in Rajpur Sonarpur 509 19712527B566 45.09 22.23 - 1.37 1995 - 1,995 - 02-Feb-2007 (Phase-1), Kolkata, West Bengal -- -- 22 West Bengal 8.49 412 Kolkata 1197 DUs for the Town of Konnagar (Phase- 510 19172527B3410 16.97 8.49 - - 412 - 412 - 17-Feb-2011 3). Hooghly. West Bengal -- 2.32 -- West Bengal 13.15 1163 Kolkata 2325 DUs for the town of in Kolkata 511 19712527B348 26.29 13.14 - - 1160 - 1,160 - 09-Jan-2008 Metropolitan Area, West Bengal -- -- 3 West Bengal 17.99 1407 Kolkata 2100 DUs for the town of Uluberia (Phase-II) 512 19712527B391 35.97 20.13 7.94 2.15 1407 - 1,407 - 07-Mar-2008 under Kolkata region, West Bengal ------West Bengal 10.09 1052 Kolkata Slum Development Programe in Barrackpore, 513 19712527B549 24.35 13.54 - 3.45 1052 - 1,052 - 28-Nov-2006 under BSUP through KMDA, West bengal ------West Bengal Revised in Sanctioned DPR - BSUP Scheme 19.36 1419 Kolkata 514 19172527JB6711 for Baruipur (Ph-II). KMA. Kolkata. West 38.71 20.94 - 1.58 1419 - 1,419 - 29-Dec-2008 Bengal ------West Bengal Project for Anandnagar (ward 59) Jalpara 3.25 320 Kolkata 515 19712527B349 (ward 58) I (ward 138) under 7.15 6.35 0.00 3.10 220 - 100 120 09-Jan-2008 BSUP in Kolkata, West Bengal -- -- 100 West Bengal 28 2167 Kolkata 2167 Dwelling Units for the town of 516 19712527B390 56.00 28 10.40 - 2019 - 2,019 - 07-Mar-2008 (Phase-II), Kolkata, West Bengal -- 7 148 West Bengal 13.99 2253 Kolkata Curtailment in project for the town of Halisahar 517 19172527JB6109 27.99 13.99 - - 2253 - 2,253 - 26-Sep-2007 Ph-I, 24 Paraganas (North), West Bengal. ------

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress West Bengal 28.64 2180 Kolkata 2180 DUs for the town of Rajarhat Gopalpur 518 19172527B1485 57.28 28.64 - - 2152 - 2,152 - 16-Dec-2008 (Phase-II), KMA, Kolkata, West Bengal -- -- 28 West Bengal 29.06 1974 Kolkata 1974 DUs for the town of 519 19172527B1486 58.13 29.06 - - 1974 - 1,974 - 16-Dec-2008 (Phase-II), KMA, Kolkata, West Bengal ------West Bengal 29.43 2486 Kolkata 2486 Dwelling Units for the town of Barasat 520 19712527B382 58.85 29.43 0.00 - 2486 - 2,486 - 27-Feb-2008 (Phase-II) under Kolkata region, West Bengal ------West Bengal 25.66 4110 Kolkata 4110 DUs for the town of Bhadreswar 521 19172527B5170 62.92 28.75 - 3.09 4110 - 4,110 - 29-Dec-2006 Municipalty, Kolkata, West Bengal. -- 3.09 -- West Bengal 25.14 2622 Kolkata Revised project for the town of Maheshtala (Ph- 522 19172527JB6508 50.28 28.73 - 3.59 2433 - 2,433 - 21-Mar-2007 I), South 24 Paraganas, West Bengal -- -- 189 West Bengal Rehabilitation of 16 Slums in Howrah 3.73 416 Kolkata 523 19712527B564 Municipal Corporation Phase-I, Kolkata, West 8.20 7.28 - 3.55 384 - 384 - 02-Feb-2007 Bengal -- -- 32 West Bengal Revised project for 2092 DUs in the town of 21.41 2092 Kolkata 524 19712527B378 Phase-II, Distt. Hooghly, West 42.82 21.41 - - 1733 - 1,653 80 24-Jan-2008 Bengal (KMDA) -- 4.39 359 West Bengal 1947 DUs for the town of Bhatpara 34.78 1947 Kolkata 525 19172527B3411 Municipality (Phase-2), North 24 Paraganas, 69.56 34.78 - - 1947 - 1,947 - 17-Feb-2011 West Bengal ------West Bengal 35.07 2485 Kolkata 2485 DUs for the town of Gayeshpur (Phase- 526 19712527B396 70.15 35.07 5.16 - 2468 - 2,468 - 05-Feb-2008 II) under Kolkata region, West Bengal -- -- 17 West Bengal 35.68 1469 Kolkata 1469 DUs for the Town of Rajarhat Gopalpur 527 19172527B3430 71.36 35.68 - - 1339 - 1,339 - 25-Feb-2011 (Phase-IV), North 24 Parganas, West Bengal -- -- 130 West Bengal 37.51 1406 Kolkata 1406 Units for the town of Madhyamgram 528 19172527B3408 75.01 37.51 - - 1406 - 1,406 - 17-Feb-2011 (Phase-III), West Bengal ------West Bengal 38.16 1499 Kolkata Revised BSUP Scheme for the Town of 529 19172527B3415 76.31 38.16 - - 1499 - 1,499 - 17-Feb-2011 (Phase-1). Hooghly, West Bengal -- 19.08 -- West Bengal 38.72 1573 Kolkata 1573 DUs for the town of Rajarhat Gopalpur 530 19172527B3431 77.45 38.72 - - 1454 - 1,454 - 25-Feb-2011 (Phase- III). North 24 Paraganas. West Bengal -- -- 119 West Bengal 38.74 1598 Kolkata 1598 DUs for the town of Serampore (Phase- 531 19172527B5548 77.88 38.74 0.02 - 1598 - 1,598 - 17-Feb-2011 3), Hoogly, West Bengal ------West Bengal 42.02 3488 Kolkata 3488 Dwelling Units for the town of Kalyani 532 19712527B383 84.04 42.02 17.15 - 1946 - 1,946 - 27-Feb-2008 (Phase-III) under Kolkata region, West Bengal -- 10.51 1542 West Bengal 2000 DUs of Slums for the town of North Dum 45.27 2000 Kolkata 533 19172527B3413 Dum (Phase-3), 24 Paraganas (North), West 90.55 45.27 0.07 - 1990 - 1,990 - 17-Feb-2011 Bengal -- 11.32 10 West Bengal 6480 DUs for Slum Dwellers of Rajarghat, 1.7 200 Kolkata 534 19712527B342 kachharipara and Hatgachia area at Mouza 3.73 13.74 - 12.04 200 - 200 - 19-Oct-2007 Boinchtala in Kolkata (KMC), ------West Bengal Project -- -- Kolkata 4936 New DUs (Relocation) for the town of Cancelled on 535 19172527B1693 40.22 - 40.22 -- - - - 05-Feb-2009 Kolkata, West Bengal dated -- 28-Mar-12 -- -- West Bengal Project -- -- Kolkata 524 DUs Rehabilitation of slums in , Cancelled on 536 19172527B2021 1.48 - 1.48 -- - - - 28-Sep-2006 through KMDA, West Bengal dated -- 20-May-14 -- -- West Bengal 4.17 Infra Kolkata Rehabilitation of Kumartuli Slums in Kolkata, 537 19712527B568 8.33 1.04 1.04 - NA - - - 02-Feb-2007 West Bengal (Additional Project) -- -- NA West Bengal 200 Transit DUs Rehabilitation Project of 3.04 200 Kolkata Kumartli for the artisans of Kumartuli at 538 19172527B3432 6.08 3.04 - - 200 - 200 - 25-Feb-2011 Rabindra Sarani. Kolkata by KMDA. -- (Additional Project) -- --

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC. Monitoring Report dated 1st Jan 2019 BSUP : State wise Report for latest Progress at Project & City Level

Project Completed Financial Progress (Rs in Crores) Physical Progress (Nos) State Central Share Houses Sr. Excess City Project Code Project Name Project UC Non Un- No. Sanctioned Central Sanctioned Occupied Sanctioned Date Cost Pending Starter Occupied Released Share Completed Adjusted In-progress West Bengal Revised- BSUP Scheme for the Town of 5.2 280 Kolkata 539 19172527JB6108 Baranagar (Phase-II), 24 Paragans (North), 10.39 5.2 0.10 - 280 - 280 - 21-Oct-2011 West Bengal. -- 0.58 -- West Bengal Project -- -- Kolkata BSUP Project for Rajpur-Sonarpur Municipality Cancelled on 540 19172527B4468 12.23 - 12.23 -- - - - 09-Feb-2012 (Phase-III) for 1728 DUs, West Bengal dated -- 20-May-14 -- -- West Bengal 49.24 2192 Kolkata BSUP Scheme for the town of Halisahar, 541 19172527B4469 98.48 49.24 - - 2192 - 2,192 - 09-Feb-2012 Phase-III, 24 Paraganas (North) West Bengal ------West Bengal 13.71 500 Kolkata BSUP Scheme for the town of Maheshtala, 542 19172527JB6908 27.42 13.71 6.79 - 416 - 416 - 09-Feb-2012 Phase-III 24 paraganas (South), West Bengal -- 5.87 84 West Bengal Project -- -- Kolkata 500 DUs Detailed project report for "BSUP Cancelled on 543 19172527B4670 3.62 - 3.62 -- - - - 13-Mar-2012 Project for Canal South road.", West Bengal dated -- 11-Nov-14 -- -- West Bengal Project -- -- Kolkata 16 DUs Detailed project report for "BSUP Cancelled on 544 19172527B4669 0.21 - 0.21 -- - - - 13-Mar-2012 Project for Chetla Haat." West Bengal dated -- 20-Feb-17 -- -- West Bengal Project -- -- Kolkata 112 DUs for BSUP Project for Dhara Para, Cancelled on 545 19172527B4668 0.89 - 0.89 -- - - - 13-Mar-2012 West Bengal dated -- 20-May-14 -- -- West Bengal Project -- -- Kolkata Construction of 300 Dwelling Units for Cancelled on 546 19172527B4652 2.12 - 2.12 -- - - - 13-Mar-2012 Mahendra Roy Lane, West Bengal dated -- 20-May-14 -- -- West Bengal 36 DUs Detailed project report for "BSUP 0.91 32 Kolkata 547 19172527B4651 Project for Sen Pally (Sardar Bustee), West 1.87 0.91 - 0.00 32 - 32 - 13-Mar-2012 Bengal -- 0.65 -- West Bengal Revised BSUP Project for Maheshtala 10.21 400 Kolkata 548 19172527JB6528 Municipality (Phase-IV) for 1184 DUs, Kolkata, 21.05 10.21 - 0.00 400 - 240 160 13-Mar-2012 West Bengal -- 2.65 -- West Bengal BSUP project for construction of 1034 DUs (in- 21.59 1034 Kolkata 549 19172527B4649 situ) in 8 slums of Bhatpara Municipality 43.19 21.59 - - 1034 - 1,034 - 13-Mar-2012 (Phase-III), West Bengal -- 4.32 -- West Bengal Revised BSUP Phase-IV for construction of 2.96 154 Kolkata 550 19172527B4756 154 DUs in 3 slums of Chandernagore 5.92 2.96 - - 154 - 154 - 13-Mar-2012 Municipality, West Bengal -- 1.48 -- West Bengal BSUP project for construction of 799 DUs (in- 19.06 799 Kolkata 551 19172527B4969 situ) in 5 slum of Bhatpara Municipality (Phase- 38.11 19.06 - - 799 - 799 - 28-Mar-2012 IV), West Bengal -- 3.81 -- West Bengal BSUP Project for construction of 1031 DUs (in- 21.66 1031 Kolkata 552 19172527B4968 situ) in 7 slums of Kanchrapara Muncipality 43.33 21.66 - - 1031 - 1,031 - 28-Mar-2012 (Phase-III), West Bengal -- 4.33 -- West Bengal 1000 DUs for the town of Ultadanga, under 18.35 780 Kolkata 553 19172527B4970 Kolkata Improvement Trust (KIT), West 36.71 11.86 - - 320 - 320 - 28-Mar-2012 Bengal. -- 5.98 460 1339.71 102101 Sub-total of Kolkata for 94 project(s) 2,746.61 1439.66 63.08 112.55 97822 - 97,270 552 121.58 4279 1603.87 122870 Total of West Bengal for 107 project(s) 3,278.17 1712.19 77.01 123.70 115868 68 1,15,316 552 including 40 project(s) which are completed 132.69 6934 11239.83 788953 Total of BSUP for 477 project(s) 23,128.82 12031.01 730.94 1,205.48 711344 22,682 6,07,973 1,03,587 including 123 project(s) which are completed 561.46 54927

* Project Cost and ACA Committed are recalculated after deducting cost of DUs alongwith proportionate cost of infrastructure dropped by CSMC.