The World Bank Report No: ISR6658
Implementation Status & Results Georgia Secondary & Local Roads Project (P086277)
Operation Name: Secondary & Local Roads Project (P086277) Project Stage: Implementation Seq.No: 16 Status: ARCHIVED Archive Date: 07-Aug-2011 Country: Georgia Approval FY: 2004
Public Disclosure Authorized Product Line:IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Roads Department of the Ministry of Regional Development and Infrastructure (RDMRDI) Key Dates Board Approval Date 24-Jun-2004 Original Closing Date 31-Oct-2009 Planned Mid Term Review Date 31-Jul-2007 Last Archived ISR Date 07-Aug-2011 Public Disclosure Copy Effectiveness Date 21-Oct-2004 Revised Closing Date 30-Jun-2012 Actual Mid Term Review Date 03-Nov-2006
Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objectives are to: (i) upgrade and rehabilitate the secondary and local roads network; and (ii) increase Roads Department of the Ministry of regional development and Infrastructure's (RDMRDI's) and local governments' capacity to manage the road network in a cost-effective and sustainable manner. Has the Project Development Objective been changed since Board Approval of the Project?
Yes No Public Disclosure Authorized Component(s)
Component Name Component Cost Rehabilitation of Secondary and Local Roads 118.50 Strengthening the capacity of the Road Sector Institutions 2.70 Designing and Supervising Road Rehabilitation 6.30
Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Satisfactory
Public Disclosure Authorized Overall Risk Rating
Implementation Status Overview The implementation progress and overall safeguard compliance of the project is Satisfactory. The project implementation is almost complete, contractors for all sections have been selected, contracts awarded, and works are at the final stage of implementation. All works will be completed by the closing date of the project. Public Disclosure Copy
Locations
Page 1 of 8 Public Disclosure Authorized The World Bank Report No: ISR6658
Country First Administrative Division Location Planned Actual Georgia Samegrelo and Zemo Svaneti Zugdidi
Georgia Guria Zemo Surebi
Georgia Not Entered Zahesi
Georgia Imereti T'uzi
Georgia Samegrelo and Zemo Svaneti Tsalenjikha
Public Disclosure Copy Georgia Racha-Lechkhumi and Kvemo Svaneti Ts'ageri
Georgia Not Entered Tqibuli
Georgia Guria T'obakhcha
Georgia Mtskheta-Mtianeti T'ianet'i
Georgia Imereti T'erjola
Georgia Kakheti T'elavi
Georgia K'alak'i T'bilisi K'alak'i T'bilisi
Georgia K'alak'i T'bilisi Tbilisi
Georgia Shida Kartli Skra
Georgia Not Entered Sioni
Georgia Imereti Sazano
Georgia Shida Kartli Samtserisi
Georgia Imereti Samtredia
Georgia Imereti Saqulia
Georgia Not Entered Sajavakho
Georgia Not Entered Rup'ot'i
Georgia Kakheti Qvareli
Public Disclosure Copy Georgia Kvemo Kartli Parikhisiya
Georgia Not Entered Ozurget'i
Page 2 of 8 The World Bank Report No: ISR6658
Country First Administrative Division Location Planned Actual Georgia Samegrelo and Zemo Svaneti Orsantia
Georgia Samtskhe-Javakheti Ninotsminda
Georgia Kakheti Ninigori
Georgia Samegrelo and Zemo Svaneti Nak'ipu
Georgia Mtskheta-Mtianeti Mts'khet'a
Georgia Shida Kartli Metekhi
Public Disclosure Copy Georgia Samegrelo and Zemo Svaneti Martvili
Georgia Kvemo Kartli Manglisi
Georgia Samegrelo and Zemo Svaneti Letsurtsume
Georgia Mtskheta-Mtianeti K'vemo Nak'alak'ari
Georgia Imereti K'vats'ikhe
Georgia Samegrelo and Zemo Svaneti Koki
Georgia Guria Kokhnari
Georgia Kvemo Kartli Kojori
Georgia Ajaria Kobuleti
Georgia Imereti Kits'khi
Georgia Imereti Khoni
Georgia Not Entered Khevsurt'sop'eli
Georgia Not Entered Kavt'iskhevi
Georgia Shida Kartli Kaspi
Georgia Samegrelo and Zemo Svaneti Kakhat'i
Georgia Kakheti Kabali
Georgia Kakheti Gurjaani
Public Disclosure Copy Georgia Shida Kartli Gori
Georgia Mtskheta-Mtianeti Gorana
Page 3 of 8 The World Bank Report No: ISR6658
Georgia Imereti Gegut'i
Georgia Samegrelo and Zemo Svaneti Jvari
Georgia Mtskheta-Mtianeti Doreulebi
Georgia Guria Ch'okhatauri
Georgia Kakheti Chabukiani
Georgia Imereti Bashi
Georgia Samegrelo and Zemo Svaneti Anaklia Public Disclosure Copy Georgia Imereti Alisubani
Georgia Kakheti Akhmeta
Georgia Shida Kartli Akhalk'alak'i
Georgia Ajaria Ajaria
Georgia Samegrelo and Zemo Svaneti Abasha
Georgia Samegrelo and Zemo Svaneti Ingiri
Georgia Kakheti Batsara
Georgia Guria Zemokheti
Georgia Kvemo Kartli Kvemo Kartli
Georgia Kakheti Kakheti
Georgia Guria Guria
Georgia Imereti Imereti
Georgia Shida Kartli Shida Kartli
Georgia Mtskheta-Mtianeti Mtskheta-Mtianeti
Georgia Racha-Lechkhumi and Kvemo Svaneti Racha-Lechkhumi and Kvemo Svaneti
Georgia Samegrelo and Zemo Svaneti Samegrelo-Zemo Svanetis Mkhare
Georgia Samtskhe-Javakheti Samtskhe-Javakheti Public Disclosure Copy Georgia Samegrelo and Zemo Svaneti Ok'tomberi
Page 4 of 8 The World Bank Report No: ISR6658
Not Entered Not Entered Not Entered
Georgia Imereti Kharagauli
Georgia Not Entered Zestaponi
Not Entered Not Entered Not Entered
Georgia Guria Chokhatauri
Georgia Not Entered Kareli
Public Disclosure Copy Results
Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Roads in good and fair condition as a share of Percentage Value 40.00 64.00 61.00 total classified roads Date 31-May-2004 31-Mar-2012 30-Jun-2012 Comments Out of total 3,392 (5,446 as Target met. The project Project anticipates to re-classified in 2009) rehabilitated total 843 km of rehabilitate up to 710 km of kilometers of secondary roads. Total length of roads in secondary roads. Out of total roads, 60 % are in poor good condition has increased 3,392 km of secondary roads condition from 1,357 km (40 % of 1,357 km are in a good 3,392km) to 2,200 km (64 % condition (40 %). Upon of 3,392). completion there will total 2067 km in a good condition (61 %). Size of the total classified network Kilometers Value 3392.00 3392.00 3392.00 Sub Type Supplemental Travel time improvement over current situation Text Value 0 19.9 20% reduction in 2010 and on targeted road sections. 2011 Date 19-Mar-2009 31-Mar-2012 30-Jun-2012 Comments The target met. Road maintenance and rehabilitation Text Value 20 184 155 expenditures (GEL million) Date 31-Aug-2004 31-Mar-2012 30-Jun-2012 Comments 184 million GEL has been spent on the road rehabilitation and Public Disclosure Copy maintenance in 2011
Page 5 of 8 The World Bank Report No: ISR6658
Number of person-month of jobs created (Bank Text Value 0 13,431 24,000 estimates) Date 19-Mar-2009 31-Mar-2012 30-Jun-2012 Comments The target not met, however the Bank estimated that there were more jobs created compared with the reported number. Annual Report published Text Value 0 yes 6 (reports to be published in 2009, 2010, 2011) Date 31-Aug-2004 31-Mar-2012 30-Jun-2012 Comments Annual reports have been Public Disclosure Copy published for 2011.
Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Rehabilitation of approximately 690-710 km of Text Value 0 631 690-710 secondary roads. Date 31-Oct-2004 31-Mar-2012 30-Jun-2012 Comments Targets met. 174 km roads The end target has been rehabilitated under SLRP increased as a result of project, additional 457 km additional finance and rehabilitated under SLRP AF restructuring. project Rehabilitation of approximately 150-170 km of Text Value 0 211 150-170 km local roads. Date 31-Oct-2004 31-Mar-2012 30-Jun-2012 Comments Targets met. 75 km of local The end target has been roads have been rehabilitated increased as a result of under the SLRP, 136 km additional finance and roads rehabilitated under restructuring. SLRP AF. Some of the local roads were reclassified as secondary roads. Regional offices operational Text Value 0 6 6 Date 31-Oct-2004 31-Mar-2012 30-Jun-2012 Comments Target is met. Regional offices continue to be operational, as planned. Traffic police trained/ year (NBF) Text Value 0 148 100
Public Disclosure Copy Date 31-Oct-2004 31-Mar-2012 30-Jun-2012 Comments Target met
Page 6 of 8 The World Bank Report No: ISR6658
5-Year Rolling Maintenance Plans Text Value no yes yes Date 31-Oct-2004 31-Mar-2012 30-Jun-2012 Comments Target met. The RD has developed 5 year rolling plan and is using it as planning tool for planning of investments. Geometric Design Standard Adopted Text Value no yes yes Date 31-Oct-2004 31-Mar-2012 30-Jun-2012 Comments Target met. Standards were adopted in February 2009 and no further progress is Public Disclosure Copy expected. Design and Maintenance standards adopted Text Value no partially yes Date 31-Oct-2004 31-Mar-2012 30-Jun-2012 Comments The design and maintenance standards have been partially adopted. Guidebook produced and provided to local Text Value no yes yes governments Date 19-Mar-2009 31-Mar-2012 30-Jun-2012 Comments Target met. The guidebook has been finalized. Workshop for local governments conducted Text Value no yes yes Date 19-Mar-2009 31-Mar-2012 30-Jun-2012 Comments Target met. The workshops have been conducted. 850 km of roads designed Text Value 0 990 850 Date 31-Oct-2004 31-Mar-2012 30-Jun-2012 Comments Target met. SLRP financed designs for 260 km roads, SLRP AF financed additional 730 km road sections.
Data on Financial Performance (as of 09-Jan-2012)
Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P086277 IBRD-76710 Effective 19-Mar-2009 25-Mar-2009 29-Apr-2009 31-Oct-2011 30-Jun-2012 Public Disclosure Copy P086277 IDA-39380 Closed 24-Jun-2004 01-Jul-2004 21-Oct-2004 31-Oct-2009 31-Oct-2011
Page 7 of 8 The World Bank Report No: ISR6658
Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P086277 IBRD-76710 Effective USD 70.00 70.00 0.00 70.00 0.00 100.00 P086277 IDA-39380 Closed USD 20.00 20.00 0.00 21.00 0.00 105.00
Disbursement Graph Public Disclosure Copy
Key Decisions Regarding Implementation There are no decision to be disclosed.
Restructuring History RVP Approved on 27-Dec-2006, Board Approved on 19-Mar-2009, Level two Approved on 25-Feb-2010, Level two Approved on 28-Oct-2011
Related Projects P114365-Secondary and Local Roads Project: Additional Financing Public Disclosure Copy
Page 8 of 8