Invitation for Bids

Total Page:16

File Type:pdf, Size:1020Kb

Invitation for Bids Invitation for Bids Date: 19 December 2017 Loan No. and L2573-PRC: Guiyang Integrated Water Resources Management (Sector) Title: Project Contract No. and II-A.3-CW-1: Hongyan Water Treatment Plant Subproject - Power Title: Facilities Construction Deadline for Submission of 18 January 2018; 9:30 hours (Beijing Time) Bids: IFB No.: 0701-172030030114 1. The People’s Republic of China has received a loan from the Asian Development Bank toward the cost of Guiyang Integrated Water Resources Management (Sector) Project, and it intends to apply part of the proceeds of this loan to payments under the contract named above. Bidding is open to Bidders from eligible source countries of ADB. 2. The China International Tendering Co., Ltd. (the “Procurement Agent”), authorized by Guiyang Zhushui Water Resources Industrial Limited Company (the “Purchaser”) to act for and on its behalf, invites sealed bids from all eligible Bidders for civil works for all the construction content of the power supply line. The construction period is twelve (12) months. 3. National Competitive Bidding (NCB) will be conducted in accordance with ADB’s Single- Stage: One-Envelope procedure and is open to all Bidders from eligible countries as described in the Bidding Document. 4. Only eligible Bidders with the following key qualifications should participate in this bidding: • Qualification Certificate: Domestic bidders shall have power engineering construction general contracting level 2, and should have electricity facilities permit level 3 for installation, repair category for level 3, testing category for level 3 and above qualification. • Historical Financial Performance: Submission of audited financial statements or if not required by the law of the bidder’s country, other financial statements acceptable to the Employer, for the last Three (3) years (2014-2016) to demonstrate the current soundness of the bidders financial position and its prospective long term profitability. As a minimum, a Bidder’s net worth calculated as the difference between total assets and total liabilities for each of the three years should be positive. • Average Annual Construction Turnover: Minimum average annual turnover of CNY 55 million, calculated as total certified payments received for contracts in progress or completed, within the last three (3) years (2014-2016). • Financial Resources: The Bidder shall demonstrate access to, or availability of, financial resources such as liquid assets, lines of credit, and other financial means, other than any contractual advance payments to meet: i. the following cash-flow requirement of CNY 5.5 million and ii. the overall cash flow requirements for this contract and its concurrent commitments. • Specific Experience: Participation as contractor, management contractor, or subcontractor, in at least two (2) contracts within the last five (5) years, each with a value of at least CNY 18 million, that have been successfully and substantially completed and that are similar to the proposed Works. The contract shall cover 10KV high voltage transmission and distribution installation by open bidden. Additional details are provided in the Bidding Documents. 5. Interested eligible Bidders may obtain further information and check the Bidding Documents from the Procurement Agent or the Purchaser at the address given below starting 19 December 2017 during working hours between 9:00 and 11:00 hours in the morning and 13:30 and 16:30 in the afternoon (Beijing time), excluding weekends and holidays. 6. The attention of prospective Bidders is drawn to the eligibility and conflict of interest provisions under ITB 4 of the Bidding Documents. All Bidders found to have a conflict of interest shall be disqualified. 7. A complete set of Bidding Documents in Chinese may be purchased by interested Bidders on the submission of a written application to the address below and upon payment of a nonrefundable fee of CNY 500 or USD 100. The method of payment will be in cash or check. 8. Bids must be delivered to the address (iii) below at or before 9:30 hours on 18 January 2018. Late bids will be rejected. Bids will be opened in the presence of the Bidders’ representatives who choose to attend in person at the address (iii) below at 9:30 hours on 18 January 2018. All bids must be accompanied by a bid security of CNY 450,000.00. 9. Any questions or complaints regarding the bidding process or contract award should be sent in writing to the Purchaser at e-mail account of [email protected]. Bidders are free to send copies of their communications on issues and questions to the institution named in the BDS at e-mail account of [email protected]. When the Purchaser does not respond promptly, or the communication is a complaint against the Purchaser, the Bidders can also write to such institution directly. 10. The addresses referred to above are as follows: For inspecting and purchasing the Bidding Documents: Guizhou province Centre for Public Resources Transaction, Guizhou Exhibition hall, No. 282 Zunyi Road, Nanming District, Guiyang, Guizhou Province, People’s Republic of China For bid submission and bid opening: Bid Opening Room, Guizhou province Centre for Public Resources Transaction, Guizhou Exhibition hall, No. 282 Zunyi Road, Nanming District, Guiyang, Guizhou Province, People’s Republic of China Procurement Agent: China International Tendering Co., Ltd. Address: Room 907 of 9th floor, Genertec Plaza, No.90, Xisanhuan Zhonglu, Beijing, People’s Republic of China. Post Code: 100055 Tel: 86-10-63348553 Fax: 86-10-63348691 Attention: Mr. Huang Email: [email protected] The Purchaser: Guiyang Zhushui Water Resources Industrial Limited Company Address: 15th Floor, Kailin Plaza, No. 237 Jinyang North Road, Guanshanhu District, Guiyang, Guizhou Province, China Post Code: 550000 Tel.: 86-851-86220039 Fax: 86-851-86220039 Attention: Mr. Li Kai .
Recommended publications
  • Directors, Supervisors and Parties Involved in the [Redacted]
    THIS DOCUMENT IS IN DRAFT FORM. THE INFORMATION CONTAINED HEREIN IS INCOMPLETE AND IS SUBJECT TO CHANGE. THIS DOCUMENT MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED “WARNING” ON THE COVER OF THIS DOCUMENT. DIRECTORS, SUPERVISORS AND PARTIES INVOLVED IN THE [REDACTED] DIRECTORS Name Address Nationality Executive Directors Mr. LI Zhiming No. 10-8-3, Dong Ting Yi Cun, Chinese (李志明) Wuchang District, Wuhan, Hubei Province, PRC Mr. XU An No. 5, Jianshe Road, Chinese (許安) Xixiu District, Anshun, Guizhou Province, PRC Non-executive Directors Mr. YANG Mingshang Sub No. 13, Unit 2, Chinese (楊明尚) No. 1, Shiling Street, Nanming District, Guiyang, Guizhou Province, PRC Mr. CHEN Yongjun No. 1102, Unit 2 Chinese (陳永軍) Building 903, Bihai Qiantu, Bihai Garden, Jinyang New District, Yunyan District, Guiyang, Guizhou Province, PRC Ms. GONG Taotao 14G, Zi Teng Xuan, Chinese (龔濤濤) Cai Tian Ming Yuan, Futian District, Shenzhen, Guangdong Province, PRC Mr. LU Lin Unit 1, Building 3, Chinese (盧麟) No. 71 Guanjing Road, Honghuagang District, Zunyi, Guizhou Province, PRC –79– THIS DOCUMENT IS IN DRAFT FORM. THE INFORMATION CONTAINED HEREIN IS INCOMPLETE AND IS SUBJECT TO CHANGE. THIS DOCUMENT MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED “WARNING” ON THE COVER OF THIS DOCUMENT. DIRECTORS, SUPERVISORS AND PARTIES INVOLVED IN THE [REDACTED] Name Address Nationality Independent Non-executive Directors Mr. TANG Xin No.143, Block Northwestern 1, Chinese (湯欣) Tsinghua University, Haidian District, Beijing, PRC Mr. WANG Gefan Room 401, Suite 2, Building No. 10, Chinese (王革凡) Guoyingyuan Xiaoqu, Xicheng District, Beijing, PRC Mr. SONG Ke Room 15004, Chinese (宋科) No.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Spatial Correlation Between Type of Mountain Area and Land Use Degree in Guizhou Province, China
    sustainability Article Spatial Correlation between Type of Mountain Area and Land Use Degree in Guizhou Province, China Yuluan Zhao 1,2 and Xiubin Li 2,* 1 School of Geographic and Environmental Sciences, Guizhou Normal University, Guiyang 550001, China; [email protected] 2 Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences, Beijing 100101, China * Correspondence: [email protected]; Tel.: +86-10-6488-9297 Academic Editors: Fausto Cavallaro and Marc A. Rosen Received: 17 May 2016; Accepted: 24 August 2016; Published: 29 August 2016 Abstract: A scientific definition of the type of mountain area and an exploration of the spatial correlation between different types of mountain areas and regional land use at the county level are important for reasonable land resource utilization and regional sustainable development. Here, a geographic information system was used to analyze digital elevation model data and to define the extent of mountainous land and types of mountain areas in Guizhou province. Exploratory spatial data analysis was used to study the spatial coupling relation between the type of mountain area and land use degree in Guizhou province at the county level. The results were as follows: (1) Guizhou province has a high proportion of mountainous land, with a ratio of mountainous land to non-mountainous land of 88:11. The county-level administrative units in Guizhou province were exclusively mountainous, consisting of eight semi mountainous counties, nine quasi mountainous counties, 35 apparently mountainous counties, 13 type I completely mountainous counties, and 23 type II completely mountainous counties; (2) The land use degree at the county level in Guizhou province have remarkable spatial differentiation characteristics.
    [Show full text]
  • Research on the Interconnected River System Network of Three Lakes and One River in Guiyang
    p-ISSN: 0972-6268 Nature Environment and Pollution Technology (Print copies up to 2016) Vol. 20 No. 2 pp. 753-757 2021 An International Quarterly Scientific Journal e-ISSN: 2395-3454 Original Research Paper Originalhttps://doi.org/10.46488/NEPT.2021.v20i02.036 Research Paper Open Access Journal Research on the Interconnected River System Network of Three Lakes and One River in Guiyang Zhang Dan*, Guo Zuo-qing**, Yang Hui-xia***† and Liang Li**** *Civil Engineering College, Guizhou University, Guiyang 550025, China **The Yangtze River Water Resources Committee of Yangtze River Project Supervision Consulting Co. Ltd. (Hubei), Wuhan 430014, China ***Civil Engineering College, Guizhou University, Guiyang 550025, China ****Guizhou Provincial Water Conservancy Research Institute, Guiyang, 550025, China †Corresponding author: Yang Hui-xia; [email protected] ABSTRACT Nat. Env. & Poll. Tech. Website: www.neptjournal.com The main geological landform in southwest China is karst, and hydrological resources in the region are rich. The water resources in this region cannot be efficiently and rationally used due to the Received: 15-05-2020 Revised: 22-06-2020 complex topography and difficulty in developing water resources, which has led to problems such as Accepted: 16-07-2020 desertification and soil erosion. The most typical area of karst landforms is in Guizhou Province. A water management method for an interconnected river system network is proposed, taking Guiyang as an Key Words: example. This study provides a foundation for China’s South-to-North Water Diversion Project and can River system network improve socioeconomic conditions in China. Karst River Lakes INTRODUCTION in hydrodynamics (Phillips et al.
    [Show full text]
  • Announcement on Relocation of Head Office and Change of Registered Address of the Bank
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. ANNOUNCEMENT ON RELOCATION OF HEAD OFFICE AND CHANGE OF REGISTERED ADDRESS OF THE BANK References are made to the circular (the “Circular”) dated April 29, 2020 and poll results of AGM and Class Meetings held on May 20, 2020 of Bank of Guizhou Co., Ltd. (the “Bank”) in relation to relocation of offices of the Bank. Terms used herein shall have the same meanings as those defined in the Circular unless otherwise specified. Due to the needs of business development, the head office of the Bank is expected to be relocated from No. 149, South Zhonghua Road, Nanming District, Guiyang, Guizhou Province, PRC to Bank of Guizhou Building, Building No. 2, Business Area, Guizhou Finance City Phase I, Guiyang, Guizhou Province, PRC (No. 9, Yongchang Road, Guanshanhu District, Guiyang, Guizhou Province) soon; afterwards, the registered address of the Bank will be changed from No. 41, Middle Ruijin Road, Yunyan District, Guiyang, Guizhou Province, PRC to No. 9, Yongchang Road, Guanshanhu District, Guiyang, Guizhou Province, PRC as well. The website, telephone, fax, email and other contact methods of the Bank remain unchanged. The Bank will make further announcements after the completion of the relocation of head office and the registration for change of registered address with relevant regulatory authorities.
    [Show full text]
  • 50164-001: Integrated Wastewater Management Project
    Initial Environmental Examination Project Number: 50164-001 March 2018 Document Stage: Final Proposed Loan China Water Environment Group Investment and Xinkai Water Environment Investment Integrated Wastewater Management Project (People’s Republic of China) The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. Nanming River Rehabilitation Project Phase 2 – Stage 2 Initial Environmental and Social Examination March 2018 China Water Environment Group Limited Table of Content I. EXECUTIVE SUMMARY ............................................................................................. 1 A. Introduction ...................................................................................................................................... 1 B. The Project ....................................................................................................................................... 1 C. Baseline Environment and Social Conditions .................................................................................. 2 D. Impacts and Mitigation Measures .................................................................................................... 3 E. Public Consultation and Grievance Redress Mechanism ................................................................ 3 F. Environmental and Social Management
    [Show full text]
  • Minimum Wage Standards in China August 11, 2020
    Minimum Wage Standards in China August 11, 2020 Contents Heilongjiang ................................................................................................................................................. 3 Jilin ............................................................................................................................................................... 3 Liaoning ........................................................................................................................................................ 4 Inner Mongolia Autonomous Region ........................................................................................................... 7 Beijing......................................................................................................................................................... 10 Hebei ........................................................................................................................................................... 11 Henan .......................................................................................................................................................... 13 Shandong .................................................................................................................................................... 14 Shanxi ......................................................................................................................................................... 16 Shaanxi ......................................................................................................................................................
    [Show full text]
  • Announcement of Annual Results for the Year Ended 31 December 2020
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. ANNOUNCEMENT OF ANNUAL RESULTS FOR THE YEAR ENDED 31 DECEMBER 2020 The board of directors (the “Board”) of Bank of Guizhou Co., Ltd. (the “Bank”) is pleased to announce the audited annual results (the “Annual Results”) of the Bank for the year ended 31 December 2020. This results announcement, containing the full text of the 2020 annual report of the Bank, complies with the relevant content requirements of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited in relation to preliminary announcements of annual results. The Board and the audit committee of the Board have reviewed and confirmed the Annual Results. This results announcement is published on the websites of The Stock Exchange of Hong Kong Limited (www.hkexnews.hk) and the Bank (www.bgzchina.com). The annual report for the year ended 31 December 2020 will be dispatched to the shareholders of the Bank and will be available on the above websites in due course. By order of the Board Bank of Guizhou Co., Ltd. XU An Executive Director Guiyang, the PRC, 30 March 2021 As of the date of this announcement, the Board of the Bank comprises Mr. XU An as executive Director; Ms.
    [Show full text]
  • Spatiotemporal Dynamic Analysis of A-Level Scenic Spots in Guizhou Province, China
    International Journal of Geo-Information Article Spatiotemporal Dynamic Analysis of A-Level Scenic Spots in Guizhou Province, China Yuanhong Qiu 1,2, Jian Yin 1,2,3,*, Ting Zhang 1, Yiming Du 1 and Bin Zhang 1,2 1 College of Big Data Application and Economic, Guizhou University of Finance and Economics, Huaxi District, Guiyang 550025, China; [email protected] (Y.Q.); [email protected] (T.Z.); [email protected] (Y.D.); [email protected] (B.Z.) 2 Center for China Western Modernization, Guizhou University of Finance and Economics, Huaxi District, Guiyang 550025, China 3 School of Water Conservancy and Civil Engineering, Northeast Agricultural University, Xiangfang District, Harbin 150050, China * Correspondence: [email protected] Abstract: A-level scenic spots are a unique evaluation form of tourist attractions in China, which have an important impact on regional tourism development. Guizhou is a key tourist province in China. In recent years, the number of A-level scenic spots in Guizhou Province has been increasing, and the regional tourist economy has improved rapidly. The spatial distribution evolution characteristics and influencing factors of A-level scenic spots in Guizhou Province from 2005 to 2019 were measured using spatial data analysis methods, trend analysis methods, and geographical detector methods. The results elaborated that the number of A-level scenic spots in all counties of Guizhou Province increased, while in the south it developed slowly. From 2005 to 2019, the spatial distribution in A-level scenic spots were characterized by spatial agglomeration. The spatial distribution equilibrium degree Citation: Qiu, Y.; Yin, J.; Zhang, T.; of scenic spots in nine cities in Guizhou Province was gradually developed to reach the “relatively Du, Y.; Zhang, B.
    [Show full text]
  • Characteristics of Economic Growth in Guizhou and Its Inspiration to PM2.5 Control
    E3S Web of Conferences 251, 02087 (2021) https://doi.org/10.1051/e3sconf/202125102087 TEES 2021 Characteristics of Economic Growth in Guizhou and its Inspiration to PM2.5 Control Jizhang Zong1, Song Li1,* , and Yi Bai1 1 School of Geography and Resources, Guizhou Education University, Guiyang 550018, China Abstract. Guizhou province, one of the poorest provinces in China, has attracted the state's close attention. The work selected such data of GDP, per-capita GDP, and industrial structure from Guizhou Statistical Yearbook and Guiyang Statistical Yearbook from 1995 to 2019. Then the spatiotemporal characteristics of county region economy were studied using several methods including spatial autocorrelation (Moran's I), and standard deviation coefficients based on GIS. The results showed that Guiyang and Zunyi were the centers of economic growth in Guizhou. There was a regional differentiation that the growth of county GDP lowered from northwest to southeast. The industrial structure changed significantly in Guizhou's county level in 2005 and 2009, and ITI was 6.7 and 8.3, respectively. There was a noticeable tendency that developed counties had low ITI. In contrast, spatiotemporal characteristics of per-capita GDP growth were more complex, and these counties of high per-capita GDP disbursed over a wide region of the Guiyang- Zunyi industrial zone. Finally, we analyzed the enlightenment on PM2.5 control in Guizhou. 1 Introduction The gap between local regions is harmful to the rapid 2.2 Methodolgy and stable growth of the country's overall economy and The spatial autocorrelation analysis was used to analyze the society's harmonious development[1], and is an the GDP and per capita GDP of Guizhou from 1995 to urgent problem for balanced regional development of the 2019, and the spatial change of counties economic region[2].
    [Show full text]
  • Annual Report 2016
    CONGRESSIONAL-EXECUTIVE COMMISSION ON CHINA ANNUAL REPORT 2016 ONE HUNDRED FOURTEENTH CONGRESS SECOND SESSION OCTOBER 6, 2016 Printed for the use of the Congressional-Executive Commission on China ( Available via the World Wide Web: http://www.cecc.gov VerDate Mar 15 2010 10:00 Oct 06, 2016 Jkt 000000 PO 00000 Frm 00001 Fmt 6011 Sfmt 5011 U:\DOCS\AR16 NEW\21471.TXT DEIDRE 2016 ANNUAL REPORT VerDate Mar 15 2010 10:00 Oct 06, 2016 Jkt 000000 PO 00000 Frm 00002 Fmt 6019 Sfmt 6019 U:\DOCS\AR16 NEW\21471.TXT DEIDRE CONGRESSIONAL-EXECUTIVE COMMISSION ON CHINA ANNUAL REPORT 2016 ONE HUNDRED FOURTEENTH CONGRESS SECOND SESSION OCTOBER 6, 2016 Printed for the use of the Congressional-Executive Commission on China ( Available via the World Wide Web: http://www.cecc.gov U.S. GOVERNMENT PUBLISHING OFFICE 21–471 PDF WASHINGTON : 2016 For sale by the Superintendent of Documents, U.S. Government Publishing Office Internet: bookstore.gpo.gov Phone: toll free (866) 512–1800; DC area (202) 512–1800 Fax: (202) 512–2104 Mail: Stop IDCC, Washington, DC 20402–0001 VerDate Mar 15 2010 10:00 Oct 06, 2016 Jkt 000000 PO 00000 Frm 00003 Fmt 5011 Sfmt 5011 U:\DOCS\AR16 NEW\21471.TXT DEIDRE CONGRESSIONAL-EXECUTIVE COMMISSION ON CHINA LEGISLATIVE BRANCH COMMISSIONERS House Senate CHRISTOPHER H. SMITH, New Jersey, MARCO RUBIO, Florida, Cochairman Chairman JAMES LANKFORD, Oklahoma ROBERT PITTENGER, North Carolina TOM COTTON, Arkansas TRENT FRANKS, Arizona STEVE DAINES, Montana RANDY HULTGREN, Illinois BEN SASSE, Nebraska DIANE BLACK, Tennessee DIANNE FEINSTEIN, California TIMOTHY J. WALZ, Minnesota JEFF MERKLEY, Oregon MARCY KAPTUR, Ohio GARY PETERS, Michigan MICHAEL M.
    [Show full text]
  • World Bank Document
    El 632 Vol. 2 Public Disclosure Authorized Guiyang World Bank Financed Transport Project Sub-project 2: Rural Transport ENVIRONMENTAL IMPACT REPORT Public Disclosure Authorized Public Disclosure Authorized Constructor: Guiyang Project Management Office Author: Guizhou Institute of Environmental Science and Designing Public Disclosure Authorized December 2006 World Bank Financed Guiyang Traffic Project EIA Sub-project 2: Rural Transport Project Compiler: Guizhou Institute of Environmental Science and Designing Certificate: No.3302, Grade 1, National Environmental Assessment Legal person: Zhang Wei Institute's technical chief: Zhang Tao Environment assessment project chief: Zhang Junfang Outline Compilers: Name Title Responsibilities Tu Senior Social Current and impact, project analysis Zhijiang Engineer Zhu Keyong Engineer Ecologic environmental impact, treatment Current noise environment and Luo Jing Engineer impact, noise treatment, , Public consultation Xie Yun Engineer Current water environment and impact, risk evaluation, treatment General provisions, Current environmental air and impact, treatment Junfang Engineer measures of Junfang _atmosphere, Public consultation Reviewer: Name Title Yang XieKe Senior Engineer Shi Lunxuan Senior Engineer 2 World Bank Financed Guiyang Traffic Project EIA Sub-project 2: Rural Transport Project List of Abbreviations EA Environmental Assessment EIA Environmental Impact Assessment EMP Environmental Management Plan BOD Biological Oxygen Demands COD Chemical Oxygen Demands TP Total Phosphor dB(A) Decibel (Acoustic) NH3-N Ammonia Nitrogen pH Acidity unit SS Suspended Solids NO2 Nitrogen Dioxide OP (World Bank) Operational Policies PMO Project Management Office PRC The People's Republic of China EPB Environmental Protection Bureau TOR Terms o f Reference 3 World Bank Financed Guiyang Traffic Project EIA Sub-project 2: Rural Transport Project Catalogue I General introduction ...................................................................................
    [Show full text]