CTC - Toronto, Ont, Canada Local Phone: 416-214-1090 Address: 595 Bay Street, 3Rd Floor Local Fax: 416-214-6353 City, State, Zip: Toronto, ON, M5G 2C2

Total Page:16

File Type:pdf, Size:1020Kb

CTC - Toronto, Ont, Canada Local Phone: 416-214-1090 Address: 595 Bay Street, 3Rd Floor Local Fax: 416-214-6353 City, State, Zip: Toronto, ON, M5G 2C2 MicroTek Affiliate Location Information Facility Address Contact Information Name: CTC - Toronto, Ont, Canada Local Phone: 416-214-1090 Address: 595 Bay Street, 3rd Floor Local Fax: 416-214-6353 City, State, Zip: Toronto, ON, M5G 2C2 Directions TTC: • Coming from the North and going Southbound on the Yonge line exit at Dundas. • Follow the signs “Atrium on Bay”. • People coming from the Union Station (Northbound tracks) will need to ensure that they take the “Yonge line” and NOT the “University Spadina line”. • When you get off at Dundas Station go down the stairs and under the train tracks. • You will see signs to the “Atrium on Bay” immediately after you pass the doors to the Eaton Centre – follow the signs to the Atrium. • We are building 595 Bay Street, 3rd Floor. www.mclabs.com|800-207-9620 2/10/2012 MicroTek Affiliate Location Information GO Train: • ctc is located North of Union Station (20 min walk up Bay Street) or take the Subway North from Union up to Dundas (see TTC directions above). From Pearson Airport: • Head southeast • Follow signs to Hwy-427 South • Take the Gardiner Expwy Exit • Merge onto Gardiner Expwy East • Take the exit toward Spadina Avenue • Merge onto Lake Shore Boulevard West • Turn Left at Spadina Avenue • Turn Right at Adelaide Street West • Turn Left at University Avenue • Turn Right at Edward Street • Turn Right at Bay Street From Toronto City Centre Airport: • Head Northwest on Bathurst Street toward Queens Quay West • Turn Right at Queens Quay West • Turn Left at Lower Spadina Avenue • Continue on Spadina Avenue • Turn Right at Blue Jays Way • Continue on Peter Street • Turn Right at Adelaide Street West • Turn Left at University Avenue • Turn Right at Edward Street • Turn Right at Bay Street Hotel Accommodations Reservations should be made directly with the hotels. Delta Chelsea Toronto 33 Gerrard Street West Toronto, ON, Canada Phone: (416) 595-1975 North America: 1-800-CHELSEA (1-800-243-5732) Internationally: 1-800-D-CHELSEA (1-800-324-35732) Callers must mention rate for ctc TrainCanada Sheraton Centre 123 Queen Street West Toronto, ON, Canada Phone: (416) 361-1000 or 866-716-8101 www.mclabs.com|800-207-9620 2/10/2012 MicroTek Affiliate Location Information Parking Parking is 1 block North of Dundas on the south side. The Cost is $11.00 per day if you are in by 9am – after that it is $14.00 per day. The lot takes Cash, Visa or MasterCard (NO DEBIT) -or- http://parking.greenp.com/find-parking/ www.mclabs.com|800-207-9620 2/10/2012 .
Recommended publications
  • Update Precinct Plan
    March 05, 2021 Mr. Carlo Bonanni, M.E.S., R.P.P. Vice President Land & Development Planning CreateTO 200 King Street West, Suite 200 Toronto, ON M5H 3T4 Dear Mr. Bonanni: Subject: � Updated Precinct Plan Allen District East Toronto, Ontario We are pleased to provide you with our opinion on the updated Precinct Plan for the Allen District East at the southeast corner of the Allen Road and Sheppard Avenue West intersection. This letter will provide an overview of the revisions to the Allen District East Precinct Plan and the impacts on the Site Servicing and Stormwater Management design. This letter also provides an update to correspondence with the City regarding the design and construction of the Almore Sanitary Sewer Upgrade. Please note that this letter pertains to the Allen District East only as the Allen District West will be a separate submission made by another proponent and remains unchanged at this time. Revisions to the Precinct Plan Based on feedback from the City Staff, the Local Advisory Committee, and the Public via Public Consultation, various updates to the Allen District East Plan have been made. The high-level revisions include: • Revised configuration of the SWM Block so that it stretches from Allen Road to Wilson Heights Boulevard along the southern boundary of the site; • Revised land use areas for the development; • Max height of buildings in mixed use area revised to 14 storeys; • Increase in SWM Block size from 1.04ha to 1.10ha; • Revised OTA facility block in the southwest corner of the development; • Potential future road allowance to connect Street A to Wilson Heights Boulevard.
    [Show full text]
  • Expropriation of Part of 228-230 Queens Quay West
    GM8.19 STAFF REPORT ACTION REQUIRED Expropriation of Part of 228-230 Queens Quay West and Part of the Lands at the Rear of 250-270 Queens Quay West for the Reconstruction of the York/Bay/Yonge Off-ramp from the F.G. Gardiner Expressway Date: October 23, 2015 To: Government Management Committee From: Chief Corporate Officer Wards: Ward 20 – Trinity Spadina Reference P:\2015\Internal Services\RE\Gm15038re (AFS #21976) Number: SUMMARY The purpose of this report is to seek authorization from City Council to commence proceedings for the expropriation of certain lands forming part of the condominium property known municipally as 228-230 Queens Quay West and certain lands located to the north (rear) of the condominium properties known municipally as 250-270 Queens Quay West. These lands are required for the reconstruction and realignment of the Gardiner Expressway's York/Bay/Yonge off ramp (the "Project") with a new ramp to Lower Simcoe Street. While discussions with the affected owner and condominium corporations are ongoing, it appears unlikely that satisfactory negotiated terms can be achieved, as the required land is directly part of, or subject to easements in favour of, condominium properties. Pursuant to the Condominium Act (Ontario), a condominium corporation is prohibited from selling part of the condominium's common elements unless at least 80% of the unit owners vote in favour of the sale and 80% of those persons with a registered claim against the property consent in writing to the sale. In order to release easements that benefit a condominium, a majority, or in some cases 80%, of the unit owners must approve the release.
    [Show full text]
  • Entrance Connection to Dundas Station
    Report for Action Entrance Connection to Dundas Station Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Summary This report requests the Board's approval for a new entrance connection to Dundas Station on Line 1 through the proposed building renovation at 595 Bay Street (Atrium on Bay). As a result of the new entrance connection, the existing open-stair station entrance on the northwest corner of Yonge Street and Dundas Street West, within the Dundas Street West right-of-way, will be closed. This report also seeks authority for staff to enter into a new entrance connection agreement and related agreements required to facilitate this new TTC entrance to Dundas Station to be constructed within the private development located at 595 Bay Street. Recommendations It is recommended that the Board: 1. Approve in principle the proposed new entrance connection to Dundas Station within the development located at 595 Bay Street and the subsequent closure of the existing entrance located at the northwest corner of Yonge Street and Dundas Street West, as illustrated in Attachments 1a, 1b and 2; and 2. Authorize the execution of a new entrance connection agreement, and any other agreements arising as a result of the development, on terms and conditions satisfactory to TTC's General Counsel. Implementation Points In accordance with Corporate Policy 8.3.0 (Entrance Connections), any entrance connection or amendment to an existing entrance connection requires the prior approval of the Board. Entrance connection refers to a physical, weather-protected or fully- protected enclosed structure between a development and a transit station.
    [Show full text]
  • Bay Street, Between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
    REPORT FOR ACTION Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 28, Toronto Centre-Rosedale SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. Transportation Services is requesting approval to amend the existing parking regulations on the east side of Bay Street, between Harbour Street and Queens Quay West. The proposed changes will allow for safe and efficient northbound right-turns from Bay Street to Harbour Street, and also improve sight lines at this intersection. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District, recommends that: 1. City Council rescind the existing designated commercial loading zone in effect from 4:30 p.m. of one day to 8:00 a.m. of the next following day Monday to Friday and anytime Saturday, Sunday, and public holidays from July 1 to August 31, inclusive; Anytime from September 1 of one year to June 30 of the next following year, inclusive on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north. 2. City Council rescind the existing designated bus parking zone in effect from 8:00 a.m. to 4:30 p.m. Monday to Friday from July 1 to August 31, inclusive, for a maximum period of 1 hour on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north.
    [Show full text]
  • Inclusion on the City of Toronto's Heritage Register –King-Spadina
    ATTACHMENT 5 KING-SPADINA PROPERTIES (STREETS B-M) Location maps, photographs and Statements of Significance (Reasons for Inclusion) are provided for the following addresses on Bathurst Street, Brant Street, Camden Street, Duncan Street, John Street and Maud Street in King-Spadina: 129-131 Bathurst Street 133-135 Bathurst Street 137-139 Bathurst Street 141 Bathurst Street 159-161 Bathurst Street 25 Brant Street 8 Camden Street 12 Camden Street 18 Camden Street 20 Camden Street 35 Camden Street 38 Camden Street 45 Camden Street 47 Camden Street 19 Charlotte Street 11 Duncan Street 30 Duncan Street 122 John Street 133 John Street 20 Maud Street Inclusion on Heritage Register - King-Spadina Properties Page 167 of 296 LOCATION MAP AND PHOTOGRAPH: 129-131 BATHURST STREET Inclusion on Heritage Register - King-Spadina Properties Page 168 of 296 STATEMENT OF SIGNIFICANCE: 129 AND 131 Bathurst Street (REASONS FOR INCLUSION) The properties at 129 and 131 Bathurst Street are worthy of inclusion on the City of Toronto’s Heritage Register for their cultural heritage value, and meet Ontario Regulation 9/06, the provincial criteria prescribed for municipal designation, which the City also applies for inclusion on its Heritage Register. This assessment indicates that the properties meet the criteria under design and contextual values, and further research may identify additional values, including associations with communities, individuals and architects. Description The properties at 129 and 131 Bathurst Street are located in the proposed King- Spadina Heritage Conservation District (HCD), and are identified as contributing properties in the King-Spadina HCD Plan (2017) for the proposed District.
    [Show full text]
  • Toronto Central Waterfront Public Forum #2
    TORONTO CENTRAL WATERFRONT PUBLIC FORUM #2 Queens Quay Revitalization EA Bathurst Street to Lower Jarvis Street Municipal Class Environmental Assessment (Schedule C) December 08, 2008 1 WATERFRONT TORONTO UPDATE 2 Central Waterfront International Design Competition 3 Waterfront Toronto Long Term Plan – Central Waterfront 4 Waterfront Toronto Long Term Plan – Central Waterfront 5 Waterfront Toronto Long Term Plan – Central Waterfront 6 Waterfront Toronto Long Term Plan – Central Waterfront 7 East Bayfront Waters Edge Promenade: Design Underway 8 Spadina Wavedeck: Opened September 2008 9 Spadina Wavedeck: Opened September 2008 10 Spadina Wavedeck: Opened September 2008 Metropolis Article 11 Rees Wavedeck: Construction Underway 12 Simcoe Wavedeck: Construction Underway 13 Spadina Bridge: Construction Early-2009 14 What Have We Been Doing for the Past 11 Months? • Consider and follow up on comments from Public Forum 1 • Assess baseline technical feasibility of design alternatives – Over 90 meetings in total: • City and TTC technical staff • Partner agencies •Stakeholders • Landowners/Property Managers • Adjacent project efforts • Advanced transit and traffic modelling • Develop Alternative Design Concepts and Evaluation (Phase 3) • Coordination with East Bayfront Transit EA 15 Study Area: Revised 16 Overview • Review of EA Phases 1 & 2 from Public Forum #1: January 2008 • EA Phase 3: Alternative Design Alternatives – Long list of Design Alternatives – Evaluation of Design Alternatives • Next Steps – Evaluation Criteria for Shortlisted Design
    [Show full text]
  • College Street Urban Design Guidelines
    College Street Urban Design Guidelines May 2017 COLLEGE STREET URBAN DESIGN GUIDELINES COLLEGE STREET URBAN DESIGN GUIDELINES College Street Bathurst Street to McCaul Street URBAN DESIGN GUIDELINES 2017 1 COLLEGE STREET URBAN DESIGN GUIDELINES City of Toronto College Street Urban Design Guidelines - May 2017 _______________________________________________________________________________ The City of Toronto City Planning Division would like to thank all those who participated in the community consultation process. This document has been enhanced by your knowledgeable and helpful feedback. CITY OF TORONTO 2017 ii Table of Contents Mandate 1 1.0 Introduction 3 1.1 Study Area 4 1.2 Historical Overview 5 1.3 Community Feedback 6 COLLEGE STREET URBAN DESIGN GUIDELINES 2.0 Planning Context 9 2.1 Provincial Planning Documents 10 2.2 Official Plan Policies 10 2.3 Additional Relevant Documents 13 3.0 Existing Character 15 3.1 Built Form 16 3.2 Heritage 17 3.3 Streetscape 18 3.4 Character Areas 19 4.0 Urban Design Guidelines 21 4.1 Public Realm 22 Pedestrian Connections 22 Streetscape 23 Views and Viewpoints 28 Parks and Open Spaces 29 iii 4.2 Built Form 30 Built Form Guidelines for Character Areas 30 Character Area A 31 Character Area B 33 Character Area C 36 Character Area D 38 Character Area E 39 Character Area F 41 Design Excellence and Sustainability 42 4.3 Heritage 44 COLLEGE STREET URBAN DESIGN GUIDELINES Official Plan Heritage Policies 45 Heritage Recommendations 45 APPENDICES Appendix A: Summary of Public Realm Recommendations 001 Appendix
    [Show full text]
  • 315-325 Spadina Avenue – Zoning By-Law Amendment Application – Final Report
    REPORT FOR ACTION 315-325 Spadina Avenue – Zoning By-law Amendment Application – Final Report Date: March 26, 2021 To: Toronto and East York Community Council From: Director, Community Planning, Toronto and East York District Ward: Ward 11 - University-Rosedale Planning Application Number: 19 195542 STE 11 OZ SUMMARY This Zoning By-law Amendment application proposes to redevelop the lands at 315-325 Spadina Avenue with a 13-storey purpose-built rental apartment building comprised of 893 square metres of retail space on the ground level and 219 rental dwelling units, including 22 affordable rental units, on the second through 13th floors. A total of 224 bicycle parking spaces and 34 vehicle parking spaces are proposed within a one-level underground garage that would be accessed from the rear lane. The proposed development is consistent with the Provincial Policy Statement (2020) and conforms with A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020), and conforms with all relevant policies of the Toronto Official Plan and the Downtown Secondary Plan. The proposal presents an appropriate built form and public realm that is compatible with the surrounding context. It has been revised since its initial submission to include 22 affordable housing units, and the proposed retail space has been redesigned to provide a better physical fit within the commercial context of Chinatown and respond to the Retail Design Manual. This report reviews and recommends approval of the proposed Zoning By-law Amendments. RECOMMENDATIONS The City Planning Division recommends that: 1. City Council amend City of Toronto Zoning By-law 569-2013 for the lands at 315-325 Spadina Avenue substantially in accordance with the draft Zoning By-law Amendment attached as Attachment No.
    [Show full text]
  • Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn
    Waterfront Transit “Reset” Phase 2 Study Public Information & Consultation Meetings September 18 & 26, 2017 Agenda 6:00 Open House 6:30 Agenda Review, Opening Remarks and Introductions 6:40 Study Overview and Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn 2 Project Study Team • A Partnership of: • The project study team is led by a joint City-TTC- Waterfront Toronto Executive Steering Committee • Metrolinx, City of Mississauga and MiWay have also provided input on relevant aspects of the study 3 What’s the Purpose of this Meeting? • Present the waterfront transit network travel demand considerations to 2041 • Present and gather feedback on options assessment for transit improvements in key areas of the network, including: – Union Station – Queens Quay Connection – Humber Bay Link – Bathurst - Fleet - Lake Shore – Queens Quay Intersection • Report the overall draft findings of the Phase 2 Study, priorities, and draft directions for further study prior to reporting to Executive Committee and Council 4 Study Timeline 5 Phase 1 Recap To view the Phase 1 Report and other background material, please visit the City’s website: www.toronto.ca/waterfronttransit 6 Vision Provide high quality transit that will integrate waterfront communities, jobs, and destinations and link the waterfront to the broader City and regional transportation network Objectives Connect waterfront communities locally and to Downtown with reliable and convenient transit service: • Promote and support residential and employment growth
    [Show full text]
  • 315-325 Spadina Avenue – Zoning Amendment Application – Preliminary Report
    REPORT FOR ACTION 315-325 Spadina Avenue – Zoning Amendment Application – Preliminary Report Date: August 20, 2019 To: Toronto and East York Community Council From: Director, Community Planning, Toronto and East York District Ward 11 - University-Rosedale Planning Application Number: 19 195542 STE 11 OZ Notice of Complete Application Issued: August 20, 2019 Current Use(s) on Site: Two low-rise multi-tenant retail commercial buildings with a surface parking lot at the rear of the buildings. SUMMARY This report provides information and identifies a preliminary set of issues regarding the application for a 13-storey mixed use building located at 315-325 Spadina Avenue. Staff are currently reviewing the application. It has been circulated to all appropriate agencies and City divisions for comment. Staff will proceed to schedule a community consultation meeting for the application with the Ward Councillor. RECOMMENDATIONS The City Planning Division recommends that: 1. Staff schedule a community consultation meeting for the application located at 315- 325 Spadina Avenue together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the application site, and to additional residents, institutions and owners to be determined in consultation with the Ward Councillor, with any additional mailing costs to be borne by the applicant. FINANCIAL IMPACT The recommendations in this report have no financial impact. Staff Report for Action - Preliminary Report - 315 Spadina Avenue Page 1 of 16 ISSUE BACKGROUND Application Description This application proposes a 13-storey mixed-use building with a total gross floor area of 15,892 square metres and a density of 7.83 times the area of the lot.
    [Show full text]
  • John Fenton, 85 Braves the Cold to Help Toronto's Hungry and Homeless
    JOHN FENTON, 85 BRAVES THE COLD TO HELP TORONTO’S HUNGRY AND HOMELESS MEDIA CONTACT Iris Ibarra Manager, Marketing & Communications Tel 416 929 9614 ext 4255 Cell 437 353 5663 Email: [email protected] February 9, 2017 TORONTO –John Fenton is proving that when there is a will, there is a way. At 85 years old, he will be braving the cold with Yonge Street Mission (YSM) during their annual Coldest Night of the Year (CNOY) walk on February 28, 2018 to raise awareness for the estimated 150,000 hungry and homeless in Toronto. John has been involved with the organization since he first accompanied his father to YSM 74 years ago. This was the first time John was exposed to poverty and he vowed to do what he could do help his neighbours living with poverty. This will be John’s fourth and last year walking due to his spinal stenosis, which has caused progressive nerve damage and affected his mobility, making it impossible to walk without the assistance of walking sticks. He has also lost most of the use of his right hand. As a result, he is hoping to go out with a bang and has set his goal at $50,000, his highest goal to date. He admits that it won’t be easy, but he wants to help provide programming and support for Toronto’s homeless youth – including the opening of the new YSM Evergreen Centre for Street Youth. “I want to give as much as I can while I am still alive. In a community, we are meant to love and care for each other when things gets bad.
    [Show full text]
  • 550 Queen's Quay W #311
    LIST PRICE $$259,800 ADDRESS 550 Queen’s Quay W #311 See More Photos And Community Information At… www.TorontoRealEstate.ca How Much Can YOU Afford? Based on 4.95% 5% 10% 15% 25% Mortgage Rate Down Down Down Down Down Payment $13,000 $26,000 $39,000 $65,000 TOTAL Monthly Payment $2,125 $2,025 $1,950 $1,750 (Mortgage, taxes, condo fees & utilities) Closing Costs $17,000 $30,000 $43,000 $69,000 (Including down payment) Gross Income Req’d To $68,500 $64,000 $60,500 $52,500 Qualify For The Mortgage Above calculations are estimates only for income required and closing costs … buyer must verify for themselves! Welcoming lobby with friendly, 24 hr concierge, terrific gym, sauna, and whirlpool. Huge party room with kitchen and library/TV area. Terrific city and lake views from the rooftop deck. List Of Neighbourhood Features Restaurants Many restaurants along Queens Quay … and fine dining in downtown Toronto, all the way from Hooters and Gretzky’s to the top of the CN Tower Night Clubs / Theatre duMaurier and Premier Dance Theatres, CIBC Stage and more at Harbourfront Centre … and Toronto’s Entertainment District … approx. King to Richmond, Duncan to Peter; The Paramount at Richmond and John has multi-theatres for 1st run movies, and the Princess of Wales at King & John for live theatre and musicals. Bookstores / Coffee Cafes all along Harbourfront; Chapters at SW corner of Richmond & Peter; Starbucks; Second Cup Shops at Pier 6, Harbourfront Parks Toronto Music Garden, 475 Queens Quay W; Greenspace at the Ferry Docks, ferry access to the Toronto Islands with more than 230 hectares of parkland; Spadina Quay Wetland; Harbour Square; Coronation Park, south of Lakeshore, west of Stadium Rd, and along the lake front.
    [Show full text]