Dpwh Presentation

Total Page:16

File Type:pdf, Size:1020Kb

Dpwh Presentation DPWH STRATEGIC INFRASTRUCTURE PROGRAMS AND POLICIES SECRETARY MARK A. VILLAR Department of Public Works and Highways Philippine Economic Briefing March 9, 2018 SMX Convention Center, SM City Lanang Premier, Davao City Presented by: CONSTANTE A. LLANES, JR., CESO III Director IV, Planning Service 2017-2022 PHILIPPINE DEVELOPMENT PLAN (STRATEGIC FRAMEWORK): 2 BOLDEST, MOST AMBITIOUS INFRASTRUCTURE PROGRAM IN HISTORY (% TO GDP) AVERAGE FOR PAST SIX (6) ADMINISTRATION IN 50 YEARS DUTERTE YEAR 1 (2017 Budget) Source: Philippine Institute for Development Studies 3 GOLDEN AGE OF INFRASTRUCTURE: P8-9 Trillion ($160-200 Billion) (2017-2022) 6.1% 5 DPWH Mandate: The DPWH is mandated to undertake (a) the planning of infrastructure, such as national roads and bridges, flood control, water resources projects and other public works, and (b) the design, construction, and maintenance of national roads and bridges, and major flood control systems. Philippine Road Network: Road Network Total (km) Paved (km) % of Paved National 32,868 31,035 94.42% Primary 7,067 7,066 99.98% Secondary 14,249 13,524 94.91% Tertiary 11,553 10,445 90.41% Local Road 177,595 33,479 18.85% Provincial 30,151 10,703 35.50% Municipal 15,349 5,375 35.02% City 15,331 9,458 61.69% Barangay 116,765 7,943 6.80% Total 210,463 64,514 30.65% National Bridges: Total Permanent % Permanent No. Lm. No. Lm. No. Lm. 8,260 367,864 8,204 365,301 99.32% 99.30% 6 6 2011-2018 DPWH TOTAL BUDGET: 39% 18% 31% 38% 30% 35% 14% Amount (In BillionPesos) (In Amount 7 DPWH MAJOR STRATEGIC INFRASTRUCTURE PROGRAM AND POLICIES: FY 2017 FY 2018 Traffic Decongestion Program P 113.1 B P 149.7 B (Implement High Standard Highways/Expressways; Construct / widen national roads and bridges; ($2.3B) ($3.0B) Construct by-passes/diversion roads; Construct flyovers; interchanges and underpasses) Integrated and Seamless Transport System P 88.0 B P 101.5 B (Mindanao Infrastructure Logistics Network, MLIN; Construct/improve roads leading to growth corridors ($1.8B) ($2.0B) in Western Mindanao; Study and implement Inter-island linkage projects; Connect gaps along national roads; Construct/replace bridges) Convergence and Rural Road Development Program P 18.1 B P 49.8B (Construct/upgrade local access roads to designated tourism destinations, RORO ports / seaports and ($0.4B) ($1.0B) airports; Construct/improve roads leading to industrial trade corridors.) Livable, Sustainable & Resilient Communities P 106.8 B P 165.0 B Integrated Water Resources Management Program ($2.1B) ($3.3B) (Construct/rehabilitate flood mitigation structures along major river basins and principal rivers; Construct water impounding projects; Construct water supply/septage & sewerage/rain collectors; Upgrade drainage capacity) Disaster Risk Reduction and Climate Change Adaptation Program (Rehabilitate, retrofit and strengthen existing bridges; Provide safe access to highly vulnerable areas; Improve national roads vulnerable to flooding, landslide and slope failure; Build evacuation centers) 8 US $ 1 = Php 50 DPWH 2018 BUDGET BY REGION (CAPITAL OUTLAYS): NORTHERN LUZON – P124.5B (21.8%) NCR – P42.6B (7.4%) CAR – P 19.8 B Region I – P 28.9 B SOUTHERN LUZON – P120.7B (21.1%) Region II – P 19.8 B Region IV-A – P 47.0 B Region III – P 55.9 B Region IV-B – P 32.3 B Region V – P 41.3 B MINDANAO – P189.9B (33.2%) Region XIII – P 31.4 B VISAYAS – P94.5B (16.5%) Region X – P 55.6 B Region VI – P 32.0 B Region IX – P 23.1 B Region VII – P 27.7 B Region XI – P 56.0 B Region VIII – P 34.9 B Region XII – P 23.9 B TOTAL : P 572.2 B * Excludes Inter-Regional/Nationwide-P40.97B 9 Complete and update the flood control and drainage Effective Flood Control master plans and feasibility studies of the 18 Major River Basins & critical Principal Rivers. Program Adopting Integrated Water Resources Management Principles and River Basin Approach 10 Master Plan for Flood Management in Metro Manila and Surrounding Areas Based on river basins: Name of Project Est. Cost (P’B) Pasig-Marikina River Basin and Laguna Lake Basin. Pasig-Marikina River Improvement and Dam 198.44 Construction Meycauayan River Improvement 14.04 Malabon-Tullahan River Improvement 21.64 South Parañaque-Las Piñas River Improvement 17.34 East Mangahan Floodway (Cainta & Taytay River 25.90 Improvement) West Laguna Lakeshore Land Raising 25.19 Land Raising for Small Cities around Laguna 7.16 Lakeshore Improvement of the Inflow Rivers to Laguna Lake 0.64 Manila Core Area Drainage Improvement 27.26 West Mangahan Area Drainage Improvement 5.52 Valenzuela-Obando-Meycauayan (VOM) 8.61 Improvement Boundary of Study Total area: 4,354 km 2 Area and the River Total Estimated Requirement: P351.72 B Basins Total Population: 17.1 M ($7.03B) 11 PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT-PHASE III Channel improvement works at remaining sections of Pasig River and priority critical sections of Lower Marikina River. It will decrease flood inundation by 18% and reduce flood damages by P14.3 B ($286 M). Pasig-Marikina River Channel Improvement, PROJECT COST: P 7.55B ($151.0M) Phase IV LP: P 6.54 B Channel improvement works for Upper Marikina River GOP: P 1.01 B (Rosario Bridge-Marikina Bridge) including construction of START: 2014 Marikina Control Gate Structure (MCGS) COMPLETION: 2018 Indicative Cost: P26.8 B ($536.0M) Schedule: 2018-2022 12 CAVITE INDUSTRIAL AREA FLOOD MANAGEMENT PROJECT Will mitigate flooding along Cavite Industrial Area covering Imus, San Juan and Canas River Basins with a total drainage area of 407.4 sq.km. It will protect 7,000 houses in the area of 556 hectares from flooding. INDICATIVE COST: P 9.89 B ($197.8M) LP: P 7.10 B GOP: P 2.79 B START: 2018 COMPLETION: 2022 13 FLOOD RISK MANAGEMENT PROJECT FOR CAGAYAN, TAGOLOAN AND IMUS RIVERS PROJECT COST: P 6.18 B ($123.6M) LP: P 4.40 B GOP: P 1.78 B START: 2016 COMPLETION: 2019 14 FLOOD RISK MANAGEMENT PROJECT IN CAGAYAN DE ORO Protects 290 ha. area and 18,100 structures PROJECT COST: P 8.55 B ($171.0M) LP: P 5.01 B GOP: P 3.54 B START: 2018 COMPLETION: 2022 15 INTEGRATED DISASTER RISK REDUCTION AND CLIMATE CHANGE ADAPTATION MEASURES IN THE LOW LYING AREAS OF PAMPANGA BAY Shortens flood duration from 66 days to 17 days PROJECT COST: P 4.22 B ($84.4M) LP: P 3.27 B GOP: P 0.95 B START: 2017 COMPLETION: 2020 Sample Picture Only 16 LEYTE TIDE EMBANKMENT 27.3 km tide embankment from Brgy Diit, Tacloban City to Brgy Ambao, Tanauan, Leyte. Will protect 33,185 houses / buildings from Storm Surge PROJECT COST: P 7.9 B ($158.0M) START: 2016 COMPLETION: 2022 17 DALTON PASS EAST ALIGNMENT ALTERNATIVE ROAD PROJECT (TUNNEL) By-pass road (with tunnel) that connects Nueva Ecija in Region III and Nueva Vizcaya in Region II. INDICATIVE COST: P 4.8 B ($96.0M) LP: P 3.6 B GOP: P 1.2 B START: 2018 COMPLETION: 2022 Sample Picture: Kaybiang Tunnel 18 METRO CEBU EXPRESSWAY 73.8 km high standard arterial road starting from Naga City and ends at Danao City with 2 km tunnel. Travel time between Danao City and Naga City will be reduced from 3 hours to 1 hour and 25 minutes. INDICATIVE COST: P 54.2 B ($1.08B) START: 2018 COMPLETION: 2022 Seg. 1-Talisay-Cebu City-Mandaue : 26.8 km – 6 lanes including 2 km tunnel. Seg. 2-Consolacion-Liloan-Compostela-Danao : 29.8 km – 4 lanes Seg. 3-Naga-Minglanilla : 17.2 km – 4 lanes 19 NEW BACOLOD ECONOMIC HIGHWAY 21.5 km road that would serve as an alternate route passing the interior area of Bacolod City leading to Bacolod Silay Airport and tourists destinations in the area. Will reduce travel time from the boundary of Bacolod City at Brgy Sum-Ag to Bacolod Silay Airport Access Road from 45 minutes to 15 minutes. PROJECT COST: P 5.79 B ($115.8M) START: 2017 COMPLETION: 2022 20 DAVAO CITY COASTAL ROAD 18.5 km coastal road (with bicycle lanes) that will start at Jct. Bago Aplaya, Matina Aplaya, Times Beach (Tulip Drive), Roxas Avenue to Sta. Ana Wharf toward R. Castillo Street. PROJECT COST: P 19.80 B ($396.0M) START: 2017 COMPLETION: 2022 DAVAO CITY BY-PASS, PHASE I 44.6 km by-pass road with 2.28 km tunnel. It will reduce travel time from 1 hour and 44 minutes via Pan-Philippine Highway and Diversion Road to 49 minutes via Davao By –pass road. PROJECT COST: P 19.81 B ($396.2M) * LP: P 9.27 B Davao City By-Pass, Phase II GOP: P 10.54 B Description: Widening of the 44.6 km by-pass road START: 2019 from 2 lanes to 4 lanes. COMPLETION: 2022 Indicative Cost: P10.0 B ($200.0M) Schedule: 2019-2025 *Includes JICA Assisted and Locally Funded Projects Sample Picture Only 22 MINDANAO LOGISTICS INFRASTRUCTURE NETWORK (MLIN) Construction / improvement of 2,567 km road network in Northern Mindanao, Davao, SOCCSKSARGEN and CARAGA Regions. PROJECT COST: P 98.15 B ($1.96 B) START: 2015 COMPLETION: 2019 23 IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT Construction / improvement of 276.5 km road network in Zamboanga del Norte, Zamboanga del Sur and Zamboanga Sibugay provinces. PROJECT COST: P 21.19 B ($423.8M) START: 2018 COMPLETION: 2020 Sample Picture Only 24 Inter-Island Linkage CAMARINES-CATANDUANES FRIENDSHIP BRIDGE, 10.7km Project MINDORO-BATANGAS SUPER BRIDGE, 15km PANAY-GUIMARAS-NEGROS LINK BRIDGE, 19.2 km LUZON-SAMAR LINK BRIDGE, 25.4km CEBU-BOHOL LINK BRIDGE, 27.5km CEBU-NEGROS LINK BRIDGE, 7km LEYTE-SURIGAO LINK BRIDGE, 23km PANGUIL BAY BRIDGE, 3.77km BOHOL-LEYTE LINK BRIDGE, 35km 25 PANGUIL BAY BRIDGE 3.77-km bridge connecting Tangub City, Misamis Occidental and Tubod, Lanao del Norte.
Recommended publications
  • LAGUNA LAKE DEVELOPMENT AUTHORITY National Ecology Center, East Avenue, Diliman, Quezon City Phone Nos
    LAGUNA LAKE DEVELOPMENT AUTHORITY National Ecology Center, East Avenue, Diliman, Quezon City Phone Nos. (02) 8 376-4039, (02) 8 376-4072, (02) 8 376-4044, (02) 8 332-2353, (02) 8 332-2341, (02) 8 376-5430 Locals 115, 116, 117 and look for Ms. Julie Ann G. Blanquisco or Ms. Marivic A. Dela Torre-Santos E-mail: [email protected] | [email protected] Website: http://llda.gov.ph List of APPROVED DISCHARGE PERMITS as of September 03, 2021 Establishment Address Permit No. Approve Date 11 FTC Enterprises, Inc. 236 P. Dela Cruz San Bartolome Quezon City MM DP-25b-2021-03532 August 18, 2021 189 Realty Corp. (CI Market) Qurino Highway Santa Monica, Novaliches Quezon City MM DP-25b-2021-03744 August 20, 2021 189 Realty Corporation - 2nd (CI Market/Commercial Complex) Quirino Highway, Sta. Monica Novaliches Quezon City MM DP-25b-2021-03743 August 20, 2021 21st Century Mouldings Corporation 18 F. Carlos St. cor. Howmart Road Apolonio Samson Quezon City MM DP-25b-2021-03541 August 23, 2021 24K Property Ventures, Inc. (20 Lansbergh Place Condominium) 170 T. Morato Ave. cor. Sct. Castor Sacred Heart Quezon City MM DP-25b-2021-02819 July 15, 2021 3J Foods Corp. Sta. Ana San Pablo City Laguna DP-16d-2021-03174 August 06, 2021 8 Gilmore Place Condominium 8 Gilmore Ave. cor. 1st St. Valencia New Manila Quezon City MM DP-25b-2021-03829 August 27, 2021 AC Technical Services, Inc. 5 RMT Ind`l. Complex Tunasan Muntinlupa City MM DP-23a-2021-01804 May 12, 2021 Ace Roller Manufacturing, Inc.
    [Show full text]
  • PPP Road Projects
    PPP Road Projects ROGELIO L. SINGSON Secretary Department of Public Works and Highways November 18, 2010 1 PRESENTATION OUTLINE Strategic Directions Expressways in Operation and Under Construction Projects for Bidding in 2011 PPP Pipeline of Projects under the Medium Term Other DPWH PPP Projects Under Development 2 STRATEGIC DIRECTIONS Upgrading the national road network in terms of quality and safety standards with focus on urban centers and strategic tourism destinations; Completion of critical bridges along national roads; Develop more Public-Private Partnership (PPP) projects for much needed infrastructure and level playing field for investments; Address private sector concerns – Transparency, RROW, regulatory risks and government support; Pursue contracts for long term maintenance period (5-10 years) in road and bridge construction; and Introduce innovative technology such as bio-engineering for road slope protection 3 EXPRESSWAYS IN OPERATION Project Name Subic-Clark-Tarlac Expressway (93.77 km) North Luzon Tollway (82.62 km) C-5 Expressway (Segment 8.1, 2.34 km) Metro Manila Skyway, Stage 1 (13.43 km At-grade & 9.30 km Viaduct) Manila-Cavite Toll Expressway (6.75 km) South Luzon Tollway (36.03 km) Southern Tagalog Arterial Road (41.90 km) 4 Total Length = 286.14 km EXPRESSWAY UNDER CONSTRUCTION/PLANNING Project Name Tarlac- Pangasinan- La Union Toll Expressway (TPLEX) (88.58 km) North Luzon Tollway, C-5 Expressway Segment 8.2 - 10.23 km Segment 9 - 4.06 km Segment 10 - 5.63 km NLEx-SLEx Link Expressway (13.4 km) (Unsolicited proposal for NEDA review and subject to Swiss Challenge) Manila-Cavite Toll Expressway, R-1 Extension (7.00 km) Metro Manila Skyway, Stage 2 (6.88 km) Total Length = 135.78 km 5 EXISTING SITUATION IN METRO MANILA AND NEARBY AREAS Arterial road network composed of 6 circumferential and 10 radial roads proposed in the late 1960s.
    [Show full text]
  • NATIONAL CAPITAL REGION Child & Youth Welfare (Residential) ACCREDITED a HOME for the ANGELS CHILD Mrs
    Directory of Social Welfare and Development Agencies (SWDAs) with VALID REGISTRATION, LICENSED TO OPERATE AND ACCREDITATION per AO 16 s. 2012 as of March, 2015 Name of Agency/ Contact Registration # License # Accred. # Programs and Services Service Clientele Area(s) of Address /Tel-Fax Nos. Person Delivery Operation Mode NATIONAL CAPITAL REGION Child & Youth Welfare (Residential) ACCREDITED A HOME FOR THE ANGELS CHILD Mrs. Ma. DSWD-NCR-RL-000086- DSWD-SB-A- adoption and foster care, homelife, Residentia 0-6 months old NCR CARING FOUNDATION, INC. Evelina I. 2011 000784-2012 social and health services l Care surrendered, 2306 Coral cor. Augusto Francisco Sts., Atienza November 21, 2011 to October 3, 2012 abandoned and San Andres Bukid, Manila Executive November 20, 2014 to October 2, foundling children Tel. #: 562-8085 Director 2015 Fax#: 562-8089 e-mail add:[email protected] ASILO DE SAN VICENTE DE PAUL Sr. Enriqueta DSWD-NCR RL-000032- DSWD-SB-A- temporary shelter, homelife Residentia residential care -5- NCR No. 1148 UN Avenue, Manila L. Legaste, 2010 0001035-2014 services, social services, l care and 10 years old (upon Tel. #: 523-3829/523-5264/522- DC December 25, 2013 to June 30, 2014 to psychological services, primary community-admission) 6898/522-1643 Administrator December 24, 2016 June 29, 2018 health care services, educational based neglected, Fax # 522-8696 (Residential services, supplemental feeding, surrendered, e-mail add: [email protected] Care) vocational technology program abandoned, (Level 2) (commercial cooking, food and physically abused, beverage, transient home) streetchildren DSWD-SB-A- emergency relief - vocational 000410-2010 technology progrm September 20, - youth 18 years 2010 to old above September 19, - transient home- 2013 financially hard up, (Community no relative in based) Manila BAHAY TULUYAN, INC.
    [Show full text]
  • Robinsons Land Corporation RLC
    The Exchange does not warrant and holds no responsibility for the veracity of the facts and representations contained in all corporate disclosures, including financial reports. All data contained herein are prepared and submitted by the disclosing party to the Exchange, and are disseminated solely for purposes of information. Any questions on the data contained herein should be addressed directly to the Corporate Information Officer of the disclosing party. Robinsons Land Corporation RLC PSE Disclosure Form 17-11 - List of Stockholders Reference: Section 17.11 of the Revised Disclosure Rules Type of Securities Common Preferred - Others - Record Date of Apr 24, 2019 Stockholders' Meeting Date of Stockholders' May 29, 2019 Meeting Type of Stockholders' Meeting Annual (Annual or Special) Other Relevant Information Please find attached the list of stockholders of Robinsons Land Corporation (RLC) as of April 24, 2019, the record date set by the Board of Directors of RLC to determine the stockholders entitled to notice and to vote at the annual meeting of the stockholders of RLC to be held on May 29, 2019. Filed on behalf by: Name Rosalinda Rivera Designation Corporate Secretary Robinsons Land Corporation April 24, 2019 SH # SH NAME SH ADDRESS NATIONALITY TOTAL NO. OF SHARES PERCENTAGE 0000230766 A & A SECURITIES, INC. 1906 PACIFIC BANK BLDG. AYALA AVENUE, MAKATI CITY FILIPINO 4,000.00 0.00007701 0000230768 A. ANGEL S. TANJANGCO 542 ARQUIZA ST.,ERMITA, MANILA FILIPINO 38,500.00 0.00074126 0000230770 ABOITIZ JEBS EN BULK TRANSPORT CORPORATION CEBU CITY, PHILIPPINES FILIPINO 400.00 0.00000770 0000230771 ABRAHAM T. CO C/O PBU, RCBC 333 SEN GIL PUYAT AVE 1200 MAKATI, METRO MANILA FILIPINO 1,000.00 0.00001925 0000230772 ACRIS CORPORATION 5/F BENPRES BUILDING,MERALCO AVENUE, PASIG CITY FILIPINO 8,900.00 0.00017136 0000230774 ADELINA A.
    [Show full text]
  • Riders Digest 2019
    RIDERS DIGEST 2019 PHILIPPINE EDITION Rider Levett Bucknall Philippines, Inc. OFFICES NATIONWIDE LEGEND: RLB Phils., Inc Office: • Manila • Sta Rosa, Laguna • Cebu • Davao • Cagayan de Oro • Bacolod • Iloilo • Bohol • Subic • Clark RLB Future Expansions: • Dumaguete • General Santos RIDERS DIGEST PHILIPPINES 2019 A compilation of cost data and related information on the Construction Industry in the Philippines. Compiled by: Rider Levett Bucknall Philippines, Inc. A proud member of Rider Levett Bucknall Group Main Office: Bacolod Office: Building 3, Corazon Clemeña 2nd Floor, Mayfair Plaza, Compound No. 54 Danny Floro Lacson cor. 12th Street, Street, Bagong Ilog, Pasig City 1600 Bacolod City, Negros Occidental Philippines 6100 Philippines T: +63 2 234 0141/234 0129 T: +63 34 432 1344 +63 2 687 1075 E: [email protected] F: +63 2 570 4025 E: [email protected] Iloilo Office: 2nd Floor (Door 21) Uy Bico Building, Sta. Rosa, Laguna Office: Yulo Street. Iloilo Unit 201, Brain Train Center City Proper, Iloilo, 5000 Lot 11 Block 3, Sta. Rosa Business Philippines Park, Greenfield Brgy. Don Jose, Sta. T:+63 33 320 0945 Rosa City Laguna, 4026 Philippines E: [email protected] M: +63 922 806 7507 E: [email protected] Cagayan de Oro Office: Rm. 702, 7th Floor, TTK Tower Cebu Office: Don Apolinar Velez Street Brgy. 19 Suite 602, PDI Condominium Cagayan De Oro City Archbishop Reyes Ave. corner J. 9000 Philippines Panis Street, Banilad, Cebu City, 6014 T: +63 88 8563734 Philippines M: +63 998 573 2107 T: +63 32 268 0072 E: [email protected] E: [email protected] Subic Office: Davao Office: The Venue Bldg.
    [Show full text]
  • ECC Issued FY 2014 ECC Reference Report Date Application Decision Name Proponent Document Status Series Code Type Received Date Date
    ECC Issued FY 2014 ECC Reference Report Date Application Decision Name Proponent Document Status Series Code Type Received Date Date Alabang Town Center BPO 1 Alabang 1 ECC-NCR-1401-0001 ECC IEEC 1/6/2014 1/6/2014 1/16/2014 Approved Alabang Town Center, Brgy. Ayala, Commercial Corp. Alabang,, Muntinlupa, Metro Manila IBP Tower Ortigas and 2 ECC-NCR-1401-0003 Company Limited ECC IEEC 1/6/2014 1/6/2014 2/6/2014 Approved Julia Vargas Ave., Ortigas Center,, Partnershipp Pasig City, Metro Manila T-Park Project Fort Bonifacio 3 ECC-NCR-1401-0005 Development ECC IEEC 1/6/2014 1/6/2014 1/28/2014 Approved B18,L4, 26th, BGC,, Taguig, Metro Corporation Manila Vertis North Towers 4 ECC-NCR-1401-0006 Ayala Land, Inc. ECC IEEC 1/6/2014 1/6/2014 1/16/2014 Approved Vertis North Triangle, Brgy. Bagong Pag-asa,, Quezon City, Metro Manila Fortune Hill Project 5 ECC-NCR-1401-0008 Filinvest Land, Inc. ECC IEEC 1/6/2014 1/6/2014 1/20/2014 Approved 173 P. Gomez St.,, San Juan, Metro Manila Studio A Residential Condominium 6 ECC-NCR-1401-0009 Filinvest Land, Inc. ECC IEER 1/6/2014 1/6/2014 1/20/2014 Approved 99 Xavierville Ave., cor. E. Abada St., Loyola Heights,, Quezon City, Metro Manila Plastic Recycling Project 7 ECC-NCR-1401-0011 Sanplas Industries ECC IEEC 1/6/2014 1/6/2014 2/7/2014 Approved 6390 Tatalon St., Ugong,, Valenzuela, Metro Manila Shipbuilding and Repair Yard 8 ECC-NCR-1401-0013 Sas Shipyard, Inc.
    [Show full text]
  • Comprehensive Land Use Plan 2016 - 2025
    COMPREHENSIVE LAND USE PLAN 2016 - 2025 PART 3: SECTORAL PROFILE 3.1. INFRASTRUCTURE, FACILITIES AND UTILITIES 3.1.1. Flood Control Facilities 3.1.1.1. “Bombastik” Pumping Stations Being a narrow strip of land with a relatively flat terrain and with an aggregate shoreline of 12.5 kilometers that is affected by tidal fluctuations, flooding is a common problem in Navotas City. This is aggravated by pollution and siltation of the waterways, encroachment of waterways and drainage right-of-ways by legitimate and informal settlers, as well as improper waste disposal. The perennial city flooding inevitably became a part of everyday living. During a high tide with 1.2 meter elevation, some parts of Navotas experience flooding, especially the low-lying areas along the coast and riverways. As a mitigating measure, the city government - thru the Local Disaster Risk Reduction and Management Office - disseminates information about the heights of tides for a specific month. This results in an increased awareness among the residents on the time and date of occurrence of high tide. During rainy days, flooding reach higher levels. The residents have already adapted to this situation. Those who are well-off are able to install their own preventive measures, such as upgrading their floorings to a higher elevation. During the term of the then Mayor and now Congressman, Tobias M. Tiangco, he conceptualized a project that aims to end the perennial flooding in Navotas. Since Navotas is surrounded by water, he believed that enclosing the city to prevent the entry of water during high tide would solve the floods.
    [Show full text]
  • No. Company Star
    Fair Trade Enforcement Bureau-DTI Business Licensing and Accreditation Division LIST OF ACCREDITED SERVICE AND REPAIR SHOPS As of November 30, 2019 No. Star- Expiry Company Classific Address City Contact Person Tel. No. E-mail Category Date ation 1 (FMEI) Fernando Medical Enterprises 1460-1462 E. Rodriguez Sr. Avenue, Quezon City Maria Victoria F. Gutierrez - Managing (02)727 1521; marivicgutierrez@f Medical/Dental 31-Dec-19 Inc. Immculate Concepcion, Quezon City Director (02)727 1532 ernandomedical.co m 2 08 Auto Services 1 Star 4 B. Serrano cor. William Shaw Street, Caloocan City Edson B. Cachuela - Proprietor (02)330 6907 Automotive (Excluding 31-Dec-19 Caloocan City Aircon Servicing) 3 1 Stop Battery Shop, Inc. 1 Star 214 Gen. Luis St., Novaliches, Quezon Quezon City Herminio DC. Castillo - President and (02)9360 2262 419 onestopbattery201 Automotive (Excluding 31-Dec-19 City General Manager 2859 [email protected] Aircon Servicing) 4 1-29 Car Aircon Service Center 1 Star B1 L1 Sheryll Mirra Street, Multinational Parañaque City Ma. Luz M. Reyes - Proprietress (02)821 1202 macuzreyes129@ Automotive (Including 31-Dec-19 Village, Parañaque City gmail.com Aircon Servicing) 5 1st Corinthean's Appliance Services 1 Star 515-B Quintas Street, CAA BF Int'l. Las Piñas City Felvicenso L. Arguelles - Owner (02)463 0229 vinzarguelles@yah Ref and Airconditioning 31-Dec-19 Village, Las Piñas City oo.com (Type A) 6 2539 Cycle Parts Enterprises 1 Star 2539 M-Roxas Street, Sta. Ana, Manila Manila Robert C. Quides - Owner (02)954 4704 iluvurobert@gmail. Automotive 31-Dec-19 com (Motorcycle/Small Engine Servicing) 7 3BMA Refrigeration & Airconditioning 1 Star 2 Don Pepe St., Sto.
    [Show full text]
  • JEEP Bus Time Schedule & Line Route
    JEEP bus time schedule & line map JEEP Aurora Blvd, Quezon City, Manila →Radial Road View In Website Mode 10 / Moriones Intersection, Manila The JEEP bus line (Aurora Blvd, Quezon City, Manila →Radial Road 10 / Moriones Intersection, Manila) has 2 routes. For regular weekdays, their operation hours are: (1) Aurora Blvd, Quezon City, Manila →Radial Road 10 / Moriones Intersection, Manila: 12:00 AM - 11:00 PM (2) Radial Road 10 / Moriones Intersection, Manila →Aurora Blvd, Quezon City, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest JEEP bus station near you and ƒnd out when is the next JEEP bus arriving. Direction: Aurora Blvd, Quezon City, JEEP bus Time Schedule Manila →Radial Road 10 / Moriones Intersection, Aurora Blvd, Quezon City, Manila →Radial Road 10 / Manila Moriones Intersection, Manila Route Timetable: 38 stops Sunday 12:00 AM - 10:00 PM VIEW LINE SCHEDULE Monday 12:00 AM - 11:00 PM Aurora Blvd, Quezon City, Manila Tuesday 12:00 AM - 11:00 PM General Romulo Ave / Aurora Blvd Intersection, Wednesday 12:00 AM - 11:00 PM Quezon City, Manila Thursday 12:00 AM - 11:00 PM Aurora Blvd / General Aguinaldo Ave Intersection, Friday 12:00 AM - 11:00 PM Quezon City, Manila Saturday 12:00 AM - 10:00 PM Aurora Blvd / Epifanio De Los Santos Avenue Intersection, Quezon City, Manila U-Turn Slot, Philippines Aurora Blvd / N Domingo Intersection, Quezon JEEP bus Info City, Manila Direction: Aurora Blvd, Quezon City, Manila →Radial Road 10 / Moriones Intersection, Manila Aurora Blvd / Betty Go-Belmonte Intersection, Stops: 38 Quezon City, Manila Trip Duration: 65 min 760 Aurora Boulevard, Philippines Line Summary: Aurora Blvd, Quezon City, Manila, General Romulo Ave / Aurora Blvd Intersection, Saint Paul University Of Quezon City, Aurora Quezon City, Manila, Aurora Blvd / General Aguinaldo Boulevard Cor.
    [Show full text]
  • Estrella – Pantaleon Bridge Under Construction
    Beata – FY Manalo Bridge Under Development Crosses Pasig River to connect Beata St. and F.Y. Manalo St. Project type New bridge Beata St. Length 637 meters Cost PhP1.4 billion Source of funds ODA - China Proponent DPWH F.Y. Manalo St. Target Construction 2021 Status Active Target completion December 2023 Photo source: Google Maps / TAPP Developments Project Description: • February 2020: To commence construction in 6-8 months The Beata – FY Manalo bridge is part of DPWH’s Metro Manila • January 2019 – June 2020: ROW Acquisition Logistics Improvement Project to build 12 new bridges across the • June 2018: DPWH requested DOF to facilitate with the application for the Pasig and Marikina Rivers, and the Manggahan Floodway. This two- Preferential Buyer’s Credit from China lane bridge will cross the Pasig River from Beata St. in Pandacan, • June 2018: Feasibility study completed Manila to FY Manalo St. in Sta. Ana, Manila, and will be located • April 2018: NEDA Board approved • March 2018: NEDA-ICC approved between Pandacan Bridge and Lambingan Bridge. Updated on April 1, 2020 Binondo – Intramuros Bridge Under Construction Connects Binondo to Intramuros Project type New bridge Length 734 meters Cost PhP3.4 billion Source of funds ODA grant, China Proponent DPWH Start of Construction July 2018 Photo source: PhilStar Status Active – 32% Complete Developments Target completion February 2021 • May 2020: Construction restarts amid quarantine due to COVID-19 • March 2020: All construction work stopped due to Enhanced Community Quarantine Project description: in NCR because of COVID-19 The bridge spans the Pasig River to connect San Fernando St., Binondo to • July 2019: Construction proceeds as NCCA approves project Solana St.
    [Show full text]
  • Name of Project Status Updates/ Suggested Revisions
    Roadmap for Transport Infrustructure Development for Metro Manila and Its Surrunding Areas(Region III and Region IV-A) Short-term Program(2014-2016) Japan-Philippines Priority Projects: Implementing Progress(Comitted Projects 5, Priority Projects 8) Category Name of Project Status Updates/ Suggested Revisions Contract Packages I & II covering about 14.65 km have been completed. Contract Package III (2.22 km + 2 bridges): Construction 1 Highways Arterial Road Bypass Project Phase II, Plaridel Bypass Progress as of 25 April 2015 is 13.02%. Contract Package IV (7.74 km + 2 bridges): Still under procurement stage. ODA Notice to Proceed Issued to CMX Consortium. The project Projects is not specifically cited in the Transport Roadmap. LRT (Committed) Line 1 South Ext and Line 2 East Ext were cited instead, Capacity Enhancement of Mass Transit Systems 2 Railways separately. Updates on LRT Line 1 South Extension and in Metro Manila Project (LRT1 Extension and LRT 2 East Extentsion) O&M: Ongoing pre-operation activities; and ongoing procurement of independent consultant. Metro Manila Interchanges Construction VI - 2 packages d. EDSA/ North Ave. - 3 Highways West Ave.- Mindanao Ave. and EDSA/ Roosevelt Ave. and f. C5: Green Meadows/ Confirmed by the NEDA Board on 17 October 2014 Acropolis/CalleIndustria Ongoing. Detailed Design is 100% accomplished. Final 4 Expressways CLLEX Phase I design plans under review. North South Commuter Railway Project 1 Railways Approved by the NEDA Board on 16 February 2015 (ex- Mega Manila North-South Commuter Railway) New Item, Line 2 West Extension not included in the 2 Railways Metro Manila CBD Transit System Project (LRT2 West Extension) short-term program (until 2016).
    [Show full text]
  • These Improvement Measures, However, Will Not Fundamentally Improve Future Traffic Congestion. Hence, the MMUTIS Proposes Two New Major Access Roads to Terminal 3
    MMUTIS Final Report These improvement measures, however, will not fundamentally improve future traffic congestion. Hence, the MMUTIS proposes two new major access roads to Terminal 3. The first proposal will provide a new interchange from the Skyway to Sales Road. The interchange has to shift slightly from the exact location of the Nichols Interchange, but contained on Sales Road as an elevated structure. This facility will connect Terminal 3 directly with the Skyway, which serves SLE near Magallanes Interchange and Pasay Road or Buendia Avenue over the Magallanes Interchange. The second proposal is an underground tunnel from C-5 South Section to Andrews Avenue to go under the main runway. Although it needs very sensitive construction technologies, it is a technically possible alternative. This facility will directly connect Terminal 3 with C-5, which serves Roxas Boulevard southbound and C-5 northbound. Table 10.18 Airport Access Improvement Projects Project Cost Project Name Length (P million) Tramo Road-Andrews Avenue Left-turning Flyover --- 120 Nichols Interchange Improvements --- 135 Alternative 1) Skyway New Airport Interchange 1.3 km 1,893 Alternative 2) Andrews Ave. Extension (underground link) 1.3 km 6,146 1) 2,148 Total 2) 6,400 Due to the cost, the better alternative would be the Skyway Interchange, while the second proposal can be for future consideration. 10.4 Proposed Public Transport Projects 1) MRT Integration This project intends to improve the integration of Lines 1 and 3 and a possible Line 6 at the Baclaran-Pasay Rotonda area. The current plan, which terminates Line 3 at Taft/EDSA Station at-grade, would create serious traffic problem in the area and restrict the opportunity to serve the reclamation area.
    [Show full text]